A deep foundation pit support and adjustment system
By coordinating the sensing and control modules, the length of the support anchor rods is dynamically adjusted, solving the instability problem of deep foundation pit support structures and achieving dynamic stability and improved safety of the foundation pit.
Patent Information
- Application Number
- CN202410087534.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-22
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2044-01-22
AI Technical Summary
In existing deep foundation pit support technologies, foundation pit support structures are prone to accidents such as displacement, damage, collapse, and damage to surrounding facilities, leading to safety hazards and losses.
The deformation information of the soil and support structure is monitored by the sensing module, and the length of the support anchor of the hydraulic telescopic module is calculated and adjusted by the control module to dynamically adjust the support force of the support system and ensure the stability of the foundation pit.
This achieved dynamic stability of the foundation pit support system, reduced the instability and accident risk of the support structure, and improved construction safety.
Smart Images

Figure CN118065907B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of engineering construction technology, and more specifically, to a deep foundation pit support and adjustment system. Background Technology
[0002] As a crucial component of underground construction, foundation pit construction presents significant risks due to its characteristics, including large excavation depths, wide excavation areas, dense surrounding buildings, and high pedestrian and vehicular traffic. Current foundation pit construction techniques typically utilize anchor bolts to protect the pit, ensuring that construction does not endanger surrounding buildings and preventing ground subsidence and deformation of the pit's retaining structure.
[0003] Deep foundation pit support engineering is a comprehensive engineering problem involving a wide range of issues and technologies. In practice, several accidents frequently occur in deep foundation pit engineering, such as significant displacement of the support structure, failure of the support structure itself, foundation pit collapse or large-scale landslide, cracking or subsidence of roads around the foundation pit, displacement or damage to adjacent underground facilities, and cracking or collapse of nearby buildings. These engineering accidents, once they occur, will cause unnecessary losses or even disasters. Summary of the Invention
[0004] To address the stability issue of foundation pit support systems, this invention provides a deep foundation pit support adjustment system.
[0005] The technical solution of this invention is as follows:
[0006] A deep foundation pit support adjustment system includes a sensing module and a control module. The sensing module senses soil deformation information and support structure deformation information. The sensing module sends the sensed data to the control module. The control module calculates the sensed data according to a preset algorithm and outputs a control signal to a specific hydraulic telescopic module via wireless communication. The hydraulic telescopic module of the support system receives the control signal output by the control module and adjusts the hydraulic output at the center of the support anchor where it is located, thereby changing the length of the support anchor.
[0007] In the preset algorithm of the control module, the control module performs correlation calculation on the received deformation data, settlement data and stress data, and outputs the corresponding control signal according to the calculated correlation value, thereby changing the length of the support anchor by controlling the hydraulic value of the hydraulic telescopic module.
[0008] The aforementioned deep foundation pit support adjustment system includes an infrared light source and an infrared receiver module. The infrared light source is mounted on the support anchor, and the infrared receiver includes a first infrared receiver and a second infrared receiver. The first infrared receiver is mounted on the inner wall of the support system, and the second infrared receiver is mounted at a fixed position outside the support system.
[0009] In the aforementioned deep foundation pit support and adjustment system, a first infrared receiver measures a first displacement change, a second infrared receiver measures a second displacement change, and all infrared receivers transmit the received displacement changes to the control module via wireless communication. After receiving the data, the control module uses the second displacement change to correct the first displacement change, thereby obtaining the displacement data of the support system.
[0010] The aforementioned deep foundation pit support adjustment system includes a stress sensing module comprising multiple stress sensing plates. These plates are positioned between each support anchor and the side of the support system. The stress sensing plates acquire stress data of the axial force of the support anchor, and the stress sensing module transmits the stress data to the control module via wireless communication.
[0011] The aforementioned deep foundation pit support adjustment system includes a hydraulic telescopic module comprising a hydraulic displacement device and a force transmission component. The hydraulic displacement device is located at the longitudinal midpoint of the support structure, and the force transmission component is located on both sides of the hydraulic displacement device. The hydraulic telescopic module is installed on each support anchor. After receiving the control signal from the control module, the hydraulic telescopic module adjusts the hydraulic value and outputs different axial forces to the support anchors on both sides through the force transmission component, thereby changing the length of the support anchor.
[0012] The aforementioned deep foundation pit support and adjustment system includes a settlement sensing module comprising a soil settlement sensor. The soil settlement sensors are set at intervals of several distances, surrounding the outside of the support system and located near the support anchors. The settlement sensors acquire settlement data of the soil surrounding the foundation pit, and the settlement sensing module transmits the settlement data of its setting location to the control module via wireless communication.
[0013] The aforementioned deep foundation pit support and adjustment system divides the foundation pit into several layers according to its depth range. Each layer is equipped with a support anchor rod, and the support anchor rods are arranged side by side at intervals along the extension direction of the foundation pit, thereby forming a support system composed of support anchor rods distributed in an array within the foundation pit.
[0014] The aforementioned deep foundation pit support and adjustment system, based on location settings, has N support anchors installed along the depth direction at a certain location point in the foundation pit. These N support anchors are referred to as a set of support structures. The sensing data corresponding to the same set of support structures form the same dataset at the control module. Between different datasets, a weight relationship is set according to the adjacent distance. The system is divided into several segments within a specific distance range, and different weight values are assigned according to the distance, with the weight values decreasing from near to far.
[0015] The aforementioned deep foundation pit support adjustment system has a control module that simultaneously monitors soil settlement and support structure deformation, and sets settlement thresholds and deformation thresholds. When the soil settlement exceeds the settlement threshold or the support structure deformation exceeds the deformation threshold, the control module adjusts the anchor support according to a preset scheme.
[0016] Starting from the point of maximum settlement or maximum deformation received by the control module, find the nearest set of support structures. If the distance is equal, select two sets of support structures. The adjustment order of the support structures is the support structure closest to the point of maximum settlement or maximum deformation, and then extend to the support structures within a specific distance range. Adjust the length of the support anchor rods of the support structures according to the weight.
[0017] The aforementioned deep foundation pit support adjustment system, when adjusting the support structure, ensures that the correlation coefficients between the displacement change rate, the soil settlement rate, and the anchor support stress change rate are all greater than 0. Then, the support anchors are adjusted according to a preset adjustment sequence to maintain a positive correlation until the soil settlement value is lower than the settlement threshold or the support structure deformation is less than the deformation threshold, or the correlation coefficient between the displacement change rate and the soil settlement rate is close to 1, and the displacement change and soil settlement show obvious periodic symmetry.
[0018] According to the above-described solution, the beneficial effect of this invention is that it provides a deep foundation pit support adjustment system. The system monitors the support structure through a sensing module, and the control module calculates the sensing data. Based on the point of maximum settlement or deformation, the system adjusts the length of the support anchors near the point of maximum settlement or deformation, so that the monitoring data returns to the threshold or is in a balanced state, thereby making the foundation pit support system with support anchors as the main body and the foundation pit in a dynamic and stable state. Attached Figure Description
[0019] To more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0020] Figure 1 This is a schematic diagram of the foundation pit support structure.
[0021] The following are the labeling elements in the figure:
[0022] 1. Hydraulic telescopic module; 2. Stress sensing plate; 3. Infrared light source; 4. Infrared receiving device; 5. Soil settlement sensor; 6. Support anchor rod. Detailed Implementation
[0023] To make the technical problems to be solved, the technical solutions, and the beneficial effects of the present invention clearer, the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0024] A deep foundation pit support and adjustment system, such as Figure 1 As shown, it includes a sensing module and a control module. The sensing module senses the deformation information of the soil and the deformation information of the support structure. The sensing module sends the sensed data to the control module. The control module calculates the sensed data according to a preset algorithm and outputs a control signal to a specific hydraulic telescopic module 1 via wireless communication. The hydraulic telescopic module 1 of the support system receives the control signal output by the control module and adjusts the hydraulic output at the center of the support anchor 6 where it is located, thereby changing the length of the support anchor 6 and keeping the foundation pit in balance.
[0025] The sensing modules include a displacement sensing module for monitoring the deformation of the support system, a settlement sensing module for monitoring soil settlement, and a stress sensing module for monitoring the axial force of the support anchor rods.
[0026] The displacement sensing module includes an infrared light source 3 and an infrared receiver 4. The infrared light source 3 is mounted on the supporting anchor bolt 6. The infrared receiver 4 includes a first infrared receiver and a second infrared receiver. The first infrared receiver is mounted on the inner wall of the support system, and the second infrared receiver is mounted at a fixed position outside the support system. The first infrared receiver measures a first displacement change, and the second infrared receiver measures a second displacement change. All infrared receivers transmit their received displacement changes to the control module via wireless communication. After receiving the data, the control module uses the second displacement change to correct the first displacement change, thus obtaining the displacement data of the support system.
[0027] The settlement sensing module includes a soil settlement sensor 5, which is set at intervals. The soil settlement sensor 5 surrounds the outside of the support system and is set near the support anchor 6. The settlement sensor acquires the settlement data of the soil around the foundation pit. The settlement sensing module transmits the settlement data of its setting location to the control module via wireless communication.
[0028] The stress sensing module includes multiple stress sensing plates 2, which are disposed between each supporting anchor rod 6 and the side of the support system. The stress sensing plates 2 acquire stress data of the axial force of the supporting anchor rod 6, and the stress sensing module transmits the stress data to the control module via wireless communication.
[0029] The hydraulic telescopic module 1 includes a hydraulic displacement device and a force transmission component. The hydraulic displacement device is located at the longitudinal midpoint of the support structure, and the force transmission component is located on both sides of the hydraulic displacement device. The hydraulic telescopic module 1 is installed on each support anchor 6. The hydraulic telescopic module 1 is located at the center of the support anchor 6. After receiving the control signal from the control module, the hydraulic telescopic module 1 adjusts the hydraulic value and outputs different axial forces to the support anchors 6 on both sides through the force transmission component, thereby changing the length of the support anchor 6. The support structure with the support anchor 6 as the main body undergoes resistant deformation to maintain the shape of the foundation pit and prevent deformation of the foundation pit.
[0030] The foundation pit is divided into several layers according to its depth, and each layer is equipped with a support anchor 6. The support anchors 6 are arranged side by side at intervals along the extension direction of the foundation pit, thus forming a support system composed of arrayed support anchors 6 within the foundation pit. The center of each support anchor 6 is a hydraulic telescopic module 1, whose hydraulic action applies axial force to the sides of the foundation pit at both ends. Stress sensing plates 2 are installed between the support anchors 6 and the foundation pit. Soil settlement sensors 5 are installed outside the support system corresponding to the longitudinally arranged support anchors 6 to monitor the soil settlement near the support anchors 6.
[0031] Thus, based on the location settings, at a certain point in the foundation pit, N support anchors 6 are installed along the depth direction. These N support anchors 6 are considered a set of support structures. Within this set of support structures, several displacement sensing modules on these support anchors 6 output displacement data about the set of support structures, and stress sensing modules between the support anchors 6 and the foundation pit wall output multiple stress data about the set of support structures. Correspondingly, a settlement sensing module is installed outside the foundation pit at this location point. The settlement sensing module outputs the settlement data of the soil closest to this set of support structures.
[0032] Based on the above settings, at the control module, displacement, stress, and settlement data for the same set of support structures are compiled into datasets, ultimately forming multiple datasets. During calculations, the unified dataset is calculated first, and then the relationships between different datasets are calculated.
[0033] Between different datasets, weights are assigned based on adjacent distances. Within a specific distance range, the dataset is divided into several segments, each with a different weight value based on its distance from the nearest to the furthest point. Taking support structure A as an example, eight support structures are set up within a specific distance range, four on the left and four on the right. The distance between the support structures is used as the dividing distance, forming four weight values. The eight support structures adjacent to support structure A are then assigned one of these four weight values based on their distance from support structure A.
[0034] In the preset algorithm of the control module, the control module performs correlation calculation on the received deformation data, settlement data and stress data, and outputs the corresponding control signal according to the calculated correlation value, thereby changing the length of the support anchor 6 by controlling the hydraulic value of the hydraulic telescopic module 1.
[0035] The control module monitors both soil settlement and support structure deformation, and sets settlement and deformation thresholds. These thresholds can be either the rate of change or a specific amplitude value. When the soil settlement exceeds the settlement threshold or the support structure deformation exceeds the deformation threshold, the control module adjusts the anchor support according to a preset scheme.
[0036] Starting from the point of maximum settlement or deformation received by the control module, the nearest set of support structures is located. If two sets of support structures are selected at equal distances, the middle anchor support is chosen for adjustment. Since the settlement or deformation value has exceeded the set threshold, it indicates that the support structure is undergoing unstable deformation, increasing the possibility of soil movement. Therefore, the support strength of the support system needs to be increased. The control module outputs a control signal wirelessly to the hydraulic telescopic module 1 of the middle anchor support in this set of support structures. This causes the hydraulic telescopic module 1 to increase the length of the anchor support, improving the stiffness of the support structure, reducing deformation, thereby reducing displacement and soil settlement, increasing its resistance to soil deformation, and maintaining the stability of the support structure and the foundation pit.
[0037] During the elongation of the anchor support, if the correlation coefficients between the displacement change rate (ΔD / Δt), the soil settlement rate (ΔH_avg / Δt), and the anchor support stress change rate are both greater than 0 (i.e., both are positively correlated), and the displacement and soil settlement show a clear synergistic trend, it indicates that there is a certain synergistic relationship between displacement, soil settlement, and anchor support stress. If the correlation coefficient between either the displacement change rate (ΔD / Δt) or the soil settlement rate (ΔH_avg / Δt) and the anchor support stress change rate is less than 0 (i.e., both are negatively correlated), it means that the adjustment of the support structure is fluctuating, and the support structure may undergo unstable deformation. Therefore, the appropriateness of adjusting the anchor support in the middle of the support structure should be judged based on the correlation coefficients between the displacement change rate, the soil settlement rate, and the anchor support stress change rate.
[0038] The adjustment sequence for the support structure is as follows: first, adjust the support structure closest to the point of maximum settlement or maximum deformation, then extend the adjustment to support structures within a specific distance range, adjusting the length of the support anchors 6 according to their weights. Assuming the adjustment length of the support anchor 6 of the support structure closest to the point of maximum settlement or maximum deformation is 'a', then the adjustment length of the support anchor 6 of the support structures within a specific distance range is the weight value multiplied by 'a'.
[0039] When adjusting the support structure, ensure that the correlation coefficients between the displacement change rate (ΔD / Δt), the soil settlement rate (ΔH_avg / Δt), and the anchor support stress change rate are both greater than 0 (i.e., both are positively correlated). Then, adjust the support anchors 6 according to the above adjustment sequence to maintain a positive correlation, ensuring that the adjustment of the support anchors 6 can effectively change the direction of deformation of the support structure and soil settlement. This continues until the soil settlement value is lower than the settlement threshold or the deformation of the support structure is less than the deformation threshold, or until the correlation coefficient between the displacement change rate and the soil settlement rate is close to 1, and the displacement change and soil settlement exhibit obvious periodic symmetry. This symmetry between displacement and soil settlement can usually reduce the risk of stress concentration and failure caused by asymmetrical deformation. If this symmetry continues for a certain period of time, the support structure and the foundation pit can be considered to be in a stable state.
[0040] The main support structure of the present invention is the support anchor 6, and other structures may be provided outside the support anchor 6.
[0041] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A deep foundation pit support and adjustment system, characterized in that, The system includes a sensing module and a control module. The sensing module senses soil deformation information and support structure deformation information, and sends the sensed data to the control module. The control module calculates the sensed data according to a preset algorithm and outputs a control signal to the hydraulic telescopic module via wireless communication. The hydraulic telescopic module of the support system receives the control signal output by the control module and adjusts the hydraulic value at the center of the support anchor, thereby changing the length of the support anchor. In the preset algorithm of the control module, the control module performs correlation calculation on the received deformation data, settlement data, and stress data. The control module outputs the corresponding control signal based on the calculated correlation value, thereby changing the length of the support anchor by controlling the hydraulic value of the hydraulic telescopic module. The foundation pit is divided into several layers according to its depth range. Each layer is equipped with a support anchor rod, and the support anchor rods are arranged side by side at a certain distance along the extension direction of the foundation pit, thus forming a support system composed of support anchor rods distributed in an array within the foundation pit. According to the location settings, at a certain location in the foundation pit, N support anchors are set along the depth direction. These N support anchors are called a set of support structures. The sensing data corresponding to the same set of support structures form the same dataset at the control module. Between different datasets, a weight relationship is set according to the adjacent distance. The distance range is divided into several segments, and different weight values are given according to the distance. The weight values decrease from near to far. The control module simultaneously monitors soil settlement and support structure deformation, and sets settlement and deformation thresholds. When the soil settlement exceeds the settlement threshold or the support structure deformation exceeds the deformation threshold, the control module adjusts the anchor support according to a preset scheme. Taking the point of maximum settlement or maximum deformation received by the control module as the initial point, it finds the closest set of support structures. If the distance is equal, it selects two sets of support structures. The adjustment order of the support structures is: the support structure closest to the point of maximum settlement or maximum deformation, and then it extends to the support structures within a certain distance range. The length of the support anchors of the support structures is adjusted according to the weight.
2. The deep foundation pit support and adjustment system according to claim 1, characterized in that, The displacement sensing module includes an infrared light source and an infrared receiver. The infrared light source is mounted on the supporting anchor bolt, and the infrared receiver includes a first infrared receiver and a second infrared receiver. The first infrared receiver is mounted on the inner wall of the support system, and the second infrared receiver is mounted at a fixed position outside the support system.
3. The deep foundation pit support and adjustment system according to claim 2, characterized in that, The first infrared receiver measures the first displacement change, and the second infrared receiver measures the second displacement change. All infrared receivers transmit the received displacement changes to the control module via wireless communication. After receiving the data, the control module uses the second displacement change to correct the first displacement change and obtains the displacement data of the support system.
4. The deep foundation pit support and adjustment system according to claim 1, characterized in that, The stress sensing module includes multiple stress sensing plates, which are installed between each supporting anchor and the side of the support system. The stress sensing plates acquire stress data of the axial force of the supporting anchor, and the stress sensing module transmits the stress data to the control module via wireless communication.
5. The deep foundation pit support and adjustment system according to claim 1, characterized in that, The hydraulic telescopic module includes a hydraulic displacement device and a force transmission component. The hydraulic displacement device is located at the longitudinal midpoint of the support structure, and the force transmission component is located on both sides of the hydraulic displacement device. The hydraulic telescopic module is installed on each support anchor. After receiving the control signal from the control module, the hydraulic telescopic module adjusts the hydraulic value and outputs different axial forces to the support anchors on both sides through the force transmission component, thereby changing the length of the support anchor.
6. The deep foundation pit support and adjustment system according to claim 1, characterized in that, The settlement sensing module includes soil settlement sensors, which are set at intervals. The soil settlement sensors surround the outside of the support system and are set near the support anchors. The settlement sensors acquire settlement data of the soil around the foundation pit, and the settlement sensing module transmits the settlement data of its setting location to the control module via wireless communication.
Citation Information
Patent Citations
Supporting method for foundation pit excavation project
CN104631468A
Comprehensive safety intelligent early warning system and method for operation subway station interval
CN114971238A