A construction safety management system

Through the design of the building construction safety management system, the multi-layer analysis module and safety management module are used to solve the problems of low efficiency and insufficient safety of traditional construction safety management, realize real-time monitoring and intelligent early warning, and improve the safety and security of the construction site. Management efficiency.

CN118037060BActive Publication Date: 2024-10-08SHANXI YIYUAN CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410392443.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-02
Publication Date
2024-10-08
Estimated Expiration
2044-04-02

AI Technical Summary

Technical Problem

Traditional building construction safety management has low efficiency and insufficient safety. It cannot provide real-time monitoring and intelligent early warning, and it is difficult to fully cover the safety hazards on the construction site.

Method used

A building construction safety management system is designed, including an information acquisition module, a multi-layer analysis module and a safety management module. By obtaining employee training information, construction area information and construction equipment information, safety analysis and inspection frequency management are performed, and presets are set Parameters to improve analysis accuracy and adjust the number and frequency of inspection personnel in real time.

Benefits of technology

It improves the management efficiency and safety of construction construction. Through accurate safety analysis and inspection management, it reduces construction safety hazards and improves the overall safety level of the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118037060B_ABST
    Figure CN118037060B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of construction safety management, and in particular to a building construction safety management system. The system comprises an information acquisition module for acquiring employee training information, construction area information, construction equipment information and construction environment information; a first analysis module for analyzing the safety of a first construction stage, managing the number of safety inspectors and the inspection frequency of a second construction stage, and adjusting the analysis process; a second analysis module for analyzing the safety of the second construction stage, and managing the inspection frequency of a third construction stage according to the analysis result; a third analysis module for analyzing the safety of construction; a safety management module for managing the number of safety inspectors and the inspection time of the next construction; and an output module for outputting the analysis result to a user. The present invention improves the management efficiency and safety of construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of construction safety management, and in particular to a building construction safety management system. Background Art

[0002] With the acceleration of urbanization, the number of construction projects continues to increase, and the safety management issues of construction sites are becoming increasingly prominent. Traditional construction safety management relies heavily on manual inspections and supervision, which has problems such as low efficiency, slow response, and difficulty in comprehensive coverage. Due to the complex environment of construction sites, a large number of construction workers, widespread equipment distribution, and various safety hazards, once a safety accident occurs, the consequences are serious. Therefore, there is an urgent need for a system that can perform real-time monitoring, intelligent early warning, and efficient management to improve the safety management level of construction.

[0003] Chinese Patent Publication No.: CN116934099A discloses a infrastructure construction site safety management system, which relates to the technical field of infrastructure construction safety management, solves the technical problem in the prior art that it is not possible to perform feature anomaly analysis on construction buildings in the infrastructure construction area, so that it is impossible to perform targeted maintenance and monitoring on different types of abnormal features, analyzes real-time construction equipment in the safety supervision area, and conducts real-time safety monitoring of the safety supervision area through analysis of real-time building completion volume, thereby improving the safety of real-time completed buildings in the safety supervision area, and at the same time, conducts safety protection monitoring through building rectification in the safety supervision area, minimizes the impact of building anomalies, and ensures the safety performance of the safety supervision area; conducts operation safety risk analysis on construction equipment in the safety supervision area, and determines whether the operation safety of construction equipment in the safety supervision area is qualified, thereby ensuring the equipment operation efficiency in the safety supervision area; it can be seen that when managing the safety of construction, the solution only analyzes the construction process, and there are problems of low efficiency and safety in construction management. Summary of the invention

[0004] To this end, the present invention provides a construction safety management system to overcome the problems of low efficiency and safety of construction management in the prior art.

[0005] To achieve the above-mentioned purpose, the present invention provides a construction management system with high efficiency and low safety. The system comprises:

[0006] Information acquisition module, used to obtain employee training information, construction area information, construction equipment information and construction environment information;

[0007] The first analysis module is used to analyze the safety of the first construction phase based on the obtained employee training information and the groundwater level in the construction area, and to manage the number of safety inspectors and the inspection frequency in the second construction phase based on the analysis results. It is also used to adjust the analysis process of the safety of the first construction phase based on the thickness of the sediment layer and the soil porosity in the construction area;

[0008] The second analysis module is used to analyze the safety of the second construction stage according to the analysis results of the safety of the first construction stage and the construction equipment information in the first management period, and manage the inspection frequency of the third construction stage according to the analysis results;

[0009] A third analysis module is used to analyze the safety of the construction according to the analysis results of the safety of the second construction stage and the construction environment information of the third construction stage;

[0010] Safety management module, which is used to manage the number and frequency of safety inspectors during the next construction process according to the safety of the construction and the number of construction violations;

[0011] The output module is used to output the management results of construction safety and the number and frequency of safety inspectors during the next construction process to the user.

[0012] Furthermore, the first analysis module is provided with a first analysis unit, which is used to compare the acquired groundwater level b0 with each preset groundwater level, and analyze the safety of the first construction stage according to the comparison result and the analysis result of the abnormality of employee safety awareness, wherein:

[0013] When the safety awareness of the employees is abnormal, if b0≤b1×[1+0.34×sin(π / 2)×(a1-a0) / (a1+a0)] or b0≥b2×[1-0.34×sin(π / 2)×(a1-a0) / (a1+a0)], the first analysis unit determines that the foundation settlement risk is abnormal and the safety of the first construction stage is abnormal; if b1×[1+0.34×sin(π / 2)×(a1-a0) / (a1+a0)]<b0<b2×[1-0.34×sin(π / 2)×(a1-a0) / (a1+a0)], the first analysis unit determines that the foundation settlement risk is normal and the safety of the first construction stage is normal;

[0014] When the safety awareness of the employees is normal, if b0≤b1 or b0≥b2, the first analysis unit determines that the foundation settlement risk is abnormal and the safety of the first construction stage is abnormal; if b1<b0<b2, the first analysis unit determines that the foundation settlement risk is normal and the safety of the first construction stage is normal;

[0015] The first analysis unit manages the number and frequency of safety inspection personnel in the second construction phase according to the analysis results of the safety in the first construction phase, wherein:

[0016] When the safety of the first construction stage is normal, the first analysis unit sets the number of security inspections in the second construction stage to L1, sets L1=g1, sets the inspection frequency in the second construction stage to J1, sets J1=j1;

[0017] When the safety of the first construction stage is abnormal, the first analysis unit sets the number of safety inspections in the second construction stage to L2, sets L2=g2, sets the inspection frequency in the second construction stage to J2, and sets J2=j2;

[0018] The first analysis unit outputs the analysis results of the number of safety inspection personnel and inspection frequency in the second construction phase to the user;

[0019] Among them, b1 is the preset minimum water level, b2 is the preset maximum water level, g1 is the first preset number of people, g2 is the second preset number of people, j1 is the first preset frequency, and j2 is the second preset frequency.

[0020] Furthermore, the first analysis module is provided with a first adjustment unit, which is used to compare the obtained deposition layer thickness c0 with the preset thickness c1, and adjust the analysis process of the safety of the first construction stage according to the comparison result, wherein:

[0021] When c0≤c1, the first adjustment unit determines that the thickness of the deposition layer is normal and does not make any adjustment;

[0022] When c0>c1, the first adjustment unit determines that the thickness of the sedimentation layer is abnormal, and adjusts the analysis process of the safety of the first construction stage, setting the adjusted preset minimum water level to b1', setting b1'=b1×{1+0.56×arctan[(c0-c1) / (c0+c1)×(π / 4)]}, and setting the adjusted preset maximum water level to b2', setting b2'=b2×{1-0.56×arctan[(c0-c1) / (c0+c1)×(π / 4)]}.

[0023] Furthermore, the first analysis module is provided with a second adjustment unit, which is used to compare the obtained soil porosity k0 with the preset porosity k1, and to make a secondary adjustment to the analysis process of the safety of the first construction stage according to the comparison result, wherein:

[0024] When k0≤k1, the second adjustment unit determines that the porosity of the soil is normal and does not make any adjustment;

[0025] When k0>k1, the second adjustment unit determines that the porosity of the soil is abnormal, and performs a second adjustment on the analysis process of the safety of the first construction stage, and sets the adjusted preset thickness to c1', setting c1'=c1×[1-(k0-k1) / (k0+k1)].

[0026] Furthermore, the second analysis module is provided with a device analysis unit, which compares the acquired device temperature with a preset temperature and analyzes the abnormality of the device temperature according to the comparison result, wherein:

[0027] When t(i)≤t1(i), the device analysis unit determines that the temperature of the device numbered i is normal;

[0028] When t(i)>t1(i), the device analysis unit determines that the temperature of the device numbered i is abnormal;

[0029] The device analysis unit compares the acquired device operating voltage with the preset voltage, and analyzes the abnormality of the device operating voltage according to the comparison result, wherein:

[0030] When d(i)≤d1(i), the device analysis unit determines that the voltage of the device numbered i is normal;

[0031] When d(i)>d1(i), the device analysis unit determines that the voltage of the device numbered i is abnormal;

[0032] Wherein, t(i) is the temperature of the device numbered i, t1(i) is the preset temperature of the device numbered i, d(i) is the voltage of the device numbered i, and d1(i) is the preset voltage of the device numbered i.

[0033] Furthermore, the second analysis module is provided with an abnormality analysis unit, and the abnormality analysis unit is used to analyze the abnormality of the equipment operation state according to the analysis results of the equipment temperature abnormality and the operating voltage abnormality in the first monitoring period, wherein:

[0034] When w1×r1i / r0+w2×r2i / r0≤α, the abnormality analysis unit determines that the equipment operation status in the current first monitoring period is normal;

[0035] When w1×r1i / r0+w2×r2i / r0>α, the abnormality analysis unit determines that the equipment operation status in the current first monitoring period is abnormal, and issues an early warning to the user;

[0036] Among them, r1i is the duration of abnormal temperature of device numbered i in the first monitoring cycle, r2i is the duration of abnormal operating voltage of device numbered i in the first monitoring cycle, r0 is the duration of the first monitoring cycle, w1 is the temperature weight, w2 is the voltage weight, w1+w2=1, w1≥w2.

[0037] Furthermore, the second analysis module is provided with a second analysis unit, and the second analysis unit is used to analyze the safety of the second construction stage according to the analysis results of the abnormality of the equipment operation status in each first monitoring period in the first management period and the analysis results of the safety of the first construction stage, wherein:

[0038] When mi / m≤β, the second analysis unit determines that the operation status of the device numbered i in the current first management period is normal;

[0039] When mi / m>β, the second analysis unit determines that the operation state of the equipment with the current first management cycle number i is abnormal; if the safety of the first construction stage is normal and n1 / n0≤γ1, the second analysis unit determines that the safety of the second construction stage is normal; if the safety of the first construction stage is normal and n1 / n0>γ1, the second analysis unit determines that the safety of the second construction stage is abnormal; if the safety of the first construction stage is abnormal and n1 / n0≤γ2, the second analysis unit determines that the safety of the second construction stage is normal; if the safety of the first construction stage is abnormal and n1 / n0>γ2, the second analysis unit determines that the safety of the second construction stage is abnormal;

[0040] The second analysis unit manages the inspection frequency of the third construction stage according to the analysis result of the safety of the second construction stage, wherein:

[0041] When the safety of the second building stage is normal, the second analysis unit does not manage the inspection frequency;

[0042] When the safety of the second construction stage is abnormal, the second analysis unit does not manage the inspection frequency. If the safety of the first construction stage is normal, the second analysis unit sets the inspection frequency of the third construction stage to J3, and sets J3=j1×[1+0.36×(n1 / n0-γ1) / (n1 / n0+γ1)]; if the safety of the first construction stage is abnormal, the second analysis unit sets the inspection frequency of the third construction stage to J4, and sets J4=j2×[1+0.36×(n1 / n0-γ2) / (n1 / n0+γ2)];

[0043] Among them, β is the second preset abnormality coefficient, γ1 is the third preset abnormality coefficient, γ2 is the fourth preset abnormality coefficient, γ1>γ2, mi is the number of abnormal first monitoring cycles of the device numbered i in the first management cycle, and m is the number of first monitoring cycles in the first management cycle.

[0044] Furthermore, the third analysis module is provided with an environment analysis unit, which is used to compare the acquired construction noise s0 with the preset noise s1, and analyze the abnormality of the environmental noise according to the comparison result, wherein:

[0045] When s0≤s1, the environment analysis unit determines that the environmental noise is normal;

[0046] When s0>s1, the environment analysis unit determines that the environment noise is abnormal;

[0047] The environmental analysis unit compares the obtained dust concentration q0 with the preset concentration q1, and analyzes the abnormality of the dust concentration according to the comparison result, wherein:

[0048] When q0≤q1, the environmental analysis unit determines that the dust concentration is normal;

[0049] When q0>q1, the environmental analysis unit determines that the dust concentration is abnormal;

[0050] The environment analysis unit analyzes the abnormality of the decoration environment according to the analysis results of the abnormality of the environmental noise and dust concentration in the second monitoring period, wherein:

[0051] When z1×v1 / v0+z2×v2 / v0≤M, the environmental analysis unit determines that the construction environment in the current second monitoring period is normal;

[0052] When z1×v1 / v0+z2×v2 / v0>M, the environmental analysis unit determines that the construction environment in the current second monitoring period is abnormal, and issues an environmental abnormality warning to the user;

[0053] Among them, z1 is the noise weight, z2 is the dust weight, z1+z2=1, v1 is the duration of abnormal environmental noise in the second monitoring period, v2 is the duration of abnormal dust concentration in the second monitoring period, v0 is the duration of the second monitoring period, and M is the preset abnormal proportion.

[0054] Furthermore, the third analysis module is provided with a third analysis unit, and the third analysis unit is used to analyze the safety of the construction according to the analysis results of the abnormality of the construction environment in each second monitoring period in the second management period and the analysis results of the safety of the second construction stage, wherein:

[0055] When the safety of the second construction stage is normal, if e1 / e0≤N1, the third analysis unit determines that the safety of the current construction is qualified; if e1 / e0>N1, the third analysis unit determines that the safety of the current construction is unqualified;

[0056] When the safety of the second construction stage is abnormal and the safety of the first construction stage is abnormal, if e1 / e0≤N1×{1-In[1+(n1 / n0-γ1) / (n1 / n0+γ1)] / In2}, the third analysis unit determines that the safety of the current construction is qualified; if e1 / e0>N1×{1-In[1+(n1 / n0-γ1) / (n1 / n0+γ1)] / In2}, the third analysis unit determines that the safety of the current construction is unqualified;

[0057] When the safety of the second construction stage is abnormal and the safety of the first construction stage is normal, if e1 / e0≤N1×{1-In[1+(n1 / n0-γ2) / (n1 / n0+γ2)] / In2}, the third analysis unit determines that the safety of the current construction is qualified; if e1 / e0>N1×{1-In[1+(n1 / n0-γ2) / (n1 / n0+γ2)] / In2}, the third analysis unit determines that the safety of the current construction is unqualified;

[0058] Among them, e1 is the number of second monitoring cycles of abnormal construction environment in the second management cycle, e0 is the number of second monitoring cycles in the second management cycle, and N1 is the preset abnormal value.

[0059] Furthermore, the safety management module manages the number and frequency of safety inspectors in the next construction process according to the analysis results of the current construction safety and the number of construction violations p0, where:

[0060] When the safety of the construction is qualified, the safety management module does not manage the number and frequency of safety inspectors in the next construction process;

[0061] When the safety of the construction is not up to standard, if p0≤p1, the safety management module does not manage the number and frequency of safety inspectors in the next construction process; if p0>p1, the management module manages the number and frequency of safety inspectors in the next construction process, sets the updated preset number of people to gx', and sets gx'=gx×[1+e 3(s2-u1) / (s2+u1)-3 ], set the updated preset frequency to jh', set jh'=jh×{1+{[(p0-p1) / (p0+p1)+1] (p0-p1) / (p0+p1)+1 -1} / 12}};

[0062] Among them, x=1,2, h=1,2, and p1 is the preset number of violations.

[0063] Compared with the prior art, the beneficial effects of the present invention are that the assessment and analysis unit improves the accuracy of the safety analysis of the employees' safety awareness abnormality by setting a preset pass rate, thereby improving the accuracy of the safety analysis of the first construction stage, thereby improving the accuracy of the safety management of the number of safety inspectors and the inspection frequency in the second construction stage, and ultimately improving the management efficiency and safety of the construction; the first analysis unit improves the accuracy of the safety analysis of the first construction stage by setting a preset water level, thereby improving the accuracy of the safety management of the number of safety inspectors and the inspection frequency in the second construction stage, and ultimately improving the management efficiency and safety of the construction; the first adjustment unit reduces the sedimentation by setting a preset thickness. The influence of excessive thickness of the accumulation layer on the safety analysis of the first construction stage is reduced, thereby improving the accuracy of the safety analysis of the first construction stage, thereby improving the accuracy of the safety management of the number of safety inspectors and the inspection frequency in the second construction stage, and ultimately improving the management efficiency and safety of the construction; the second adjustment unit reduces the influence of excessive soil porosity on the safety analysis of the first construction stage by setting a preset porosity, thereby improving the accuracy of the safety analysis of the first construction stage, thereby improving the accuracy of the safety management of the number of safety inspectors and the inspection frequency in the second construction stage, and ultimately improving the management efficiency and safety of the construction; the equipment analysis unit increases the The accuracy of equipment abnormality analysis is improved, thereby improving the accuracy of safety analysis in the second construction stage, thereby improving the accuracy of patrol frequency management in the third construction stage, and ultimately improving the management efficiency and safety of construction; the abnormality analysis unit improves the accuracy of equipment abnormality analysis by setting a first preset abnormality coefficient, thereby improving the accuracy of safety analysis in the second construction stage, thereby improving the accuracy of patrol frequency management in the third construction stage, and ultimately improving the management efficiency and safety of construction; the second analysis unit improves the accuracy of safety analysis in the second construction stage by setting each preset abnormality coefficient, thereby improving the accuracy of patrol frequency management in the third construction stage, and ultimately improving the management efficiency and safety of construction The management efficiency and safety of construction are improved; the environmental analysis unit improves the accuracy of construction environment abnormality analysis by setting preset noise, preset concentration and preset abnormality ratio, thereby improving the accuracy of construction safety analysis, and ultimately improving the management efficiency and safety of construction; the third analysis unit improves the accuracy of construction safety analysis by setting preset abnormal values, thereby ultimately improving the management efficiency and safety of construction; the safety management module improves the accuracy of the update management of the number of safety inspectors and inspection frequency for the next construction by setting a preset number of violations, thereby improving the accuracy of construction safety analysis, and ultimately improving the management efficiency and safety of construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0064] Figure 1 This is a schematic diagram of the structure of a construction safety management system according to this embodiment;

[0065] Figure 2 is a schematic diagram of the structure of the first analysis module of this embodiment;

[0066] Figure 3 is a schematic diagram of the structure of the second analysis module of this embodiment;

[0067] Figure 4 It is a schematic diagram of the structure of the third analysis module of this embodiment. DETAILED DESCRIPTION

[0068] In order to make the objects and advantages of the present invention more clearly understood, the present invention is further described below in conjunction with embodiments; it should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0069] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.

[0070] It should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0071] See also Figure 1 As shown, it is a structural schematic diagram of a construction safety management system of this embodiment, the system includes:

[0072] An information acquisition module is used to obtain employee training information, construction area information, construction equipment information and construction environment information; the employee training information is the employee training pass rate; the construction area information includes the thickness of the sedimentary layer in the construction area, the groundwater level and the soil porosity; the groundwater level is the height of the groundwater from the surface, the construction equipment information includes the equipment operating temperature and operating voltage; the construction environment information includes construction noise and dust concentration; in this embodiment, no specific limitation is made on the acquisition method of employee training information, construction area information, construction equipment information and construction environment information, and technical personnel in this field can freely set it as long as the acquisition requirements of employee training information, construction area information, construction equipment information and construction environment information are met. Yes, wherein the employee training pass rate can be obtained through interaction, the sediment layer thickness can be obtained through airborne geological radar, the groundwater level can be obtained through a water level meter probe, the soil porosity can be obtained through interaction, the equipment operating temperature can be obtained through a temperature sensor, the equipment operating voltage can be obtained through a pressure sensor, the construction noise can be obtained through a sound sensor, and the dust concentration sensor can be obtained through a particle concentration sensor. It is worth noting that the employee training method is not specifically limited in this embodiment, and those skilled in the art can freely set it as long as the requirements for employee training are met, such as training can be carried out through video learning methods, and an examination can be conducted, and the examination pass rate is used as the employee training pass rate;

[0073] The first analysis module is used to analyze the safety of the first construction stage according to the acquired employee training information and the groundwater level in the construction area, and to manage the number of safety inspectors and the inspection frequency in the second construction stage according to the analysis results, and to adjust the analysis process of the safety of the first construction stage according to the thickness of the sediment layer and the soil porosity in the construction area; the first analysis module is connected to the information acquisition module; the first construction stage is the preparation stage before construction;

[0074] A second analysis module is used to analyze the safety of the second construction stage according to the analysis results of the safety of the first construction stage and the construction equipment information in the first management period, and manage the inspection frequency of the third construction stage according to the analysis results, the second construction stage is the main structure construction stage, and the second analysis module is connected to the first analysis module;

[0075] A third analysis module, used for analyzing the safety of the construction according to the analysis result of the safety of the second construction stage and the construction environment information of the third construction stage, wherein the third construction stage is the decoration construction stage, and the third analysis module is connected to the second analysis module;

[0076] The safety management module is used to manage the number of safety inspectors and the inspection frequency during the next construction process according to the safety of the construction and the number of construction violations. The management module is connected to the third analysis module. The number of construction violations in this embodiment is the total number of construction violations in the second construction stage and the third construction stage. In this embodiment, no specific limitation is made on the method for obtaining the number of construction violations. Those skilled in the art can set it freely as long as the requirements for obtaining construction violations are met. Among them, the number of construction violations can be obtained through the interactive input of safety inspectors. It is worth noting that no specific limitation is made on construction violations in this embodiment. Those skilled in the art can set it freely. The technicians can set it freely, and only need to meet the setting requirements of the construction violations. Among them, the construction violations can be set as unbuilt or non-standard scaffolding, lack of safety nets and guardrails, non-standard traffic organization, lack of traffic signs and warning facilities, unlicensed driving of mechanical equipment, failure to take noise and dust control measures, etc.; the next construction process described in this embodiment is a project of the same type as the current construction project. In this embodiment, the standards for the same type of construction projects are not specifically limited. The technicians in this field can set it freely, and only need to meet the setting requirements of the standards for the same type of construction projects, such as the same construction area and the building type is a villa project;

[0077] The output module is used to output the management results of the construction safety and the number and frequency of safety inspectors in the next construction process to the user. The output module is connected to the safety management module.

[0078] See also Figure 2 As shown, it is a schematic diagram of the structure of the first analysis module of this embodiment, and the first analysis module includes:

[0079] Assessment and analysis unit, used to analyze the abnormality of employees' safety awareness based on their training qualification rate;

[0080] A first analysis unit is used to analyze the safety of the first construction stage according to the analysis results of the abnormality of the safety awareness of the employees and the groundwater level of the construction area, and to manage the number and frequency of safety inspection personnel in the second construction stage according to the analysis results. The first analysis unit is connected to the assessment analysis unit;

[0081] A first adjustment unit, used for adjusting the analysis process of the safety of the first construction stage according to the obtained sediment layer thickness, the first adjustment unit being connected to the first analysis unit;

[0082] The second adjustment unit is used to perform secondary adjustment on the analysis process of the safety of the first construction stage according to the acquired soil porosity, and the second adjustment unit is connected to the first adjustment unit.

[0083] See also Figure 3 As shown, it is a schematic diagram of the structure of the second analysis module of this embodiment, and the second analysis module includes:

[0084] A device analysis unit, used to analyze the abnormality of the device temperature and the abnormality of the device operating voltage according to the acquired device temperature and the device operating voltage;

[0085] An abnormality analysis unit, used for analyzing the abnormality of the equipment operating state according to the analysis results of the equipment temperature abnormality and the operating voltage abnormality in the first monitoring period, the abnormality analysis unit being connected to the equipment analysis unit;

[0086] The second analysis unit is used to analyze the safety of the second building stage based on the analysis results of the abnormality of the equipment operating status in each first monitoring period within the first management period and the analysis results of the safety of the first building stage, and to manage the inspection frequency of the third building stage based on the analysis results of the safety of the second building stage. The second analysis unit is connected to the abnormality analysis unit.

[0087] See also Figure 4 As shown, it is a schematic diagram of the structure of the third analysis module of this embodiment, and the third analysis module includes:

[0088] An environmental analysis unit, used to analyze the abnormality of the decoration environment based on the construction noise and dust concentration obtained during the second monitoring period;

[0089] The third analysis unit is used to analyze the safety of the construction according to the analysis results of the abnormality of the construction environment in each second monitoring period within the second management period and the analysis results of the safety of the second construction stage. The third analysis unit is connected to the environmental analysis unit.

[0090] Specifically, the construction safety management system described in this embodiment is applied to the safety management of large-scale projects. It analyzes the safety of each construction stage, manages the number and frequency of safety inspections based on the analysis results, and adjusts and optimizes the analysis process through the thickness of the sediment layer and the soil porosity in the construction area, thereby improving the management efficiency and safety of the construction.

[0091] Specifically, the first analysis module sets a preset pass rate to improve the accuracy of abnormal analysis of employee safety awareness, sets a preset water level to improve the accuracy of safety analysis in the first construction phase, thereby improving the accuracy of safety management of the number of safety inspectors and inspection frequency in the second construction phase, sets a preset thickness to reduce the impact of excessive sediment thickness on the safety analysis in the first construction phase, thereby improving the accuracy of safety analysis in the first construction phase, sets a preset porosity to reduce the impact of excessive soil porosity on the safety analysis in the first construction phase, thereby improving the accuracy of safety analysis in the first construction phase, the second analysis module sets a preset temperature and a preset voltage to improve the accuracy of equipment abnormality analysis, and sets the A preset abnormality coefficient is used to improve the accuracy of equipment abnormality analysis, and each preset abnormality coefficient is set to improve the accuracy of the safety analysis of the second construction stage, thereby improving the accuracy of the inspection frequency management of the third construction stage. The third analysis module improves the accuracy of the abnormality analysis of the construction environment by setting preset noise, preset concentration and preset abnormality ratio, and improves the accuracy of the safety analysis of the construction by setting preset abnormal values, thereby ultimately improving the management efficiency and safety of the construction; the safety management module improves the accuracy of the number of safety inspectors for the next construction and the inspection frequency update management by setting a preset number of violations, thereby improving the accuracy of the safety analysis of the construction, thereby ultimately improving the management efficiency and safety of the construction.

[0092] Specifically, the assessment analysis unit compares the employee's training qualification rate a0 with the preset qualification rate a1, and analyzes the abnormality of the employee's safety awareness according to the comparison result, wherein:

[0093] When a0≤a1, the assessment and analysis unit determines that the employee's safety awareness is abnormal;

[0094] When a0>a1, the assessment and analysis unit determines that the employee's safety awareness is normal.

[0095] Specifically, the assessment and analysis unit improves the accuracy of the analysis of abnormalities in employees' safety awareness by setting a preset pass rate, thereby improving the accuracy of the safety analysis in the first construction phase, thereby improving the accuracy of the safety management of the number of safety inspectors and the frequency of inspections in the second construction phase, and ultimately improving the management efficiency and safety of construction. In this embodiment, there is no specific limitation on the setting of the preset pass rate, and technical personnel in this field can set it freely as long as the setting requirements of the preset pass rate are met. Among them, the optimal value of a1 is 0.8.

[0096] Specifically, the first analysis unit compares the acquired groundwater level b0 with each preset groundwater level, and analyzes the safety of the first construction phase according to the comparison result and the analysis result of the abnormality of employees' safety awareness, wherein:

[0097] When the safety awareness of the employees is abnormal, if b0≤b1×[1+0.34×sin(π / 2)×(a1-a0) / (a1+a0)] or b0≥b2×[1-0.34×sin(π / 2)×(a1-a0) / (a1+a0)], the first analysis unit determines that the safety of the first construction stage is abnormal; if b1×[1+0.34×sin(π / 2)×(a1-a0) / (a1+a0)]<b0<b2×[1-0.34×sin(π / 2)×(a1-a0) / (a1+a0)], the first analysis unit determines that the safety of the first construction stage is normal;

[0098] When the safety awareness of the employees is normal, if b0≤b1 or b0≥b2, the first analysis unit determines that the safety of the first construction stage is abnormal; if b1<b0<b2, the first analysis unit determines that the safety of the first construction stage is normal;

[0099] The first analysis unit manages the number and frequency of safety inspection personnel in the second construction phase according to the analysis results of the safety in the first construction phase, wherein:

[0100] When the safety of the first construction stage is normal, the first analysis unit sets the number of security inspections in the second construction stage to L1, sets L1=g1, sets the inspection frequency in the second construction stage to J1, sets J1=j1;

[0101] When the safety of the first construction stage is abnormal, the first analysis unit sets the number of safety inspections in the second construction stage to L2, sets L2=g2, sets the inspection frequency in the second construction stage to J2, and sets J2=j2;

[0102] The first analysis unit outputs the analysis results of the number of safety inspection personnel and inspection frequency in the second construction phase to the user;

[0103] Among them, b1 is the preset minimum water level, b2 is the preset maximum water level, g1 is the first preset number of people, g2 is the second preset number of people, j1 is the first preset frequency, and j2 is the second preset frequency.

[0104] Specifically, the first analysis unit improves the accuracy of the safety analysis in the first construction phase by setting a preset water level, thereby improving the accuracy of the safety management of the number of safety inspectors and the inspection frequency in the second construction phase, and ultimately improving the management efficiency and safety of the construction. In this embodiment, there is no specific limitation on the setting of the preset water level, the preset number of inspectors and the preset frequency, and those skilled in the art can set them freely as long as the setting requirements of the preset water level, the preset number of inspectors and the preset frequency are met. In large-scale projects in coastal areas, the optimal value of b1 is 5m, the optimal value of b2 is 10m, the optimal value of g1 is 6, the optimal value of g2 is 8, the optimal value of j1 is 8h / time, and the optimal value of j2 is 6h / time.

[0105] Specifically, the first adjustment unit compares the obtained deposition layer thickness c0 with the preset thickness c1, and adjusts the safety analysis process of the first construction stage according to the comparison result, wherein:

[0106] When c0≤c1, the first adjustment unit determines that the thickness of the deposition layer is normal and does not make any adjustment;

[0107] When c0>c1, the first adjustment unit determines that the thickness of the sedimentation layer is abnormal, and adjusts the analysis process of the safety of the first construction stage, setting the adjusted preset minimum water level to b1', setting b1'=b1×{1+0.56×arctan[(c0-c1) / (c0+c1)×(π / 4)]}, and setting the adjusted preset maximum water level to b2', setting b2'=b2×{1-0.56×arctan[(c0-c1) / (c0+c1)×(π / 4)]}.

[0108] Specifically, the first adjustment unit reduces the impact of excessive thickness of the sediment layer on the safety analysis of the first construction stage by setting a preset thickness, thereby improving the accuracy of the safety analysis of the first construction stage, thereby improving the accuracy of the safety management of the number of safety inspectors and the frequency of inspections in the second construction stage, and ultimately improving the management efficiency and safety of construction. In this embodiment, no specific limitation is made to the setting of the preset thickness, and technical personnel in this field can set it freely, as long as the setting requirements of the preset thickness are met. Among them, the optimal value of c1 is 15m. It is worth noting that in this embodiment, no specific limitation is made to the one-time adjustment method of the safety analysis process of the first construction stage, and a one-time adjustment can also be made through influencing factors such as soil moisture.

[0109] Specifically, the second adjustment unit compares the obtained soil porosity k0 with the preset porosity k1, and performs secondary adjustment on the safety analysis process of the first construction stage according to the comparison result, wherein:

[0110] When k0≤k1, the second adjustment unit determines that the porosity of the soil is normal and does not make any adjustment;

[0111] When k0>k1, the second adjustment unit determines that the porosity of the soil is abnormal, and performs a second adjustment on the analysis process of the safety of the first construction stage, and sets the adjusted preset thickness to c1', setting c1'=c1×[1-(k0-k1) / (k0+k1)].

[0112] Specifically, the second adjustment unit reduces the impact of excessive soil porosity on the safety analysis of the first construction stage by setting a preset porosity, thereby improving the accuracy of the safety analysis of the first construction stage, thereby improving the accuracy of the safety management of the number of safety inspectors and the frequency of inspections in the second construction stage, and ultimately improving the management efficiency and safety of construction; in this embodiment, no specific limitation is made to the setting of the preset thickness, and technical personnel in this field can set it freely, as long as the setting requirements of the preset thickness are met, among which the optimal value of k1 is 0.45. It is worth noting that in this embodiment, no specific limitation is made to the secondary adjustment method of the analysis process of the safety of the first construction stage, and secondary adjustment can also be made through influencing factors such as soil density.

[0113] Specifically, the device analysis unit compares the acquired device temperature with the preset temperature, and analyzes the abnormality of the device temperature according to the comparison result, wherein:

[0114] When t(i)≤t1(i), the device analysis unit determines that the temperature of the device numbered i is normal;

[0115] When t(i)>t1(i), the device analysis unit determines that the temperature of the device numbered i is abnormal;

[0116] The device analysis unit compares the acquired device operating voltage with the preset voltage, and analyzes the abnormality of the device operating voltage according to the comparison result, wherein:

[0117] When d(i)≤d1(i), the device analysis unit determines that the voltage of the device numbered i is normal;

[0118] When d(i)>d1(i), the device analysis unit determines that the voltage of the device numbered i is abnormal;

[0119] Wherein, t(i) is the temperature of the device numbered i, t1(i) is the preset temperature of the device numbered i, d(i) is the voltage of the device numbered i, and d1(i) is the preset voltage of the device numbered i.

[0120] Specifically, the equipment analysis unit sets a preset temperature and a preset voltage to improve the accuracy of equipment abnormality analysis, thereby improving the accuracy of safety analysis in the second construction stage, thereby improving the accuracy of patrol frequency management in the third construction stage, and ultimately improving the management efficiency and safety of construction. In this embodiment, there is no specific limitation on the setting of the preset temperature and the preset voltage, and those skilled in the art can set them freely, as long as the setting requirements of the preset temperature and the preset voltage are met. When the equipment is a large mixer, the optimal value of t1(i) is 80°C, and the optimal value of d1(i) is 380V.

[0121] Specifically, the abnormality analysis unit analyzes the abnormality of the equipment operating state according to the analysis results of the equipment temperature abnormality and the operating voltage abnormality in the first monitoring period, wherein:

[0122] When w1×r1i / r0+w2×r2i / r0≤α, the abnormality analysis unit determines that the equipment operation status in the current first monitoring period is normal;

[0123] When w1×r1i / r0+w2×r2i / r0>α, the abnormality analysis unit determines that the equipment operation status in the current first monitoring period is abnormal, and issues an early warning to the user;

[0124] Among them, r1i is the duration of temperature abnormality of device numbered i in the first monitoring period, r2i is the duration of operating voltage abnormality of device numbered i in the first monitoring period, r0 is the duration of the first monitoring period, w1 is the temperature weight, w2 is the voltage weight, w1+w2=1, w1≥w2, and α is the first preset abnormality coefficient.

[0125] Specifically, the abnormality analysis unit improves the accuracy of equipment abnormality analysis by setting a first preset abnormality coefficient, thereby improving the accuracy of safety analysis in the second construction stage, thereby improving the accuracy of patrol frequency management in the third construction stage, and ultimately improving the management efficiency and safety of construction; in this embodiment, there is no specific limitation on the setting of the first preset abnormality coefficient, temperature weight and voltage weight, and those skilled in the art can set them freely, as long as the setting requirements of the first preset abnormality coefficient, temperature weight and voltage weight are met, wherein the optimal value of α is 0.3, the optimal value of w1 is 0.55, and the optimal value of w2 is 0.45; in this embodiment, there is no specific limitation on the setting of the first monitoring period, and those skilled in the art can set it freely, as long as the setting requirements of the first monitoring period are met, wherein the first monitoring period can be set to 2h, 4h, etc.; it is worth noting that in this embodiment, factors such as the vibration frequency of the equipment can be added to analyze the abnormality of the equipment. When the vibration frequency is added as an influencing factor, w1 can be set to 0.4, w2 can be set to 0.35, and w3 is the vibration frequency weight, which can be set to 0.25.

[0126] Specifically, the second analysis unit analyzes the safety of the second construction stage according to the analysis results of the abnormality of the equipment operation status in each first monitoring period within the first management period and the analysis results of the safety of the first construction stage, wherein:

[0127] When mi / m≤β, the second analysis unit determines that the operation status of the device numbered i in the current first management period is normal;

[0128] When mi / m>β, the second analysis unit determines that the operation state of the equipment with the current first management cycle number i is abnormal; if the safety of the first construction stage is normal and n1 / n0≤γ1, the second analysis unit determines that the safety of the second construction stage is normal; if the safety of the first construction stage is normal and n1 / n0>γ1, the second analysis unit determines that the safety of the second construction stage is abnormal; if the safety of the first construction stage is abnormal and n1 / n0≤γ2, the second analysis unit determines that the safety of the second construction stage is normal; if the safety of the first construction stage is abnormal and n1 / n0>γ2, the second analysis unit determines that the safety of the second construction stage is abnormal;

[0129] The second analysis unit manages the inspection frequency of the third construction stage according to the analysis result of the safety of the second construction stage, wherein:

[0130] When the safety of the second building stage is normal, the second analysis unit does not manage the inspection frequency;

[0131] When the safety of the second construction stage is abnormal, the second analysis unit does not manage the inspection frequency. If the safety of the first construction stage is normal, the second analysis unit sets the inspection frequency of the third construction stage to J3, and sets J3=j1×[1+0.36×(n1 / n0-γ1) / (n1 / n0+γ1)]; if the safety of the first construction stage is abnormal, the second analysis unit sets the inspection frequency of the third construction stage to J4, and sets J4=j2×[1+0.36×(n1 / n0-γ2) / (n1 / n0+γ2)];

[0132] Among them, β is the second preset abnormality coefficient, γ1 is the third preset abnormality coefficient, γ2 is the fourth preset abnormality coefficient, γ1>γ2, mi is the number of abnormal first monitoring cycles of the device numbered i in the first management cycle, m is the number of first monitoring cycles in the first management cycle, n1 is the number of devices with abnormal operating status, n0 is the total number of devices, and 0<i≤n0.

[0133] Specifically, in this embodiment, the first management cycle is the duration of the second construction stage. The second analysis unit improves the accuracy of the safety analysis of the second construction stage by setting each preset abnormality coefficient, thereby improving the accuracy of the inspection frequency management of the third construction stage, and ultimately improving the management efficiency and safety of the construction. This embodiment does not make specific limitations on the setting of each preset abnormality coefficient, and technical personnel in this field can set it freely as long as the setting requirements of each preset abnormality coefficient are met. Among them, the optimal value of β is 0.2, the optimal value of γ1 is 0.2, and the optimal value of γ2 is 0.15.

[0134] Specifically, the environmental analysis unit compares the acquired construction noise s0 with the preset noise s1, and analyzes the abnormality of the environmental noise according to the comparison result, wherein:

[0135] When s0≤s1, the environment analysis unit determines that the environmental noise is normal;

[0136] When s0>s1, the environment analysis unit determines that the environment noise is abnormal;

[0137] The environmental analysis unit compares the obtained dust concentration q0 with the preset concentration q1, and analyzes the abnormality of the dust concentration according to the comparison result, wherein:

[0138] When q0≤q1, the environmental analysis unit determines that the dust concentration is normal;

[0139] When q0>q1, the environmental analysis unit determines that the dust concentration is abnormal;

[0140] The environment analysis unit analyzes the abnormality of the decoration environment according to the analysis results of the abnormality of the environmental noise and dust concentration in the second monitoring period, wherein:

[0141] When z1×v1 / v0+z2×v2 / v0≤M, the environmental analysis unit determines that the construction environment in the current second monitoring period is normal;

[0142] When z1×v1 / v0+z2×v2 / v0>M, the environmental analysis unit determines that the construction environment in the current second monitoring period is abnormal, and issues an environmental abnormality warning to the user;

[0143] Among them, z1 is the noise weight, z2 is the dust weight, z1+z2=1, v1 is the duration of abnormal environmental noise in the second monitoring period, v2 is the duration of abnormal dust concentration in the second monitoring period, v0 is the duration of the second monitoring period, and M is the preset abnormal proportion.

[0144] Specifically, the environmental analysis unit improves the accuracy of construction environment abnormality analysis by setting preset noise, preset concentration and preset abnormality ratio, thereby improving the accuracy of construction safety analysis, and ultimately improving the management efficiency and safety of construction; this embodiment does not specifically limit the setting of preset noise, preset concentration, noise weight, concentration weight and preset abnormality ratio, and technicians in this field can set them freely, as long as the setting requirements of preset noise, preset concentration, noise weight, concentration weight and preset abnormality ratio are met. Among them, the optimal value of s1 is 85dB, and the optimal value of q1 is 15mg / m 3 , the optimal value of z1 is 0.5, the optimal value of z2 is 0.5, and the optimal value of M is 0.22; in this embodiment, the setting of the second monitoring period is not specifically limited, and those skilled in the art can set it freely as long as the setting requirements of the second monitoring period are met, wherein the second monitoring period can be set to 2h, 3h, etc.

[0145] Specifically, the third analysis unit analyzes the safety of the construction according to the analysis results of the abnormality of the construction environment in each second monitoring period within the second management period and the analysis results of the safety of the second construction stage, wherein:

[0146] When the safety of the second construction stage is normal, if e1 / e0≤N1, the third analysis unit determines that the safety of the current construction is qualified; if e1 / e0>N1, the third analysis unit determines that the safety of the current construction is unqualified;

[0147] When the safety of the second construction stage is abnormal and the safety of the first construction stage is abnormal, if e1 / e0≤N1×{1-In[1+(n1 / n0-γ1) / (n1 / n0+γ1)] / In2}, the third analysis unit determines that the safety of the current construction is qualified; if e1 / e0>N1×{1-In[1+(n1 / n0-γ1) / (n1 / n0+γ1)] / In2}, the third analysis unit determines that the safety of the current construction is unqualified;

[0148] When the safety of the second construction stage is abnormal and the safety of the first construction stage is normal, if e1 / e0≤N1×{1-In[1+(n1 / n0-γ2) / (n1 / n0+γ2)] / In2}, the third analysis unit determines that the safety of the current construction is qualified; if e1 / e0>N1×{1-In[1+(n1 / n0-γ2) / (n1 / n0+γ2)] / In2}, the third analysis unit determines that the safety of the current construction is unqualified;

[0149] Among them, e1 is the number of second monitoring cycles of abnormal construction environment in the second management cycle, e0 is the number of second monitoring cycles in the second management cycle, and N1 is the preset abnormal value.

[0150] Specifically, in this embodiment, the second management cycle is the duration of the third construction stage. The third analysis unit improves the accuracy of construction safety analysis by setting preset abnormal values, thereby ultimately improving the management efficiency and safety of construction. In this embodiment, there is no specific limitation on the setting of preset abnormal values, and technical personnel in this field can set them freely as long as the setting requirements of the preset abnormal values ​​are met. Among them, the optimal value of N1 is 0.18.

[0151] Specifically, the safety management module manages the number and frequency of safety inspectors in the next construction process according to the analysis results of the current construction safety and the number of construction violations p0, where:

[0152] When the safety of the construction is qualified, the safety management module does not manage the number and frequency of safety inspectors in the next construction process;

[0153] When the safety of the construction is not up to standard, if p0≤p1, the safety management module does not manage the number and frequency of safety inspectors in the next construction process; if p0>p1, the management module manages the number and frequency of safety inspectors in the next construction process, sets the updated preset number of people to gx', and sets gx'=gx×[1+e 3(s2-u1) / (s2+u1)-3], set the updated preset frequency to jh', set jh'=jh×{1+{[(p0-p1) / (p0+p1)+1] (p0-p1) / (p0+p1)+1 -1} / 12}};

[0154] Where x=1,2, h=1,2, p1 is the preset number of violations, and gx' is gx×[1+e 3(s2-u1) / (s2+u1)-3 ]The result is rounded up.

[0155] Specifically, the safety management module sets a preset number of violations to improve the accuracy of the management of the number of safety inspectors and the frequency of inspections for the next construction project, thereby improving the accuracy of the safety analysis of the construction project, and ultimately improving the management efficiency and safety of the construction project. This embodiment does not specifically limit the setting of the preset number of violations, and technicians in this field can set it freely, as long as the setting requirements of the preset number of violations are met. The optimal value of p1 is 20.

[0156] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.

Claims

1. A construction safety management system, characterized in that: include, Information acquisition module, used to obtain employee training information, construction area information, construction equipment information and construction environment information; The first analysis module is used to analyze the safety of the first construction phase based on the obtained employee training information and the groundwater level in the construction area, and to manage the number of safety inspectors and the inspection frequency in the second construction phase based on the analysis results. It is also used to adjust the analysis process of the safety of the first construction phase based on the thickness of the sediment layer and the soil porosity in the construction area; The second analysis module is used to analyze the safety of the second construction stage according to the analysis results of the safety of the first construction stage and the construction equipment information in the first management period, and manage the inspection frequency of the third construction stage according to the analysis results; A third analysis module is used to analyze the safety of the construction according to the analysis results of the safety of the second construction stage and the construction environment information of the third construction stage; Safety management module, which is used to manage the number and frequency of safety inspectors during the next construction process according to the safety of the construction and the number of construction violations; The output module is used to output the management results of the construction safety and the number and frequency of safety inspectors in the next construction process to the user; The first analysis module is provided with an assessment analysis unit and a first analysis unit. The assessment analysis unit compares the employee's training qualification rate a0 with the preset qualification rate a1, and analyzes the abnormality of the employee's safety awareness according to the comparison result, wherein: When a0≤a1, the assessment and analysis unit determines that the employee's safety awareness is abnormal; When a0>a1, the assessment and analysis unit determines that the employee's safety awareness is normal; The first analysis unit is used to compare the acquired groundwater level b0 with each preset groundwater level, and analyze the safety of the first construction stage according to the comparison result and the analysis result of the abnormality of employees' safety awareness, wherein: When the safety awareness of the employees is abnormal, if b0≤b1×[1+0.34×sin(π / 2)×(a1-a0) / (a1+a0)] or b0≥b2×[1-0.34×sin(π / 2)×(a1-a0) / (a1+a0)], the first analysis unit determines that the foundation settlement risk is abnormal and the safety of the first construction stage is abnormal; if b1×[1+0.34×sin(π / 2)×(a1-a0) / (a1+a0)]<b0<b2×[1-0.34×sin(π / 2)×(a1-a0) / (a1+a0)], the first analysis unit determines that the foundation settlement risk is normal and the safety of the first construction stage is normal; When the safety awareness of the employees is normal, if b0≤b1 or b0≥b2, the first analysis unit determines that the foundation settlement risk is abnormal and the safety of the first construction stage is abnormal; if b1<b0<b2, the first analysis unit determines that the foundation settlement risk is normal and the safety of the first construction stage is normal; The first analysis unit manages the number and frequency of safety inspection personnel in the second construction phase according to the analysis results of the safety in the first construction phase, wherein: When the safety of the first construction stage is normal, the first analysis unit sets the number of security inspections in the second construction stage to L1, sets L1=g1, sets the inspection frequency in the second construction stage to J1, sets J1=j1; When the safety of the first construction stage is abnormal, the first analysis unit sets the number of safety inspections in the second construction stage to L2, sets L2=g2, sets the inspection frequency in the second construction stage to J2, and sets J2=j2; The first analysis unit outputs the analysis results of the number of safety inspection personnel and inspection frequency in the second construction phase to the user; Among them, b1 is the preset minimum water level, b2 is the preset maximum water level, g1 is the first preset number of people, g2 is the second preset number of people, j1 is the first preset frequency, and j2 is the second preset frequency.

2. The construction safety management system according to claim 1, characterized in that: The first analysis module is provided with a first adjustment unit, which is used to compare the obtained sedimentation layer thickness c0 with the preset thickness c1, and adjust the analysis process of the safety of the first construction stage according to the comparison result, wherein: When c0≤c1, the first adjustment unit determines that the thickness of the deposition layer is normal and does not make any adjustment; When c0>c1, the first adjustment unit determines that the thickness of the sedimentation layer is abnormal, and adjusts the analysis process of the safety of the first construction stage, setting the adjusted preset minimum water level to b1', setting b1'=b1×{1+0.56×arctan[(c0-c1) / (c0+c1)×(π / 4)]}, and setting the adjusted preset maximum water level to b2', setting b2'=b2×{1-0.56×arctan[(c0-c1) / (c0+c1)×(π / 4)]}.

3. The construction safety management system according to claim 2, characterized in that: The first analysis module is provided with a second adjustment unit, which is used to compare the obtained soil porosity k0 with the preset porosity k1, and to make a secondary adjustment to the analysis process of the safety of the first construction stage according to the comparison result, wherein: When k0≤k1, the second adjustment unit determines that the porosity of the soil is normal and does not make any adjustment; When k0>k1, the second adjustment unit determines that the porosity of the soil is abnormal, and performs a second adjustment on the analysis process of the safety of the first construction stage, and sets the adjusted preset thickness to c1', setting c1'=c1×[1-(k0-k1) / (k0+k1)].

4. The construction safety management system according to claim 3, characterized in that: The second analysis module is provided with a device analysis unit, which compares the acquired device temperature with a preset temperature and analyzes the abnormality of the device temperature according to the comparison result, wherein: When t(i)≤t1(i), the device analysis unit determines that the temperature of the device numbered i is normal; When t(i)>t1(i), the device analysis unit determines that the temperature of the device numbered i is abnormal; The device analysis unit compares the acquired device operating voltage with the preset voltage, and analyzes the abnormality of the device operating voltage according to the comparison result, wherein: When d(i)≤d1(i), the device analysis unit determines that the voltage of the device numbered i is normal; When d(i)>d1(i), the device analysis unit determines that the voltage of the device numbered i is abnormal; Wherein, t(i) is the temperature of the device numbered i, t1(i) is the preset temperature of the device numbered i, d(i) is the voltage of the device numbered i, and d1(i) is the preset voltage of the device numbered i.

5. The construction safety management system according to claim 4, characterized in that: The second analysis module is provided with an abnormality analysis unit, and the abnormality analysis unit is used to analyze the abnormality of the equipment operation state according to the analysis results of the equipment temperature abnormality and the operating voltage abnormality in the first monitoring period, wherein: When w1×r1i / r0+w2×r2i / r0≤α, the abnormality analysis unit determines that the equipment operation status in the current first monitoring period is normal; When w1×r1i / r0+w2×r2i / r0>α, the abnormality analysis unit determines that the equipment operation status in the current first monitoring period is abnormal, and issues an early warning to the user; Among them, r1i is the duration of temperature abnormality of device numbered i in the first monitoring period, r2i is the duration of operating voltage abnormality of device numbered i in the first monitoring period, r0 is the duration of the first monitoring period, w1 is the temperature weight, w2 is the voltage weight, w1+w2=1, w1≥w2, and α is the first preset abnormality coefficient.

6. The construction safety management system according to claim 5, characterized in that: The second analysis module is provided with a second analysis unit, and the second analysis unit is used to analyze the safety of the second construction stage according to the analysis results of the abnormality of the equipment operation status in each first monitoring period in the first management period and the analysis results of the safety of the first construction stage, wherein: When mi / m≤β, the second analysis unit determines that the operation status of the device numbered i in the current first management period is normal; When mi / m>β, the second analysis unit determines that the operation state of the equipment with the current first management cycle number i is abnormal; if the safety of the first construction stage is normal and n1 / n0≤γ1, the second analysis unit determines that the safety of the second construction stage is normal; if the safety of the first construction stage is normal and n1 / n0>γ1, the second analysis unit determines that the safety of the second construction stage is abnormal; if the safety of the first construction stage is abnormal and n1 / n0≤γ2, the second analysis unit determines that the safety of the second construction stage is normal; if the safety of the first construction stage is abnormal and n1 / n0>γ2, the second analysis unit determines that the safety of the second construction stage is abnormal; The second analysis unit manages the inspection frequency of the third construction stage according to the analysis result of the safety of the second construction stage, wherein: When the safety of the second building stage is normal, the second analysis unit does not manage the inspection frequency; When the safety of the second construction stage is abnormal, the second analysis unit does not manage the inspection frequency. If the safety of the first construction stage is normal, the second analysis unit sets the inspection frequency of the third construction stage to J3, and sets J3=j1×[1+0.36×(n1 / n0-γ1) / (n1 / n0+γ1)]; if the safety of the first construction stage is abnormal, the second analysis unit sets the inspection frequency of the third construction stage to J4, and sets J4=j2×[1+0.36×(n1 / n0-γ2) / (n1 / n0+γ2)]; Among them, β is the second preset abnormality coefficient, γ1 is the third preset abnormality coefficient, γ2 is the fourth preset abnormality coefficient, γ1>γ2, mi is the number of abnormal first monitoring cycles of the device numbered i in the first management cycle, m is the number of first monitoring cycles in the first management cycle, n1 is the number of devices with abnormal operating status, and n0 is the total number of devices.

7. The construction safety management system according to claim 6, characterized in that: The third analysis module is provided with an environment analysis unit, which is used to compare the acquired construction noise s0 with the preset noise s1, and analyze the abnormality of the environmental noise according to the comparison result, wherein: When s0≤s1, the environment analysis unit determines that the environmental noise is normal; When s0>s1, the environment analysis unit determines that the environmental noise is abnormal; The environmental analysis unit compares the obtained dust concentration q0 with the preset concentration q1, and analyzes the abnormality of the dust concentration according to the comparison result, wherein: When q0≤q1, the environmental analysis unit determines that the dust concentration is normal; When q0>q1, the environmental analysis unit determines that the dust concentration is abnormal; The environment analysis unit analyzes the abnormality of the decoration environment according to the analysis results of the abnormality of the environmental noise and dust concentration in the second monitoring period, wherein: When z1×v1 / v0+z2×v2 / v0≤M, the environment analysis unit determines that the construction environment in the current second monitoring period is normal; When z1×v1 / v0+z2×v2 / v0>M, the environmental analysis unit determines that the construction environment in the current second monitoring period is abnormal, and issues an environmental abnormality warning to the user; Among them, z1 is the noise weight, z2 is the dust weight, z1+z2=1, v1 is the duration of abnormal environmental noise in the second monitoring period, v2 is the duration of abnormal dust concentration in the second monitoring period, v0 is the duration of the second monitoring period, and M is the preset abnormal proportion.

8. The construction safety management system according to claim 7, characterized in that: The third analysis module is provided with a third analysis unit, and the third analysis unit is used to analyze the safety of the construction according to the analysis results of the abnormality of the construction environment in each second monitoring period in the second management period and the analysis results of the safety of the second construction stage, wherein: When the safety of the second construction stage is normal, if e1 / e0≤N1, the third analysis unit determines that the safety of the current construction is qualified; if e1 / e0>N1, the third analysis unit determines that the safety of the current construction is unqualified; When the safety of the second construction stage is abnormal and the safety of the first construction stage is abnormal, if e1 / e0≤N1×{1-In[1+(n1 / n0-γ1) / (n1 / n0+γ1)] / In2}, the third analysis unit determines that the safety of the current construction is qualified; if e1 / e0>N1×{1-In[1+(n1 / n0-γ1) / (n1 / n0+γ1)] / In2}, the third analysis unit determines that the safety of the current construction is unqualified; When the safety of the second construction stage is abnormal and the safety of the first construction stage is normal, if e1 / e0≤N1×{1-In[1+(n1 / n0-γ2) / (n1 / n0+γ2)] / In2}, the third analysis unit determines that the safety of the current construction is qualified; if e1 / e0>N1×{1-In[1+(n1 / n0-γ2) / (n1 / n0+γ2)] / In2}, the third analysis unit determines that the safety of the current construction is unqualified; Among them, e1 is the number of second monitoring cycles of abnormal construction environment in the second management cycle, e0 is the number of second monitoring cycles in the second management cycle, and N1 is the preset abnormal value.

9. The construction safety management system according to claim 8, characterized in that: The safety management module manages the number and frequency of safety inspectors in the next construction process according to the analysis results of the current construction safety and the number of construction violations p0, where: When the safety of the construction is qualified, the safety management module does not manage the number and frequency of safety inspectors in the next construction process; When the safety of the construction is not up to standard, if p0≤p1, the safety management module does not manage the number and frequency of safety inspectors in the next construction process; if p0>p1, the management module manages the number and frequency of safety inspectors in the next construction process, sets the updated preset number of people to gx', and sets gx'=gx×[1+e 3(s2-u1) / (s2+u1)-3 ], set the updated preset frequency to jh', set jh'=jh×{1+{[(p0-p1) / (p0+p1)+1] (p0-p1) / (p0+p1)+1 -1} / 12}}; Where x=1,2, h=1,2, p1 is the preset number of violations, and gx' is gx×[1+e 3(s2-u1) / (s2+u1)-3 ]The result is rounded up.