A fast optimization chart for deep pumping design of dense oil and its use method

Through the design of deep oil pumping, the problem of reducing the liquid production of dense oil wells and biased grinding and rod breaking is solved, and the output improvement and design efficiency are optimized.

CN118114321BActive Publication Date: 2025-03-14DAQING OILFIELD CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202211517300.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-11-29
Publication Date
2025-03-14
Estimated Expiration
2042-11-29

AI Technical Summary

Technical Problem

The fluid production volume of dense oil wells decreases after conventional fracturing, resulting in serious problems of grinding and rod breakage, short pump inspection cycle, and increased operating costs.

Method used

It provides a fast-precision drawing board for deep oil pumping design. It displays the relationship between liquid production, pump diameter, oil pump, pump depth, oil pump rod and straightener matching, lifting parameters and other parameters through the disc diagram board, helping designers quickly select appropriate parameter combinations.

Benefits of technology

It improves the output of dense oil wells, extends the optimal state of the production operation conditions, reduces the situation of pipe rods being deteriorated and broken, and improves design efficiency and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118114321B_ABST
    Figure CN118114321B_ABST
Patent Text Reader

Abstract

The present invention relates to a fast optimization chart for deep pumping design of tight oil. It mainly solves the problem of how to increase the production and ensure the optimal operation condition of machine mining when the liquid production is low in the existing deep pumping stage of tight oil, and reduce the occurrence of pipe and rod eccentric wear, rod breakage and the like. It is characterized in that: the disc is divided into a number of concentric rings, and the disc is provided with 5 rings from the center ring to the outside; the disc is divided into four quadrants from the center; the central ring and the 5 outer rings are respectively provided with six items of liquid production, pump diameter, pumping unit, pump depth, matching of sucker rod and centralizer, and lifting parameters; the corresponding relationship between the liquid production, pump diameter, pumping unit, pump depth, matching of sucker rod and centralizer, and lifting parameters is displayed through the disc and the separated rings and quadrants in the disc. The use of this chart can ensure the optimal operation condition of machine mining and increase the production, reduce the occurrence of pipe and rod eccentric wear, rod breakage and the like, improve the design efficiency, and ensure the design quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tight oil development in oil fields, and in particular to a fast optimization chart for tight oil deep pumping design and a use method thereof. Background Art

[0002] In order to achieve better production results, tight oil development is usually designed to be put into production after conventional fracturing. The lifting parameters are still designed according to conventional oil wells. There are many wells that are operated due to eccentric wear and rod breakage, and the pump inspection cycle is much shorter than that of conventional oil wells. For example, after the fracturing of the tight oil wells in the Fuyu oil layer, the lifting method is designed according to the design concept of the pumping wells in the Putaohua oil layer. The pump depth is designed to be 70m-100m above the top of the oil layer. Wells that have been put into production for more than one year have prominent problems of eccentric wear and rod breakage. The pump inspection cycle is 542 days on average, which is much shorter than the 1157-day pump inspection cycle of conventional oil wells, and the operating costs remain high.

[0003] After conventional fracturing of tight oil wells is put into production, wells that have been producing for more than one year have basically passed the effective period of oil increase, the liquid production has been greatly reduced, and the problems of eccentric wear and rod breakage are prominent. The concept of tight oil deep pumping is proposed. Through the design of tight oil deep pumping, the production can be increased when the liquid production is low, the optimal operating conditions of the machine mining can be ensured, and the occurrence of eccentric wear of pipes and rods and rod breakage can be reduced. This is an urgent problem that needs to be solved at present.

[0004] Through the search for relevant literature on dense deep extraction, a total of three relevant journal articles were retrieved, but no relevant patent literature:

[0005] Journal document 1: Research and Application of Deep Pumping Technology for Medium and Deep Oil Wells, from "Management and Technology of Small and Medium Enterprises". This study designed supporting processes for oil wells with a pumping depth of 2000-2400m and above, but did not provide deep pumping recommendations for oil wells with a pumping depth of 1600-2000m.

[0006] Journal Literature 2: Research and Application of Deep Pumping Technology in Jinzhou Oilfield, from Inner Mongolia Petrochemical Industry, the study gives the combination and proportion of pump rods with diameters of Φ70, Φ57, Φ44, and Φ38 when the pump hanging depth is 1100-2850m, but does not specify the type of pumping unit and specific parameters such as stroke and stroke frequency, which cannot meet the design requirements of deep pumping of dense oil.

[0007] Journal document three: Deep pumping technology for oil wells, from Petroleum Drilling and Production Technology, this document studies the combination of pump types, pumping parameters and sucker rod types for pumping depths of 2100-3500m. It only gives suggestions for using deep pumping technology for oil wells with a dynamic liquid level below 1800m, a pump efficiency below 20%, and insufficient fluid supply diagnosed on the dynamometer diagram. This cannot meet the design requirements for deep pumping of tight oil. Summary of the invention

[0008] The present invention aims to overcome the problem in the background technology of how to increase the output and ensure the optimal operation condition of the machine mining when the liquid production is low in the existing deep extraction stage of tight oil, and reduce the occurrence of pipe and rod eccentric wear, rod breakage, etc., and provide a fast optimization chart for the design of tight oil deep extraction. The fast optimization chart for the design of tight oil deep extraction has unified and standardized standards, can increase the output and ensure the optimal operation condition of the machine mining, reduce the occurrence of pipe and rod eccentric wear, rod breakage, etc., improve the design efficiency, and ensure the design quality. The present invention also provides a method for using the fast optimization chart for the design of tight oil deep extraction.

[0009] The present invention can solve the problem through the following technical scheme: a fast optimization chart for tight oil deep pumping design, comprising a chart body composed of a disc; the disc is divided into a plurality of concentric rings, and the disc is provided with 5 rings from the central ring outward; the disc is divided into four quadrants from the center; they are the first quadrant, the second quadrant, the third quadrant, and the fourth quadrant; the first quadrant and the second quadrant are respectively divided into the front first quadrant, the rear first quadrant, the front second quadrant, and the rear second quadrant; six items of liquid production, pump diameter, pumping unit, pump depth, matching of sucker rod and centralizer, and lifting parameters are respectively provided in the central ring and the 5 outer rings; the corresponding relationship between the liquid production, pump diameter, pumping unit, pump depth, matching of sucker rod and centralizer, and lifting parameters is displayed through the disc and the quadrant intervals separated in the disc.

[0010] Furthermore, the liquid production project is located at the center ring of the circle, and the liquid production is divided into four production ranges of ≤5t, 5-7t, 7-10t, and ≥10t during the deep pumping stage, which are respectively arranged in the first quadrant, the second quadrant, the third quadrant, and the fourth quadrant.

[0011] Furthermore, the pump diameter item is located within the second circle, and the pump diameter is divided into four indicators: Φ32mm, Φ38mm, Φ44mm, and Φ57mm; which are respectively arranged in the first quadrant, the second quadrant, the third quadrant, and the fourth quadrant.

[0012] Furthermore, the pump depth project is located within the third ring, and the pump depth is divided into six indicators: 2100m, 1850m, 1750m, 2050m, 1950m, and 1600m; which are respectively set in the six quadrants of the first quadrant of the front part, the first quadrant of the rear part, the second quadrant of the front part, the second quadrant of the rear part, the third quadrant, and the fourth quadrant.

[0013] Furthermore, the oil pumping unit model item is located in the fourth ring, and the oil pumping unit models are divided into eight types and ten types; the oil pumping unit eight type is located in the interval between the first quadrant of the rear part and the second quadrant of the front part; the oil pumping unit ten type is located in the remaining quadrant interval, that is, the quadrant interval connected by the second quadrant of the rear part, the third quadrant, the fourth quadrant and the first quadrant of the front part.

[0014] Furthermore, the sucker rod and centralizer matching project is located in the fifth ring, and the sucker rod and centralizer matching is divided into:

[0015] When the planned liquid production is ≤5t, the pump diameter design parameter is 32mm. If the designed pump depth is 2100m, the type 10 machine should be used. The matching standard of sucker rod and centralizer is φ25:φ22:φ19=0.24:0.27:0.49. The lower part adopts φ38 weight rod 70m. The centralizer is installed 3 times at the deflection point and 20m above and below it, and 2 centralizers are installed at 1450-2030m.

[0016] When the planned liquid production is ≤5t, the pump diameter design parameter is 32mm. If the designed pump depth is 1850m, the eight-type machine should be used, the matching standard of sucker rod and centralizer is φ22:φ19=0.3:0.7, the lower part uses φ38 weight rod 70m, and the centralizer is installed at the deflection point and 20m above and below it. A total of 3 centralizers are installed, and 2 centralizers are installed at 1200-1780m.

[0017] When the planned production is 5-7t, the pump diameter design parameter is 38mm. If the designed pump depth is 1750m, the eight-type machine should be used, the matching standard of sucker rod and centralizer is φ22:φ19=0.35:0.65, the lower part uses φ38 weight rod 80m, and the centralizer is installed 3 times at the deflection point and 20m above and below it, and 2 centralizers are installed at 1100-1670m;

[0018] When the planned production is 5-7t, the pump diameter design parameter is 38mm. If the designed pump depth is 2050m, the type 10 machine should be used. The matching standard of sucker rod and centralizer is φ25:φ22:φ19=0.24:0.27:0.49. The lower part uses φ38 weight rod 80m. The centralizer is installed 3 times at the deflection point and 20m above and below it. Two centralizers are installed at 1400-1970m.

[0019] When the planned production of liquid is 7-10t, the pump diameter design parameter is 44mm, the pump depth should be designed to be 1950m, and the type 10 machine should be used. The matching standard of sucker rod and centralizer is φ25:φ22:φ19=0.24:0.27:0.49, the lower part uses φ38 weight rod 100m, and the centralizer is installed at the deflection point and 20m above and below it. 2 centralizers are installed at 1300-1850m;

[0020] When the planned liquid production is ≥10t, the pump diameter design parameter is 57mm, the pump depth should be designed to be 1600m, and the type 10 machine should be used. The matching standard of sucker rod and centralizer is φ25:φ22:φ19=0.31:0.34:0.35, the lower part uses φ38 weight rod 100m, and the centralizer is installed at the deflection point and 20m above and below it. Two centralizers are installed at 950-1500m.

[0021] It is divided into 6 areas in total; they are respectively set in the first quadrant of the front part, the first quadrant of the rear part, the second quadrant of the front part, the second quadrant of the rear part, the third quadrant, and the fourth quadrant;

[0022] Furthermore, the lifting parameter item is located in the sixth ring; the lifting parameters are 3m, 4n / min, and 3m, 6n / min; the lifting parameters are 3m, 4n / min, respectively set in the first quadrant of the front part; and in the second and third quadrants of the rear part; the lifting parameters are 3m, 6n / min, respectively set in the first quadrant of the rear part, and in the second and fourth quadrants of the front part.

[0023] Furthermore, a rotatable arrow line is set from the center point to the circumference of the disk, and the arrow line passes through the area where circular design options such as production liquid, pump diameter, pump depth, pumping unit, sucker rod and stabilizer matching, and lifting parameters are staggered, which is used to clearly indicate the optimal results of underground and ground parameter design in the deep pumping stage.

[0024] The present invention also provides a method for using a fast optimization chart for deep pumping design of tight oil, comprising the following steps:

[0025] a) Determine the single well production in the deep pumping stage, whether it belongs to the range of ≤5t, 5-7t, 7-10t, or ≥10t;

[0026] b) Design pump diameter: Determine the pump diameter based on the range of single well production during the deep pumping stage;

[0027] c) Design the pump depth, which should be selected based on the single well production, pump diameter, reservoir depth and drilling depth during the deep pumping stage;

[0028] d) Design model: Select the pumping unit model according to the determined pump depth;

[0029] e) Design the matching of sucker rod and centralizer: by determining the pump depth, select the matching of sucker rod and centralizer corresponding to the pump depth;

[0030] f) Design lifting parameters and complete the design of deep pumping of tight oil in oil layers.

[0031] Compared with the above background technology, the present invention has the following beneficial effects:

[0032] (1) By using a fast optimization chart for deep pumping design of tight oil provided by the present invention, the deep pumping design of tight oil in Fuyu oil layer can be quickly carried out. The chart is simple and convenient to use, with unified and standardized standards, which can improve the design efficiency and ensure the design quality.

[0033] (2) The fast optimization chart for tight oil deep pumping design not only designs the pump diameter and pump depth, but also designs the matching scheme of the pumping unit, sucker rod and centralizer. The design is relatively comprehensive and in-depth. The design concept of the tight oil deep pumping stage is integrated into one chart. The pump diameter, pump depth, sucker rod and centralizer matching, lifting parameters, etc. are designed according to the single well liquid production. The judgment is simple and the application is convenient.

[0034] (3) The fast optimization chart for the deep tight oil pumping design designed in this application can intuitively reflect the accurate application of oil production engineering parameters such as liquid production, pump diameter, pumping unit, pump depth, sucker rod and stabilizer matching, and lifting parameters during the deep tight oil pumping design; it can quickly optimize the underground and surface parameters of the pump depth and pumping unit lifting to solve the problem of increasing production when the liquid production is low during the deep tight oil pumping stage, ensure the optimal operating conditions of the machine production, and reduce the occurrence of pipe and rod eccentric wear, rod breakage, etc. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Attached Figure 1 Invented a fast optimization chart for deep pumping design of dense oil;

[0036] Attached Figure 2 It is an invention Example Use the fast optimization diagram for tight oil deep pumping design with arrow indication. DETAILED DESCRIPTION

[0037] The present invention will be further described below with reference to the accompanying drawings and specific embodiments:

[0038] Depend on Figure 1 As shown, in order to realize the efficient development of tight oil, a fast optimization chart of the design of tight oil deep pumping of the present invention is adopted for the Fuyu oil layer, including a chart body composed of a disk; the disk is divided into a plurality of concentric rings, and the disk is provided with 5 rings from the central ring to the outside; the disk is divided into four quadrants from the center; they are the first quadrant, the second quadrant, the third quadrant and the fourth quadrant; the first quadrant and the second quadrant are respectively divided into the front part first quadrant, the rear part first quadrant, the front part second quadrant and the rear part second quadrant; six items of liquid production, pump diameter, pumping unit, pump depth, matching of sucker rod and centralizer, and lifting parameters are respectively provided in the central ring and the 5 outer rings; the corresponding relationship between the liquid production, pump diameter, pumping unit, pump depth, matching of sucker rod and centralizer, and lifting parameters is displayed through the disk and the quadrant intervals separated in the disk.

[0039] The liquid production project is located at the center ring of the circle. The liquid production is divided into four production ranges of ≤5t, 5-7t, 7-10t, and ≥10t during the deep pumping stage, which are respectively arranged in the first quadrant, the second quadrant, the third quadrant, and the fourth quadrant.

[0040] The pump diameter item is located within the second circle, and the pump diameter is divided into four indicators: Φ32mm, Φ38mm, Φ44mm, and Φ57mm; they are respectively set in the first quadrant, the second quadrant, the third quadrant, and the fourth quadrant.

[0041] The pump depth project is located within the third ring, and the pump depth is divided into six indicators: 2100m, 1850m, 1750m, 2050m, 1950m, and 1600m; they are respectively set in the six quadrants of the first quadrant of the front part, the first quadrant of the rear part, the second quadrant of the front part, the second quadrant of the rear part, the third quadrant, and the fourth quadrant.

[0042] The oil pumping unit model item is located in the fourth ring, and the oil pumping unit models are divided into eight types and ten types; the oil pumping unit eight type is located in the interval between the first quadrant of the rear part and the second quadrant of the front part; the oil pumping unit ten type is located in the remaining quadrant interval, that is, the quadrant interval connected by the second quadrant of the rear part, the third quadrant, the fourth quadrant and the first quadrant of the front part.

[0043] The sucker rod and centralizer matching items are located in the fifth ring, and the sucker rod and centralizer matching is divided into:

[0044] When the planned liquid production is ≤5t, the pump diameter design parameter is 32mm. If the designed pump depth is 2100m, the type 10 machine should be used. The matching standard of sucker rod and centralizer is φ25:φ22:φ19=0.24:0.27:0.49. The lower part adopts φ38 weight rod 70m. The centralizer is installed 3 times at the deflection point and 20m above and below it, and 2 centralizers are installed at 1450-2030m.

[0045] When the planned liquid production is ≤5t, the pump diameter design parameter is 32mm. If the designed pump depth is 1850m, the eight-type machine should be used, the matching standard of sucker rod and centralizer is φ22:φ19=0.3:0.7, the lower part uses φ38 weight rod 70m, and the centralizer is installed at the deflection point and 20m above and below it. A total of 3 centralizers are installed, and 2 centralizers are installed at 1200-1780m.

[0046] When the planned production is 5-7t, the pump diameter design parameter is 38mm. If the designed pump depth is 1750m, the eight-type machine should be used, the matching standard of sucker rod and centralizer is φ22:φ19=0.35:0.65, the lower part uses φ38 weight rod 80m, and the centralizer is installed 3 times at the deflection point and 20m above and below it, and 2 centralizers are installed at 1100-1670m;

[0047] When the planned production is 5-7t, the pump diameter design parameter is 38mm. If the designed pump depth is 2050m, the type 10 machine should be used. The matching standard of sucker rod and centralizer is φ25:φ22:φ19=0.24:0.27:0.49. The lower part uses φ38 weight rod 80m. The centralizer is installed 3 times at the deflection point and 20m above and below it. Two centralizers are installed at 1400-1970m.

[0048] When the planned production of liquid is 7-10t, the pump diameter design parameter is 44mm, the pump depth should be designed to be 1950m, and the type 10 machine should be used. The matching standard of sucker rod and centralizer is φ25:φ22:φ19=0.24:0.27:0.49, the lower part uses φ38 weight rod 100m, and the centralizer is installed at the deflection point and 20m above and below it. 2 centralizers are installed at 1300-1850m;

[0049] When the planned liquid production is ≥10t, the pump diameter design parameter is 57mm, the pump depth should be designed to be 1600m, and the type 10 machine should be used. The matching standard of sucker rod and centralizer is φ25:φ22:φ19=0.31:0.34:0.35, the lower part uses φ38 weight rod 100m, and the centralizer is installed at the deflection point and 20m above and below it. Two centralizers are installed at 950-1500m.

[0050] It is divided into 6 areas in total; they are respectively set in the first quadrant of the front part, the first quadrant of the rear part, the second quadrant of the front part, the second quadrant of the rear part, the third quadrant, and the fourth quadrant;

[0051] The lifting parameter items are located in the sixth ring; the lifting parameters are two indicators of 3m and 4n / min, and 3m and 6n / min; the lifting parameters of 3m and 4n / min are respectively set in the first quadrant of the front part; and in the second and third quadrants of the rear part; the lifting parameters of 3m and 6n / min are respectively set in the first quadrant of the rear part, and the second and fourth quadrants of the front part.

[0052] The disc is provided with a rotatable arrow line from the center point to the circumference, and the arrow line passes through the area where circular design options such as production liquid, pump diameter, pump depth, pumping unit, sucker rod and stabilizer matching, lifting parameters, etc. are staggeredly arranged, and is used to clearly indicate the optimal design results of underground and ground parameters in the deep pumping stage.

[0053] The present invention also provides a method for using a fast optimization chart for deep pumping design of tight oil, comprising the following steps:

[0054] a) Determine the single well production in the deep pumping stage, whether it belongs to the range of ≤5t, 5-7t, 7-10t, or ≥10t;

[0055] b) Design pump diameter: Determine the pump diameter based on the range of single well production during the deep pumping stage;

[0056] c) Design the pump depth, which should be selected based on the single well production, pump diameter, reservoir depth and drilling depth during the deep pumping stage;

[0057] d) Design model: Select the pumping unit model according to the determined pump depth;

[0058] e) Design the matching of sucker rod and centralizer: by determining the pump depth, select the matching of sucker rod and centralizer corresponding to the pump depth;

[0059] f) Design lifting parameters and complete the design of deep pumping of tight oil in oil layers.

[0060] Example 1

[0061] As attached Figure 1 As shown in the figure, in order to realize the efficient development of tight oil, the method of using the fast optimization chart of tight oil deep pumping design for Fuyu oil layer is as follows: the single well liquid production of the designed well in the deep pumping stage is 5-7t, and the pump diameter should be designed to be Φ38mm according to the liquid production design;

[0062] In the first case, if the well pump depth is selected as 1750m, the pumping unit type should be designed as an eight-type unit, the pumping rod and the centralizer matching design is φ22:φ19=0.35:0.65, the lower part uses a φ38 weight rod of 80m, and the centralizer is installed at the deflection point and 20m above and below it. A total of 3 centralizers are installed at 1100-1670m. The lifting parameters should be designed to be 3m and 6n / min.

[0063] In the second case, if the pump depth of the well is selected to be 2050m, the pumping unit type should be designed as a type ten unit, and the sucker rod and centralizer are designed to match φ25:φ22:φ19=0.24:0.27:0.49. The lower part uses a φ38 weight rod of 80m. Three centralizers are installed at the inclination point and 20m above and below it, and two centralizers are installed at 1400-1970m. The lifting parameters should be designed to be 3m, 4n / min.

[0064] Example 2

[0065] As attached Figure 2 As shown in the figure, in order to realize the efficient development of tight oil, for the Fuyu oil layer, the method of using the fast optimization chart of tight oil deep pumping design with arrows is interpreted as follows:

[0066] Set arrow line indication, which passes through the area where circular design options such as production liquid, pump diameter, pump depth, pumping unit, sucker rod and stabilizer matching, and lifting parameters are staggered, to clearly indicate the optimal design results of underground and ground parameters in the deep pumping stage.

[0067] According to the set arrow line indication, the single well production of the designed well in the deep pumping stage is 5-7t, the designed pump diameter should be designed to be Φ38mm, the pump depth is selected to be 1750m, and the pumping unit type should be designed to be a type eight unit. The sucker rod and the centralizer are designed to match φ22:φ19=0.35:0.65, the lower part uses a φ38 weight rod of 80m, and 3 centralizers are installed at the deflection point and 20m above and below it, and 2 centralizers are installed at 1100-1670m. The lifting parameters should be designed to be 3m, 6n / min.

Claims

1. A method for using a fast optimization chart for deep pumping design of dense oil, characterized by: It includes a plate body composed of a disk; the disk is divided into a plurality of concentric rings, and the disk is provided with 5 rings from the central ring outward; the disk is divided into four quadrants from the center; they are the first quadrant, the second quadrant, the third quadrant, and the fourth quadrant; the first quadrant and the second quadrant are respectively divided into the front first quadrant, the rear first quadrant, the front second quadrant, and the rear second quadrant; the central ring and the 5 outer rings are respectively provided with six items of liquid production, pump diameter, pumping unit, pump depth, matching of sucker rod and centralizer, and lifting parameters; the corresponding relationship between the liquid production, pump diameter, pumping unit, pump depth, matching of sucker rod and centralizer, and lifting parameters is displayed through the disk and the rings and quadrants separated in the disk; The pump depth project is located in the third circle, and the pump depth is divided into six indicators: 2100m, 1850m, 1750m, 2050m, 1950m, and 1600m; which are respectively set in the first quadrant of the front part, the first quadrant of the rear part, the second quadrant of the front part, the second quadrant of the rear part, the third quadrant, and the fourth quadrant; The sucker rod and centralizer matching items are located in the fifth ring, and the sucker rod and centralizer matching is divided into: φ25:φ22:φ19=0.24:0.27:0.49, φ38 weight rod 70m is used in the lower part, 3 centralizers are installed at the deflection point and 20m above and below, and 2 centralizers are installed at 1450-2030m; φ22:φ19=0.3:0.7, φ38 weight rod 70m is used in the lower part, 3 centralizers are installed at the deflection point and 20m above and below, and 2 centralizers are installed at 1200-1780m; φ22:φ19=0.35:0.65, φ38 weight rod 80m is used at the lower part, 3 centralizers are installed at the deflection point and 20m above and below, and 2 centralizers are installed at 1100-1670m; φ25:φ22:φ19=0.24:0.27:0.49, φ38 weight rod 80m is used in the lower part, 3 centralizers are installed at the deflection point and 20m above and below, and 2 centralizers are installed at 1400-1970m; φ25:φ22:φ19=0.24:0.27:0.49, φ38 weight rod 100m is used at the lower part, 3 centralizers are installed at the deflection point and 20m above and below, and 2 centralizers are installed at 1300-1850m; φ25:φ22:φ19=0.31:0.34:0.35, φ38 weight rod 100m is used at the lower part, 3 centralizers are installed at the deflection point and 20m above and below, and 2 centralizers are installed at 950-1500m; It is subdivided into 6 areas in total, which are respectively set in the first quadrant of the front part, the first quadrant of the rear part, the second quadrant of the front part, the second quadrant of the rear part, the third quadrant, and the fourth quadrant.

2. The method for using a fast optimization chart for deep pumping design of dense oil according to claim 1, characterized in that: The liquid production project is located at the center ring of the circle. The liquid production is divided into four production ranges of ≤5t, 5-7t, 7-10t, and ≥10t during the deep pumping stage, which are respectively arranged in the first quadrant, the second quadrant, the third quadrant, and the fourth quadrant.

3. The method for using a fast optimization chart for deep pumping design of tight oil according to claim 1 is characterized by: The pump diameter item is located in the second circle. The pump diameter is divided into four indicators: 32mm, 38mm, 44mm, and 57mm; they are set in the first quadrant, the second quadrant, the third quadrant, and the fourth quadrant respectively.

4. The method for using a fast optimization chart for deep pumping design of tight oil according to claim 1 is characterized by: The oil pumping unit model item is located in the fourth ring, and the oil pumping unit models are divided into eight types and ten types; the oil pumping unit eight type is located in the interval between the first quadrant of the rear part and the second quadrant of the front part; the oil pumping unit ten type is located in the remaining quadrant interval, that is, the quadrant interval connected by the second quadrant of the rear part, the third quadrant, the fourth quadrant and the first quadrant of the front part.

5. The method for using a fast optimization chart for deep pumping design of tight oil according to claim 1 is characterized by: The lifting parameter items are located in the sixth ring; the lifting parameters are 3m, 4n / min, and 3m, 6n / min; the lifting parameters are 3m, 4n / min, which are respectively set in the first quadrant of the front part; and in the second and third quadrants of the rear part; the lifting parameters are 3m, 6n / min, which are respectively set in the first quadrant of the rear part, and the second and fourth quadrants of the front part.

6. The method for using a fast optimization chart for deep pumping design of tight oil according to claim 1 is characterized by: A rotatable arrow line is set from the center point to the circumference of the disc. The arrow line passes through the area where circular design options such as production liquid, pump diameter, pump depth, pumping unit, sucker rod and stabilizer matching, lifting parameters, etc. are staggered, which is used to clearly indicate the optimization results of underground and ground parameter design in the deep pumping stage.