A method and terminal for predicting building environment based on point-by-point calculation of three-dimensional information
Through the point-by-point calculation method based on three-dimensional information, the problem that the existing technology cannot reflect the three-dimensional information of the building is solved, the calculation accuracy and applicability are improved, and a more accurate prediction of the building wind environment is achieved.
Patent Information
- Application Number
- CN202410090041.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-22
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-01-22
AI Technical Summary
The existing method of calculating building wind environment point by point cannot effectively reflect the three-dimensional information of the building, resulting in insufficient calculation accuracy.
Using a point-by-point calculation method based on three-dimensional information, the three-dimensional model of the architectural space is obtained, discretized to form grid points, the three-dimensional model information parameters and representation values are calculated, combined into a representation model, and sliced with the grid point as the center for input to the neural network Network model to obtain building performance field values, including wind speed vector values.
The accuracy and robustness of the point-by-point calculation method are improved, so that it can effectively reflect the three-dimensional information of the architectural space, the applicable scenarios are more diverse, and the calculation accuracy and applicability are greatly improved.
Smart Images

Figure CN118094699B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of architectural technology and science, and in particular to a method and a terminal for predicting an architectural environment based on point-by-point calculation of three-dimensional information. Background Art
[0002] High-density cities bring many environmental challenges. Take the wind environment as an example. High-density cities have problems such as urban heat islands and air pollution. Natural ventilation can play a good role in alleviating these problems. In order to improve the natural ventilation of cities, the relationship between the wind environment and the architectural design scheme is usually analyzed through the calculation of fluid dynamics equations (hereinafter referred to as CFD, computational fluid dynamics). In the prior art, the use of numerically discretized Navier-Stokes equations to simulate flow problems has made significant progress. Compared with wind tunnel tests and field measurements, computational fluid dynamics shows advantages such as low cost and high precision. Therefore, it has also been widely used in related research on building wind environment.
[0003] However, this cost advantage is only relative, and it usually takes hours or days to obtain results. On the other hand, CFD calculations are different from the working logic of designers, and require tedious physical parameter settings. Therefore, existing airflow simulation tools are rarely intuitively integrated into the tools commonly used by designers.
[0004] To this end, the prior art has proposed a variety of algorithms, such as a technology for quickly solving the incompressible NS equations, namely Fast Fluid Dynamics simulation, which has been used for fluid visualization in video games. Its application on GPU can realize real-time informative airflow simulation for a small building, which is 500-1500 times faster than the traditional CFD method based on CPU calculation.
[0005] For example, the porous media model (PMM) is applied to the wind environment simulation of building complexes. The basic idea is to simplify the urban geometry and divide the urban street canyons into interconnected areas, and then evaluate the ventilation conditions and pollutant diffusion between urban blocks.
[0006] For example, the boundary-lattice Boltzmann method based on forced boundary conditions studies the influence of particles on the wall boundary layer. It is based on the collision and propagation of particles and the numerical simulation of a discrete Boltzmann equation.
[0007] However, all of the above methods are based on mathematical models or empirical formulas. Such methods require a large number of iterative calculations and data inputs, and complex theoretical assumptions are required before calculation. The technical difficulty is relatively high, there are high technical barriers, and it is difficult to accurately predict complex architectural forms.
[0008] The prior art proposes a method using a GAN adversarial generative network. This method encodes the building geometry into the network in the form of a two-dimensional picture, thereby obtaining the wind environment calculation result of the building space. Although this method overcomes the shortcomings of the method based on mathematical models or empirical formulas, it is easy to implement and easy to operate. However, its structure is still relatively complex, requiring a large number of building wind environment CFD calculation cases (more than 10,000) for model training, and the error is high, and the prediction problem robustness is low.
[0009] To this end, on this basis, the existing technology adopts a point-by-point calculation method to transform the perspective from the relationship between fields to a point-based perspective, and explores the relationship between the field where the point is located and the performance field situation corresponding to the point. The data input to the neural network model is only related to the surrounding environment of the grid. The model can input any number of measurement points in areas of any shape or size, thereby greatly reducing the complexity of the input dimension and the output dimension, and greatly reducing the number of training sets required for the model. Only a small number of calculation samples are required. The applicable scenarios of model calculation will be more diversified, and the accuracy and robustness of the acquisition will also be greatly improved.
[0010] However, the point-by-point calculation method is only applicable to two-dimensional architectural geometric models and cannot reflect the three-dimensional information of the architectural space, resulting in room for improvement in the accuracy of the calculation. Summary of the invention
[0011] The purpose of the present invention is to provide a method and terminal for predicting building environment based on point-by-point calculation of three-dimensional information, aiming to solve the problem that the existing method for calculating building wind environment point by point cannot reflect the three-dimensional information of the building.
[0012] The technical solution adopted by the present invention to solve the technical problem is as follows:
[0013] The present invention provides a method for predicting a building environment based on point-by-point calculation of three-dimensional information, the method comprising:
[0014] Acquire a building space geometric model and a building space three-dimensional model, and discretize the building space geometric model to obtain a plurality of grid points;
[0015] Calculate the three-dimensional model information parameters of each of the grid points according to the three-dimensional model of the building space and form a three-dimensional model information parameter matrix, calculate the representation value of each of the grid points according to the geometric model of the building space and form a representation value matrix, and combine the three-dimensional model information parameter matrix and the representation value matrix into a representation model;
[0016] Slicing the representation model with each of the grid points as the center to obtain a plurality of representation model slices with each of the grid points as the center;
[0017] Each of the characterization model slices is input into a neural network model, and the building performance field value of each of the grid points is obtained according to the output of the neural network model.
[0018] Further, the building performance field includes a wind field, and the building performance field value includes a wind speed vector value;
[0019] The step of calculating the three-dimensional model information parameters of each grid point of the gridded building space geometric model according to the building space three-dimensional model to form a three-dimensional model information parameter matrix specifically includes:
[0020] Calculating the sky visible factor three-dimensional model information parameters of each grid point of the gridded building space geometric model according to the building space three-dimensional model to form a sky visible factor information matrix;
[0021] And / or, the windward area ratio three-dimensional model information parameters of each grid point of the gridded building space geometric model are calculated according to the building space three-dimensional model to form a windward area ratio information matrix.
[0022] Further, calculating the sky visibility factor three-dimensional model information parameters of each grid point of the gridded building space geometric model according to the building space three-dimensional model specifically includes:
[0023] If the grid point is where the obstacle is located, the sky visibility factor three-dimensional model information parameter of the grid point is zero;
[0024] If the grid point is not the grid point where the obstacle is located, a hemispherical dome is generated with the grid point as the center, the occlusion projection of each obstacle in the three-dimensional model of the building space on the hemispherical dome is obtained, and the area ratio of the unobstructed dome part in the hemispherical dome is calculated as the three-dimensional model information parameter of the sky visibility factor of the grid point.
[0025] Furthermore, the calculating of the windward area ratio three-dimensional model information parameter of each grid point of the gridded building space geometric model according to the building space three-dimensional model specifically includes:
[0026] If the grid point is the grid point where the obstacle is located, the windward area ratio of the three-dimensional model information parameter of the grid point is one;
[0027] If the grid point is not the grid point where the obstacle is located, multiple design wind directions of the building space are obtained, and a plane perpendicular to the design wind direction and passing through the grid point is established for each design wind direction. The height of each plane is twice the highest height of the three-dimensional model of the building space, and the width is the width of the three-dimensional model of the building space on the plane. The intersection area of each plane and the obstacle is obtained, and the ratio of each intersection area to the area of the corresponding plane is calculated as the windward area ratio of the wind direction corresponding to the plane. The weighted sum of the windward surface area ratios of all wind directions of the grid point is calculated as the windward area ratio three-dimensional model information parameter of the grid point.
[0028] Furthermore, the calculating the representation value of each of the grid points according to the building space geometric model specifically includes:
[0029] If the grid point is where the obstacle is located, the representation value of the grid point is zero;
[0030] If the grid point is not the grid point where the obstacle is located, the minimum distance between the grid point and the nearest obstacle is calculated as the representation value of the grid point.
[0031] Furthermore, slicing the representation model with each grid point as the center to obtain the representation model slices with each grid point as the center specifically includes:
[0032] Extending the representation model by the size of the slice radius all around to obtain an extended representation model;
[0033] The extended representation model is sliced with each of the grid points as the center to obtain representation model slices with each of the grid points as the center.
[0034] Furthermore, when training the neural network model, the following steps are specifically included:
[0035] Acquire the architectural space geometric model of the training case, and characterize the architectural space geometric model of the training case to obtain the characterization model of the training case;
[0036] Sampling points in the representation model of the training case to obtain a plurality of sampling grid points, and obtaining a representation model slice of the training case centered at each sampling grid point;
[0037] Train the neural network model based on the representation model slices of the training cases.
[0038] Further, the building performance field is specifically a wind field, and the building performance field value is specifically a wind speed vector value;
[0039] The closer the sampling grid points are to the ground, the denser they are.
[0040] Furthermore, the architectural environment prediction method based on point-by-point calculation of three-dimensional information also includes:
[0041] A visualization view of the building performance field is drawn according to the building performance field values of each of the grid points.
[0042] In addition, to achieve the above-mentioned purpose, the present invention also provides a terminal, which includes: a memory, a processor, and a building wind environment prediction program based on a neural network model stored in the memory and run on the processor. When the building wind environment prediction program based on the neural network model is executed by the processor, the terminal is controlled to implement the steps of the building environment prediction method based on point-by-point calculation based on three-dimensional information as described above.
[0043] The present invention adopts the above technical solution to achieve the following effects:
[0044] The present invention maps the three-dimensional model information parameters obtained by calculating the three-dimensional model of the building space to the building space geometric model in the two-dimensional space, and performs point-by-point calculation on the representation model composed of the three-dimensional model information parameter matrix and the two-dimensional matrix of the building space geometric model, so that the point-by-point calculation method can reflect the three-dimensional information of the building space, thereby retaining the advantages of the point-by-point calculation method while further improving the accuracy of the point-by-point calculation method. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 It is a flowchart of the steps of the building environment prediction method based on point-by-point calculation of three-dimensional information in a preferred embodiment of the present invention;
[0046] Figure 2 is a schematic diagram of dome shielding for calculating sky visibility factor in a preferred embodiment of the present invention;
[0047] Figure 3 1 is a schematic diagram of a plane projection of a dome occlusion for calculating a sky visibility factor in a preferred embodiment of the present invention;
[0048] Figure 4 is a schematic diagram of an example of calculating a sky visibility factor in a preferred embodiment of the present invention;
[0049] Figure 5 is another exemplary schematic diagram of calculating the sky visibility factor in a preferred embodiment of the present invention;
[0050] Figure 6 Schematic diagram of the steps for calculating the frontal area ratio in a preferred embodiment of the present invention;
[0051] Figure 7 is a schematic diagram representing a geometric model of a building space in a preferred embodiment of the present invention;
[0052] Figure 8 is a schematic diagram of a partial representation model slice in a preferred embodiment of the present invention;
[0053] Fig. 9 is a schematic diagram of a partial structure of a neural network model in a preferred embodiment of the present invention;
[0054] Fig.10 is a schematic diagram of establishing sampling points in a preferred embodiment of the present invention;
[0055] Fig.11 is an overlapping schematic diagram of the output of the neural network model of the preferred embodiment of the terminal of the present invention;
[0056] Fig.12 It is a schematic diagram of the operating environment of a preferred embodiment of the terminal of the present invention. DETAILED DESCRIPTION
[0057] In order to make the purpose, technical solution and advantages of the present invention clearer and more specific, the present invention is further described in detail below with reference to the accompanying drawings and examples. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0058] Embodiment 1
[0059] See also Figure 1 Embodiment 1 of the present application is a method for predicting a building environment based on point-by-point calculation of three-dimensional information. In this embodiment, an example is given in a wind field, but this does not mean that the method is only applicable to wind field environments. It can also be applied to the calculation and acquisition of other building environments, such as light fields, thermal fields, or sound fields.
[0060] S1. Obtain a building space geometric model and a building space three-dimensional model, and discretize the building space geometric model to obtain a plurality of grid points.
[0061] Specifically, the architectural space geometry model obtained in this embodiment may be an architectural space geometry model of a block section, or an architectural space geometry model of an urban plane building.
[0062] The said meshing of the architectural space geometric model is to represent the architectural space by point cloud method (point-based model) or triangle mesh method (triangle mesh), but such methods have huge data volume and complex structure, which greatly increases the complexity of the neural network. Therefore, in this implementation, it is specifically represented by (x n ,y n ) is a two-dimensional matrix (x, y) formed by precision. Among them, x is the horizontal coordinate of the two-dimensional matrix, y is the vertical coordinate of the two-dimensional matrix, x n is the grid representation accuracy of the horizontal axis, y n is the grid representation accuracy of the ordinate, x n ,y n The closer it is to 0, the more the two-dimensional matrix (x, y) can fully reflect the environment of the building space. However, due to the limitation of computational cost, (x n ,y n ) is (1,1), which means that for any point in the space, (1,1) is the smallest segmentation unit. It can be to represent the architectural space geometry model in BNR form or in SDF form.
[0063] S2. Calculate the three-dimensional model information parameters of each of the grid points according to the three-dimensional model of the building space and form a three-dimensional model information parameter matrix; calculate the characterization value of each of the grid points according to the geometric model of the building space and form a characterization value matrix; and combine the three-dimensional model information parameter matrix and the characterization value matrix into a characterization model.
[0064] Specifically, in this embodiment, the three-dimensional model information parameters of each grid point of the gridded building space geometric model are calculated according to the three-dimensional model of the building space to form a three-dimensional model information parameter matrix, which specifically includes one or both of the following:
[0065] Calculating the sky visible factor three-dimensional model information parameters of each grid point of the gridded building space geometric model according to the building space three-dimensional model to form a sky visible factor information matrix;
[0066] The windward area ratio three-dimensional model information parameters of each grid point of the gridded building space geometric model are calculated according to the building space three-dimensional model to form a windward area ratio information matrix.
[0067] The step of calculating the sky visibility factor of each grid point of the gridded building space geometric model according to the building space three-dimensional model specifically includes:
[0068] If the grid point is where the obstacle is located, the sky visibility factor three-dimensional model information parameter of the grid point is zero;
[0069] Please refer to Figure 2If the grid point is not the grid point where the obstacle is located, a hemispherical dome is generated with the grid point as the center, the occlusion projection of each obstacle in the three-dimensional model of the building space on the dome is obtained, and the area ratio of the unobstructed dome in the dome is calculated as the sky visibility factor three-dimensional model information parameter of the grid point.
[0070] Please refer to Figure 3 , calculate the area ratio of the unobstructed dome in the dome, and the obstruction projection of each obstacle on the dome can be further projected as a projection on a plane prototype with the grid as the prototype, and calculate the area of the projection on the circle.
[0071] For example, see Figure 4 and Figure 5 As shown, Figure 4 is a schematic diagram of an example of calculating the sky visibility factor in a preferred embodiment of the present invention, Figure 5 is another exemplary schematic diagram of calculating the sky visibility factor in a preferred embodiment of the present invention, Figure 4 and Figure 5 In the figure, a represents the projection of the obstacle on the horizontal plane, b represents the three-dimensional model of the building space, and c represents the plane projection of the occlusion projection of each obstacle in the three-dimensional model of the building space on the dome.
[0072] Please refer to Figure 6 , calculating the windward area ratio three-dimensional model information parameters of each grid point of the gridded building space geometric model according to the building space three-dimensional model to form a windward area ratio information matrix, specifically including:
[0073] If the grid point is the grid point where the obstacle is located, the windward area ratio of the three-dimensional model information parameter of the grid point is one;
[0074] If the grid point is not the grid point where the obstacle is located, the design wind direction of the building space is obtained, and a plane perpendicular to the design wind direction and passing through the grid point is established for each design wind direction. The height of the plane is twice the highest height of the three-dimensional model of the building space, and the width is the width of the three-dimensional model of the building space on the plane. The intersection area A of each plane and the obstacle is obtained. proj , calculate the intersection area A proj The area A of the corresponding plane T The ratio of the windward area to the plane corresponding to the wind direction is λ f (θ)_e:
[0075]
[0076] Among them, λ f (θ)_e represents the windward surface area ratio under a specific wind direction θ, A proj A represents the total area of each obstacle projected onto the plane, that is, the total area of the intersection of the plane and the obstacle. TRepresents the plane area, and the weighted sum of the windward surface area ratios of all wind directions at each grid point is calculated as the three-dimensional model information parameter λ of the windward area ratio of the grid point f _e:
[0077]
[0078] λ f _e is the weighted sum of the windward surface area ratios under N specific wind directions, where N is the number of specific wind directions, and B θ is a weighted value corresponding to a specific wind direction θ, which may be the frequency of the corresponding specific wind direction θ.
[0079] Please refer to Figure 7 , the representation value of each grid point is calculated according to the building space geometric model. Specifically, in a Cartesian coordinate system with an accuracy of 1 meter, the grid point where the obstacle is located is represented as zero, and the value of the grid point without obstacle is represented as the data of the minimum distance between the point and the nearest obstacle, forming a two-dimensional matrix with a matrix dimension of (x, y).
[0080] The minimum distance is determined by the sum of the number of grid positions that the point moves in the horizontal direction or the vertical direction.
[0081] Through experiments and verification, the present invention represents the grid point where the obstacle is located as zero, and represents the value of the grid point without obstacle as the data of the minimum distance between the point and the nearest obstacle. It has global information and can reflect the distance and shape of the nearest obstacle in the entire space to a certain extent in the spatial slice of any point. Therefore, the prediction effect is more excellent.
[0082] S3. Slice the representation model with each of the grid points as the center to obtain a plurality of representation model slices with each of the grid points as the center.
[0083] In this embodiment, slicing the representation model with each grid point as the center specifically includes:
[0084] The slice radius will be extended all around the characterization model.
[0085] In this embodiment, the size of the original representation model is 360m in the horizontal direction and 120m in the vertical direction. The predetermined slice range in this embodiment is 120m, so in this embodiment, the upper, lower, left and right sides of the representation model are extended by 120 meters. The purpose of this is to still sample the environmental data around the sampling point at the edge of the representation model.
[0086] Please refer to Figure 8 , the extended representation model is sliced with each grid point as the center to obtain multiple Figure 8 Slices shown.
[0087] In this embodiment, for any point (x, y) in space, the surrounding environment S (x,y) It can be expressed as the perimeter of the point (x m ,y m ) in the range of two-dimensional matrix (x,y), when x m ,y m As S approaches infinity, (x,y) The more it can fully reflect the surrounding environment of the point, but due to the limitation of computational cost, in this paper (x m ,y m ) takes the value of (120,120), which means that for any grid point in the space, a slice is made with (120,120) as the surrounding range, and a slice of size (241,241) is obtained, including the sampling point itself.
[0088] S4. Input each of the characterization model slices into a neural network model, and obtain the building performance field value of each of the grid points according to the output of the neural network model.
[0089] Since the wind speed vector value V corresponding to any point (x, y) in space (x,y) Only with the surrounding environment S (x,y) Therefore, the building performance field value at that point can be predicted based on the representation model slice of its surrounding environment.
[0090] In this embodiment, the building performance field value specifically refers to the wind speed vector value. In other optional embodiments, it may also be light intensity or temperature, etc.
[0091] Please refer to Fig. 9 The neural network model specifically includes a Vgg-CFD-19 neural network model constructed based on the classic Vggnet deep convolutional neural network. Figure 6 A partial structure thereof is shown. In other optional embodiments, neural network models with other network structures such as ResNet and Inception may also be selected, but the present invention is not limited thereto.
[0092] Vgg-CFD-19 consists of 5 sequentially connected blocks and 4 fully connected layers. Each block consists of a sequentially connected convolution part, a pooling layer, a normalization layer and an activation function.
[0093] The convolution part of the first block of Vgg-CFD-19 includes two convolution layers connected in sequence, the convolution part of the second block of Vgg-CFD-19 includes two convolution layers connected in sequence; the convolution part of the third block of Vgg-CFD-19 includes four convolution layers connected in sequence; the convolution part of the fourth block of Vgg-CFD-19 includes four convolution layers connected in sequence; the convolution part of the fifth block of Vgg-CFD-19 includes four convolution layers connected in sequence.
[0094] It is worth noting that in the research process of the present invention, it was found that as the depth of the model increased, the prediction performance of the model gradually improved, but after the depth of the model reached a certain level, the effect decreased instead. On the one hand, it may be due to the fact that the training process of the model has a certain randomness, and this randomness may occasionally cause the accuracy of a deeper network to decrease instead. On the other hand, the negative effects brought about by the increase in the depth of the neural network, such as gradient explosion and other phenomena, can no longer offset the positive effects it brings. Vgg-CFD-19 is the best model obtained in the research process of the present invention.
[0095] The neural network model of the prior art establishes the relationship between fields. The neural network model specifies the size and dimension of the field through preset definitions. In the model calculation, the scene setting needs to follow this dimension, and its dimension cannot be changed. The data input by the neural network model of this embodiment is only related to the surrounding environment of the grid. The model can input any number of measurement points in areas of any shape or size, and the applicable scenarios of the model calculation will be more diversified.
[0096] The training samples of the model are CFD calculation cases of more than 100 cases, among which the CFD calculation cases can be obtained by calculation using common CFD calculation software (such as OpenFOAM, Fluent, CFX, Start-CCM+, etc.). According to the trained model, the corresponding actual urban cases or ideal block models are selected as cases according to the type of object to be calculated.
[0097] For the calculated training cases and the corresponding calculation results,
[0098] For the architectural space geometric model of the training case, the architectural space geometric model is characterized to obtain a representation model;
[0099] The points in the representation model are sampled to obtain a plurality of sampling measurement points, and a representation model slice centered on each measurement point is obtained.
[0100] Please refer to Fig.10Specifically, the sampling method can be uniform sampling at intervals of 1 meter, or non-uniform sampling with reference to CFD calculation. In this embodiment, because the wind field is studied, in the relevant research on the wind environment, the wind speed near the ground is considered to be more important. Therefore, in this embodiment, a non-uniform network is specifically used for sampling to enable the model to obtain a better training effect, specifically, including:
[0101] Establish horizontal sampling lines and vertical sampling lines;
[0102] The intersection of the horizontal sampling line and the vertical sampling line is taken as the sampling point.
[0103] In this embodiment, the vertical sampling lines are evenly arranged in the characterization model before extension, with an interval of 2m, and the height of the horizontal sampling line is taken as the value rounded to an exponential multiple of 1.2, and finally 21 horizontal sampling lines and 180 sampling lines are obtained, and 21×180=2160 sampling points are obtained.
[0104] After that, the 100 training cases are multiplied into a large number of training cases, which are divided into training sets and validation sets in proportion to train the model.
[0105] The loss function during model training is set to MSE (Mean Square Error):
[0106]
[0107] In the formula, m represents the number of samples, y i represents the true value, Represents the output value of the model.
[0108] The ADAM optimization method is used for training, and the maximum iteration number of the model is set to 100 epochs. In other embodiments, AdaGrad or RMSProp methods may also be used for optimization training, but the present invention is not limited thereto.
[0109] In this embodiment, the representation model slices centered at each grid point are input into a neural network model, and the building performance field value of each grid point is obtained according to the output of the neural network model, specifically including:
[0110] The representation model slices centered on each grid point are sequentially input into the neural network model, and the neural network model sequentially outputs the building performance field values of the grid points within a set range centered on the grid point corresponding to the input representation model slice;
[0111] The average value of all building performance field values at each grid point is calculated as the building performance field value of the grid point.
[0112] Please refer to Fig.11In this embodiment, by outputting the building performance field value of a set range centered on the center grid point of the slice in each calculation, for example, outputting the building performance field value of a grid point in the range of 3*3 or 4*4, the building performance field values output by the neural network model overlap for the input of multiple characterization model slices. The building performance field values of the overlapping parts are averaged, which can smooth the jumps in the building performance field values caused by the changes in the slices, so as to achieve the smoothing of the building performance output value prediction of the entire building space geometric model and increase the prediction accuracy.
[0113] S5. Draw a visualization of the building performance field based on the building performance field values of each grid point.
[0114] Specifically, in this embodiment, the wind speed vector data V_pre of each grid point is obtained. (x,y) , they will be rearranged according to the original coordinates (x, y) to obtain wind field vector data. These data will be plotted into wind speed cloud charts through matlibplot or connected to the Grasshopper platform through python scripts to obtain visualization results.
[0115] In addition, this embodiment uses the wind field as the performance field only as an illustrative distance, and does not mean that the technical solution of the present invention is only applicable to the wind field. For example, the method of the present invention can also be used in geothermal fields. As a neural network model widely used in image and video processing tasks, the convolutional neural network has good spatial resolution capabilities, which enables it to be applied to various performance fields. The local receptive field and weight sharing characteristics of the convolution kernel play an important role in parsing the mapping relationship between the building wind environment and the building space.
[0116] Embodiment 2
[0117] See also Fig.12 Based on the above method, the present invention also provides a terminal, which includes: a memory 10, a processor 20, and a building wind environment prediction program based on a neural network model stored in the memory 10 and executable on the processor 20. When the building wind environment prediction program based on a neural network model is executed by the processor 20, the terminal is controlled to implement the steps of the building environment prediction method based on point-by-point calculation based on three-dimensional information as described above.
[0118] In some embodiments, the memory 10 may be an internal storage unit of the terminal, such as a hard disk or memory of the terminal. In other embodiments, the memory 10 may also be an external storage device of the terminal, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the terminal. Furthermore, the memory 10 may also include both an internal storage unit of the terminal and an external storage device. The memory 10 is used to store application software and various types of data installed on the terminal, such as the program code of the installation terminal. The memory 10 can also be used to temporarily store data that has been output or is to be output. In one embodiment, a building wind environment prediction program based on a neural network model is stored on the memory 10, and the building wind environment prediction program based on the neural network model can be executed by the processor 20, thereby realizing the building environment prediction method based on point-by-point calculation of three-dimensional information in this application.
[0119] In some embodiments, the processor 20 may be a central processing unit (CPU), a microprocessor or other data processing chip, used to run the program code or process data stored in the memory 10, such as executing the building environment prediction method based on point-by-point calculation of three-dimensional information.
[0120] Embodiment 3
[0121] This embodiment provides a storage medium, which stores a building wind environment prediction program based on a neural network model. When the building wind environment prediction program based on the neural network model is executed by a processor, the steps of the building environment prediction method based on point-by-point calculation based on three-dimensional information as described above are implemented.
[0122] To summarize, the present invention maps the three-dimensional model information parameters obtained by calculating the three-dimensional model of the building space to the building space geometric model in the two-dimensional space, and performs point-by-point calculation on the representation model composed of the three-dimensional model information parameter matrix and the two-dimensional matrix of the building space geometric model, so that the point-by-point calculation method can reflect the three-dimensional information of the building space, thereby retaining the advantages of the point-by-point calculation method while further improving the accuracy of the point-by-point calculation method.
[0123] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or terminal including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or terminal. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the presence of other identical elements in the process, method, article or terminal including the element.
[0124] Of course, those skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be implemented by instructing related hardware (such as a processor, a controller, etc.) through a computer program, and the program can be stored in a computer-readable storage medium, and the program can include the processes of the above-mentioned method embodiments when executed. The storage medium can be a memory, a disk, an optical disk, etc.
[0125] It should be understood that the application of the present invention is not limited to the above examples. For ordinary technicians in this field, improvements or changes can be made based on the above description. All these improvements and changes should fall within the scope of protection of the claims attached to the present invention.
Claims
1. A method for predicting building environment based on point-by-point calculation of three-dimensional information, characterized in that: The architectural environment prediction method based on point-by-point calculation of three-dimensional information comprises: Acquire a building space geometric model and a building space three-dimensional model, and discretize the building space geometric model to obtain a plurality of grid points; Calculate the three-dimensional model information parameters of each of the grid points according to the three-dimensional model of the building space and form a three-dimensional model information parameter matrix, calculate the representation value of each of the grid points according to the geometric model of the building space and form a representation value matrix, and combine the three-dimensional model information parameter matrix and the representation value matrix into a representation model; Slicing the representation model with each of the grid points as the center to obtain a plurality of representation model slices with each of the grid points as the center; Inputting each of the characterization model slices into a neural network model, and obtaining the building performance field value of each of the grid points according to the output of the neural network model; The building performance field includes a wind field, and the building performance field value includes a wind speed vector value; The step of calculating the three-dimensional model information parameters of each grid point of the gridded building space geometric model according to the building space three-dimensional model to form a three-dimensional model information parameter matrix specifically includes: Calculating the sky visible factor three-dimensional model information parameters of each grid point of the gridded building space geometric model according to the building space three-dimensional model to form a sky visible factor information matrix; and / or, calculating the windward area ratio three-dimensional model information parameters of each grid point of the gridded building space geometric model according to the building space three-dimensional model to form a windward area ratio information matrix; Calculating the sky visibility factor three-dimensional model information parameters of each grid point of the gridded building space geometric model according to the building space three-dimensional model specifically includes: If the grid point is where the obstacle is located, the sky visibility factor three-dimensional model information parameter of the grid point is zero; If the grid point is not the grid point where the obstacle is located, a hemispherical dome is generated with the grid point as the center, the occlusion projection of each obstacle of the three-dimensional model of the building space on the hemispherical dome is obtained, and the area ratio of the unoccluded dome part in the hemispherical dome is calculated as the sky visibility factor three-dimensional model information parameter of the grid point; The step of calculating the windward area ratio three-dimensional model information parameter of each grid point of the gridded building space geometric model according to the building space three-dimensional model specifically includes: If the grid point is the grid point where the obstacle is located, the windward area ratio of the three-dimensional model information parameter of the grid point is one; If the grid point is not the grid point where the obstacle is located, multiple design wind directions of the building space are obtained, and a plane perpendicular to the design wind direction and passing through the grid point is established for each design wind direction. The height of each plane is twice the highest height of the three-dimensional model of the building space, and the width is the width of the three-dimensional model of the building space on the plane. The intersection area of each plane and the obstacle is obtained, and the ratio of each intersection area to the area of the corresponding plane is calculated as the windward area ratio of the wind direction corresponding to the plane. The weighted sum of the windward surface area ratios of all wind directions of the grid point is calculated as the windward area ratio three-dimensional model information parameter of the grid point; Calculating the representation value of each of the grid points according to the building space geometric model specifically includes: If the grid point is where the obstacle is located, the representation value of the grid point is zero; If the grid point is not the grid point where the obstacle is located, the minimum distance between the grid point and the nearest obstacle is calculated as the representation value of the grid point; Slicing the representation model with each grid point as the center to obtain the representation model slices with each grid point as the center specifically includes: Extending the representation model by the size of the slice radius all around to obtain an extended representation model; The extended representation model is sliced with each of the grid points as the center to obtain representation model slices with each of the grid points as the center.
2. The method for predicting building environment based on point-by-point calculation of three-dimensional information according to claim 1, characterized in that: The neural network model, when being trained, specifically includes: Acquire the architectural space geometric model of the training case, and characterize the architectural space geometric model of the training case to obtain the characterization model of the training case; Sampling points in the representation model of the training case to obtain a plurality of sampling grid points, and obtaining a representation model slice of the training case centered at each sampling grid point; Train the neural network model based on the representation model slices of the training cases.
3. The method for predicting building environment based on point-by-point calculation of three-dimensional information according to claim 2, characterized in that: The closer the sampling grid points are to the ground, the denser they are.
4. The method for predicting building environment based on point-by-point calculation of three-dimensional information according to claim 1, characterized in that: The architectural environment prediction method based on point-by-point calculation of three-dimensional information also includes: A visualization view of the building performance field is drawn according to the building performance field values of each of the grid points.
5. A terminal, characterized in that: The terminal includes: a memory, a processor, and a building wind environment prediction program based on a neural network model stored in the memory and executable on the processor. When the building wind environment prediction program based on a neural network model is executed by the processor, the terminal is controlled to implement the steps of the building environment prediction method based on point-by-point calculation of three-dimensional information as described in any one of claims 1 to 4.
Citation Information
Patent Citations
Open space periphery building form optimization control method based on sky visible range evaluation
CN105893675A
Urban environment electric wave path prediction method and device
CN111355544A