Dispatching method, device, storage medium and electronic device for active distribution network
By calculating the flexibility and transmission abundance in the power grid, and optimizing the scheduling model of the active distribution network, the power balance and safe operation problems faced by the active distribution network after the increase in the penetration rate of renewable energy are solved, and flexible regulation and efficiency are achieved promote.
Patent Information
- Application Number
- CN202410045652.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-11
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-01-11
AI Technical Summary
After the renewable energy penetration rate increases, the active distribution network faces difficulties in consumption, line capacity overload, declining power quality and two-way problems, resulting in the safe operation of the system, increasing volatility and uncertainty, and flexible adjustment is required. Capability to ensure power balance on multiple time scales.
The predicted power error intervals of wind turbines and photovoltaic power generation units in the power grid are determined through the pre-constructed probability density function, and combined with the total load error interval of the power grid, the upward and downward flexibility requirements are calculated, and combined with gas turbines, energy storage units, interruptible loads and The superior power grid determines the node flexibility supply, calculates flexibility and transmission abundance rate, and optimizes the scheduling model to achieve minimum operating loss, maximum node flexibility and maximum transmission abundance rate.
It realizes flexible scheduling of the power grid, improves power balance capabilities, reduces system volatility and uncertainty, and ensures the safe operation and efficiency of the power grid.
Smart Images

Figure CN117937625B_ABST
Abstract
Description
Technical Field
[0001] Embodiments of the present application relate to the technical field of power distribution, and in particular to a scheduling method, device, storage medium, and electronic device for an active power distribution network. Background Art
[0002] With the increasing penetration rate of renewable energy in distribution networks, active distribution networks are faced with problems such as difficulty in absorption, line capacity overload, power quality degradation and bidirectional flow, which affect the safe operation of the system. The volatility and uncertainty of active distribution networks are becoming more prominent.
[0003] Therefore, in order to ensure power balance at multiple time scales, the active distribution network must have flexible adjustment capabilities and need to consider the coordinated optimization of multiple types of flexible energy.
[0004] Based on this, a solution that can achieve flexible coordinated scheduling is needed. Summary of the invention
[0005] In view of this, the purpose of the present application is to propose a scheduling method, device, storage medium and electronic device for an active power distribution network.
[0006] Based on the above purpose, the present application provides a dispatching method for an active distribution network, including:
[0007] Determine a first error interval of predicted power of wind turbines in a power grid, a second error interval of predicted power of photovoltaic power generation units, and a third error interval of total load of the power grid by using a pre-constructed probability density function, and determine an upward flexibility demand and a downward flexibility demand of the power grid by using the first error interval, the second error interval, and the third error interval;
[0008] Respectively determine the upward node flexibility supply and the downward node flexibility supply of the gas turbine, the energy storage unit, the interruptible load and the upper power grid in the power grid, and obtain the upward node flexibility supply and the downward node flexibility supply of the power grid by summing them;
[0009] Determine a first difference between the node flexibility supply and the corresponding flexibility demand at the current moment, determine the ratio of the first difference to the corresponding flexibility demand as the corresponding flexibility margin rate, determine a second difference between the maximum transmission capacity and the actual transmission capacity of each transmission line in the power grid during current transmission, and determine the ratio of the second difference to the maximum transmission capacity as the current transmission margin rate of the transmission line;
[0010] Minimizing the operating loss, maximizing the node flexibility and maximizing the transmission margin rate during the operation of the power grid are taken as multiple objectives, and the preset scheduling model is optimized according to the multiple objectives to obtain an optimized scheduling model, and scheduling is performed according to the optimized scheduling model.
[0011] Further, determining an upward flexibility demand and a downward flexibility demand of the power grid by using the first error interval, the second error interval, and the third error interval includes:
[0012] Determine a first error upper bound and a first error lower bound of the first error interval, determine a second error upper bound and a second error lower bound of the second error interval, and determine a second error upper bound and a second error lower bound of the second error interval;
[0013] The upward flexibility requirement is determined according to the formula shown below:
[0014]
[0015] And determine the downward flexibility requirement according to the formula shown below,
[0016]
[0017] in, represents the upward flexibility requirement, represents the downward flexibility requirement, P nl,t =P l,t -P wt,t -P pv,t , P nl,t represents the predicted power of the net load of the power grid at time t, P l,t represents the predicted power of the total load of the power grid at time t, P wt,t represents the predicted power of the wind turbines in the power grid at time t, P pv,t represents the predicted power of the photovoltaic power generation unit of the power grid at time t, represents the first upper error bound, represents the second upper error bound, represents the third upper error bound, represents the first lower bound of the error, represents the second lower error bound, represents the third lower error bound.
[0018] Further, respectively determining the upward node flexibility supply and the downward node flexibility supply of the gas turbine, the energy storage unit, the interruptible load and the upper-level power grid in the power grid, including:
[0019] According to the formula shown below, the upward node flexibility supply of the gas turbine, energy storage unit, interruptible load and upper grid in the power grid is determined respectively.
[0020]
[0021] According to the formula shown below, the flexibility supply to the downstream nodes of the gas turbine, energy storage unit, interruptible load and upper grid in the power grid is determined respectively.
[0022]
[0023] in, represents the upward node flexibility supply of the power grid, represents the grid's downstream node flexibility supply, represents the upward flexibility supply of the gas turbine at time t, represents the upward flexibility supply of the energy storage unit at time t, represents the upward flexibility supply of the interruptible load at time t, represents the upward flexibility supply of the upper power grid at time t, represents the downward flexibility supply of the gas turbine at time t, represents the downward flexibility supply of the energy storage unit at time t, represents the downward flexibility supply of the interruptible load at time t, represents the downward flexibility supply of the upper power grid at time t, N mt represents the number of gas turbines, N es Represents the number of energy storage units, N il The number of devices that can interrupt the load, P mt,m,t represents the output power of the mth gas turbine at time t, represents the upper limit of the processing power of the mth gas turbine at time t, represents the lower limit of the processing power of the mth gas turbine at time t, represents the ramp-up rate of the mth gas turbine, represents the ramp-down rate of the mth gas turbine, P es,n,t represents the energy storage output of the nth energy storage unit at time t, represents the maximum charging power of the nth energy storage unit, Indicates the maximum discharge power of the nth energy storage unit, E es,n,t represents the capacity of the nth energy storage unit at time t, represents the upper capacity limit of the nth energy storage unit at time t, represents the lower limit of the capacity of the nth energy storage unit at time t, η c Represents the charging efficiency of the energy storage unit, η dc Represents the discharge efficiency of the energy storage unit, P il,k,t represents the interruption amount of the kth interruptible load at time t, represents the interruption upper limit of the kth interruptible load at time t, Ptn,t represents the tie line output power of the upper power grid at time t, represents the upper limit of the tie line power of the upper power grid at time t, It represents the lower limit of the tie line power of the upper power grid at time t.
[0024] Further, determining a ratio of the first difference to the corresponding flexibility requirement as a corresponding flexibility margin ratio includes:
[0025] According to the formula shown below, determine the upward flexibility margin corresponding to the upward flexibility demand and the upward node flexibility supply:
[0026]
[0027] in, represents the upward flexibility margin;
[0028] According to the formula shown below, determine the downward flexibility margin corresponding to the downward flexibility demand and the downward node flexibility supply:
[0029]
[0030] in, Indicates the downward flexibility margin.
[0031] Further, determining the ratio of the second difference to the maximum transmission capacity as the current transmission margin rate of the transmission line includes:
[0032] According to the formula shown below, the current transmission margin rate is determined:
[0033]
[0034] Among them, F TR,ij,t represents the transmission margin rate of line ij in the power grid at time t, S ij,t represents the transmission volume of line ij at time t, represents the transmission upper limit of line ij at time t.
[0035] Furthermore, the minimum operation loss, maximum node flexibility and maximum transmission margin rate during the operation of the power grid are taken as multiple goals, including:
[0036] Determine the loss data of the gas turbine, the depreciation data of the energy storage unit, the compensation data of the interruptible load, the loss data of the upper power grid and the loss sum of the loss data of the power grid;
[0037] Determining a flexibility margin sum of the upward flexibility margin and the downward flexibility margin;
[0038] Determining a sum of transmission margin ratios of transmission margin ratios of all lines in the power grid;
[0039] The multiple objectives are to minimize the total loss, maximize the total flexibility margin, and maximize the total transmission margin.
[0040] Furthermore, the preset scheduling model is optimized according to the multiple objectives, including:
[0041] Setting respective constraints on the power flow of the power grid, the gas turbine, the interruptible load, the upper power grid and the flexibility margin;
[0042] According to the multiple objectives, a multi-objective group algorithm is used to optimize the preset scheduling model under the respective constraints.
[0043] Based on the same inventive concept, the present application also provides a dispatching device for an active distribution network, including: a flexibility demand calculation module, a flexibility supply calculation module, a sufficiency calculation module and an optimization module;
[0044] The flexibility demand calculation module is configured to determine a first error interval of the predicted power of the wind turbine in the power grid, a second error interval of the predicted power of the photovoltaic power generation unit, and a third error interval of the total load of the power grid using a pre-constructed probability density function, and determine the upward flexibility demand and the downward flexibility demand of the power grid using the first error interval, the second error interval, and the third error interval;
[0045] The flexibility supply calculation module is configured to respectively determine the upward node flexibility supply and the downward node flexibility supply of the gas turbine, the energy storage unit, the interruptible load and the upper-level power grid in the power grid, and obtain the upward node flexibility supply and the downward node flexibility supply of the power grid by summing them;
[0046] The abundance rate calculation module is configured to determine a first difference between the node flexibility supply and the corresponding flexibility demand at a current moment, determine a ratio of the first difference to the corresponding flexibility demand as the corresponding flexibility abundance rate, determine a second difference between the maximum transmission capacity and the actual transmission capacity of each transmission line in the power grid during current transmission, and determine a ratio of the second difference to the maximum transmission capacity as the current transmission abundance rate of the transmission line;
[0047] The optimization module is configured to take minimizing operating losses, maximizing node flexibility and maximizing transmission margin rate during operation of the power grid as multiple objectives, optimize the preset scheduling model according to the multiple objectives, obtain an optimized scheduling model, and perform scheduling according to the optimized scheduling model.
[0048] Based on the same inventive concept, the present application also provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the scheduling method for the active distribution network as described in any one of the above items is implemented.
[0049] Based on the same inventive concept, the present application also provides a non-transitory computer-readable storage medium, wherein the non-transitory computer-readable storage medium stores computer instructions, and the computer instructions are used to enable the computer to execute the scheduling method of the active distribution network as mentioned above.
[0050] From the above, it can be seen that the scheduling method, device, storage medium and electronic device of the active distribution network provided in the present application determine the error interval when predicting the power of each wind turbine and photovoltaic power generation unit based on the probability density function, and combine the error interval of the predicted total power grid to determine the upward flexibility demand and downward flexibility demand of the power grid, and determine the upward node flexibility supply and downward node flexibility supply of the power grid by comprehensively considering the power grid's aggregated gas turbine, energy storage unit, interruptible load and upper-level power grid, so as to determine the flexibility margin and transmission margin, so that the flexibility margin and transmission margin can be used to set multiple optimization objectives for the power grid scheduling model, and thereby set multiple constraints, and then optimize the scheduling model using multiple optimization objectives under multiple constraints. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] In order to more clearly illustrate the technical solutions in the present application or related technologies, the drawings required for use in the embodiments or related technical descriptions are briefly introduced below. Obviously, the drawings described below are only embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0052] Figure 1 This is a flow chart of a scheduling method for an active power distribution network according to an embodiment of the present application;
[0053] Figure 2 This is a schematic diagram of the structure of a dispatching device for an active power distribution network according to an embodiment of the present application;
[0054] Figure 3 This is a schematic diagram of the structure of an electronic device according to an embodiment of the present application. DETAILED DESCRIPTION
[0055] In order to make the objectives, technical solutions and advantages of the present application more clearly understood, the present application is further described in detail below in combination with specific embodiments and with reference to the accompanying drawings.
[0056] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in the embodiments of the present application should be the usual meanings understood by people with ordinary skills in the field to which the present application belongs. The "first", "second" and similar words used in the embodiments of the present application do not represent any order, quantity or importance, but are only used to distinguish different components. "Including" or "comprising" and similar words mean that the elements or objects appearing in front of the word cover the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connecting" or "connected" and similar words are not limited to physical or mechanical connections, but can include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0057] As described in the background technology section, the related dispatching methods of active distribution networks are still difficult to meet the dispatching needs in actual work.
[0058] In the process of implementing this application, the applicant discovered that the main problem with the relevant active distribution network scheduling method is that with the continuous increase in the penetration rate of renewable energy in the distribution network, the active distribution network faces problems such as difficulty in absorption, line capacity overload, power quality degradation and bidirectional flow, which affect the safe operation of the system. The volatility and uncertainty of the active distribution network are becoming more and more prominent.
[0059] Therefore, in order to ensure power balance at multiple time scales, the active distribution network must have flexible adjustment capabilities and need to consider the coordinated optimization of multiple types of flexible energy.
[0060] Based on this, one or more embodiments of the present application provide a scheduling method for an active power distribution network.
[0061] In an embodiment of the present application, a power grid is used as a specific example for power distribution and scheduling. The power grid can access electric energy from a superior power grid and a gas turbine respectively. In addition, it can also access electric energy from new energy power generation units such as wind turbines and photovoltaic power generation units.
[0062] In this embodiment, the power grid also carries interruptible loads of other equipment.
[0063] The embodiments of the present application are described in detail below with reference to the accompanying drawings.
[0064] refer to Figure 1 A method for dispatching an active power distribution network according to an embodiment of the present application comprises the following steps:
[0065] Step S101, using a pre-constructed probability density function to determine a first error interval of the predicted power of the wind turbine in the power grid, a second error interval of the predicted power of the photovoltaic power generation unit, and a third error interval of the total load of the power grid, and using the first error interval, the second error interval, and the third error interval to determine the upward flexibility demand and the downward flexibility demand of the power grid.
[0066] In an embodiment of the present application, the flexibility demand of the power grid can be determined by predicting the output of wind turbines and photovoltaic power generation units in the power grid.
[0067] Among them, flexibility demand can be divided into upward flexibility demand and downward flexibility demand. In this embodiment, upward flexibility demand can be considered as an increase in the performance or capacity required by the power grid, and downward flexibility demand can be considered as a decrease in the performance or capacity required by the power grid.
[0068] Specifically, in this embodiment, the actual power of each of the wind turbine, photovoltaic power generation unit and total grid load can be equivalent to the sum of the predicted value and the predicted error, wherein the predicted value can be regarded as a determined value and the predicted error can be regarded as a random variable.
[0069] Furthermore, accurate characterization of the flexibility demand of the power grid can establish a prediction error probability model for the predicted power of wind power, photovoltaic power and total load.
[0070] Among them, the prediction accuracy of total load is higher, and its prediction error generally obeys normal distribution; while the prediction accuracy of wind turbines and photovoltaic power generation units is lower, and the prediction errors in different power sections often show different distribution characteristics. Therefore, a more adaptable mixed Gaussian model can be used to establish the probability density function of the first prediction error of the predicted power of wind turbines: f(ΔP wt ), and the probability density function of the second prediction error of the predicted power of the photovoltaic power generation unit: f(ΔP pv ), where ΔP wt represents the first prediction error, ΔP pv represents the second prediction error.
[0071] Further, when using the definite integral to determine the first prediction error and the second prediction error, a confidence level may be set, and the confidence level is used to indicate the credibility of the definite integral calculation result. In this embodiment, the confidence level may be regarded as a given fixed value. Under a given confidence level, the confidence interval is not unique, and the smaller the width, the higher the credibility. Therefore, according to the definite integral approximate calculation principle, the confidence interval may be divided into M rectangles of equal width. By determining the minimum M, the upper and lower limits of the minimum confidence interval may be determined, and expressed as the following formula:
[0072]
[0073] Among them, 1-β represents the confidence level; represents the upper limit of the first prediction error of the wind turbine, represents the lower limit of the first prediction error of the wind turbine, represents the upper limit of the second prediction error of the photovoltaic power generation unit, represents the lower limit of the second prediction error of the photovoltaic power generation unit; S m represents the area of the mth rectangle; τ represents the preset calculation accuracy.
[0074] Based on this, the minimum confidence interval of the first prediction error and the second prediction error under a given confidence level can be determined, and then the first error interval of the first prediction error, that is, the upper and lower limits of the first prediction error, and the second error interval of the second prediction error, that is, the second prediction error, can be determined. Based on this, the upward flexibility demand and downward flexibility demand of the power grid can be determined.
[0075] Specifically, the upward flexibility demand of the power grid can be determined according to the following formula:
[0076]
[0077] And determine the downward flexibility demand of the power grid according to the formula shown below:
[0078]
[0079] Among them, P nl,t =P l,t -P wt,t -P pv,t .
[0080] in, represents the upward flexibility demand of the grid, represents the downward flexibility demand of the power grid, P nl,t It represents the predicted power of the net load of the power grid at time t, P l,t It represents the predicted power of the total load of the power grid at time t, P wt,t represents the predicted power of the wind turbines in the power grid at time t, P pv,t represents the predicted power of the photovoltaic power generation unit of the power grid at time t, represents the first upper error bound, represents the second upper error bound, represents the third error upper bound, represents the first lower bound of the error, represents the second error lower bound, represents the third lower error bound.
[0081] In this embodiment, the net load represents the remaining load that the power grid needs to supply after all active loads are deducted from the output of uncontrollable distributed power sources, for example, after deducting the power output of wind turbines and photovoltaic power generation units.
[0082] Step S102, respectively determine the upward node flexibility supply and downward node flexibility supply of the gas turbine, energy storage unit, interruptible load and upper-level power grid in the power grid, and obtain the upward node flexibility supply and downward node flexibility supply of the power grid by summing them.
[0083] In an embodiment of the present application, an energy storage unit cooperating with the wind turbine generator set and the photovoltaic power generation unit is also provided in the power grid, and electric energy is connected from the wind turbine generator set and the photovoltaic power generation unit through the energy storage unit.
[0084] Furthermore, interruptible loads and upper-level power grids are connected to the power grid.
[0085] Based on this, the gas turbine, energy storage unit, interruptible load and upper-level power grid can be regarded as various power supply nodes, and the flexibility of the supply capacity of the gas turbine, energy storage unit and upper-level power grid can be determined respectively, that is, the node flexibility supply.
[0086] Among them, the flexibility supply of each node can be divided into upward flexibility supply and downward flexibility supply.
[0087] Specifically, the upward node flexibility supply of the gas turbine, energy storage unit, interruptible load and upper grid in the power grid can be determined according to the following formula:
[0088]
[0089] And according to the formula shown below, the flexibility supply to the downstream nodes of the gas turbine, energy storage unit, interruptible load and upper grid in the power grid is determined respectively.
[0090]
[0091] in, represents the upward node flexibility supply of the power grid, represents the grid's downstream node flexibility supply, represents the upward flexibility supply of the gas turbine at time t, represents the upward flexibility supply of the energy storage unit at time t, represents the upward flexibility supply of interruptible load at time t, represents the upward flexibility supply of the upper power grid at time t, represents the downward flexibility supply of the gas turbine at time t, represents the downward flexibility supply of the energy storage unit at time t, represents the downward flexibility supply of interruptible load at time t, represents the downward flexibility supply of the upper power grid at time t, N mt represents the number of gas turbines, N es Represents the number of energy storage units, N il The number of devices that can interrupt the load, P mt,m,t represents the output power of the mth gas turbine at time t, represents the upper limit of the processing power of the mth gas turbine at time t, represents the lower limit of the processing power of the mth gas turbine at time t, represents the ramp-up rate of the mth gas turbine, represents the ramp-down rate of the mth gas turbine, P es,n,t represents the energy storage output of the nth energy storage unit at time t, represents the maximum charging power of the nth energy storage unit, Indicates the maximum discharge power of the nth energy storage unit, E es,n,t represents the capacity of the nth energy storage unit at time t, represents the upper capacity limit of the nth energy storage unit at time t, represents the lower limit of the capacity of the nth energy storage unit at time t, η c Represents the charging efficiency of the energy storage unit, η dc Represents the discharge efficiency of the energy storage unit, P il,k,t represents the interruption amount of the kth interruptible load at time t, represents the interruption upper limit of the kth interruptible load at time t, P tn,t represents the tie line output power of the upper power grid at time t, represents the upper limit of the tie line power of the upper power grid at time t, Indicates the lower limit of the interconnection line power of the upper power grid at time t.
[0092] It can be seen that through this step, the upward node flexibility supply and the downward node flexibility supply of the power grid at the current moment, as well as the upward flexibility demand and the downward flexibility demand can be determined.
[0093] Step S103, determine the first difference between the node flexibility supply and the corresponding flexibility demand at the current moment, determine the ratio of the first difference to the corresponding flexibility demand as the corresponding flexibility margin rate, determine the second difference between the maximum transmission capacity and the actual transmission capacity of each transmission line in the power grid during current transmission, and determine the ratio of the second difference to the maximum transmission capacity as the current transmission margin rate of the transmission line.
[0094] In an embodiment of the present application, based on the node flexibility supply and corresponding flexibility demand of the power grid at the current moment determined in the aforementioned steps, the degree of sufficiency of the node flexibility supply of the current power grid relative to the flexibility demand, that is, the flexibility sufficiency rate, can be further determined.
[0095] Specifically, the difference between the node flexibility supply and the corresponding flexibility demand can be determined and used as the first difference. Specifically, the difference between the upward node flexibility supply and the corresponding upward flexibility demand can be determined as the first upward difference, and the difference between the downward node flexibility supply and the corresponding downward flexibility demand can be determined as the first downward difference.
[0096] Based on this, the upward flexibility margin ratio of the upward node flexibility relative to the upward flexibility demand can be determined according to the following formula:
[0097]
[0098] in, Indicates the upward flexibility margin.
[0099] And determine the downward flexibility margin of the downward node flexibility relative to the downward flexibility demand according to the formula shown below:
[0100]
[0101] in, Indicates the downward flexibility margin.
[0102] Furthermore, each transmission line of the power grid has a maximum transmission capacity and an actual transmission capacity at the current moment, based on which a second difference between the maximum transmission capacity and the actual transmission capacity at the current moment can be further determined.
[0103] Furthermore, a ratio between the second difference and the above-mentioned maximum transmission capacity may be calculated, and the ratio may be used as the transmission margin rate of the transmission line at the current moment.
[0104] Specifically, the transmission margin rate of line ij in the transmission line at the current time t can be calculated according to the following formula:
[0105]
[0106] Among them, F TR,ij,t represents the transmission margin rate of line ij in the power grid at time t, S ij,t represents the transmission volume of line ij at time t, represents the transmission upper limit of line ij at time t.
[0107] Step S104, taking the minimization of operating loss, maximization of node flexibility and maximization of transmission margin rate during operation of the power grid as multiple objectives, optimizing the preset scheduling model according to the multiple objectives, obtaining an optimized scheduling model, and performing scheduling according to the optimized scheduling model.
[0108] In an embodiment of the present application, based on a preset dispatching model for controlling the dispatching and transmission of electric energy by a power grid, the operating losses, node flexibility and transmission margin rate existing in the operation of the power grid can be used to set optimization targets, thereby optimizing the dispatching model.
[0109] Specifically, since the power grid is connected to the gas turbine, energy storage unit, interruptible load and the upper-level power grid, the total loss between the loss data of the gas turbine, the depreciation data of the energy storage unit, the compensation data of the interruptible load, the loss data of the upper-level power grid and the loss data of the power grid can be determined first.
[0110] Furthermore, the minimum total loss can be expressed as follows and used as one of the optimization goals:
[0111]
[0112] Among them, T represents the scheduling period, a m represents the first loss coefficient preset for the mth micro gas turbine, b m represents the second loss coefficient preset for the mth micro gas turbine, c m represents the third loss coefficient preset for the mth micro gas turbine, C es,n Represents the depreciation value of the nth energy storage unit, M es,n Indicates the number of charge and discharge cycles of the nth energy storage unit, C il,k,t represents the compensation value of the kth interruptible load at time t, C tn,t P represents the loss value of electric energy connected from the upper power grid at time t, lost,t Represents the loss value of the power grid at time t.
[0113] Furthermore, since the node flexibility can be best characterized as the maximum upward flexibility margin and downward flexibility margin in the entire scheduling cycle, the maximum node flexibility can be expressed according to the following formula and used as one of the optimization goals:
[0114]
[0115] Where s represents the state variable of the flexibility margin ratio at time t, which is 1 when it indicates upward and 0 when it indicates downward.
[0116] Furthermore, the sum of the transmission margin rates of all transmission lines in the power grid can be determined according to the following formula and used as one of the optimization targets:
[0117]
[0118] Where B represents the set of all transmission lines, F TR,ij,t It represents the transmission margin rate of line ij at time t.
[0119] Based on this, multiple constraints can be set for the dispatch model of the power grid to constrain the power flow, gas turbines, interruptible loads, upper power grid and flexibility margin in the power grid.
[0120] Specifically, for the power flow in the power grid, the following power flow constraints can be set for the power grid:
[0121]
[0122] Among them, Ω a represents the set of all transmission line headend nodes whose end node is j; Ω b represents the set of all line end nodes whose first end node is j; P ij,t represents the active power flowing from node i to node j at time t; Q ij,t P represents the reactive power flowing from node i to node j at time t. In this embodiment, it is defined as the positive direction flowing from the node with a smaller number to the node with a larger number; j,t represents the active power injected into node j at time t, Q j,t represents the reactive power injected by node j at time t; U i,t represents the voltage of node i at time t; I ij,t represents the current of line ij at time t; r ij represents the resistance of line ij, x ij Represents the reactance of line ij.
[0123] Furthermore, in order to ensure that the power grid can operate safely during dispatch, the following safe operation constraints can be set:
[0124]
[0125] Furthermore, the following gas turbine constraints can be set for the gas turbine:
[0126]
[0127] Among them, Q mt,m,t represents the reactive power of the mth micro gas turbine at time t; Represents the power angle of the micro gas turbine.
[0128] Furthermore, the following interruptible load constraints can be set for the interruptible load:
[0129]
[0130] Among them, s k,t represents the state variable of the kth interruptible load at time t, where 0 indicates no interruption and 1 indicates interruption; Q il,k,t represents the reactive load interrupted by the kth interruptible load at time t; P l,k,t Represents the original active load of the node, Q l,k,t Represents the original reactive load of the node; Indicates the maximum outage duration.
[0131] Furthermore, the following upper-level grid constraints may be set for the upper-level grid:
[0132]
[0133] Among them, Q tn,t represents the reactive power transmitted by the upper power grid at time t, represents the upper limit of the transmission of the upper power grid at time t, Indicates the lower limit of the upper power grid transmission at time t.
[0134] Furthermore, the flexibility margin constraint as shown below can be set for the flexibility margin ratio:
[0135]
[0136] Furthermore, the power grid is also equipped with SOP (intelligent soft switch), which can control the power transmission at both ends of the feeder in real time according to the received dispatching instructions to change the power flow distribution of the system. Furthermore, the energy storage unit can be connected to the distribution network through the SOP DC terminal to form an E-SOP, which can enhance the power regulation capability of the SOP while maximizing the peak-shaving and valley-filling effect of energy storage.
[0137] In this embodiment, taking the discharge of the energy storage unit as an example, the active powers output at both ends of the SOP are P sop,1,t , P sop,2,t Both flow into the system, the value is positive, and the sum of the two is always equal to the energy storage output P es,n,t .
[0138] Furthermore, the charging scenario of the energy storage unit is similar, but the active power output at both ends of the SOP flows out of the system and the value is negative.
[0139] Therefore, the SOP's control over the active power at both ends is limited by the maximum charging and discharging power of the energy storage unit.
[0140] Based on this, the reactive power output at both ends of the SOP is P sop,1,t , P sop,2,t , the two do not affect each other due to the isolation effect of the DC capacitor and are only limited by the capacity of the SOP itself. Therefore, the E-SOP needs to meet the following constraints when running the optimization:
[0141]
[0142] Among them, P sop,i,t represents the active power injected into the feeder by SOP at time t, Q sop,i,t represents the reactive power injected into the feeder by SOP at time t; S sop,i,max represents the upper limit of the SOP capacity connected to feeder i; s n,t Represents the charge and discharge state variable of the energy storage unit, where 0 represents charging and 1 represents discharging; P c,n,t represents the charging power of the nth energy storage unit at time t, P dc,n,t Represents the discharge power of the nth energy storage unit at time t.
[0143] Based on the above multiple optimization objectives and multiple constraints, it can be seen that the process of optimizing the scheduling model is a nonlinear, multi-variable, multi-objective optimization problem. Therefore, a multi-objective swarm particle algorithm can be used for optimization.
[0144] Specifically, the fuzzy membership algorithm can be used to calculate the preference value of each solution in the Pareto solution set for each optimization objective, and the solution with the largest preference value is selected as the optimal compromise solution of the optimization model.
[0145] Furthermore, the multi-objective particle swarm algorithm is combined with uncertainty analysis and power flow calculation. The flexibility requirements are obtained through uncertainty analysis, and power flow calculation is performed on each particle at the same time, and particles that do not meet the safe operation constraints are discarded.
[0146] Furthermore, on this basis, the flexibility supply is determined, and the objective function values of the above three optimization objectives are calculated. According to the dominating relationship, the non-dominated solution is determined, and the optimal compromise solution of the scheduling model is finally obtained through cyclic iteration.
[0147] It can be seen that the scheduling method of the active distribution network in the embodiment of the present application determines the error interval when predicting the power of each wind turbine and photovoltaic power generation unit based on the probability density function, and determines the upward flexibility demand and downward flexibility demand of the power grid in combination with the error interval of the predicted total power grid compliance, and determines the upward node flexibility supply and downward node flexibility supply of the power grid by comprehensively considering the power grid aggregated gas turbine, energy storage unit, interruptible load and upper-level power grid, thereby determining the flexibility margin and transmission margin, so that the flexibility margin and transmission margin can be used to set multiple optimization objectives for the scheduling model of the power grid, and thereby set multiple constraints, and then optimize the scheduling model using multiple optimization objectives under multiple constraints.
[0148] It should be noted that the method of the embodiment of the present application can be performed by a single device, such as a computer or server. The method of this embodiment can also be applied to a distributed scenario and completed by multiple devices cooperating with each other. In the case of such a distributed scenario, one of the multiple devices can only perform one or more steps in the method of the embodiment of the present application, and the multiple devices will interact with each other to complete the described method.
[0149] It should be noted that the above describes some embodiments of the present application. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the above embodiments and still achieve the desired results. In addition, the processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0150] Based on the same inventive concept, corresponding to any of the above-mentioned embodiments and methods, an embodiment of the present application further provides a scheduling device for an active power distribution network.
[0151] refer to Figure 2 , the dispatching device of the active distribution network includes: a flexibility demand calculation module 201, a flexibility supply calculation module 202, a surplus rate calculation module 203 and an optimization module 204;
[0152] The flexibility demand calculation module 201 is configured to determine a first error interval of the predicted power of the wind turbine in the power grid, a second error interval of the predicted power of the photovoltaic power generation unit, and a third error interval of the total load of the power grid using a pre-constructed probability density function, and determine the upward flexibility demand and the downward flexibility demand of the power grid using the first error interval, the second error interval, and the third error interval;
[0153] The flexibility supply calculation module 202 is configured to respectively determine the upward node flexibility supply and the downward node flexibility supply of the gas turbine, the energy storage unit, the interruptible load and the upper-level power grid in the power grid, and obtain the upward node flexibility supply and the downward node flexibility supply of the power grid by summing them;
[0154] The abundance rate calculation module 203 is configured to determine a first difference between the node flexibility supply and the corresponding flexibility demand at the current moment, determine the ratio of the first difference to the corresponding flexibility demand as the corresponding flexibility abundance rate, determine a second difference between the maximum transmission capacity and the actual transmission capacity of each transmission line in the power grid during current transmission, and determine the ratio of the second difference to the maximum transmission capacity as the current transmission abundance rate of the transmission line;
[0155] The optimization module 204 is configured to take minimizing the operating loss, maximizing the node flexibility and maximizing the transmission margin rate during the operation of the power grid as multiple objectives, optimize the preset scheduling model according to the multiple objectives, obtain the optimized scheduling model, and perform scheduling according to the optimized scheduling model.
[0156] For the convenience of description, the above devices are described in terms of functions and are divided into various modules. Of course, when implementing the embodiments of the present application, the functions of each module can be implemented in the same or multiple software and / or hardware.
[0157] The device of the above embodiment is used to implement the corresponding active distribution network scheduling method in any of the above embodiments, and has the beneficial effects of the corresponding method embodiment, which will not be repeated here.
[0158] Figure 3 A more specific schematic diagram of the hardware structure of an electronic device provided in this embodiment is shown, and the device may include: a processor 1010, a memory 1020, an input / output interface 1030, a communication interface 1040, and a bus 1050. The processor 1010, the memory 1020, the input / output interface 1030, and the communication interface 1040 are connected to each other through the bus 1050 in the device.
[0159] The processor 1010 can be implemented by a general-purpose CPU (Central Processing Unit), a microprocessor, an application-specific integrated circuit (ASIC), or one or more integrated circuits, and is used to execute relevant programs to implement the technical solutions provided in the embodiments of the present application.
[0160] The memory 1020 may be implemented in the form of ROM (Read Only Memory), RAM (Random Access Memory), static storage device, dynamic storage device, etc. The memory 1020 may store an operating system and other application programs. When the technical solution provided in the embodiment of the present application is implemented by software or firmware, the relevant program code is stored in the memory 1020 and is called and executed by the processor 1010.
[0161] The input / output interface 1030 is used to connect the input / output module to realize information input and output. The input / output module can be configured in the device as a component (not shown in the figure), or it can be externally connected to the device to provide corresponding functions. The input device may include a keyboard, a mouse, a touch screen, a microphone, various sensors, etc., and the output device may include a display, a speaker, a vibrator, an indicator light, etc.
[0162] The communication interface 1040 is used to connect a communication module (not shown) to realize communication interaction between the device and other devices. The communication module can realize communication through a wired mode (such as USB, network cable, etc.) or a wireless mode (such as mobile network, WIFI, Bluetooth, etc.).
[0163] The bus 1050 includes a path that transmits information between the various components of the device (eg, the processor 1010, the memory 1020, the input / output interface 1030, and the communication interface 1040).
[0164] It should be noted that, although the above device only shows the processor 1010, the memory 1020, the input / output interface 1030, the communication interface 1040 and the bus 1050, in the specific implementation process, the device may also include other components necessary for normal operation. In addition, it can be understood by those skilled in the art that the above device may also only include the components necessary for implementing the embodiment of the present application, and does not necessarily include all the components shown in the figure.
[0165] The device of the above embodiment is used to implement the corresponding active distribution network scheduling method in any of the above embodiments, and has the beneficial effects of the corresponding method embodiment, which will not be repeated here.
[0166] Based on the same inventive concept, corresponding to any of the above-mentioned embodiment methods, the present application also provides a non-transitory computer-readable storage medium, wherein the non-transitory computer-readable storage medium stores computer instructions, and the computer instructions are used to enable the computer to execute the scheduling method of the active distribution network as described in any of the above embodiments.
[0167] The computer-readable medium of this embodiment includes permanent and non-permanent, removable and non-removable media, and information storage can be implemented by any method or technology. Information can be computer-readable instructions, data structures, modules of programs, or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, read-only compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, tape disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device.
[0168] The computer instructions stored in the storage medium of the above embodiments are used to enable the computer to execute the scheduling method of the active power distribution network as described in any of the above embodiments, and have the beneficial effects of the corresponding method embodiments, which will not be repeated here.
[0169] Those skilled in the art should understand that the discussion of any of the above embodiments is merely illustrative and is not intended to imply that the scope of the present application (including the claims) is limited to these examples. In line with the concept of the present application, the technical features in the above embodiments or different embodiments may be combined, the steps may be implemented in any order, and there are many other variations of different aspects of the embodiments of the present application as described above, which are not provided in detail for the sake of simplicity.
[0170] In addition, to simplify the description and discussion, and in order not to make the embodiments of the present application difficult to understand, the known power supply / ground connection with the integrated circuit (IC) chip and other components may or may not be shown in the provided drawings. In addition, the device can be shown in the form of a block diagram to avoid making the embodiments of the present application difficult to understand, and this also takes into account the fact that the details of the implementation of these block diagram devices are highly dependent on the platform on which the embodiments of the present application will be implemented (that is, these details should be fully within the scope of understanding of those skilled in the art). In the case of elaborating specific details (e.g., circuits) to describe exemplary embodiments of the present application, it is obvious to those skilled in the art that the embodiments of the present application can be implemented without these specific details or when these specific details are changed. Therefore, these descriptions should be considered illustrative rather than restrictive.
[0171] Although the present application has been described in conjunction with specific embodiments of the present application, many replacements, modifications and variations of these embodiments will be apparent to those skilled in the art from the foregoing description. For example, other memory architectures (e.g., dynamic RAM (DRAM)) may use the embodiments discussed.
[0172] The embodiments of the present application are intended to cover all such substitutions, modifications and variations that fall within the broad scope of the appended claims. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the embodiments of the present application should be included in the protection scope of the present application.
Claims
1. A dispatching method for active distribution network, It is characterized in that include: Determine a first error interval of predicted power of wind turbines in a power grid, a second error interval of predicted power of photovoltaic power generation units, and a third error interval of total load of the power grid by using a pre-constructed probability density function, and determine an upward flexibility demand and a downward flexibility demand of the power grid by using the first error interval, the second error interval, and the third error interval; The determining of the upward flexibility demand and the downward flexibility demand of the power grid by using the first error interval, the second error interval and the third error interval includes: Determine a first error upper bound and a first error lower bound of the first error interval, determine a second error upper bound and a second error lower bound of the second error interval, and determine a second error upper bound and a second error lower bound of the second error interval; The upward flexibility requirement is determined according to the formula shown below: And determine the downward flexibility requirement according to the formula shown below, in, represents the upward flexibility requirement, represents the downward flexibility requirement, , represents the predicted power of the net load of the power grid at time t, represents the predicted power of the total load of the power grid at time t, represents the predicted power of the wind turbines in the power grid at time t, represents the predicted power of the photovoltaic power generation unit of the power grid at time t, represents the first upper error bound, represents the second upper error bound, represents the third error upper bound, represents the first lower bound of the error, represents the second lower error bound, represents the third error lower bound; Respectively determine the upward node flexibility supply and the downward node flexibility supply of the gas turbine, the energy storage unit, the interruptible load and the upper power grid in the power grid, and obtain the upward node flexibility supply and the downward node flexibility supply of the power grid by summing them; The step of respectively determining the upward node flexibility supply and the downward node flexibility supply of the gas turbine, the energy storage unit, the interruptible load and the upper-level power grid in the power grid includes: According to the formula shown below, the upward node flexibility supply of the gas turbine, energy storage unit, interruptible load and upper grid in the power grid is determined respectively. According to the formula shown below, the flexibility supply to the downstream nodes of the gas turbine, energy storage unit, interruptible load and upper grid in the power grid is determined respectively. in, represents the upward node flexibility supply of the power grid, represents the grid's downstream node flexibility supply, represents the upward flexibility supply of the gas turbine at time t, represents the upward flexibility supply of the energy storage unit at time t, represents the upward flexibility supply of the interruptible load at time t, represents the upward flexibility supply of the upper power grid at time t, represents the downward flexibility supply of the gas turbine at time t, represents the downward flexibility supply of the energy storage unit at time t, represents the downward flexibility supply of the interruptible load at time t, represents the downward flexibility supply of the upper power grid at time t, represents the number of gas turbines, represents the number of energy storage units, Indicates the number of devices that can interrupt the load, represents the output power of the mth gas turbine at time t, represents the upper limit of the processing power of the mth gas turbine at time t, represents the lower limit of the processing power of the mth gas turbine at time t, represents the ramp-up rate of the mth gas turbine, represents the ramp-down rate of the mth gas turbine, represents the energy storage output of the nth energy storage unit at time t, represents the maximum charging power of the nth energy storage unit, represents the maximum discharge power of the nth energy storage unit, represents the capacity of the nth energy storage unit at time t, represents the upper capacity limit of the nth energy storage unit at time t, represents the lower limit of the capacity of the nth energy storage unit at time t, represents the charging efficiency of the energy storage unit, Represents the discharge efficiency of the energy storage unit, represents the interruption amount of the kth interruptible load at time t, represents the interruption upper limit of the kth interruptible load at time t, represents the tie line output power of the upper power grid at time t, represents the upper limit of the tie line power of the upper power grid at time t, Indicates the lower limit of the tie line power of the upper power grid at time t; Determine a first difference between the node flexibility supply and the corresponding flexibility demand at the current moment, determine the ratio of the first difference to the corresponding flexibility demand as the corresponding flexibility margin rate, determine a second difference between the maximum transmission capacity and the actual transmission capacity of each transmission line in the power grid during current transmission, and determine the ratio of the second difference to the maximum transmission capacity as the current transmission margin rate of the transmission line; The step of determining the ratio of the first difference to the corresponding flexibility requirement as the corresponding flexibility margin ratio includes: According to the formula shown below, determine the upward flexibility margin corresponding to the upward flexibility demand and the upward node flexibility supply: in, represents the upward flexibility margin; According to the formula shown below, determine the downward flexibility margin corresponding to the downward flexibility demand and the downward node flexibility supply: in, represents the downward flexibility margin; The step of determining the ratio of the second difference to the maximum transmission capacity as the current transmission margin rate of the transmission line comprises: According to the formula shown below, the current transmission margin rate is determined: in, represents the transmission margin rate of line ij in the power grid at time t, represents the transmission volume of line ij at time t, represents the transmission upper limit of line ij at time t; Minimizing the operation loss, maximizing the node flexibility, and maximizing the transmission margin rate during the operation of the power grid are taken as multiple objectives, optimizing the preset scheduling model according to the multiple objectives to obtain an optimized scheduling model, and scheduling according to the optimized scheduling model; The minimization of the operation loss, the maximization of the node flexibility and the maximization of the transmission margin rate during the operation of the power grid are taken as multiple objectives, and the preset scheduling model is optimized according to the multiple objectives, including: Determine the loss data of the gas turbine, the depreciation data of the energy storage unit, the compensation data of the interruptible load, the loss data of the upper power grid and the loss sum of the loss data of the power grid; Determining a flexibility margin sum of the upward flexibility margin and the downward flexibility margin; Determining a sum of transmission margin ratios of transmission margin ratios of all lines in the power grid; and taking the minimum total loss, the maximum total flexibility margin and the maximum total transmission margin as the multiple objectives; Setting respective constraints on the power flow of the power grid, the gas turbine, the interruptible load, the upper power grid and the flexibility margin; According to the multiple objectives, a multi-objective group algorithm is used to optimize the preset scheduling model under the respective constraints; Among them, according to the formula shown below, the minimum total loss is expressed and used as one of the optimization goals: Where T represents the scheduling period, represents the first loss coefficient preset for the mth micro gas turbine, represents the second loss coefficient preset for the mth micro gas turbine, represents the third loss coefficient preset for the mth micro gas turbine, represents the depreciation value of the nth energy storage unit, represents the number of charge and discharge cycles of the nth energy storage unit, represents the compensation value of the kth interruptible load at time t, It represents the loss value of electric energy connected from the upper power grid at time t, represents the loss value of the power grid at time t; The maximum node flexibility is expressed as follows and is used as one of the optimization goals: Among them, s represents the state variable of the flexibility margin at time t, which is 1 when it indicates upward and 0 when it indicates downward; The sum of the transmission margin rates of all transmission lines in the power grid is determined according to the following formula and used as one of the optimization objectives: Where B represents the set of all transmission lines, It represents the transmission margin rate of line ij at time t.
2. A dispatching device for an active power distribution network, It is characterized in that include: Flexibility demand calculation module, flexibility supply calculation module, sufficiency calculation module and optimization module; The flexibility demand calculation module is configured to determine a first error interval of the predicted power of the wind turbine in the power grid, a second error interval of the predicted power of the photovoltaic power generation unit, and a third error interval of the total load of the power grid using a pre-constructed probability density function, and determine the upward flexibility demand and the downward flexibility demand of the power grid using the first error interval, the second error interval, and the third error interval; The determining of the upward flexibility demand and the downward flexibility demand of the power grid by using the first error interval, the second error interval and the third error interval includes: Determine a first error upper bound and a first error lower bound of the first error interval, determine a second error upper bound and a second error lower bound of the second error interval, and determine a second error upper bound and a second error lower bound of the second error interval; The upward flexibility requirement is determined according to the formula shown below: And determine the downward flexibility requirement according to the formula shown below, in, represents the upward flexibility requirement, represents the downward flexibility requirement, , represents the predicted power of the net load of the power grid at time t, represents the predicted power of the total load of the power grid at time t, represents the predicted power of the wind turbines in the power grid at time t, represents the predicted power of the photovoltaic power generation unit of the power grid at time t, represents the first upper error bound, represents the second upper error bound, represents the third error upper bound, represents the first lower bound of the error, represents the second lower error bound, represents the third error lower bound; The flexibility supply calculation module is configured to respectively determine the upward node flexibility supply and the downward node flexibility supply of the gas turbine, the energy storage unit, the interruptible load and the upper-level power grid in the power grid, and obtain the upward node flexibility supply and the downward node flexibility supply of the power grid by summing them; The step of respectively determining the upward node flexibility supply and the downward node flexibility supply of the gas turbine, the energy storage unit, the interruptible load and the upper-level power grid in the power grid includes: According to the formula shown below, the upward node flexibility supply of the gas turbine, energy storage unit, interruptible load and upper grid in the power grid is determined respectively. According to the formula shown below, the flexibility supply to the downstream nodes of the gas turbine, energy storage unit, interruptible load and upper grid in the power grid is determined respectively. in, represents the upward node flexibility supply of the power grid, represents the grid's downstream node flexibility supply, represents the upward flexibility supply of the gas turbine at time t, represents the upward flexibility supply of the energy storage unit at time t, represents the upward flexibility supply of the interruptible load at time t, represents the upward flexibility supply of the upper power grid at time t, represents the downward flexibility supply of the gas turbine at time t, represents the downward flexibility supply of the energy storage unit at time t, represents the downward flexibility supply of the interruptible load at time t, represents the downward flexibility supply of the upper power grid at time t, represents the number of gas turbines, represents the number of energy storage units, Indicates the number of devices that can interrupt the load, represents the output power of the mth gas turbine at time t, represents the upper limit of the processing power of the mth gas turbine at time t, represents the lower limit of the processing power of the mth gas turbine at time t, represents the ramp-up rate of the mth gas turbine, represents the ramp-down rate of the mth gas turbine, represents the energy storage output of the nth energy storage unit at time t, represents the maximum charging power of the nth energy storage unit, represents the maximum discharge power of the nth energy storage unit, represents the capacity of the nth energy storage unit at time t, represents the upper capacity limit of the nth energy storage unit at time t, represents the lower limit of the capacity of the nth energy storage unit at time t, represents the charging efficiency of the energy storage unit, Represents the discharge efficiency of the energy storage unit, represents the interruption amount of the kth interruptible load at time t, represents the interruption upper limit of the kth interruptible load at time t, represents the tie line output power of the upper power grid at time t, represents the upper limit of the tie line power of the upper power grid at time t, Indicates the lower limit of the tie line power of the upper power grid at time t; The abundance rate calculation module is configured to determine a first difference between the node flexibility supply and the corresponding flexibility demand at a current moment, determine a ratio of the first difference to the corresponding flexibility demand as the corresponding flexibility abundance rate, determine a second difference between the maximum transmission capacity and the actual transmission capacity of each transmission line in the power grid during current transmission, and determine a ratio of the second difference to the maximum transmission capacity as the current transmission abundance rate of the transmission line; The step of determining the ratio of the first difference to the corresponding flexibility requirement as the corresponding flexibility margin ratio includes: According to the formula shown below, determine the upward flexibility margin corresponding to the upward flexibility demand and the upward node flexibility supply: in, represents the upward flexibility margin; According to the formula shown below, determine the downward flexibility margin corresponding to the downward flexibility demand and the downward node flexibility supply: in, represents the downward flexibility margin; The step of determining the ratio of the second difference to the maximum transmission capacity as the current transmission margin rate of the transmission line comprises: According to the formula shown below, the current transmission margin rate is determined: in, represents the transmission margin rate of line ij in the power grid at time t, represents the transmission volume of line ij at time t, represents the transmission upper limit of line ij at time t; The optimization module is configured to optimize a preset scheduling model according to multiple objectives, namely, minimizing operation loss, maximizing node flexibility, and maximizing transmission margin rate when the power grid is running, obtain an optimized scheduling model, and perform scheduling according to the optimized scheduling model; The minimization of the operation loss, the maximization of the node flexibility and the maximization of the transmission margin rate during the operation of the power grid are taken as multiple objectives, and the preset scheduling model is optimized according to the multiple objectives, including: Determine the loss data of the gas turbine, the depreciation data of the energy storage unit, the compensation data of the interruptible load, the loss data of the upper power grid and the loss sum of the loss data of the power grid; Determining a flexibility margin sum of the upward flexibility margin and the downward flexibility margin; Determining a sum of transmission margin ratios of transmission margin ratios of all lines in the power grid; and taking the minimum total loss, the maximum total flexibility margin and the maximum total transmission margin as the multiple objectives; Setting respective constraints on the power flow of the power grid, the gas turbine, the interruptible load, the upper power grid and the flexibility margin; According to the multiple objectives, a multi-objective group algorithm is used to optimize the preset scheduling model under the respective constraints; Among them, according to the formula shown below, the minimum total loss is expressed and used as one of the optimization goals: Where T represents the scheduling period, represents the first loss coefficient preset for the mth micro gas turbine, represents the second loss coefficient preset for the mth micro gas turbine, represents the third loss coefficient preset for the mth micro gas turbine, represents the depreciation value of the nth energy storage unit, represents the number of charge and discharge cycles of the nth energy storage unit, represents the compensation value of the kth interruptible load at time t, It represents the loss value of electric energy connected from the upper power grid at time t, represents the loss value of the power grid at time t; The maximum node flexibility is expressed as follows and is used as one of the optimization goals: Among them, s represents the state variable of the flexibility margin at time t, which is 1 when it indicates upward and 0 when it indicates downward; The sum of the transmission margin rates of all transmission lines in the power grid is determined according to the following formula and used as one of the optimization objectives: Where B represents the set of all transmission lines, It represents the transmission margin rate of line ij at time t.
3. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable by the processor, It is characterized in that When the processor executes the computer program, the method according to claim 1 is implemented.
4. A non-transitory computer-readable storage medium, It is characterized in that The non-transitory computer-readable storage medium stores computer instructions for causing a computer to execute the method according to claim 1 .
Citation Information
Patent Citations
Power system optimization scheduling method considering wind-solar output prediction errors and demand response flexibility
CN112467730A
Evaluation method for virtual power generation capacity of adjustable load and related equipment
CN116683467A
Source network load storage coordination optimization method and device, equipment and storage medium
CN117236574A
Power distribution network economic optimization scheduling method considering wind-solar random correlation
CN117293794A
Optimized scheduling method and device based on energy sharing mechanism and medium
CN117318179A