Distribution station area data acquisition, calculation and storage integrated system and method
By adopting a station operation status assessment method based on the integration of collection, calculation and storage in the distribution station area, and combining the attention network to optimize the frequency of data collection, the problems of insufficient objectiveness of evaluation and data backlog in the traditional method are solved, and a more accurate station evaluation is achieved. District operation monitoring.
Patent Information
- Application Number
- CN202410040653.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-11
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-01-11
AI Technical Summary
The traditional distribution station area data collection, calculation and storage method cannot accurately evaluate the operation status of the station area. It ignores the delay in data collection, calculation and storage, resulting in an unobjective assessment and the inability to obtain important data in a timely manner, which may lead to data backlog.
A platform operation status assessment method based on the integration of collection, computing and storage is adopted, taking fuzziness and randomness into consideration, and by constructing an attention network for station operation monitoring, the frequency of data collection is adjusted to balance needs and capabilities, and the data collection process is optimized.
It improves the objectivity and accuracy of the operation status assessment of the station area, avoids data backlog, and achieves more accurate monitoring.
Smart Images

Figure CN118228059B_ABST
Abstract
Description
Technical Field
[0001] The invention provides a data collection, calculation and storage integrated system for a distribution station area and a method thereof, belonging to the technical field of power systems. Background Art
[0002] The distribution substation is an important part of the power system, which is responsible for distributing the electric energy of the high-voltage transmission line to the low-voltage users. In order to effectively monitor and manage the distribution substation, various power grid data need to be collected. These data include but are not limited to current, voltage, power factor, frequency, power load, etc. After calculation and processing, these data can be used for real-time monitoring of the power grid operation status, fault detection and location, load forecasting and optimal scheduling, etc. Data collection, calculation and storage are the three key links of data processing in the distribution substation. Data collection provides the basis for calculation and storage. The calculation requires the collected data as input, and storage is the output of the calculation results.
[0003] The integrated data collection, computing and storage method integrates data collection, computing and storage, reducing the complexity and maintenance cost of the system. At the same time, the integrated solution can ensure the consistency of collected, computed and stored data, avoiding misjudgments caused by delayed or inconsistent data transmission. However, the traditional method faces the following problems.
[0004] In the process of substation operation status assessment, traditional methods do not make fuzzy judgments on the substation status and ignore the impact of data collection, queuing, and calculation delays on the assessment results, resulting in the substation operation status assessment being not objective and accurate enough.
[0005] Traditional methods are unable to adjust the collection frequency based on the results of substation status assessment, data differentiation attention, and server storage and computing capabilities. This may result in the inability to timely obtain data that has a greater impact on substation status, and cannot achieve more accurate substation operation monitoring, and will cause data backlogs. Summary of the invention
[0006] In response to the above technical problems, the present invention provides a data collection, calculation and storage integrated system and method for distribution station areas. The present invention proposes an evaluation of the operation status of the distribution station area based on the integration of collection, calculation and storage, evaluates the operation status of the distribution station area based on monitoring data, fully considers the fuzziness and randomness of the distribution station area status evaluation itself, solves the probability that the current distribution station area is in each state, and makes the evaluation result of the distribution station area status more objective. Considering the influence of data collection delay, calculation delay and queuing delay in the collection, calculation and storage process, solves the consistency of the evaluation of the operation status of the distribution station area, and improves the accuracy of the evaluation of the operation status of the distribution station area. The present invention proposes data collection optimization based on the differentiated attention and storage and computing capabilities of the evaluation of the operation status of the distribution station area. By constructing a distribution station operation monitoring attention network, using the evaluation results of the distribution station area operation status and its corresponding sample data and consistency to calculate the differentiated attention of the data, and calculating the data collection demand-capacity balance, the frequency of data collection is adjusted, which helps to achieve more accurate distribution station operation monitoring while avoiding data backlogs.
[0007] The specific technical solutions are:
[0008] The integrated system of data collection, calculation and storage in the distribution area includes data collection module, data storage and processing module, area operation status evaluation module, consistency calculation module, area operation monitoring attention network module and data collection frequency optimization module;
[0009] Data acquisition module: comprehensively collects the electrical quantity, electric energy, state quantity and environmental quantity data generated during the operation of power equipment in the distribution station area.
[0010] Data storage and processing module: responsible for collecting and storing real-time monitoring data uploaded by the data acquisition module, and performing standardization and positive processing on various types of data.
[0011] Substation operation status evaluation module: Based on the statistical characteristics of the monitoring data, the comprehensive evaluation value of the substation operation status is obtained. The membership function of the comprehensive evaluation value for the four states of "excellent, good, medium, and poor" is given to obtain the probability of the current substation being in each state.
[0012] Consistency calculation module: Based on the total delay of monitoring data, the consistency between the theoretical evaluation results of the distribution station area operation status and the actual operation status is solved.
[0013] Substation operation monitoring attention network module: Build a substation operation monitoring attention network, and use the substation operation status evaluation results and their corresponding sample data and consistency calculation data to differentiate attention.
[0014] Data collection frequency optimization module: Calculate the data collection demand-capacity balance based on data differentiation attention and station storage computing capacity, and adjust the data collection frequency according to changes in the data collection demand-capacity balance.
[0015] The integrated method for data collection, calculation and storage of distribution station area provided by the present invention comprises:
[0016] S1. Evaluation of the operation status of the substation based on the integration of acquisition, calculation and storage;
[0017] Collect data from distribution stations in all directions; process the collected data and calculate the comprehensive evaluation value; evaluate the current status of the substation based on the membership function; calculate the consistency of the total delay based on data collection and storage;
[0018] S2. Optimize data collection based on differentiated attention and storage computing capabilities based on the operation status of the substation.
[0019] Construct an attention network for monitoring substation operation; adjust collection frequency based on attention data.
[0020] The specific technical solutions are:
[0021] Step S1 includes:
[0022] S1.1 Evaluate the operation status of the substation based on real-time monitoring data
[0023] First, the data generated during the operation of the distribution substation is collected in all directions. Secondly, the real-time monitoring data is processed and the comprehensive evaluation value of the substation operation status is obtained based on the statistical characteristics of the monitoring data. Finally, the fuzziness and randomness of the distribution substation status evaluation itself are fully considered, and the membership function of the comprehensive evaluation value for the four states of "excellent, good, medium, and poor" is given to obtain the probability of the current substation being in each state.
[0024] Comprehensively collect K-type monitoring data of electrical quantity, electrical energy, state quantity and environmental quantity generated during the operation of the distribution station area. 0 The operation status of the distribution station area is evaluated based on the collected monitoring data, that is, the evaluation period is T 0 In each evaluation cycle, the equipment collects various types of data at different frequencies. The kth type of monitoring data collected is U k (n) is represented by U k (n) = {U k,1 (n),...,U k,h (n),...,U k,Hn,k (n)}, where U k,h (n) is the hth value of the kth monitoring data collected in the nth evaluation cycle, H n,kis the total number of monitoring data of the kth category collected in the nth evaluation cycle.
[0025] After completing the collection of all K-type monitoring data in an evaluation cycle, the K-type monitoring data are standardized and normalized in turn to eliminate the influence of different indicator dimensions. The processed k-th monitoring data is expressed as in, It represents the processed data of the hth value collected by the kth monitoring data in the nth evaluation cycle. The comprehensive evaluation value I(n) of the distribution station area in the nth evaluation cycle is expressed as:
[0026]
[0027] in, Ω 1 ,Ω 2 They are the first-order moment evaluation weight and the second-order moment evaluation weight respectively. The larger the mean and the smaller the variance of the processed K-type monitoring data, the better and more stable the operation status of the distribution station area, and the larger the comprehensive evaluation value I(n).
[0028] The operation status of the distribution station area includes four levels: excellent, good, medium, and poor. Let i be the state level variable, i = 1, 2, 3, 4 correspond to the four levels of excellent, good, medium, and poor respectively. Given the membership function of the comprehensive evaluation value for each state, the probability of the current comprehensive evaluation value being in each state is obtained. Initially, the parameters E of the membership function of each state are given i ,P i ,Q i , the three represent the expected value, entropy and super entropy of the membership function corresponding to the state level i, and the membership function of the comprehensive evaluation value of the distribution station area to the i-th state level is defined as:
[0029]
[0030] Among them, P i ′ is based on P i Q i is a normal random number with a standard deviation. The membership function can reflect the probability that the state level of the substation is i when the independent variable x takes different values.
[0031] The comprehensive evaluation value I(n) of the nth evaluation cycle is input into Formula 2, that is, x=I(n), and the membership values μ of the comprehensive evaluation value of the distribution station area in the nth evaluation cycle for the four levels of station area operation status are obtained respectively. 1 (I(n)),μ 2 (I(n)),μ 3 (I(n)),μ 4 (I(n)), the probability of being in the four levels of station operation status ζ is calculated 1 (n),ζ2 (n),ζ 3 (n),ζ 4 (n), the calculation formula is as follows:
[0032]
[0033] S1.2 Solving the consistency of substation operation status evaluation
[0034] By solving the consistency between the theoretical evaluation results of the distribution station area operation status and the actual operation status, the impact of the total delay from the start of monitoring data collection to the completion of the area status evaluation on the evaluation accuracy is measured. The consistency η(n) of the nth evaluation is expressed as:
[0035]
[0036] Among them, τ k (n) is the total delay of the k-th type of monitoring data at the nth evaluation. The larger the total delay, the greater the lag of the theoretical evaluation result and the smaller the consistency. For the data collected by the terminal with a timestamp, the total delay τ k (n) The data acquisition module directly reads the timestamp; for the data collected by the terminal without a timestamp, a fitting function τ is constructed based on historical experience data k (n) = y(f k (n),B k (n),ψ k (n)), the collection frequency f of the k-th monitoring data at the nth evaluation k (n), communication bandwidth B k (n), computing resources ψ k (n) is mapped to the total delay.
[0037] If the operation status of the substation is evaluated as excellent in the nth evaluation, the probability ζ 1 (n) is greater than the probability threshold ζ of the evaluation state being excellent th , and the consistency η(n) is greater than the consistency threshold η th , then the current substation operation status is considered to be excellent and the evaluation effectiveness is high. Otherwise, it means that the current substation operation status is poor or the evaluation effectiveness is low. Further based on S2.1 and S2.2, the collection frequency of various types of data is adjusted to find out the cause of the status failure in time and improve the evaluation effectiveness.
[0038] The specific implementation steps of step S2 are as follows.
[0039] S2.1 Obtaining data differentiation attention based on the operation status evaluation of the substation
[0040] First, construct the area operation monitoring attention network model, which includes three parts: input layer, hidden layer, and output layer. Define the number of neurons in the input layer as O=K+2, the number of neurons in the hidden layer as G, and the number of neurons in the output layer as K. Define the network parameters of the area operation monitoring attention network as P(W,B), where W is the weight matrix of the area operation monitoring attention network, and B is the threshold matrix of the area operation monitoring attention network. Based on the above-mentioned area operation monitoring attention network model, define the differentiated attention of the kth type of data output by the area operation monitoring attention network in the nth evaluation cycle as β k (n), expressed as:
[0041]
[0042] Among them, X o (n) is the input matrix of the input layer of the attention network for monitoring the operation of the substation in the nth evaluation period, i.e., the comprehensive evaluation value I(n) of the substation operation status in the nth evaluation period solved by S1.1 and its corresponding K-class sample data And the consistency of the substation operation status evaluation solved by S1.2 η(n), that is, W og (n) is the weight matrix between the input layer and the hidden layer neurons in the nth evaluation cycle, W gk (n) is the weight matrix between the hidden layer and the output layer in the nth evaluation cycle, B g (n) is the hidden layer threshold matrix of the nth evaluation cycle, B k (n) is the output layer threshold matrix of the nth evaluation cycle, B k (n) is the kth value in the output layer threshold matrix of the nth evaluation cycle, B j (n) is the jth value in the output layer threshold matrix of the nth evaluation cycle, γ k [·] function is used to extract the kth value in a 1-row K-column matrix, γ j The [·] function is used to extract the jth value in the 1-row K-column matrix. r(·) is the hidden layer function, which is used to extract the factors affecting the operation status of the substation data. Softmax[·] is the mapping function between the hidden layer and the output layer, which is used to output the differentiated attention of the kth category of data.
[0043] S2.2 Optimization of data collection frequency based on differentiated attention and storage computing capabilities for evaluation of station operation status
[0044] The data collection demand-capacity balance of the k-th data is defined as D(n), which represents the balance between the data collection demand of the data collection area and the storage and computing capacity of the area. Based on the computing resources ψ(n), storage space V(n), computing backlog L(n), and the attention β of the area status evaluation to the k-th datak (n), D(n) is calculated as:
[0045]
[0046] The data collection demand-capacity balance D(n) of the station for the k-th type of data is proportional to the station's computing resources ψ(n) and storage space V(n) and the station's state evaluation's attention βk(n) to the k-th type of data, and inversely proportional to the station's computing backlog L(n).
[0047] When the operation status evaluation of the substation is not optimal and the effectiveness of the evaluation is low, the collection frequency of the kth type of data is adjusted according to the data collection demand-capacity balance D(n) of the substation for the kth type of data. The adjustment formula is:
[0048]
[0049] Among them, f k (n+1) is the frequency of data collection for the kth type in the n+1th evaluation period, f k (n) is the frequency of data collection for the kth category in the nth evaluation cycle, and D(n-1) is the data collection demand-capacity balance for the kth category in the n-1th evaluation cycle. When the data collection demand-capacity balance D(n) for the kth category increases, it means that the data collection demand for the kth category increases and the storage and computing capacity of the area can meet the data collection demand for the kth category. At this time, the frequency of data collection for the kth category should be increased, and more data should be used to achieve more accurate operation monitoring of the area; when the data collection demand-capacity balance D(n) for the kth category decreases, it means that the data collection demand for the kth category decreases or the storage and computing capacity of the area cannot meet the data collection demand for the kth category. At this time, the frequency of data collection for the kth category should be reduced; when the data collection demand-capacity balance D(n) for the kth category remains unchanged, the frequency of data collection for the kth category remains unchanged.
[0050] The present invention proposes a method for evaluating the operation status of a substation based on the integration of collection, calculation and storage. The method evaluates the operation status of the substation based on monitoring data, fully considers the fuzziness and randomness of the distribution substation status evaluation itself, solves the probability of the current substation being in each state, and makes the substation status evaluation result more objective. Considering the influence of data collection delay, calculation delay and queuing delay in the process of collection, calculation and storage, the consistency of the substation operation status evaluation is solved, and the accuracy of the substation operation status evaluation is improved.
[0051] The present invention takes into account the need to adjust the collection frequency when the substation operating status is poor or the evaluation effectiveness is low, and proposes a data collection optimization method based on differentiated attention and storage computing power of substation operating status evaluation. By constructing a substation operation monitoring attention network, the substation operation status evaluation results and their corresponding sample data and consistency calculation data differentiated attention are used, and the data collection demand-capability balance is calculated, so as to adjust the data collection frequency, which helps to achieve more accurate substation operation monitoring while avoiding data backlogs. BRIEF DESCRIPTION OF THE DRAWINGS
[0052] Figure 1 The data collection, calculation and storage integrated system of the distribution station area of the present invention;
[0053] Figure 2 This is a flow chart of the integrated method for data collection, calculation and storage in distribution station areas of the present invention. DETAILED DESCRIPTION
[0054] The specific technical solution of the present invention is described in conjunction with the accompanying drawings.
[0055] The present invention proposes a data collection, calculation and storage integrated system for distribution station area. Figure 1 As shown, it includes data acquisition module, data storage and processing module, substation operation status evaluation module, consistency calculation module, substation operation monitoring attention network module and data acquisition frequency optimization module. The modules are introduced as follows:
[0056] Data acquisition module: comprehensively collects data such as electrical quantity, electrical energy, state quantity and environmental quantity generated during the operation of power equipment in the distribution station area.
[0057] Data storage and processing module: responsible for collecting and storing real-time monitoring data uploaded by the data acquisition module, and performing standardization and positive processing on various types of data.
[0058] Substation operation status evaluation module: Based on the statistical characteristics of the monitoring data, the comprehensive evaluation value of the substation operation status is obtained. The membership function of the comprehensive evaluation value for the four states of "excellent, good, medium, and poor" is given to obtain the probability of the current substation being in each state.
[0059] Consistency calculation module: Based on the total delay of monitoring data, the consistency between the theoretical evaluation results of the distribution station area operation status and the actual operation status is solved.
[0060] Substation operation monitoring attention network module: Build a substation operation monitoring attention network, and use the substation operation status evaluation results and their corresponding sample data and consistency calculation data to differentiate attention.
[0061] Data collection frequency optimization module: Calculate the data collection demand-capacity balance based on data differentiation attention and station storage computing capacity, and adjust the data collection frequency according to changes in the data collection demand-capacity balance.
[0062] The present invention proposes a method for integrating data collection, calculation and storage in a distribution station area, including S1, evaluation of the operation status of the area based on the integration of collection, calculation and storage; S2, optimization of data collection based on differentiated attention and storage and calculation capabilities of the operation status evaluation of the area. The specific process is as follows: Figure 2 As shown.
[0063] First, the distribution station area data is collected in all directions; secondly, the collected data is processed and the comprehensive evaluation value is calculated; then, the current state of the substation is evaluated based on the membership function; then, the consistency of the total delay calculation storage is calculated based on the data collection; then, the substation operation monitoring attention network is constructed; finally, the collection frequency is adjusted based on the attention of the data.
[0064] In a further embodiment, step S1 comprises:
[0065] S1.1 Evaluate the operation status of the substation based on real-time monitoring data
[0066] Real-time monitoring and status evaluation are very important for the safe and stable operation of the distribution substation. Through real-time monitoring of the status of the substation, abnormal conditions and faults can be discovered in time, and corresponding measures can be taken to deal with them. Through the analysis and processing of the monitoring data, the status of the substation can be evaluated, so as to timely warn and prevent possible faults and accidents, and improve the safety and reliability of the distribution substation. The data acquisition speed and quality in the real-time monitoring process will directly affect the results of subsequent calculations and storage. If the collected data is inaccurate or incomplete, the results of calculations and storage will also be affected. At the same time, the complexity and efficiency of the status evaluation method will directly affect the speed and accuracy of data calculation and processing, and then affect the storage results. Therefore, the present invention first collects the data generated during the operation of the distribution substation in an all-round way. Secondly, the real-time monitoring data is processed and the comprehensive evaluation value of the substation operation status is obtained based on the statistical characteristics of the monitoring data. Finally, the fuzziness and randomness of the status evaluation of the distribution substation itself are fully considered, and the membership function of the comprehensive evaluation value for the four states of "excellent, good, medium, and poor" is given to obtain the probability that the current substation is in each state.
[0067] In order to comprehensively and objectively evaluate the operation status of the distribution station area, the present invention collects K types of monitoring data such as electrical quantity, electrical energy, state quantity and environmental quantity generated during the operation of the distribution station area. Considering that the frequency of collecting different types of data in the distribution station area is different, the present invention collects K types of monitoring data every T 0The operation status of the distribution station area is evaluated based on the collected monitoring data, that is, the evaluation period is T 0 In each evaluation cycle, the equipment collects various types of data at different frequencies. The kth type of monitoring data collected is U k (n) is expressed as Among them, U k,h (n) is the hth value of the kth monitoring data collected in the nth evaluation cycle, H n,k is the total number of monitoring data of the kth category collected in the nth evaluation cycle.
[0068] After completing the collection of all K-type monitoring data in an evaluation cycle, the K-type monitoring data are standardized and normalized in turn to eliminate the influence of different indicator dimensions and make the comprehensive evaluation results better with the increase of normalized values. The processed k-th monitoring data is expressed as in, It represents the processed data of the hth value collected by the kth monitoring data in the nth evaluation cycle. The comprehensive evaluation value I(n) of the distribution station area in the nth evaluation cycle is expressed as:
[0069]
[0070] in, Ω 1 ,Ω 2 They are the first-order moment evaluation weight and the second-order moment evaluation weight respectively. The larger the mean and the smaller the variance of the processed K-type monitoring data, the better and more stable the operation status of the distribution station area, and the larger the comprehensive evaluation value I(n).
[0071] The distribution substation operation status considered in the present invention includes four levels: excellent, good, medium, and poor. Let i be the state level variable, i=1, 2, 3, 4 correspond to the four levels of excellent, good, medium, and poor respectively. Due to the fuzziness and randomness of the distribution substation status evaluation, the present invention gives the membership function of the comprehensive evaluation value for each state to obtain the probability of the current comprehensive evaluation value being in each state. The parameters E of the membership function of each state are initially given i ,P i ,Q i , the three represent the expected value, entropy and super entropy of the membership function corresponding to the state level i, and the membership function of the comprehensive evaluation value of the distribution station area to the i-th state level is defined as
[0072]
[0073] Among them, P i ′ is based on P i Q iis a normal random number with a standard deviation. The membership function can reflect the probability that the state level of the substation is i when the independent variable x takes different values.
[0074] The comprehensive evaluation value I(n) of the nth evaluation cycle is input into Formula 2, that is, x=I(n), and the membership values μ of the comprehensive evaluation value of the distribution station area in the nth evaluation cycle for the four levels of station area operation status are obtained respectively. 1 (I(n)),μ 2 (I(n)),μ 3 (I(n)),μ 4 (I(n)), the probability of being in the four levels of station operation status ζ is calculated 1 (n),ζ 2 (n),ζ 3 (n),ζ 4 (n), the calculation formula is as follows:
[0075]
[0076] S1.2 Solving the consistency of substation operation status evaluation
[0077] From collecting real-time monitoring data of the distribution station area to completing the status evaluation, data collection, data calculation and data storage are required. The operation status of the substation obtained based on the S1.1 evaluation does not fully consider the influence of data collection delay, calculation delay and queuing delay in the collection, calculation and storage process, and may have lag, resulting in poor accuracy of the evaluation results. Therefore, the present invention measures the impact of the total delay from collecting monitoring data to completing the substation status evaluation on the evaluation accuracy by solving the consistency between the theoretical evaluation results of the distribution station area operation status and the actual operation conditions. The consistency η(n) of the nth evaluation is expressed as:
[0078]
[0079] Among them, τ k (n) is the total delay of the k-th type of monitoring data at the nth evaluation. The larger the total delay, the greater the lag of the theoretical evaluation result and the smaller the consistency. For the data collected by the terminal with a timestamp, the total delay τ k (n) can be directly read by the data acquisition module through the timestamp; for the data collected by the terminal without a timestamp, the present invention constructs a fitting function τ based on historical experience data k (n) = y(f k (n),B k (n),ψ k (n)), the collection frequency of the k-th monitoring data at the nth evaluation can be f k (n), communication bandwidth B k (n), computing resources ψk (n) is mapped to the total delay. Under limited computing resources, the higher the acquisition frequency, the higher the computing delay and queuing delay, and the higher the total delay. However, the increase in communication bandwidth and computing resources will reduce the total delay.
[0080] If the operation status of the substation is evaluated as excellent in the nth evaluation, the probability ζ 1 (n) is greater than the probability threshold ζ of the evaluation state being excellent th , and the consistency η(n) is greater than the consistency threshold η th , then the current operation status of the substation can be evaluated as excellent and the effectiveness of the evaluation is high. Otherwise, it means that the current operation status of the substation is poor or the effectiveness of the evaluation is low. The collection frequency of various types of data should be further adjusted based on S2.1 and S2.2 to find out the cause of the status failure in time and improve the effectiveness of the evaluation.
[0081] In a further embodiment, the specific implementation steps of step S2 are as follows.
[0082] S2.1 Obtaining data differentiation attention based on the operation status evaluation of the substation
[0083] The attention mechanism can ensure that key data is focused on when evaluating the operation status of the substation, thereby effectively avoiding interference from irrelevant data and effectively reducing data transmission, ensuring efficiency and accuracy when monitoring the operation status of the substation. In order to obtain the differentiated attention of the substation status evaluation to each data, a substation operation monitoring attention network model is first constructed, including three parts: input layer, hidden layer, and output layer. The number of neurons in the input layer is defined as O=K+2, the number of neurons in the hidden layer is G, and the number of neurons in the output layer is K. The network parameters of the substation operation monitoring attention network are defined as P(W,B), where W is the weight matrix of the substation operation monitoring attention network, and B is the threshold matrix of the substation operation monitoring attention network. Based on the above substation operation monitoring attention network model, the differentiated attention of the kth type of data output by the substation operation monitoring attention network in the nth evaluation cycle is defined as β k (n), which can be expressed as:
[0084]
[0085] Among them, X o (n) is the input matrix of the input layer of the attention network for monitoring the operation of the substation in the nth evaluation period, i.e., the comprehensive evaluation value I(n) of the substation operation status in the nth evaluation period solved by S1.1 and its corresponding K-class sample data And the consistency of the substation operation status evaluation solved by S1.2 η(n), that is, W og (n) is the weight matrix between the input layer and the hidden layer neurons in the nth evaluation cycle, Wgk (n) is the weight matrix between the hidden layer and the output layer in the nth evaluation cycle, B g (n) is the hidden layer threshold matrix of the nth evaluation cycle, B k (n) is the output layer threshold matrix of the nth evaluation cycle, B k (n) is the kth value in the output layer threshold matrix of the nth evaluation cycle, B j (n) is the jth value in the output layer threshold matrix of the nth evaluation cycle, γ k [·] function is used to extract the kth value in a 1-row K-column matrix, γ j The [·] function is used to extract the jth value in the 1-row K-column matrix. r(·) is the hidden layer function, which is used to extract the factors affecting the operation status of the substation data. Softmax[·] is the mapping function between the hidden layer and the output layer, which is used to output the differentiated attention of the kth category of data.
[0086] S2.2 Optimization of data collection frequency based on differentiated attention and storage computing capabilities for evaluation of station operation status
[0087] The adjustment of the frequency of data collection is affected by the attention of the area status evaluation to the data and the storage and computing capacity of the area. k (n), the larger its value is, the more k-th data is needed to monitor the operation status of the substation. At this time, the substation should increase the intensity of data collection for the k-th data. However, the intensity of data collection in the substation cannot be increased infinitely. It is also affected by the storage and computing capacity of the substation. In the present invention, the storage and computing capacity of the substation refers to the computing resources ψ(n), storage space V(n) and computing backlog L(n) of the substation. When the computing resources ψ(n) and storage space V(n) of the substation are sufficient and the computing backlog L(n) is not large, the demand for data collection in the substation can be met. At this time, if the substation pays more attention to a certain data, that is, the demand for data collection increases, the storage and computing capacity of the substation can support the increase in the frequency of collection. When the computing resources ψ(n) and storage space V(n) of the substation are not enough and the computing backlog L(n) is large, if the frequency of data collection is increased, the substation cannot calculate and store the collected data in time, which will cause a large amount of data backlog and affect the operation status of the substation. If the attention of the substation status assessment to the data is reduced or the storage and computing capacity of the substation is insufficient, the frequency of collection is reduced.
[0088] The data collection demand-capacity balance of the station for the k-th type of data is defined as D(n), which represents the balance between the station's demand for data collection and the station's storage and computing capabilities. Based on the station's computing resources ψ(n), storage space V(n), computing backlog L(n), and the station's state evaluation attention to the k-th type of data βk(n), D(n) can be calculated as
[0089]
[0090] This formula means that the data collection demand-capacity balance D(n) of the station for the k-th type of data and the computing resources ψ(n) and storage space V(n) of the station, as well as the attention β of the station status evaluation to the k-th type of data k (n), and inversely proportional to the calculated backlog L(n) of the station area.
[0091] When the operation status of the substation is not optimal and the effectiveness of the evaluation is low, it is necessary to adjust the collection frequency of the kth type of data according to the data collection demand-capacity balance D(n) of the substation for the kth type of data. The adjustment formula is:
[0092]
[0093] Among them, f k (n+1) is the frequency of data collection for the kth type in the n+1th evaluation period, f k (n) is the frequency of data collection for the kth type in the nth assessment cycle, and D(n-1) is the balance between the demand and capability of data collection for the kth type in the n-1th assessment cycle. This formula means that when the data collection demand-capacity balance D(n) of the substation for the k-th data increases, it means that the data collection demand of the substation for the k-th data increases, and the storage and computing capacity of the substation can meet the data collection demand for the k-th data. At this time, the collection frequency of the k-th data should be increased, and more data should be used to achieve more accurate substation operation monitoring; when the data collection demand-capacity balance D(n) of the substation for the k-th data decreases, it means that the data collection demand of the k-th data decreases or the storage and computing capacity of the substation cannot meet the data collection demand for the k-th data. At this time, the collection frequency of the k-th data should be reduced to avoid the inability of the substation to calculate and store the collected data in time due to the mismatch between the storage and computing capacity of the substation and the amount of collected data, resulting in a large amount of data backlog, affecting the operation status of the substation; when the data collection demand-capacity balance D(n) of the substation for the k-th data remains unchanged, the collection frequency of the k-th data remains unchanged.
Claims
1. The integrated system of data acquisition, calculation and storage in the distribution area is characterized by: It includes data acquisition module, data storage and processing module, substation operation status evaluation module, consistency calculation module, substation operation monitoring attention network module and data acquisition frequency optimization module; Data acquisition module: comprehensively collects the electrical quantity, electrical energy, state quantity and environmental quantity data generated during the operation of power equipment in the distribution station area; Data storage and processing module: responsible for collecting and storing the real-time monitoring data uploaded by the data acquisition module, and performing standardization and positive processing on various types of data; Substation operation status evaluation module: Based on the statistical characteristics of monitoring data, the comprehensive evaluation value of the substation operation status is obtained. The membership function of the comprehensive evaluation value for the four states of "excellent, good, medium, and poor" is given to obtain the probability of the current substation being in each state; Consistency calculation module: based on the total delay of monitoring data, it solves the consistency between the theoretical evaluation results of the operation status of the distribution station area and the actual operation status; Substation operation monitoring attention network module: Construct the substation operation monitoring attention network, and use the substation operation status evaluation results and their corresponding sample data and consistency calculation data to differentiate attention; Data collection frequency optimization module: Calculate the data collection demand-capacity balance based on data differentiation attention and area storage computing capacity, and adjust the data collection frequency according to the change of data collection demand-capacity balance; The data collection, calculation and storage integrated system and the calculation and storage integrated method of the distribution station area include the following steps: S1. Evaluation of the operation status of the substation based on the integration of acquisition, calculation and storage; Collect data from distribution stations in all directions; process the collected data and calculate the comprehensive evaluation value; evaluate the current status of the substation based on the membership function; calculate the consistency of the total delay based on data collection and storage; S2, data collection optimization based on the evaluation of differentiated attention and storage computing capabilities based on the operation status of the station area; Construct an attention network for monitoring the operation of the substation; adjust the collection frequency based on the attention of the data; Step S1 specifically includes the following sub-steps: S1.1 Evaluate the operation status of the substation based on real-time monitoring data; Firstly, the data generated during the operation of the distribution substation is collected in an all-round way; secondly, the real-time monitoring data is processed and the comprehensive evaluation value of the substation operation status is obtained based on the statistical characteristics of the monitoring data; finally, the fuzziness and randomness of the distribution substation status evaluation itself are fully considered, and the membership function of the comprehensive evaluation value for the four states of "excellent, good, medium, and poor" is given to obtain the probability of the current substation being in each state; The K-type monitoring data of electrical quantity, electric energy, state quantity and environmental quantity generated during the operation of the distribution station area are collected in an all-round way; the operation status of the distribution station area is evaluated according to the collected monitoring data every T0 time, that is, the evaluation cycle is T0; in each evaluation cycle, the equipment uses different frequencies to collect various types of data; the collected k-th monitoring data U k (n) is represented by U k (n) = {U k,1 (n),...,U k,h (n),...,U k,Hn,k (n)}, where U k,h (n) is the hth value of the kth monitoring data collected in the nth evaluation cycle, H n,k is the total number of monitoring data of the kth category collected in the nth assessment cycle; After completing the collection of all K-type monitoring data in an evaluation cycle, the K-type monitoring data are standardized and normalized in turn to eliminate the influence of different indicator dimensions; the processed k-th monitoring data is expressed as in, It represents the processed data of the hth value collected by the kth monitoring data in the nth evaluation cycle; the comprehensive evaluation value I(n) of the distribution station area in the nth evaluation cycle is expressed as: in, Ω1 and Ω2 are the first-order moment evaluation weight and the second-order moment evaluation weight respectively; the larger the mean and the smaller the variance of the processed K-type monitoring data, the better and more stable the operation status of the distribution station area, and the larger the comprehensive evaluation value I(n); The operation status of the distribution station area includes four levels: excellent, good, medium and poor. Let i be the state level variable, i = 1, 2, 3, 4 correspond to the four levels of excellent, good, medium and poor respectively; the membership function of the comprehensive evaluation value for each state is given to obtain the probability of the current comprehensive evaluation value being in each state; the parameters E of the membership function of each state are initially given i ,P i ,Q i , the three represent the expected value, entropy and super entropy of the membership function corresponding to the state level i, and the membership function of the comprehensive evaluation value of the distribution station area to the i-th state level is defined as: Among them, P i ′ is based on P i Q i is a normal random number with a standard deviation; the membership function can reflect the probability that the substation status level is i when the independent variable x takes different values; The comprehensive evaluation value I(n) of the nth evaluation cycle is input into Formula 2, that is, x=I(n), and the membership values μ1(I(n)), μ2(I(n)), μ3(I(n)), and μ4(I(n)) of the comprehensive evaluation value of the distribution station area in the nth evaluation cycle for the four levels of station area operation status are obtained respectively. The probabilities ζ1(n), ζ2(n), ζ3(n), and ζ4(n) of being in the four levels of station area operation status are calculated, and the calculation formula is as follows: S1.2 Solve the consistency of the substation operation status assessment; By solving the consistency between the theoretical evaluation results of the distribution station area operation status and the actual operation status, the influence of the total delay from the start of collecting monitoring data to the completion of the area status evaluation on the evaluation accuracy is measured; the consistency η(n) of the nth evaluation is expressed as: Among them, τ k (n) is the total delay of the k-th monitoring data at the nth evaluation. The larger the total delay, the greater the hysteresis of the theoretical evaluation result and the smaller the consistency. For the data collected by the terminal with a timestamp, the total delay τ k (n) The data acquisition module directly reads the timestamp; for the data collected by the terminal without a timestamp, a fitting function τ is constructed based on historical experience data. k (n) = y(f k (n),B k (n),ψ k (n)), the collection frequency f of the k-th monitoring data at the nth evaluation k (n), communication bandwidth B k (n), computing resources ψ k (n) is mapped to the total delay; If the probability that the operation status of the substation is evaluated as excellent in the nth evaluation is greater than the probability threshold value ζ th , and the consistency η(n) is greater than the consistency threshold η th , then the current substation operation status is considered to be excellent and the evaluation effectiveness is high; otherwise, it means that the current substation operation status is poor or the evaluation effectiveness is low. Further based on S2.1 and S2.2, the collection frequency of various types of data is adjusted to find out the cause of the status failure in time and improve the evaluation effectiveness; Step S2 specifically includes the following sub-steps: S2.1 Obtain data differentiated attention based on the operation status assessment of the substation; First, a substation operation monitoring attention network model is constructed, including the input layer, hidden layer, and output layer. The number of neurons in the input layer is defined as O=K+2, the number of neurons in the hidden layer is G, and the number of neurons in the output layer is K. The network parameters of the substation operation monitoring attention network are defined as P(W,B), where W is the weight matrix of the substation operation monitoring attention network, and B is the threshold matrix of the substation operation monitoring attention network. Based on the above substation operation monitoring attention network model, the differentiated attention of the kth type of data output by the substation operation monitoring attention network in the nth evaluation cycle is defined as β k (n), expressed as: Among them, X o (n) is the input matrix of the input layer of the attention network for monitoring the operation of the substation in the nth evaluation period, i.e., the comprehensive evaluation value I(n) of the substation operation status in the nth evaluation period solved by S1.1 and its corresponding K-class sample data And the consistency of the substation operation status evaluation solved by S1.2 η(n), that is, W og (n) is the weight matrix between the input layer and the hidden layer neurons in the nth evaluation cycle, W gk (n) is the weight matrix between the hidden layer and the output layer in the nth evaluation cycle, B g (n) is the hidden layer threshold matrix of the nth evaluation cycle, B k (n) is the output layer threshold matrix of the nth evaluation cycle, B k (n) is the kth value in the output layer threshold matrix of the nth evaluation cycle, B j (n) is the jth value in the output layer threshold matrix of the nth evaluation cycle, γ k [·] function is used to extract the kth value in a 1-row K-column matrix, γ j The [·] function is used to extract the jth value in the 1-row K-column matrix, r(·) is the hidden layer function, which is used to extract the factors affecting the operation status of the substation data, and Softmax[·] is the mapping function between the hidden layer and the output layer, which is used to output the differentiated attention of the kth type of data; S2.2 Optimize the frequency of data collection based on the differentiated attention and storage computing capabilities of the evaluation of the operation status of the station area; The data collection demand-capacity balance of the area for the k-th type of data is defined as D(n), which represents the balance between the area's demand for data collection and the area's storage and computing capabilities. Based on the area's computing resources ψ(n), storage space V(n), computing backlog L(n), and the area's state evaluation attention to the k-th type of data βk(n), D(n) is calculated as: The data collection demand-capacity balance D(n) of the station for the k-th type of data is proportional to the station's computing resources ψ(n) and storage space V(n) and the attention βk(n) of the station's state evaluation to the k-th type of data, and inversely proportional to the station's computing backlog L(n); When the operation status evaluation of the substation is not optimal and the effectiveness of the evaluation is low, the collection frequency of the kth type of data is adjusted according to the data collection demand-capacity balance D(n) of the substation for the kth type of data. The adjustment formula is: Among them, f k (n+1) is the frequency of data collection for the kth type in the n+1th evaluation period, f k (n) is the frequency of data collection of the kth category in the nth evaluation cycle, and D(n-1) is the balance between the data collection demand and capability of the kth category in the n-1th evaluation cycle; when the data collection demand and capability balance D(n) of the kth category increases, it means that the data collection demand of the kth category increases and the storage and computing capacity of the kth category can meet the data collection demand. At this time, the frequency of data collection of the kth category should be increased, and more data should be used to achieve more accurate operation monitoring of the kth category; when the data collection demand and capability balance D(n) of the kth category decreases, it means that the data collection demand of the kth category decreases or the storage and computing capacity cannot meet the data collection demand. At this time, the frequency of data collection of the kth category should be reduced; when the data collection demand and capability balance D(n) of the kth category remains unchanged, the frequency of data collection of the kth category remains unchanged.