A test bench for pump-turbine transition process based on digital twin
Through digital twin technology, combined with the PAT physical model and virtual system, the optimal operation strategy is generated, which solves the problem of slow response speed of the pump turbine system during the transition process, achieves fast response and system stability, and improves the reliability of the power system. Safety and economy.
Patent Information
- Application Number
- CN202410284163.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-13
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-03-13
AI Technical Summary
The existing pump-turbine system responds slowly during the transition process, causing great safety risks. It is difficult to quickly judge and adjust the working conditions, resulting in unstable power systems.
Design a test bed for the pump-to-turbine transition process based on digital twins, including the PAT physical model, PAT virtual system and PAT service system. Through data collection, numerical simulation and machine learning, the optimal operating strategy is generated to quickly respond to the power system. requirements to ensure system stability and security.
It achieves rapid response during the transition process of the pump to turbine, ensures the stability and economy of the small power system, predicts and prevents dangerous conditions during the extreme transition process, and improves the safety of the system.
Smart Images

Figure CN118013858B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of transition process testing, and in particular relates to a test bench for a pump-turbine transition process based on digital twins. Background Art
[0002] With the development of small hydropower, the application of pump as turbine PAT is becoming more and more widespread. Power grid equipment in many rural areas, mountainous areas, islands, etc. is often damaged by natural disasters such as strong winds and heavy rains. However, due to the remote location, complex terrain, and difficulty in maintenance, emergency repairs often take a long time. There are even some remote areas where it is difficult to cover the power grid, and only some ready-made resources can be used for self-generation, such as solar energy, wind energy, and biogas power generation. Therefore, a new power system with new energy (wind power, solar energy, etc.) as the main body should be constructed according to local conditions. However, wind power, solar energy, etc. are typical high-quality energy and low-quality electricity. There are fluctuations, intermittent and instability in power generation, so a storage device is needed to convert low-quality electricity into usable electricity.
[0003] PAT is mainly responsible for frequency and phase modulation in small power systems and rapid response to power systems. Therefore, the PAT system needs to quickly judge and respond to demand conditions. In this process, PAT needs to transition from one stable condition to another, that is, PAT will be in an unstable transition process with rapid performance changes. Previously, most people used empirical judgment and adjustment of the transition process, which had slow response speed and great safety risks. Summary of the invention
[0004] The purpose of the present invention is to provide a test bench for the pump-turbine transition process based on digital twins to solve the problems existing in the above-mentioned prior art.
[0005] To achieve the above object, the present invention provides a test bench for pump-turbine transition process based on digital twin, comprising:
[0006] PAT physical model, PAT service system, PAT virtual system and PAT twin data system;
[0007] The PAT physical model is used to control the pump-turbine transition process and collect data of the pump-turbine transition process;
[0008] The PAT twin data system is used to process the data of the pump-turbine transition process to obtain a measurement database;
[0009] The PAT virtual system is used to perform numerical simulation on the pump-turbine transition process based on the measurement database to obtain the value obtained by the numerical simulation of the PAT virtual system;
[0010] The PAT service system is used to process the values obtained by the numerical simulation of the PAT virtual system, obtain the optimal operation strategy and feed it back to the PAT physical model, and update the measurement database at the same time until the target operating condition is achieved.
[0011] Preferably, the PAT physical model includes: a PAT module, a booster pump module, a control system module, and a collection module;
[0012] The PAT module includes a lower water level tank, a static pressure sensor, a solenoid valve, a flow meter, an upper water level tank, and a variable frequency motor;
[0013] The booster pump module includes a lower water level tank, a solenoid valve, a booster pump, a static pressure sensor, and an upper water level tank;
[0014] The control system module includes a frequency converter, an energy feedback unit, and an electrical cabinet;
[0015] The acquisition module includes a static pressure sensor, a dynamic pressure sensor, a speed torque sensor, a host computer, an acquisition card, and a speed torque sensor.
[0016] Preferably, the upper water level tank is arranged on an adjustable height bracket and is provided with an overflow hole for cooperating with the water level tank to keep the liquid height difference unchanged;
[0017] The booster pump is used to lift the water in the lower water level tank to the upper water level tank, so that the water level in the upper water level tank is maintained at an overflow water level;
[0018] The flow meter is installed at a distance of 10 times the pipe diameter from the upper water level tank to ensure the accuracy of flow measurement.
[0019] Preferably, the PAT twin data system is also used to add flow, outlet pressure, inlet pressure, and valve opening data as a set of states to the database, and at the same time, the flow, pressure, and torque values collected by the acquisition card are processed and passed to the PAT service system.
[0020] Preferably, the PAT twin virtual system includes a numerical simulation module and a dynamic display module;
[0021] The numerical simulation module is used to simulate the measurement database through a boundary condition calculation method, a boundary condition adjustment method, a numerical simulation method and a result preprocessing method;
[0022] The dynamic display module is used to display the test bench twin system interface and the real-time data dynamic change interface.
[0023] Preferably, the PAT service system includes: a machine learning module, an optimal strategy selection module and a judgment module;
[0024] The machine learning module is used to determine the relationship between flow rate, outlet pressure, inlet pressure, and valve opening through machine learning, and to construct a neural network model;
[0025] The optimal strategy selection module is used to find the corresponding strategy through the neural network model to obtain the optimal operation strategy;
[0026] The judgment module is used to judge the matching relationship between the valve opening and the adjustment time, calculate the response time of the optimal strategy, and judge the rationality of the strategy selection.
[0027] Preferably, the expression of the strategy optimization mode of the optimal strategy selection module is:
[0028] Y min =(valve 1 opening'-valve 1 opening) 2 +(Valve 2 opening'-Valve 2 opening) 2 ;
[0029] The valve 1 opening' is the target opening of valve 1, and the valve 1 opening is the current opening of valve 1; the valve 2 opening' is the target opening of valve 2, and the valve 2 opening is the current opening of valve 2. min It is an excellent evaluation indicator.
[0030] Preferably, the PAT service system is also used to evaluate the pressure pulsation value generated during the transition process of the numerical simulation, determine that the amplitude of the pressure pulsation is within a safe range, and ensure that the frequency of the pressure pulsation is inconsistent with the resonant frequency of the unit, and then transmit the new valve opening to the PAT physical model.
[0031] The technical effects of the present invention are:
[0032] The purpose of the present invention is to build a test system based on digital twins that can be applied to the transition process of pumps as turbines. Through experimental research methods, the optimal strategy in the transition process is found, small power systems are quickly responded to, and the stability and economy of the power system are guaranteed. Secondly, the present invention conducts experimental design for the extreme transition process: the power-off transition process of the pump working condition, predicts the consequences of dangerous working conditions, and ensures the safety of PAT in actual operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] The drawings constituting a part of the present application are used to provide a further understanding of the present application. The illustrative embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0034] Figure 1 : is a logical relationship diagram of the PAT digital twin system in an embodiment of the present invention;
[0035] Figure 2Schematic diagram of a PAT physical model system in an embodiment of the present invention;
[0036] Figure 3 Schematic diagram of a PAT virtual system in an embodiment of the present invention;
[0037] Figure 4 Schematic diagram of a PAT service system in an embodiment of the present invention; DETAILED DESCRIPTION
[0038] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0039] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0040] Embodiment 1
[0041] like Figure 1-4 As shown, in this embodiment, a test bench for the pump-turbine transition process based on digital twin is provided, including:
[0042] They are PAT physical model, PAT service system, PAT twin virtual system and PAT twin data system.
[0043] The PAT physical model includes: a test bench for the pump-turbine transition process, including: a PAT module, a booster pump module, a control system module, and a collection module.
[0044] The booster pump module comprises a lower water level tank, a solenoid valve, a booster pump, a static pressure sensor and an upper water level tank.
[0045] The PAT module includes a lower water level tank, a static pressure sensor, a solenoid valve, a flow meter, an upper water level tank, and a variable frequency motor.
[0046] The control system module includes: frequency converter, energy feedback unit, electrical cabinet;
[0047] The acquisition module includes: static pressure sensor, dynamic pressure sensor, speed torque sensor, host computer, acquisition card, speed torque sensor;
[0048] The upper water level tank is arranged on an adjustable height bracket and is provided with an overflow hole, which cooperates with the lower water level tank to keep the liquid height difference unchanged. The booster pump is mainly used to lift the water in the lower water level tank to the upper water level tank, so that the water level in the upper water level tank is always maintained at the overflow water level to ensure the stability of the water head. The flow meter is installed at a distance of 10 times the pipe diameter from the upper water level tank to ensure the accuracy of the flow measurement. The solenoid valve, through the operation of the PAT service system, is precisely controlled by the control system to control the valve opening and quickly respond to the needs of the power system. Flow meter: measures the flow data in the PAT physical model system and transmits it to the PAT twin data system through the acquisition card. PAT: is the core component of the physical model system, which meets the power consumption conditions of the water pump and the power generation conditions of the turbine. It can balance the reactive power and active power in the power system and reduce the system volatility caused by the input of unstable electric power. Torque meter: mainly used to measure torque and transmit the torque value to the twin data. Frequency converter: used to adjust the speed of PAT and booster pump.
[0049] The PAT service system includes a first part: providing an operating strategy for the transition of the operating state of the PAT physical model. The second part is to judge whether the results of the numerical simulation of the PAT twin virtual system are safe and reasonable. The main contents of the first part include: a machine learning module and an optimal strategy selection module. Machine learning module: Determine the relationship between flow, outlet pressure, inlet pressure, and valve opening through machine learning. Through the determined neural network model, according to the P' required by the power system, find (P'-P) / P'≤0.01, find the X value according to P, that is, multiple groups of strategies, find the current optimal strategy in the multiple groups of strategies, extract the valve opening in the strategy, and perform the following strategy optimization method:
[0050] Y min =(valve 1 opening'-valve 1 opening) 2 +(Valve 2 opening'-Valve 2 opening) 2
[0051] The second part: By judging the matching relationship between valve opening and adjustment time, the response time of the optimal strategy is calculated to judge the rationality of the strategy selection. If the time is too long, the number of strategy groups will be reselected.
[0052] The maximum pressure pulsation of the PAT virtual system is compared with the maximum pressure pulsation and natural frequency that the unit can withstand, and the data is exchanged with the PAT physical model under safe circumstances.
[0053] The PAT virtual system includes a numerical simulation module and a dynamic display module: boundary condition calculation method, boundary condition adjustment method, numerical simulation method, result preprocessing method
[0054] The dynamic display module includes: the test bench twin system interface and the real-time data dynamic transformation interface. The PAT virtual system is the digital twin of the PAT physical model. The data in the PAT physical simulation system is transferred to the PAT virtual system through the PAT twin data system, so that the boundary starting state in the PAT virtual system is highly consistent with the PAT physical model system. In addition, the strategy scheme given by the PAT service system is numerically simulated, and the torque value, power value and pressure pulsation vibration are output to the PAT twin data system. The PAT twin data system transmits the values obtained by the numerical simulation of the PAT virtual system to the PAT service system, which judges the rationality and safety of the strategy and then passes the strategy to the PAT physical model.
[0055] The PAT twin data system includes: building a database: data is measured from the PAT physical model system, and after processing by the PAT twin data system, the flow, outlet pressure, inlet pressure, and valve opening data are added to the database as a set of states. The flow, pressure, and torque values collected by the acquisition card are processed and passed to the PAT service system. In the PAT service system, the data is calculated and processed and then passed to the PAT twin data system. The PAT twin data system then passes this part of the data to the PAT virtual system, which is first simulated in the PAT virtual system, and the simulated data is then passed to the PAT twin data system, and the data is passed to the PAT physical model through the PAT twin data system. It is worth noting that the number of numerical simulation steps in the PAT virtual system is small. This can ensure the speed of response and predict faults in advance.
[0056] This embodiment also provides a test method for a pump-turbine transition process based on digital twins, including:
[0057] The first step is to build a database, using the PAT physical model to build a database of the pump-turbine transition process. And for the built database, the neural network learning method is used to fit the mathematical model.
[0058] Step 2: In the PAT physical model, there are two branches. PAT branch water flow direction: upper water level tank-flow meter-first static pressure sensor-first solenoid valve-PAT-second solenoid valve-second static pressure sensor-lower water level tank. Booster pump branch water flow direction: lower water level tank-third solenoid valve-boost pump-fourth solenoid valve-static pressure sensor 3-upper water level tank. First open the third solenoid valve in the booster pump branch and start the booster pump. When the water fills the entire pump cavity, gradually open the solenoid valve to increase the flow rate until the design flow rate. When the water flow in the booster pump branch fills the entire upper water level tank, control the first solenoid valve and the second solenoid valve so that the pump turbine speed reaches 90% of the rated speed, and then start the motor excitation function to generate a stable voltage. Adjust the first solenoid valve and the second solenoid valve so that the power reaches the current test power.
[0059] Step 3: The data in the PAT physical model at this time is passed to the PAT twin virtual system through the PAT twin data system, the corresponding CCL language is formed using Python language, and the CCL language is imported into the ANSYS Workbech platform, which is used to perform numerical simulation on the working conditions of the current test power of PAT.
[0060] Step 4: The simulated power system requirement target is transmitted to the PAT service system through the PAT twin data system. Using the database established in step 1, according to the simulated target operating conditions, the corresponding strategy is found according to the mathematical model obtained by the neural network. The strategy search is stopped when 30 sets of strategies are limited.
[0061] Step 5: Select the optimal strategy. The optimal evaluation index is shown in the following formula.
[0062] Y = (valve 1 opening'-valve 1 opening) 2 +(Valve 2 opening'-Valve 2 opening) 2
[0063] Among them, valve 1 opening' is the target opening of valve 1, and valve 1 opening is the current opening of valve 1; valve 2 opening' is the target opening of valve 2, and valve 2 opening is the current opening of valve 2.
[0064] Step 6: Pass the optimal strategy data value to the PAT virtual system. In the PAT virtual system, the change value of the valve opening is split, and the splitting index is that the change rate θ does not exceed 3%.
[0065]
[0066] Op in the formula d Op represents the valve opening at the moment after the split, and Op represents the valve opening at the moment before the split.
[0067] Step 7: The split valve opening is converted into a corresponding CCL language through Python language, and the CCL language is imported into the ANSYS Workbech platform. The previous working condition is used as the initial working condition to form a numerical simulation calculation of the transition process. The calculation results are passed to the PAT service system through the PAT twin data system.
[0068] Step 8: In the PAT service system, the pressure pulsation value generated during the transition process of the numerical simulation is evaluated to determine that the amplitude of the pressure pulsation is within a safe range and that the frequency of the pressure pulsation is consistent with the resonant frequency of the unit. Then, the new valve opening is passed to the PAT physical model.
[0069] Step 9: Pass the operating data of the PAT physical model to the PAT service model through the twin data model, update the database, and repeat steps 1 to 9 until the target operating condition is reached.
[0070] Embodiment 2
[0071] In this embodiment, a test bench for a pump-turbine transition process based on digital twin is provided, comprising:
[0072] Upper water level tank, lower water level tank, static pressure sensor, solenoid valve, flow meter, PAT, booster pump, frequency converter, control cabinet, energy feedback unit, electrical cabinet, speed torque sensor, sensor, host computer, acquisition card.
[0073] Upper and lower water level tanks: connect the water inlet and outlet pipes to make
[0074] H=H 溢 -H1
[0075] Where, H is the water head; H 溢 is the height of the overflow hole of the upper water level tank, which remains unchanged; H1 is the height of the lower water level tank, which remains unchanged, so H remains stable.
[0076] The booster pump is mainly used to lift the water in the lower water level tank to the upper water level tank, so that the water level in the upper water level tank is always maintained at the overflow level to ensure the stability of the water head. The flow meter is installed at a distance of 10 times the pipe diameter from the upper water level tank to ensure the accuracy of the flow measurement.
[0077] The solenoid valve, through the calculation of the PAT service system, the control system accurately controls the valve opening and quickly responds to the needs of the power system.
[0078] Flow meter: measures the flow data in the PAT physical model system and transmits it to the PAT twin data system through an acquisition card.
[0079] PAT: It is the core component of the physical model system, which meets both the power consumption of the pump and the power generation of the turbine. It can balance the reactive power and active power in the power system and reduce the system volatility caused by the input of unstable power.
[0080] Speed and torque sensing: mainly used to measure torque and transmit the torque value to twin data.
[0081] Variable frequency motor: used to adjust the speed of PAT. By adjusting the speed, the power storage or power consumption can be adjusted.
[0082] P=9.81Q(H2-H1)*η t
[0083] The present invention mainly designs a test bench for the pump-turbine transition process based on digital twin. The test bench mainly includes four systems, namely, PAT physical model system, PAT virtual system, PAT service system and PAT twin data system. These four systems cooperate with each other to provide a good way for the test and operation of the PAT transition process.
[0084] Twin data: It is the center of the entire digital twin. Including: acquisition data, simulation data, database
[0085] The flow, pressure, and torque values collected by the acquisition card are processed and passed to the PAT service system. In the PAT system, the data is calculated and processed and then passed to the PAT twin data system. The PAT twin data system then passes this part of the data to the PAT virtual system, where simulation is first performed. The simulated data is then passed to the PAT twin data system, and the data is passed to the PAT system through the PAT twin data system. It is worth noting that the number of numerical simulation steps in the PAT virtual system is small. This ensures the speed of response and predicts faults in advance.
[0086] PAT virtual system: It is the digital twin of the PAT physical model. It includes numerical simulation module and dynamic display module. The numerical simulation module includes: boundary condition calculation method, boundary condition adjustment method, numerical simulation method, result preprocessing method
[0087] The dynamic display module includes: test bench twin system interface, real-time data dynamic transformation interface. The data in the PAT physical simulation system is transferred to the PAT virtual system through the PAT twin data system, so that the boundary starting state in the PAT virtual system is highly consistent with the PAT physical model system. And the strategy scheme given by the PAT service system is numerically simulated, and the torque value, power value and pressure pulsation vibration are output to the PAT twin data system. The PAT twin data system transmits the values obtained by the numerical simulation of the PAT virtual system to the PAT service system, which judges the rationality and safety of the strategy and then passes the strategy to the PAT physical model.
[0088] PAT service system: It is the decision-making layer of the digital twin, which mainly includes two parts. The first part: provides an operating strategy for the change of the operating state of the PAT physical model. The second part is to judge whether the results of the numerical simulation of the PAT twin virtual system are safe and reasonable. The main contents of the first part include: machine learning module and optimal strategy selection module. Machine learning module: Determine the relationship between flow, outlet pressure, inlet pressure, and valve opening through machine learning. Through the determined neural network model, according to the P' required by the power system, find (P'-P) / P'≤0.01, and find the electromagnetic valve opening value according to P, that is, multiple groups of strategies, find the current optimal strategy in multiple groups of strategies, extract the valve opening in the strategy, and perform the following strategy optimization method:
[0089] Y min =(valve 1 opening'-valve 1 opening) 2 +(Valve 2 opening'-Valve 2 opening) 2
[0090] Part 2: Calculate the response time of the optimal strategy through the matching relationship between valve opening and adjustment time to judge the rationality of strategy selection. If the time is too long, reselect the number of strategy groups.
[0091] The maximum pressure pulsation of the PAT virtual system is compared with the maximum pressure pulsation and natural frequency that the unit can withstand, and the data is exchanged with the PAT physical model under safe circumstances.
[0092] Embodiment 3
[0093] In this embodiment, a test bench for a pump-turbine transition process based on digital twin is provided, comprising:
[0094] This embodiment simulates that when the current PAT physical model is in the turbine operating condition power of 2Kw, the power system requires the target operating condition turbine operating power to be 3Kw.
[0095] Step 1: Build a database. Adjust the variable frequency motor through the control cabinet to obtain the corresponding relationship between multiple groups of solenoid valves i (i = 1, 2, 3, 4), static pressure sensors i (i = 1, 2, 3), torque values, flow meters, upper and lower water level differences and power values. When PAT is set to work as a water pump, the power value is negative; when PAT is set to work as a turbine, the power value is positive. Collect 80 sets of data for positive power values and negative power values respectively. These data are transmitted to the PAT service system through the PAT twin data system. Create a database through the MySQL system in the PAT service system.
[0096] Step 2: Apply machine learning methods to the database established in step 1 to establish a mathematical model. The main steps are as follows:
[0097] 1. Grid initialization, extract data X and power P from the database, determine the number of neurons in the grid input layer, hidden layer and output layer. Set the connection weight v at each node between the input layer and hidden layer, hidden layer and output layer ij ,w jk , initialize the hidden layer threshold a and the output layer threshold b.
[0098] 2. Hidden layer output calculation:
[0099]
[0100] In the formula, v i0 =-1,x0=a j ; f(x) is the hidden layer transfer function.
[0101]
[0102] 3. Output layer output calculation.
[0103]
[0104] 4. Error calculation.
[0105]
[0106] 5. Weight update.
[0107] v ij =v ij +Δv ij w jk =w jk +Δw jk
[0108]
[0109]
[0110]
[0111] Where η is the learning rate.
[0112] 6. When the model error is less than 0.01, the update ends.
[0113] Step 3: Adjust the solenoid valve i (i=1,2,3,4), static pressure sensor i (i=1,2,3), torque value, flow meter, upper and lower water level difference, so that the PAT physical model is in turbine working condition, and the power is 2Kw in the forward direction. In the PAT physical model, there are two branches. The water flow direction of the PAT branch: upper water level tank-flow meter-first static pressure sensor-first solenoid valve-PAT-second solenoid valve-second static pressure sensor-lower water level tank. The water flow direction of the booster pump branch: lower water level tank-third solenoid valve-boosting pump-fourth solenoid valve-static pressure sensor 3-upper water level tank. The flow rate of the PAT branch is 21.3m 3 / h, the booster pump outlet in the booster pump branch controlled by the control cabinet is a fixed pressure outlet, and the outlet pressure is set to 1.5×10 5 Pa, the difference between upper and lower water levels in the tank is 5m.
[0114] Step 4: The data in the PAT physical model at this time is passed to the PAT twin virtual system through the PAT twin data system, and the corresponding CCL language is formed using Python language. The CCL language is imported into the ANSYS Workbech platform, and the platform is used to perform numerical simulation of the PAT turbine operating condition with a power of positive 2Kw.
[0115] Step 5: The PAT twin data system transmits the power system requirement target, i.e., transition to the turbine operating condition of positive 3Kw, to the PAT service system. In the mathematical model established in step 2, the corresponding strategy is found according to the target operating condition, and the strategy search is stopped when 30 sets of corresponding strategies are set as the limit.
[0116] Step 6: Select the optimal strategy. The optimal evaluation index is shown in the following formula.
[0117] Y = (valve 1 opening'-valve 1 opening) 2 +(Valve 2 opening'-Valve 2 opening) 2;
[0118] Among them, valve 1 opening' is the target opening of valve 1, and valve 1 opening is the current opening of valve 1; valve 2 opening' is the target opening of valve 2, and valve 2 opening is the current opening of valve 2.
[0119] Step 7: Pass the optimal strategy data value to the PAT virtual system. In the PAT virtual system, the change value of the valve opening is split, and the splitting index is that the change rate θ does not exceed 3%.
[0120]
[0121] Op in the formula d Op represents the valve opening at the moment after the split, and Op represents the valve opening at the moment before the split.
[0122] Step 8: The split valve opening is converted into a corresponding CCL language through Python language, and the CCL language is imported into the ANSYS Workbech platform. The previous working condition is used as the initial working condition to form a numerical simulation calculation of the transition process. The calculation results are passed to the PAT service system through the PAT twin data system.
[0123] Step 9: In the PAT service system, the pressure pulsation value generated during the transition process of the numerical simulation is evaluated to determine that the amplitude of the pressure pulsation is within a safe range and that the frequency of the pressure pulsation is inconsistent with the resonant frequency of the unit. Then, the new valve opening is passed to the PAT physical model.
[0124] Step 10: Pass the operating data of the PAT physical model to the PAT service model through the twin data model, update the database, and repeat steps 1 to 9 until the target operating condition is reached.
[0125] The above is only a preferred specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A test bench for pump-turbine transition process based on digital twin, It is characterized in that include: PAT physical model, PAT service system, PAT twin virtual system and PAT twin data system; The PAT physical model is used to control the pump-turbine transition process and collect data of the pump-turbine transition process; The PAT twin data system is used to process the data of the pump-turbine transition process to obtain a measurement database; The PAT twin virtual system is used to perform numerical simulation on the pump-turbine transition process based on the measurement database to obtain the value obtained by the numerical simulation of the PAT virtual system; The PAT service system is used to process the values obtained by the numerical simulation of the PAT virtual system, obtain the optimal operation strategy and feed it back to the PAT physical model, and update the measurement database at the same time until the target operating condition is achieved; The PAT service system includes: a machine learning module, an optimal strategy selection module and a judgment module; The machine learning module is used to determine the relationship between flow rate, outlet pressure, inlet pressure, and valve opening through machine learning, and to construct a neural network model; The optimal strategy selection module is used to find the corresponding strategy through the neural network model to obtain the optimal operation strategy; The judgment module is used to judge the matching relationship between the valve opening and the adjustment time, calculate the response time of the optimal strategy, and judge the rationality of the strategy selection; The expression of the strategy optimization mode of the optimal strategy selection module is: Ymin = (valve 1 opening'-valve 1 opening) 2 +(Valve 2 opening'-Valve 2 opening) 2 ; Among them, valve 1 opening' is the target opening of valve 1, valve 1 opening is the current opening of valve 1; valve 2 opening' is the target opening of valve 2, valve 2 opening is the current opening of valve 2, and Ymin is the evaluation index; The PAT service system is also used to evaluate the pressure pulsation value generated during the transition process of the numerical simulation, determine that the amplitude of the pressure pulsation is within a safe range, and ensure that the frequency of the pressure pulsation is inconsistent with the resonant frequency of the unit, and then transmit the new valve opening to the PAT physical model.
2. The test bench for pump-turbine transition process based on digital twinning according to claim 1, It is characterized in that The PAT physical model includes: a PAT module, a booster pump module, a control system module, and a collection module; The PAT module includes a lower water level tank, a static pressure sensor, a solenoid valve, a flow meter, an upper water level tank, and a variable frequency motor; The booster pump module includes a lower water level tank, a solenoid valve, a booster pump, a static pressure sensor, and an upper water level tank; The control system module includes a frequency converter, an energy feedback unit, and an electrical cabinet; The acquisition module includes a static pressure sensor, a dynamic pressure sensor, a speed torque sensor, a host computer, an acquisition card, and a speed torque sensor.
3. The test bench for pump-turbine transition process based on digital twin according to claim 2, It is characterized in that The upper water level tank is arranged on the height-adjustable bracket and is provided with an overflow hole for cooperating with the water level tank to keep the liquid height difference unchanged; The booster pump is used to lift the water in the lower water level tank to the upper water level tank, so that the water level in the upper water level tank is maintained at an overflow water level; The flow meter is installed at a distance of 10 times the pipe diameter from the upper water level tank to ensure the accuracy of flow measurement.
4. The test bench for pump-turbine transition process based on digital twin according to claim 2, It is characterized in that The PAT twin data system is also used to add flow, outlet pressure, inlet pressure, and valve opening data as a set of states to the database, and at the same time, the flow, pressure, and torque values collected by the acquisition card are processed and transmitted to the PAT service system.
5. The test bench for pump-turbine transition process based on digital twinning according to claim 1, It is characterized in that The PAT twin virtual system includes a numerical simulation module and a dynamic display module; The numerical simulation module is used to simulate the measurement database through a boundary condition calculation method, a boundary condition adjustment method, a numerical simulation method and a result preprocessing method; The dynamic display module is used to display the test bench twin system interface and the real-time data dynamic change interface.
Citation Information
Cited By
Test-bed for pump as turbine transition process based on digital twinning
US12540595B2