An operator safety management system suitable for cotton plucking machines

By implementing the operator safety management system on the cotton picking machine, the problem of improper matching of the number of personnel and equipment has been solved, intelligent management has been achieved, production safety and efficiency have been improved, and costs have been reduced.

CN118211817BActive Publication Date: 2024-10-11SHANDONG WENSHANG RUYI RUNFA TEXTILE
View PDF 11 Cites 0 Cited by

Patent Information

Application Number
CN202410634482.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-22
Publication Date
2024-10-11
Estimated Expiration
2044-05-22

AI Technical Summary

Technical Problem

The existing cotton picking machines lack an effective comprehensive management system, resulting in improper matching of the number of personnel and equipment, prone to excess or shortage of manpower, and affecting production safety and efficiency.

Method used

An operator safety management system is designed. Through the continuous working hours supervision unit, equipment operation management unit, historical working hours supervision unit and personnel quantity supervision unit, a comprehensive analysis is carried out on the number of personnel on duty, operating proficiency, and equipment status to generate personnel fatigue signals. and equipment abnormal signals to achieve intelligent matching of personnel and equipment.

Benefits of technology

It improves the matching degree between personnel and equipment, avoids excess or shortage of manpower, ensures production safety and efficiency, reduces production costs, and reduces risks caused by fatigue operation and equipment failure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118211817B_ABST
    Figure CN118211817B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of safety management of cotton plucking machines, and is used to solve the problem of lack of an effective comprehensive management system for operators, resulting in insufficient matching between the number of operators and equipment. Specifically, it is an operator safety management system suitable for cotton plucking machines. In the present invention, during the operation of the cotton plucking machine, by comprehensively analyzing the number of on-the-job personnel, the operating proficiency of the on-the-job personnel, the number of equipment and the status of the equipment, the matching status of personnel and equipment can be standardized and intelligent, and the matching degree of personnel and equipment is improved, which can ensure that sufficient personnel will not affect production and avoid increasing production costs due to excess manpower. The continuous working time of employees is analyzed, so as to intelligently evaluate the continuous work intensity of all employees, avoid excessive continuous working time of on-the-job employees, and at the same time avoid property losses and safety hazards caused by misoperation due to employee fatigue.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of safety management of cotton plucking machines, and in particular to an operator safety management system suitable for cotton plucking machines. Background Art

[0002] Cotton plucker, also known as bale grabber, is a machine that grabs cotton fibers from cotton bales in the cotton opening and cleaning combined unit. It is usually ranked first in the combined machine. There are upper grabbing type, lower grabbing type; trolley reciprocating type, trolley rotary type; trolley lifting type, platform lifting type, etc. Generally, blade beaters and ribs are used, and there are also corner nails or spring clamps to grab fibers from the surface of the cotton bale, which are transported to the subsequent machine for further processing by airflow or machinery. Its structure is constantly being improved. For example, the upper grabbing type is adopted to achieve multi-bale cotton mixing; the installation of automatic control devices such as quantitative grabbing makes it easier to change the mixing ratio and improve the accuracy of the mixing ratio;

[0003] At present, the cotton plucking machine in the prior art has a certain degree of automation capability during production and operation, but still requires employee supervision to ensure the normal operation of the cotton plucking machine. The existing cotton plucking machine lacks an effective comprehensive management system for operators, so that the matching of the number of personnel and equipment is basically determined based on experience, which makes it easy for the cotton plucking machine to cause excess manpower and waste of manpower during production, or insufficient manpower leading to insufficient supervision of the cotton plucking machine production process;

[0004] In view of the above technical problems, this application proposes a solution. Summary of the invention

[0005] In the present invention, during the operation of the cotton plucking machine, a comprehensive analysis is performed on the number of on-the-job personnel, the operating proficiency of the on-the-job personnel, the number of equipment and the equipment status, so that the matching status of personnel and equipment can be standardized and intelligent, and the matching degree of personnel and equipment is improved, which can ensure that sufficient personnel will not affect production and avoid excessive manpower to increase production costs. The problem of lack of an effective comprehensive management system for operators, which leads to insufficient matching degree between the number of personnel and equipment, is solved, and an operator safety management system suitable for a cotton plucking machine is proposed.

[0006] The purpose of the present invention can be achieved through the following technical solutions:

[0007] An operator safety management system applicable to a cotton plucking machine includes a continuous working time monitoring unit, which can collect statistics on on-the-job employee information, obtain continuous workload, make judgments based on the continuous workload, and generate a personnel fatigue signal based on the judgment results;

[0008] An equipment operation management unit, which can collect statistics on the operation status of the cotton plucking machine and perform stability analysis on the equipment according to the statistical results;

[0009] A historical working hours monitoring unit, which is used to count the total historical working hours of employees;

[0010] A personnel quantity supervision unit, which obtains the total number of currently running equipment and the total number of employees on duty, and obtains the total historical working hours corresponding to each currently on-duty employee through a historical working hour supervision unit;

[0011] The safety warning reminder unit can obtain the total number of equipment, the total number of employees on duty and the total historical working hours corresponding to each employee on duty through the personnel quantity supervision unit, and conduct quantitative analysis on production safety, and generate a warning signal according to the analysis results.

[0012] As a preferred embodiment of the present invention, the method for determining whether the continuous working hours monitoring unit generates a personnel fatigue signal is as follows:

[0013] The continuous working hours monitoring unit compares the continuous workload of the on-duty employee with the preset maximum continuous workload value. If the continuous workload exceeds the preset maximum continuous workload value, a personnel fatigue signal is generated. If the continuous workload does not exceed the preset maximum continuous workload value, no response is made.

[0014] As a preferred implementation of the present invention, when the continuous working hours monitoring unit monitors the continuous workload of the on-the-job employees, the method for obtaining the continuous workload is:

[0015] 1. The continuous working time supervision unit collects statistics on the operating power of the cotton plucking machine at a pre-set data collection interval and records it as real-time power. The continuous working time supervision unit records the cotton plucking amount completed by the cotton plucking machine within a preset time interval as real-time workload;

[0016] 2. The continuous working time supervision unit starts timing after the cotton plucking machine starts running, and records it as the first time. When the cotton plucking machine stops running, another set of timing is performed, and recorded as the second time. The second time is stopped when the cotton plucking machine resumes running. After obtaining the second time, the continuous working time supervision unit compares the second time with the preset downtime interval time. If the second time is less than the preset downtime interval time, the first time will continue to be recorded. If the second time is greater than or equal to the preset downtime interval time, the first time will be stopped from being recorded, and the first time will be used as the continuous working time.

[0017] 3. The continuous working time supervision unit obtains the continuous working time. If there is no continuous working time, the current first time is used as the equivalent continuous working time. The continuous working time supervision unit records the continuous working time and the equivalent continuous working time, and obtains the continuous workload through formula analysis.

[0018] As a preferred implementation of the present invention, the process of the equipment operation management unit performing stability analysis on the equipment according to the statistical results is as follows:

[0019] The equipment operation management unit detects the operation status of the cotton plucking machine, and the detected operation status includes mechanical faults generated during the operation of the cotton plucking machine and internal control system faults of the cotton plucking machine. Mechanical faults during the operation of the equipment include operation noise and operation vibration, and internal control system faults include equipment control failure and equipment control deviation.

[0020] The equipment operation management unit compares the operation noise with the preset noise range. If the operation noise is less than or equal to the preset noise range, no response is made. If the operation noise is greater than the preset noise range, a noise exceeding standard signal is generated and recorded.

[0021] The equipment operation management unit compares the operation vibration with a preset vibration range. If the operation vibration is less than or equal to the preset vibration range, no response is made. If the operation vibration is greater than the preset vibration range, a vibration exceeding standard signal is generated and recorded.

[0022] When the equipment operation management unit detects equipment control failure or equipment control deviation, it generates a control abnormality signal, counts the number of control abnormality signals, records them as abnormal number, compares the abnormal number with a preset number threshold, and generates an abnormal exceeding signal if the abnormal number is greater than the preset number threshold, and does not respond if the abnormal number is less than the preset number threshold;

[0023] The equipment operation management unit sends the vibration exceeding standard signal, the noise exceeding standard signal and the abnormal exceeding standard signal to the safety warning reminder unit, and the safety warning reminder unit generates the corresponding type of alarm reminder.

[0024] As a preferred implementation of the present invention, the method for the historical working hours supervision unit to obtain the historical total working hours is:

[0025] S1: The historical working hours supervision unit obtains the employee's employment date and records it as the employment date. The historical formula supervision unit calculates based on the current time and employment date to obtain the cumulative employment time.

[0026] S2: The historical working time supervision unit obtains all continuous working time through the continuous working time supervision unit, sums up all continuous working time, and records it as actual working time;

[0027] S3: The historical working hours supervision unit assigns different weights to the actual working hours and the accumulated employment time, and obtains the total historical working hours through formula analysis.

[0028] As a preferred embodiment of the present invention, the method for the safety early warning reminder unit to perform quantitative analysis on production safety is:

[0029] The safety warning reminder unit obtains the on-the-job employees who generate personnel fatigue signals through the continuous working hours supervision unit, removes the employees who generate personnel fatigue signals from the total number of on-the-job employees, and records the total number of on-the-job employees after the removal. The safety warning reminder unit records the total number of equipment, and at the same time calculates the average value of the historical total working hours of the remaining employees after removing the employees who generate personnel fatigue signals, and generates a production safety estimate through formula analysis;

[0030] The safety warning reminder unit compares the production safety estimated value with the preset safety threshold. If the production safety estimated value Y is greater than or equal to the preset safety threshold, a normal production signal is generated. If the production safety estimated value is less than the preset safety threshold, a high-risk production signal is generated.

[0031] Compared with the prior art, the present invention has the following beneficial effects:

[0032] 1. In the present invention, during the operation of the cotton plucking machine, a comprehensive analysis is performed on the number of on-the-job personnel, the operating proficiency of the on-the-job personnel, the number of equipment and the equipment status, so that the matching status of personnel and equipment can be standardized and intelligent, thereby improving the matching degree of personnel and equipment, which can ensure that sufficient personnel will not affect production and avoid excessive manpower to increase production costs.

[0033] 2. In the present invention, when supervising on-duty employees, the continuous working hours of the employees are analyzed, so as to intelligently evaluate the continuous working intensity of all employees, avoid on-duty employees from working too long continuously, and at the same time avoid property losses and safety hazards caused by misoperation due to employee fatigue.

[0034] 3. In the present invention, when supervising the equipment, a multi-dimensional analysis is performed on the status of the equipment, and different evaluation signals are generated according to the analysis results, so as to judge the operation of the equipment, which is convenient for the management personnel to perform maintenance and repair on the abnormal equipment in time. At the same time, the operation status of the equipment and the matching work of the equipment and personnel can be comprehensively analyzed, so that the matching of personnel and equipment can be more scientific. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.

[0036] Figure 1 is a system block diagram of the present invention;

[0037] Figure 2 It is a system flow chart of the present invention. DETAILED DESCRIPTION

[0038] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0039] Embodiment 1

[0040] See also Figure 1-Figure 2 As shown, a safety management system for operators of a cotton plucking machine includes a continuous working time supervision unit, a safety early warning reminder unit, an equipment operation management unit, a historical working time supervision unit and a personnel quantity supervision unit. The continuous working time supervision unit can count the on-the-job employees when the equipment is running, obtain the continuous workload of the on-the-job employees, and compare the continuous workload of the on-the-job employees with a preset maximum continuous workload. If the continuous workload exceeds the preset maximum continuous workload, a personnel fatigue signal is generated. If the continuous workload does not exceed the preset maximum continuous workload, no response is made.

[0041] When the continuous working hours supervision unit supervises the continuous workload of on-the-job employees, the method for obtaining the continuous workload is:

[0042] 1. The continuous working time supervision unit counts the operating power of the cotton plucking machine at a pre-set data collection interval and records it as real-time power. The continuous working time supervision unit records the cotton plucking amount completed by the cotton plucking machine within a preset time interval as real-time workload. The continuous working time supervision unit records the real-time power as P and the real-time workload as F.

[0043] 2. The continuous working time supervision unit starts timing after the cotton plucking machine starts running, and records it as the first time. When the cotton plucking machine stops running, another set of timing is performed, and recorded as the second time. The second time is stopped when the cotton plucking machine resumes running. After obtaining the second time, the continuous working time supervision unit compares the second time with the preset downtime interval time. If the second time is less than the preset downtime interval time, the first time will continue to be recorded. If the second time is greater than or equal to the preset downtime interval time, the first time will be stopped from being recorded, and the first time will be used as the continuous working time.

[0044] 3. The continuous working time supervision unit obtains the continuous working time. If there is no continuous working time, the current first time is used as the equivalent continuous working time. The continuous working time supervision unit records the continuous working time and the equivalent continuous working time as T, and obtains the continuous workload X through formula analysis. , where a and b are preset weight coefficients, b is positively correlated with the design operating power of the cotton plucking machine, and the weight coefficient a is positively correlated with the real-time workload when the operating power is the design power. The value of a is 10, and the value of b is 0.15.

[0045] Embodiment 2

[0046] See also Figure 1-Figure 2 As shown, the equipment operation management unit detects the operation status of the cotton plucking machine. The detected operation status includes mechanical faults generated during the operation of the cotton plucking machine and internal control system faults of the cotton plucking machine. Mechanical faults during the operation of the equipment include operation noise and operation vibration. Internal control system faults include equipment control failure and equipment control deviation.

[0047] The equipment operation management unit compares the operation noise with the preset noise range. If the operation noise is less than or equal to the preset noise range, no response is made. If the operation noise is greater than the preset noise range, a noise exceeding standard signal is generated and recorded.

[0048] The equipment operation management unit compares the operation vibration with the preset vibration range. If the operation vibration is less than or equal to the preset vibration range, no response is made. If the operation vibration is greater than the preset vibration range, a vibration exceeding standard signal is generated and recorded.

[0049] When the equipment operation management unit detects equipment control failure or equipment control deviation, it generates a control abnormality signal, counts the number of control abnormality signals, records them as abnormal times, and compares the abnormal times with the preset times threshold. If the abnormal times are greater than the preset times threshold, it generates an abnormality exceeding standard signal. If the abnormal times are less than the preset times threshold, it does not respond.

[0050] The equipment operation management unit sends the vibration exceeding standard signal, the noise exceeding standard signal and the abnormal exceeding standard signal to the safety warning reminder unit. After the safety warning reminder unit obtains the vibration exceeding standard signal, the noise exceeding standard signal and the abnormal exceeding standard signal, it generates the corresponding type of alarm reminder and sends the alarm reminder to the management personnel, so that the management personnel can timely discover the fault conditions of the equipment.

[0051] Embodiment 3

[0052] See also Figure 1-Figure 2 As shown, the historical working hours supervision unit can obtain the historical total working hours N of the employees on duty. The method for the historical working hours supervision unit to obtain the historical total working hours is:

[0053] S1: The historical working time supervision unit obtains the employee's employment date and records it as the employment date. The historical formula supervision unit calculates based on the current time and the employment date to obtain the cumulative employment time s;

[0054] S2: The historical working time supervision unit obtains all continuous working time through the continuous working time supervision unit, and sums up all the continuous working time, and records it as the actual working time t;

[0055] S3: The historical working hours supervision unit assigns different weights to the actual working time t and the accumulated employment time s, and obtains the historical total working hours N through formula analysis. , where q and k are different weights assigned, the value of q is 1.3, and the value of k is 0.7.

[0056] The personnel quantity supervision unit obtains the total number of equipment currently in operation and the total number of employees on duty, and obtains the total historical working hours corresponding to each currently on-duty employee through the historical working hour supervision unit. The personnel quantity supervision unit sends the total number of equipment, the total number of employees on duty and the total historical working hours corresponding to each on-duty employee to the safety warning reminder unit.

[0057] The safety warning reminder unit obtains the on-the-job employees who generate fatigue signals through the continuous working hours supervision unit, and removes the employees who generate fatigue signals from the total number of on-the-job employees. The total number of employees after removal is recorded as m. The safety warning reminder unit records the total number of equipment as M, and generates the production safety estimate Y through formula analysis. , where N0 is the average of the total historical working hours of the remaining employees after removing the employees who generate fatigue signals, and W is the preset weight coefficient. The value of W is negatively correlated with the number of occurrences of vibration exceeding standard signals, noise exceeding standard signals, and abnormal exceeding standard signals;

[0058] The safety warning reminder unit compares the production safety estimated value Y with the preset safety threshold. If the production safety estimated value Y is greater than or equal to the preset safety threshold, a normal production signal is generated. If the production safety estimated value Y is less than the preset safety threshold, a high-risk production signal is generated and sent to the management personnel through the network. The management personnel promptly adjust the number of operating equipment and the number of on-duty employees to ensure production safety.

[0059] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. A safety management system for operators of a cotton plucking machine, characterized in that: It includes a continuous working hours monitoring unit, which can collect statistics on the information of on-the-job employees, obtain the continuous workload, make judgments based on the continuous workload, and generate personnel fatigue signals based on the judgment results; The equipment operation management unit can collect statistics on the operation status of the cotton plucking machine and perform stability analysis on the equipment according to the statistical results. The process of the equipment operation management unit performing stability analysis on the equipment according to the statistical results is as follows: The equipment operation management unit detects the operation status of the cotton plucking machine, and the detected operation status includes mechanical faults generated when the cotton plucking machine is running and internal control system faults of the cotton plucking machine. The mechanical faults generated when the equipment is running include operation noise and operation vibration, and the internal control system faults include equipment control failure and equipment control deviation. The equipment operation management unit compares the operation noise with the preset noise range. If the operation noise is less than or equal to the preset noise range, no response is made. If the operation noise is greater than the preset noise range, a noise exceeding standard signal is generated and recorded. The equipment operation management unit compares the operation vibration with a preset vibration range. If the operation vibration is less than or equal to the preset vibration range, no response is made. If the operation vibration is greater than the preset vibration range, a vibration exceeding standard signal is generated and recorded. When the equipment operation management unit detects equipment control failure or equipment control deviation, it generates a control abnormality signal, counts the number of control abnormality signals, records them as abnormal number, compares the abnormal number with a preset number threshold, and generates an abnormal exceeding signal if the abnormal number is greater than the preset number threshold, and does not respond if the abnormal number is less than the preset number threshold; The equipment operation management unit sends the vibration exceeding standard signal, the noise exceeding standard signal and the abnormal exceeding standard signal to the safety warning reminder unit, and the safety warning reminder unit generates the corresponding type of alarm reminder; A historical working hours monitoring unit, which is used to count the total historical working hours of employees; A personnel quantity supervision unit, which obtains the total number of currently running equipment and the total number of employees on duty, and obtains the total historical working hours corresponding to each currently on-duty employee through a historical working hour supervision unit; A safety warning reminder unit, which can obtain the total number of equipment, the total number of employees on duty and the total historical working hours corresponding to each employee on duty through the personnel quantity supervision unit, and conduct quantitative analysis on production safety, and generate a warning signal according to the analysis results; The method for the historical working hours supervision unit to obtain the historical total working hours is: S1: The historical working hours supervision unit obtains the employee's employment date and records it as the employment date. The historical working hours supervision unit calculates the accumulated employment time s based on the current time and the employment date. S2: The historical working time supervision unit obtains all continuous working time through the continuous working time supervision unit, and sums up all the continuous working time, and records it as the actual working time t; S3: The historical working hours supervision unit assigns different weights to the actual working time t and the accumulated employment time s, and obtains the historical total working hours N through formula analysis. , where q and k are different weights assigned; The method for the safety early warning reminder unit to perform quantitative analysis on production safety is: The safety warning reminder unit obtains the on-the-job employees who generate fatigue signals through the continuous working hours supervision unit, removes the employees who generate fatigue signals from the total number of on-the-job employees, and records the total number of on-the-job employees after removal as m. The safety warning reminder unit records the total number of equipment as M, and generates a production safety estimate Y through formula analysis. , where N0 is the average of the total historical working hours of the remaining employees after removing the employees who generate fatigue signals, and W is the preset weight coefficient. The value of W is negatively correlated with the number of occurrences of vibration exceeding standard signals, noise exceeding standard signals, and abnormal exceeding standard signals; The safety warning reminder unit compares the production safety estimated value with the preset safety threshold. If the production safety estimated value Y is greater than or equal to the preset safety threshold, a normal production signal is generated. If the production safety estimated value is less than the preset safety threshold, a high-risk production signal is generated.

2. The operator safety management system for a cotton plucking machine according to claim 1, characterized in that: The method for determining whether the continuous working hours monitoring unit generates a personnel fatigue signal is as follows: The continuous working hours monitoring unit compares the continuous workload of the on-duty employee with the preset maximum continuous workload value. If the continuous workload exceeds the preset maximum continuous workload value, a personnel fatigue signal is generated. If the continuous workload does not exceed the preset maximum continuous workload value, no response is made.

Citation Information

Patent Citations

  • Management system for real-time early warning of digital energy production and manufacturing

    CN111861180A

  • Working efficiency evaluation method, system and equipment based on computer vision and medium

    CN112819306A

  • Industrial intelligent production scheduling management system

    CN116050788A

  • Monitoring data processing system based on automobile safety production

    CN116307365A

  • Intelligent manufacturing scheduling method with self-learning capability

    CN116757562A