By integrating user intentions and knowledge graphs, the resource scheduling of the edge computing system is optimized, which solves the problem of under- or over-configuration of resources in the edge computing system and improves the automated management and user experience of the system.

CN118034920BActive Publication Date: 2024-10-15GUANGDONG POLYTECHNIC NORMAL UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410125133.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-29
Publication Date
2024-10-15
Estimated Expiration
2044-01-29

AI Technical Summary

Technical Problem

In existing edge computing systems, network management efficiency is low and user intentions are difficult to truly reflect, resulting in under- or over-configuration of resources and the inability to meet the low-latency and efficient computing needs of industrial and manufacturing users.

Method used

A collaborative scheduling method for network computing resources that integrates user intentions and knowledge graphs is adopted. By constructing an edge computing knowledge graph, user intentions and system status are periodically monitored, scheduling strategies are generated and updated, and resource allocation and utilization are optimized.

Benefits of technology

It improves the automation capabilities of network management, reduces manual intervention, avoids waste of resources, provides a more personalized user experience, and improves the resource utility and performance of edge computing systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118034920B_ABST
    Figure CN118034920B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for collaborative scheduling of network computing resources integrating user intention and knowledge graph, which relates to the field of edge computing technology. The key points of its technical solution are: constructing an edge computing knowledge graph ontology model, constructing a knowledge graph of the edge computing system based on the ontology model and collected edge computing system information, generating a collaborative scheduling strategy for network computing resources according to the input user intention and knowledge graph and sending it to the edge computing system for execution, and updating the collaborative scheduling strategy and knowledge graph of network computing resources according to the state change of the edge computing system. Through this method, the intention of the application user is automatically converted into a network computing resource demand that can be recognized by the edge computing system, and the strategy for collaborative scheduling of network and computing power resources is automatically generated and executed, thereby enhancing the automation capability of network management, improving the resource utility of the edge computing system, and meeting the service experience satisfaction requirements of the application user.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of edge computing technology, and more specifically, to a method for collaborative scheduling of network computing resources that integrates user intent and knowledge graphs. Background Art

[0002] Today, industries such as industry, agriculture, and manufacturing are undergoing rapid development in terms of intelligence, networking, digitization, and high-end development, and are greatly supported by information technologies such as 5G / 6G, artificial intelligence, big data, and advanced computing. This development trend will push human society into the era of intelligence, and the digital world and the physical world will be seamlessly integrated, providing impetus for the sustainable development of the economy and society. In the vision of 6G, humans, machines, objects, and the environment will collaborate in multiple dimensions, and the production processes of industry, agriculture, and manufacturing will be fully automated and intelligent over a long period of time. To achieve this vision, equipment and products in various fields will integrate sensors, communication modules, and even computing capabilities, and production areas will be filled with various devices with communication and computing capabilities, such as high-definition cameras, sensors, and operating robots, which are called terminal devices. During the production process, these terminal devices will generate and collect a large amount of data. In order to maximize the value of these data, it is necessary to perform fast and efficient computational processing on these data.

[0003] In the traditional cloud computing paradigm, the data generated by the terminal device needs to be transmitted to the remote cloud computing center through the access network and core network for processing, which causes the data to often experience a network delay of more than several hundred milliseconds, which cannot meet the low latency requirements of 6G applications. However, the edge computing that has emerged in recent years has provided a new paradigm, providing a solution for the fast and efficient computing and processing of data, and has also become one of the important technologies for the development of 6G. In the edge computing paradigm, the terminal device that generates data can migrate the data to the edge server at the edge of the network or perform computing and processing in the local computing node. Through computing migration, edge computing effectively reduces the network delay of data transmission. However, compared with cloud computing, the computing power of terminal devices and edge servers is relatively limited, and a single node is difficult to meet the high-performance computing requirements of massive data. In addition, the computing power of terminal devices and edge servers is highly heterogeneous, the network transmission delay of local computing and edge computing is diverse, and the wireless environment is also dynamic. Therefore, it is urgent to carry out end-edge cooperation and coordinated scheduling of network computing resources, that is, to formulate a coordinated scheduling strategy based on the computing power of the terminal device and edge server, as well as the network capacity of the network transmission path between the data source and the computing node, so that part of the data is processed locally on the IoT terminal device, while the other part of the data is migrated to the edge server for processing. Through end-edge cooperation and coordinated scheduling of network computing resources, the ability of edge computing can be improved.

[0004] At present, researchers are committed to conducting research on the coordinated scheduling of network computing resources in edge computing systems to achieve goals such as minimizing latency and minimizing energy consumption. However, most existing scheduling methods only focus on computing migration strategies, or jointly optimize computing migration strategies with wireless bandwidth and computing resource allocation of edge servers. At the same time, in existing research methods, it is usually assumed that the computing power and network resource requirements of computing tasks are known. The actual situation is that in a real edge computing environment, network managers need to collect application requirements of users such as industry and manufacturing, and convert them into computing power and network resource requirements that can be recognized by the edge computing system, and then schedule network computing resources through manual configuration. This method not only leads to inefficient network management, but also is subject to the lack of knowledge of industrial and manufacturing users in communication networks and high-performance computing, as well as the limitations of network maintenance personnel in the field of industry and manufacturing. Therefore, the resource requirements initiated by network personnel in edge computing systems often cannot truly reflect the intentions of industrial and manufacturing users, resulting in over-configuration of network computing resources and waste of resources, or under-configuration leading to a decline in user service experience. These challenges need to be addressed to better achieve the coordinated scheduling of network computing resources. Summary of the invention

[0005] The purpose of the present invention is to provide a method for collaborative scheduling of network computing resources that integrates user intentions and knowledge graphs to solve the problems of over-configuration of network computing resources, waste of resources, low network management automation capabilities, and resource utility of edge computing systems in the prior art.

[0006] The above technical objectives of the present invention are achieved through the following technical solutions: a method for collaborative scheduling of network computing resources integrating user intention and knowledge graph, comprising the following steps:

[0007] S101: Construct an edge computing knowledge graph ontology model based on the concepts and information used to describe computing power networks and edge computing;

[0008] S102: Constructing a knowledge graph of the edge computing system based on the collected network information and computing power information of the edge computing system and the ontology model described in step S101, specifically including: determining the relationship between network nodes, computing nodes, computing power entities, and entity attributes according to the basic relationship between ontologies in the ontology model described in step S101, and taking the above entities and entity attributes as vertices and the above relationships as edges to construct a knowledge graph of the edge computing system;

[0009] S103: Periodically monitor user intent; generate a network computing resource collaborative scheduling strategy by judging the user's input intent, the timeliness of the user's intent, and the knowledge graph in step S102, and send it to the edge computing system for execution, update the knowledge graph, handle the situation where the intent is expired, and periodically monitor the user's intent;

[0010] S104: Periodically monitor the status of the edge computing system; based on changes in the monitored edge computing system status, update the network computing resource collaborative scheduling strategy of the edge computing system and send it to the edge computing system for execution, and update the knowledge graph described in step S102.

[0011] By adopting the above technical solution, the present invention can more accurately analyze and understand user needs by integrating user intentions and knowledge graphs, and perform resource scheduling in combination with the actual situation of the edge computing system, thereby avoiding resource waste and over-configuration and improving the utilization efficiency of network computing resources; the present invention also automatically generates scheduling strategies by periodically monitoring user intentions and the status of the edge computing system, and sends them to the edge computing system for execution, which can reduce the workload of manual intervention and management, improve the automation capability of network management, and reduce the risk of errors;

[0012] Under the current background of growing demands for intelligence and personalization, the present invention can better meet users' personalized needs by integrating user intentions and knowledge graphs, and generate corresponding scheduling strategies and resource allocations by analyzing user input intentions, thereby providing a more customized and personalized user experience and increasing user satisfaction. The present invention not only comprehensively considers multiple factors such as user intentions, system status, and resource information, but also optimizes the utilization efficiency and performance of resources in the edge computing system by generating appropriate scheduling strategies, thereby improving the resource utility of the entire edge computing system and improving the performance and response speed of the system.

[0013] The present invention is further configured as follows: Step S103 of updating the knowledge graph specifically includes the following steps:

[0014] S50-A: Identify user intention and update the knowledge graph of the edge computing system;

[0015] S50-B: Generate a network computing resource collaborative scheduling strategy based on the knowledge graph described in step S50-A and send it to the edge computing system for execution;

[0016] S50-C: Update the knowledge graph described in step S50-A according to the scheduling strategy described in step S50-B.

[0017] By adopting the above technical solution, the present invention can understand the user's current needs and intention changes by identifying the user's intention, and update the information related to the user in the knowledge graph, so as to track and reflect the user's needs changes in real time and maintain the accuracy and real-time performance of the knowledge graph; based on the information in the knowledge graph and the user's intention, generate a suitable resource scheduling strategy, including selecting appropriate computing nodes, network transmission paths and weight allocation, etc., so as to optimize the allocation and utilization of resources and improve the performance and efficiency of the edge computing system; according to the generated scheduling strategy, update the information related to resource scheduling in the knowledge graph, including updating the node status, updating the resource allocation, etc., so as to maintain the accuracy and real-time performance of the knowledge graph, achieve more efficient resource scheduling, improve the performance and efficiency of the edge computing system, and the update of user intention can also provide a better personalized user experience. .

[0018] The present invention is further configured as follows: Step S50-A specifically includes the following steps:

[0019] S50-A01-S50-A02: determining whether the user's intention is expressed in text form and converting it into text form;

[0020] S50-A03: Using a named entity recognition method to identify a keyword group in the user's intended text described in S50-A01;

[0021] S50-A04 to S50-A06: According to the user intention identification number and the change of the keyword group in S50-A03, determine whether the intention already exists in the knowledge graph, determine whether the keyword group of the intention has changed, and add a user intention entity in the knowledge graph;

[0022] S50-A07 to S50-A14: updating the attributes of the user intent entity and its associated entities in the support graph according to the parameter information contained in the keyword group described in S50-A03; the parameter information includes application scenario information, business information, computing power service demand information, and network service demand information;

[0023] S50-A15: Check the resource demand path of the user's intention in the knowledge graph, and update the knowledge graph accordingly;

[0024] S50-A16: Abandon the intention and end the knowledge graph update process.

[0025] By adopting the above technical solution, the present invention can describe user needs more clearly and intuitively by using user intent in text form, which is convenient for subsequent analysis and processing. By converting user intent into text form, different forms of user intent can be uniformly processed, thereby improving the compatibility and usability of the system. The present invention can more accurately understand user needs and intentions by identifying keyword phrases, thereby accurately updating user intent entities in the knowledge graph to maintain the accuracy and completeness of the knowledge graph. And by updating attribute information, the specific characteristics of user intent and needs can be described in more detail, providing more accurate resource scheduling strategies and services.

[0026] By checking the resource demand path, the present invention can understand the status and path of the current resource scheduling, and timely update the knowledge graph to meet the resource allocation requirements, so as to ensure the accuracy and efficiency of resource scheduling; the present invention completes the update process of the knowledge graph to ensure the consistency and synchronization of the knowledge graph with the user's intention, provide an accurate basis for the subsequent resource scheduling strategy generation and execution, and realize accurate and real-time updating of the knowledge graph, thereby providing more accurate resource scheduling strategies and services, which can improve the flexibility and accuracy of resource scheduling, thereby improving the performance and efficiency of the edge computing system and providing a better user experience.

[0027] The present invention is further configured as follows: Step S50-B specifically includes the following steps:

[0028] S50-B01: Extract the location information of the data source according to the input user intention information, and establish the data source relationship between the business entity and the corresponding data source node in the knowledge graph;

[0029] S50-B02: Based on the extracted user intent data source node entities, an intent data source set is formed in the knowledge graph, and the existence of each source node is checked and processed accordingly in the knowledge graph;

[0030] S50-B03~S50-B04: Determine whether the collaborative offloading data source set is empty, and call the resource scheduling strategy for each source node to determine the best transmission path, target computing node set and offloading weight vector;

[0031] S50-B05: Generate resource scheduling instructions based on the optimal parameters of each source node, and send them to related network nodes and computing nodes for execution.

[0032] By adopting the above technical solution, the present invention can accurately indicate the location and access method of the data source node by extracting the location information of the data source, and establish the data source relationship in the knowledge graph, which can clearly describe the data source and association of different entities. In this way, accurate data information support can be provided for subsequent resource scheduling and unloading; by checking and processing the existence of each source node, the accuracy and integrity of the data source node in the knowledge graph can be guaranteed; finally, by determining the optimal transmission path and the target computing node set, the effect of collaborative unloading can be achieved, the computing load of the edge computing node can be reduced, and the subsequent issuance and execution of resource scheduling instructions can realize the dynamic allocation and optimization of resources, and improve the performance and efficiency of the edge computing system; the above method can realize collaborative unloading, reduce the computing load, and improve the performance and efficiency of the edge computing system. The management and processing of the data source node can also provide more accurate resource scheduling and services, so that the present invention can solve the problem of resource scheduling and unloading, and promote the development and application of edge computing systems.

[0033] The present invention is further configured as follows: Step S50-C specifically includes the following steps:

[0034] S50-C01: Find the business entities related to the source node entity from the knowledge graph;

[0035] By searching for triples with the source node as the tail entity and "data source" as the relationship in the knowledge graph, the business entity associated with the source node entity is found;

[0036] S50-C02: Establishing an association relationship between a business entity and an optimal target computing node set;

[0037] With the business entity as the head entity, each computing node in the best target computing node set as the tail entity, and "computed on" as the relationship, an association relationship between the business entity and the best target computing node set is established, and the new triple is added to the knowledge graph;

[0038] S50-C03: Update the available bandwidth of the network node;

[0039] According to each network node in the optimal network transmission path, find the corresponding entity in the knowledge graph and update its total available network bandwidth, that is, subtract the equivalent network bandwidth allocated to the path from the original value;

[0040] S50-C04: Add knowledge of computational offloading;

[0041] Add an offloading vector entity, with the source node as the head entity and the optimal offloading weight vector as the tail entity; add an offloading weight value attribute to the offloading vector entity, the number of which is the same as the number of optimal target computing nodes, and the attribute value is the element value in the optimal offloading weight vector.

[0042] By adopting the above technical scheme, the present invention finds the business entity associated with the source node entity by searching the triple with the source node as the tail entity and "data source" as the relationship in the knowledge graph, so as to establish the association between the origin node and its related business entities, and provide accurate information support for the subsequent association between the target computing node and the network node; the present invention establishes the association relationship between the business entity and the best target computing node set by establishing the business entity as the head entity, each computing node in the best target computing node set as the tail entity, and "computed on" as the relationship, and adds the new triple to the association relationship in the knowledge graph, so as to clearly describe the relationship between the business entity and the best computing node set, and provide accurate association information for resource scheduling and computing offloading;

[0043] The present invention can also dynamically reflect the real-time bandwidth status of network nodes by updating the available bandwidth of network nodes, and provide accurate bandwidth information support for subsequent resource scheduling and network transmission; the present invention adds an unloading vector entity, with the source node as the head entity and the optimal unloading weight vector as the tail entity. An unloading weight value attribute is added to the unloading vector entity, and the number is the same as the number of optimal target computing nodes. The attribute value is the element value in the optimal unloading weight vector, which can clearly describe the relationship and weight distribution between the source node and the optimal unloading target node, so that the dynamic update and improvement of the knowledge graph can be realized, and more precise and accurate information support is provided for subsequent resource scheduling and computing unloading. In this way, the present invention can improve the accuracy and efficiency of resource scheduling and promote the application and development of edge computing systems.

[0044] The present invention is further configured as follows: the processing method of the source node described in step S50-B02 is specifically:

[0045] S50-B0201: Search for computing nodes that meet the computing power requirements of business entities in the knowledge graph to form a candidate set of computing nodes;

[0046] S50-B0202: According to the network topology information in the knowledge graph, find the transmission path that meets the network requirements of the business entity and form a candidate set of network transmission paths for the source node;

[0047] S50-B0203: extracting the intersection of the network transmission path candidate set and the computing node candidate set to form a reachable computing node candidate set;

[0048] S50-B0204: Determine whether the candidate set of reachable computing nodes is empty, if so, jump to step S50-B0206, if not, go to step S50-B0205;

[0049] S50-B0205: Select an optimal network transmission path and a target computing node for the source node from the network transmission path candidate set and set an offloading weight, and put the source node into a completely offloading data source set, and go to step S50-B03;

[0050] S50-B0206: Place the source node into the collaborative offloading data source set, and go to step S50-B03.

[0051] By adopting the above technical scheme, the present invention can search for computing nodes and transmission paths that meet the conditions in the knowledge graph according to the computing power requirements and network requirements of the business entity, select the best target computing nodes and transmission paths, and set appropriate unloading weights; according to the needs of resource scheduling, different unloading methods can be selected for task processing, which can more accurately schedule resources, improve the performance and efficiency of the edge computing system, and meet the needs of the business entity at the same time, so that the present invention can optimize the task processing method and improve resource utilization.

[0052] The present invention is further configured as follows: the specific steps of selecting the best transmission path and target computing node from the network transmission path candidate set and setting the offloading weight in step S50-B0204 are as follows:

[0053] Determining whether there are two or more network transmission paths in the network transmission path candidate set;

[0054] If there are multiple paths, the network computing resource usage cost of each path needs to be calculated, that is, the end-to-end delay, total energy consumption, and total price cost expressed by weighted values;

[0055] Assume that the natural number i represents the i-th path in the candidate set of transmission paths of the source node, D i represents the end-to-end delay of the path, E i Represents the total energy consumption, C i represents the total price cost, then the network computing resource occupation cost g of this path i Expressed as

[0056] g i =a 1 D i +a 2 E i +a 3 C i

[0057] Among them, a 1 、a 2 、a 3Respectively represent weighted values ​​of end-to-end delay, total energy consumption and total price cost, the end-to-end delay includes end-to-end network transmission delay and calculation delay of target computing node, the total energy consumption includes end-to-end network transmission energy consumption and calculation energy consumption of target computing node, and the total price cost includes network transmission cost and calculation cost;

[0058] The network computing resource occupation cost of all paths is calculated according to the above formula, and the path with the minimum cost is selected as the optimal network transmission path. The destination node of the path is used as the optimal target computing node of the source node, and the optimal offloading weight of the target computing node is set to 1;

[0059] If there are not multiple paths in the network transmission path candidate set, the path in the path candidate set is directly used as the optimal network transmission path of the source node, the destination node of the path is used as the optimal target computing node of the source node, and the optimal offloading weight of the target computing node is set to 1.

[0060] By adopting the above technical scheme, the present invention can select the best network transmission path and target computing node according to the network computing resource occupancy cost of the path, and set the corresponding unloading weight. By calculating the cost index of the path, factors such as end-to-end delay, total energy consumption and total price cost can be comprehensively considered to select the best path and target computing node. This can ensure the optimal effect of resource scheduling and unloading, improve the performance and efficiency of the system, and thus the present invention can provide accurate resource scheduling and unloading strategies to meet the needs of different application scenarios.

[0061] The present invention is further configured as follows: Step S104 is a specific method for updating the knowledge graph according to the change of the edge computing system state, comprising the following steps:

[0062] S601: Determine whether the network status of the edge computing system has changed, and if so, update the network status in the knowledge graph;

[0063] S602: Determine whether the change in network status causes a degradation in user service experience. If so, find the affected user intentions and business entities from the knowledge graph and determine the optimal network transmission path set.

[0064] S603: Check whether there is a suitable network transmission path. If so, send it to the edge computing system for execution, and update the corresponding knowledge in the knowledge graph; if not, call the collaborative resource scheduling strategy to determine the best network transmission path, the best target computing node, and the best offloading weight vector, and send the resource scheduling instruction to the relevant nodes for execution, and update the corresponding knowledge in the knowledge graph;

[0065] S604: Determine whether the computing power resources of the edge computing system have changed, and if so, update the status of the computing power resources;

[0066] S605: Determine whether the change in computing power resources affects the user service experience. If so, find the affected user intentions and business entities from the knowledge graph and determine the best target computing node.

[0067] S606: Check whether the available computing power meets the requirements of the optimal target computing node. If so, determine the optimal network transmission path, send the path to the edge computing system for execution, and update the relevant knowledge in the knowledge graph. If it does not meet the requirements, call the collaborative resource scheduling strategy to determine the optimal network transmission path, the optimal target computing node, and the optimal offloading weight vector, and send the resource scheduling instructions to the relevant nodes for execution, and update the relevant knowledge in the knowledge graph.

[0068] By adopting the above technical solution, the present invention can perceive the changes in the network status and computing resource status of the edge computing system in real time through S401 and S404 in step S4, and update them in real time in the knowledge graph, so as to timely reflect the actual operation of the system and provide an accurate data basis for subsequent decision-making, so as to adjust resources and optimize services more timely; the present invention can judge whether the user service experience is affected according to the changes in network status and computing resources, and accurately determine the affected user intentions, business entities, optimal network transmission path sets and optimal target computing nodes, so as to optimize the user experience, adjust resources in time, and ensure system stability and service quality;

[0069] The present invention performs intelligent resource scheduling and collaborative decision-making based on the knowledge graph, dynamically adjusts resource allocation and unloading decisions according to changes in network status and computing resources, and ensures the efficiency and robustness of system operation; the present invention uses the knowledge graph to manage the system's network status, user needs, resource allocation and other information. By updating and maintaining the knowledge graph in real time, comprehensive and accurate information support is provided to the system, making resource scheduling and decision-making more scientific, comprehensive and personalized; the present invention can provide the system's adaptability and flexibility, perform resource scheduling and optimization according to changes in system status, improve the system's robustness and adaptability, and better meet the needs of different global edge computing scenarios.

[0070] The present invention is further configured as follows: the collaborative resource scheduling strategy in step S603 specifically includes the following steps:

[0071] S50-D01: Find available computing nodes that meet the computing threshold in the knowledge graph to form a candidate set of computing nodes for the source node;

[0072] S50-D02: Find the network transmission path that meets the transmission delay threshold based on the network topology knowledge to form a candidate set of network transmission paths for the source node;

[0073] S50-D03: For each set of source and destination nodes in the network transmission path candidate set, retain the path with the shortest end-to-end network transmission delay and delete other paths;

[0074] S50-D04: extracting the intersection of the network transmission path candidate set and the computing node candidate set to form a reachable computing node candidate set of the source node;

[0075] S50-D05: Determine whether the candidate set of reachable computing nodes is empty. If so, jump to step S50-D07. If not, go to step S50-D06.

[0076] S50-D06: Determine the optimal network transmission path set of the source node, the optimal target computing node set and the optimal offloading weight vector;

[0077] S50-D07: If the user's intent cannot be met, the relevant information will be recorded and the relevant knowledge in the knowledge graph will be updated.

[0078] By adopting the above technical scheme, the present invention finds the available computing power nodes that meet the computing threshold and the network transmission path that meets the transmission delay threshold in the knowledge graph, and forms a computing node candidate set and a network transmission path candidate set of the source node, which are used to integrate the considerations of computing power and network transmission, and provide a data basis for subsequent resource scheduling; subsequently, the present invention evaluates each group of source and destination nodes in the network transmission path candidate set, retains the path with the shortest end-to-end network transmission delay, and deletes other paths, thereby ensuring the selection of the optimal network transmission path, thereby improving the efficiency and quality of data transmission; the present invention extracts the intersection of the network transmission path candidate set and the computing node candidate set to form a reachable computing node candidate set of the source node, thereby ensuring the matching of the selected computing node with the network transmission path, and providing a more targeted choice for resource scheduling; the present invention also judges whether the reachable computing node candidate set is empty, and records the situation that cannot meet the user's intention requirements and updates the knowledge graph, thereby ensuring the system's processing logic and information recording when facing special situations, and providing a feedback mechanism for system optimization and improvement.

[0079] The present invention is further configured as follows: the network information in step S2 includes network node information, network topology information and network capability information; the computing power information in step S2 includes computing node entities, computing power size of computing node entities, available computing power and location attribute information;

[0080] The network node information includes network node entities and attribute information of the entities, the network topology information includes network connection relationship information between network node entities and between network node entities and computing power node entities, and the network capability information includes bandwidth, delay, and delay jitter attribute information of network node entities or network transmission paths.

[0081] By adopting the above technical scheme, the above information of the present invention can be recorded and managed in the knowledge graph, providing basic data for the network scheduling and optimization of the system, and by recording the connection relationship between network node entities, the knowledge graph can accurately reflect the network topology of the entire edge computing system, and provide support for subsequent network path selection and transmission delay calculation and other steps; network capability information reflects the performance characteristics of network nodes or paths, and plays an important role in the resource scheduling and collaborative decision-making of the system. By recording this information, the system can select appropriate network transmission paths and optimize resource allocation according to user needs and network status. The present invention can accurately record and manage network information and computing power information in the edge computing system, and play an important role in resource scheduling and network optimization, thereby improving the performance and efficiency of the system.

[0082] In summary, the present invention has the following beneficial effects:

[0083] 1. The network computing resource collaborative scheduling method integrating user intention and knowledge graph disclosed in the present invention strengthens the presentation and reasoning of edge computing system knowledge by constructing an edge computing knowledge graph ontology model and further constructing the knowledge graph of the edge computing system based on the model. It can collaboratively schedule the network and computing power resources of the edge computing system under the dual drive of user intention and knowledge, and improve the utility of network computing resources;

[0084] 2. The network computing resource collaborative scheduling method that integrates user intention and knowledge graph disclosed in the present invention improves the automation capability of network management by applying user input intention and the edge computing system automatically identifying user intention based on natural language processing technology and converting it into network and computing power requirements that can be recognized by the edge computing system. It also avoids the problem of over- or under-configuration of resources caused by the mismatch between application requirements and network computing resources due to insufficient knowledge of users in industry application fields and insufficient knowledge of network maintenance personnel in industry application fields, thereby improving network efficiency and user experience satisfaction. BRIEF DESCRIPTION OF THE DRAWINGS

[0085] Figure 1 It is a general flow chart of collaborative scheduling of network computing resources integrating user intention and knowledge graph provided by an embodiment of the present invention;

[0086] Figure 2 It is a schematic diagram of an edge computing knowledge graph ontology model provided by an embodiment of the present invention;

[0087] Figure 3 It is a partial schematic diagram of an edge computing system knowledge graph constructed based on edge computing system information and an ontology model provided by an embodiment of the present invention;

[0088] Figure 4is a flowchart of identifying user intent and updating a knowledge graph provided by an embodiment of the present invention;

[0089] Figure 5 It is a partial schematic diagram of the knowledge graph of the edge computing system updated based on user intention provided by an embodiment of the present invention;

[0090] Figure 6 It is a flowchart provided by an embodiment of the present invention for generating a network computing resource collaborative scheduling strategy according to the knowledge graph and sending it to the edge computing system for execution;

[0091] Figure 7 It is a flow chart of updating the knowledge graph according to the resource network computing resource collaborative scheduling strategy provided by an embodiment of the present invention;

[0092] Figure 8 is a flow chart of a collaborative offloading resource scheduling strategy provided by an embodiment of the present invention;

[0093] Fig. 9 It is a flowchart of updating the collaborative scheduling strategy of network computing resources and sending it to the edge computing system for execution and updating the knowledge graph provided by an embodiment of the present invention;

[0094] Fig.10 This is a first schematic diagram of a network computing resource collaborative scheduling strategy result that integrates user intent and knowledge graph provided by an embodiment of the present invention;

[0095] Fig.11 This is the second schematic diagram of the results of the network computing resource collaborative scheduling strategy that integrates user intention and knowledge graph provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0096] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0097] Example 1: A method for collaborative scheduling of network computing resources integrating user intent and knowledge graph, the flowchart of which is as follows: Figure 1 As shown, the following steps are included:

[0098] S101: Based on the concepts and information used to describe computing power networks and edge computing, an edge computing knowledge graph ontology model is constructed. A partial schematic diagram of the ontology model is shown in the attached figure. Figure 2As shown in the figure, the ontology is the vertex and the relationship between the ontologies is the edge. The ontology model mainly includes eight core ontologies, including network, computing power, business, application scenario, resource, computing node, user intention, and location, and the relationship between them. The ontology model describes the concepts, characteristics, and relationship between the core ontology of the edge computing system and its extended ontology. Among them, the concepts of the eight core ontologies are preferably as follows:

[0099] Network: The function of the network is to connect the isolated devices or nodes of the edge computing system, and to provide the edge computing system with the ability of information interaction and communication;

[0100] Computing power: Computing power describes the ability of a computer to process data, which can be used to perform computing tasks such as artificial intelligence algorithms and machine learning algorithms;

[0101] Business: Business description refers to applications that require network and / or computing resources to support them. Different types of business have different service quality requirements. Based on user requirements for network bandwidth, communication reliability, connection scale, intelligence, and integration, business types include ultra-large bandwidth, ultra-large-scale connection, and extremely reliable communication.

[0102] Application scenarios: Application scenarios describe the application of services with network and computing power requirements in agriculture, industry, manufacturing and other industries;

[0103] Resources: Resources describe the communication network media that provide network capabilities for edge computing systems or the processors, memories, and other media that provide data processing capabilities;

[0104] Compute nodes: Compute nodes describe the infrastructure that provides computing power;

[0105] User intent: User intent describes the state that users expect network and computing services to achieve, expressed in the form of text, voice, or images;

[0106] User intent: Location describes the geographical location of a node or resource in an edge computing system;

[0107] The network ontology further includes network capabilities, network nodes, and network topology ontology. Network capabilities describe the network's ability to provide services, including bandwidth, latency, and jitter. Network nodes include base stations, routers, and smart metasurfaces. Network topology describes the network connection relationships between network nodes and between network nodes and computing nodes. Computing nodes further include terminals with communication capabilities, edge servers, and cloud servers.

[0108] The above eight core ontologies contain the following triple relationship descriptions: <computing power, belongs to subclass, resources>, <network capability, belongs to subclass, resources>, <computing node, has computing capability, computing power>, <business, has computing power demand, computing power>, <business, has network demand, network capability>, <user intention, applied to, application scenario>, <user intention, business type, business>, <application scenario, business type, business>, <network topology, has network capability, network capability>, <network topology, includes, network nodes>, <network topology includes, computing nodes>, <network node has network capability, network capability>, <network node, located in, location>, <computing node, located in, location>, <network node, network connection, network node>, <network node, network connection, computing node>, <computing node, network connection, network node>, <network node, communication enhancement, network node>, where<A,B,C> A, B, and C represent the head ontology, relationship, and tail ontology respectively. For example, in the triple <computing power, belongs to subclass, resources>, computing power is the head ontology, resources are the tail ontology, and 'belongs to subclass' is the relationship.

[0109] S102: constructing a knowledge graph of the edge computing system based on the collected network information and computing power information of the edge computing system and the ontology model;

[0110] The edge computing system includes network information and computing power information: There are two terminals T1 and T2 and an edge server E1 in the service area of ​​base station B1. The base station communicates with base station B2 through routers R1 and R2. There is a terminal T3 and an edge server E2 in the service area of ​​base station B2. An intelligent super surface I1 is placed between terminal T3 and base station B2. The positions of terminals T1, T2, T3, edge servers E1, E2 and intelligent super surface I1 are (22.8836, 113.4569), (22.8862, 113.4638), (21.5101, 110.9990), (22.8843, 113.4547 ), (21.6632, 110.9252), (21.6803, 110.9252), the locations of base stations B1 and B2 are the same as edge servers E1 and E2 respectively, the (uplink rate, downlink rate) of terminals T1, T2, and T3 are (50, 18) Mbps, (48, 15) Mbps, and (54, 21) Mbps respectively, and the (CPU, memory, storage space) are all (1.5GHz, 1GB, 2GB), the bandwidth of edge servers E1 and E2 are both 1Gbps, and the (CPU, memory, storage space) are all (10GHz, 16GB, 100GB), and the bandwidth of routers R1 and R2 are both 10Gbps. Based on the above information, combined with Figure 1 and Figure 2, we can extract computing node entities: terminals T1, T2, T3, edge servers E1, E2, network node entities: base stations B1, B2, routers R1, R2 and intelligent hypersurface I1, and the network capabilities, computing power, location attributes and network transmission paths of the above entities: (terminals T1, T2, edge server E1)-base station B1-router R1-router-R2-base station B2-(terminal T3, edge server E2). With the above entities and attributes as vertices and the relationships between entities as edges, we can get the following: Figure 3 The schematic diagram of the knowledge graph shown;

[0111] S103: Periodically monitor user intent; determine whether there is user intent input, if so, generate a network computing resource collaborative scheduling strategy based on the input user intent and the knowledge graph of the edge computing system and send it to the edge computing system for execution, update the knowledge graph, if not, further determine whether the user intent has expired, if so, release the resources of the user intent, delete the intent and related entities and relationships from the knowledge graph, if not, continue to perform periodic monitoring of user intent;

[0112] S104: Periodically monitor the status of the edge computing system; determine whether the status of the monitored edge computing system has changed. If so, update the network computing resource collaborative scheduling strategy of the edge computing system and send it to the edge computing system for execution, and update the knowledge graph. If not, continue to periodically monitor the status of the edge computing system.

[0113] Embodiment 2: A method for identifying user intention and updating knowledge graph based on a network computing resource collaborative scheduling method integrating user intention and knowledge graph, the flow chart of which is as shown in the attached figure. Figure 4 As shown, an example is given to illustrate the process of identifying user intent and updating the knowledge graph of the edge computing system:

[0114] Let the ontology model have the following description about the application scenario: "Future collaborative machine control, remote industrial motion control, etc. are typical intelligent manufacturing applications", and the following description about the business: "Among them, collaborative machine control in intelligent manufacturing applications requires a precise working environment and machine motion perception, intelligent and refined control, and therefore requires low latency, ultra-high reliability, and ultra-high deterministic service requirements, which generally belong to extremely reliable communication types. In a collaborative machine control environment, in order to collaborate in real time, the network delay is required to be no higher than 10ms and the bandwidth is required to be above 100Mbps. In order to run the collaborative control algorithm, the processor power is required to be no less than 10GHz, the memory is 4GB or above, and the storage space is no less than 10GB."

[0115] Make users happy Figure 1The input is "In the first area of ​​the smart factory, it is now necessary to control the products on the collaborative assembly production line of robot terminals T1 and T2 in real time."

[0116] It can be determined that the user intention is expressed in text form. The named entity recognition method is further used to identify the keyword group in the user intention text, and the keyword group of 'smart factory, real-time control, terminals T1, T2, collaborative assembly' can be obtained. Assuming that the above intention does not exist in the current knowledge graph, the next step is to add 'user intention' to the knowledge graph. Figure 1 'This entity, because the keyword group contains 'smart factory, collaborative assembly', that is, it contains application scenario information, which is the 'smart manufacturing' application scenario, specifically the collaborative control application, so <user intention Figure 1 , applied to, intelligent manufacturing 1> triples. Since the user intention keyword group does not contain business information, according to the description of application scenarios and businesses in the ontology model, it can be inferred that the application scenario belongs to 'extremely reliable communication'. Therefore, the 'extremely reliable communication T1' entity is added to the knowledge graph. According to the relationship definition in the edge computing knowledge graph ontology model, the <user intention Figure 1 , business type, extremely reliable communication T1>, <intelligent manufacturing 1, business type, extremely reliable communication T1> triples. Further, since the keyword group does not contain computing power service demand information or network service demand information, the next step is to enter the user intention Figure 1 In the step of checking the resource requirement path in the knowledge graph, according to the network and computing power characteristic description of the business type 'Extremely Reliable Communication' in the 'Collaborative Machine Control' application scenario of 'Intelligent Manufacturing' in the ontology model, it can be inferred that the network capability requirement (delay, bandwidth) of the business type 'Extremely Reliable Communication T1' is (10ms, 100Mbps), and the computing power requirement (processor, memory, storage space) is (10GHz, 4GB, 10GB). Therefore, the 'Network Capability' and 'Computing Power' entities and their attributes are added to the knowledge graph, and the following triples <Extremely Reliable Communication T1, with network requirements, network capabilities>, <Extremely Reliable Communication T1, with computing power requirements, computing power> are added to the knowledge graph to obtain the following Figure 5 A partial schematic diagram of the knowledge graph updated based on user intent is shown.

[0117] Embodiment 3: A flowchart of generating a network computing resource collaborative scheduling strategy based on the knowledge graph and sending it to the edge computing system for execution is shown in the attached figure. Figure 6 As shown; S50-B01: extract the location information of the data source from the input user intention information, add the relationship of 'data source' in the knowledge graph with the business entity as the head entity and the data source node as the tail entity;

[0118] S50-B02: Extract the data source node entity of the user's intention to form an intention data source set, and perform the following steps for each source node in the intention data source set:

[0119] S50-B0201: Find a computing node entity whose available computing power is not less than the computing power requirement attribute of the business entity in the knowledge graph to form a computing node candidate set, wherein the available computing power is the difference between the computing power of the computing node and the computing power that has been allocated;

[0120] S50-B0202: Taking the data source node entity as the source address and the computing node entity in the computing node candidate set as the destination address, find out the network transmission path that meets the network capability requirement attributes of the business entity according to the network topology knowledge in the knowledge graph, and form the network transmission path candidate set of the source node, wherein the network topology knowledge is the knowledge obtained by reasoning based on the attributes of the network nodes and computing nodes in the knowledge graph and the network connection relationship;

[0121] S50-B0203: extracting the intersection of the network transmission path candidate set and the computing node candidate set to form a reachable computing node candidate set;

[0122] S50-B0204: Determine whether the candidate set of reachable computing nodes is empty, if so, jump to step S50-B0206, if not, go to step S50-B0205;

[0123] S50-B0205: Select an optimal network transmission path and target computing node for the source node from the network transmission path candidate set and set the offloading weight, and put the source node into the complete offloading data source set, and go to step S50-B03;

[0124] Among them, in the network transmission path candidate set, an optimal network transmission path and an optimal target computing node are selected for the source node and an optimal offloading weight is set, specifically:

[0125] Determine whether there are two or more network transmission paths in the network transmission path candidate set,

[0126] If so, a path with the minimum network computing resource occupation cost is selected from the network transmission path candidate set as the optimal network transmission path, the destination node of the path is selected as the optimal target computing node of the source node, and the optimal offloading weight of the target computing node is set to 1, wherein the network computing resource occupation cost is the weighted value of the end-to-end delay, total energy consumption and total price cost experienced in the process of using the network transmission path to transmit data from the source node to the destination node of the network transmission path and performing computing processing at the destination node, that is, assuming that the natural number i represents the i-th path in the source node transmission path candidate set, D i represents the end-to-end delay of the path, E i Represents the total energy consumption, C i represents the total price cost, then the network computing resource occupation cost g of this path i Expressed as

[0127] g i =a 1 D i +a 2 E i +a 3 C i

[0128] Among them, a 1 、a 2 、a 3 Respectively represent weighted values ​​of end-to-end delay, total energy consumption and total price cost, the end-to-end delay includes end-to-end network transmission delay and calculation delay of target computing node, the total energy consumption includes end-to-end network transmission energy consumption and calculation energy consumption of target computing node, and the total price cost includes network transmission cost and calculation cost;

[0129] If not, taking a path in the network transmission path candidate set as the best network transmission path of the source node, taking the destination node of the path as the best target computing node of the source node, and setting the best offloading weight of the target computing node to 1;

[0130] S50-B0206: put the source node into the collaborative unloading data source set, and go to step S50-B03;

[0131] S50-B03: Determine whether the collaborative offloading data source set is empty, if not, go to S50-B04, if yes, jump to step S50-B05;

[0132] S50-B04: for each source node of the collaborative offloading data source set, calling the collaborative offloading resource scheduling strategy to determine the optimal network transmission path, the optimal target computing node set and the optimal offloading weight vector of the source node, and proceeding to step S50-B05;

[0133] S50-B05: For each source node in the complete unloading data source set and the collaborative unloading data source set, a resource scheduling instruction of the edge computing system is generated according to the optimal network transmission path, the optimal target computing node set and the optimal unloading weight vector of the node, and the resource scheduling instruction is sent to the relevant network nodes and computing nodes of the edge computing system for execution.

[0134] Embodiment 4: A flowchart of updating the knowledge graph according to the resource network computing resource collaborative scheduling strategy based on the network computing resource collaborative scheduling method integrating user intention and knowledge graph, as shown in the attached Figure 7 As shown, when completely uninstalling the data source set N 1 and collaborative offloading data source set N 2 When not empty, for N 1 、N 2 Each source node n(n∈S 1 ∪S 2 ), based on the optimal network transmission path of the node Best target computing node set and the optimal offloading weight vector Updating the knowledge graph, specifically including:

[0135] S50-C01: Find the business entity associated with the source node entity in the knowledge graph, specifically, find the corresponding triple with the source node as the tail entity and 'data source' as the relationship, then the head entity of the triple is the business entity;

[0136] S50-C02: Taking the business entity as the head entity, taking each computing node in the best target computing node set of the source node as the tail entity, and taking 'computed on' as the relationship, a triple set is formed and added to the knowledge graph;

[0137] S50-C03: For each network node in the optimal network transmission path of the source node, the total available network bandwidth of the corresponding entity is updated in the knowledge graph to the difference between the original value and the equivalent network bandwidth allocated to the path;

[0138] S50-C04: Add the computational offloading knowledge of the source node to the knowledge graph, specifically, add an offloading vector entity to the knowledge graph, with the source node as the head entity and the newly added offloading vector as the tail entity, add the relationship 'offloading weight vector' to the knowledge graph, and add an offloading weight value attribute to the offloading vector entity, the number of attribute values ​​is the same as the number of optimal target computing nodes, the attribute value is the numerical value of the element in the optimal offloading weight vector, the attribute relationship is 'has weight', and according to the correspondence between the optimal target computing node set and the optimal offloading weight vector, add the relationship 'data weight' between each pair of optimal target computing nodes and the optimal offloading weight value.

[0139] Example 5: A flowchart of a collaborative offloading resource scheduling strategy based on a collaborative scheduling method for network computing resources integrating user intent and knowledge graph, as shown in the attached figure. Figure 8 As shown, when the collaborative offloading data source set is not empty, for each source node in the set, the following collaborative offloading resource scheduling strategy is called to determine the optimal network transmission path, optimal target computing node, and optimal offloading weight vector for the source node:

[0140] S50-D01: Find a computing node entity whose available computing power is not less than the computing threshold of the business entity in the knowledge graph to form a computing node candidate set of the source node, wherein the business entity is the business entity shown by the head entity in the triple whose tail entity is the source node and whose relationship is 'data source' in the knowledge graph;

[0141] S50-D02: Taking the source node entity as the source node and the computing node entity in the computing node candidate set of the source node as the destination node, find a network transmission path whose end-to-end network transmission delay is not greater than the transmission delay threshold of the service according to the network topology knowledge in the knowledge graph, and form a network transmission path candidate set of the source node;

[0142] S50-D03: for each pair of source and destination nodes in the network transmission path candidate set of the source node, determine whether there are two or more network transmission paths; if so, only retain the path with the shortest end-to-end network transmission delay, and delete other paths from the network transmission path candidate set;

[0143] S50-D04: extracting the intersection of the network transmission path candidate set of the source node and the computing node candidate set of the source node to form a reachable computing node candidate set of the source node;

[0144] S50-D05: Determine whether the candidate set of reachable computing nodes of the source node is empty, if so, jump to step S50-D07, if not, go to step S50-D06;

[0145] S50-D06: Determine the optimal network transmission path set, the optimal target computing node set and the optimal offloading weight vector of the source node, specifically:

[0146] Let the natural number S represent the data size of the source node in bits, W represent the size of the data in computing power, where χ represents the computing power required per bit, N = {1, 2, ..., N} represents the candidate set of reachable computing nodes, the integer N represents the number of reachable computing nodes in the candidate set of reachable computing nodes, and P = {P 1 ,P 2 ,...,P n ,...,PN} represents the network transmission path candidate set of the source node, where P n represents the nth (1≤n≤N) path, the destination node of the path is the nth reachable computing node in the reachable computing node candidate set, B Pn represents the equivalent network bandwidth that the path can allocate to the source node, f n represents the available computing power that the nth reachable computing node in the reachable computing node candidate set can allocate to the source node, a={a 1 ,a 2 ,...,a n ,...,aN} represents the unloading weight vector, where a n represents the weight of the amount of data unloaded to the nth reachable computing node in the reachable computing node candidate set, let They represent the source node from path P n Uninstall a n The end-to-end delay, total energy consumption, and total price cost experienced when the weighted data volume is processed by the nth reachable computing node, where: is the sum of the end-to-end network transmission delay and the computation delay of computing node n, that is, The end-to-end network transmission delay is given by the formula Determine that the computational delay of computing node n is given by the formula Sure, By formula Determine, where the natural number β P , β C are the energy consumption factors of network transmission and high performance computing, By formula Determine, where γ P , γ C are the price factors of network transmission and high performance computing respectively. The source node passes through the path p n Uninstall a nThe network computing resource occupation cost of the weighted data volume to the nth reachable computing node is defined as the weighted sum of the end-to-end delay, total energy consumption and total price cost of the path and the computing node, that is, Among them, the natural number a 1 、a 2 、a 3 Represent the weighted values ​​of end-to-end delay, total energy consumption and total price cost respectively. Let (N', P', a') represent a collaborative offloading resource scheduling strategy for the source node, where the set N', P', a' respectively represent the target computing node set, network transmission path set and offloading weight vector of the source node under the strategy. Let Indicates that the p' n ∈P' paths to unload α' n ∈α' weighted data volume to the computing node n'∈N' network computing resource occupation cost, where, The calculation formula and If they are consistent, the network computing resource occupation cost of the strategy is defined as the sum of the network computing resource occupation costs of all paths and target computing nodes under the strategy.

[0147] Right now,

[0148] In addition, the strategy (N', P', a') should satisfy the conditions shown in the following set of equations:

[0149]

[0150] Among them, the natural number f Th Indicates the computing power requirement attribute of the business entity represented by the head entity in the triple whose tail entity in the knowledge graph is the source node and whose relationship is 'data source', a natural number D Th represents the end-to-end delay requirement attribute of the business entity, let θ represent the network computing resource occupation cost set corresponding to the collaborative offloading resource scheduling strategy set that satisfies the conditions of the above equation group, that is, g(N',P',α')∈θ, determine the strategy with the smallest network computing resource occupation cost in the network computing resource occupation cost set as the optimal collaborative offloading resource scheduling strategy for the source node, and use the network transmission path set, target computing node set and offloading weight vector in the strategy as the optimal network transmission path set, optimal target computing node set and optimal offloading weight of the source node respectively, that is, let (N * ,P * ,a * ) represents the optimal cooperative offloading resource scheduling strategy of the source node, and the network computing resource occupation cost under the strategy is expressed as g * (N * ,P * ,α * ), where g* (N * ,P * ,α * ) is calculated in the same way as g(N',P',α'), then the g * (N * ,P * ,α * ) The strategy satisfies g * (N * ,P * ,α * )=minθ and the conditions of the system of equations, where minθ represents the minimum function;

[0151] S50-D07: Set the optimal network transmission path set, optimal target computing node set and optimal offloading weight vector of the source node to an empty set, and feedback the information that the intent cannot be satisfied to the user whose tail entity is the source node, the path contains the business entity, and the head entity is the user intent.

[0152] Example 6: A flowchart of updating the collaborative scheduling strategy of network computing resources based on the collaborative scheduling method of network computing resources integrating user intention and knowledge graph and sending it to the edge computing system for execution and updating the knowledge graph, as shown in the attached figure. Fig. 9 As shown in the figure, when the state of the edge computing system is monitored to change, the process of updating the network computing resource collaborative scheduling strategy and sending it to the edge computing system for execution and updating the knowledge graph includes:

[0153] S601: Determine whether the network status of the edge computing system has changed. If so, go to S602; if not, jump to S605;

[0154] S602: Update the state of the network in the knowledge graph;

[0155] S603: Determine whether the change in the network status causes a decrease in the service experience of any intended user in the edge computing system. If so, proceed to S604; if not, end the process;

[0156] S604: Find out from the knowledge graph the user intention entity with degraded user service experience, the business entity associated with the intention entity, and the best network transmission path set of the data source node of the business entity, find out from the best network transmission path set the best network transmission path affected by the network change, update the best network transmission path and send it to the edge computing system for execution, and update the knowledge of the knowledge graph;

[0157] In S604, the optimal network transmission path is updated and sent to the edge computing system for execution, and the knowledge of the knowledge graph is updated, specifically including:

[0158] Determine whether there is a network transmission path with the head entity of the optimal network transmission path as the source node, the tail entity as the destination node, and the end-to-end network transmission delay is not greater than the network transmission delay threshold of the business entity; if so, determine the network transmission path as the optimal network transmission path of the source node and send it to the edge computing system for execution, and update the knowledge of the optimal network transmission path in the knowledge graph; if not, call the collaborative resource scheduling strategy to determine the optimal network transmission path, the optimal target computing node set and the optimal offloading weight vector of the source node, generate the resource call instruction of the edge computing system and send it to the relevant network nodes and computing nodes of the edge computing system for execution, and update the knowledge of the optimal network transmission path, the optimal target computing node set and the optimal offloading weight vector of the source node in the knowledge graph;

[0159] S605: Determine whether the computing power resources of the edge computing system have changed. If so, proceed to S606. If not,

[0160] S606: Update the status of the computing resources in the knowledge graph;

[0161] S607: Determine whether the change in computing power resources causes a decrease in the service experience of any intended user in the edge computing system. If so, proceed to S608; if not, end this process;

[0162] S608: Find out the user intention entity with degraded user service experience, the business entity associated with the intention entity, and the best target computing node set associated with the business entity from the knowledge graph, find out the best target computing node affected by the change in computing power resources from the best target computing node set, further find out the source node corresponding to the best target computing node and the unloading weight of the source node to the best target computing node, update the best target computing node, the best network transmission path, and the best unloading weight of the source node, and send them to the edge computing system for execution, and update the knowledge of the knowledge graph;

[0163] In step S608, the optimal target computing node is updated and sent to the edge computing system for execution, and the knowledge of the knowledge graph is updated, specifically including:

[0164] Find a computing node whose available computing power is not less than the computing power of the optimal target computing node in the knowledge graph to form a computing node candidate set, take the source node as the source address and the computing node entity in the computing node candidate set as the destination address, and find a network transmission path whose end-to-end network transmission delay is not higher than the end-to-end network transmission delay of the optimal network transmission path with the source node as the source address and the affected optimal target computing node as the destination address according to the network topology knowledge in the knowledge graph, and determine whether there is such a network transmission path. If so, determine the network transmission path as the optimal network transmission path of the source node and the computing node as the optimal target address of the source node. The target computing node is determined, and the resource scheduling instruction of the edge computing system is generated with the offloading weight as the optimal offloading weight and sent to the edge computing system for execution, and the optimal network transmission path, optimal target computing node and optimal offloading weight vector knowledge of the source node are updated in the knowledge graph. If not, the collaborative resource scheduling strategy is called to determine the optimal network transmission path, optimal target computing node set and optimal offloading weight vector of the source node, and the resource calling instruction of the edge computing system is generated and sent to the relevant network nodes and computing nodes of the edge computing system for execution, and the optimal network transmission path, optimal target computing node set and optimal offloading weight vector knowledge of the source node are updated in the knowledge graph.

[0165] Example 7: Results of the collaborative scheduling method for network computing resources based on the fusion of user intention and knowledge graph. Fig.10 As shown, the following example illustrates the first effect of the network computing resource collaborative scheduling strategy that integrates user intent and knowledge graph:

[0166] Make users happy Figure 1 The input is "In the first area of ​​the smart factory, the robot terminal T1 needs to be remotely controlled in real time to assemble products on the production line. The amount of data used by the terminal T1 for the control algorithm calculation is about 5.2Mb, and the calculation amount is about 10.9GHz. The control algorithm requires a control decision to be made within 10ms, and the processor power of the node running the control algorithm must be no less than 1GHz and the memory must be no less than 1GB";

[0167] User intention Figure 1 , intelligent manufacturing 1, extremely reliable communication T1, computing power and network capabilities, and the triplet based on the above entities <user intention Figure 1 , applied to, intelligent manufacturing 1>, <User Figure 1,Business type, extremely reliable communication T1>, <intelligent manufacturing 1, business type, extremely reliable communication T2>, <extremely reliable communication T1, with computing power requirements, computing power>, <extremely reliable communication T1, with network requirements, network capabilities>, <computing power, CPU, 1GHz>, <computing power, MEM, 1GB>, <network capabilities, delay, 10ms>, add the above entities and relationships to the knowledge graph;

[0168] According to user's opinion Figure 1 Input, it can be determined that the data source is 'terminal T1', and the triplet <extremely reliable communication T1, data source, terminal T1> is obtained, as well as the data volume attribute triplet <terminal T1, data volume, 5.2Mb>, <terminal T1, computing volume, 10.9GHz> of the data source, and the above triplet information is added to the knowledge graph. According to the knowledge paths of <extremely reliable communication T1, with computing power requirement, computing power, CPU, 1GHz>, <extremely reliable communication T1, with computing power requirement, computing power, MEM, 1GB> in the knowledge graph, the candidate set of computing nodes with available computing power not less than the computing power requirement attribute of the business 'extremely reliable communication T1' can be obtained. According to the knowledge path of <extremely reliable communication T1, with network requirements, network capabilities, delay, 10ms> in the knowledge graph, the network transmission path candidate set p of the data source node 'terminal T1' can be obtained = {p 1 ,p 2 ,p 3 ,p 4 ,p 5}, where p 1 =(Terminal T1, Terminal T1), p 2 =(terminal T1, base station B1, terminal T2), p 3 =(terminal T1, base station B1, edge server E1), p 4 =(terminal T1, base station B1, router R1, router R2, base station B2, edge server E2), p 5 =(terminal T1, base station B1, router R1, router R2, base station B2, terminal T3), according to p∩N, we get the candidate set of reachable computing nodes N 0 ={terminal T1, terminal T2, terminal T3, edge server E1, edge server E2}, based on the knowledge in the knowledge graph, the path p can be calculated 1 、p 2 、p 3 、p 4 、p 5The end-to-end delays are 7.2667ms, 7.6639, 1.3841ms, 1.3851ms, and 7.6529ms respectively. Let 0.51J, 0.62J, 0.3J, 0.32J, and 0.72J represent the energy consumption of the above five paths, and 0.2, 0.5, 0.8, 0.9, and 0.6 represent the costs of the above five paths respectively. Let the weighted values ​​of end-to-end delay, total energy consumption, and total price cost be 0.3, 0.4, and 0.3 respectively. The network computing resource occupation costs of the above five paths are 2.444, 2.6972, 0.7752, 0.8835, and 2.6939 respectively. Therefore, path p is selected. 3 = (terminal T1, base station B1, edge server E1) as the best network transmission path of the source node 'terminal T1', 'edge server E1' as the best target computing node, and the best offloading weight α E1 Set to 1.

[0169] Example 8: Results of the collaborative scheduling method for network computing resources based on the fusion of user intention and knowledge graph. Fig.11 As shown, the following example illustrates the second effect of the network computing resource collaborative scheduling strategy that integrates user intent and knowledge graph:

[0170] Make users happy Figure 1 The input is "In the first area of ​​the smart factory, it is now necessary to remotely control the products on the collaborative assembly production line of robot terminals T1 and T2 in real time. The amount of data used by terminal T1 for control algorithm calculation is about 100Mb, and the computing power is about 10.9GHz. The amount of data used by terminal T2 for control algorithm calculation is about 150Mb, and the computing power is about 15.96GHz. The collaborative control algorithm requires a control decision to be made within 10ms, and the processor power of the node running the control algorithm is required to be no less than 1.5GHz, and the memory is required to be no less than 1GB";

[0171] The user's opinion can be obtained Figure 1 Related entities: User intent Figure 1 , intelligent manufacturing 1, extremely reliable communication T1, computing power and network capabilities, and the triplet based on the above entities <user intention Figure 1 , applied to, intelligent manufacturing 1>, <User intention Figure 1 ,Business type, extremely reliable communication T1>, <intelligent manufacturing 1, business type, extremely reliable communication T2>, <extremely reliable communication T1, with computing power requirements, computing power>, <extremely reliable communication T1, with network requirements, network capabilities>, <computing power, CPU, 1.5GHz>, <computing power, MEM, 1GB>, <network capabilities, delay, 10ms>, add the above entities and relationships to the knowledge graph;

[0172] According to user's opinion Figure 1Input, it can be determined that the data sources are 'terminal T1' and 'terminal T2', and the triples <extremely reliable communication T1, data source, terminal T1>, <extremely reliable communication T1, data source, terminal T2> are obtained, as well as the data source data volume attribute triples <terminal T1, data volume, 100Mb>, <terminal T1, computing volume, 10.9GHz>, <terminal T2, data volume, 150Mb>, <terminal T2, computing volume, 15.96GHz>, and the above triplet information is added to the knowledge graph.

[0173] According to the user intention, the intention data source set N 0 ={terminal T1, terminal T2}.

[0174] For the data source node "Terminal T1", according to the knowledge paths of <Extremely Reliable Communication T1, with computing power requirement, computing power, CPU, 1.5GHz>, <Extremely Reliable Communication T1, with computing power requirement, computing power, MEM, 1GB> in the knowledge graph and the knowledge in Example 3, a candidate set of computing nodes with available computing power not less than the computing power requirement attribute of the service 'Extremely Reliable Communication T1' can be obtained. According to the knowledge path of <Extremely Reliable Communication T1, with network requirements, network capabilities, delay, 10ms> in the knowledge graph and the knowledge in Example 3, the end-to-end delays (the sum of network transmission delay and calculation delay) of the paths pT1-T1=(terminal T1, terminal T1), pT1-T2=(terminal T1, base station B1, terminal T2), pT1-E1=(terminal T1, base station B1, edge server E1), pT1-E2=(terminal T1, base station B1, router R1, router R2, base station B2, edge server E2), and pT1-T3=(terminal T1, base station B1, router R1, router R2, base station B2, terminal T3) are calculated to be 7.2667ms, 14.9056ms, 6.7456ms, 6.7656ms, and 14.6941ms, respectively. Therefore, the candidate set of network transmission paths for the source node 'terminal T1' is P T1 ={pT1-T1,pT1-E1,pT1-E2}, by P T1 ∩N, get the candidate set N of reachable computing nodes of the source node 'Terminal T1' T1={terminal T1, edge server E1, edge server E2}, let 0.6J, 0.32J, 0.45J represent the energy consumption of the above three paths respectively, 0.3, 0.8, 0.9 represent the cost of the above three paths respectively, let the weighted values ​​of end-to-end delay, total energy consumption and total price cost be 0.3, 0.4, 0.3 respectively, the network computing resource occupation costs of the above three paths are 2.51, 2.3917, 2.4797 respectively, so the path pT1-E1=(terminal T1, base station B1, edge server E1) is selected as the best network transmission path of the source node 'terminal T1', 'edge server E1' is selected as the best target computing node, the best offloading weight αT1-E1 is set to 1, and the source node 'terminal T1' is placed in the completely offloaded data source set;

[0175] For the data source node "Terminal T2", according to the knowledge paths of <Extremely Reliable Communication T1, with computing power requirement, computing power, CPU, 1.5GHz>, <Extremely Reliable Communication T1, with computing power requirement, computing power, MEM, 1GB> in the knowledge graph and the knowledge in Example 3, a candidate set of computing nodes with available computing power not less than the computing power requirement attribute of the service 'Extremely Reliable Communication T1' can be obtained. According to the knowledge path of <Extremely Reliable Communication T1, with Network Requirements, Network Capabilities, Delay, 10ms> in the knowledge graph and the knowledge in Example 3, it can be calculated that the end-to-end delays of the paths pT2-T2=(terminal T2, terminal T2), pT2-T1=(terminal T2, base station B1, terminal T1), pT2-E1=(terminal T2, base station B1, edge server E1), pT2-E2=(terminal T2, base station B1, router R1, router R2, base station B2, edge server E2), and pT2-T3=(terminal T2, base station B1, router R1, router R2, base station B2, terminal T3) are 10.64ms respectively. , 23.64ms, 12.936 (it has been considered that the data of terminal T1 is also transmitted to the edge server E1 for calculation), 11.776ms, 23.4478ms. There is no network transmission path that meets the network capability requirements of the service (delay is not more than 10ms). Therefore, the source node 'terminal T2' is placed in the collaborative data source set, and the collaborative offloading resource scheduling strategy is called for the 'terminal T2' to determine the optimal network transmission path, the optimal target computing node and the optimal offloading weight vector for the 'terminal T2'. Specifically, let 1.5GHz represent the calculation threshold of the service 'extremely reliable communication T1', let 15ms represent the transmission delay threshold of the 'terminal T2', then according to Figure 8 , the candidate set of reachable computing nodes of the source node 'Terminal T2' is The optimal cooperative offloading resource scheduling strategy of the source node is obtained, that is, the optimal target computing node set is The optimal network transmission path set is The optimal unloading weight vector is The optimal network computing resource occupancy cost is 4.006.

[0176] This specific embodiment is merely an explanation of the present invention and is not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to the present embodiment as needed. However, as long as they are within the scope of the claims of the present invention, they are protected by the patent law.

Claims

1. A network computing resource collaborative scheduling method integrating user intention and knowledge graph, characterized by: The following steps are involved: S101: Construct an edge computing knowledge graph ontology model based on the concepts and information used to describe computing power networks and edge computing; S102: Constructing a knowledge graph of the edge computing system based on the collected network information and computing power information of the edge computing system and the ontology model described in step S101, specifically including: determining the relationship between network nodes, computing nodes, computing power entities, and entity attributes according to the basic relationship between ontologies in the ontology model described in step S101, and taking the above entities and entity attributes as vertices and the above relationships as edges to construct a knowledge graph of the edge computing system; S103: Periodically monitor user intent; generate a network computing resource collaborative scheduling strategy by judging the intent of the user input, the timeliness of the user intent, and the knowledge graph in step S102, and send it to the edge computing system for execution, update the knowledge graph, and handle the expired intent; further judge whether the user intent has expired, if so, release the resources of the user intent, delete the intent and the associated entities and relationships from the knowledge graph, if not, continue to perform periodic monitoring of user intent; Step S103 of updating the knowledge graph specifically includes the following steps: S50-A: Identify user intention and update the knowledge graph of the edge computing system; Step S50-A specifically includes the following steps: S50-A01~S50-A02: determine whether the user's intention is expressed in text form and convert it into text form; S50-A03: Using a named entity recognition method to identify a keyword group in the user's intended text described in S50-A01; S50-A04: judging whether the intention already exists in the knowledge graph according to the user intention identification number and the keyword group, if so, proceeding to step S50-A05, if not, jumping to step S50-A06; S50-A05: Determine whether the keyword group of the intention has changed, if so, jump to step S50-A07, if not, jump to step S50-A16; S50-A06: Add a user intention entity to the knowledge graph, and go to step S50-A07; S50-A07: Determine whether the keyword group contains application scenario information, if so, go to step S50-A08; if not, jump to step S50-A09; S50-A08: Add application scenario entities and relationships in the knowledge graph, and go to step S50-A09; S50-A09: Determine whether the keyword group contains business information, if so, go to step S50-A10, if not, jump to step S50-A11; S50-A10: Add business entities and relationships in the knowledge graph, and go to step S50-A11; S50-A11: Determine whether the keyword contains computing power service demand information, if so, go to step S50-A12; if not, jump to step S50-A13; S50-A12: Add computing power entities and attributes, as well as the relationship from user intent to computing power entities, to the knowledge graph, and proceed to step S50-A13; S50-A13: Determine whether the keyword contains network service demand information, if so, go to step S50-A14; if not, jump to step S50-A15; S50-A14: Add network capability entities and attributes, as well as the relationship from user intent to network capability entities, to the knowledge graph, and proceed to step S50-A15; S50-A15: Check the resource demand path of the user's intention in the knowledge graph, and the knowledge graph update process ends; S50-A16: Abandon the user intention, and the knowledge graph update process ends; S50-B: Generate a network computing resource collaborative scheduling strategy based on the knowledge graph described in step S50-A and send it to the edge computing system for execution; Step S50-B specifically includes the following steps: S50-B01: Extract the location information of the data source according to the input user intention information, and establish the data source relationship between the business entity and the corresponding data source node in the knowledge graph; S50-B02: Based on the extracted user intent data source node entities, an intent data source set is formed in the knowledge graph, and the existence of each source node is checked and the following processing is performed in the knowledge graph: S50-B0201: Search for computing nodes that meet the computing power requirements of business entities in the knowledge graph to form a candidate set of computing nodes; S50-B0202: According to the network topology information in the knowledge graph, find the transmission path that meets the network requirements of the business entity and form a candidate set of network transmission paths for the source node; S50-B0203: extracting the intersection of the network transmission path candidate set and the computing node candidate set to form a reachable computing node candidate set; S50-B0204: Determine whether the candidate set of reachable computing nodes is empty, if so, jump to step S50-B0206, if not, go to step S50-B0205; S50-B0205: Select an optimal network transmission path and a target computing node for the source node from the network transmission path candidate set and set an offloading weight, and put the source node into a completely offloading data source set, and go to step S50-B03; The specific steps of selecting the best transmission path and target computing node from the network transmission path candidate set and setting the offloading weight in step S50-B0205 are as follows: Determining whether there are two or more network transmission paths in the network transmission path candidate set; If there are multiple paths, the network computing resource usage cost of each path needs to be calculated, that is, the end-to-end delay, total energy consumption, and total price cost expressed by weighted values; Assume that the natural number i represents the i-th path in the candidate set of transmission paths of the source node, represents the end-to-end delay of the path, represents the total energy consumption, represents the total price cost, then the network computing resource occupation cost of this path Expressed as ; in, , , Respectively represent weighted values ​​of end-to-end delay, total energy consumption and total price cost, the end-to-end delay includes end-to-end network transmission delay and calculation delay of target computing node, the total energy consumption includes end-to-end network transmission energy consumption and calculation energy consumption of target computing node, and the total price cost includes network transmission cost and calculation cost; The network computing resource occupation cost of all paths is calculated according to the above formula, and the path with the minimum cost is selected as the optimal network transmission path. The destination node of the path is used as the optimal target computing node of the source node, and the optimal offloading weight of the target computing node is set to 1; If there are no multiple paths in the network transmission path candidate set, the path in the path candidate set is directly used as the best network transmission path of the source node, the destination node of the path is used as the best target computing node of the source node, and the best offloading weight of the target computing node is set to 1; S50-B0206: put the source node into the collaborative unloading data source set, and go to step S50-B03; S50-B03~S50-B04: determine whether the collaborative offloading data source set is empty, and call the resource scheduling strategy for each source node to determine the optimal transmission path, target computing node set and offloading weight vector; S50-B05: Generate resource scheduling instructions based on the optimal parameters of each source node, and send them to relevant network nodes and computing nodes for execution; S50-C: updating the knowledge graph described in step S50-A according to the scheduling strategy described in step S50-B; Step S50-C specifically includes the following steps: S50-C01: Find the business entities related to the source node entity from the knowledge graph; By searching for triples with the source node as the tail entity and "data source" as the relationship in the knowledge graph, the business entity associated with the source node entity is found; S50-C02: Establishing an association relationship between a business entity and an optimal target computing node set; With the business entity as the head entity, each computing node in the best target computing node set as the tail entity, and "computed on" as the relationship, an association relationship between the business entity and the best target computing node set is established, and the new triple is added to the knowledge graph; S50-C03: Update the available bandwidth of the network node; According to each network node in the optimal network transmission path, find the corresponding entity in the knowledge graph and update its total available network bandwidth, that is, subtract the equivalent network bandwidth allocated to the path from the original value; S50-C04: Add knowledge of computational offloading; Add an offloading vector entity, with the source node as the head entity and the optimal offloading weight vector as the tail entity; add an offloading weight value attribute to the offloading vector entity, the number of which is the same as the number of optimal target computing nodes, and the attribute value is the element value in the optimal offloading weight vector; S104: periodically monitor the state of the edge computing system; according to the changes in the monitored state of the edge computing system, update the network computing resource collaborative scheduling strategy of the edge computing system and send it to the edge computing system for execution, and update the knowledge graph described in step S102; The specific method of step S104 updating the knowledge graph according to the change of the edge computing system state includes the following steps: S601: Determine whether the network status of the edge computing system has changed, and if so, update the network status in the knowledge graph; S602: Determine whether the change in network status causes a degradation in user service experience. If so, find the affected user intentions and business entities from the knowledge graph and determine the optimal network transmission path set. S603: Check whether there is a suitable network transmission path. If so, send it to the edge computing system for execution, and update the corresponding knowledge in the knowledge graph; if not, call the collaborative resource scheduling strategy to determine the best network transmission path, the best target computing node, and the best offloading weight vector, and send the resource scheduling instruction to the relevant nodes for execution, and update the corresponding knowledge in the knowledge graph; The collaborative resource scheduling strategy in step S603 specifically includes the following steps: S50-D01: Find available computing nodes that meet the computing threshold in the knowledge graph to form a candidate set of computing nodes for the source node; S50-D02: Find the network transmission path that meets the transmission delay threshold based on the network topology knowledge to form a candidate set of network transmission paths for the source node; S50-D03: For each set of source and destination nodes in the network transmission path candidate set, retain the path with the shortest end-to-end network transmission delay and delete other paths; S50-D04: extracting the intersection of the network transmission path candidate set and the computing node candidate set to form a reachable computing node candidate set of the source node; S50-D05: Determine whether the candidate set of reachable computing nodes is empty. If so, jump to step S50-D07. If not, go to step S50-D06. S50-D06: Determine the optimal network transmission path set of the source node, the optimal target computing node set and the optimal offloading weight vector; S50-D07: setting the optimal network transmission path set, the optimal target computing node set and the optimal offloading weight vector of the source node to an empty set, and feeding back information that the intent cannot be satisfied to the user whose tail entity is the source node, whose path includes the business entity and whose head entity is the user intent; S604: Determine whether the computing power resources of the edge computing system have changed, and if so, update the status of the computing power resources; S605: Determine whether the change in computing power resources affects the user service experience. If so, find the affected user intentions and business entities from the knowledge graph and determine the best target computing node. S606: Check whether the available computing power meets the requirements of the optimal target computing node. If so, determine the optimal network transmission path, send the path to the edge computing system for execution, and update the relevant knowledge in the knowledge graph. If it does not meet the requirements, call the collaborative resource scheduling strategy to determine the optimal network transmission path, the optimal target computing node, and the optimal offloading weight vector, and send the resource scheduling instructions to the relevant nodes for execution, and update the relevant knowledge in the knowledge graph.

2. According to claim 1, a method for collaborative scheduling of network computing resources integrating user intention and knowledge graph is characterized by: The network information in step S102 includes network node information, network topology information and network capability information, and the computing power information in step S102 includes computing node entities, computing power size of computing node entities, available computing power and location attribute information; The network node information includes network node entities and attribute information of the entities, the network topology information includes network connection relationship information between network node entities and between network node entities and computing power node entities, and the network capability information includes bandwidth, delay, and delay jitter attribute information of network node entities or network transmission paths.