A foundation pit intelligent dewatering and water stopping method

Through the four methods of 'lowering, draining, plugging and intercepting' and the automatic emergency measure system, the problem of groundwater control in foundation pit construction is solved, a dry environment and construction safety in the foundation pit are achieved, and slope instability and foundation bearing capacity are avoided. The problem of decline.

CN118309093BActive Publication Date: 2024-10-11NO 4 ENG CO LTD OF CHINA RAILWAY NO 9 GRP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410732978.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-07
Publication Date
2024-10-11
Estimated Expiration
2044-06-07

AI Technical Summary

Technical Problem

Existing technology is difficult to effectively control groundwater during foundation pit construction, leading to problems such as slope instability, foundation running sand, pit bottom uplift, pit bottom piping, and reduced foundation bearing capacity.

Method used

The four methods of 'dropping, draining, blocking and intercepting' are combined with the automatic emergency measures system. By setting up dewatering wells, water collection systems, groundwater barrier barriers and water-stop curtains, the water level and stability indicators are monitored, and dewatering and water-stop measures are automatically initiated. to control groundwater levels.

Benefits of technology

It achieves a dry environment in the foundation pit, prevents slope instability and decrease in foundation bearing capacity, and ensures construction safety and project quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118309093B_ABST
    Figure CN118309093B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of tunnel engineering construction, and provides a method for intelligent dewatering and water stopping of a foundation pit, and adopts the following steps: step S1, dewatering: setting multiple dewatering wells; setting dewatering water pumps; lowering the water level in the dewatering wells to a preset position by means of the dewatering water pumps; step S2, drainage: setting a water collection system; draining the water inside the foundation pit by means of the water collection system; step S3, water blocking: setting a groundwater blocking barrier to block the groundwater outside the foundation pit from flowing into the inside of the foundation pit; step S4, water interception: setting a water-stopping curtain to block the water layer communication between the inside of the foundation pit and the outside of the foundation pit; step S5, well water level monitoring, starting emergency measures: when the water level exceeds a preset safety range or the foundation pit stability index decreases, the automatic emergency measures system is turned on. The present invention adopts an automatic emergency measures system for groundwater control to achieve the purpose of intelligent dewatering and water stopping of the foundation pit.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of foundation pit dewatering, and in particular relates to an intelligent foundation pit dewatering and water stopping method. Background Art

[0002] Foundation pit dewatering refers to the dewatering work done when the groundwater level is higher than the excavation bottom surface during foundation pit excavation. Groundwater will continuously seep into the pit to ensure that the foundation pit can be constructed under dry conditions and to prevent slope instability, foundation sand flow, pit bottom uplift, pit bottom pipe burst and reduced foundation bearing capacity.

[0003] Groundwater is a common problem in foundation pit projects, significantly impacting their safe construction and quality. Therefore, adopting appropriate groundwater control technologies is a crucial component of foundation pit engineering. Because the water level drawdown curve around the pit varies significantly depending on the dewatering requirements, methods, and specific plans, different dewatering methods must be analyzed and compared to select the optimal solution, while still meeting basic dewatering requirements.

[0004] Therefore, it is necessary to provide an improved technical solution to the above-mentioned deficiencies in the prior art. Summary of the Invention

[0005] The present invention aims to overcome the existing problems in effectively controlling groundwater by proposing four methods for groundwater control: "lowering, draining, blocking, and intercepting." This method utilizes an automated emergency response system to achieve intelligent dewatering and water stabilization for foundation pits. This method provides a novel solution for deep foundation pit excavation in lakeside areas.

[0006] In order to achieve the above object, the present invention provides the following technical solutions:

[0007] A method for intelligent dewatering and water stopping of a foundation pit, wherein the method comprises the following steps:

[0008] Step S1, dewatering: multiple dewatering wells are set up around the foundation pit; dewatering pumps are set up in the dewatering wells; the water level in the dewatering wells is lowered to a preset position by the dewatering pumps;

[0009] Step S2, drainage: a water collection system is set up at the bottom and side walls of the foundation pit; the water collection system includes a water collection well and a water collection pipe; the water inside the foundation pit is drained through the water collection system;

[0010] Step S3, water blocking: setting up a groundwater blocking barrier around the foundation pit to prevent groundwater outside the foundation pit from flowing into the foundation pit;

[0011] Step S4, water blocking: setting a water-stop curtain around the foundation pit to block the flow of water between the inside and outside of the foundation pit;

[0012] Step S5, well water level monitoring, start emergency measures: when the water level exceeds the preset safety range or the foundation pit stability index drops, start the automatic emergency measures system; starting the automatic emergency measures system includes starting the dewatering pump to dewater until the water level reaches the designed water level.

[0013] Preferably, the depth, location, and spacing of the dewatering wells in step S1 are determined based on a groundwater flow model and a lake water level dynamic change model:

[0014] Step S1-1, determining the depth of the precipitation wells based on the groundwater flow model, includes: according to the groundwater flow model, the depth of the precipitation wells must reach the aquifer to control the groundwater level in the foundation pit area; the depth of the precipitation wells is determined based on the annual average groundwater level, seasonal fluctuations, and groundwater flow direction and velocity;

[0015] Step S1-2, arranging the locations of precipitation wells according to the groundwater flow model, includes: arranging the locations of precipitation wells based on the groundwater flow direction and velocity, and arranging precipitation wells along the main groundwater flow path to enhance precipitation efficiency;

[0016] Step S1-3, determining the spacing of the precipitation wells based on the groundwater flow model, includes: the spacing of the plurality of precipitation wells is determined based on the groundwater flow model, the plurality of precipitation wells are arranged to cover the entire foundation pit area, the plurality of precipitation wells are independent of each other, and the groundwater level in the entire foundation pit area can be uniformly lowered;

[0017] Step S1-4, determining the depth of the precipitation well based on the lake water level dynamic variation model, includes: based on the seasonal and interannual variations in the lake water level, the depth of the precipitation well must adapt to the groundwater pressure during the period of the highest lake water level, and be able to control the water level inside the foundation pit during the period of the highest lake water level;

[0018] Step S1-5, determining the location of the precipitation well according to the lake water level dynamic change model, includes: arranging the precipitation well close to the lake or water body according to the lake water level dynamic change model to control the rise of the groundwater level caused by the rise of the lake water level;

[0019] Step S1-6, determining the spacing of dewatering wells based on the dynamic change model of the lake water level includes: based on the dynamic changes of the lake water level, the spacing of multiple dewatering wells is set according to the changes in the lake water level and the flow direction of groundwater, which can control the groundwater level in the foundation pit area during the peak period of the lake water level.

[0020] Preferably, step S2 of setting up a water collection system includes:

[0021] Step S2-1, determining the location of the water collection well; the location of the water collection well is determined based on the water flow direction and concentration area inside the foundation pit; the water collection well is arranged at the low point at the bottom of the foundation pit or the water flow convergence area to collect the accumulated water in the foundation pit;

[0022] Step S2-2, designing the structure of the water collection well: The structure of the water collection well is designed based on the foundation pit depth, geological conditions, and expected water volume; the capacity and structural strength of the water collection well are sufficient to cope with collapse or blockage during precipitation;

[0023] Step S2-3, setting up water collection pipes, including designing the water collection pipe layout: water collection pipes are set along the bottom and side walls of the foundation pit to form a water flow guidance and collection network; the water collection pipe layout design is designed based on the specific shape and size of the foundation pit and the characteristics of water flow collection;

[0024] Step S2-4, connecting the water collection well, connecting the water collection pipe to the water collection well, ensuring that the water collected in the water collection well can be transported to the designated discharge location or treatment facility.

[0025] Preferably, step S3 of setting up a groundwater barrier includes:

[0026] Step S3-1, selecting a grouting material for forming a groundwater barrier, including: a polymer material or a chemical water-stopping agent;

[0027] Step S3-2: setting grouting holes and injecting cement-water-glass slurry into the periphery of the foundation pit through the grouting holes;

[0028] In step S3-3, the polymer material or chemical water-stopping agent can combine with the water molecules in the soil to form a continuous and stable waterproof barrier around the foundation pit, so as to isolate the groundwater from entering the foundation pit.

[0029] Preferably, step S4 of setting a water-stop curtain around the foundation pit further includes:

[0030] Step S4-1, selecting the material of the water-stop curtain, including polyethylene, polypropylene and polyvinyl chloride;

[0031] Step S4-2, setting up a water-stop curtain: design the depth, thickness and arrangement of the water-stop curtain based on the geological conditions, hydrological conditions and construction environment around the foundation pit; the water-stop curtain extends from the bottom of the foundation pit to the stratum at a preset depth to form a water-blocking layer.

[0032] Preferably, step S5 of well water level monitoring also includes: setting an observation well; setting the observation well outside the foundation pit; setting a liquid level gauge in the observation well for automatically monitoring the water level, and automatically starting the precipitation pump when the water level reaches within ±5cm of the design water level.

[0033] Preferably, the emergency measures in step S5 include:

[0034] Step S5-1: Water level sensors are installed inside and outside the foundation pit, and the water level sensors are connected to an automatic monitoring system. The water level sensors and the automatic monitoring system are used to collect real-time water level data and stability indicators inside and outside the foundation pit to evaluate the dewatering effect and the water level stability of the foundation pit.

[0035] Step S5-2: Install inclinometers and stress sensors in the soil surrounding the foundation pit. Use the inclinometers and stress sensors to monitor displacement and stress changes in the soil and support structure surrounding the foundation pit. Obtain soil mechanical property data through field and laboratory tests, including soil density, porosity, internal friction angle, and cohesion parameters. Use total stations, global navigation satellite systems, and laser scanning measurement technology to obtain deformation data to monitor settlement and horizontal displacement of the foundation pit and its surrounding ground.

[0036] Step S5-3, collecting relevant data in step S5-1 and step S5-2, the relevant data including water level data, stability index, soil mechanical property data, and deformation data;

[0037] Step S5-4, analyzing the relevant data; if the relevant data is within the preset range, repeating steps S5-1 to S5-3; if the relevant data exceeds the preset range, proceeding to step S5-5;

[0038] Step S5-5: when the water level rises or the foundation pit stability decreases, start the observation well and increase the injection rate of the chemical waterstop;

[0039] Step S5-6, continuously repeating steps S5-1 to S5-5 until all relevant data are within a preset range.

[0040] Beneficial effects:

[0041] (1) The present invention proposes to arrange dewatering wells at appropriate locations in the surrounding area of ​​the foundation pit based on the geological structure and hydrogeological conditions. Each dewatering well is equipped with a high-efficiency dewatering pump. Its design purpose is to effectively lower the groundwater level through continuous dewatering activities.

[0042] (2) The present invention arranges a water collection system at the bottom and side walls of the foundation pit. The system includes a water collection pipe and a water collection well. Its main function is to quickly discharge the surface water and groundwater accumulated in the foundation pit.

[0043] (3) The present invention constructs a groundwater barrier around the foundation pit. The function of this barrier is to guide the groundwater to a controllable area, thereby achieving effective control of the groundwater level.

[0044] (4) The present invention sets a water-stop curtain on the periphery of the foundation pit. The curtain uses physical isolation means to effectively separate the groundwater inside and outside the foundation pit, and then the groundwater outside the foundation pit is pumped out.

[0045] (5) The present invention also includes a set of emergency measures. When abnormal water level or stability indicators are detected, additional precipitation measures are automatically initiated and the injection amount of water-stopping agent is increased to ensure the absolute safety of the foundation pit. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] The drawings and the accompanying drawings, which constitute part of this application, are intended to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are intended to explain the present invention and do not constitute an undue limitation of the present invention. Among them:

[0047] Figure 1 This is a flow chart of the steps of intelligent dewatering and water stopping for foundation pits involved in the present invention;

[0048] Figure 2 This is a schematic diagram of the structure of the precipitation well used in the present invention;

[0049] Figure 3 This is a schematic diagram of the distribution of precipitation wells, dewatering wells, and observation wells involved in one embodiment of the present invention;

[0050] Figure 4 A flow chart of the construction steps of a dewatering well according to the present invention;

[0051] Among them: 1. Skeleton steel bars; 2. Reinforcement stirrups; 3. Filter layer; 4. Nylon mesh; 5. Pump pipe. DETAILED DESCRIPTION

[0052] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention are within the scope of protection of the present invention.

[0053] In the description of the present invention, the terms "longitudinal", "transverse", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing the present invention and do not require that the present invention must be constructed and operated in a specific orientation. Therefore, they should not be understood as limitations on the present invention. The terms "connected" and "connected" used in the present invention should be understood in a broad sense. For example, it can be a fixed connection or a detachable connection; it can be a direct connection or an indirect connection through an intermediate component. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to the specific circumstances.

[0054] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that, in the absence of conflict, the embodiments and features of the embodiments of the present invention can be combined with each other.

[0055] Foundation pit dewatering refers to the dewatering work done when the groundwater level is higher than the excavation bottom surface during foundation pit excavation. Groundwater will continuously seep into the pit to ensure that the foundation pit can be constructed under dry conditions and to prevent slope instability, foundation sand flow, pit bottom uplift, pit bottom pipe burst and reduced foundation bearing capacity.

[0056] Groundwater is a common problem in foundation pit projects, significantly impacting their safe construction and quality. Therefore, adopting appropriate groundwater control technologies is a crucial component of foundation pit engineering. Because the water level drawdown curve around the pit varies significantly depending on the dewatering requirements, methods, and specific plans, different dewatering methods must be analyzed and compared to select the optimal solution, while still meeting basic dewatering requirements.

[0057] The intelligent dewatering and water-stopping methods for foundation pits involved in this application can be summarized into four methods: "dewatering, drainage, blocking, and interception". "Dewatering" means taking various measures to pump groundwater to achieve the goal of lowering the groundwater level; "drainage" means collecting water and draining it openly, which can be used for both surface water and groundwater; "blocking" means taking various blocking and intercepting measures to move groundwater to a controllable area to achieve the purpose of controlling the groundwater level; "interception" means placing groundwater on the outside of the foundation pit through a water-stop curtain, separating the groundwater inside and outside the foundation pit by physical methods, and then pumping the groundwater outside the foundation pit to achieve the purpose of groundwater control. The problem of groundwater control is involved in many types of projects, such as deep foundation pit projects, mining projects, bridge and tunnel projects, slope projects, road projects, and dam projects.

[0058] like Figure 1 As shown, the present application relates to a method for intelligent dewatering and water stopping of a foundation pit, the improvement of which is that the method comprises the following steps:

[0059] Step S1, Dewatering: Multiple dewatering wells are set up in the perimeter of the foundation pit; dewatering pumps are installed in the dewatering wells; and the water level in the dewatering wells is lowered to a preset position using the dewatering pumps. Specifically, Step S1, Dewatering: Within the perimeter of the foundation pit, the locations of the dewatering wells are determined based on the geological structure and hydrogeological conditions, with suitable locations selected for placement. Dewatering pumps are installed in the dewatering wells, ensuring that each is equipped with a high-efficiency dewatering pump; and the water level in the dewatering wells is lowered to a preset position using the dewatering pumps. The goal is to effectively lower the groundwater level through continuous dewatering activities, creating a stable working environment for foundation pit excavation.

[0060] Step S2, Drainage: A water collection system is installed at the bottom and sides of the foundation pit. The water collection system includes a water collection well and a water collection pipe. Water from the pit is drained through the water collection system. Specifically, step S2, Drainage: A water collection system is installed at the bottom and sides of the foundation pit. The water collection system includes a water collection well and a water collection pipe. Water from the bottom of the pit is drained through the water collection system. This allows for rapid drainage of surface water and groundwater accumulated within the pit, ensuring that the pit remains dry.

[0061] Step S3, Water Blocking: A groundwater barrier is installed around the foundation pit to prevent groundwater from flowing into the pit. Specifically, step S3, Water Blocking: A groundwater barrier is constructed around the foundation pit using specific materials or technical means to prevent groundwater from flowing into the pit. This groundwater barrier is designed to guide groundwater into a controllable area, thereby effectively controlling the groundwater level and minimizing the adverse effects of groundwater on the foundation pit.

[0062] Step S4, water interception: a water-stop curtain is set on the periphery of the foundation pit to block the exchange of water layers inside and outside the foundation pit; specifically, step S4, water interception: a water-stop curtain is set on the periphery of the foundation pit, and the curtain uses physical isolation means to effectively separate the groundwater inside and outside the foundation pit; then, the groundwater outside the foundation pit is pumped out to ensure that the water level in the foundation pit is stable and achieves the expected control effect.

[0063] Step S5, monitoring the well water level and initiating emergency measures: When the water level exceeds a preset safety range or the foundation pit stability index decreases, the automatic emergency measures system is activated; activating the automatic emergency measures system includes activating a water pump to lower the water level to the designed water level. Specifically, S5, monitoring the well water level and initiating emergency measures: When the water level exceeds a preset safety range or the foundation pit stability index decreases, the emergency measures system is automatically activated, including activating a water pump to lower the water level to the designed water level.

[0064] Preferably, the depth, location, and spacing of the dewatering wells in step S1 are determined based on a groundwater flow model and a lake water level dynamic change model:

[0065] Step S1-1, determining the depth of the precipitation wells based on the groundwater flow model, includes: According to the groundwater flow model, the depth of the precipitation wells must reach the aquifer to control the groundwater level within the foundation pit area; the depth of the precipitation wells is determined based on the annual average groundwater level, seasonal fluctuations, and groundwater flow direction and velocity. Specifically, according to the groundwater flow model, the depth of the precipitation wells should be designed to effectively reach the primary aquifer to effectively control the groundwater level within the foundation pit area; the depth determination needs to take into account the influence of the annual average groundwater level, seasonal fluctuations, and groundwater flow direction and velocity.

[0066] Step S1-2, determining the location of precipitation wells based on the groundwater flow model, includes: The location of precipitation wells is based on groundwater flow direction and velocity, with wells placed along primary groundwater flow paths to enhance precipitation efficiency. Specifically, the location of precipitation wells should be based on a detailed analysis of groundwater flow direction and velocity, ensuring they are located along primary groundwater flow paths to enhance precipitation efficiency. Furthermore, the geological structure should be taken into consideration to avoid placement along geological faults or weak zones.

[0067] Step S1-3, determining the spacing of the dewatering wells based on the groundwater flow model, includes: The spacing of the multiple dewatering wells is calculated and determined based on the groundwater flow model; the multiple dewatering wells must be distributed to cover the entire foundation pit area; the multiple dewatering wells must be independent of each other, and the groundwater level in the entire foundation pit area can be uniformly lowered. Specifically, the spacing of the dewatering wells should be calculated based on the groundwater flow model to ensure that the dewatering wells effectively cover the entire foundation pit area while avoiding mutual interference, ensuring a uniform groundwater level drop across the entire foundation pit area.

[0068] Step S1-4, determining the depth of the dewatering wells based on the lake water level dynamics model, includes: Based on the seasonal and interannual variations in the lake water level, the depth of the dewatering wells must be designed to accommodate groundwater pressure during periods of peak lake water levels, ensuring that the water level within the foundation pit is effectively controlled during these periods. Specifically, considering the seasonal and interannual variations in the lake water level, the depth of the dewatering wells must be designed to accommodate groundwater pressure during peak lake water levels, ensuring that the water level within the foundation pit remains effectively controlled during these periods.

[0069] Step S1-5, determining the location of the precipitation wells based on the lake water level dynamic change model, includes: locating the precipitation wells near a lake or water body based on the lake water level dynamic change model to control the rise in groundwater level caused by the lake water level rise. Specifically, based on the lake water level dynamic change model, the precipitation wells should be located in areas most affected by lake water level changes, particularly near the lake or water body, to more effectively control the rise in groundwater level caused by the lake water level rise.

[0070] Step S1-6, determining the spacing of dewatering wells based on the lake water level dynamics model, includes: Based on the dynamic changes in the lake water level, the spacing of the multiple dewatering wells is set according to the lake water level changes and the groundwater flow direction, thereby controlling the groundwater level within the foundation pit area during peak lake water level periods. Specifically, based on the dynamic changes in the lake water level, the spacing of the dewatering wells should be adjusted based on the sensitivity of the lake water level changes and the groundwater flow direction, ensuring that the groundwater level within the entire foundation pit area can be effectively controlled during peak lake water level periods and preventing lake water backflow.

[0071] Preferably, step S2 of setting up a water collection system includes:

[0072] Step S2-1: Determine the location of the water collection well. The location of the water collection well is determined based on the direction and concentration of water flow within the foundation pit. The water collection well is placed at a low point at the bottom of the foundation pit or in a water flow convergence area to collect accumulated water within the foundation pit. Specifically, setting up the water collection well includes determining the location of the water collection well. The location of the water collection well should be determined based on the direction and concentration of water flow within the foundation pit, preferably at a low point at the bottom of the foundation pit or in a water flow convergence area to effectively collect accumulated water within the foundation pit.

[0073] Step S2-2, Design the Sinkhole Structure: The structure of the sinkhole is designed based on the foundation pit depth, geological conditions, and expected water volume. The sinkhole's capacity and structural strength are sufficient to prevent collapse or blockage during precipitation. Specifically, the sinkhole's structural design must take into account the foundation pit depth, geological conditions, and expected water volume. The sinkhole should have sufficient capacity and structural strength to prevent collapse or blockage during precipitation.

[0074] Step S2-3 involves setting up water collection pipes, including pipe layout design. Water collection pipes are installed along the bottom and side walls of the foundation pit to form a water flow guidance and collection network. The layout design is based on the specific shape and size of the foundation pit, as well as the characteristics of the water flow. Specifically, the pipes should be strategically placed along the bottom and side walls of the foundation pit to form an efficient water flow guidance and collection network. The layout design should take into account the specific shape and size of the foundation pit, as well as the characteristics of the water flow. The material and specifications of the pipes should be selected based on the water volume and geological conditions within the foundation pit, ensuring pipe durability and sufficient flow channels. The installation and maintenance of the pipes should ensure that the pipes are installed with a sufficient slope to facilitate water flow and avoid dead corners or water accumulation. The design should also facilitate subsequent inspection and maintenance to ensure the long-term and effective operation of the water collection system.

[0075] Step S2-4: Connect the water collection well. Connect the water collection pipe to the water collection well to ensure that the water collected in the water collection well can be transported to the designated discharge location or treatment facility. Specifically, the water collection well should be effectively connected to the water collection pipe system to ensure that the water collected from the water collection well can be quickly and efficiently transported to the designated discharge location or treatment facility.

[0076] Preferably, step S3 of setting up a groundwater barrier includes:

[0077] Step S3-1, selecting a grouting material for forming a groundwater barrier, including: a polymer material or a chemical water-stopping agent, such as polyvinyl alcohol (PVA), polyacrylamide (PAM), or a specific chemical water-stopping agent such as an acrylic resin grouting material;

[0078] Step S3-2: Set up grouting holes and inject a cement-water-glass slurry around the foundation pit through them. Specifically, grouting holes are arranged from the inside of the foundation pit to reinforce and seal the soil outside the retaining piles. The grouting holes range from 2.4m to 9.1m deep, and the grouting area extends from the outside of the initial retaining pile to the bottom of the grouting hole. Cement-water-glass slurry is used.

[0079] In step S3-3, the polymer material or chemical water-stopping agent can combine with the water molecules in the soil to form a continuous and stable waterproof barrier around the foundation pit, so as to isolate the groundwater from entering the foundation pit.

[0080] Specifically, the groundwater barrier uses specific polymer materials or chemical water-stopping agents, which can quickly combine with water molecules in the soil to form a continuous and stable waterproof barrier.

[0081] Preferably, the specific solution of setting a water-stop curtain on the periphery of the foundation pit in step S4 is as follows: Step S4-1, selecting the material of the water-stop curtain, including polyethylene, polypropylene and polyvinyl chloride.

[0082] Step S4-2, setting up a water-stop curtain: design the depth, thickness and arrangement of the water-stop curtain based on the geological conditions, hydrological conditions and construction environment around the foundation pit; the water-stop curtain extends from the bottom of the foundation pit to the stratum at a preset depth to form a water-blocking layer.

[0083] Specifically, step S4-1 is to select the material of the water-stop curtain: the material selection of the water-stop curtain needs to take into account its waterproof effect, durability, adaptability to the environment and cost-effectiveness; polymer materials such as polyethylene (PE), polypropylene (PP), polyvinyl chloride (PVC) and ethylene-vinyl acetate copolymer (EVA) are widely used as water-stop curtain materials due to their excellent waterproof performance, anti-aging ability and environmental adaptability; at the same time, considering sustainability and environmental protection, environmentally friendly waterproof materials can be used; the selected materials should have good physical and chemical stability and be able to resist corrosion from chemical substances that may exist in groundwater; and should have sufficient mechanical strength and flexibility to adapt to geological changes or changes in ground load.

[0084] Step S4-2, Installing a Waterstop Curtain: Design the depth, thickness, and layout of the waterstop curtain based on the surrounding geological conditions, hydrological conditions, and construction environment. The waterstop curtain should extend from the bottom of the foundation pit to a certain depth of stratum, forming an effective water barrier to effectively isolate groundwater inside and outside the pit. Use appropriate construction techniques to install the waterstop curtain, including underground continuous walls, steel sheet piles, and chemical grouting. The selected method should ensure that the curtain is continuous and seamless, effectively blocking water flow. The joints of the waterstop curtain are critical to its waterproofing effectiveness and require specialized sealing materials and techniques to ensure the continuity and sealing of the entire curtain. After the waterstop curtain is installed, a monitoring mechanism should be established to regularly check its integrity and waterproofing effectiveness. If damage or leakage is found, it should be repaired or reinforced promptly.

[0085] Preferably, step S5 of well water level monitoring also includes: setting up an observation well; the structure of the observation well is the same as that of the dewatering well, and is set outside the foundation pit; a liquid level gauge is set in the observation well for automatically monitoring the water level, and when the water level reaches within the range of ±5cm of the design water level, the dewatering pump is automatically turned on to realize automatic dewatering of the foundation pit and ensure the stability of the foundation pit.

[0086] The structures of the precipitation well and observation well used in this application are the same, such as Figure 2 As shown, specifically: the precipitation well type is a well pipe type, and the precipitation well uses secondary steel with a diameter of 10mm and a spacing of 12mm along the circumference as the skeleton steel bar 1, and a reinforcing stirrup 2 with a diameter of 12mm and a spacing of 250mm is used to fix the skeleton steel bar. The wellhead diameter of the precipitation well is 400mm, and a filter layer 3 with a thickness of 100mm and coaxial with the well is set outside the wellhead, so the final well diameter is 600mm. Preferably, a 60-mesh nylon mesh 4 is also required between the wellhead and the filter layer to wrap the precipitation well to filter sand and gravel. The pump pipe 5 is set at the center of the precipitation well.

[0087] The emergency measures in step S5 include:

[0088] In step S5-1, water level sensors are installed inside and outside the foundation pit, and the water level sensors are connected to an automatic monitoring system. The water level sensors and the automatic monitoring system are used to collect real-time water level data and stability indicators inside and outside the foundation pit to evaluate the dewatering effect and the water level stability of the foundation pit. Specifically, the water level sensors and the automatic monitoring system are used to collect real-time water level data inside and outside the foundation pit to evaluate the dewatering effect and the water level stability of the foundation pit.

[0089] Step S5-2: Install inclinometers and stress sensors in the soil surrounding the foundation pit. Use the inclinometers and stress sensors to monitor displacement and stress changes in the soil and supporting structures surrounding the foundation pit. Obtain soil mechanical property data through field and laboratory tests, including soil density, void ratio, internal friction angle, and cohesion parameters. Use total stations, global navigation satellite systems, and laser scanning measurement technology to obtain deformation data to monitor the settlement and horizontal displacement of the foundation pit and its surrounding ground. Specifically, use tools such as inclinometers and stress sensors to monitor displacement and stress changes in the soil and supporting structures surrounding the foundation pit. Obtain soil parameters such as density, void ratio, internal friction angle, and cohesion through field and laboratory tests. Use modern measurement technologies such as total stations, global navigation satellite systems (GNSS), and laser scanning to monitor the settlement and horizontal displacement of the foundation pit and its surrounding ground.

[0090] Step S5-3, collecting relevant data in step S5-1 and step S5-2, the relevant data including water level data, stability index, soil mechanical property data, and deformation data.

[0091] Step S5-4, analyzing the relevant data; if the relevant data is within the preset range, repeating steps S5-1 to S5-3, if the relevant data exceeds the preset range, proceeding to step S5-5.

[0092] Step S5-5: When the water level rises or the stability of the foundation pit decreases, the observation well is started and the injection volume of the chemical water-stopping agent is increased to quickly respond to the situation of rising water level or decreased stability of the foundation pit.

[0093] Step S5-6, continuously repeating steps S5-1 to S5-5 until all relevant data are within the preset range, ensuring the stability and safety of the foundation pit.

[0094] Application scenarios:

[0095] Step S1: In the surrounding area of ​​the foundation pit, two foundation pit areas are selected according to the geological structure and hydrogeological conditions of the fully weathered, strongly weathered and moderately weathered granite layers, and drainage wells are arranged in each area.

[0096] Among them, the first area adopts pipe well dewatering, and a total of 55 dewatering wells in the first area are set up, with a well spacing of 10-15m, a well depth of 28m, and a pumping capacity of 5-15m³ / h; the center point of the dewatering well in the first area is 2m away from the outer edge of the support structure, and can be adjusted according to the actual situation on site during the specific construction period. The dewatering well type in the first area is a well pipe type, and the drainage wells are arranged on the inside of the foundation pit with a well spacing of 30m; the observation wells are arranged on the outside of the foundation pit with a spacing of 50m. Specifically, the drainage wells adopt the same structure as the dewatering wells mentioned above. Among them, there are no clear requirements for the relative positions of the dewatering wells and the observation wells. They are all adjusted according to the actual situation on site during the construction period. The following can be used Figure 3 The installation location is shown. There is no specific requirement for the spacing of observation wells. An observation well can be set up next to 3 to 5 water collection wells. The drainage wells are evenly distributed in the middle of the foundation pit.

[0097] Among them, the second area adopts pipe well dewatering, with a total of 42 dewatering wells in the second area, with a well spacing of 10-15m, a well depth of 28m, and a pumping capacity of 5-15m³ / h; the center point of the dewatering well in the second area is 2m away from the outer edge of the support structure, which can be adjusted according to the actual situation on site during the specific construction period. The dewatering well type in the second area is well pipe type, and the drainage wells are arranged on the inside of the foundation pit with a well spacing of 30m; the observation wells are arranged on the outside of the foundation pit with a spacing of 50m.

[0098] Specifically, such as Figure 4 The specific steps for constructing a dewatering well are as follows:

[0099] Step 1, construction preparation, includes:

[0100] Step 1-1: Make temporary construction fences and various warning signs;

[0101] Step 1-2: Connect temporary circuits and water pipes for construction;

[0102] Steps 1-3: Identify underground pipelines and underground structures.

[0103] Step 2, setting the location of the precipitation well, including:

[0104] Step 2-1, measure the placement points;

[0105] Step 2-2, verification;

[0106] Step 2-3, dig a test pit.

[0107] Step 3: bury the steel casing and build the mud pool.

[0108] Step 4: Position the drill and adjust it, including:

[0109] Step 4-1, aligning the drilling rig with the well site;

[0110] Step 4-2, adjust the horizontality and verticality of the drilling rig;

[0111] Step 4-3, check the drill bit diameter.

[0112] Step 5: Drill to the designed hole depth.

[0113] Step 6: Change the slurry and inspect the hole.

[0114] Step 7: Lower the well pipe and fill the filter material.

[0115] Step 8: washing the well, replenishing the filter material and sealing the upper part of the well;

[0116] Step 9, determine whether the installation of the precipitation well will affect traffic: if it affects traffic, proceed to step 9-1 to build a buried precipitation well; and proceed to step 9-2 to build an underground drainage branch pipe; if it does not affect traffic, proceed to step 10.

[0117] Step 10: Install the water pump to pump water.

[0118] The intelligent dewatering and water-stopping method for a foundation pit further comprises step S2: arranging a water collection system at the bottom and side walls of the foundation pit to collect seepage water from the bottom and side walls of the foundation pit;

[0119] The water collection system, consisting of a collection pipe and a collection well, is designed to quickly drain surface and groundwater accumulated within the foundation pit, ensuring the pit remains dry. The collection well utilizes a reinforced concrete structure that has undergone special treatments, such as the addition of waterproofing agents and fiber-reinforced concrete, to enhance its stability and durability. The collection pipe, located at the center of the collection well, is constructed of corrosion-resistant and durable high-density polyethylene (HDPE) to ensure high corrosion resistance and a long service life.

[0120] The water collection pipe should be arranged below the bottom plate of the foundation pit and guide the water to the water collection well through a slope; the water collection well should be set at the low point of the foundation pit to utilize gravity drainage.

[0121] The intelligent dewatering and water-stopping method for foundation pits also includes step S3: determining the best location around the foundation pit and using specific materials or technical means to construct a groundwater blocking barrier, such as a grouting curtain or a soil nail wall.

[0122] Groundwater barrier materials can be selected from polymer materials such as polyvinyl alcohol (PVA), polyacrylamide (PAM) or specific chemical water-stopping agents such as acrylic resin grouting materials.

[0123] The construction method uses grouting or other appropriate technical means to inject materials into the soil layer to combine with the soil and water molecules. It is necessary to ensure that the material or water-stopping agent can quickly combine with the water molecules in the soil to form a continuous and stable waterproof barrier.

[0124] The intelligent dewatering and water-stopping method for the foundation pit further includes step S4: setting a water-stopping curtain around the periphery of the foundation pit;

[0125] Select a suitable location outside the foundation pit to set up a water-stop curtain;

[0126] Waterstop curtains are usually made of polymer materials or other advanced waterproof materials, such as polyvinyl chloride (PVC) or ethylene-vinyl acetate copolymer (EVA), to effectively isolate groundwater inside and outside the foundation pit.

[0127] During construction, use excavation or piling machinery to embed the water-stop curtain into the ground at an appropriate depth, ensuring that the water-stop curtain is connected to the groundwater barrier to form a continuous waterproof system and maintain a stable water level in the foundation pit.

[0128] The intelligent dewatering and water-stopping method for foundation pits also includes step S5: when the water level of the foundation pit exceeds a preset safety range or the foundation pit stability index decreases, starting the emergency measures system.

[0129] The emergency measures system is activated to automatically initiate additional precipitation measures and increase the injection volume of water-stopping agents when abnormal water levels or stability indicators are monitored to ensure the absolute safety of the foundation pit.

[0130] Preferably, the emergency response involves automatically activating additional dewatering wells and increasing the injection of chemical waterstops when the automatic monitoring system detects that the pit water level exceeds a preset safety range or that the pit stability indicator has decreased, thereby ensuring the absolute safety of the pit. The key to automatically activating observation wells and increasing the injection of chemical waterstops lies in the automatic monitoring system and control device, where water level sensors are installed inside and outside the pit to monitor changes in the pit water level in real time.

[0131] A data acquisition system collects water level data, stability indicators, soil mechanical properties, and deformation data. A controller uses this data to determine whether emergency measures need to be initiated. The controller can be an embedded system, programmable logic controller, or other control device. The activation actuator is used to actually execute dewatering and chemical waterstop injection. This includes a dewatering pump to activate the dewatering well and an automated chemical injection system.

[0132] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention are within the scope of protection of the pending claims of the present invention.

Claims

1. A method for intelligent dewatering and water stopping of foundation pit, It is characterized in that The method comprises the following steps: Step S1, dewatering: multiple dewatering wells are arranged around the foundation pit; dewatering pumps are arranged in the dewatering wells; the water level in the dewatering wells is lowered to a preset position by the dewatering pumps; Step S2, drainage: a water collection system is set at the bottom and side walls of the foundation pit; the water collection system includes a water collection well and a water collection pipe; the water inside the foundation pit is drained through the water collection system; Step S3, water blocking: setting up a groundwater blocking barrier around the foundation pit to block the groundwater outside the foundation pit from flowing into the foundation pit; Step S4, water blocking: a water-stop curtain is set at the periphery of the foundation pit to block the water layer communication between the inside and outside of the foundation pit; Step S5, monitoring the well water level and starting emergency measures: when the water level exceeds the preset safety range or the foundation pit stability index decreases, the automatic emergency measures system is started; the automatic emergency measures system is started including starting the dewatering pump to dewater until the designed water level; Step S1 includes: the depth, location and spacing of the precipitation wells are determined according to the groundwater flow model and the lake water level dynamic change model: Step S1-1, determining the setting depth of the precipitation well according to the groundwater flow model includes: according to the groundwater flow model, the depth of the precipitation well needs to reach the aquifer so as to control the groundwater level in the foundation pit area; the setting depth of the precipitation well is determined according to the annual average water level of the groundwater level, seasonal fluctuations, and the flow direction and velocity of the groundwater; Step S1-2, setting the position of the precipitation well according to the groundwater flow model includes: the setting position of the precipitation well is based on the groundwater flow direction and flow velocity, and the precipitation well is arranged on the main flow path of the groundwater to enhance the precipitation efficiency; Step S1-3, determining the spacing of the precipitation wells according to the groundwater flow model includes: the spacing of the plurality of precipitation wells is determined by calculation according to the groundwater flow model, the plurality of precipitation wells are arranged to cover the entire foundation pit area, the plurality of precipitation wells are independent of each other, and the groundwater level of the entire foundation pit area can be uniformly reduced; Step S1-4, determining the depth of the precipitation well according to the lake water level dynamic change model includes: according to the seasonal and interannual changes in the lake water level, the depth of the precipitation well needs to adapt to the groundwater pressure during the period of the highest lake water level, and can control the water level inside the foundation pit during the period of the highest lake water level; Step S1-5, determining the location of the precipitation well according to the lake water level dynamic change model includes: arranging the precipitation well on a side close to the lake or water body according to the lake water level dynamic change model, so as to control the situation where the groundwater level rises due to the increase of the lake water level; Step S1-6, determining the spacing of the precipitation wells according to the lake water level dynamic change model includes: based on the dynamic change of the lake water level, the spacing of the plurality of precipitation wells is set according to the lake water level change and the flow direction of the groundwater, so as to control the groundwater level in the foundation pit area during the peak period of the lake water level; The well water level monitoring in step S5 further includes: setting an observation well; the observation well is set outside the foundation pit; a liquid level gauge is set in the observation well for automatically monitoring the water level, and when the water level reaches the range of ±5cm of the designed water level, the precipitation pump is automatically turned on; The initiation of emergency measures in step S5 includes: Step S5-1, water level sensors are installed inside and outside the foundation pit, and the water level sensors are connected to the automatic monitoring system; the water level sensors and the automatic monitoring system are used to collect water level data and stability indicators inside and outside the foundation pit in real time, so as to evaluate the precipitation effect and the water level stability of the foundation pit; Step S5-2, setting an inclinometer and a stress sensor in the soil around the foundation pit; using the inclinometer and the stress sensor to monitor the displacement and stress changes of the soil and the supporting structure around the foundation pit, and obtaining soil mechanical property data through field tests and indoor tests: soil density, porosity, internal friction angle and cohesion parameters; using a total station, a global navigation satellite system and laser scanning measurement technology to obtain deformation data to monitor the settlement and horizontal displacement of the foundation pit and its surrounding ground; Step S5-3, collecting relevant data in step S5-1 and step S5-2, wherein the relevant data includes water level data, stability index, soil mechanical property data, and deformation data; Step S5-4, analyzing the relevant data; if the relevant data is within the preset range, repeating steps S5-1 to S5-3, and if the relevant data exceeds the preset range, proceeding to step S5-5; Step S5-5, when the water level rises or the stability of the foundation pit decreases, start the observation well and increase the injection amount of the chemical water-stopping agent; Step S5-6, continuously repeating steps S5-1 to S5-5 until all relevant data are within a preset range.

2. The intelligent dewatering and water stopping method for foundation pit according to claim 1, It is characterized in that Step S2 of setting up the water collection system includes: Step S2-1, determining the location of the water collection well; the location of the water collection well is determined according to the water flow direction and the concentrated area inside the foundation pit; the water collection well is arranged at the low point or water flow convergence area at the bottom of the foundation pit to collect the accumulated water in the foundation pit; Step S2-2, designing the structure of the water collection well: designing the structure of the water collection well according to the foundation pit depth, geological conditions and expected water volume; the capacity and structural strength of the water collection well are sufficient to cope with the situation of collapse or blockage during precipitation; Step S2-3, setting water collecting pipes, including water collecting pipe layout design: the water collecting pipes are set along the bottom and side walls of the foundation pit to form a water flow guiding and collecting network; the water collecting pipe layout design is designed according to the specific shape and size of the foundation pit and the characteristics of water flow collection; Step S2-4, connecting the water collection well, the water collection pipe is connected to the water collection well, ensuring that the water collected in the water collection well can be transported to a designated discharge location or treatment facility.

3. The intelligent dewatering and water stopping method for foundation pit according to claim 1, It is characterized in that Step S3 of setting up a groundwater barrier comprises: Step S3-1, selecting a grouting material for forming the groundwater barrier, including: a polymer material or a chemical water-stopping agent; Step S3-2, setting a grouting hole, and injecting cement-water-glass double slurry into the periphery of the foundation pit through the grouting hole; Step S3-3, the polymer material or chemical water-stopping agent can combine with water molecules in the soil to form a continuous and stable waterproof barrier around the foundation pit to isolate groundwater from entering the foundation pit.

4. The intelligent dewatering and water stopping method for foundation pit according to claim 1, It is characterized in that Step S4 of setting a water-stop curtain around the foundation pit also includes: Step S4-1, selecting the material of the water-stop curtain, including polyethylene, polypropylene and polyvinyl chloride; Step S4-2, setting a water-stop curtain: design the depth, thickness and arrangement of the water-stop curtain according to the geological conditions, hydrological conditions and construction environment around the foundation pit; the water-stop curtain extends from the bottom of the foundation pit to a stratum of a preset depth to form a water-blocking layer.