A three-dimensional visualization control method and device for excavation quality in cross construction areas
The three-dimensional visualization control method is used to analyze the excavation quality of intersecting construction areas in earthworks, solving the problems of low efficiency and complex calculations in the existing technology, and achieving efficient excavation quality analysis and accurate result output.
Patent Information
- Application Number
- CN202410733903.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-07
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-06-07
AI Technical Summary
Existing earthwork engineering technology has problems such as low efficiency, complex calculations, large repetitive workload, and low accuracy in handling excavation quality analysis in cross-construction areas, especially in large-area complex areas and irregular cross-construction areas.
The three-dimensional visual control method of excavation quality in the cross-construction area is adopted. By establishing the design interface of the waterway, harbor basin, and water service area foundation trench, the design interface is merged, the three-dimensional terrain is imported, and the secondary development tool is used to realize the three-dimensional visual analysis and output the over-under excavation. Measurements and cross-section diagrams can be used to reduce repetitive work and improve calculation efficiency.
Under the condition of ensuring calculation accuracy, the intermediate process data is clear and complete, with good visualization effect, greatly reducing the complex calculation process, improving calculation efficiency, and being suitable for excavation quality analysis of any shape site.
Smart Images

Figure CN118313049B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of earthwork engineering, and in particular to a three-dimensional visualization control method and device for excavation quality in a cross construction area. Background Art
[0002] Earthwork projects often use methods such as the cross-section method, grid method, and geometric area method to calculate excavation volume and analyze excavation quality. The principles of each earthwork calculation method are different and the applicable conditions are different.
[0003] The cross-section method divides the site into several parallel cross-sections, assumes that the adjacent cross-sections change evenly, calculates the earthwork volume between each adjacent cross-section, and the sum of the earthwork volume between each cross-section is the total earthwork volume. It is essentially a simplified model. The cross-section method has clear and intuitive steps, and can verify the earthwork volume of super-deep and super-wide areas. The intermediate data is complete and clear, and the cross-section diagram of each specific pile number can be obtained. The cross-section diagram can be used to intuitively analyze the construction quality and provide a detailed earthwork volume calculation result report. It is suitable for the earthwork volume calculation of narrow and long strip linear projects such as roads, river embankments, waterway dredging, foundation trench excavation, etc. For large and complex areas and situations where the calculation area changes at any time, there are shortcomings such as low efficiency and complicated calculation process.
[0004] The grid method divides the site into several square grids, measures or interpolates the elevation of the four corner points of each grid, calculates the earthwork of each grid surface (quadrangular prism method), and the sum of the earthwork volume of each grid is the total earthwork volume. It has the advantages of being intuitive, easy to understand, and simple to operate, and is suitable for earthwork calculations on large and relatively flat sites. However, the integrity of the intermediate data is poor, the workload is large for complex terrain, and the accuracy is low.
[0005] For irregular intersection construction areas of point-shaped projects and linear projects, the cross-section method is used to analyze the excavation quality. To ensure the calculation accuracy, it is necessary to redraw the overall design and construction drawings of the intersection construction area based on the design and construction drawings of the point-shaped projects and linear projects, and then calculate and draw the cross-section lines in large quantities. The above process has a large amount of repetitive work, a complex calculation process, and a long time consumption. Summary of the invention
[0006] The purpose of the present invention is to solve the problems existing in the prior art and to propose a three-dimensional visualization control method and device for excavation quality in a cross construction area.
[0007] In order to achieve the above object, the present invention adopts the following technical solutions:
[0008] A three-dimensional visualization control method for excavation quality in a cross construction area comprises the following steps:
[0009] S10: Establish the terrain surface formed by excavation in the cross construction area;
[0010] S20: Establish the channel design interface of the cross construction area;
[0011] S30: Establish the cross-construction area basin design interface;
[0012] S40: Establish the foundation trench design interface of the water service area in the cross construction area;
[0013] S50: Combine the design interface of the channel, harbor and water service area foundation trench;
[0014] S60: 3D visualization analysis of excavation quality in cross-construction areas;
[0015] S70: 3D visualization analysis of over-excavation, under-excavation and flatness of cross-construction areas;
[0016] S80: Output the over-excavation and under-excavation amount of any local area in the cross construction area;
[0017] S90: Output any excavation section diagram of the cross-construction area.
[0018] Preferably, the step S10 of establishing the terrain surface formed by excavating the cross construction area comprises the following steps:
[0019] S110: Use a single-beam bathymetric system to measure the water depth in the cross-construction area, and use a drone to measure the land elevation in the cross-construction area;
[0020] S120: Processing the water depth and land elevation data of the cross construction area to generate a cross construction area elevation data file;
[0021] S130: Using the elevation data of the intersection construction area, establish an excavation terrain surface of the intersection construction area.
[0022] Preferably, the step S20 of establishing the waterway design interface of the cross construction area includes the following steps:
[0023] S210: Draw the channel centerline of the cross construction area;
[0024] S220: Establishing a channel cross-section template library: classifying slopes according to the number of different slope points, drawing corresponding cross-section templates according to each type of slope, and establishing a channel cross-section template library;
[0025] S230: Establishing a waterway design interface: stretching the template of the waterway cross-section template library, adjusting the spatial position of the slope point, and establishing the waterway design interface;
[0026] The step S30 of establishing the cross construction area basin design interface includes the following steps:
[0027] S310: Select the boundary line of the crossing construction area, generate a polygonal diagram of the port design interface, assign a surface template, and establish the port design interface;
[0028] The step S40 of establishing the foundation trench design interface of the water service area in the cross construction area includes the following steps:
[0029] S410: Establish the baseline of the design interface of the foundation trench of the water service area: refer to the general plan of the design and construction of the water service area, copy the front baseline of the retaining wall, assign the elevation, and generate the baseline of the design base surface of the foundation trench of the water service area;
[0030] S420: Establishing a cross-section template library: Classifying the bottom plate and the side slope of the foundation pit according to different directions and different numbers of side slope points, and drawing corresponding cross-section templates according to each type of bottom plate and side slope, and establishing a cross-section template library;
[0031] S430: Establish the design interface of the foundation trench bottom plate and the slope: stretch the template of the cross-section template library, adjust the spatial position of the slope point, and establish the design interface of the foundation trench bottom plate and the slope of the water service area;
[0032] S440: Establish transition section design interface between foundation trench slopes, between bottom plates, and between slopes and bottom plates: There are irregular transition sections between slopes with different slope ratios of foundation trenches. Use polylines to connect the slope points to form closed polygons, assign materials to distinguish the design interface from the terrain surface formed by excavation, and establish the transition section design interface;
[0033] S450: Establish the foundation trench design interface of the water service area in the cross construction area: stitch the design interface of the foundation trench bottom plate, slope and transition section, and establish the foundation trench design interface of the water service area in the cross construction area;
[0034] The S50 design interface for merging the waterway, harbor, and water service area foundation trench includes the following steps:
[0035] S510: Sew up the design interfaces of the waterway, harbor and water service area foundation trench, and establish the design interface of the cross construction area.
[0036] Preferably, the S70 three-dimensional visualization analysis of over-break, under-break and flatness of the cross-construction area includes the following steps:
[0037] S710: 3D visualization analysis of over-excavation and under-excavation in the construction area: Establish a 3D color difference map attached to the excavation terrain surface, and use different color blocks and water depth numbers to 3D visualize the under-excavation thickness and over-excavation depth of the cross construction area;
[0038] S720: 3D visualization analysis of the flatness of the cross-construction area: Input the boundary conditions of the area to be analyzed for flatness, select water depth points in different elevation ranges, and realize 3D visualization analysis of the flatness of the cross-construction area.
[0039] Preferably, the S80 outputs the over-break and under-break amount of any local area in the cross construction area including:
[0040] S810: Input the boundary conditions of the over-excavation and under-excavation area to be analyzed, and output the under-excavation workload and over-excavation workload of the area;
[0041] The S90 outputs any excavation cross-section diagram of the cross-construction area including:
[0042] S910: Input any straight line on a two-dimensional plane and output the excavation section diagram corresponding to the straight line, which is used to analyze the over-excavation or under-excavation of any section in the cross-construction area.
[0043] A three-dimensional visualization control device for excavation quality in an intersection construction area, comprising a notebook computer and a computer program for executing any of the above methods on the notebook computer, wherein the notebook computer comprises a main body, a rotating shaft rotatably connected to the main body, and a display screen arranged on the rotating shaft, wherein an arc groove is provided on the main body, a rotating seat is provided in the arc groove, a socket is provided in the rotating seat, a plurality of plug interfaces are provided on the socket, the socket is connected to the main body by a wire, a self-driving component for driving the rotating seat to rotate is provided in the main body, and the self-driving component is connected to the rotating shaft.
[0044] Preferably, the self-driving component includes a driving shaft rotatably connected to the main body, the driving shaft is provided with a secondary bevel gear, the rotating shaft is provided with a main bevel gear meshing with the secondary bevel gear, the end of the rotating shaft away from the secondary bevel gear is connected to the rotating seat, and the inner wall of the arc groove is provided with a rubber pad that is movably against the rotating seat.
[0045] Preferably, a plurality of first ear plates are fixedly provided on the inner wall of the rotating seat, and a second ear plate corresponding to the plurality of first ear plates is fixedly provided on the outer wall of the socket, an elastic telescopic rod is rotatably connected between the first ear plate and the second ear plate, and the plug interface includes a beveled material guide port and an electrical socket connected to an external plug.
[0046] Preferably, an elastic element is fixedly disposed on the inner wall of the electrical socket, and a push plate is disposed at one end of the elastic element away from the inner wall of the electrical socket, and the push plate is slidably connected in the electrical socket.
[0047] Preferably, a support plate is fixedly provided on the inner wall of the arc groove, an arc spring is fixedly provided on the support plate, an end of the arc spring away from the support plate is connected to the arc plate, a movable groove for sliding of the arc plate is provided on the rotating seat, and an arc surface that resists the movement of the arc plate is provided at one end of the socket away from the rotating seat.
[0048] Compared with the prior art, the present invention provides a three-dimensional visualization control method and device for excavation quality in a cross construction area, which has the following beneficial effects:
[0049] 1. The three-dimensional visualization control method and device for the excavation quality of the intersection construction area, based on the design and construction drawings of the waterway, harbor and water service area foundation trench, respectively establish the design interfaces of the waterway, harbor and water service area foundation trench, then merge the design interfaces to generate the design interface of the intersection construction area of the waterway, harbor and water service area foundation trench, import the three-dimensional terrain, and use the secondary development tools to realize the three-dimensional visualization of the excavation quality of the intersection construction area. Under the condition of ensuring the calculation accuracy, the intermediate process data is clear and complete, with good visualization effect, greatly reducing the repetitive work generated by a large number of interpolation calculations of cross-section lines, avoiding complex calculation processes, and improving calculation efficiency; it is suitable for excavation quality analysis of sites of any shape, including linear projects, point projects, surface projects and excavation quality analysis of intersections or intersection construction areas of projects of different natures.
[0050] 2. The three-dimensional visualization control method and device for the excavation quality of the cross-construction area uses a laptop computer for three-dimensional modeling because the laptop computer has good stability and is easy to carry. After the laptop computer is changed to a new place of use, it is necessary to reconnect the peripherals to the socket. When the user flips the display screen to use it, the socket on the side of the main body is rotated to the upper side of the main body with the socket and the rotating seat. The user can see the position of the socket at a glance and connect it. There is no need to carefully calibrate the socket on the side of the laptop computer with the naked eye, which improves the convenience of using the laptop computer.
[0051] 3. The three-dimensional visualization control method and device for the excavation quality of the intersection construction area, by setting the plug interface as an inclined material guide port and an electrical socket, when the user plugs the external plug into the plug interface, there is no need to make the external plug accurately docked with the plug interface. Even if there is a docking error between the external plug and the plug interface, the external plug first abuts against the inclined material guide surface of the inclined material guide port, the inclined material guide surface is subjected to force and transmits the force to the socket, so that the socket moves and translates in the rotating seat, thereby making the external plug and the electrical socket accurately docked, thereby improving the convenience of connecting the laptop computer with the external device, and thereby improving the work efficiency of the three-dimensional visualization of the excavation quality in the construction area. BRIEF DESCRIPTION OF THE DRAWINGS
[0052] Figure 1 A schematic flow chart of a three-dimensional visualization control method for excavation quality in a cross construction area provided by the present invention;
[0053] Figure 2 A schematic diagram of the location of the foundation trench plane and cross-sectional views of the water service area provided by the present invention;
[0054] Figure 3 Schematic diagrams of cross-sectional views provided by the present invention;
[0055] Figure 4A three-dimensional topographical schematic diagram of the waterway, harbor, and water service area foundation trench intersection construction area provided by the present invention;
[0056] Figure 5 A schematic diagram of the waterway design interface provided by the present invention;
[0057] Figure 6 A schematic diagram of the harbor design interface provided by the present invention;
[0058] Figure 7 A schematic diagram of the design interface of the foundation trench of the water service area provided by the present invention;
[0059] Figure 8 A schematic diagram of the design interface of the cross construction area after merging the design interfaces of the waterway, harbor, and water service area provided by the present invention;
[0060] Fig. 9 It is a schematic diagram of the structure of the notebook computer of the present invention when it is closed;
[0061] Fig.10 The structure of the notebook computer of the present invention when unfolded is shown in FIG. Figure 1 ;
[0062] Fig.11 The structure of the notebook computer of the present invention when unfolded is shown in FIG. Figure 2 ;
[0063] Fig.12 is a schematic cross-sectional structural diagram of a notebook computer of the present invention;
[0064] Fig.13 It is a schematic cross-sectional structure diagram of the notebook computer rotating base of the present invention;
[0065] Fig.14 It is a structural schematic diagram of the arc groove of the present invention;
[0066] Fig.15 It is a schematic diagram of the cross-sectional structure of the socket of the present invention.
[0067] In the figure: 1. laptop computer; 101. main body; 102. rotating shaft; 1021. main bevel gear; 103. display screen; 2. arc groove; 201. rubber pad; 3. rotating seat; 301. movable groove; 302. arc surface; 4. socket; 401. plug interface; 4011. inclined guide port; 4012. electrical socket; 5. driving shaft; 501. secondary bevel gear; 6. elastic telescopic rod; 601. first ear plate; 602. second ear plate; 7. support plate; 701. arc spring; 702. arc plate; 8. elastic element; 801. push plate. DETAILED DESCRIPTION
[0068] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0069] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0070] Embodiment 1: A preferred embodiment of the present invention is described in detail below with reference to the accompanying drawings.
[0071] The cross-construction area of the foundation trench of the waterway, harbor, and water service area is an irregular site excavation project. The cross-section method is used to analyze the excavation quality of the cross-construction area. It is necessary to combine the design and construction drawings of the foundation trench and the waterway, interpolate and calculate a large number of cross-section lines, which requires a large amount of repetitive work and a complex calculation process.
[0072] In response to the above problems, according to the design and construction drawings of the waterway, harbor and foundation trench, the three-dimensional design interface of the waterway, harbor and foundation trench is established respectively, the excavation terrain is imported, and the three-dimensional model is generated. Based on the model, the secondary development tool is used to realize the three-dimensional visualization analysis of over-excavation and flatness, and quickly output the over-excavation and under-excavation engineering volume and any cross-section formed by excavation. Compared with traditional methods such as the cross-section method, it has the advantages of high calculation efficiency, strong applicability, clear and complete intermediate process data, and good visualization effect.
[0073] Reference Figure 1-8 A three-dimensional visualization control method for excavation quality in a cross construction area is characterized by comprising the following steps:
[0074] S10: Establish the terrain surface formed by excavation in the cross construction area.
[0075] Specifically, a topographic surface is established by excavating the intersection construction areas of the foundation trenches of the above-mentioned waterways, harbors, and water service areas.
[0076] S20: Establish the channel design interface of the cross construction area.
[0077] Specifically, a design interface for the waterway in the above-mentioned intersection construction area is established.
[0078] S30: Establish the cross-construction area basin design interface.
[0079] Specifically, a design interface for the above-mentioned cross-construction area harbor is established.
[0080] S40: Establish the foundation trench design interface of the water service area in the cross construction area.
[0081] Specifically, a design interface for the foundation pit of the water service area in the above-mentioned intersection construction area is established.
[0082] S50: Design interface for merging the waterway, harbor, and water service area foundation trench.
[0083] Specifically, after the aforementioned S20, S30, and S40 respectively form the design interface of the waterway of the intersection construction area, the design interface of the harbor, and the design interface of the foundation trench of the water service area, the obtained design interfaces of the aforementioned areas are merged to form the design interface of the intersection construction area.
[0084] S60: 3D visualization analysis of excavation quality in cross-construction areas.
[0085] Specifically, based on the design interface of the cross construction area obtained above, the three-dimensional terrain is imported, and the secondary development tools are used to realize the three-dimensional visualization of the excavation quality of the cross construction area.
[0086] Reference Figure 2 As a preferred technical solution of this embodiment, the three-dimensional visualization control method for excavation quality in the cross construction area also includes:
[0087] S70: 3D visualization analysis of over-excavation, under-excavation and flatness of cross-construction areas.
[0088] Specifically, the excavation quality of the intersection construction area includes over-excavation, under-excavation and flatness, so the over-excavation, under-excavation and flatness of the intersection construction area can be visualized in three dimensions based on S60.
[0089] S80: Output the over-excavation and under-excavation amount of any local area in the cross-construction area.
[0090] Specifically, the excavation quality of the intersection construction area also includes a measurement parameter of the output of any local area. Therefore, based on S60, the over-excavation or under-excavation of any local area in the intersection construction area can also be output to measure the output of any local area in the intersection construction area.
[0091] S90: Output any excavation section diagram of the cross-construction area.
[0092] Specifically, the excavation quality of the cross-construction area also includes a measurement parameter of any excavation cross-section diagram, so based on S60, it is also possible to output any excavation cross-section diagram of the cross-construction area.
[0093] Furthermore, the step S10 of establishing the terrain surface formed by excavation of the cross construction area includes the following steps:
[0094] S110: Use a single-beam bathymetric system to measure the water depth in the cross-construction area, and use a drone to measure the land elevation in the cross-construction area.
[0095] Specifically, the construction content of the cross construction area includes water excavation and land excavation. The water excavation area uses an unmanned survey ship-borne single-beam depth sounding system to measure the water depth, and the land excavation area uses a drone to measure the elevation.
[0096] S120: Processing the water depth and land elevation data of the cross-construction area to generate a cross-construction area elevation data file.
[0097] Specifically, refer to Figure 4 Based on the water depth of the water excavation area and the elevation data of the land excavation area measured in the aforementioned S110, the water depth and land elevation data are processed to generate an elevation data file in the TXT text format of the cross construction area.
[0098] S130: Using the elevation data of the intersection construction area, establish an excavation terrain surface of the intersection construction area.
[0099] Specifically, the elevation data of the intersection construction area is used to establish the excavation terrain surface of the intersection construction area.
[0100] The step S20 of establishing the cross construction area waterway design interface includes the following steps:
[0101] S210: Draw the centerline of the channel crossing the construction area.
[0102] Specifically, refer to Figure 5 When drawing the channel centerline of the intersection construction area, first import the design and construction general plan, copy the two-dimensional channel centerline, set the elevation value, and thus establish the three-dimensional channel centerline of the intersection construction area.
[0103] S220: Establish a waterway cross-section template library: classify the slopes according to the number of different slope points, draw the corresponding cross-section template according to each type of slope, and establish a waterway cross-section template library.
[0104] Specifically, when establishing a waterway cross-section template, the slopes are classified according to the number of different slope points, and the corresponding cross-section template is drawn according to each type of slope to establish a waterway cross-section template library.
[0105] S230: Establishing a waterway design interface: stretching the template of the waterway cross-section template library, adjusting the spatial position of the slope point, and establishing the waterway design interface.
[0106] Specifically, when establishing the waterway design interface, the template of the cross section is stretched along the centerline of the waterway, and the slope ratio or elevation of each slope point is adjusted according to the design and construction general plan to establish the waterway design interface.
[0107] The step S30 of establishing the cross construction area basin design interface includes the following steps:
[0108] S310: Select the boundary line of the port basin in the cross construction area, generate a polygonal diagram of the port basin design interface, assign a surface template, and establish the port basin design interface.
[0109] Specifically, refer to Figure 6 When establishing the cross-construction area port basin design interface, select the boundary line of the cross-construction area port basin, establish the terrain, assign the surface template, and establish the cross-construction area port basin design interface.
[0110] The step S40 of establishing the foundation trench design interface of the water service area in the cross construction area includes the following steps:
[0111] S410: Establish the baseline of the design interface of the foundation pit of the water service area: refer to the general plan of the design and construction of the water service area, copy the front baseline of the retaining wall, assign elevation, and generate the baseline of the design base surface of the foundation pit of the water service area.
[0112] Specifically, draw a baseline for establishing the design interface of the water service area foundation pit, import the design and construction general plan, copy and locate the two-dimensional baseline of the water service area retaining wall, assign an elevation, and use this as the baseline for establishing the design interface of the water service area foundation pit.
[0113] S420: Establish a cross-section template library: classify the bottom plate and slope of the foundation pit according to different directions and different numbers of slope points, and draw corresponding cross-section templates according to each type of bottom plate and slope to establish a cross-section template library.
[0114] Specifically, when establishing the cross-section template library, draw the cross-section templates of the bottom plate and slope in different directions of the foundation trench of the water service area. Figure 2 and Figure 3 For example, Figure 2 It is a schematic diagram of the foundation pit plane and the distribution position of each cross-section; Figure 3 Schematic diagram of the cross-sections of the foundation pit.
[0115] According to the 1-1' to 8-8' foundation pit cross-section diagram, the slope ratio of the foundation pit bottom plate of the water service area is 1:20; according to the 9-9' to 10-10' foundation pit cross-section diagram, the slope ratio of the foundation pit bottom plate of the water service area is 0; draw a cross-section template, and the slope ratio of the cross-section template can be adjusted from 1:20 to 0 through parameter constraints.
[0116] According to the cross-sectional diagram of the foundation pit from 1-1' to 10-10', the slopes around the foundation pit can be divided into four situations: (1) The slope of the foundation pit outside the retaining wall has a slope ratio of 1:1 and 1:1.5, such as Figure 2As shown in the schematic diagram of the section from 1-1' to 8-8', a cross-section template is drawn. The slope ratio can be adjusted from 1:1 to 1:1.5 through parameter constraints. (2) The slope ratio of the inner foundation trench of the retaining wall is a combination of different slope ratios from left to right, including: ① 1:1+1:2, such as Figure 3 As shown in the schematic diagram of the 1-1', 2-2', 8-8', and 10-10' sections, draw a cross-section template; ②1:1.5+1:2, such as Figure 3 As shown in the schematic diagram of the 3-3' section, draw a cross-section template; ③1:1+1:1.5+1:2, such as Figure 3 As shown in the schematic diagram of the 4-4', 5-5', 7-7', and 9-9' sections, draw a cross-section template; ④1:1; Figure 3 Draw a cross-section template as shown in the 6-6' section diagram in the figure. (3) The slope ratio of the front side slope of the foundation trench platform at both ends of the retaining wall is 1:1. Figure 3 Draw a cross-section template as shown in the 7-7' and 8-8' section schematics.
[0117] In view of the above situation, seven cross-section templates were established, and the vertex of each template was set to “end infinity” to identify terrains of different elevations.
[0118] S430: Establish the design interface of the foundation pit bottom plate and the slope: stretch the template of the cross-section template library, adjust the spatial position of the slope point, and establish the design interface of the foundation pit bottom plate and the slope of the water service area.
[0119] Specifically, when establishing the design interface of the foundation pit bottom plate and the slope, each cross section in S420 is stretched, and the foundation pit bottom plate, the inner and outer sides of the retaining wall, and the left and right side slopes are generated through parameter constraints.
[0120] S440: Establish transition section design interface between foundation pit slopes, between bottom plates, and between slopes and bottom plates: There are irregular transition sections between slopes of different slope ratios of foundation pits. Use polylines to connect the slope points to form closed polygons, assign materials, and establish transition section design interface.
[0121] Specifically, when establishing the transition section design interface between the trench slopes, between the bottom plates, and between the slopes and the bottom plates, the slopes with different slope ratios in the trench are irregular transition sections, and it is impossible to establish a transition section design interface generated by cross-section stretching. In response to the above problem, a polyline is used to connect the slope points to form a closed polygon, and a material is assigned to it, so that it is converted into a mesh attribute to establish a transition design interface; it should be noted that the material assigned in this embodiment is mainly used to distinguish the design interface from the terrain surface formed by excavation, so that over-excavation and under-excavation can be intuitively judged.
[0122] S450: Establish the foundation trench design interface of the water service area in the cross-construction area: stitch the design interface of the foundation trench bottom plate, slope and transition section, and establish the foundation trench design interface of the water service area in the cross-construction area.
[0123] Specifically, refer to Figure 7 When establishing the foundation pit design interface of the water service area in the cross-construction area, the design interfaces of the foundation pit bottom plate, slope, and transition section are stitched to establish the foundation pit design interface of the water service area in the cross-construction area.
[0124] Furthermore, the S50 design interface for merging the waterway, the harbor, and the water service area foundation trench includes the following steps:
[0125] S510: Sew up the design interfaces of the waterway, harbor and water service area foundation trench, and establish the design interface of the cross construction area.
[0126] Specifically, refer to Figure 8 , stitching the design interfaces of the waterway, harbor, and water service area foundation trench to establish a cross-construction area design interface; it should be noted that the stitching in this embodiment is to stitch the design interfaces of the waterway, harbor, and water service area foundation trench to form an overall design interface, and there is no order of stitching between the three.
[0127] Further, the S70 three-dimensional visualization analysis of over-break, under-break and flatness of the cross-construction area includes the following steps:
[0128] S710: 3D visualization analysis of over-excavation and under-excavation in the cross-construction area: Create a 3D color difference map attached to the excavation terrain surface, and use color blocks of different colors and water depth numbers to perform 3D visualization analysis of the under-excavation thickness and over-excavation depth in the cross-construction area.
[0129] Specifically, when performing a three-dimensional visualization analysis of over-excavation and under-excavation in an intersection construction area, the design interface of the intersection construction area is converted into a DTM terrain, and a three-dimensional color difference map attached to the excavation terrain surface is established. The three-dimensional visualization analysis of the under-excavation thickness and over-excavation depth of the intersection construction area is realized by using color blocks of different colors and water depth numbers.
[0130] S720: 3D visualization analysis of the flatness of the cross-construction area: Input the boundary conditions of the area to be analyzed for flatness, select water depth points in different elevation ranges, and realize 3D visualization analysis of the flatness of the cross-construction area.
[0131] Specifically, when conducting a three-dimensional visual analysis of the flatness of an intersection construction area, a water depth point screening tool was developed based on the model to meet this demand. The boundary conditions of the area to be analyzed for flatness were input, and water depth points in different elevation ranges were screened. Combined with the model, a three-dimensional visual analysis of the flatness of an intersection construction area was achieved.
[0132] Furthermore, the S80 outputs the over-break and under-break amount of any local area in the cross construction area, including:
[0133] S810: Input the boundary conditions of the over-excavation and under-excavation area to be analyzed, and output the under-excavation workload and over-excavation workload of the area.
[0134] Specifically, when it is necessary to output the over-excavation and under-excavation quantities of any local area in the cross-construction area, the boundary conditions of the over-excavation and under-excavation areas to be analyzed are input, and the under-excavation and over-excavation quantities of the area are output.
[0135] Furthermore, the S90 outputs any excavation cross-section diagram of the cross-construction area including:
[0136] S910: Input any straight line on the plane and output the excavation section diagram corresponding to the straight line, which is used to analyze the over-excavation or under-excavation of any section in the cross-construction area.
[0137] Specifically, when it is necessary to output any excavation cross-section diagram of the intersection construction area, since the water service area foundation trench and the waterway intersection construction area are irregular sites and do not have linear properties, it is impossible to output an excavation cross-section diagram containing complete information. In response to the above problems, a cross-section analysis tool was developed for the second time. Any straight line is input on the plane, and the excavation cross-section diagram corresponding to the straight line is output, so that the over-excavation and under-excavation of the intersection construction area can be analyzed through any excavation cross-section diagram; it should be noted that the plane in this embodiment is a two-dimensional plane, that is, a two-dimensional plane straight line is input, and the cross-section plane under the projection of the two-dimensional plane straight line is cut, and the excavation situation is analyzed through the section.
[0138] Example 2: Reference Figure 9-15 A three-dimensional visualization control device for excavation quality in a cross construction area includes a notebook computer 1 and a computer program for executing any of the above methods on the notebook computer 1. The notebook computer 1 includes a main body 101, a rotating shaft 102 rotatably connected to the main body 101, and a display screen 103 arranged on the rotating shaft 102. An arc groove 2 is opened on the main body 101, a rotating seat 3 is arranged in the arc groove 2, a socket 4 is arranged in the rotating seat 3, a plurality of plug interfaces 401 are arranged on the socket 4, the socket 4 is connected to the main body 101 through a wire, a self-driving component for driving the rotating seat 3 to rotate is arranged in the main body 101, and the self-driving component is connected to the rotating shaft 102.
[0139] Specifically, because the notebook computer 1 has good stability and is easy to carry, the notebook computer 1 is used to process three-dimensional modeling. After the notebook computer 1 is changed to a new place of use, the peripherals need to be reconnected to the socket 4. When the user flips the display screen 103 for use, the rotating shaft 102 drives the self-driving component to move. The self-driving component causes the plug interface 401 located on the side of the main body 101 to rotate to the upper side of the main body 101 along with the socket 4 and the rotating base 3. The user can see the position of the plug interface 401 at a glance and make a connection. There is no need to carefully calibrate the plug interface 401 of the notebook computer 1 from the side with the naked eye, which improves the convenience of using the notebook computer 1.
[0140] Example 3: Reference Figure 9-15 , a three-dimensional visualization control device for excavation quality in an intersection construction area, based on Example 2, further, a self-driving component includes a driving shaft 5 rotatably connected to the main body 101, a secondary bevel gear 501 is provided on the driving shaft 5, a main bevel gear 1021 meshing with the secondary bevel gear 501 is provided on the rotating shaft 102, one end of the rotating shaft 102 away from the secondary bevel gear 501 is connected to the rotating seat 3, and a rubber pad 201 that is movably against the rotating seat 3 is provided on the inner wall of the arc groove 2.
[0141] Specifically, when the display screen 103 is flipped, the rotating shaft 102 is driven to rotate, and the main bevel gear 1021 on the outer side of the rotating shaft 102 is meshed with the secondary bevel gear 501 for transmission, so that the secondary bevel gear 501 drives the driving shaft 5 to rotate on the side of the main body 101, and the driving shaft 5 drives the rotating seat 3 connected thereto to rotate, thereby causing the plug interface 401 disposed on the side of the main body 101 to rotate to the upper side of the main body 101 along with the socket 4 and the rotating seat 3. The user can see the position of the plug interface 401 at a glance and connect it, without the need for manual naked eye to carefully calibrate the plug interface 401 of the notebook computer 1 from the side, thereby improving the convenience of using the notebook computer 1; a rubber pad 201 is provided between the arc groove 2 and the rotating seat 3, which can improve the connection between the main body 101 and the rotating seat 3, so as to prevent the rotating seat 3 from rotating at will and affecting the plugging work of the peripheral plug and the plug interface 401; it should be noted that the main bevel gear 1021 can be set as an incomplete bevel gear. At the beginning of the rotation of the main bevel gear 1021, the main bevel gear 1021 meshes with the auxiliary bevel gear 501 and drives the rotating seat 3 to rotate, so that the plug interface 401 of the socket 4 rotates from the side of the notebook computer 1 to the top of the notebook computer 1. As the main bevel gear 1021 continues to rotate, the main bevel gear 1021 will no longer mesh with the auxiliary bevel gear 501 for transmission, thereby preventing the rotating seat 3 from rotating when the staff uses the notebook computer 1 to adjust the viewing angle of the display screen 103, thereby affecting the connection between the notebook computer 1 and the peripheral.
[0142] Example 4: Reference Figure 9-15, a three-dimensional visualization control device for excavation quality in a cross construction area. On the basis of Example 3, further, a plurality of first ear plates 601 are fixedly provided on the inner wall of a rotating seat 3, and a second ear plate 602 corresponding to the plurality of first ear plates 601 is fixedly provided on the outer wall of a socket 4. An elastic telescopic rod 6 is rotatably connected between the first ear plate 601 and the second ear plate 602, and a plug interface 401 includes a beveled material guide port 4011 and an electrical socket 4012 for plugging in an external plug.
[0143] Specifically, by setting the plug interface 401 as the inclined material guide port 4011 and the electrical socket 4012, when the user plugs the external device plug into the plug interface 401, there is no need to make the external device plug accurately docked with the plug interface 401. Even if there is a docking error between the external device plug and the plug interface 401, the external device plug first abuts against the inclined material guide surface of the inclined material guide port 4011, and the inclined material guide surface is subjected to force and transmits the force to the socket 4, so that the socket 4 can move and translate in the rotating seat 3, and then the external device plug and the electrical socket 4012 are accurately plugged and fixed, thereby improving the convenience of connecting the notebook computer 1 with the external device, and thereby improving the work efficiency of the three-dimensional visualization of the excavation quality in the construction area.
[0144] Example 5: Reference Figure 9-15 , a three-dimensional visualization control device for excavation quality in a cross construction area. On the basis of Example 4, further, an elastic element 8 is fixedly provided on the inner wall of the electrical socket 4012, and a push plate 801 is provided on one end of the elastic element 8 away from the inner wall of the electrical socket 4012, and the push plate 801 is slidably connected in the electrical socket 4012.
[0145] Specifically, when the notebook computer 1 is in use, the plug interface 401 of the socket 4 is rotated from the side of the notebook computer 1 to the top of the notebook computer 1. During this period, when the external plug is connected to the plug interface 401, a thrust is applied to the push plate 801, so that the push plate 801 is forced to shrink into the electrical socket 4012. The plug interface 401 without an external plug may have debris falling inside it. By arranging the push plate 801 at the end of the electrical socket 4012, the debris can be effectively prevented from falling. After the notebook computer 1 is used, the plug interface 401 is rotated from facing upward to facing the side, so that the debris intercepted by the push plate 801 automatically falls along the inclined surface of the inclined guide port 4011, thereby ensuring the subsequent normal use of the plug interface 401 of the notebook computer 1.
[0146] Example 6: Reference Figure 9-15, a three-dimensional visualization control device for excavation quality in a cross construction area, based on Example 5, further, a support plate 7 is fixedly provided on the inner wall of the arc groove 2, an arc spring 701 is fixedly provided on the support plate 7, an arc plate 702 is connected to the end of the arc spring 701 away from the support plate 7, a movable groove 301 for sliding of the arc plate 702 is provided on the rotating seat 3, and an arc surface 302 that is movably opposed to the arc plate 702 is provided on the end of the socket 4 away from the rotating seat 3.
[0147] Specifically, by arranging the arc plate 702 on the side of the rotating seat 3, when the notebook computer 1 is not in use, the arc plate 702 can block the plug interface 401 of the socket 4, so as to prevent water, dust or other impurities from entering the plug interface 401, thereby causing the plug interface 401 to be contaminated and causing the plug interface 401 to have poor contact; and the arc plate 702 can slide elastically in the arc groove 2, and when the plug interface 401 of the notebook computer 1 is plugged with an external plug, the display screen 103 is closed, and the external plug rotates with the rotating seat 3 when the display screen 103 is closed, and the external plug abuts against the arc plate 702 when rotating, and the arc plate 702 is forced to compress the arc spring 701, so that the arc plate 702 is forced to slide relative to the arc groove 2, thereby preventing the arc plate 702 from affecting the rotation of the external plug, and effectively preventing the arc plate 702 and the external plug from being damaged due to rotation collision.
[0148] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A three-dimensional visualization control method for excavation quality in a cross construction area, characterized in that: The following steps are involved: S10: Establish the terrain surface formed by excavation in the cross construction area; S20: Establish the channel design interface of the cross construction area; S30: Establish the cross-construction area basin design interface; S40: Establish the foundation trench design interface of the water service area in the cross construction area; S50: Combine the design interface of the channel, harbor and water service area foundation trench; S60: 3D visualization analysis of excavation quality in cross-construction areas; S70: 3D visualization analysis of over-excavation, under-excavation and flatness of cross-construction areas; S80: Output the over-excavation and under-excavation amount of any local area in the cross construction area; S90: Output any excavation section diagram of the cross construction area; The step S10 of establishing the terrain surface formed by excavating the cross construction area includes the following steps: S110: Use a single-beam bathymetric system to measure the water depth in the cross-construction area, and use a drone to measure the land elevation in the cross-construction area; S120: Processing the water depth and land elevation data of the cross construction area to generate a cross construction area elevation data file; S130: using the elevation data of the intersection construction area, establishing an excavation terrain surface of the intersection construction area; The step S20 of establishing the cross construction area waterway design interface includes the following steps: S210: Draw the channel centerline of the cross construction area; S220: Establishing a channel cross-section template library: classifying slopes according to the number of different slope points, drawing corresponding cross-section templates according to each type of slope, and establishing a channel cross-section template library; S230: Establishing a waterway design interface: stretching the template of the waterway cross-section template library, adjusting the spatial position of the slope point, and establishing the waterway design interface; The step S30 of establishing the cross construction area basin design interface includes the following steps: S310: Select the boundary line of the crossing construction area, generate a polygonal diagram of the port design interface, assign a surface template, and establish the port design interface; The step S40 of establishing the foundation trench design interface of the water service area in the cross construction area includes the following steps: S410: Establish the baseline of the design interface of the foundation trench of the water service area: refer to the general plan of the design and construction of the water service area, copy the front baseline of the retaining wall, assign the elevation, and generate the baseline of the design base surface of the foundation trench of the water service area; S420: Establishing a cross-section template library: Classifying the bottom plate and the side slope of the foundation pit according to different directions and different numbers of side slope points, and drawing corresponding cross-section templates according to each type of bottom plate and side slope, and establishing a cross-section template library; S430: Establish the design interface of the foundation trench bottom plate and the slope: stretch the template of the cross-section template library, adjust the spatial position of the slope point, and establish the design interface of the foundation trench bottom plate and the slope of the water service area; S440: Establish transition section design interface between foundation trench slopes, between bottom plates, and between slopes and bottom plates: There are irregular transition sections between slopes with different slope ratios of foundation trenches. Use polylines to connect the slope points to form closed polygons, assign materials to distinguish the design interface from the terrain surface formed by excavation, and establish the transition section design interface; S450: Establish the foundation trench design interface of the water service area in the cross construction area: stitch the design interface of the foundation trench bottom plate, slope and transition section, and establish the foundation trench design interface of the water service area in the cross construction area; The S50 design interface for merging the waterway, harbor, and water service area foundation trench includes the following steps: S510: Sew up the design interfaces of the waterway, harbor and water service area foundation trench, and establish the design interface of the cross construction area.
2. A three-dimensional visualization control method for excavation quality in an intersection construction area according to claim 1, characterized in that: The S70 three-dimensional visual analysis of over-break, under-break and flatness of the cross-construction area includes the following steps: S710: 3D visualization analysis of over-excavation and under-excavation in the construction area: Establish a 3D color difference map attached to the excavation terrain surface, and use different color blocks and water depth numbers to 3D visualize the under-excavation thickness and over-excavation depth of the cross construction area; S720: 3D visualization analysis of the flatness of the cross-construction area: Input the boundary conditions of the area to be analyzed for flatness, select water depth points in different elevation ranges, and realize 3D visualization analysis of the flatness of the cross-construction area.
3. The three-dimensional visualization control method for excavation quality in an intersection construction area according to claim 1 is characterized in that: The S80 outputs the over-break and under-break amount of any local area in the cross construction area, including: S810: Input the boundary conditions of the over-excavation and under-excavation area to be analyzed, and output the under-excavation workload and over-excavation workload of the area; The S90 outputs any excavation cross-section diagram of the cross-construction area including: S910: Input any straight line on a two-dimensional plane and output the excavation section diagram corresponding to the straight line, which is used to analyze the over-excavation or under-excavation of any section in the cross-construction area.
4. A three-dimensional visualization control device for excavation quality in an intersection construction area, comprising a notebook computer (1) and a computer program for executing a three-dimensional visualization control method for excavation quality in an intersection construction area according to any one of claims 1 to 3 on the notebook computer (1), characterized in that: The notebook computer (1) comprises a main body (101), a rotating shaft (102) rotatably connected to the main body (101), and a display screen (103) arranged on the rotating shaft (102); the main body (101) is provided with an arc-shaped groove (2); a rotating seat (3) is arranged in the arc-shaped groove (2); a socket (4) is arranged in the rotating seat (3); a plurality of plug interfaces (401) are arranged on the socket (4); the socket (4) and the main body (101) are connected via a wire; a self-driving component for driving the rotating seat (3) to rotate is arranged in the main body (101); the self-driving component is connected to the rotating shaft (102); The self-driving assembly comprises a driving shaft (5) rotatably connected in the main body (101), the driving shaft (5) is provided with a secondary bevel gear (501), the rotating shaft (102) is provided with a main bevel gear (1021) meshing with the secondary bevel gear (501), one end of the rotating shaft (102) away from the secondary bevel gear (501) is connected to the rotating seat (3), and the inner wall of the arc groove (2) is provided with a rubber pad (201) that movably contacts the rotating seat (3); The inner wall of the rotating seat (3) is fixedly provided with a plurality of first ear plates (601), the outer wall of the socket (4) is fixedly provided with second ear plates (602) corresponding one to one with the plurality of first ear plates (601), an elastic telescopic rod (6) is rotatably connected between the first ear plates (601) and the second ear plates (602), and the plug interface (401) comprises an inclined material guide port (4011) and an electrical socket (4012) for plugging into an external device plug.
5. The three-dimensional visualization control device for excavation quality in a cross construction area according to claim 4 is characterized in that: An elastic element (8) is fixedly provided on the inner wall of the electrical socket (4012), and a push plate (801) is provided at one end of the elastic element (8) away from the inner wall of the electrical socket (4012), and the push plate (801) is slidably connected in the electrical socket (4012).
6. The three-dimensional visualization control device for excavation quality in a cross construction area according to claim 5 is characterized in that: A support plate (7) is fixedly provided on the inner wall of the arc-shaped groove (2), an arc-shaped spring (701) is fixedly provided on the support plate (7), an end of the arc-shaped spring (701) away from the support plate (7) is connected to an arc-shaped plate (702), a movable groove (301) for sliding the arc-shaped plate (702) is provided on the rotating seat (3), and an arc-shaped surface (302) that is movably opposed to the arc-shaped plate (702) is provided on the end of the socket (4) away from the rotating seat (3).