A method and system for dispatching an electric-heat system taking into account a multi-regional interactive strategy

By introducing an adjustable capacity exchange interval into the electric-thermal integrated energy system, flexibility sharing between the thermal system and the electric power system is realized, which solves the problem of unused flexibility of the thermal network in the existing technology and improves the efficiency of the electric power system. Adjustability and system safety and economy.

CN118246710BActive Publication Date: 2024-10-15SHANDONG UNIV +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410668552.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-28
Publication Date
2024-10-15
Estimated Expiration
2044-05-28

AI Technical Summary

Technical Problem

The existing technology ignores the flexible supply and modeling of the thermal network in the electric-thermal integrated energy system, resulting in the power system lacking effective flexible adjustment capabilities in the face of power fluctuations brought by new energy sources, affecting the safety and security of the system. Economy.

Method used

By introducing the concept of adjustable capacity exchange intervals and utilizing the direct exchange between the flexibility of the thermal system and the power system, an optimal dispatch model for the electric-thermal comprehensive energy system taking into account regional interconnection is constructed to achieve flexibility between the acceptance and provision systems. sharing to reduce wind curtailment and ensure the safe and stable operation of the power system.

Benefits of technology

Make full use of the flexibility resources of the thermal system to achieve power synergy and flexibility between electric and thermal systems, which improves the power system's adjustment capability, reduces wind curtailment, and ensures the safety and economy of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118246710B_ABST
    Figure CN118246710B_ABST
Patent Text Reader

Abstract

The present invention provides an electric-thermal system scheduling method and system taking into account multi-regional interactive strategies, belonging to the technical field of integrated energy system optimization scheduling. A flexibility acceptance system is defined as an electric-thermal integrated energy system that obtains flexibility replenishment from other interconnected systems in a regional interconnected system, and a flexibility provision system is defined as an electric-thermal integrated energy system that provides flexibility to other interconnected systems in a regional interconnected system. The flexibility acceptance system is connected to at least one flexibility provision system for flexibility sharing; the scheduling of the electric-thermal system taking into account multi-regional interactive strategies is carried out with the goal of minimizing the total cost of the flexibility acceptance system and the flexibility provision system; the present invention simultaneously performs power coordination and flexibility mutual assistance, constructs an optimized scheduling model for an electric-thermal integrated energy system taking into account regional interconnection, fully taps the flexibility resources of the regional interconnected electric-thermal system, reduces wind abandonment, and ensures safe and stable operation of the power system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of integrated energy system optimization and scheduling, and in particular to an electric-thermal system scheduling method and system taking into account a multi-regional interactive strategy. Background Art

[0002] The statements in this section merely provide background art related to the present invention and do not necessarily constitute prior art.

[0003] While the high proportion of new energy grid connection brings environmental benefits, it also exacerbates the contradiction between supply and demand of power balance in the power system due to its strong uncertainty, affecting the stability and security of the power system. The power system urgently needs rich flexible adjustment capabilities. The optimal dispatch of the integrated energy system is a complex issue, involving the close coupling of multiple energy forms with significant differences in characteristics. Due to the different forms of supply and demand of energy systems such as electricity, heat, and gas, various types of energy systems in the integrated energy system show prominent dynamic differences, which are mainly reflected in the network time constant. For the electric-heat integrated energy system, the propagation of electricity is close to the speed of light, and its transient process occurs at the millisecond level, so it can be ignored in the system optimization dispatch; while hot water exhibits different dynamic characteristics such as time delay and inertia when transmitted in the heating network, which is equivalent to giving the thermal network a certain heat storage capacity, thereby providing more flexible resources for the integrated energy system. Therefore, by tapping the flexibility of the thermal network and incorporating it as a dispatching resource into the coordinated dispatch of the electric-heat integrated energy system, it has positive significance for coping with power fluctuations caused by new energy such as wind power.

[0004] The electric-heat integrated energy system realizes the complementarity of electric energy and thermal energy, as well as the coupling between multiple subsystem energies through combined heat and power (CHP) units. How to ensure the safety and economy of the electric-heat integrated energy system while meeting the demand for new energy consumption is an urgent issue to be solved. At present, domestic and foreign scholars have conducted a lot of research on the problem of coordinated optimization and scheduling of electric-heat. Most studies have shown that coordinated scheduling of electric-heat integrated energy systems and utilizing the heat storage characteristics of thermal networks can tap the flexible adjustment capabilities of the system. However, current research on increasing the flexible adjustment capabilities of electric-heat integrated energy systems mostly focuses on adding flexible equipment, ignoring the impact of network structure characteristics, and lacks a modeling method for tapping the flexible adjustment capabilities of the system.

[0005] Most methods optimize the operating state of the thermal network by introducing the dynamic characteristics of the thermal network, so that the electric-thermal coupling equipment operates in a better state, thereby giving the power system more flexible adjustment capabilities. This flexibility sharing between different energy systems is more of an indirect sharing. The power system still uses its own flexibility, while ignoring the direct use and modeling of the flexibility supply of the thermal network. Some researchers pointed out that the gas-thermal system has inertia, and constructed an integrated energy system model in which the gas-thermal inertia provides power support for the power system, so that the flexible adjustment capability provided by the thermal network can directly participate in the coordinated dispatch of the integrated energy system. However, it failed to carry out refined mathematical modeling of the flexibility provided by the dynamic characteristics of the thermal network.

[0006] With the increasing perfection of cross-regional interconnection structures and the large-scale access of distributed power sources, many researchers have chosen to build regional interconnected power systems in order to improve the flexibility of power systems. By building regional interconnected power systems, each region can achieve optimal utilization of resources in a larger spatial range through load peak shifting benefits and backup sharing, thereby improving the economy and reliability of system operation.

[0007] Most current studies focus on power sharing between multi-regional interconnected power systems. Some researchers have shared spare capacity in addition to achieving power sharing. However, most studies have ignored the safe, stable operation and economic benefits brought about by the coordinated dispatch of multiple energy coupling. Considering the multi-region interconnected multi-energy coupling system, it is possible to utilize the differences in multi-energy flows, smooth the fluctuations of renewable energy power generation, coordinate and optimize the energy output of multiple regions, allocate power generation resources and spare resources across regions, and promote load transfer and new energy consumption between regions. In addition, the regional interconnected multi-energy coupling system needs to consider the cross-temporal allocation of resources, involving many devices. Compared with the centralized algorithm, the distributed algorithm can autonomously perform a large number of core calculations within the region, which can not only reduce the burden on the dispatching center and reduce the communication pressure between regions, but also protect the privacy of each region.

[0008] In the field of integrated energy systems, some scholars have also conducted research on the dispatch of regional interconnected integrated energy systems. Liu Shuyan et al. took the interconnection line exchange power as the coordination variable and considered its cost to establish a dispatch model for multi-region interconnected electric-thermal integrated energy systems based on the target cascade analysis method; however, the regional interconnection coordination strategy of integrated energy systems proposed by most studies only considers power coordination. When the system has power disturbances, the power system can only use its own regulation capabilities to combat disturbances, which can achieve a certain degree of flexibility mutual assistance between interconnected power systems. For example, when the flexible regulation capacity of a certain power system is insufficient, changing the transmission power on the interconnection line can alleviate the restrictions on the reserve capacity of the generator generation capacity constraints in the power system, increase the reserve space of the generator set, and thus improve the regulation capacity of the power system. However, the flexibility mutual assistance between the above-mentioned types of interconnected systems is still an indirect mutual assistance. In essence, the power system still uses its own flexibility rather than the flexibility of the interconnected system; in addition, when the power system itself does not have the regulation capacity, the interconnected system cannot share sufficient flexibility with the power system. If the generator set in the power system only increases the reserve space but does not increase the reserve response rate, the regulation capacity of the system may not be improved. Summary of the invention

[0009] In order to address the deficiencies in the prior art, the present invention provides an electric-thermal system scheduling method and system taking into account a multi-regional interactive strategy, in which power coordination and flexibility assistance are simultaneously performed between regional interconnected systems, and an optimized scheduling model for an electric-thermal integrated energy system taking into account regional interconnection is constructed, which fully taps the flexibility resources of the regional interconnected electric-thermal integrated energy system, reduces wind curtailment, and ensures safe and stable operation of the power system.

[0010] In order to achieve the above object, the present invention adopts the following technical solution:

[0011] In a first aspect, the present invention provides an electric-thermal system scheduling method taking into account a multi-region interaction strategy.

[0012] A method for dispatching an electric-heat system taking into account a multi-regional interactive strategy, wherein a flexibility receiving system is defined as an electric-heat integrated energy system in a regional interconnected system that obtains flexibility replenishment from other interconnected systems, and a flexibility providing system is defined as an electric-heat integrated energy system in a regional interconnected system that provides flexibility to other interconnected systems, and the flexibility receiving system is connected to at least one flexibility providing system for flexibility sharing;

[0013] With the goal of minimizing the total cost of the flexibility receiving system and the flexibility providing system, the dispatch of the electricity-heat system taking into account the multi-regional interaction strategy is carried out.

[0014] As a further limitation of the first aspect of the present invention, the cogeneration unit is used as a flexibility transmission device, the thermal system adjusts the electric power of the cogeneration unit to meet the flexibility of the power system, and the flexibility transferred from the thermal system to the power system is quantified by an adjustable capacity exchange interval;

[0015] The adjustable capacity exchange interval of the power system is , the adjustable capacity exchange range of the thermal system is , the relationship between the adjustable capacity exchange interval of the power system and the adjustable capacity exchange interval of the thermal system can be expressed as:

[0016] , ;

[0017] in, and are the upper and lower bounds of the adjustable capacity exchange interval of the power system, and is the upper / lower bound of the adjustable capacity exchange interval of the thermal system, and Combined heat and power units k exist t The ability to adjust upwards and downwards within a time period, and is the upward and downward thermal regulation capability of the CHP unit, is the thermoelectric ratio, C It is a collection of combined heat and power units.

[0018] As a further limitation of the first aspect of the present invention, the goal is to minimize the total cost of the flexibility receiving system and the flexibility providing system, including: ,in, To accommodate the cost of the system for flexibility, The cost of providing the system with flexibility, F A collection of systems that provide flexibility.

[0019] As a further limitation of the first aspect of the present invention, the flexible receiving system The cost is the sum of the power generation cost of conventional thermal power units and cogeneration units, the standby configuration cost and the wind power acceptance cost; the flexibility provides the system The cost is the sum of the power generation cost of conventional thermal power units and cogeneration units, the standby configuration cost and the wind power acceptance cost.

[0020] As a further limitation of the first aspect of the present invention, the objective function of minimizing the total cost of the flexibility accepting system and the flexibility providing system includes: power system constraints, regional interconnection system coupling constraints, and thermal system constraints;

[0021] The power system constraints include: flexibility acceptance system power balance constraints, flexibility acceptance system generator set output power constraints, flexibility acceptance system generator set ramp rate constraints, flexibility acceptance system tie line capacity constraints, flexibility acceptance system flexibility demand constraints, flexibility acceptance system branch flow constraints, flexibility provision system power balance constraints, flexibility provision system flexibility demand constraints and flexibility provision system other constraints (including flexibility provision system generator set output power constraints, flexibility provision system generator set ramp rate constraints and flexibility provision system tie line capacity constraints);

[0022] The regional interconnection system coupling constraints include: transmission power coupling constraints and reserve capacity coupling constraints;

[0023] The thermal system constraints include: electric-thermal coupling constraints, thermal network steady-state constraints and thermal network dynamic constraints.

[0024] As a further limitation of the first aspect of the present invention, solving the objective function of minimizing the total cost of the flexibility accommodating system and the flexibility providing system includes:

[0025] Decouple the dispatch objective function of the electric-thermal system taking into account the multi-regional interactive strategy into the optimal dispatch objective functions of multiple single-region electric-thermal integrated energy systems;

[0026] Initialize iteration coefficients k=0 , initial parameters, the parameters include: coupling variables, Lagrange multipliers and penalty factors;

[0027] Solve each single-region electric-thermal integrated energy system separately according to the current parameters and transfer the coupling variables;

[0028] Check the iteration stop condition, calculate the original residual and the dual residual, if the residual meets the requirements, the result converges; otherwise, update the Lagrange multiplier;

[0029] Make k=k+1, Repeat the process of solving each single-region electric-thermal integrated energy system according to the current parameters , Until the operation result meets the convergence condition.

[0030] In a second aspect, the present invention provides an electric-heat system scheduling system taking into account a multi-region interaction strategy.

[0031] An electric-heat system dispatching system taking into account a multi-regional interactive strategy, wherein a flexibility receiving system is defined as an electric-heat integrated energy system in a regional interconnected system that obtains flexibility replenishment from other interconnected systems, and a flexibility providing system is defined as an electric-heat integrated energy system in a regional interconnected system that provides flexibility to other interconnected systems, and the flexibility receiving system is connected to at least one flexibility providing system for flexibility sharing;

[0032] The dispatching unit is configured to dispatch the electric-heat system taking into account the multi-regional interaction strategy with the goal of minimizing the total cost of the flexibility receiving system and the flexibility providing system.

[0033] In a third aspect, the present invention provides a computer device, characterized in that it includes: a processor and a computer-readable storage medium;

[0034] a processor adapted to execute a computer program;

[0035] A computer-readable storage medium having a computer program stored therein, wherein the computer program, when executed by the processor, implements the following process: scheduling an electric-thermal system taking into account a multi-regional interaction strategy with the goal of minimizing the total cost of a flexibility receiving system and a flexibility providing system.

[0036] In a fourth aspect, the present invention provides a computer-readable storage medium storing a computer program, wherein the computer program is suitable for being loaded by a processor and executing the following process: scheduling an electric-heat system taking into account a multi-regional interaction strategy with the goal of minimizing the total cost of the flexibility accepting system and the flexibility providing system.

[0037] In a fifth aspect, the present invention provides a computer program product, which includes a computer program. When the computer program is executed by a processor, it implements the following process: scheduling an electric-heat system taking into account a multi-regional interaction strategy with the goal of minimizing the total cost of the flexibility accepting system and the flexibility providing system.

[0038] Compared with the prior art, the present invention has the following beneficial effects:

[0039] 1. Different from the existing research that only the electric power of the cogeneration unit can be directly shared between the power system and the thermal system, the present invention introduces the concept of adjustable capacity exchange interval to make full use of the flexibility of the thermal system, and simultaneously carry out power coordination and flexibility mutual assistance between regional interconnected systems, and construct an optimized scheduling model for the electric-thermal integrated energy system taking into account regional interconnection, fully tapping the flexibility resources of the electric-thermal system of the multi-regional interactive strategy, reducing wind power abandonment, and ensuring the safe and stable operation of the power system.

[0040] 2. The present invention takes into account the flexibility sharing of interconnected power systems and heterogeneous energy systems, and proposes a new flexibility coordination strategy for multi-regional interconnected integrated energy systems. Compared with existing strategies, this strategy can tap more flexibility and is suitable for power systems with large-scale new energy grid connection.

[0041] 3. The flexibility assessment of the integrated energy system involves the uncertainty of wind power generation. By quantifying the uncertainty of wind power, the present invention can make full use of the flexibility resources of the electric and thermal integrated energy system and ensure the safety of the system. By evaluating the risk of wind power acceptance and balancing the operating costs between interconnected systems and the risk cost of wind power acceptance, the consumption of new energy can be improved.

[0042] Advantages of additional aspects of the present invention will be given in part in the following description, and in part will become obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.

[0044] Figure 1 A schematic diagram of a flexibility sharing mechanism provided in Embodiment 1 of the present invention;

[0045] Figure 2 A schematic cross-sectional diagram of a thermal network pipeline provided in Example 1 of the present invention;

[0046] Figure 3 This is a distributed solution flow chart provided in Example 1 of the present invention. DETAILED DESCRIPTION

[0047] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0048] It should be noted that the following detailed descriptions are exemplary and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.

[0049] In the absence of conflict, the embodiments of the present invention and the features of the embodiments may be combined with each other.

[0050] Embodiment 1:

[0051] This implementation proposes an electric-thermal system scheduling method that takes into account multi-regional interaction strategies, establishes a day-ahead optimization scheduling model for an electric-thermal integrated energy system that takes into account regional interconnection, and considers the flexibility mutual assistance between interconnected integrated energy systems as a supplement to the flexibility of the thermal system.

[0052] For a multi-region interconnected electric-thermal integrated energy system, two sources of flexibility can be considered: the flexibility resources shared by the thermal system and the power system in the same electric-thermal integrated energy system, and the flexibility resources shared between the interconnected electric-thermal integrated energy systems. The schematic diagram of the flexibility sharing mechanism is shown in Figure 1 shown.

[0053] In this implementation, a solution for mining the flexible adjustment capability of the thermal system is provided. In the initial dispatching strategy, the power system and the thermal system are dispatched separately, and the cogeneration unit works in the "heat-to-electricity" mode. The power prioritizes meeting the thermal load demand. The power system dispatch is greatly affected by the thermal load and the power adjustment space is small. However, as the demand for new energy grid connection continues to increase, the uncertainty of new energy poses severe challenges to the flexible adjustment capability of the power system, affecting the stability and economy of the power system.

[0054] In the traditional electric-heat coordinated dispatch strategy, the dynamic characteristics of the thermal network are considered to optimize its operating state, so that the power adjustment space of the cogeneration unit of the electric-heat coupling equipment is expanded, breaking the limitation of "determining electricity by heat", and improving the flexible adjustment ability of the power system. However, under this strategy, the flexibility sharing between the electric-heat system is more of an indirect sharing. The power system still uses its own flexibility, while ignoring the direct use and modeling of the flexibility supply of the thermal network.

[0055] Based on the above-mentioned traditional electric-heat coordinated scheduling strategy, the present invention further quantifies the flexibility that can be provided by the dynamic characteristics of the thermal network and the flexibility of the thermal load, so that the flexible adjustment capability provided by the thermal system can directly participate in the coordinated scheduling of the electric-heat integrated energy system as a scheduling resource. The flexible adjustment capability of the thermal system mainly includes two parts: the flexible adjustment capability brought by the dynamic characteristics of the thermal network and the flexible adjustment capability of the thermal load.

[0056] (1) Flexible adjustment capability brought by the dynamic characteristics of the thermal network.

[0057] When the dynamic characteristics of the thermal network are taken into account, due to the time delay characteristics in the dynamic characteristics, it can be equivalent to a heat storage tank with the ability to store thermal energy. By adjusting the temperature and flow of the hot water, the heat transfer medium of the thermal network, energy can be stored or released. This energy storage capacity gives the thermal network a certain amount of flexibility. By quantifying the flexibility that the dynamic characteristics of the thermal network can provide, the flexible adjustment capability provided by the thermal network can be directly used as a scheduling resource to participate in the coordinated scheduling of the integrated energy system. The constraints of the thermal network mainly include steady-state constraints and dynamic constraints.

[0058] (1-1) Steady-state constraints of thermal network: In a thermal network, thermal energy is generated by a heat source, with hot water in a thermal pipeline as a carrier, and then transmitted from the heat source to a heat exchange station through a transmission network. The present invention uses a cogeneration unit as a heat source and a heat exchange station as a heat load.

[0059] ① Node thermal power model: For heat source nodes (i.e. nodes where cogeneration units are located) and heat load nodes (i.e. nodes where heat exchange occurs in the thermal network), the thermal power of the nodes depends on the hot water parameters and the temperature difference between the supply water temperature and the return water temperature at the nodes; at the same time, the supply water and return water temperatures should meet the upper and lower limits of the pipeline design temperature:

[0060] (1);

[0061] (2);

[0062] In the formula, j is the number of the thermal network node, t is the number of the scheduling time period, For Node j The heat power at Flow through the node j The hot water mass flow rate at For Node j The water supply temperature at For Node j The return water temperature at is the upper limit of the water supply temperature of the pipes in the thermal network, is the lower limit of the water supply temperature of the pipes in the thermal network, is the upper limit of the return water temperature of the pipes in the thermal network, It is the lower limit of the return water temperature of the pipes in the thermal network.

[0063] ②Node temperature mixing model: The sum of the heat input to the same node is equal to the sum of the heat output from the node. Therefore, hot water from different pipes flowing into the same node will become hot water of the same temperature after mixing:

[0064] (3);

[0065] In the formula, and Node b As the starting point, with nodes b is the set of pipes at the end point, and Water supply pipeline j and return pipes j The outlet water temperature, and Nodeb Water supply pipeline j and return pipes j The water inlet temperature, and Node b The mixed temperature of the supply and return pipes.

[0066] ③ Pipeline heat transfer equation: When hot water flows through the pipes in the thermal network, temperature loss will occur due to the influence of the pipe and ambient temperature. The steady-state temperature loss of the pipe is mainly reflected by the relationship between the pipe outlet temperature and the inlet temperature, the ambient temperature and the pipe parameters, as follows:

[0067] (4);

[0068] In the formula, is the ambient temperature, is the heat transfer coefficient of the thermal pipe, is the length of the thermal pipe.

[0069] (1-2) Dynamic constraints of thermal network: The dynamic characteristics of thermal network are mainly reflected in transmission delay and temperature loss. Compared with the steady-state model, the main consideration is the transmission delay. Since hot water flows slowly, there is a temperature difference between the temperature at the inlet and the temperature at the outlet of the pipeline, so part of the thermal energy is stored in the thermal network. Due to the temperature difference between hot water and the environment, part of the heat will be lost during the flow, resulting in a drop in temperature.

[0070] ① Transmission delay: The time delay of temperature change at both ends of the heating pipeline can be expressed as:

[0071] (5);

[0072] In the formula, j is the number of the thermal pipe, For heat pipes j The delay, is the density of water, is the radius of the thermal pipe.

[0073] Due to the time lag of temperature transmission in the thermal network pipeline, the heat transfer time delay will occur. j exist t The outlet water temperature at any time can be Estimation of the pipe water inlet temperature at time:

[0074] (6);

[0075] From formula (5), we can see that the transmission delay is a continuous variable. For the convenience of calculation and explanation, the transmission delay To convert units, take , The scheduling period interval. It is generally not an integer variable. For this reason, the present invention uses a quality weight method to process the transmission delay, which will be described in detail below.

[0076] Figure 2 This is a cross-sectional diagram of a heating pipeline. The hot water flows from left to right. Each scheduling cycle [0, T ]Depend on N Consecutive and equal-length scheduling periods In each scheduling period The part that flows into the pipe from the inlet is called a mass, denoted as WM, from left to right, WM1 to WM N+1 , the mass at the exit is denoted as WM N , and WM N+1 Already out of the pipe.

[0077] In each time period, the physical quantities in the mass remain unchanged. Generally it is not an integer, it should be greater than an integer variable , which is less than an integer variable Therefore, the mass flowing out of the pipeline in the current period represented by the gray part in the figure should be N and WM N+1 The parts in WM N,2 Mass N exist The portion of the time that flows out of the pipeline, WM N+1,1 Mass N +1 on The portion of the pipe that flows out of the pipe during the time period. The hot water flowing out of the pipe during this period is WM N,2 and WM N+1,1 The sum of t The outlet water temperature of the pipeline at the moment can be expressed by the weighted average of the temperatures of the two masses according to their masses, as shown in formula (7):

[0078] (7);

[0079] (8);

[0080] In the formula, is the ceiling function, is not less than The smallest integer of Mass N The mass flow rate, Mass N +1 mass flow rate, Mass N The outlet water temperature, Mass N +1 for the outlet water temperature.

[0081] Considering the pipeline j exist t The outlet water temperature at any time can be The pipe water inlet temperature is estimated at the moment, and the present invention considers that the hot water in the thermal network is transmitted in a quality-regulated manner, which can be considered and Equal, rearrange (7) to get the outlet water temperature of the pipe:

[0082] (9);

[0083] (10);

[0084] In the formula, is not less than The smallest integer of For pipeline j exist t Water outlet temperature at all times, For pipeline j exist t Water temperature at all times, a , b is the quality weight coefficient. Therefore, considering only the transmission delay, the expression of the pipeline outlet water temperature can be obtained.

[0085] ②Temperature loss: Only the temperature loss of hot water is taken into account, and the transmission delay is ignored. The outlet water temperature of the pipeline is:

[0086] (11);

[0087] (12);

[0088] In the formula, is the ambient temperature, is the pipe temperature loss coefficient, c is the coefficient used to calculate the temperature loss.

[0089] When the transmission delay and temperature loss are considered at the same time, the outlet water temperature of the pipeline can be expressed as:

[0090] (13).

[0091] (2) Flexible adjustment capability of heat load.

[0092] The variability of heat loads can also provide flexibility to the power system:

[0093] (14);

[0094] In the formula, It is j The expected demand for heat load, and They are upward / downward reserve of heat load, and are the maximum / minimum values ​​of the heat load, HL is the collection of heat loads.

[0095] In this implementation, a flexibility mutual assistance solution between interconnected systems is provided. Specifically, the electric-heat integrated energy system in the regional interconnection is divided into two categories, which are defined as flexibility receiving electric-heat integrated energy system and flexibility providing electric-heat integrated energy system; wherein, the flexibility receiving electric-heat integrated energy system is an electric-heat integrated energy system in the regional interconnection system that obtains flexibility replenishment from other interconnected systems, referred to as flexibility receiving system; the flexibility providing electric-heat integrated energy system is an electric-heat integrated energy system in the regional interconnection system that provides flexibility to other interconnected systems, referred to as flexibility providing system. The flexibility receiving system can be connected to multiple flexibility providing systems for flexibility sharing; during the flexibility sharing process, power and spare capacity are transmitted through the interconnection lines in the interconnection system, and flexibility is also transmitted through the interconnection lines.

[0096] In this implementation, the flexibility of the thermal system is quantified, including:

[0097] Due to the large fluctuations in renewable energy power generation, the thermal system needs to change its operating state to provide flexibility. The present invention uses the cogeneration unit as a flexibility transmission device. The thermal system can adjust the power of the cogeneration unit to meet the flexibility requirements of the power system; the flexibility transferred from the thermal system to the power system can be quantified by the adjustable capacity exchange interval. The adjustable capacity exchange interval is defined to fully utilize the upward / downward adjustment capability of the thermal system. The adjustable capacity exchange interval of the power system is , the adjustable capacity exchange range of the thermal system is , the relationship between the adjustable capacity exchange interval of the power system and the adjustable capacity exchange interval of the thermal system can be expressed as:

[0098] (15);

[0099] (16);

[0100] In the formula, and are the upper and lower bounds of the adjustable capacity exchange interval of the power system, and is the upper / lower bound of the adjustable capacity exchange range of the thermal system, and Combined heat and power units k exist t Up / down adjustment capability within the time period, and is the upward / downward thermal regulation capability of the CHP, is the thermoelectric ratio, C It is a collection of combined heat and power units.

[0101] The transmission delay characteristics and temperature loss characteristics in the thermal pipeline will cause a temperature difference between the outlet water temperature and the inlet water temperature of the thermal pipeline, causing the thermal network to "passively" store or release heat; the present invention uses a cogeneration unit as a flexibility transmission device from the thermal system to the power system, and provides backup to the power system by changing its power generation to meet the flexibility requirements of the power system.

[0102] The dynamic characteristics of the thermal network make the thermal power of the cogeneration unit and the thermal load have a delayed matching of supply and demand in the time series, making it functionally equivalent to a virtual thermal storage tank, that is, there are processes of "storing heat" and "releasing heat". In actual operation, the thermal network cannot exist in the above two states at the same time, and there are the following constraints:

[0103] (17);

[0104] In the formula, and They represent the heat storage and heat release states of the thermal network, respectively, and are both 0 or 1 variables. Correspondingly, the flexibility constraint provided by the thermal system through the heat source node is expressed as:

[0105] (18);

[0106] In the formula, Indicates that the thermal system is connected through a combined heat and power unit k The maximum upward adjustability provided, Indicates that the thermal system is connected through a combined heat and power unit k The maximum downward adjustability provided, Considering the dynamic characteristics of the thermal network, the pipeline heat transfer delay of the combined heat and power unit k The outlet water temperature of the water supply pipe, It is a combined heat and power unit k The maximum outlet water temperature of the water supply pipe, It is a combined heat and power unit k Minimum outlet water temperature of the water supply pipe.

[0107] In order to ensure the safe operation of the thermal network and avoid unlimited use of its regulation capacity, so that the thermal network continues to store or release heat, and the temperature of the thermal pipeline runs at a high or low level for a long time, it is necessary to set the state time constraint of the thermal network, that is, the maximum heat storage time and the maximum heat release time. Assuming that the initial state in the pipeline scheduling period is "storing heat", then must be switched to the "heat release" state before the moment. The state must be switched to "heat storage" before the moment, specifically:

[0108] (19);

[0109] In the formula, is the maximum heat storage time, is the maximum heat release time.

[0110] In this implementation, wind power acceptance risk measurement is performed, specifically including:

[0111] When the probability distribution is known, the expected economic loss caused by wind power disturbance exceeding the acceptable range of wind power is defined as the wind power acceptance risk cost. Specifically, the wind power acceptance risk can be expressed as follows:

[0112] (20);

[0113] In the formula, express Expected value; Represents wind power The probability density function of and Represent the penalty factors for wind curtailment and power shortage respectively; and They are the lower and upper limits of the acceptable range of wind power.

[0114] Using the K-block based piecewise linear method, Equation (20) can be approximated by the following linear expression containing auxiliary variables and constraints:

[0115] (twenty one);

[0116] In the formula, The risk of wind curtailment. is the risk of power shortage, , , , and n is a constant coefficient; Nis the number of segments; it should be pointed out that the piecewise linearization method used here is different from the traditional piecewise linear method. This method does not introduce integer variables in the linearization process, which will help improve the computational efficiency of the optimization model and enhance the convergence of the distributed optimization algorithm; at the same time, in the above-mentioned piecewise linearization method, the more segments are selected, the more accurate the solution results will be; of course, as the number of segments increases, the computational burden will also increase; in actual operation, an appropriate number of segments can be selected to balance the solution efficiency and solution accuracy of the model.

[0117] The regional interconnected integrated energy system optimization scheduling model of this implementation method considers the flexible adjustment capability of the thermal network due to the time delay characteristics and the flexible adjustment capability shared by the interconnected electric-thermal integrated energy system as flexibility resources. The optimization target Z of the regional interconnected integrated energy system scheduling model is to minimize the total cost of the regional interconnected integrated energy system; the total cost of the system is composed of the total cost of the flexibility receiving system and the total cost of multiple flexibility providing systems; the flexibility receiving system Providing system with flexibility The cost of the power generation is composed of the power generation cost of conventional thermal power units and cogeneration units, the standby configuration cost and the wind power acceptance cost. The specific objective function is as follows:

[0118] (twenty two);

[0119] (twenty three);

[0120] In the formula, F is a collection of flexibility providing systems, G It is a collection of conventional thermal power units. C It is a collection of combined heat and power units. W is a collection of wind farms, N is the cost segment set. For conventional thermal power units, and Conventional thermal power units i The power generation and power generation cost coefficient of each section, and Conventional thermal power units i The configured up and down reserve capacity, and Conventional thermal power units i The upward and downward adjustment of the reserve capacity cost coefficient, and Combined heat and power units k The power generation and power generation cost coefficient of each section, and Combined heat and power units kDue to the upward and downward reserve capacity formed by the regulation of the thermal system, and Combined heat and power units k Upward and downward adjustment of reserve capacity cost coefficient; is the wind curtailment cost coefficient, is the power shortage cost coefficient, The risk of wind curtailment. There is a risk of power shortage.

[0121] The constraints of the above objective function include:

[0122] (1) Power system constraints, more specifically, include:

[0123] (1-1) Flexibility to accommodate system power balance constraints.

[0124] The total load demand in the flexible acceptance system should be jointly borne by conventional thermal power units, cogeneration units, wind farms and the transmission power of the tie line. The specific power balance constraint can be expressed as follows:

[0125] (twenty four);

[0126] In the formula, It is a wind farm m The expected output of It is a flexible admission system l and flexibility providing system f The power exchanged between represents the load power in the flexible accommodation system, EL is a collection of electrical loads.

[0127] (1-2) Flexibility to accommodate system generator output power constraints:

[0128] (25);

[0129] (26);

[0130] In the formula, , They are the maximum output power limits of conventional thermal power units and cogeneration units in the flexible accommodation system, , They are the minimum output power limits of conventional thermal power units and cogeneration units in the flexible accommodation system.

[0131] (1-3) Flexibility to accommodate system generator set ramp rate constraints.

[0132] In order to ensure the backup response rate, the ramp rate of the generator should be fully considered during the optimization process. The ramp rate constraint of the generator set in the flexible admission system is expressed as follows:

[0133] (27);

[0134] (28);

[0135] In the formula, , They are the upward climbing rate limits of conventional thermal power units and cogeneration units in the flexible accommodation system, , They are the downward ramp rate limits for conventional thermal power units and cogeneration units in the flexible accommodation system.

[0136] (1-4) Flexible acceptance of system interconnection line capacity constraints:

[0137] (29);

[0138] In the formula, Is a connection flexibility reception system l and flexibility providing system f The capacity limit of the tie line.

[0139] (1-5) Flexibility accommodates system flexibility requirements constraints.

[0140] When wind power fluctuates, the system should have sufficient flexibility to respond to ensure power balance under disturbance. The present invention considers the flexibility provided by conventional thermal power units, thermal systems and interconnected systems. The total regulation capacity within the system should match the degree of wind power fluctuation. The following constraints need to be met:

[0141] (30);

[0142] In the formula, Is a flexibility providing system f Admission system for flexibility l Provides uplink flexibility, Is a flexibility providing system f Admission system for flexibility l The downside flexibility provided; and Wind farms The lower and upper limits of the perturbation range.

[0143] (1-6) Flexibility to accommodate system branch flow constraints:

[0144] (31);

[0145] In the formula, , , and Conventional units i , combined heat and power units v , Wind Farm m and flexibility providing system f Corresponding lines l The power generation distribution transfer factor. It is a line l Under disturbance, the current It is a line l The maximum transmission capacity.

[0146] (1-7) Flexibility provides system power balance constraints:

[0147] (32);

[0148] In the formula, Provides power to the system for flexibility. Provides power to the system for flexibility.

[0149] (1-8) Flexibility provides system flexibility requirements constraints:

[0150] (33);

[0151] In the formula, Is a flexibility providing system f Admission system for flexibility l Provides uplink flexibility, Is a flexibility providing system f Admission system for flexibility l Provides downstream flexibility.

[0152] (1-9) Flexibility provides other constraints on the system.

[0153] Since the flexibility provision system is similar to the flexibility acceptance system, other constraints of the flexibility provision system can be found in equations (25)-(29) and will not be elaborated here.

[0154] (2) Coupling constraints of regional interconnected systems.

[0155] There are two types of coupling constraints in the proposed scheduling method, namely, transmission power coupling constraint and reserve capacity coupling constraint. The transmission power coupling constraint is closely related to the active power basis point of the exchange; the reserve capacity coupling constraint is determined based on the reserve capacity of the exchange. The two constraints can be expressed as:

[0156] (34);

[0157] (35);

[0158] In the proposed distributed coordinated scheduling method, all flexibility providing systems can provide backup capacity support for interconnected flexibility receiving systems; flexibility providing systems can decide whether to provide backup capacity support for connected flexibility receiving systems, and flexibility receiving systems can cope with the uncertainty of new energy with the help of all flexibility providing systems willing to provide backup capacity support. The proposed distributed coordinated scheduling method can optimize the system's backup support capacity; flexibility receiving systems may not need backup capacity support from some flexibility providing systems even if they are willing to provide backup capacity support.

[0159] (3) Thermal system constraints.

[0160] (3-1) Electric-thermal coupling constraints. The present invention considers using a cogeneration unit as a coupling device between the power system and the thermal system. The constraints on the electric power, thermal power, and electric-thermal regulation capabilities of the cogeneration unit are as follows:

[0161] (36);

[0162] (37);

[0163] (3-2) Steady-state constraints of thermal network: Equation (1) to (4), which will not be repeated here;

[0164] (3-3) Dynamic constraints of thermal network: Equation (5) to (13), which will not be repeated here.

[0165] In order to reduce the difficulty of solution and the communication burden, this implementation method designs a distributed solution framework based on the ADMM algorithm, and uses the augmented Lagrangian function to relax the coupling constraints (i.e., Equations (34) and (35)), so that the original interconnected system problem can be decomposed into multiple single-region system problems and can be solved in each single system region. After the solution is obtained in each system region, the coupling variable values ​​are exchanged with the adjacent system, the problem parameters in the region are updated, and the problem is solved iteratively continuously until the coupling variable residuals exchanged between the adjacent systems meet the stopping conditions and the solution process completes the optimal solution.

[0166] According to the ADMM algorithm, by relaxing the coupling constraints, the regional interconnected integrated energy system is decoupled into a single electric-thermal integrated energy system, so the original objective function is reformulated as:

[0167] (38);

[0168] (39);

[0169] In the formula, , , is the Lagrange multiplier, , and is the penalty factor. The above multiplier will be updated in the iterative process until the final decision is obtained.

[0170] More specifically, based on the ADMM algorithm, this implementation method designs an iterative distributed solution framework to coordinate the flexibility acceptance system and the flexibility provision system. The iterative process flow chart can be found in Figure 3 , the detailed solution process is as follows:

[0171] Step 1: Decouple the optimal scheduling problem of the regional interconnected electricity-heat integrated energy system into the optimal scheduling problem of multiple single-region electricity-heat integrated energy systems.

[0172] Step 2: Initialize iteration coefficients k=0 , initialization parameters, including coupling variables ( , , , , , ), Lagrange multipliers ( , , ) and the penalty factor ( , , ).

[0173] Step 3: Solve the single-region electric-thermal integrated energy system separately according to the current parameters and transfer the coupling variables.

[0174] Step 4: Check the iteration stop condition and calculate the original residual and the dual residual according to equation (40). If the residual meets the requirements, the result converges; otherwise, update the Lagrange multiplier according to equation (41). (40);

[0175] (41);

[0176] in, k Represents the current moment, k+1 Represents the next moment, and are all constants.

[0177] Step 5: k=k+1 , repeat Step 3 - Step 5 until the operation result meets the convergence condition.

[0178] Embodiment 2:

[0179] This implementation provides an electric-heat system dispatching system taking into account a multi-regional interactive strategy, wherein a flexibility receiving system is defined as an electric-heat integrated energy system in a regional interconnected system that obtains flexibility replenishment from other interconnected systems, and a flexibility providing system is defined as an electric-heat integrated energy system in a regional interconnected system that provides flexibility to other interconnected systems, and the flexibility receiving system is connected to at least one flexibility providing system for flexibility sharing;

[0180] The dispatching unit is configured to dispatch the electric-heat system taking into account the multi-regional interaction strategy with the goal of minimizing the total cost of the flexibility receiving system and the flexibility providing system.

[0181] For the detailed process of the specific scheduling unit, please refer to the specific process of Example 1, which will not be repeated here.

[0182] It is understandable that the above-mentioned scheduling units can be separately or completely combined into one or several other units to constitute, or one (some) of the units can be further divided into multiple smaller units in function to constitute, which can achieve the same operation without affecting the realization of the technical effects of the embodiments of the present application. The above-mentioned units are divided based on logical functions. In practical applications, the functions of one unit can also be implemented by multiple units, or the functions of multiple units can be implemented by one unit. In other embodiments of the present application, the scheduling system may also include other units. In practical applications, these functions can also be implemented with the assistance of other units, and can be implemented by the collaboration of multiple units.

[0183] According to another embodiment of the present application, the system described in this embodiment can be constructed and the scheduling method of the embodiment of the present application can be implemented by running a computer program (including program code) capable of executing the steps involved in the corresponding method described in Example 1 on a general computing device such as a computer including processing elements and storage elements such as a central processing unit (CPU), random access memory (RAM), and read-only memory (ROM). The computer program can be recorded on, for example, a computer-readable recording medium, and loaded into the above-mentioned computing device through the computer-readable recording medium and run therein.

[0184] Embodiment 3:

[0185] This implementation provides an electronic device, which includes a processor, a communication interface, and a computer-readable storage medium, wherein the processor, the communication interface, and the computer-readable storage medium may be connected via a bus or other means.

[0186] Among them, the communication interface is used to receive and send data, the computer-readable storage medium can be stored in the memory of the electronic device, the computer-readable storage medium is used to store a computer program, the computer program includes program instructions, and the processor is used to execute the program instructions stored in the computer-readable storage medium.

[0187] A processor (or CPU (Central Processing Unit)) is the computing core and control core of an electronic device, which is suitable for implementing one or more instructions, and specifically suitable for loading and executing one or more instructions to implement corresponding method flows or corresponding functions.

[0188] The processor is configured to execute the following process: scheduling the electric-heat system taking into account the multi-regional interaction strategy with the goal of minimizing the total cost of the flexibility receiving system and the flexibility providing system. The specific scheduling process refers to the process in Example 1 and will not be repeated here.

[0189] Embodiment 4:

[0190] This implementation provides a computer-readable storage medium (Memory), which is a memory device in an electronic device for storing programs and data. It is understandable that the computer-readable storage medium here can include both built-in storage media in the electronic device and, of course, extended storage media supported by the electronic device. The computer-readable storage medium provides a storage space that stores the processing system of the electronic device.

[0191] In addition, the storage space also stores one or more instructions suitable for being loaded and executed by the processor, and these instructions may be one or more computer programs (including program codes). It should be noted that the computer-readable storage medium here may be a high-speed RAM memory, or a non-volatile memory (non-volatile memory), such as at least one disk storage; optionally, it may also be at least one computer-readable storage medium located away from the aforementioned processor.

[0192] In one embodiment, the computer-readable storage medium stores one or more instructions; the processor loads and executes the one or more instructions stored in the computer-readable storage medium to implement the following process:

[0193] With the goal of minimizing the total cost of the flexibility receiving system and the flexibility providing system, the scheduling of the electric-heat system taking into account the multi-regional interaction strategy is carried out. The specific scheduling process is shown in the process of Example 1 and will not be repeated here.

[0194] Embodiment 5:

[0195] This implementation provides a computer program product or a computer program, which includes computer instructions stored in a computer-readable storage medium. A processor of an electronic device reads the computer instructions from the computer-readable storage medium, and the processor executes the computer instructions, so that the electronic device executes: scheduling an electric-heat system taking into account a multi-regional interactive strategy with the goal of minimizing the total cost of a flexibility receiving system and a flexibility providing system. The specific scheduling process is described in Example 1, which will not be repeated here.

[0196] A person skilled in the art can appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed in this application can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. A person skilled in the art can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0197] In the above embodiments, it can be implemented in whole or in part by software, hardware, firmware or any combination thereof. When implemented using software, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on the computer, the process or function according to the embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable devices. The computer instructions can be stored in a computer-readable storage medium or transmitted through a computer-readable storage medium. The computer instructions can be transmitted from a website site, a computer, a server or a data center to another website site, a computer, a server or a data center by wired (e.g., coaxial cable, optical fiber, digital line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that can be accessed by the computer or a data processing device such as a server, a data center, etc. that includes one or more available media integrated. The available medium can be a magnetic medium (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium (e.g., a solid-state drive (SSD)), etc.

[0198] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for dispatching an electric-heat system taking into account a multi-regional interactive strategy, characterized in that: A flexibility receiving system is defined as an electricity-heat integrated energy system in a regional interconnected system that obtains flexibility replenishment from other interconnected systems. A flexibility providing system is defined as an electricity-heat integrated energy system in a regional interconnected system that provides flexibility to other interconnected systems. A flexibility receiving system is connected to at least one flexibility providing system for flexibility sharing. The dispatch of the electricity-heat system taking into account the multi-regional interaction strategy is carried out with the goal of minimizing the total cost of the flexibility receiving system and the flexibility providing system; The flexibility specifically includes: The thermal system and the electric power system in the same integrated power-heat energy system share flexibility resources, as well as the flexibility resources shared between interconnected integrated power-heat energy systems; The goal of minimizing the total cost of the flexible admission system and the flexible provision system is to specifically include: Among them, Z L The cost of the flexibility accommodation system, Z f The cost of the flexibility providing system, F is the set of flexibility providing systems, and Z is the flexibility receiving system L The cost of the flexibility provision system Z is the sum of the power generation cost of conventional thermal power units and cogeneration units, the standby configuration cost, and the wind power acceptance cost. f The cost is the sum of the power generation cost of conventional thermal power units and cogeneration units, the standby configuration cost, and the wind power acceptance cost; The objective function of minimizing the total cost of the flexibility receiving system and the flexibility providing system includes: power system constraints, regional interconnection system coupling constraints and thermal system constraints; The power system constraints include: flexibility acceptance system power balance constraints, flexibility acceptance system generator set output power constraints, flexibility acceptance system generator set ramp rate constraints, flexibility acceptance system tie line capacity constraints, flexibility acceptance system flexibility demand constraints, flexibility acceptance system branch flow constraints, flexibility provision system power balance constraints, flexibility provision system flexibility demand constraints, flexibility provision system generator set output power constraints, flexibility provision system generator set ramp rate constraints and flexibility provision system tie line capacity constraints; The regional interconnection system coupling constraints include: transmission power coupling constraints and reserve capacity coupling constraints; The thermal system constraints include: electric-thermal coupling constraints, thermal network steady-state constraints and thermal network dynamic constraints; By quantifying the flexible adjustment capability brought by the dynamic characteristics of the thermal network, the flexible adjustment capability provided by the thermal network can be directly used as a dispatching resource to participate in the coordinated dispatching of the integrated energy system. The constraints of the thermal network include steady-state constraints and dynamic constraints. In the dynamic constraint, only the transmission delay is taken into account, and the outlet water temperature of the pipeline is: In the formula, is the ceiling function, is not less than t-τ j The smallest integer of is the outlet water temperature of pipe j at time t, is the water inlet temperature of pipe j at time t, a and b are the mass weight coefficients, Δt is the scheduling period interval, is the transmission delay of pipeline j, t is the number of the scheduling time period; When only the temperature loss of hot water is taken into account, the outlet water temperature of the pipe is: Where, T am is the ambient temperature, α j is the pipe temperature loss coefficient, c is the coefficient used to calculate the temperature loss, k j is the heat transfer coefficient of the jth thermal pipeline, l j is the length of the jth thermal pipeline; When the transmission delay and temperature loss are considered at the same time, the outlet water temperature of the pipeline is expressed as: The transmission delay characteristics and temperature loss characteristics in the thermal pipeline will cause a temperature difference between the outlet and inlet water temperatures of the thermal pipeline, causing the thermal network to passively store or release heat. The cogeneration unit is used as a flexibility transmission device. The thermal system adjusts the electrical power of the cogeneration unit to meet the flexibility of the power system. The flexibility transferred from the thermal system to the power system is quantified by the adjustable capacity exchange interval. Set the state time constraints of the thermal network, that is, the maximum heat storage time and the maximum heat release time. Assuming that the initial state in the pipeline scheduling period is heat storage, it must be converted to the heat release state before time t1, and must be converted to the heat storage state before time t2. Specifically: In the formula, is the maximum heat storage time, is the maximum heat release time; Conduct wind power acceptance risk measurement, including: When the probability distribution is known, the expected economic loss caused by wind power disturbance exceeding the acceptable range of wind power is defined as the wind power acceptance risk cost. The wind power acceptance risk is expressed as follows: In the formula, E(.) represents the expected value of (.); p m,t Represents wind power The probability density function of lo and β up Represent the penalty factors for wind curtailment and power shortage respectively; and They are the lower and upper limits of the acceptable range of wind power; The wind power acceptance risk is approximated by the following linear expression with auxiliary variables and constraints: In the formula, The risk of wind curtailment. is the risk of power shortage, and n are constant coefficients; N is the number of segments, and m represents the mth wind farm. The adopted piecewise linearization method is different from the traditional piecewise linear method. It does not introduce integer variables in the linearization process, which is conducive to improving the calculation efficiency of the optimization model and enhancing the convergence of the distributed optimization algorithm. At the same time, in the above-mentioned piecewise linearization method, the more the number of segments selected, the more accurate the solution obtained; A distributed solution framework based on the ADMM algorithm is designed. The augmented Lagrangian function is used to relax the coupling constraints, so that the original interconnected system problem is decomposed into multiple single-region system problems, and the problem is solved in each single system region. After the problem is solved in each system region, the coupling variable values ​​are exchanged with the adjacent system, the problem parameters in the region are updated, and the problem is solved iteratively continuously until the residual of the coupling variables exchanged between the adjacent systems meets the stopping condition and the solution process completes the optimal solution. More specifically, based on the ADMM algorithm, an iterative distributed solution framework is designed to coordinate the flexibility acceptance system and the flexibility provision system. The solution process is as follows: Decouple the dispatch objective function of the electric-thermal system taking into account the multi-regional interactive strategy into the optimal dispatch objective functions of multiple single-region electric-thermal integrated energy systems; Initialize the iteration coefficient k=0, initial parameters, the parameters include: coupling variables, Lagrange multipliers and penalty factors; Solve each single-region electric-thermal integrated energy system separately according to the current parameters and transfer the coupling variables; Check the iteration stop condition, calculate the original residual and the dual residual, if the residual meets the requirements, the result converges; otherwise, update the Lagrange multiplier; Let k=k+1, and repeat the process of solving each single-region electric-thermal integrated energy system according to the current parameters until the calculation result meets the convergence condition.

2. An electric-heat system dispatching system taking into account multi-regional interactive strategies, characterized in that: A flexibility receiving system is defined as an electricity-heat integrated energy system in a regional interconnected system that obtains flexibility replenishment from other interconnected systems. A flexibility providing system is defined as an electricity-heat integrated energy system in a regional interconnected system that provides flexibility to other interconnected systems. A flexibility receiving system is connected to at least one flexibility providing system for flexibility sharing. A dispatching unit is configured to: dispatch the electric-heat system taking into account the multi-regional interaction strategy with the goal of minimizing the total cost of the flexibility receiving system and the flexibility providing system; The flexibility specifically includes: The thermal system and the electric power system in the same integrated power-heat energy system share flexibility resources, as well as the flexibility resources shared between interconnected integrated power-heat energy systems; The goal of minimizing the total cost of the flexible admission system and the flexible provision system is to specifically include: Among them, Z L The cost of the flexibility accommodation system, Z f The cost of the flexibility providing system, F is the set of flexibility providing systems, and Z is the flexibility receiving system L The cost of the flexibility provision system Z is the sum of the power generation cost of conventional thermal power units and cogeneration units, the standby configuration cost, and the wind power acceptance cost. f The cost is the sum of the power generation cost of conventional thermal power units and cogeneration units, the standby configuration cost, and the wind power acceptance cost; The objective function of minimizing the total cost of the flexibility receiving system and the flexibility providing system includes: power system constraints, regional interconnection system coupling constraints and thermal system constraints; The power system constraints include: flexibility acceptance system power balance constraints, flexibility acceptance system generator set output power constraints, flexibility acceptance system generator set ramp rate constraints, flexibility acceptance system tie line capacity constraints, flexibility acceptance system flexibility demand constraints, flexibility acceptance system branch flow constraints, flexibility provision system power balance constraints, flexibility provision system flexibility demand constraints, flexibility provision system generator set output power constraints, flexibility provision system generator set ramp rate constraints and flexibility provision system tie line capacity constraints; The regional interconnection system coupling constraints include: transmission power coupling constraints and reserve capacity coupling constraints; The thermal system constraints include: electric-thermal coupling constraints, thermal network steady-state constraints and thermal network dynamic constraints; By quantifying the flexible adjustment capability brought by the dynamic characteristics of the thermal network, the flexible adjustment capability provided by the thermal network can be directly used as a dispatching resource to participate in the coordinated dispatching of the integrated energy system. The constraints of the thermal network include steady-state constraints and dynamic constraints. In the dynamic constraint, only the transmission delay is taken into account, and the outlet water temperature of the pipeline is: In the formula, is the ceiling function, is not less than t-τ j The smallest integer of is the outlet water temperature of pipe j at time t, is the water inlet temperature of pipe j at time t, a and b are the mass weight coefficients, Δt is the scheduling period interval, is the transmission delay of pipeline j, t is the number of the scheduling time period; When only the temperature loss of hot water is taken into account, the outlet water temperature of the pipe is: Where, T am is the ambient temperature, α j is the pipe temperature loss coefficient, c is the coefficient used to calculate the temperature loss, k j is the heat transfer coefficient of the jth thermal pipeline, l j is the length of the jth thermal pipeline; When the transmission delay and temperature loss are considered at the same time, the outlet water temperature of the pipeline is expressed as: The transmission delay characteristics and temperature loss characteristics in the thermal pipeline will cause a temperature difference between the outlet and inlet water temperatures of the thermal pipeline, causing the thermal network to passively store or release heat. The cogeneration unit is used as a flexibility transmission device. The thermal system adjusts the electrical power of the cogeneration unit to meet the flexibility of the power system. The flexibility transferred from the thermal system to the power system is quantified by the adjustable capacity exchange interval. Set the state time constraints of the thermal network, that is, the maximum heat storage time and the maximum heat release time. Assuming that the initial state in the pipeline scheduling period is heat storage, it must be converted to the heat release state before time t1, and must be converted to the heat storage state before time t2. Specifically: In the formula, is the maximum heat storage time, is the maximum heat release time; Conduct wind power acceptance risk measurement, including: When the probability distribution is known, the expected economic loss caused by wind power disturbance exceeding the acceptable range of wind power is defined as the wind power acceptance risk cost. The wind power acceptance risk is expressed as follows: In the formula, E(.) represents the expected value of (.); p m,t Represents wind power The probability density function of lo and β up Represent the penalty factors for wind curtailment and power shortage respectively; and They are the lower and upper limits of the acceptable range of wind power; The wind power acceptance risk is approximated by the following linear expression with auxiliary variables and constraints: In the formula, The risk of wind curtailment. is the risk of power shortage, and n are constant coefficients; N is the number of segments, and m represents the mth wind farm. The adopted piecewise linearization method is different from the traditional piecewise linear method. It does not introduce integer variables in the linearization process, which is conducive to improving the calculation efficiency of the optimization model and enhancing the convergence of the distributed optimization algorithm. At the same time, in the above-mentioned piecewise linearization method, the more the number of segments selected, the more accurate the solution obtained; A distributed solution framework based on the ADMM algorithm is designed. The augmented Lagrangian function is used to relax the coupling constraints, so that the original interconnected system problem is decomposed into multiple single-region system problems, and the problem is solved in each single system region. After the problem is solved in each system region, the coupling variable values ​​are exchanged with the adjacent system, the problem parameters in the region are updated, and the problem is solved iteratively continuously until the residual of the coupling variables exchanged between the adjacent systems meets the stopping condition and the solution process completes the optimal solution. More specifically, based on the ADMM algorithm, an iterative distributed solution framework is designed to coordinate the flexibility acceptance system and the flexibility provision system. The solution process is as follows: Decouple the dispatch objective function of the electric-thermal system taking into account the multi-regional interactive strategy into the optimal dispatch objective functions of multiple single-region electric-thermal integrated energy systems; Initialize the iteration coefficient k=0, initial parameters, the parameters include: coupling variables, Lagrange multipliers and penalty factors; Solve each single-region electric-thermal integrated energy system separately according to the current parameters and transfer the coupling variables; Check the iteration stop condition, calculate the original residual and the dual residual, if the residual meets the requirements, the result converges; otherwise, update the Lagrange multiplier; Let k=k+1, and repeat the process of solving each single-region electric-thermal integrated energy system according to the current parameters until the calculation result meets the convergence condition.

3. A computer device, characterized in that: include: A processor and a computer readable storage medium; a processor adapted to execute a computer program; A computer-readable storage medium having a computer program stored therein, wherein when the computer program is executed by the processor, the following process is implemented: scheduling an electric-heat system taking into account a multi-regional interactive strategy with the goal of minimizing the total cost of a flexibility receiving system and a flexibility providing system; The flexibility specifically includes: The thermal system and the electric power system in the same integrated power-heat energy system share flexibility resources, as well as the flexibility resources shared between interconnected integrated power-heat energy systems; The goal of minimizing the total cost of the flexible admission system and the flexible provision system is to specifically include: Among them, Z L The cost of the flexibility accommodation system, Z f The cost of the flexibility providing system, F is the set of flexibility providing systems, and Z is the flexibility receiving system L The cost of the flexibility provision system Z is the sum of the power generation cost of conventional thermal power units and cogeneration units, the standby configuration cost, and the wind power acceptance cost. f The cost is the sum of the power generation cost of conventional thermal power units and cogeneration units, the standby configuration cost, and the wind power acceptance cost; The objective function of minimizing the total cost of the flexibility receiving system and the flexibility providing system includes: power system constraints, regional interconnection system coupling constraints and thermal system constraints; The power system constraints include: flexibility acceptance system power balance constraints, flexibility acceptance system generator set output power constraints, flexibility acceptance system generator set ramp rate constraints, flexibility acceptance system tie line capacity constraints, flexibility acceptance system flexibility demand constraints, flexibility acceptance system branch flow constraints, flexibility provision system power balance constraints, flexibility provision system flexibility demand constraints, flexibility provision system generator set output power constraints, flexibility provision system generator set ramp rate constraints and flexibility provision system tie line capacity constraints; The regional interconnection system coupling constraints include: transmission power coupling constraints and reserve capacity coupling constraints; The thermal system constraints include: electric-thermal coupling constraints, thermal network steady-state constraints and thermal network dynamic constraints; By quantifying the flexible adjustment capability brought by the dynamic characteristics of the thermal network, the flexible adjustment capability provided by the thermal network can be directly used as a dispatching resource to participate in the coordinated dispatching of the integrated energy system. The constraints of the thermal network include steady-state constraints and dynamic constraints. In the dynamic constraint, only the transmission delay is taken into account, and the outlet water temperature of the pipeline is: In the formula, is the ceiling function, is not less than t-τ j The smallest integer of is the outlet water temperature of pipe j at time t, is the water inlet temperature of pipe j at time t, a and b are the mass weight coefficients, Δt is the scheduling period interval, is the transmission delay of pipeline j, t is the number of the scheduling time period; When only the temperature loss of hot water is taken into account, the outlet water temperature of the pipe is: Where, T am is the ambient temperature, α j is the pipe temperature loss coefficient, c is the coefficient used to calculate the temperature loss, k j is the heat transfer coefficient of the jth thermal pipeline, l j is the length of the jth thermal pipeline; When the transmission delay and temperature loss are considered at the same time, the outlet water temperature of the pipeline is expressed as: The transmission delay characteristics and temperature loss characteristics in the thermal pipeline will cause a temperature difference between the outlet and inlet water temperatures of the thermal pipeline, causing the thermal network to passively store or release heat. The cogeneration unit is used as a flexibility transmission device. The thermal system adjusts the electrical power of the cogeneration unit to meet the flexibility of the power system. The flexibility transferred from the thermal system to the power system is quantified by the adjustable capacity exchange interval. Set the state time constraints of the thermal network, that is, the maximum heat storage time and the maximum heat release time. Assuming that the initial state in the pipeline scheduling period is heat storage, it must be converted to the heat release state before time t1, and must be converted to the heat storage state before time t2. Specifically: In the formula, is the maximum heat storage time, is the maximum heat release time; Conduct wind power acceptance risk measurement, including: When the probability distribution is known, the expected economic loss caused by wind power disturbance exceeding the acceptable range of wind power is defined as the wind power acceptance risk cost. The wind power acceptance risk is expressed as follows: In the formula, E(.) represents the expected value of (.); p m,t Represents wind power The probability density function of lo and β up Represent the penalty factors for wind curtailment and power shortage respectively; and They are the lower and upper limits of the acceptable range of wind power; The wind power acceptance risk is approximated by the following linear expression with auxiliary variables and constraints: In the formula, The risk of wind curtailment. is the risk of power shortage, and n are constant coefficients; N is the number of segments, and m represents the mth wind farm. The adopted piecewise linearization method is different from the traditional piecewise linear method. It does not introduce integer variables in the linearization process, which is conducive to improving the calculation efficiency of the optimization model and enhancing the convergence of the distributed optimization algorithm. At the same time, in the above-mentioned piecewise linearization method, the more the number of segments selected, the more accurate the solution obtained; A distributed solution framework based on the ADMM algorithm is designed. The augmented Lagrangian function is used to relax the coupling constraints, so that the original interconnected system problem is decomposed into multiple single-region system problems, and the problem is solved in each single system region. After the problem is solved in each system region, the coupling variable values ​​are exchanged with the adjacent system, the problem parameters in the region are updated, and the problem is solved iteratively continuously until the residual of the coupling variables exchanged between the adjacent systems meets the stopping condition and the solution process completes the optimal solution. More specifically, based on the ADMM algorithm, an iterative distributed solution framework is designed to coordinate the flexibility acceptance system and the flexibility provision system. The solution process is as follows: Decouple the dispatch objective function of the electric-thermal system taking into account the multi-regional interactive strategy into the optimal dispatch objective functions of multiple single-region electric-thermal integrated energy systems; Initialize the iteration coefficient k=0, initial parameters, the parameters include: coupling variables, Lagrange multipliers and penalty factors; Solve each single-region electric-thermal integrated energy system separately according to the current parameters and transfer the coupling variables; Check the iteration stop condition, calculate the original residual and the dual residual, if the residual meets the requirements, the result converges; otherwise, update the Lagrange multiplier; Let k=k+1, and repeat the process of solving each single-region electric-thermal integrated energy system according to the current parameters until the calculation result meets the convergence condition.

4. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, which is suitable for being loaded by a processor and executing the following process: scheduling an electric-heat system taking into account a multi-regional interactive strategy with the goal of minimizing the total cost of a flexibility receiving system and a flexibility providing system; The flexibility specifically includes: The thermal system and the electric power system in the same integrated power-heat energy system share flexibility resources, as well as the flexibility resources shared between interconnected integrated power-heat energy systems; The goal of minimizing the total cost of the flexible admission system and the flexible provision system is to specifically include: Among them, Z L The cost of the flexibility accommodation system, Z f The cost of the flexibility providing system, F is the set of flexibility providing systems, and Z is the flexibility receiving system L The cost of the flexibility provision system Z is the sum of the power generation cost of conventional thermal power units and cogeneration units, the standby configuration cost, and the wind power acceptance cost. f The cost is the sum of the power generation cost of conventional thermal power units and cogeneration units, the standby configuration cost, and the wind power acceptance cost; The objective function of minimizing the total cost of the flexibility receiving system and the flexibility providing system includes: power system constraints, regional interconnection system coupling constraints and thermal system constraints; The power system constraints include: flexibility acceptance system power balance constraints, flexibility acceptance system generator set output power constraints, flexibility acceptance system generator set ramp rate constraints, flexibility acceptance system tie line capacity constraints, flexibility acceptance system flexibility demand constraints, flexibility acceptance system branch flow constraints, flexibility provision system power balance constraints, flexibility provision system flexibility demand constraints, flexibility provision system generator set output power constraints, flexibility provision system generator set ramp rate constraints and flexibility provision system tie line capacity constraints; The regional interconnection system coupling constraints include: transmission power coupling constraints and reserve capacity coupling constraints; The thermal system constraints include: electric-thermal coupling constraints, thermal network steady-state constraints and thermal network dynamic constraints; By quantifying the flexible adjustment capability brought by the dynamic characteristics of the thermal network, the flexible adjustment capability provided by the thermal network can be directly used as a dispatching resource to participate in the coordinated dispatching of the integrated energy system. The constraints of the thermal network include steady-state constraints and dynamic constraints. In the dynamic constraint, only the transmission delay is taken into account, and the outlet water temperature of the pipeline is: In the formula, is the ceiling function, is not less than t-τ j The smallest integer of is the outlet water temperature of pipe j at time t, is the water inlet temperature of pipe j at time t, a and b are the mass weight coefficients, Δt is the scheduling period interval, is the transmission delay of pipeline j, t is the number of the scheduling time period; When only the temperature loss of hot water is taken into account, the outlet water temperature of the pipe is: Where, T am is the ambient temperature, α j is the pipe temperature loss coefficient, c is the coefficient used to calculate the temperature loss, k j is the heat transfer coefficient of the jth thermal pipeline, l j is the length of the jth thermal pipeline; When the transmission delay and temperature loss are considered at the same time, the outlet water temperature of the pipeline is expressed as: The transmission delay characteristics and temperature loss characteristics in the thermal pipeline will cause a temperature difference between the outlet and inlet water temperatures of the thermal pipeline, causing the thermal network to passively store or release heat. The cogeneration unit is used as a flexibility transmission device. The thermal system adjusts the electrical power of the cogeneration unit to meet the flexibility of the power system. The flexibility transferred from the thermal system to the power system is quantified by the adjustable capacity exchange interval. Set the state time constraints of the thermal network, that is, the maximum heat storage time and the maximum heat release time. Assuming that the initial state in the pipeline scheduling period is heat storage, it must be converted to the heat release state before time t1, and must be converted to the heat storage state before time t2. Specifically: In the formula, is the maximum heat storage time, is the maximum heat release time; Conduct wind power acceptance risk measurement, including: When the probability distribution is known, the expected economic loss caused by wind power disturbance exceeding the acceptable range of wind power is defined as the wind power acceptance risk cost. The wind power acceptance risk is expressed as follows: In the formula, E(.) represents the expected value of (.); p m,t Represents wind power The probability density function of lo and β up Represent the penalty factors for wind curtailment and power shortage respectively; and They are the lower and upper limits of the acceptable range of wind power; The wind power acceptance risk is approximated by the following linear expression with auxiliary variables and constraints: In the formula, The risk of wind curtailment. is the risk of power shortage, and n are constant coefficients; N is the number of segments, and m represents the mth wind farm. The adopted piecewise linearization method is different from the traditional piecewise linear method. It does not introduce integer variables in the linearization process, which is conducive to improving the calculation efficiency of the optimization model and enhancing the convergence of the distributed optimization algorithm. At the same time, in the above-mentioned piecewise linearization method, the more the number of segments selected, the more accurate the solution obtained; A distributed solution framework based on the ADMM algorithm is designed. The augmented Lagrangian function is used to relax the coupling constraints, so that the original interconnected system problem is decomposed into multiple single-region system problems, and the problem is solved in each single system region. After the problem is solved in each system region, the coupling variable values ​​are exchanged with the adjacent system, the problem parameters in the region are updated, and the problem is solved iteratively continuously until the residual of the coupling variables exchanged between the adjacent systems meets the stopping condition and the solution process completes the optimal solution. More specifically, based on the ADMM algorithm, an iterative distributed solution framework is designed to coordinate the flexibility acceptance system and the flexibility provision system. The solution process is as follows: Decouple the dispatch objective function of the electric-thermal system taking into account the multi-regional interactive strategy into the optimal dispatch objective functions of multiple single-region electric-thermal integrated energy systems; Initialize the iteration coefficient k=0, initial parameters, the parameters include: coupling variables, Lagrange multipliers and penalty factors; Solve each single-region electric-thermal integrated energy system separately according to the current parameters and transfer the coupling variables; Check the iteration stop condition, calculate the original residual and the dual residual, if the residual meets the requirements, the result converges; otherwise, update the Lagrange multiplier; Let k=k+1, and repeat the process of solving each single-region electric-thermal integrated energy system according to the current parameters until the calculation result meets the convergence condition.

5. A computer program product, characterized in that The computer program product includes a computer program, and when the computer program is executed by a processor, the following process is implemented: dispatching the electric-heat system taking into account the multi-regional interactive strategy with the goal of minimizing the total cost of the flexibility receiving system and the flexibility providing system; The flexibility specifically includes: The thermal system and the electric power system in the same integrated power-heat energy system share flexibility resources, as well as the flexibility resources shared between interconnected integrated power-heat energy systems; The goal of minimizing the total cost of the flexible admission system and the flexible provision system is to specifically include: Among them, Z L The cost of the flexibility accommodation system, Z f The cost of the flexibility providing system, F is the set of flexibility providing systems, and Z is the flexibility receiving system L The cost of the flexibility provision system Z is the sum of the power generation cost of conventional thermal power units and cogeneration units, the standby configuration cost, and the wind power acceptance cost. f The cost is the sum of the power generation cost of conventional thermal power units and cogeneration units, the standby configuration cost, and the wind power acceptance cost; The objective function of minimizing the total cost of the flexibility receiving system and the flexibility providing system includes: power system constraints, regional interconnection system coupling constraints and thermal system constraints; The power system constraints include: flexibility acceptance system power balance constraints, flexibility acceptance system generator set output power constraints, flexibility acceptance system generator set ramp rate constraints, flexibility acceptance system tie line capacity constraints, flexibility acceptance system flexibility demand constraints, flexibility acceptance system branch flow constraints, flexibility provision system power balance constraints, flexibility provision system flexibility demand constraints, flexibility provision system generator set output power constraints, flexibility provision system generator set ramp rate constraints and flexibility provision system tie line capacity constraints; The regional interconnection system coupling constraints include: transmission power coupling constraints and reserve capacity coupling constraints; The thermal system constraints include: electric-thermal coupling constraints, thermal network steady-state constraints and thermal network dynamic constraints; By quantifying the flexible adjustment capability brought by the dynamic characteristics of the thermal network, the flexible adjustment capability provided by the thermal network can be directly used as a dispatching resource to participate in the coordinated dispatching of the integrated energy system. The constraints of the thermal network include steady-state constraints and dynamic constraints. In the dynamic constraint, only the transmission delay is taken into account, and the outlet water temperature of the pipeline is: In the formula, is the ceiling function, is not less than t-τ j The smallest integer of is the outlet water temperature of pipe j at time t, is the water inlet temperature of pipe j at time t, a and b are the mass weight coefficients, Δt is the scheduling period interval, is the transmission delay of pipeline j, t is the number of the scheduling time period; When only the temperature loss of hot water is taken into account, the outlet water temperature of the pipe is: Where, T am is the ambient temperature, α j is the pipe temperature loss coefficient, c is the coefficient used to calculate the temperature loss, k j is the heat transfer coefficient of the jth thermal pipeline, l j is the length of the jth thermal pipeline; When the transmission delay and temperature loss are considered at the same time, the outlet water temperature of the pipeline is expressed as: The transmission delay characteristics and temperature loss characteristics in the thermal pipeline will cause a temperature difference between the outlet and inlet water temperatures of the thermal pipeline, causing the thermal network to passively store or release heat. The cogeneration unit is used as a flexibility transmission device. The thermal system adjusts the electrical power of the cogeneration unit to meet the flexibility of the power system. The flexibility transferred from the thermal system to the power system is quantified by the adjustable capacity exchange interval. Set the state time constraints of the thermal network, that is, the maximum heat storage time and the maximum heat release time. Assuming that the initial state in the pipeline scheduling period is heat storage, it must be converted to the heat release state before time t1, and must be converted to the heat storage state before time t2. Specifically: In the formula, is the maximum heat storage time, is the maximum heat release time; Conduct wind power acceptance risk measurement, including: When the probability distribution is known, the expected economic loss caused by wind power disturbance exceeding the acceptable range of wind power is defined as the wind power acceptance risk cost. The wind power acceptance risk is expressed as follows: In the formula, E(.) represents the expected value of (.); p m,t Represents wind power The probability density function of lo and β up Represent the penalty factors for wind curtailment and power shortage respectively; and They are the lower and upper limits of the acceptable range of wind power; The wind power acceptance risk is approximated by the following linear expression with auxiliary variables and constraints: In the formula, The risk of wind curtailment. is the risk of power shortage, and n are constant coefficients; N is the number of segments, and m represents the mth wind farm. The adopted piecewise linearization method is different from the traditional piecewise linear method. It does not introduce integer variables in the linearization process, which is conducive to improving the calculation efficiency of the optimization model and enhancing the convergence of the distributed optimization algorithm. At the same time, in the above-mentioned piecewise linearization method, the more the number of segments selected, the more accurate the solution obtained; A distributed solution framework based on the ADMM algorithm is designed. The augmented Lagrangian function is used to relax the coupling constraints, so that the original interconnected system problem is decomposed into multiple single-region system problems, and the problem is solved in each single system region. After the problem is solved in each system region, the coupling variable values ​​are exchanged with the adjacent system, the problem parameters in the region are updated, and the problem is solved iteratively continuously until the residual of the coupling variables exchanged between the adjacent systems meets the stopping condition and the solution process completes the optimal solution. More specifically, based on the ADMM algorithm, an iterative distributed solution framework is designed to coordinate the flexibility acceptance system and the flexibility provision system. The solution process is as follows: Decouple the dispatch objective function of the electric-thermal system taking into account the multi-regional interactive strategy into the optimal dispatch objective functions of multiple single-region electric-thermal integrated energy systems; Initialize the iteration coefficient k=0, initial parameters, the parameters include: coupling variables, Lagrange multipliers and penalty factors; Solve each single-region electric-thermal integrated energy system separately according to the current parameters and transfer the coupling variables; Check the iteration stop condition, calculate the original residual and the dual residual, if the residual meets the requirements, the result converges; otherwise, update the Lagrange multiplier; Let k=k+1, and repeat the process of solving each single-region electric-thermal integrated energy system according to the current parameters until the calculation result meets the convergence condition.