Multi-dimensional traffic planning scenario evaluation system and method based on big data

Through big data analysis of abnormal events recorded in the traffic database, we build a feature analysis model and monitor traffic data in real time, which solves the problem of the inability of existing technology to pre-evaluate the effectiveness of traffic planning, and enables the assessment and early warning of traffic scenarios before they are put into use. response, reducing the risk of congestion and waste of resources.

CN117875558BActive Publication Date: 2024-10-29QINGDAO TRAFFIC TECH INFORMATION
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202410058625.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-16
Publication Date
2024-10-29
Estimated Expiration
2044-01-16

AI Technical Summary

Technical Problem

Existing technology cannot effectively evaluate the effectiveness of traffic planning results in reducing congestion risk events. It cannot be accurately evaluated until the traffic is put into actual operation, making repairs or adjustments difficult.

Method used

A multi-dimensional traffic planning scenario evaluation system based on big data, by obtaining abnormal traffic events recorded in the traffic database, classifying the causes of congestion, building a feature analysis model, monitoring traffic data in real time, extracting congestion features and performing alarm responses, early warning reminders to reduce congestion risks .

Benefits of technology

Effectively evaluate traffic scenarios before being put into use, reduce the cost of repair resources after the project is put into use, improve the rationality and effectiveness of traffic planning, and reduce the probability of congestion accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117875558B_ABST
    Figure CN117875558B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of scenario assessment, and specifically to a multi-dimensional traffic planning scenario assessment system and method based on big data, comprising a traffic database storage module, a feature data classification module, a feature analysis model construction module, a response monitoring module and a real-time congestion alarm module; the traffic database storage module is used to obtain abnormal traffic events recorded in the traffic database; the feature data classification module is used to classify the feature data of the abnormal traffic events based on the cause of congestion; the feature analysis model construction module is used to match the feature data of the corresponding assessment dimension of the traffic planning and to construct a feature analysis model; the response monitoring module is used to input the feature data to be analyzed into the feature analysis model, and to issue an early warning reminder when the feature analysis model is not satisfied; when the feature analysis model is satisfied, a congestion monitoring response signal is triggered; and the real-time congestion alarm module is used to respond to an alarm when the abnormal alarm model is satisfied.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of scenario assessment technology, and in particular to a multi-dimensional traffic planning scenario assessment system and method based on big data. Background Art

[0002] The current comprehensive transportation planning provides a strong guarantee for urban travel needs and the transportation and distribution of hundreds of millions of tons of materials; however, my country's large cities still generally face challenges such as large travel scale, complex transportation network operation, and increased traffic congestion. Intelligent transportation is an important means to solve the above-mentioned urban traffic problems, and it is also an extension and support for urban transportation planning. It plays an important role in ensuring the efficient operation, order management, safe operation and maintenance, and travel services of my country's large cities. In addition, in transportation planning, a digital-real integrated twin fusion technology for all elements of multi-source and multi-scale transportation has been invented, making the analysis and planning of traffic scenarios by planners more intelligent. However, for the assessment of congestion, the existing technology cannot evaluate the effectiveness of planning results in reducing congestion risk events based on planning content and planning elements. Only after the transportation is put into actual operation can an accurate assessment be made based on the analysis of data elements. However, at this time, the part of the transportation planning that needs to be repaired or adjusted has become a difficult task that consumes manpower and material resources; how to effectively evaluate the results and feasibility of existing planned but unused traffic scenarios on the basis of digital integration is a direction worthy of research. Summary of the invention

[0003] The purpose of the present invention is to provide a multi-dimensional traffic planning scenario evaluation system and method based on big data to solve the problems raised in the above background technology.

[0004] In order to solve the above technical problems, the present invention provides the following technical solution: a multi-dimensional traffic planning scenario evaluation method based on big data, characterized in that it includes the following analysis steps:

[0005] Step S100: Acquire abnormal traffic events recorded in the traffic database, where the abnormal traffic events refer to events that include a congested road section and the congestion condition lasts for e time units; the traffic database records the congestion causes and characteristic data of the abnormal traffic events; and classify the characteristic data of the abnormal traffic events based on the congestion causes;

[0006] Step S200: Based on the classified abnormal traffic events, matching the feature data of the corresponding evaluation dimension of the traffic planning, and building a feature analysis model;

[0007] Step S300: Acquire the feature data to be analyzed corresponding to the real-time traffic planning scenario, input the feature data to be analyzed into the feature analysis model, and issue an early warning reminder when the feature analysis model is not satisfied; trigger the analysis of the congestion monitoring response signal when the feature analysis model is satisfied;

[0008] Step S400: extract the congestion characteristics corresponding to the congestion causes in abnormal traffic events based on the response signal, establish an abnormal alarm model corresponding to the congestion characteristics, monitor the traffic data recorded in the traffic planning scenario in real time, and respond to the alarm when the abnormal alarm model is met.

[0009] Furthermore, step S100 includes the following analysis process:

[0010] Step S110: A congested road section refers to a road section with a congested condition. A congested condition means that the mobility value L of vehicles in the same monitoring area within a consecutive unit time T is less than the mobility value threshold, L = [X iT -X (i+1)T ] / T,X iT represents the total vehicle flow recorded in the i-th unit time T, X (i+1)T It represents the total vehicle flow recorded in the i+1th unit time T; if the flow value is less than the flow value threshold, it means that the difference in the number of vehicles in the same monitoring area in adjacent time periods is small, and the traffic is likely to be stagnant;

[0011] Step S120: The causes of congestion include natural congestion and unnatural congestion. Natural congestion refers to the congestion state caused by traffic flow, and unnatural congestion refers to the congestion caused by external factors. The feature data includes environmental features, road features, and traffic indication features. Environmental features refer to the building features contained in the congested road section within the monitoring area. Road features refer to the structural features of the road, and traffic indication features refer to all features that need to be added before passing except for the road features.

[0012] Step S130: Taking the abnormal factors recorded in each congestion cause as the parent search item, extracting the feature data in the corresponding abnormal traffic event and storing it in the child search item corresponding to the parent search item to form a parent-child chain L, L = {R→(U, V, W)},

[0013] U={u1,u2,......,u m}, V={v1,v2,......,v n},W

[0014] ={w1,w2,......,w k}

[0015] Where R represents the abnormal factors of the traffic recorded in natural congestion and the abnormal factors corresponding to the external factors in non-natural congestion, and each external factor corresponds to an abnormal factor; (U, V, W) represents a data packet composed of feature data; U represents the set of environmental features of abnormal traffic event records under the corresponding abnormal factors, u1, u2, ..., u mrepresents the 1st, 2nd, ..., mth sub-environmental features in the set; V represents the road feature set of abnormal traffic event records under abnormal factors, V1, V2, ..., V n represents the 1st, 2nd, ..., nth sub-road features in the set; W represents the traffic indication feature set of abnormal traffic event records under abnormal factors, w1, w2, ..., w k represents the 1st, 2nd, ..., kth sub-traffic index features in the set;

[0016] Step S140: extract the events that have the parent search item but do not cause congestion as the control events, and generate the control parent-child chain L0 according to the generation method of the parent-child chain L based on the feature data recorded in the control event, and perform intersection operation on the data packets in the parent-child chain L and the control parent-child chain L0 with the same parent search item for each congestion cause to obtain the conventional feature set PR,

[0017] Step S150: Screen out the corresponding conventional feature set in each parent-child chain, obtain updated valid feature data and generate a valid parent-child chain L1.

[0018] Further, step S200 includes the following steps:

[0019] Step S210: the evaluation dimensions include the safety dimension and the efficiency dimension. The abnormal traffic event whose parent search item is not an abnormal factor of a traffic accident is marked as the first traffic event. The valid feature data recorded in the valid parent-child chain corresponding to the first traffic event is extracted for attribute marking of the efficiency dimension. The events other than the first traffic event are marked as the second traffic event. The valid feature data in the second traffic event is verified. The verification process is as follows:

[0020] Get the number of times d that the jth valid feature data is recorded in the first traffic event 1j and the number of times recorded in the second traffic event d 2j , calculate the ratio value b of the jth valid feature data j =d 1j / d 2j ;

[0021] Comparative value b j The effective feature data with a value greater than 1 are marked with the attribute of the efficiency dimension, and the ratio value b j The valid feature data with a value less than 1 is marked with the attribute of the security dimension, and the ratio value b j =1 to mark the attributes of efficiency dimension and safety dimension;

[0022] Step S220: The effective feature record value of the attribute marked as the security dimension or the efficiency dimension is a1, and the effective feature record value of the attribute marked as the security dimension and the efficiency dimension is a2. Based on each parent search item, the corresponding feature analysis index Y is calculated, Y=a1*M+a2*N, a2>a1, and the minimum value Y of the feature analysis index corresponding to the same parent search item is extracted. min is the evaluation value of the corresponding parent search item, and constructs a feature analysis model Y0<Y min , Y0 represents the real-time feature analysis index, M represents the total number of valid feature data with attributes marked as security dimension and valid feature data marked as efficiency dimension, and N represents the number of valid feature data with attributes marked as security dimension and efficiency dimension.

[0023] Furthermore, step S300 includes:

[0024] The feature data to be analyzed refers to the data recorded corresponding to the environmental features, road features and traffic index features; the valid feature data recorded in the traffic database is retrieved, the feature data to be analyzed is matched with the valid feature data, the successfully retrieved feature data to be analyzed is marked as the target feature data, and the attribute tag corresponding to the target feature data is obtained;

[0025] Calculate the real-time feature analysis index Y0 based on the attribute tag, Y0=a1*M1+a2*N1, where M1 represents the total number of target feature data with attributes marked as security dimension and efficiency dimension, and N1 represents the number of target feature data with attributes marked as security dimension and efficiency dimension;

[0026] If Y0≥Y min , then the signal that does not meet the feature analysis model is output and an early warning reminder is issued. The early warning reminder refers to determining the effective parent-child chain to which the target feature data corresponds to the most effective feature data, and based on the effective parent-child chain, determining the parent search item as the early warning factor item and the control parent-child chain corresponding to the parent search item as the early warning feature data.

[0027] When the characteristic analysis model is not satisfied, it indicates that there is a high risk of congestion in the traffic planning in the monitoring area. Early warning reminders can effectively help planners to carry out repairs and rectifications before they are put into use, reducing the repair losses after they are put into use; and intelligently increase the evaluation direction to reduce the uncertainty of human influence. Congestion caused by unreasonable planning can be avoided to the greatest extent, and unreasonable planning scenarios affected by characteristic factors can be effectively avoided.

[0028] Further, step S400 includes the following:

[0029] Congestion characteristics refer to the parent search items in the parent-child chain. Each type of parent search item marks the starting point of the abnormal traffic event. The starting point refers to the first location with the largest vehicle density in the monitoring area. The vehicle density is equal to the ratio of the number of vehicles in the monitoring block to the area of ​​the monitoring block. Several monitoring blocks constitute the monitoring area.

[0030] Calculate the congestion rate h corresponding to each type of parent search item, h = (Q-Q0) / (e*T), Q0 represents the number of vehicles at the starting point, and Q represents the number of vehicles in the monitoring area after e unit time T;

[0031] If the real-time monitoring traffic planning scenario has a starting point corresponding to the parent search item, calculate the real-time congestion rate h0 after the interval unit time T, h0 ≥ h min When the transmission alarm signal indicates congestion occurs, h min Indicates the minimum congestion rate corresponding to each type of parent search item, h0<h min Continue to monitor and calculate the real-time congestion rate e unit time ago at intervals of unit time, and there exists h0≥h min If it does not exist, no alarm will be given.

[0032] Judging the congestion rate can determine whether it is a real congested section that causes the congestion, because there are some congestion situations that can exist for a short time and can be cleared without intervention. The congestion in this application is a more serious congestion situation, generally with a unit time of 5 minutes, and e is 5-10.

[0033] Multi-dimensional traffic planning scenario evaluation system, including traffic database storage module, feature data classification module, feature analysis model building module, response monitoring module and real-time congestion alarm module;

[0034] The traffic database storage module is used to obtain abnormal traffic events recorded in the traffic database;

[0035] The feature data classification module is used to classify the feature data of abnormal traffic events based on the cause of congestion;

[0036] The feature analysis model building module is used to match the feature data of the corresponding evaluation dimension of the traffic planning and build a feature analysis model;

[0037] The response monitoring module is used to input the characteristic data to be analyzed into the characteristic analysis model, and issue an early warning reminder when the characteristic analysis model is not satisfied; when the characteristic analysis model is satisfied, the congestion monitoring response signal is triggered;

[0038] The real-time congestion alarm module is used to establish an abnormal alarm model corresponding to the congestion characteristics, monitor the traffic data recorded in the traffic planning scenario in real time, and respond to the alarm when the abnormal alarm model is met.

[0039] Further, the characteristic data classification module includes a congestion cause determination unit, a characteristic data determination unit, a parent-child chain building unit, a comparison parent-child chain building unit and a valid parent-child chain generation unit;

[0040] The congestion cause determination unit is used to determine natural congestion and unnatural congestion;

[0041] The characteristic data determination unit is used for characteristic data including environmental characteristics, road characteristics and traffic indication characteristics;

[0042] The parent-child chain building unit is used to take the abnormal factors recorded in each congestion cause as the parent search item, extract the characteristic data in the corresponding abnormal traffic event and store it in the child search item corresponding to the parent search item to form a parent-child chain;

[0043] The control parent-child chain building unit is used to extract events that have a parent search item but do not generate a congestion state as control events, and generate a control parent-child chain according to the generation method of the parent-child chain based on the characteristic data recorded by the control event;

[0044] The effective parent-child chain generation unit is used to screen out the corresponding conventional feature set in each parent-child chain, obtain updated effective feature data and generate effective parent-child chains.

[0045] Further, the feature analysis module construction module includes an attribute labeling unit, a feature analysis index calculation unit and a feature analysis model output unit;

[0046] The attribute marking unit is used to mark the attributes corresponding to the valid feature data; the attributes include security dimension and efficiency dimension;

[0047] The feature analysis index calculation unit is used to calculate the corresponding feature analysis index based on each parent search item;

[0048] The feature analysis model output unit is used to extract the minimum value of the feature analysis index corresponding to the same parent search item as the evaluation value of the corresponding parent search item, and to construct a feature analysis model.

[0049] Further, the real-time congestion alarm module includes a starting point marking unit, a congestion rate calculation unit and an alarm analysis unit;

[0050] The starting point marking unit is used to mark the starting point of each type of abnormal traffic event corresponding to the parent search item. The starting point refers to the first location with the largest vehicle density in the monitoring area. The vehicle density is equal to the ratio of the number of vehicles in the monitoring block to the area of ​​the monitoring block.

[0051] The congestion rate calculation unit is used to calculate the congestion rate corresponding to each type of parent search item;

[0052] The alarm analysis unit is used to analyze the relationship between the real-time congestion rate and the congestion rate of the corresponding parent search item to issue an alarm.

[0053] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the present invention realizes digital evaluation by analyzing different congestion events recorded in the traffic database, extracting characteristic data of each congestion cause and constructing a parent-child chain, which can effectively perform system simulation analysis on the planned traffic scenarios based on human analysis, thereby verifying the rationality and effectiveness of the plan, avoiding the waste of resources for secondary repairs due to poor results after the project is put into operation, and when planning traffic congestion, the system can capture and warn the data of real-time monitoring points based on historical data, so that supervisors can respond with warnings before large-scale congestion, thereby reducing the probability of congestion accidents. BRIEF DESCRIPTION OF THE DRAWINGS

[0054] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0055] Figure 1 It is a structural diagram of a multi-dimensional traffic planning scenario evaluation system and method based on big data of the present invention. DETAILED DESCRIPTION

[0056] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0057] See also Figure 1 The present invention provides a technical solution: a multi-dimensional traffic planning scenario evaluation method based on big data, characterized in that it includes the following analysis steps:

[0058] Step S100: Acquire abnormal traffic events recorded in the traffic database, where the abnormal traffic events refer to events that include a congested road section and the congestion condition lasts for e time units; the traffic database records the congestion causes and characteristic data of the abnormal traffic events; and classify the characteristic data of the abnormal traffic events based on the congestion causes;

[0059] Step S200: Based on the classified abnormal traffic events, matching the feature data of the corresponding evaluation dimension of the traffic planning, and building a feature analysis model;

[0060] Step S300: Acquire the feature data to be analyzed corresponding to the real-time traffic planning scenario, input the feature data to be analyzed into the feature analysis model, and issue an early warning reminder when the feature analysis model is not satisfied; trigger the analysis of the congestion monitoring response signal when the feature analysis model is satisfied;

[0061] Step S400: extract the congestion characteristics corresponding to the congestion causes in abnormal traffic events based on the response signal, establish an abnormal alarm model corresponding to the congestion characteristics, monitor the traffic data recorded in the traffic planning scenario in real time, and respond to the alarm when the abnormal alarm model is met.

[0062] Step S100 includes the following analysis process:

[0063] Step S110: A congested road section refers to a road section with a congested condition. A congested condition means that the mobility value L of vehicles in the same monitoring area within a consecutive unit time T is less than the mobility value threshold, L = [X iT -X (i+1)T ] / T,X iT represents the total vehicle flow recorded in the i-th unit time T, X (i+1)T Indicates the total vehicle flow recorded in the i+1th unit time T; the flow value threshold is set by the system; if the flow value is less than the flow value threshold, it means that the difference in the number of vehicles in the same monitoring area in adjacent time periods is small, and the traffic is likely to be stagnant;

[0064] Step S120: The causes of congestion include natural congestion and unnatural congestion. Natural congestion refers to the congestion state caused by traffic flow, and unnatural congestion refers to the congestion caused by external factors. External factors may be traffic accidents and road maintenance that cause the road to narrow. Feature data include environmental features, road features and traffic indication features. Environmental features refer to the building features contained in the congested road section within the monitoring area, such as office buildings, shopping malls, etc. on both sides of the road. Road features refer to the structural features of the road, such as the road is a one-way street and there are vertical forks at the intersection. Traffic indication features refer to all features that need to be added before passing except for road features, such as the waiting time feature of the indicator light setting, the content feature of the road sign, etc.

[0065] Step S130: Taking the abnormal factors recorded in each congestion cause as the parent search item, extracting the feature data in the corresponding abnormal traffic event and storing it in the child search item corresponding to the parent search item to form a parent-child chain L, L = {R→(U, V, W)},

[0066] U={u1,u2,......,u m}, V={v1,v2,......,v n},W

[0067] ={w1,w2,......,w k}

[0068] Among them, R represents the abnormal factors of the traffic recorded in natural congestion and the abnormal factors corresponding to the external factors in non-natural congestion, and each external factor corresponds to an abnormal factor; (U, V, W) represents a data packet composed of feature data; U represents the set of environmental features of abnormal traffic event records under the corresponding abnormal factors, u1, u2, ..., u m represents the 1st, 2nd, ..., mth sub-environmental features in the set; V represents the road feature set of abnormal traffic event records under abnormal factors, v1, v2, ..., v n Indicates the 1st, 2nd,

[0069] ...., n sub-road features; W represents the traffic indication feature set of abnormal traffic event records under abnormal factors, w1, w2, ..., w k represents the 1st, 2nd, ..., kth sub-traffic index features in the set;

[0070] Step S140: extract the events that have the parent search item but do not cause congestion as the control events, and generate the control parent-child chain L0 according to the generation method of the parent-child chain L based on the feature data recorded in the control event, and perform intersection operation on the data packets in the parent-child chain L and the control parent-child chain L0 with the same parent search item for each congestion cause to obtain the conventional feature set P R ,

[0071] It means the intersection of the environmental feature set in the parent-child chain L and the environmental feature set in the control parent-child chain L0;

[0072] If the congestion is caused by a parent search item with heavy traffic, there is a parent-child chain and a control parent-child chain, with the following specific features:

[0073] L: (Environmental characteristics: the buildings in the monitoring area are office buildings and apartments, road characteristics: east-west one-way street, traffic sign characteristics: signpost 1, traffic light interval duration t);

[0074] L0: (Environmental characteristics: the buildings in the monitoring area are parks, road characteristics: east-west one-way streets, traffic sign characteristics: signpost 1, traffic light interval duration t);

[0075] Then the conventional feature set can be obtained as (road feature: east-west one-way street, traffic sign feature: sign 1, traffic light interval duration t); indicating that the feature data that has a great impact on traffic flow is the environmental feature of buildings such as office buildings and apartments;

[0076] Step S150: Screen out the corresponding conventional feature set in each parent-child chain, obtain updated valid feature data and generate a valid parent-child chain L1.

[0077] Step S200 includes the following steps:

[0078] Step S210: the evaluation dimensions include the safety dimension and the efficiency dimension. The abnormal traffic event whose parent search item is not an abnormal factor of a traffic accident is marked as the first traffic event. The valid feature data recorded in the valid parent-child chain corresponding to the first traffic event is extracted for attribute marking of the efficiency dimension. The events other than the first traffic event are marked as the second traffic event. The valid feature data in the second traffic event is verified. The verification process is as follows:

[0079] Get the number of times d that the jth valid feature data is recorded in the first traffic event 1j and the number of times recorded in the second traffic event d 2j , calculate the ratio value b of the jth valid feature data j =d 1j / d 2j ;

[0080] Comparative value b j The effective feature data with a value greater than 1 are marked with the attribute of the efficiency dimension, and the ratio value b j The valid feature data with a value less than 1 is marked with the attribute of the security dimension, and the ratio value b j =1 to mark the attributes of efficiency dimension and safety dimension;

[0081] Step S220: The effective feature record value of the attribute marked as the security dimension or the efficiency dimension is a1, and the effective feature record value of the attribute marked as the security dimension and the efficiency dimension is a2. Based on each parent search item, the corresponding feature analysis index Y is calculated, Y=a1*M+a2*N, a2>a1, and the minimum value Y of the feature analysis index corresponding to the same parent search item is extracted. min is the evaluation value of the corresponding parent search item, and constructs a feature analysis model Y0<Y min , Y0 represents the real-time feature analysis index, M represents the total number of valid feature data with attributes marked as security dimension and valid feature data marked as efficiency dimension, and N represents the number of valid feature data with attributes marked as security dimension and efficiency dimension.

[0082] Step S300 includes:

[0083] The feature data to be analyzed refers to the data recorded corresponding to the environmental features, road features and traffic index features; the valid feature data recorded in the traffic database is retrieved, the feature data to be analyzed is matched with the valid feature data, the successfully retrieved feature data to be analyzed is marked as the target feature data, and the attribute tag corresponding to the target feature data is obtained;

[0084] Calculate the real-time feature analysis index Y0 based on the attribute tag, Y0=a1*M1+a2*N1, where M1 represents the total number of target feature data with attributes marked as security dimension and efficiency dimension, and N1 represents the number of target feature data with attributes marked as security dimension and efficiency dimension;

[0085] If Y0≥Y min , then the signal that does not meet the feature analysis model is output and an early warning reminder is issued. The early warning reminder refers to determining the effective parent-child chain to which the target feature data corresponds to the most effective feature data, and based on the effective parent-child chain, determining the parent search item as the early warning factor item and the control parent-child chain corresponding to the parent search item as the early warning feature data.

[0086] When the characteristic analysis model is not satisfied, it indicates that there is a high risk of congestion in the traffic planning in the monitoring area. Early warning reminders can effectively help planners to carry out repairs and rectifications before they are put into use, reducing the repair losses after they are put into use; and intelligently increase the evaluation direction to reduce the uncertainty of human influence. Congestion caused by unreasonable planning can be avoided to the greatest extent, and unreasonable planning scenarios affected by characteristic factors can be effectively avoided.

[0087] Successful retrieval means that there are valid feature data in the traffic database that are identical to the feature data to be analyzed;

[0088] As shown in the examples:

[0089] The real-time features are: (environmental features: the buildings in the monitoring area are parks and apartments, road features: east-west one-way streets, traffic sign features: signpost 1, traffic light interval duration t1);

[0090] If Y0≥Y min , then an early warning reminder is issued, and it is determined that the valid parent-child chain to which the target feature data corresponds to the most valid feature data is (traffic indication feature: signpost 2, traffic light interval duration t1), and the corresponding parent search item is a traffic accident, then it is further determined that some data packets in the control parent-child chain corresponding to the parent search item are (traffic indication feature: signpost 1, traffic light interval duration t2), and the early warning factor item can be given as a traffic accident. The risk of traffic accidents in the monitoring and early warning plan is relatively high, and the early warning feature data is the traffic light interval duration t2. It is recommended to modify the traffic light interval duration of the monitored section to t2.

[0091] Step S400 includes the following:

[0092] Congestion characteristics refer to the parent search items in the parent-child chain. Each type of parent search item marks the starting point of the abnormal traffic event. The starting point refers to the first location with the largest vehicle density in the monitoring area. The vehicle density is equal to the ratio of the number of vehicles in the monitoring block to the area of ​​the monitoring block. Several monitoring blocks constitute the monitoring area.

[0093] Calculate the congestion rate h corresponding to each type of parent search item, h = (Q-Q0) / (e*T), Q0 represents the number of vehicles at the starting point, and Q represents the number of vehicles in the monitoring area after e unit time T;

[0094] If the real-time monitoring traffic planning scenario has a starting point corresponding to the parent search item, calculate the real-time congestion rate h0 after the interval unit time T, h0 ≥ h min When the transmission alarm signal indicates congestion occurs, h min Indicates the minimum congestion rate corresponding to each type of parent search item, h0<h min Continue to monitor and calculate the real-time congestion rate e unit time ago at intervals of unit time. There exists h0≥h min If it does not exist, no alarm will be given.

[0095] Judging the congestion rate can determine whether it is a real congested section that causes the congestion, because there are some congestion situations that can exist for a short time and can be cleared without intervention. The congestion in this application is a more serious congestion situation, generally with a unit time of 5 minutes, and e is 5-10.

[0096] Multi-dimensional traffic planning scenario evaluation system, including traffic database storage module, feature data classification module, feature analysis model building module, response monitoring module and real-time congestion alarm module;

[0097] The traffic database storage module is used to obtain abnormal traffic events recorded in the traffic database;

[0098] The feature data classification module is used to classify the feature data of abnormal traffic events based on the cause of congestion;

[0099] The feature analysis model building module is used to match the feature data of the corresponding evaluation dimension of the traffic planning and build a feature analysis model;

[0100] The response monitoring module is used to input the characteristic data to be analyzed into the characteristic analysis model, and issue an early warning reminder when the characteristic analysis model is not satisfied; when the characteristic analysis model is satisfied, the congestion monitoring response signal is triggered;

[0101] The real-time congestion alarm module is used to establish an abnormal alarm model corresponding to the congestion characteristics, monitor the traffic data recorded in the traffic planning scenario in real time, and respond to the alarm when the abnormal alarm model is met.

[0102] The characteristic data classification module includes a congestion cause determination unit, a characteristic data determination unit, a parent-child chain building unit, a comparison parent-child chain building unit and a valid parent-child chain generation unit;

[0103] The congestion cause determination unit is used to determine natural congestion and unnatural congestion;

[0104] The characteristic data determination unit is used for characteristic data including environmental characteristics, road characteristics and traffic indication characteristics;

[0105] The parent-child chain building unit is used to take the abnormal factors recorded in each congestion cause as the parent search item, extract the characteristic data in the corresponding abnormal traffic event and store it in the child search item corresponding to the parent search item to form a parent-child chain;

[0106] The control parent-child chain building unit is used to extract events that have a parent search item but do not generate a congestion state as control events, and generate a control parent-child chain according to the generation method of the parent-child chain based on the characteristic data recorded by the control event;

[0107] The effective parent-child chain generation unit is used to screen out the corresponding conventional feature set in each parent-child chain, obtain updated effective feature data and generate effective parent-child chains.

[0108] The feature analysis module building block includes an attribute labeling unit, a feature analysis index calculation unit, and a feature analysis model output unit;

[0109] The attribute marking unit is used to mark the attributes corresponding to the valid feature data; the attributes include security dimension and efficiency dimension;

[0110] The feature analysis index calculation unit is used to calculate the corresponding feature analysis index based on each parent search item;

[0111] The feature analysis model output unit is used to extract the minimum value of the feature analysis index corresponding to the same parent search item as the evaluation value of the corresponding parent search item, and to construct a feature analysis model.

[0112] The real-time congestion alarm module includes a starting point marking unit, a congestion rate calculation unit and an alarm analysis unit;

[0113] The starting point marking unit is used to mark the starting point of each type of abnormal traffic event corresponding to the parent search item. The starting point refers to the first location with the largest vehicle density in the monitoring area. The vehicle density is equal to the ratio of the number of vehicles in the monitoring block to the area of ​​the monitoring block.

[0114] The congestion rate calculation unit is used to calculate the congestion rate corresponding to each type of parent search item;

[0115] The alarm analysis unit is used to analyze the relationship between the real-time congestion rate and the congestion rate of the corresponding parent search item to issue an alarm.

[0116] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0117] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. Multi-dimensional traffic planning scenario evaluation method based on big data, It is characterized in that The analysis steps include: Step S100: Acquire abnormal traffic events recorded in the traffic database, wherein the abnormal traffic events refer to events that include a congested road section and the congestion condition lasts for e time units; The traffic database records the congestion causes and characteristic data of abnormal traffic events; classifies the characteristic data of abnormal traffic events based on the congestion causes; The step S100 includes the following analysis process: Step S110: The congested road section refers to a road section with congestion. The congestion means that the mobility value L of vehicles in the same monitoring area within the adjacent unit time T is less than the mobility value threshold, L = [X iT -X (i+1)T ] / T,X iT represents the total vehicle flow recorded in the i-th unit time T, X (i+1)T represents the total vehicle flow recorded in the i+1th unit time T; Step S120: The congestion causes include natural congestion and unnatural congestion. The natural congestion refers to the congestion state caused by traffic flow, and the unnatural congestion refers to the congestion caused by external factors. The feature data includes environmental features, road features and traffic indication features. The environmental features refer to the building features contained in the congested road section within the monitoring area, the road features refer to the structural features of the road, and the traffic indication features refer to all features that need to be added before passing except the road features. Step S130: Taking the abnormal factors recorded in each congestion cause as the parent search item, extracting the feature data in the corresponding abnormal traffic event and storing it in the child search item corresponding to the parent search item to form a parent-child chain L. L={R→(U,V,W)}, U={u 1 ,u 2 ,......,u m },V={v 1 ,v 2 ,......,v n },W ={in 1 ,In 2 ,......,In k } Among them, R represents the abnormal factors of the traffic recorded in natural congestion and the abnormal factors corresponding to the external factors in non-natural congestion, and each external factor corresponds to an abnormal factor; (U, V, W) represents a data packet composed of feature data; U represents the environmental feature set of abnormal traffic event records under the corresponding abnormal factors, u 1 ,u 2 ,......,u m represents the 1st, 2nd, ..., mth sub-environmental features in the set; V represents the road feature set of abnormal traffic event records under abnormal factors, v 1 ,v 2 ,......,v n represents the 1st, 2nd, ..., nth sub-road features in the set; W represents the traffic indication feature set of abnormal traffic event records under abnormal factors, w 1 ,w 2 ,......,w k represents the 1st, 2nd, ..., kth sub-traffic index features in the set; Step S140: extracting events that have a parent search item but do not cause congestion as control events, and generating a control parent-child chain L according to the generation method of the parent-child chain L based on the feature data recorded by the control event 0 , each congestion cause corresponds to the same parent search item as the parent-child chain L and the control parent-child chain L 0 The data packets in the intersection operation are used to obtain the conventional feature set P R , Step S150: Screen out the corresponding conventional feature set in each parent-child chain, obtain updated valid feature data and generate a valid parent-child chain L 1 , Step S200: Based on the classified abnormal traffic events, matching the feature data of the corresponding evaluation dimension of the traffic planning, and building a feature analysis model; The step S200 includes the following steps: Step S210: The evaluation dimensions include a safety dimension and an efficiency dimension. The abnormal traffic event whose parent search item is not an abnormal factor of a traffic accident is marked as a first traffic event. The valid feature data recorded in the valid parent-child chain corresponding to the first traffic event is extracted for attribute marking of the efficiency dimension. The events other than the first traffic event are marked as second traffic events. The valid feature data in the second traffic event is verified. The verification process is as follows: Get the number of times d that the jth valid feature data is recorded in the first traffic event 1j and the number of times recorded in the second traffic event d 2j , calculate the ratio value b of the jth valid feature data j =d 1j / d 2j ; Comparative value b j The effective feature data >1 is marked with the attribute of efficiency dimension, and the ratio value b j <1 is used to mark the attribute of security dimension, and the ratio value b j =1 to mark the attributes of efficiency dimension and safety dimension; Step S220: Mark the attribute as a valid feature record of the security dimension or the efficiency dimension with a feature value of a 1 , mark the attribute as a valid feature of the security dimension and efficiency dimension and record the feature value as a 2 , based on each parent search item, calculate the corresponding feature analysis index Y, Y = a 1 *M+a 2 *N,a 2 >a 1 , extract the minimum value Y of the feature analysis index corresponding to the same parent search item min is the evaluation value of the corresponding parent search item, and constructs the feature analysis model Y 0 <Y min , Y 0 represents the real-time feature analysis index, M represents the total number of valid feature data with attributes marked as security dimension and valid feature data marked as efficiency dimension, and N represents the number of valid feature data with attributes marked as security dimension and efficiency dimension; Step S300: Acquire the feature data to be analyzed corresponding to the real-time traffic planning scenario, input the feature data to be analyzed into the feature analysis model, and issue an early warning reminder when the feature analysis model is not satisfied; trigger the analysis of the congestion monitoring response signal when the feature analysis model is satisfied; Step S400: extract the congestion characteristics corresponding to the congestion causes in abnormal traffic events based on the response signal, establish an abnormal alarm model corresponding to the congestion characteristics, monitor the traffic data recorded in the traffic planning scenario in real time, and respond to the alarm when the abnormal alarm model is met.

2. According to the multi-dimensional traffic planning scenario evaluation method based on big data in claim 1, Features: The step S300 includes: The feature data to be analyzed refers to data recorded corresponding to environmental features, road features and traffic index features; the valid feature data recorded in the traffic database is retrieved, the feature data to be analyzed is matched with the valid feature data, the successfully retrieved feature data to be analyzed is marked as the target feature data, and the attribute mark corresponding to the target feature data is obtained; Calculate real-time feature analysis index Y based on attribute tags 0 , Y 0 =a 1 *M 1 +a 2 *N 1 , where M 1 Indicates the total number of target feature data with attributes marked as security dimension and attributes marked as efficiency dimension, N 1 Indicates the number of target feature data with attributes marked as security dimension and efficiency dimension; If Y 0 ≥Y min , then a signal that does not meet the feature analysis model is output and an early warning reminder is issued. The early warning reminder refers to determining the effective parent-child chain to which the target feature data corresponds to the most effective feature data, and based on the effective parent-child chain, determining the parent search item as the early warning factor item and the control parent-child chain corresponding to the parent search item as the early warning feature data.

3. According to the multi-dimensional traffic planning scenario evaluation method based on big data in claim 2, Features: The step S400 includes the following: The congestion feature refers to the parent search item in the parent-child chain, marking the starting point of each type of parent search item corresponding to the abnormal traffic event. The starting point refers to the first location with the largest vehicle density in the monitoring area. The vehicle density is equal to the ratio of the number of vehicles in the monitoring block to the area of ​​the monitoring block. Several monitoring blocks constitute the monitoring area. Calculate the congestion rate h corresponding to each type of parent search item, h = (QQ 0 ) / (e*T), Q 0 represents the number of vehicles at the starting point, Q represents the number of vehicles in the monitoring area after e unit time T; If the real-time monitoring traffic planning scenario has a starting point corresponding to the parent search item, calculate the real-time congestion rate h after the interval unit time T 0 ,h 0 ≥h min When the transmission alarm signal indicates congestion occurs, h min represents the minimum congestion rate corresponding to each type of parent search item, h 0 <h min Continue to monitor and calculate the real-time congestion rate e unit time ago at intervals of unit time. 0 ≥h min If it does not exist, no alarm will be given.

4. A multidimensional traffic planning scenario evaluation system using the multidimensional traffic planning scenario evaluation method based on big data according to any one of claims 1 to 3, It is characterized in that It includes traffic database storage module, feature data classification module, feature analysis model building module, response monitoring module and real-time congestion alarm module; The traffic database storage module is used to obtain abnormal traffic events recorded in the traffic database; The characteristic data classification module is used to classify characteristic data of abnormal traffic events based on the cause of congestion; The feature analysis model building module is used to match the feature data of the corresponding evaluation dimension of the traffic planning and build a feature analysis model; The response monitoring module is used to input the characteristic data to be analyzed into the characteristic analysis model, and to issue an early warning reminder when the characteristic analysis model is not satisfied; when the characteristic analysis model is satisfied, a congestion monitoring response signal is triggered for analysis; The real-time congestion alarm module is used to establish an abnormal alarm model corresponding to the congestion characteristics, monitor the traffic data recorded in the traffic planning scene in real time, and respond to the alarm when the abnormal alarm model is met.

5. The multi-dimensional traffic planning scenario evaluation system according to claim 4, Features: The characteristic data classification module includes a congestion cause determination unit, a characteristic data determination unit, a parent-child chain construction unit, a comparison parent-child chain construction unit and a valid parent-child chain generation unit; The congestion cause determination unit is used to determine natural congestion and non-natural congestion; The characteristic data determination unit is used for characteristic data including environmental characteristics, road characteristics and traffic indication characteristics; The parent-child chain building unit is used to take the abnormal factors recorded in each congestion cause as the parent search item, extract the characteristic data in the corresponding abnormal traffic event and store it in the child search item corresponding to the parent search item to form a parent-child chain; The control parent-child chain building unit is used to extract events that have a parent search item but do not cause a congestion state as control events, and generate a control parent-child chain according to the generation method of the parent-child chain based on the feature data recorded by the control event; The effective parent-child chain generation unit is used to screen out the corresponding conventional feature set in each parent-child chain, obtain updated effective feature data and generate an effective parent-child chain.

6. The multi-dimensional traffic planning scenario evaluation system according to claim 4, Features: The feature analysis module construction module includes an attribute marking unit, a feature analysis index calculation unit and a feature analysis model output unit; The attribute marking unit is used to mark the attributes corresponding to the valid feature data; the attributes include a security dimension and an efficiency dimension; The feature analysis index calculation unit is used to calculate the corresponding feature analysis index based on each parent search item; The feature analysis model output unit is used to extract the minimum value of the feature analysis index corresponding to the same parent search item as the evaluation value of the corresponding parent search item, and to construct a feature analysis model.

7. The multi-dimensional traffic planning scenario evaluation system according to claim 4, Features: The real-time congestion alarm module includes a starting point marking unit, a congestion rate calculation unit and an alarm analysis unit; The starting point marking unit is used to mark the starting point of each type of parent search item corresponding to the abnormal traffic event, and the starting point refers to the first location point with the largest vehicle density in the monitoring area, and the vehicle density is equal to the ratio of the number of vehicles in the monitoring block to the area of ​​the monitoring block; The congestion rate calculation unit is used to calculate the congestion rate corresponding to each type of parent search item; The alarm analysis unit is used to analyze the relationship between the real-time congestion rate and the congestion rate of the corresponding parent search item to issue an alarm.

Citation Information

Patent Citations

  • Jam cause analysis method and device, computer equipment and memory medium

    CN109035778A

  • Traffic operation state evaluation method and device for intersection problem diagnosis

    CN111540204A

  • Traffic operation situation evaluation method, system and device

    CN112598169A

  • Early warning method, device and equipment for traffic incident and storage medium

    CN114664060A

  • Traffic jam early warning method and system based on real-time big data

    CN116246463A