Asset management system and method based on prefabricated tags
The asset management method of prefabricated tags solves the problem of difficulty in quickly finding the wrong location recorded in the asset management system, improves the efficiency and accuracy of asset tracking, and reduces the system usage threshold and cost.
Patent Information
- Application Number
- CN202410397208.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-03
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-04-03
AI Technical Summary
When using asset tags in existing asset management systems, users are required to register and generate barcode or QR code labels themselves, making it difficult to quickly find the wrong location and reducing the efficiency and accuracy of asset tracking.
Use prefabricated tags, read and store tag information, establish asset statistics tables, regularly collect and import them into verification strategies, calculate the probability of error locations, and output error locations through overall probability, reducing system usage thresholds and costs, and improving asset tracking efficiency and accuracy sex.
Asset management methods based on prefabricated tags can greatly increase the scope of use of asset management systems, improve the efficiency and accuracy of asset tracking, and help organizations better manage assets and make informed decisions.
Smart Images

Figure CN118277898B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of data processing systems for supervision, and in particular to an asset management system and method based on prefabricated tags. Background Art
[0002] The current asset management system, including fixed asset management system, inventory management system, etc., has roughly the same functions in different systems, including registration, system settings, category management, asset master data registration management, warehousing, use, collection, internal transfer, assembly, disassembly, conversion adjustment, repair and maintenance, after-sales service, rental and lending, inventory, status change, consumption and loss reporting, sales and transfer, cancellation of registration, etc. The current asset management system has relatively mature and stable functions, but there is still a common problem that restricts the scope of use of these asset management systems, that is: in situations where asset tags are needed, the current asset management system and operators do not provide pre-made asset tags, but generally require users to register assets and generate barcode or QR code tags in the system first, and then print or organize the production of these tags by themselves, in order to finally obtain usable tags and paste the tags on assets for marking and use. The above problems exist in the existing technologies;
[0003] For example, a Chinese patent with announcement number CN116523508B discloses a smart operation and maintenance management system based on AIoT assets, including: obtaining different data sequences; obtaining environmental data representation values according to the data values corresponding to each time point in different data sequences, and obtaining a data distribution map by counting the environmental data representation values to obtain distribution density; obtaining a data distribution curve, dividing it into several data segments according to the distribution density, and obtaining the degree of data change in each data segment, thereby obtaining the bandwidth; obtaining a data interval according to the bandwidth, obtaining marked data points, obtaining the kernel value of the data interval according to the marked data points, and obtaining a kernel function; obtaining abnormal data points according to the kernel function, and obtaining the corresponding degree of influence of each marked data point according to the abnormal data points; judging whether maintenance is needed according to the degree of influence of the marked pixel point. The present invention enables the obtained kernel function to accurately reflect the type of data change, thereby improving the accuracy of data in abnormality detection;
[0004] The above patents all have the problem raised by this background technology: it is impossible to quickly find the wrong location of the asset management record, which reduces the efficiency and accuracy of asset tracking. In order to solve these problems, this application designs an asset management system and method based on prefabricated tags. Summary of the invention
[0005] In view of the deficiencies in the prior art, the present invention proposes an asset management system and method based on prefabricated tags. The present invention obtains prefabricated tags, reads information of the prefabricated tags and stores the information of the read prefabricated tags, establishes an asset statistics table according to the information of the pasted prefabricated tags, regularly collects the information of the pasted prefabricated tags, imports the prefabricated tag information into the primary verification strategy to verify the asset statistics table, calculates the primary probability of the statistical error position, obtains historical asset statistical data in the asset statistics table, imports the historical asset statistical data into the secondary verification strategy to verify the asset statistics table, calculates the secondary probability of the statistical error position, imports the obtained primary probability and secondary probability of the statistical error position into the error position identification strategy to calculate the overall probability of the error position, and outputs the statistical error position according to the overall probability of the found error position. The asset management method based on prefabricated tags can reduce the system use threshold and use cost, greatly improve the use scope of the asset management system, thereby improving the efficiency and accuracy of asset tracking, and helping organizations better manage assets and make wise decisions.
[0006] To achieve the above object, the present invention provides the following technical solutions:
[0007] An asset management method based on prefabricated tags comprises the following specific steps:
[0008] Obtaining prefabricated labels, reading information of the prefabricated labels and storing the information of the prefabricated labels, and establishing an asset statistics table according to the information of the pasted prefabricated labels;
[0009] Regularly collect the information of the prefabricated labels, import the prefabricated label information into the primary verification strategy to verify the asset statistics table, and calculate the primary probability of the statistical error location;
[0010] Obtain historical asset statistical data from the asset statistical table, import the historical asset statistical data into the secondary verification strategy to verify the asset statistical table, and calculate the secondary probability of the statistical error position;
[0011] The obtained primary probability and secondary probability of the statistical error position are introduced into the error position identification strategy to calculate the overall probability of the error position;
[0012] The statistical error positions are output according to the overall probability of the error positions found.
[0013] It should be specifically explained that the steps of obtaining the prefabricated label, reading the information of the prefabricated label and storing the read information of the prefabricated label, and establishing the asset statistics table according to the information of the pasted prefabricated label include the following specific steps:
[0014] S11, obtaining a prefabricated label from a manufacturer, reading information on the prefabricated label, pasting the prefabricated label on a corresponding device, and storing the read information of the prefabricated label in a storage component;
[0015] S12. Count the information of the pasted prefabricated labels, and construct an asset statistics table based on the information of the pasted prefabricated labels. It should be noted that at least the prefabricated labels store data such as the product introduction QR code, product name, model, and production information. The asset statistics table will count the corresponding data types of the data cases such as the product name, model, and production information into a table format.
[0016] It should be specifically explained here that the first-level verification strategy includes the following specific contents:
[0017] S21. Periodically collect information of the attached prefabricated labels and compare it with the asset statistics table, obtain the difference between the statistical data in the asset statistics table and the statistical data of the prefabricated label information, and simultaneously obtain the data type of the difference, and compare the difference between the statistical data in the asset statistics table and the statistical data of the prefabricated label information with a set difference threshold. If the obtained difference is greater than or equal to the set difference threshold, perform asset verification; if the obtained difference is less than the set difference threshold, do not perform asset verification;
[0018] S22, obtaining statistical data of the asset statistical table and statistical balance data of the prefabricated label information, and obtaining all data of the same type as the difference within the verification period from the asset statistical table;
[0019] S23, extracting the i-th data from all the data of the same type as the difference data within the obtained verification period, importing the i-th data and all the data of the same type as the difference data within the verification period into the primary probability calculation formula to calculate the primary probability, and the primary probability calculation formula is: Among them, m is the total number of data of the same type as the difference data within the verification period, x i is the i-th data extracted, x j The jth data of the same type as the difference data within the verification period;
[0020] It should be specifically explained here that the secondary verification strategy includes the following specific steps:
[0021] S31, obtaining the difference between the statistical data in the asset statistical table and the statistical data of the prefabricated tag information, and simultaneously obtaining the statistical data in the asset statistical table and the statistical balance data of the prefabricated tag information, and obtaining all data of the same type as the difference within the verification period from the asset statistical table;
[0022] S32. Extract the i-th data from all the data of the same type as the difference in the obtained verification period, and import the difference between the i-th data and all the data of the same type as the difference in the verification period, the statistical data in the asset statistical table and the statistical data of the prefabricated tag information into the secondary probability calculation formula to calculate the secondary probability. The secondary probability calculation formula is: Among them, r is the difference between the statistical data in the asset statistics table and the statistical data of the prefabricated tag information.
[0023] It should be specifically explained here that the error location identification strategy includes the following specific steps:
[0024] S41, obtaining the calculated primary probability and secondary probability of all data of the same type as the difference within the verification period;
[0025] S42, the calculated primary probability and secondary probability are introduced into the overall probability calculation formula of the error position to calculate the overall probability of the error position, and the overall probability calculation formula of the error position is: Among them, a1 is the first-level probability coefficient, a2 is the second-level probability coefficient, among which, a1+a2=1, among which, a1≤a2.
[0026] It should be specifically explained here that the specific steps of outputting the statistical error positions according to the overall probability of the error positions found are as follows:
[0027] The calculated overall probability of the error position of all data of the same data type as the difference within the verification period is extracted, the overall probabilities of the error positions of all data obtained are arranged in descending order, and the statistical error position corresponding to the largest overall probability of the error position is output. The checker performs data verification on the output statistical error positions in order of the size of the overall probabilities of the error positions.
[0028] An asset management system based on prefabricated labels is implemented based on the above-mentioned asset management method based on prefabricated labels, and specifically comprises an asset statistical table construction module, a primary probability calculation module, a secondary probability calculation module, an overall probability calculation module, an error position verification module and a control module; the asset statistical table construction module is used to obtain prefabricated labels, read the information of the prefabricated labels and store the information of the read prefabricated labels, and establish an asset statistical table according to the information of the pasted prefabricated labels;
[0029] The primary probability calculation module is used to regularly collect the information of the prefabricated labels, import the prefabricated label information into the primary verification strategy to verify the asset statistics table, and calculate the primary probability of the statistical error position;
[0030] The secondary probability calculation module is used to obtain historical asset statistical data in the asset statistical table, import the historical asset statistical data into the secondary verification strategy to verify the asset statistical table, and calculate the secondary probability of the statistical error position.
[0031] It should be specifically explained here that the overall probability calculation module is used to import the obtained primary probability and secondary probability of the statistical error position into the error position identification strategy to calculate the overall probability of the error position;
[0032] The error position checking module is used to output the statistical error positions according to the overall probability of the error positions found.
[0033] It should be specifically explained here that the control module is used to control the operation of the asset statistics table construction module, the primary probability calculation module, the secondary probability calculation module, the overall probability calculation module and the error position verification module.
[0034] An electronic device comprises: a processor and a memory, wherein the memory stores a computer program that can be called by the processor;
[0035] The processor executes the above-mentioned asset management method based on prefabricated tags by calling the computer program stored in the memory.
[0036] A computer-readable storage medium stores instructions, which, when executed on a computer, enable the computer to execute the above-mentioned asset management method based on prefabricated tags.
[0037] Compared with the prior art, the present invention has the following beneficial effects:
[0038] The present invention obtains a prefabricated label, reads information of the prefabricated label and stores the information of the read prefabricated label, establishes an asset statistics table according to the information of the pasted prefabricated label, regularly collects information of the pasted prefabricated label, imports the information of the prefabricated label into a primary verification strategy to verify the asset statistics table, calculates a primary probability of a statistical error position, obtains historical asset statistical data in the asset statistics table, imports the historical asset statistical data into a secondary verification strategy to verify the asset statistics table, calculates a secondary probability of a statistical error position, imports the obtained primary probability and secondary probability of the statistical error position into an error position identification strategy to calculate the overall probability of the error position, outputs the statistical error position according to the overall probability of the found error position, and the asset management method based on prefabricated labels can reduce the threshold and cost of system use, greatly improve the scope of use of the asset management system, thereby improving the efficiency and accuracy of asset tracking, and helping organizations to better manage assets and make wise decisions. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 This is a schematic diagram of the overall process of an asset management method based on prefabricated tags of the present invention;
[0040] Figure 2 This is a schematic diagram of the overall framework of an asset management system based on prefabricated tags of the present invention;
[0041] Figure 3 The figure is a schematic diagram of the prefabricated label binding process of the present invention. DETAILED DESCRIPTION
[0042] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0043] Example 1
[0044] See also Figure 1 and Figure 3 , an embodiment provided by the present invention: the technical problem solved by this embodiment is: it is impossible to quickly find the wrong location of the record of asset management, resulting in reduced efficiency and accuracy of asset tracking;
[0045] An asset management method based on prefabricated tags comprises the following specific steps:
[0046] Obtaining prefabricated labels, reading information of the prefabricated labels and storing the information of the prefabricated labels, and establishing an asset statistics table according to the information of the pasted prefabricated labels;
[0047] The usage of the prefabricated labels here is as follows: The typical implementation of binding is: open WeChat on your mobile phone and scan the barcode or QR code on a new label that has not been enabled, that is, open the corresponding WeChat applet (after completing the user login process, or completing the user login in advance) to enter the binding function interface. The system automatically captures the number information contained in the barcode or QR code in the label and enters it into the label number field (which cannot be modified). The user manually enters the relevant information of the asset to which the label is attached, confirms submission, and the system saves the data binding;
[0048] If the user has entered or imported asset information in batches in advance, then when performing the above scan code binding operation, there is no need to manually enter the asset information. Instead, the user only needs to scan the code, select an asset record, and confirm the submission. The system will then save the data binding.
[0049] Furthermore, if the supplier has bound the asset and the tag before shipment, the purchaser only needs to scan the code to retrieve the relevant information, complete other information and confirm the submission, and the system will update and save the data binding;
[0050] To prevent counterfeiting of labels, the system generates a verification code or anti-counterfeiting code in advance when the label is generated. After scanning the code, a verification program can be added to verify whether the number in the barcode or QR code corresponds to the verification code or anti-counterfeiting code;
[0051] To prevent duplication of labels, the system can add a verification procedure after scanning the code to verify whether the label number is duplicated with the record already existing in the system;
[0052] To improve the efficiency of binding operation processing, the system can support binding tags and assets or asset categories in batches;
[0053] When necessary, authorized operators can also unbind assets from tags. When unbinding, the user opens or selects the bound asset record, clicks Unbind and submits, and the system unbinds.
[0054] If the asset is bound to multiple tags, you can choose to unbind one or more tags at a time;
[0055] To improve the efficiency of unbinding operations, the system can support batch unbinding of tags and assets;
[0056] To prevent assets from being maliciously bound by unrelated persons during transfer, the previous owner may register a transfer code for the asset tag during transfer registration and send it to the next owner. When the next owner inherits the binding, he can enter the transfer code to confirm the validity of the inherited binding.
[0057] In the database table structure of the system, in the asset master data table, there is a tag number field that is independent of the asset ID or asset number information, or although there is no independent tag number field, there is an independent tag information table, which at least contains the tag number field and the bound asset record (asset ID or asset number) field. During the binding operation, the tag number is registered and saved in the asset master data table, or a tag number and asset information record is registered or updated in the tag information table; during the unbinding operation, the tag number is deleted in the asset master data table, or the asset information record of the tag number is deleted or marked invalid in the tag information table;
[0058] When the system realizes the association between tags and assets through an independent tag information table, it can support the function of realizing multiple tags corresponding to one asset record;
[0059] When no tag binding is performed, the asset management system under the present invention can also be run independently, and tag and binding operations are not necessary prerequisites for asset registration and management operations. Assets under this system can also be untagged, partially tagged, or fully tagged;
[0060] Scan the QR code to open the bound asset record, or browse and search for existing asset records in the asset management system interface to perform asset-related operations.
[0061] In addition to scanning the QR code to register and bind assets, you can also directly register assets through the registration function in the asset management system interface;
[0062] Regularly collect the information of the prefabricated labels, import the prefabricated label information into the primary verification strategy to verify the asset statistics table, and calculate the primary probability of the statistical error location;
[0063] Obtain historical asset statistical data from the asset statistical table, import the historical asset statistical data into the secondary verification strategy to verify the asset statistical table, and calculate the secondary probability of the statistical error position;
[0064] The obtained primary probability and secondary probability of the statistical error position are introduced into the error position identification strategy to calculate the overall probability of the error position;
[0065] The statistical error positions are output according to the overall probability of the error positions found.
[0066] In this embodiment, it should be specifically explained that obtaining the prefabricated label, reading the information of the prefabricated label and storing the read information of the prefabricated label, and establishing the asset statistics table according to the information of the pasted prefabricated label include the following specific steps:
[0067] S11, obtaining a prefabricated label from a manufacturer, reading information on the prefabricated label, pasting the prefabricated label on a corresponding device, and storing the read information of the prefabricated label in a storage component;
[0068] S12. Count the information of the pasted prefabricated labels, and construct an asset statistics table based on the information of the pasted prefabricated labels. It should be noted that at least the prefabricated labels store data such as the product introduction QR code, product name, model, and production information. The asset statistics table will count the corresponding data types of the data cases such as the product name, model, and production information into a table format.
[0069] In this embodiment, it should be specifically explained that the first-level verification strategy includes the following specific contents:
[0070] S21. Periodically collect information of the attached prefabricated labels and compare it with the asset statistics table, obtain the difference between the statistical data in the asset statistics table and the statistical data of the prefabricated label information, and simultaneously obtain the data type of the difference, and compare the difference between the statistical data in the asset statistics table and the statistical data of the prefabricated label information with a set difference threshold. If the obtained difference is greater than or equal to the set difference threshold, perform asset verification; if the obtained difference is less than the set difference threshold, do not perform asset verification;
[0071] S22, obtaining statistical data of the asset statistical table and statistical balance data of the prefabricated label information, and obtaining all data of the same type as the difference within the verification period from the asset statistical table;
[0072] S23, extracting the i-th data from all the data of the same type as the difference data within the obtained verification period, importing the i-th data and all the data of the same type as the difference data within the verification period into the primary probability calculation formula to calculate the primary probability, and the primary probability calculation formula is: Among them, m is the total number of data of the same type as the difference data within the verification period, x i is the i-th data extracted, x j The jth data of the same type as the difference data within the verification period;
[0073] It should be specifically explained in this embodiment that the secondary verification strategy includes the following specific steps:
[0074] S31, obtaining the difference between the statistical data in the asset statistical table and the statistical data of the prefabricated tag information, and simultaneously obtaining the statistical data in the asset statistical table and the statistical balance data of the prefabricated tag information, and obtaining all data of the same type as the difference within the verification period from the asset statistical table;
[0075] S32. Extract the i-th data from all the data of the same type as the difference in the obtained verification period, and import the difference between the i-th data and all the data of the same type as the difference in the verification period, the statistical data in the asset statistical table and the statistical data of the prefabricated tag information into the secondary probability calculation formula to calculate the secondary probability. The secondary probability calculation formula is: Among them, r is the difference between the statistical data in the asset statistics table and the statistical data of the prefabricated tag information.
[0076] It should be specifically explained in this embodiment that the error location identification strategy includes the following specific steps:
[0077] S41, obtaining the calculated primary probability and secondary probability of all data of the same type as the difference within the verification period;
[0078] S42, the calculated primary probability and secondary probability are introduced into the overall probability calculation formula of the error position to calculate the overall probability of the error position, and the overall probability calculation formula of the error position is: Among them, a1 is the first-level probability coefficient, a2 is the second-level probability coefficient, among which, a1+a2=1, among which, a1≤a2.
[0079] In this embodiment, it should be specifically explained that the specific steps of outputting the statistical error positions according to the overall probability of the error positions to be found are as follows:
[0080] Extract the calculated overall probability of error positions of all data of the same data type as the difference value within the verification period, arrange the overall probabilities of error positions of all data obtained in descending order, output the statistical error position corresponding to the largest overall probability of error position, and the checker performs data verification on the output statistical error positions in the order of the overall probabilities of error positions;
[0081] It should be noted here that the advantages of this embodiment over the prior art are: obtaining prefabricated tags, reading the information of the prefabricated tags and storing the read information of the prefabricated tags, establishing an asset statistics table based on the information of the pasted prefabricated tags, regularly collecting the information of the pasted prefabricated tags, importing the prefabricated tag information into the primary verification strategy to verify the asset statistics table, calculating the primary probability of the statistical error position, obtaining the historical asset statistical data in the asset statistics table, importing the historical asset statistical data into the secondary verification strategy to verify the asset statistics table, calculating the secondary probability of the statistical error position, importing the obtained primary probability and secondary probability of the statistical error position into the error position identification strategy to calculate the overall probability of the error position, and outputting the statistical error position according to the overall probability of the found error position. The asset management method based on prefabricated tags can reduce the system use threshold and use cost, greatly increase the use scope of the asset management system, thereby improving the efficiency and accuracy of asset tracking, and helping organizations better manage assets and make wise decisions.
[0082] Example 2
[0083] like Figure 2 As shown, an asset management system based on prefabricated labels is implemented based on the above-mentioned asset management method based on prefabricated labels, and specifically includes an asset statistical table construction module, a primary probability calculation module, a secondary probability calculation module, an overall probability calculation module, an error position verification module and a control module; the asset statistical table construction module is used to obtain prefabricated labels, read the information of the prefabricated labels and store the information of the read prefabricated labels, and establish an asset statistical table according to the information of the pasted prefabricated labels;
[0084] The first-level probability calculation module is used to regularly collect the information of the prefabricated labels, import the prefabricated label information into the first-level verification strategy to verify the asset statistics table, and calculate the first-level probability of the statistical error position;
[0085] The secondary probability calculation module is used to obtain historical asset statistical data in the asset statistical table, import the historical asset statistical data into the secondary verification strategy to verify the asset statistical table, and calculate the secondary probability of the statistical error position;
[0086] In this embodiment, it should be specifically explained that the overall probability calculation module is used to import the obtained primary probability and secondary probability of the statistical error position into the error position identification strategy to calculate the overall probability of the error position;
[0087] An error position checking module is used to output the statistical error positions according to the overall probability of the error positions found;
[0088] It should be specifically explained in this embodiment that the control module is used to control the operation of the asset statistics table construction module, the primary probability calculation module, the secondary probability calculation module, the overall probability calculation module and the error position verification module.
[0089] Example 3
[0090] This embodiment provides an electronic device, including: a processor and a memory, wherein the memory stores a computer program that can be called by the processor;
[0091] The processor executes the above-mentioned asset management method based on prefabricated tags by calling the computer program stored in the memory.
[0092] The electronic device may have relatively large differences due to different configurations or performances, and may include one or more processors (Central Processing Units, CPU) and one or more memories, wherein the memory stores at least one computer program, and the computer program is loaded and executed by the processor to implement an asset management method based on prefabricated tags provided in the above method embodiment. The electronic device may also include other components for implementing the functions of the device. For example, the electronic device may also have components such as a wired or wireless network interface and an input / output interface to input and output data. This embodiment will not be described in detail here.
[0093] Example 4
[0094] This embodiment provides a computer-readable storage medium having a rewritable computer program stored thereon;
[0095] When the computer program runs on a computer device, the computer device executes the above-mentioned asset management method based on prefabricated tags.
[0096] For example, the computer readable storage medium can be a read-only memory (ROM), a random access memory (RAM), a compact disc (CD-ROM), a magnetic tape, a floppy disk, an optical data storage device, etc.
[0097] It should be understood that in the various embodiments of the present application, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0098] It should be understood that determining B based on A does not mean determining B only based on A. B can also be determined based on A and / or other information.
[0099] The above embodiments can be implemented in whole or in part by software, hardware, firmware or any other combination. When implemented by software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When a computer instruction or computer program is loaded or executed on a computer, a process or function according to an embodiment of the present invention is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network or other programmable device. Computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, computer instructions can be transmitted from one website site, computer, server or data center to another website site, computer, server or data center through a wired network or / and a wireless network. The computer-readable storage medium can be any available medium that a computer can access or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (for example, a floppy disk, a hard disk, a tape), an optical medium (for example, a DVD), or a semiconductor medium. The semiconductor medium can be a solid-state hard disk.
[0100] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed in the present invention can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0101] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0102] In the several embodiments provided by the present invention, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of units is only one way of division, and there may be other ways of division in actual implementation, for example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0103] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0104] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.
[0105] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0106] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. An asset management method based on prefabricated tags, It is characterized in that It includes the following specific steps: Obtaining prefabricated labels, reading information of the prefabricated labels and storing the information of the prefabricated labels, and establishing an asset statistics table according to the information of the pasted prefabricated labels; Regularly collect the information of the prefabricated labels, import the prefabricated label information into the primary verification strategy to verify the asset statistics table, and calculate the primary probability of the statistical error location; The first-level verification strategy includes the following specific contents: S21. Periodically collect information of the attached prefabricated labels and compare it with the asset statistics table, obtain the difference between the statistical data in the asset statistics table and the statistical data of the prefabricated label information, and simultaneously obtain the data type of the difference, and compare the difference between the statistical data in the asset statistics table and the statistical data of the prefabricated label information with a set difference threshold. If the obtained difference is greater than or equal to the set difference threshold, perform asset verification; if the obtained difference is less than the set difference threshold, do not perform asset verification; S22, obtaining statistical data of the asset statistical table and statistical balance data of the prefabricated label information, and obtaining all data of the same type as the difference within the verification period from the asset statistical table; S23, extracting the i-th data from all the data of the same type as the difference data within the obtained verification period, importing the i-th data and all the data of the same type as the difference data within the verification period into the primary probability calculation formula to calculate the primary probability, and the primary probability calculation formula is: , where m is the total number of data of the same type as the difference data within the verification period, is the i-th data extracted, The jth data of the same type as the difference data within the verification period; Obtain historical asset statistical data from the asset statistical table, import the historical asset statistical data into the secondary verification strategy to verify the asset statistical table, and calculate the secondary probability of the statistical error position; The obtained primary probability and secondary probability of the statistical error position are introduced into the error position identification strategy to calculate the overall probability of the error position; The secondary verification strategy includes the following specific steps: S31, obtaining the difference between the statistical data in the asset statistical table and the statistical data of the prefabricated tag information, and simultaneously obtaining the statistical data in the asset statistical table and the statistical balance data of the prefabricated tag information, and obtaining all data of the same type as the difference within the verification period from the asset statistical table; S32. Extract the i-th data from all the data of the same type as the difference in the obtained verification period, and import the difference between the i-th data and all the data of the same type as the difference in the verification period, the statistical data in the asset statistical table and the statistical data of the prefabricated tag information into the secondary probability calculation formula to calculate the secondary probability. The secondary probability calculation formula is: , where r is the difference between the statistical data in the asset statistics table and the statistical data of the prefabricated tag information; The error location identification strategy includes the following specific steps: S41, obtaining the calculated primary probability and secondary probability of all data of the same type as the difference within the verification period; S42, the calculated primary probability and secondary probability are introduced into the overall probability calculation formula of the error position to calculate the overall probability of the error position, and the overall probability calculation formula of the error position is: ,in, is the first-level probability coefficient, is the secondary probability ratio, where ,in, ; The statistical error positions are output according to the overall probability of the error positions found.
2. The asset management method based on prefabricated tags as claimed in claim 1, It is characterized in that The steps of obtaining the prefabricated label, reading the information of the prefabricated label and storing the read information of the prefabricated label, and establishing the asset statistics table according to the information of the pasted prefabricated label include the following specific steps: S11, obtaining a prefabricated label from a manufacturer, reading information on the prefabricated label, pasting the prefabricated label on a corresponding device, and storing the read information of the prefabricated label in a storage component; S12. Count the information of the pasted prefabricated labels, and construct an asset statistics table based on the information of the pasted prefabricated labels.
3. The asset management method based on prefabricated tags as claimed in claim 2, It is characterized in that The specific steps of outputting the statistical error positions according to the overall probability of the error positions found are as follows: The calculated overall probability of the error position of all data of the same data type as the difference within the verification period is extracted, the overall probabilities of the error positions of all data obtained are arranged in descending order, and the statistical error position corresponding to the largest overall probability of the error position is output. The checker performs data verification on the output statistical error positions in order of the size of the overall probabilities of the error positions.
4. An asset management system based on prefabricated tags, which is implemented based on the asset management method based on prefabricated tags as claimed in any one of claims 1 to 3, It is characterized in that It specifically includes an asset statistics table construction module, a primary probability calculation module, a secondary probability calculation module, an overall probability calculation module, an error position verification module and a control module; the asset statistics table construction module is used to obtain prefabricated labels, read the information of the prefabricated labels and store the read information of the prefabricated labels, and establish an asset statistics table according to the information of the pasted prefabricated labels; The primary probability calculation module is used to regularly collect the information of the prefabricated labels, import the prefabricated label information into the primary verification strategy to verify the asset statistics table, and calculate the primary probability of the statistical error position; The secondary probability calculation module is used to obtain historical asset statistical data in the asset statistical table, import the historical asset statistical data into the secondary verification strategy to verify the asset statistical table, and calculate the secondary probability of the statistical error position.
5. An asset management system based on prefabricated tags as claimed in claim 4, It is characterized in that The overall probability calculation module is used to import the obtained primary probability and secondary probability of the statistical error position into the error position identification strategy to calculate the overall probability of the error position; The error position checking module is used to output the statistical error positions according to the overall probability of the error positions found; The control module is used to control the operation of the asset statistics table construction module, the primary probability calculation module, the secondary probability calculation module, the overall probability calculation module and the error position verification module.
6. An electronic device, include: A processor and a memory, wherein the memory stores a computer program that can be called by the processor; It is characterized in that the processor executes the asset management method based on prefabricated tags as described in any one of claims 1 to 3 by calling the computer program stored in the memory.
7. A computer-readable storage medium, It is characterized in that Instructions are stored, and when the instructions are executed on a computer, the computer is caused to execute an asset management method based on prefabricated tags as described in any one of claims 1 to 3.
