A robot path planning method and system
Through environment modeling and dynamic obstacle avoidance optimization technology, the dynamic ability of robot path planning is improved, the problem of poor dynamic planning ability in the existing technology is solved, and the movement efficiency and stability of the robot in complex environments are improved.
Patent Information
- Application Number
- CN202410732389.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-07
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-06-07
AI Technical Summary
Existing robot path planning technology has poor dynamic planning capabilities in dynamic environments, which affects robot motion efficiency.
By obtaining the map information of the target environment for environment modeling, extracting task points for global path planning, combining obstacle determination and dynamic obstacle avoidance to generate a dynamic adjustment parameter set, optimizing the local path planning scheme, and generating an intelligent path planning scheme.
It improves the dynamic capability and movement efficiency of robot path planning, and enhances the adaptability and stability in complex environments.
Smart Images

Figure CN118310535B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of wind turbine monitoring, and in particular to a robot path planning method and system. Background Art
[0002] In the field of robotics, path planning is a key task that allows robots to find the optimal or most suitable path in a complex environment to reach a specific target point.
[0003] Traditional robot path planning methods usually assume that the environment is static, but in actual applications, the environment often contains dynamic obstacles, which may cause the planned path to become invalid during execution, and trajectory planning may become very difficult when multiple goals need to be met at the same time. Existing robot path planning technology has poor dynamic planning capabilities, which affects the technical problems of robot motion efficiency. Summary of the invention
[0004] The present invention provides a robot path planning method and system to solve the technical problem in the prior art that the dynamic planning ability is poor and affects the robot's motion efficiency, and achieve the technical effect of improving the dynamic planning ability and improving the robot's motion efficiency and stability.
[0005] In a first aspect, the present invention provides a robot path planning method, wherein the method comprises:
[0006] Obtain map information of the target environment to perform environmental modeling and generate a driving environment space model;
[0007] Mapping the target task to the driving environment space model based on the task requirements, extracting N task points of the robot, where N is an integer greater than or equal to 1;
[0008] Performing global path planning based on the N task points to generate a first global path planning solution, wherein the first global path planning solution includes multiple local path planning solutions;
[0009] Extracting local paths according to the multiple local path planning schemes to perform obstacle determination, performing dynamic obstacle avoidance according to the determination results, and generating a dynamic adjustment parameter set;
[0010] Optimize the multiple local path planning solutions according to the dynamically adjusted parameter set, generate multiple local optimized path planning solutions, update the first global path planning solution, and output a second global path planning solution;
[0011] Execute the second global path planning solution to perform intelligent path planning for the robot.
[0012] In this method, the environment modeling is performed by obtaining the map information of the target environment, and then the target task is mapped to the environment space model, thereby realizing the effective combination of task requirements and environment. Based on the task requirements, global path planning is performed to generate a first global path planning scheme, which includes multiple local path planning schemes. Then, a dynamic adjustment parameter set is generated based on obstacle judgment and dynamic obstacle avoidance, and multiple local path planning schemes are optimized to generate multiple local optimized path planning schemes. Finally, the first global path planning scheme is updated to the second global path planning scheme, thereby realizing intelligent planning and optimization of the path.
[0013] In this method, a dynamic adjustment parameter set is generated according to the obstacle determination results, which realizes the real-time adjustment and optimization of the local path planning scheme and enhances the path planning capability and adaptability of the robot.
[0014] In a second aspect, the present invention further provides a robot path planning system, wherein the system comprises:
[0015] An environmental space digitization module, which is used to obtain map information of the target environment to perform environmental modeling and generate a driving environment space model;
[0016] A task target mapping module, the task target mapping module is used to map the target task to the driving environment space model based on the task requirements, and extract N task points of the robot, where N is an integer greater than or equal to 1;
[0017] A path planning module, wherein the path planning module is used to perform global path planning based on the N task points and generate a first global path planning solution, wherein the first global path planning solution includes multiple local path planning solutions;
[0018] An obstacle avoidance adjustment module, the obstacle avoidance adjustment module is used to extract a local path according to the multiple local path planning schemes to perform obstacle determination, perform dynamic obstacle avoidance according to the determination result, and generate a dynamic adjustment parameter set;
[0019] A local update module, the local update module is used to optimize the paths of the multiple local path planning schemes according to the dynamically adjusted parameter set, generate multiple local optimized path planning schemes to update the first global path planning scheme, and output a second global path planning scheme;
[0020] A path planning application module is used to execute the second global path planning solution to perform intelligent path planning for the robot.
[0021] The present invention discloses a robot path planning method and system, including: obtaining target environment map information and generating a driving environment space model. Mapping the target task to the environment model and extracting N task points of the robot. Performing global path planning and generating a first global path planning scheme, which includes multiple local path planning schemes. Extracting local paths for obstacle determination, performing dynamic obstacle avoidance according to the results, and generating a dynamic adjustment parameter set. Performing path optimization on the local path planning scheme, generating multiple local optimized path planning schemes, updating the first global path planning scheme, and outputting a second global path planning scheme. Executing the second global path planning scheme to plan the path of the robot. The robot path planning method and system disclosed in the present invention solve the technical problem of poor dynamic planning capability and affecting the robot's motion efficiency, and achieve the technical effect of improving dynamic planning capability and improving the robot's motion efficiency and stability. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 The figure is a flow chart of a robot path planning method according to the present invention.
[0023] Figure 2 The figure is a schematic diagram of the structure of a robot path planning system of the present invention.
[0024] Explanation of the reference numerals: environment space digitization module 11, task target mapping module 12, path planning module 13, obstacle avoidance adjustment module 14, local update module 15, planned path application module 16. DETAILED DESCRIPTION
[0025] The technical solution provided in the embodiments of the present invention is to solve the technical problem that the prior art has poor dynamic planning ability and affects the motion efficiency of the robot. The overall idea adopted is as follows:
[0026] First, the map information of the target environment is obtained to perform environmental modeling and generate a driving environment space model;
[0027] Next, based on the task requirements, the target task is mapped to the driving environment space model, and N task points of the robot are extracted, where N is an integer greater than or equal to 1;
[0028] Then, performing global path planning based on the N task points to generate a first global path planning solution, wherein the first global path planning solution includes multiple local path planning solutions;
[0029] Next, extracting local paths according to the multiple local path planning schemes to perform obstacle determination, performing dynamic obstacle avoidance according to the determination results, and generating a dynamic adjustment parameter set;
[0030] Finally, the multiple local path planning schemes are optimized according to the dynamically adjusted parameter set, multiple local optimized path planning schemes are generated to update the first global path planning scheme, and a second global path planning scheme is output;
[0031] Execute the second global path planning solution to perform intelligent path planning for the robot.
[0032] The above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods of the specification to better understand the above technical solution. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments of the present invention. It should be understood that the present invention is not limited to the example embodiments used only to explain the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention. In addition, it should be noted that, for the convenience of description, only the parts related to the present invention are shown in the drawings, rather than all of them.
[0033] Embodiment 1
[0034] Figure 1 The present invention is a schematic flow chart of a robot path planning method; wherein, it includes:
[0035] Obtain map information of the target environment to perform environmental modeling and generate a driving environment space model;
[0036] In some embodiments, map information of a target environment is obtained to perform environment modeling and generate a driving environment space model, and the method includes:
[0037] Use surveying and mapping equipment to conduct on-site surveying and mapping of the target environment to obtain initial map information of the target environment;
[0038] Performing data preprocessing on the initial map information of the target environment to generate the map information of the target environment;
[0039] Extracting key features of the map information, wherein the key features include road boundary features, road traffic features, obstacle location features, and building location features;
[0040] Constructing obstacle point cloud data and building point cloud data based on the obstacle position features and the building position features;
[0041] The driving environment space model is generated according to the road boundary features and the road traffic features using the obstacle point cloud data and the building point cloud data.
[0042] Optionally, the target environment is surveyed and mapped using surveying and mapping equipment, where surveying and mapping equipment refers to tools used to measure and record geographic spatial data, such as laser scanners, drones, etc. The target environment is surveyed and mapped using surveying and mapping equipment to obtain initial map information of the environment, which includes spatial location data of terrain, landforms, buildings, obstacles, etc.
[0043] Optionally, the acquired map information is processed to remove noise and convert it into a usable map data format. As needed, the surveyed data is preprocessed such as denoising, coordinate calibration, and data format unification to ensure data accuracy and consistency, and then the preprocessed data is integrated to generate map information of the target environment.
[0044] Optionally, the key features of the map information refer to map information elements that have a significant impact on driving decisions. Specifically, by analyzing the map information, features that are critical to driving decisions are identified and extracted, such as road boundaries, traffic conditions, and specific locations of obstacles and buildings.
[0045] Furthermore, the extracted obstacle and building location features are used to construct corresponding point cloud data, which reflects the distribution of obstacles and buildings in three-dimensional space. Then, a comprehensive driving environment spatial model is generated by combining road boundary features, road traffic features, and point cloud data of obstacles and buildings. The driving environment spatial model is a three-dimensional model that describes the driving environment in detail, including information such as roads, obstacles, and buildings.
[0046] Preferably, the environment map is constructed through SLAM (Simultaneous Localization and Mapping) technology. Through this process, an accurate spatial model of the driving environment is created, providing important data support for the robot's navigation and decision-making in complex environments.
[0047] Mapping the target task to the driving environment space model based on the task requirements, extracting N task points of the robot, where N is an integer greater than or equal to 1;
[0048] In some embodiments, based on the task requirements, the target task is mapped to the driving environment space model, and N task points of the robot are extracted. The method includes:
[0049] Decomposing the target task based on the task requirements to obtain multiple subtasks;
[0050] Constructing the task layer, and determining multiple key point information of the multiple subtasks in the task layer according to the execution areas of the multiple subtasks;
[0051] The task layer is spatially aligned with the driving environment space model, and the multiple key point information is synchronously mapped to the driving environment space model for annotation to generate the N task points of the robot.
[0052] Optionally, the target task is decomposed into multiple subtasks according to task requirements, so as to decompose the complex overall task into multiple smaller and manageable subtasks, which is convenient for path planning. Specifically, by analyzing the task requirements, the target task is decomposed into multiple subtasks according to multiple target points of the task, wherein each subtask is part of the overall task and has clear execution goals and requirements. For example, for the distribution and packaging task, it can be decomposed into multiple point-to-point transportation tasks.
[0053] Optionally, a task layer is constructed to represent the task execution area and key point information. Multiple subtasks correspond to multiple task layers, and the multiple task layers are marked with the execution areas of multiple subtasks and the key point information within the execution areas. Among them, the key point is the location where the subtask starts or ends, or an important checkpoint in the execution process. Exemplarily, for point-to-point moving tasks, the key points are the starting point and the end point. For inspection tasks, the key points are the control points on the inspection route. For handling tasks, the key points include cargo pickup points, placement points, and possible intermediate transfer points.
[0054] Optionally, spatial alignment refers to the process of matching the key point information on the task layer with the position in the actual driving environment spatial model. By aligning the task layer with the driving environment spatial model, it is ensured that the key point information on the task layer corresponds to the actual position in the spatial model.
[0055] Furthermore, the key point information on the task layer is mapped to the driving environment space model, and each key point is labeled. Then, based on the results of mapping and labeling, N task points that the robot needs to reach when performing the task are generated. These task points will serve as the basis for the robot to navigate and perform tasks.
[0056] Through this process, abstract task requirements are converted into precise location points that the robot can understand and execute, making it easier for the robot to subsequently plan paths to complete complex tasks in a real environment.
[0057] Performing global path planning based on the N task points to generate a first global path planning solution, wherein the first global path planning solution includes multiple local path planning solutions;
[0058] In some embodiments, performing global path planning based on the N task points to generate a first global path planning solution includes:
[0059] Constructing an execution sequence table of the N task points based on the correlation coefficients between the N task points;
[0060] Parsing the execution sequence table of the N task points to determine whether the execution area is a plurality of areas;
[0061] If yes, the execution sequence list of the N task points is subjected to regional clustering to obtain multiple task point set groups, the initial position of the robot is taken as the starting point, the multiple task point set groups are traversed according to the execution sequence list of the N task points to perform local path planning for the first task point set group, and a first local path planning scheme is generated, and this is iterated until multiple task point set groups are traversed to obtain the multiple local path planning schemes;
[0062] Path connection is performed based on the multiple local path planning solutions to generate the first global path planning solution.
[0063] Among them, the correlation coefficient refers to the quantitative index of the relationship between task points, such as distance, time, efficiency, etc. According to the correlation coefficient between task points, an execution sequence table is constructed to determine the execution order of task points. Exemplarily, first, the strength of the correlation relationship is determined based on factors such as the distance and time relationship between task points, where the time relationship is the first order of magnitude, the distance is the second order of magnitude, and the strength of the correlation relationship is the correlation coefficient with the time relationship being the high digit and the distance being the low digit; then, according to the correlation coefficient, an algorithm such as topological sorting is used to determine the execution order of task points to ensure that the correlation between task points is satisfied.
[0064] Optionally, analyze the execution sequence table to determine whether the task points are distributed in multiple different areas. If so, it is necessary to perform regional clustering on the execution sequence table of N task points, group the task points according to the area they are located in, and obtain multiple task point set groups. Among them, each task point set group contains all the task points that need to be executed in a region. Through region-based clustering analysis, the task points in a region are aggregated together for path planning, which helps to improve the efficiency of path planning.
[0065] Optionally, the robot's initial position is used as a starting point to traverse multiple task point sets for local path planning, wherein local path planning refers to planning an optimal path from a current point to a next task point in a single area.
[0066] Specifically, starting from the initial position of the robot, according to the order of task execution, the path planning algorithm (such as A* algorithm, Dijkstra algorithm, etc.) is used to plan the path of the robot from the starting point to the target point in the area of the task point, generate a local path planning scheme, and then update the end point in the local path planning scheme to the target point, and prepare to execute the local path planning of the next task point. This process is iterative until all task point groups are traversed and multiple local path planning schemes are generated.
[0067] Optionally, multiple local path planning schemes are integrated and optimized to ensure smooth transition between different areas and generate a global path planning scheme covering all mission points. Specifically, it includes planning the intermediate paths of multiple local path planning schemes based on the sequence relationship and start and end points of multiple local path planning schemes, and connecting multiple local path planning schemes through the planned intermediate paths.
[0068] Through the above process, an optimized global path planning solution is provided for the robot to ensure that the robot can complete all task points efficiently and orderly.
[0069] Extracting local paths according to the multiple local path planning schemes to perform obstacle determination, performing dynamic obstacle avoidance according to the determination results, and generating a dynamic adjustment parameter set;
[0070] In some embodiments, extracting a local path according to the multiple local path planning schemes to determine obstacles, performing dynamic obstacle avoidance according to the determination results, and generating a dynamic adjustment parameter set, the method includes:
[0071] Execute a first local path planning scheme based on the driving environment space model to determine a local path;
[0072] Determining whether there is obstacle point cloud data in the local path;
[0073] If so, based on the obstacle point cloud data, fuzzy calculation is performed on the local path to make an obstacle avoidance decision;
[0074] Execute the obstacle avoidance decision and generate dynamic adjustment instructions in combination with the real-time path information collected by the camera embedded in the robot;
[0075] The obstacle avoidance decision is updated based on the dynamic adjustment instruction for replanning, and the dynamic adjustment parameter set is generated.
[0076] Optionally, first, based on the first local path planning scheme, a local path is obtained, specifically, the local path is obtained according to the task characteristics corresponding to the first local path. Then, based on the driving environment spatial model and the local path, obstacle judgment is performed to check whether there is obstacle point cloud data on the local path to determine whether the path needs to be adjusted to avoid the obstacle.
[0077] If there are obstacles on the path, fuzzy computing methods are used to make obstacle avoidance decisions, including evaluating the size, shape and position of the obstacle, as well as the dynamic characteristics of the robot, to determine the best obstacle avoidance path. Fuzzy computing is a computing method for processing uncertain information, which processes ambiguous or imprecise data by imitating human fuzzy logic.
[0078] Exemplarily, fuzzy calculation is performed on the local path to make obstacle avoidance decisions, including: processing and analyzing obstacle point cloud data to identify the location, shape and size of the obstacle. According to the location and shape of the obstacle, combined with the robot's movement ability and safety requirements, obstacle avoidance decisions are made, including strategies such as early avoidance, detour or stop avoidance. Using fuzzy logic methods, the specific actions to be taken are calculated based on the location of the obstacle and the current state of the robot. Fuzzy calculation takes into account uncertainty and ambiguity, and can better adapt to obstacle avoidance needs in complex environments. Based on the results of fuzzy calculation, specific obstacle avoidance instructions are generated, including measures such as adjusting the robot's speed, direction or stop, to ensure that the robot passes the obstacle safely.
[0079] Optionally, while executing obstacle avoidance decisions, the robot uses an embedded camera to collect real-time images of the surrounding environment and combines them with pre-planned path information to generate dynamic adjustment instructions. Then, according to the dynamic adjustment instructions, the obstacle avoidance decision is updated, the local path is replanned, and a dynamic adjustment parameter set is generated. The dynamic adjustment parameter set is used to dynamically adjust the robot's navigation and behavior to adapt to environmental changes.
[0080] Optimize the multiple local path planning solutions according to the dynamically adjusted parameter set, generate multiple local optimized path planning solutions, update the first global path planning solution, and output a second global path planning solution;
[0081] In some embodiments, the method of performing path optimization on the multiple local path planning schemes according to the dynamically adjusted parameter set to generate multiple local optimized path planning schemes includes:
[0082] Decompose the robot's driving parameters to obtain the robot's driving speed and steering angle;
[0083] Mapping the dynamic adjustment parameter set to the multiple local path planning schemes to dynamically adjust the path, and obtain a path adjustment information set, wherein the path adjustment information set includes path length information and path curvature information;
[0084] Performing obstacle avoidance analysis according to the travel speed of the robot based on the path length information to obtain first obstacle avoidance data;
[0085] Performing obstacle avoidance analysis according to the steering angle of the robot based on the path curvature information to obtain second obstacle avoidance data;
[0086] The first obstacle avoidance data and the second obstacle avoidance data are added to the multiple local path planning schemes to generate the multiple local optimized path planning schemes.
[0087] Optionally, the local path planning scheme is optimized based on the robot's driving parameters to ensure that the path generated by the local path planning scheme meets the robot's motion capability, thereby improving the safety and stability of the robot's motion. The robot's driving parameters include the robot's driving speed and the robot's steering angle.
[0088] Specifically, the path length information and the driving speed of the robot are used to analyze the obstacle avoidance strategy required when the robot encounters an obstacle on the current path, and the first obstacle avoidance data is generated. The first obstacle avoidance data includes information such as a safety distance and a braking distance.
[0089] Furthermore, the steering angle is crucial for the robot to bypass obstacles, which determines whether the robot can safely turn in a space-constrained environment. According to the path curvature information and the robot's steering angle, the steering strategy required for the robot to bypass obstacles is analyzed. If the path curvature information does not meet the robot's minimum turning radius at the corresponding speed, the path curvature is adjusted to generate the second obstacle avoidance data, including the adjusted path curvature, steering speed, etc.
[0090] Optionally, the local optimized path planning scheme refers to a scheme that optimizes and adjusts the original path planning after considering the obstacle avoidance data. By integrating the first obstacle avoidance data and the second obstacle avoidance data into the original multiple local path planning schemes, a new, optimized path planning scheme is generated and stored as a local optimized path planning scheme. The local optimized path planning scheme can better adapt to obstacles in the environment and ensure the safe driving of the robot.
[0091] In some implementations, multiple local optimized path planning solutions update the first global path planning solution, and output a second global path planning solution, the method includes:
[0092] Evaluate the driving efficiency of the multiple local optimized path solutions to obtain multiple efficiency evaluation results;
[0093] Perform weight training of the multiple local optimization path solutions based on the multiple efficiency evaluation results to obtain weight allocation information;
[0094] Taking the first local optimization path solution as a vertex, constructing edges according to the reachability and distance relationship between the local paths in the multiple local optimization path solutions, and constructing a local optimization path graph;
[0095] The first global path planning scheme is traversed to optimize and align with the multiple local optimization path schemes, and the local optimization path schemes corresponding to M local optimization paths are extracted in the local optimization path graph according to the weight distribution information to update and replace the first global path planning scheme to generate the second global path planning scheme, where M is an integer greater than or equal to 1.
[0096] Optionally, a driving efficiency evaluation is performed on multiple local optimized path solutions, including analyzing the local optimized path solutions, calculating the driving time, energy consumption, resource utilization and other indicators of each solution, and performing a weighted sum of multiple indicators based on the target task preference to obtain multiple efficiency evaluation results. Among them, the efficiency evaluation result is a quantitative expression of the efficiency of each local optimized path solution.
[0097] Optionally, performing weight training of multiple local optimization path solutions based on multiple efficiency evaluation results to obtain weight allocation information refers to the process of prioritizing each local optimization path solution according to the efficiency evaluation results. Among them, the local optimization path solution with better efficiency evaluation results has a higher weight.
[0098] Optionally, the first local optimization path solution is used as a vertex, and edges are constructed according to the reachability and distance relationship between local paths in multiple local optimization path solutions. If two local paths can be directly reached and the distance is short, an edge is constructed between them, and then the vertex edges are combined together to construct a local optimization path graph. Each vertex in the graph represents an endpoint of a local path, and the edge represents the reachability relationship and distance relationship between two local paths.
[0099] Traversing the first global path planning scheme and optimizing and aligning the multiple local optimized path schemes refers to matching and adjusting the global path planning scheme with the local optimized path schemes to improve the efficiency and effect of the overall path planning.
[0100] Specifically, first, according to the weight distribution information, M local optimization path solutions corresponding to the M local optimization paths that meet the preset weight constraints are extracted in the local optimization path graph, and the above-mentioned M local optimization path solutions have good efficiency evaluation results. Then, based on the M local optimization path solutions, the first global path planning solution is updated and replaced to generate a second global path planning solution, wherein the second global path planning solution is based on the optimization result of the first global path planning solution and the M local optimization path solutions. This solution combines the advantages of global path planning and local path planning, and improves the efficiency and effect of path planning.
[0101] Execute the second global path planning solution to perform intelligent path planning for the robot.
[0102] Optionally, a second global path planning scheme is used to formulate a driving path from the starting point to the end point for the robot. This path is globally optimized and locally adjusted to ensure that the robot can complete the task efficiently and safely.
[0103] In summary, the robot path planning method provided by the present invention has the following technical effects:
[0104] By acquiring the map information of the target environment, environmental modeling is performed to generate a driving environment space model;
[0105] Based on the task requirements, the target task is mapped to the driving environment space model, and N task points of the robot are extracted, where N is an integer greater than or equal to 1; global path planning is performed based on the N task points to generate a first global path planning solution, which includes multiple local path planning solutions; local paths are extracted according to multiple local path planning solutions to determine obstacles, and dynamic obstacle avoidance is performed according to the determination results to generate a dynamic adjustment parameter set; multiple local path planning solutions are optimized according to the dynamic adjustment parameter set to generate multiple local optimized path planning solutions to update the first global path planning solution and output a second global path planning solution; the second global path planning solution is executed to perform intelligent path planning for the robot. This achieves the technical effect of improving the dynamic planning capability and improving the robot's motion efficiency and stability.
[0106] Embodiment 2
[0107] Figure 2 Schematic diagram of a robot path planning system of the present invention. Figure 1 The schematic flow chart of a robot path planning method of the present invention can be shown as follows: Figure 2 The structure shown is implemented.
[0108] Based on the same concept as the robot path planning method in the embodiment, the present invention also provides a robot path planning system including:
[0109] The environment space digitization module 11 is used to obtain the map information of the target environment to perform environment modeling and generate a driving environment space model;
[0110] A task target mapping module 12 is used to map the target task to the driving environment space model based on the task requirements, and extract N task points of the robot, where N is an integer greater than or equal to 1;
[0111] A path planning module 13, configured to perform global path planning based on the N task points and generate a first global path planning solution, wherein the first global path planning solution includes multiple local path planning solutions;
[0112] The obstacle avoidance adjustment module 14 is used to extract the local path according to the multiple local path planning schemes to determine the obstacles, perform dynamic obstacle avoidance according to the determination results, and generate a dynamic adjustment parameter set;
[0113] A local update module 15, configured to perform path optimization on the multiple local path planning schemes according to the dynamically adjusted parameter set, generate multiple local optimized path planning schemes to update the first global path planning scheme, and output a second global path planning scheme;
[0114] The planning path application module 16 is used to execute the second global path planning solution to perform intelligent path planning for the robot.
[0115] The environment space digitization module 11 includes:
[0116] A surveying and mapping acquisition unit is used to conduct on-site surveying and mapping of the target environment using surveying and mapping equipment to obtain initial map information of the target environment;
[0117] A preprocessing unit, used for performing data preprocessing on the initial map information of the target environment to generate the map information of the target environment;
[0118] A key extraction unit, used to extract key features of the map information, wherein the key features include road boundary features, road traffic features, obstacle location features, and building location features;
[0119] An obstacle forming unit, used for constructing obstacle point cloud data and building point cloud data based on the obstacle position features and the building position features;
[0120] A spatial fusion unit is used to generate the driving environment spatial model using the obstacle point cloud data and the building point cloud data according to the road boundary characteristics and the road traffic characteristics.
[0121] Furthermore, the task target mapping module 12 includes:
[0122] A task decomposition unit, used to decompose the target task based on the task requirements to obtain multiple subtasks;
[0123] A task layer construction unit, used for constructing the task layer, and determining a plurality of key point information of the plurality of subtasks in the task layer according to the execution areas of the plurality of subtasks;
[0124] A mapping and annotation unit is used to spatially align the task layer with the driving environment space model, synchronously map the multiple key point information to the driving environment space model for annotation, and generate the N task points of the robot.
[0125] Furthermore, the path planning module 13 includes:
[0126] A list sorting unit, used for constructing an execution sequence list of the N task points based on the correlation coefficients between the N task points;
[0127] A region determination unit, used for parsing the execution sequence table of the N task points to determine whether the execution region is a plurality of regions;
[0128] A cluster planning unit, for performing regional clustering on the execution sequence list of the N task points, obtaining a plurality of task point sets, taking the initial position of the robot as the starting point, traversing the plurality of task point sets according to the execution sequence list of the N task points to perform local path planning for the first task point set, generating a first local path planning scheme, and iterating until the plurality of task point sets are traversed to obtain the plurality of local path planning schemes;
[0129] A path connection unit is used to perform path connection based on the multiple local path planning solutions to generate the first global path planning solution.
[0130] Furthermore, the obstacle avoidance adjustment module 14 includes:
[0131] A path extraction unit, configured to execute a first local path planning scheme based on the driving environment space model to determine a local path;
[0132] An obstacle determination unit, used to determine whether there is obstacle point cloud data in the local path;
[0133] A fuzzy obstacle avoidance unit, configured to perform fuzzy calculation on the local path based on the obstacle point cloud data to make an obstacle avoidance decision if any;
[0134] A dynamic adjustment unit, used to execute the obstacle avoidance decision and generate dynamic adjustment instructions in combination with the real-time path information collected by the camera embedded in the robot;
[0135] A replanning unit is used to update the obstacle avoidance decision based on the dynamic adjustment instruction to perform replanning and generate the dynamic adjustment parameter set.
[0136] Furthermore, the local update module 15 includes:
[0137] A driving capability acquisition unit is used to decompose the robot's driving parameters and obtain the robot's driving speed and steering angle;
[0138] A path adjustment unit, configured to dynamically adjust the path according to the mapping of the dynamic adjustment parameter set to the multiple local path planning schemes, and obtain a path adjustment information set, wherein the path adjustment information set includes path length information and path curvature information;
[0139] a speed analysis unit, configured to perform obstacle avoidance analysis according to the travel speed of the robot based on the path length information to obtain first obstacle avoidance data;
[0140] a curvature analysis unit, configured to perform obstacle avoidance analysis according to the steering angle of the robot based on the path curvature information to obtain second obstacle avoidance data;
[0141] A local optimization unit is used to add the first obstacle avoidance data and the second obstacle avoidance data to the multiple local path planning schemes to generate the multiple local optimized path planning schemes.
[0142] In some implementations, the local update module 15 also includes
[0143] An efficiency evaluation unit, used to evaluate the driving efficiency of the multiple local optimized path solutions and obtain multiple efficiency evaluation results;
[0144] A weight allocation unit, configured to perform weight training of the plurality of local optimization path solutions based on the plurality of efficiency evaluation results to obtain weight allocation information;
[0145] A path graph unit, configured to construct a local optimization path graph by taking the first local optimization path solution as a vertex and constructing edges according to the reachability and distance relationship between the local paths in the multiple local optimization path solutions;
[0146] An updating and replacing unit is used to traverse the first global path planning scheme and optimize and align it with the multiple local optimization path schemes, extract the local optimization path schemes corresponding to M local optimization paths in the local optimization path graph according to the weight distribution information, update and replace the first global path planning scheme, and generate the second global path planning scheme, where M is an integer greater than or equal to 1.
[0147] It should be understood that the embodiments mentioned in this specification focus on their differences from other embodiments. The specific embodiments in the aforementioned embodiment one are also applicable to a robot path planning system described in embodiment two. For the sake of brevity of the specification, they will not be further elaborated here.
[0148] It should be understood that the embodiments disclosed in the present invention and the above description can enable those skilled in the art to use the present invention to implement the present invention. At the same time, the present invention is not limited to the above-mentioned embodiments. It should be understood that those skilled in the art can still modify the technical solutions recorded in the above-mentioned embodiments, or replace some of the technical features therein by equivalents; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention.
Claims
1. A robot path planning method, characterized in that: The method comprises: Obtain map information of the target environment to perform environmental modeling and generate a driving environment space model; Mapping the target task to the driving environment space model based on the task requirements, extracting N task points of the robot, where N is an integer greater than or equal to 1; Performing global path planning based on the N task points to generate a first global path planning solution, wherein the first global path planning solution includes multiple local path planning solutions; Extracting local paths according to the multiple local path planning schemes to perform obstacle determination, performing dynamic obstacle avoidance according to the determination results, and generating a dynamic adjustment parameter set; Optimize the multiple local path planning solutions according to the dynamically adjusted parameter set, generate multiple local optimized path planning solutions, update the first global path planning solution, and output a second global path planning solution; Executing the second global path planning solution to perform intelligent path planning for the robot; The method of performing path optimization on the multiple local path planning schemes according to the dynamically adjusted parameter set to generate multiple local optimized path planning schemes includes: Decompose the robot's driving parameters to obtain the robot's driving speed and steering angle; Mapping the dynamic adjustment parameter set to the multiple local path planning schemes to dynamically adjust the path, and obtain a path adjustment information set, wherein the path adjustment information set includes path length information and path curvature information; Performing obstacle avoidance analysis according to the travel speed of the robot based on the path length information to obtain first obstacle avoidance data; Performing obstacle avoidance analysis according to the steering angle of the robot based on the path curvature information to obtain second obstacle avoidance data; Adding the first obstacle avoidance data and the second obstacle avoidance data to the multiple local path planning schemes to generate the multiple local optimized path planning schemes; The method includes: updating the first global path planning scheme by using multiple local optimized path planning schemes and outputting a second global path planning scheme. Evaluate the driving efficiency of the multiple local optimized path planning solutions to obtain multiple efficiency evaluation results; Perform weight training of the multiple local optimization path planning solutions based on the multiple efficiency evaluation results to obtain weight allocation information; Taking the first local optimization path planning scheme as a vertex, constructing edges according to the reachability and distance relationship between the local paths in the multiple local optimization path planning schemes, and constructing a local optimization path graph; Traverse the first global path planning scheme and optimize and align it with the multiple local optimization path planning schemes, extract the local optimization path planning schemes corresponding to M local optimization paths in the local optimization path graph according to the weight distribution information, update and replace the first global path planning scheme, and generate the second global path planning scheme, where M is an integer greater than or equal to 1.
2. The method according to claim 1, characterized in that Obtaining map information of the target environment to perform environmental modeling and generate a driving environment space model, the method includes: Use surveying and mapping equipment to conduct on-site surveying and mapping of the target environment to obtain initial map information of the target environment; Performing data preprocessing on the initial map information of the target environment to generate the map information of the target environment; Extracting key features of the map information, wherein the key features include road boundary features, road traffic features, obstacle location features, and building location features; Constructing obstacle point cloud data and building point cloud data based on the obstacle position features and the building position features; The driving environment space model is generated according to the road boundary features and the road traffic features using the obstacle point cloud data and the building point cloud data.
3. The method according to claim 1, characterized in that Mapping the target task to the driving environment space model based on the task requirements and extracting N task points of the robot, the method includes: Decomposing the target task based on the task requirements to obtain multiple subtasks; Constructing a task layer, and determining a plurality of key point information of the plurality of subtasks in the task layer according to the execution areas of the plurality of subtasks; The task layer is spatially aligned with the driving environment space model, and the multiple key point information is synchronously mapped to the driving environment space model for annotation to generate the N task points of the robot.
4. The method according to claim 3, characterized in that Performing global path planning based on the N task points to generate a first global path planning solution, the method comprising: Constructing an execution sequence table of the N task points based on the correlation coefficients between the N task points; Parsing the execution sequence table of the N task points to determine whether the execution area is a plurality of areas; If yes, the execution sequence list of the N task points is subjected to regional clustering to obtain multiple task point set groups, the initial position of the robot is taken as the starting point, the multiple task point set groups are traversed according to the execution sequence list of the N task points to perform local path planning for the first task point set group, and a first local path planning scheme is generated, and this is iterated until multiple task point set groups are traversed to obtain the multiple local path planning schemes; Path connection is performed based on the multiple local path planning solutions to generate the first global path planning solution.
5. The method according to claim 2, characterized in that Extracting local paths according to the multiple local path planning schemes to determine obstacles, performing dynamic obstacle avoidance according to the determination results, and generating a dynamic adjustment parameter set, the method includes: Execute a first local path planning scheme based on the driving environment space model to determine a local path; Determining whether there is obstacle point cloud data in the local path; If so, based on the obstacle point cloud data, fuzzy calculation is performed on the local path to make an obstacle avoidance decision; Execute the obstacle avoidance decision and generate dynamic adjustment instructions in combination with the real-time path information collected by the camera embedded in the robot; The obstacle avoidance decision is updated based on the dynamic adjustment instruction for replanning, and the dynamic adjustment parameter set is generated.
6. A robot path planning system, characterized in that: The system comprises: An environmental space digitization module, which is used to obtain map information of the target environment to perform environmental modeling and generate a driving environment space model; A task target mapping module, the task target mapping module is used to map the target task to the driving environment space model based on the task requirements, and extract N task points of the robot, where N is an integer greater than or equal to 1; A path planning module, wherein the path planning module is used to perform global path planning based on the N task points and generate a first global path planning solution, wherein the first global path planning solution includes multiple local path planning solutions; An obstacle avoidance adjustment module, the obstacle avoidance adjustment module is used to extract a local path according to the multiple local path planning schemes to perform obstacle determination, perform dynamic obstacle avoidance according to the determination result, and generate a dynamic adjustment parameter set; A local update module, the local update module is used to optimize the paths of the multiple local path planning schemes according to the dynamically adjusted parameter set, generate multiple local optimized path planning schemes to update the first global path planning scheme, and output a second global path planning scheme; A path planning application module, wherein the path planning application module is used to execute the second global path planning solution to perform intelligent path planning for the robot; Among them, the local update module includes: A driving capability acquisition unit is used to decompose the robot's driving parameters and obtain the robot's driving speed and steering angle; A path adjustment unit, configured to dynamically adjust the path according to the mapping of the dynamic adjustment parameter set to the multiple local path planning schemes, and obtain a path adjustment information set, wherein the path adjustment information set includes path length information and path curvature information; A speed analysis unit, configured to perform obstacle avoidance analysis according to the travel speed of the robot based on the path length information to obtain first obstacle avoidance data; a curvature analysis unit, configured to perform obstacle avoidance analysis according to the steering angle of the robot based on the path curvature information to obtain second obstacle avoidance data; A local optimization unit, configured to add the first obstacle avoidance data and the second obstacle avoidance data to the multiple local path planning schemes to generate the multiple local optimized path planning schemes; An efficiency evaluation unit, used to evaluate the driving efficiency of the multiple local optimized path planning solutions and obtain multiple efficiency evaluation results; A weight allocation unit, configured to perform weight training of the plurality of local optimization path planning schemes based on the plurality of efficiency evaluation results, and obtain weight allocation information; A path graph unit, configured to construct a local optimization path graph by taking the first local optimization path planning scheme as a vertex and constructing edges according to the reachability and distance relationship between the local paths in the multiple local optimization path planning schemes; An updating and replacing unit is used to traverse the first global path planning scheme and optimize and align it with the multiple local optimization path planning schemes, extract the local optimization path planning schemes corresponding to M local optimization paths in the local optimization path graph according to the weight distribution information, update and replace the first global path planning scheme, and generate the second global path planning scheme, where M is an integer greater than or equal to 1.