Remote monitoring and operation method of low voltage power distribution system based on ZigBee technology

By using ZigBee technology to design the wireless sensor network architecture in the low-voltage power distribution system, the problem of lack of overall real-time monitoring in the existing technology is solved, rapid fault location and efficient fault handling of the low-voltage power distribution system are achieved, and the system's reliability is improved. Operation stability and fault handling efficiency.

CN118316194BActive Publication Date: 2024-10-29ZHENJINAG KLOCKNER MOELLER ELECTRICAL SYST CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410427922.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-10
Publication Date
2024-10-29
Estimated Expiration
2044-04-10

AI Technical Summary

Technical Problem

The existing technology lacks overall real-time monitoring of the low-voltage power distribution system, which makes fault location difficult and affects fault handling efficiency.

Method used

Design the low-voltage power distribution network architecture based on ZigBee technology, determine the main station node, routing node and terminal sensor node through the wireless sensor network architecture, conduct connectivity analysis and communication link simulation, and optimize the network topology to achieve dynamic reconstruction and remote monitoring Operation and maintenance deployment plan.

Benefits of technology

It improves fault handling efficiency. Through real-time monitoring and dynamic optimization of network topology, problems can be quickly located and the operational stability and reliability of the power distribution system are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118316194B_ABST
    Figure CN118316194B_ABST
Patent Text Reader

Abstract

The present invention discloses a remote monitoring and operation and maintenance method for a low-voltage power distribution system based on ZigBee technology, and relates to the technical field of low-voltage power distribution. The method includes: designing a low-voltage power distribution network architecture; determining a master station node set, a routing node set, and a terminal sensor node set; determining a first predetermined low-voltage power distribution partition; performing communication link simulation, selecting M routing nodes, and combining the terminal sensor node set to construct N simulated communication links; based on the simulated communication link and routing node, performing network topology optimization, dynamically reconstructing the power distribution partition, and obtaining a first communication link architecture; traversing the master station node set to obtain a communication link architecture, combining monitoring requirements, evaluating the communication link architecture, and determining an operation and maintenance deployment plan. The present invention solves the problem that the prior art lacks real-time monitoring of the entire power distribution system, and it is difficult to quickly locate the problem, which affects the efficiency of fault handling, and achieves the technical effect of improving the efficiency of fault handling.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of low-voltage power distribution, and in particular to a remote monitoring and operation method for a low-voltage power distribution system based on ZigBee technology. Background Art

[0002] With the advancement of science and technology and the development of the power industry, the low-voltage distribution system is a key component of the power grid, and its operating status and safety are crucial to the stability and reliability of power supply. However, the traditional monitoring method only monitors the more important switch cabinets in real time, while ignoring the overall situation. This makes it difficult to quickly locate the problem when a fault occurs, affecting the efficiency and accuracy of fault handling. Summary of the invention

[0003] The present application provides a remote monitoring and operation and maintenance method for a low-voltage power distribution system based on ZigBee technology, which is used to solve the technical problems that the prior art lacks real-time monitoring of the entire power distribution system, making it difficult to quickly locate problems and affecting the efficiency of fault handling.

[0004] In view of the above problems, the present application provides a remote monitoring and operation and maintenance method for a low-voltage power distribution system based on ZigBee technology.

[0005] In a first aspect of the present application, a remote monitoring and operation method for a low-voltage power distribution system based on ZigBee technology is provided, the method comprising:

[0006] Based on the target low-voltage power distribution area, a low-voltage power distribution network architecture is designed based on the wireless sensor network architecture of ZigBee technology, and the low-voltage power distribution network architecture includes multiple key points; based on the low-voltage power distribution network architecture, a master station node set, a routing node set and a terminal sensor node set are determined; based on the first master station node in the master station node set, a connectivity analysis is performed in comparison with the low-voltage power distribution network architecture to determine the first predetermined low-voltage power distribution partition, and the first master station node is any master station node in the master station node set; in the routing node set, a communication link simulation is performed in comparison with the first predetermined low-voltage power distribution partition, and M routing nodes are selected, combined with The terminal sensor node set constructs N simulated communication links from the first master station node to each terminal sensor node; based on the N simulated communication links and the M routing nodes, the multiple key points are used as constraint information to perform self-organizing optimization of the network topology, and dynamically reconstructed in combination with the first predetermined low-voltage power distribution partition to obtain a first communication link architecture; based on the first master station node and the first communication link architecture, the master station node set is traversed to obtain multiple communication link architectures, and in combination with remote monitoring requirements, the multiple communication link architectures are evaluated for adaptability to obtain adaptability evaluation results, and a remote monitoring operation and maintenance deployment plan is determined based on the adaptability evaluation results.

[0007] The second aspect of the present application provides a remote monitoring and operation system for a low-voltage power distribution system based on ZigBee technology, the system comprising:

[0008] A low-voltage distribution network architecture design module, which designs a low-voltage distribution network architecture based on a target low-voltage distribution area and a wireless sensor network architecture based on ZigBee technology, and the low-voltage distribution network architecture includes multiple key points; a node set determination module, which determines a master station node set, a routing node set and a terminal sensor node set based on the low-voltage distribution network architecture; a connectivity analysis module, which performs a connectivity analysis based on the first master station node in the master station node set and compares it with the low-voltage distribution network architecture to determine a first predetermined low-voltage distribution partition, and the first master station node is any master station node in the master station node set; a simulated communication link construction module, which performs a communication link simulation in the routing node set and compares it with the first predetermined low-voltage distribution partition. , select M routing nodes, combine with the terminal sensor node set, and construct N simulated communication links from the first master station node to each terminal sensor node; a first communication link architecture acquisition module, the first communication link architecture acquisition module is based on the N simulated communication links and the M routing nodes, uses the multiple key points as constraint information to perform self-organizing optimization of the network topology, and dynamically reconstructs in combination with the first predetermined low-voltage power distribution partition to obtain a first communication link architecture; a remote monitoring and operation and maintenance deployment plan determination module, the remote monitoring and operation and maintenance deployment plan determination module is based on the first master station node and the first communication link architecture, traverses the master station node set, obtains multiple communication link architectures, combines the remote monitoring requirements, performs adaptability evaluation on the multiple communication link architectures, obtains adaptability evaluation results, and determines the remote monitoring and operation and maintenance deployment plan through the adaptability evaluation results.

[0009] One or more technical solutions provided in this application have at least the following technical effects or advantages:

[0010] The present application designs a low-voltage distribution network architecture based on a target low-voltage distribution area and a wireless sensor network architecture based on ZigBee technology. The low-voltage distribution network architecture includes multiple key points. Based on the low-voltage distribution network architecture, a master station node set, a routing node set and a terminal sensor node set are determined. Based on the first master station node in the master station node set, a connectivity analysis is performed in comparison with the low-voltage distribution network architecture to determine a first predetermined low-voltage distribution partition. The first master station node is any master station node in the master station node set. In the routing node set, a communication link simulation is performed in comparison with the first predetermined low-voltage distribution partition, and M routing nodes are selected to form a structure. Combine the terminal sensor node set, build N simulated communication links from the first master station node to each terminal sensor node; based on the N simulated communication links and M routing nodes, use multiple key points as constraint information to perform self-organizing optimization of the network topology, and dynamically reconstruct in combination with the first predetermined low-voltage distribution partition to obtain the first communication link architecture; based on the first master station node and the first communication link architecture, traverse the master station node set to obtain multiple communication link architectures, combine the remote monitoring needs, perform adaptability evaluation on the multiple communication link architectures, obtain adaptability evaluation results, and determine the remote monitoring operation and maintenance deployment plan based on the adaptability evaluation results. The present invention solves the technical problems that the prior art lacks real-time monitoring of the entire distribution system, is difficult to quickly locate the problem, and affects the efficiency of fault handling. The technical effect of improving the efficiency of fault handling is achieved by designing a low-voltage distribution network architecture for connectivity analysis to determine the low-voltage distribution partition. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0012] Figure 1 A schematic diagram of a remote monitoring and operation method for a low-voltage power distribution system based on ZigBee technology provided in an embodiment of the present application;

[0013] Figure 2 A schematic diagram of the structure of a remote monitoring and operation and maintenance system for a low-voltage power distribution system based on ZigBee technology provided in an embodiment of the present application.

[0014] Explanation of the accompanying drawings: low-voltage distribution network architecture design module 11, node set determination module 12, connectivity analysis module 13, simulation communication link construction module 14, first communication link architecture acquisition module 15, remote monitoring and operation and maintenance deployment plan determination module 16. DETAILED DESCRIPTION

[0015] The present application provides a remote monitoring and operation and maintenance method for a low-voltage power distribution system based on ZigBee technology, which is used to solve the technical problems that the existing technology lacks real-time monitoring of the entire power distribution system, making it difficult to quickly locate the problem, and affecting the efficiency of fault handling. By designing a low-voltage power distribution network architecture to conduct connectivity analysis and determine the low-voltage power distribution partitions, the technical effect of improving the efficiency of fault handling is achieved.

[0016] The technical solutions in the embodiments of the present application will be described clearly and completely below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0017] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or server that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or modules that are not clearly listed or inherent to these processes, methods, products or devices.

[0018] Embodiment 1

[0019] like Figure 1 As shown, the present application provides a remote monitoring and operation and maintenance method for a low-voltage power distribution system based on ZigBee technology, the method comprising:

[0020] Step S100: Based on the target low-voltage power distribution area and the wireless sensor network architecture based on ZigBee technology, a low-voltage power distribution network architecture is designed, wherein the low-voltage power distribution network architecture includes a plurality of key points;

[0021] In the embodiment of the present application, the characteristics of the target low-voltage distribution area are first obtained, including the scale of the distribution system, equipment distribution, power load conditions, environmental conditions, etc. The characteristics of the target low-voltage distribution area are analyzed to clarify the goals and constraints of the network architecture design. Based on the characteristics of ZigBee technology, the basic framework of the wireless sensor network architecture is determined. Appropriate ZigBee devices, such as sensor nodes, routing nodes, and coordinators, are selected to build a basic wireless sensor network.

[0022] When designing the low-voltage distribution network architecture, we should pay attention to the setting of multiple key points. Key points are key equipment or locations in the distribution system, such as transformers, switch cabinets, important load points, etc.

[0023] Step S200: Based on the low-voltage power distribution network architecture, determine a master station node set, a routing node set and a terminal sensor node set;

[0024] In the embodiment of the present application, the master station nodes are deployed at key locations of the power distribution system. They have strong data processing capabilities and a wide communication range, and can communicate with multiple routing nodes and terminal sensor nodes. When determining the master station node set, the processing capacity requirements, communication coverage, and geographical location of the nodes are considered.

[0025] When determining the master node set, the scope and key locations of each small area are determined according to the design of the low-voltage distribution network architecture. In each small area, devices with sufficient processing power and communication range are selected as candidate master nodes, and finally the master node set is determined.

[0026] Routing nodes play a bridging role in the low-voltage distribution network architecture. They are responsible for forwarding the data of the terminal sensor nodes to the master node and passing the control instructions of the master node to the corresponding terminal sensor nodes. When selecting routing nodes, their communication relay capabilities and location distribution are considered.

[0027] When determining the set of routing nodes, the number of required routing nodes is determined based on the number and distribution of terminal sensor nodes in each small area. Devices with stable communication capabilities are selected as candidate routing nodes in each small area. The best location of routing nodes is determined through simulation or actual testing, and finally the set of routing nodes is determined.

[0028] The terminal sensor nodes are responsible for collecting various data in the low-voltage power distribution system, such as voltage, current, temperature, etc. When determining the set of terminal sensor nodes, their monitoring requirements, location selection, and environmental adaptability are considered.

[0029] When determining the terminal sensor node set, determine the type and frequency of data that needs to be collected in each small area based on the actual operation of the low-voltage power distribution system and monitoring requirements. Select the appropriate sensor type based on the monitoring requirements, and consider its accuracy, stability, and environmental adaptability. Finally, install sensor nodes at key locations and ensure smooth communication with routing nodes and master station nodes.

[0030] Step S300: Based on the first master station node in the master station node set, a connectivity analysis is performed in comparison with the low-voltage power distribution network architecture to determine a first predetermined low-voltage power distribution partition, wherein the first master station node is any master station node in the master station node set;

[0031] In an embodiment of the present application, first a node is randomly selected from the determined master station node set as the first master station node. After the first master station node is selected, a connectivity analysis is performed against the overall layout of the low-voltage power distribution network architecture, the location and function of each node, the connection mode of the communication link, etc. By sending test signals, checking the compatibility of the communication protocol, verifying the data transmission rate, etc., it is analyzed whether the communication link between it and the routing node and the terminal sensor node is unobstructed, whether there are communication obstacles or breakpoints, and determining the accessibility of the communication path between the master station node and other nodes. When performing connectivity analysis, the stability and reliability of the communication link are considered. For example, the signal strength, bit error rate and other indicators of the link are analyzed to evaluate the communication quality of the link.

[0032] Based on the result of the connectivity analysis, the low-voltage power distribution partition that can be covered and effectively communicated by the first master station node is determined, that is, the first predetermined low-voltage power distribution partition.

[0033] Step S400: In the routing node set, in accordance with the first predetermined low-voltage power distribution partition, a communication link simulation is performed, M routing nodes are selected, and N simulated communication links are constructed from the first master station node to each terminal sensor node in combination with the terminal sensor node set;

[0034] In the embodiment of the present application, all key equipment, lines and possible communication obstacles in the first predetermined low-voltage power distribution partition are identified by comparing the first predetermined low-voltage power distribution partition. Next, a simulation tool is used to simulate the communication link of the routing node set. The communication effects under different routing node combinations are evaluated, and the optimal routing node set is selected.

[0035] Based on the simulation results, M routing nodes are selected as key nodes for constructing the simulated communication link. The geographical location and distribution of the nodes are considered during the selection to ensure that the communication link can cover the entire first predetermined low-voltage distribution area and avoid communication blind spots.

[0036] After selecting the routing nodes, the simulated communication links are constructed in combination with the terminal sensor node set to determine the best communication path between each terminal sensor node and the routing node. Starting from the first master node, N simulated communication links are constructed through the selected M routing nodes and terminal sensor node set.

[0037] Step S500: Based on the N simulated communication links and the M routing nodes, the multiple key points are used as constraint information to perform self-organizing optimization of the network topology, and dynamically reconstructed in combination with the first predetermined low-voltage power distribution partition to obtain a first communication link architecture;

[0038] In an embodiment of the present application, an in-depth analysis is performed on the existing network topology to understand the connection relationship between each node, the communication quality, and potential bottlenecks. At the same time, in combination with the characteristics and requirements of the low-voltage power distribution system, multiple key points are identified, and the key points are important equipment or locations in the power distribution system. After determining the key points, the key points are used as constraints to guide the subsequent network topology optimization and dynamic reconstruction process. The constraints include the communication requirements, data transmission rate, latency requirements, etc. of the key points to ensure that the optimized network can meet the monitoring and operation and maintenance requirements of the key points.

[0039] The information of N simulated communication links is used in combination with the optimization algorithm to perform self-organization optimization of the network topology. The optimization algorithm uses intelligent optimization algorithms such as genetic algorithm, ant colony algorithm, particle swarm optimization, etc. In the optimization process, multiple factors are considered, such as the stability, reliability, and energy efficiency of the communication link. By adjusting the location of the nodes, communication parameters, etc., the optimization algorithm finds a network topology structure that optimizes the performance of the entire network while satisfying the constraints.

[0040] A static optimal network topology is obtained through the optimization algorithm. However, in actual applications, the operating state and environmental conditions of the low-voltage distribution system may change. Therefore, dynamic reconstruction is performed in combination with the first predetermined low-voltage distribution partition. The dynamic reconstruction strategy is to dynamically adjust the network topology according to the real-time operating state and environmental conditions of the system. For example, when the communication quality of a key point decreases, the communication link is rebuilt by adjusting the location or communication parameters of the routing node to restore the communication capability of the key point.

[0041] Through the above steps, a first communication link architecture based on self-organizing optimization and dynamic reconstruction of network topology is obtained.

[0042] Step S600: Based on the first master station node and the first communication link architecture, traverse the master station node set to obtain multiple communication link architectures, and perform adaptability evaluation on the multiple communication link architectures in combination with remote monitoring requirements to obtain adaptability evaluation results, and determine the remote monitoring operation and maintenance deployment plan based on the adaptability evaluation results.

[0043] In the embodiment of the present application, the first master station node and the first communication link architecture are used as the starting point and reference to traverse the master station node set. During the traversal process, factors such as the location, communication capability, and processing capability of different master station nodes are considered, as well as the connection relationship and communication quality between them and the routing nodes and terminal sensor nodes. For each traversed master station node, a corresponding communication link architecture is constructed in combination with the existing network topology information and constraints. In this way, by traversing the master station node set, multiple different communication link architectures are obtained.

[0044] After obtaining multiple communication link architectures, these architectures are evaluated for adaptability in combination with the specific needs of remote monitoring. Remote monitoring requirements include data transmission rate, latency, reliability, coverage, and other aspects. When conducting adaptability evaluation, the quantitative analysis method is used to quantitatively score the performance of the communication link architecture by setting evaluation indicators and weights, and to evaluate the feasibility, stability, and ease of use of the architecture. Through adaptability evaluation, the evaluation results of each communication link architecture are obtained, including its advantages and disadvantages, applicable scenarios, etc.

[0045] Finally, based on the adaptability evaluation results, determine the best remote monitoring and operation and maintenance deployment plan.

[0046] Furthermore, step S300 in the method provided in the application embodiment also includes:

[0047] Performing connectivity assessment based on the low-voltage power distribution network architecture to determine overall connectivity performance indicators, wherein the connectivity performance indicators include signal strength, transmission rate, and network delay;

[0048] Based on the low-voltage power distribution network architecture, a first master station node in the master station node set is used as a starting point for connectivity evaluation to determine a local connectivity performance index;

[0049] The first predetermined low-voltage power distribution zone is determined by the overall connectivity performance index and the local connectivity performance index.

[0050] In an embodiment of the present application, an overall connectivity assessment is performed on the low-voltage distribution network architecture, and the communication quality and performance of the entire network architecture are understood by evaluating the signal strength, transmission rate, and network delay. When evaluating the signal strength, the signal coverage range and quality are evaluated by measuring the signal strength between each node in the network architecture. When evaluating the transmission rate, the data transmission capacity of the entire network is understood by measuring the data transmission rate of each communication link. When evaluating the network delay, the real-time performance of the network architecture is evaluated by measuring the delays of different communication paths. Based on the evaluation results, the overall connectivity performance index is determined.

[0051] The first master station node in the master station node set is used as the starting point to conduct a local connectivity assessment to understand the performance and reliability of the communication link centered on the first master station node. When conducting the connectivity assessment, the communication links from the first master station node to each routing node and terminal sensor node are analyzed, including the evaluation of the stability, signal strength, transmission rate, etc. of the link. Based on the above analysis, the connectivity performance index of the local area centered on the first master station node is determined. The connectivity performance index will reflect the communication quality and capability between the area and the master station node.

[0052] Finally, the overall connectivity performance index and the local connectivity performance index are compared, and the weight of each index is determined in combination with the actual situation. Finally, the low-voltage distribution partition with good communication quality and performance with the first master station node is delineated according to the weight, that is, the first predetermined low-voltage distribution partition.

[0053] Furthermore, step S400 in the method provided in the application embodiment further includes:

[0054] Based on the first predetermined low-voltage power distribution partition, setting simulation parameters, the simulation parameters including communication distance data, signal attenuation data, communication rate data, and power consumption data;

[0055] Based on the simulation parameters, in the routing node set, in comparison with the first predetermined low-voltage power distribution partition, a communication link simulation is performed, and communication coverage information and communication delay information under different candidate routing node combinations are recorded;

[0056] Based on the communication coverage information and communication delay information, determine one by one whether the combination of multiple random routing nodes in the communication link simulation process meets the preset communication performance index requirements;

[0057] If a first random routing node combination among the multiple random routing node combinations meets the preset communication performance indicator requirement, the first random routing node combination is used as a candidate routing node combination, and M routing nodes are selected from the candidate routing node combinations.

[0058] In an embodiment of the present application, corresponding simulation parameters are set according to the characteristics of the first predetermined low-voltage power distribution partition. The simulation parameters include communication distance data, signal attenuation data, communication rate data, and power consumption data. The communication distance data includes the maximum communication distance, average communication distance, etc. between the master station node and the routing node, and between the routing node and the terminal sensor node. These data are determined by the layout of the low-voltage power distribution network and the communication capability of the equipment. Since the signal will be attenuated by various factors during the transmission process, the signal attenuation data is obtained by obtaining the signal attenuation at different distances. The communication rate data includes the communication rate between different nodes and the transmission rate of the entire network. These data are set according to the performance of the equipment and the actual needs of the network. Finally, the power consumption parameters are obtained by collecting the power consumed by each node.

[0059] Using the set simulation parameters, the communication link simulation is performed in the routing node set against the first predetermined low-voltage distribution partition. During the simulation process, the communication coverage information and communication delay information under different candidate routing node combinations are recorded. The communication coverage reflects the coverage of the network to the first predetermined low-voltage distribution partition, while the communication delay is related to the real-time performance of data transmission.

[0060] After the simulation is completed, the recorded communication coverage information and communication delay information are used to determine whether the combination of multiple random routing nodes meets the preset communication performance index requirements. These preset indicators are set according to the actual needs of the low-voltage power distribution network, such as communication coverage reaching more than 95% and communication delay less than 100 milliseconds.

[0061] If the first random routing node combination among the multiple random routing node combinations meets the preset communication performance index requirement, it is used as the candidate routing node combination. Next, M routing nodes are selected from the candidate routing node combinations. The selection criteria include better communication performance, lower power consumption, etc.

[0062] Through this process, a routing node combination that meets the communication requirements of the low-voltage distribution network can be selected based on the simulation parameters and simulation results.

[0063] Furthermore, the method further comprises:

[0064] Normalizing the communication distance data, signal attenuation data, communication rate data, and power consumption data in the simulation parameters to obtain a basic evaluation index;

[0065] Taking the minimum basic evaluation index as a constraint, M routing nodes are selected from the candidate routing node combination.

[0066] In the embodiment of the present application, normalization processing is a data processing method, which can convert simulation parameters of different dimensions and units into dimensionless values ​​to facilitate comparison and comprehensive analysis.

[0067] When normalizing the communication distance data, a maximum value or reference value of the communication distance is set according to the actual layout and communication requirements of the low-voltage power distribution network. Then, the actual communication distance of each routing node is divided by the maximum value or reference value to obtain the normalized communication distance data.

[0068] When normalizing the signal attenuation data, since signal attenuation is usually related to the communication distance, but may also be affected by other factors, a signal attenuation benchmark value is selected, and then the actual signal attenuation data of each routing node is divided by this benchmark value to obtain the normalized signal attenuation data.

[0069] When normalizing the communication rate data, a maximum value or reference value of the communication rate is set, and then the actual communication rate of each routing node is divided by the maximum value or reference value to obtain the normalized communication rate data.

[0070] When normalizing the power consumption data, since power consumption is related to the operating cost and life of the equipment, a baseline value of power consumption is selected, and then the actual power consumption data of each routing node is divided by this baseline value to obtain the normalized power consumption data.

[0071] After normalization, the communication distance data, signal attenuation data, communication rate data, power consumption data, etc. are integrated into a basic evaluation index. This index is in the form of a weighted sum or weighted product, where the weight of each parameter is set according to the actual situation and needs of the low-voltage distribution network.

[0072] Among the candidate routing node combinations, M routing nodes are selected with the minimum basic evaluation index as the constraint. In the specific selection process, an optimization algorithm or a heuristic search method is used to find the optimal solution that meets the constraint conditions. These algorithms sort the candidate routing node combinations according to the size of the basic evaluation index and select the M optimal combinations.

[0073] Furthermore, the method further comprises:

[0074] Get remote monitoring tasks;

[0075] Based on the remote monitoring history records, the remote monitoring tasks are allocated to obtain a first remote monitoring allocation task corresponding to a first predetermined low-voltage power distribution partition;

[0076] Taking the minimum of the basic evaluation index as a constraint and the first remote monitoring assignment task as a goal, M routing nodes are selected.

[0077] In the embodiment of the present application, firstly, remote monitoring tasks are obtained from the monitoring system, which include monitoring the power status of a specific area, collecting the operating data of a specific device, checking a specific fault point, etc.

[0078] After obtaining the remote monitoring tasks, these tasks are assigned based on the remote monitoring history records. The history records contain information such as the execution of previous monitoring tasks, the monitoring requirements of each partition, the usage of routing nodes, etc. By analyzing this information, the remote monitoring tasks are assigned to the partition that is most suitable for execution, that is, the first predetermined low-voltage power distribution partition. Specifically, based on the monitoring requirements of the partition in the historical records, the frequency of faults, the operating status of the equipment, and other factors, the type and number of monitoring tasks that the partition currently needs to execute are determined. Then the remote monitoring tasks are assigned to the partition according to the type and quantity to form the first remote monitoring assignment task.

[0079] After determining the first remote monitoring assignment task, M routing nodes are selected with the minimum basic evaluation index as the constraint and the task as the goal. During the selection process, the selected routing nodes can cover all monitoring points of the first predetermined low-voltage distribution partition to ensure comprehensive coverage of the monitoring task. Secondly, the communication performance and power consumption of these routing nodes meet the requirements of the monitoring task, ensuring the accurate transmission of monitoring data and the stable operation of the system. Finally, the stability and reliability of the routing nodes are considered to avoid interruption of the monitoring task due to node failure.

[0080] Under the premise of satisfying the above constraints, M routing nodes with the smallest basic evaluation index are selected from the candidate routing node combination through the optimization algorithm.

[0081] Furthermore, step S500 in the method provided in the application embodiment also includes:

[0082] The N simulated communication links are used as an initial state, the selected M routing nodes are used as intermediate nodes, and a communication link simulation model is constructed;

[0083] The network topology is self-organized and optimized through the communication link simulation model, and the iterative direction is corrected by comparing the abnormal data in the low-voltage power distribution monitoring and operation database;

[0084] When the iterative calculation result meets a preset stopping criterion, a first communication link architecture is determined.

[0085] In the embodiment of the present application, the N simulated communication links set before are used as the initial state. These simulated communication links represent the communication paths in the low-voltage power distribution network. M routing nodes selected from the alternative routing nodes are used as the intermediate nodes of the communication link simulation model. These routing nodes are responsible for forwarding and transmission of data. Based on the simulated communication links in the initial state and the selected intermediate nodes, a communication link simulation model is constructed.

[0086] When constructing the communication link simulation model, the basic framework of the simulation model is determined based on the network topology, including the connection relationship between nodes, communication protocol, etc. N simulated communication links are integrated into the simulation model, and then the selected M routing nodes are added to the simulation model as intermediate nodes, and their positions and communication parameters are set. After the simulation model framework is built, the corresponding communication parameters such as transmission power, receiving sensitivity, communication protocol, etc. are configured for each communication link and routing node according to the simulation parameters. At the same time, in order to simulate the network operation more realistically, some fault simulation parameters are set in the model, such as link interruption probability, node failure rate, etc. In the simulation model, the flow logic of data from the source node to the target node is established, including the process of data sending, routing selection, forwarding and receiving. The various protocols used in the simulation implementation network communication are ensured to ensure the correct transmission of data and the collaborative work between nodes.

[0087] After building the communication link simulation model, an initial verification is performed to check whether the model can operate normally and whether the parameters are set correctly. Based on the results of the initial verification, the model is debugged and optimized as necessary to ensure that it can accurately simulate the communication process in the low-voltage distribution network.

[0088] After completing the construction of the communication link simulation model, in the simulation model, the connection relationship between nodes is dynamically adjusted to optimize the topology of the communication link according to the performance indicators of the communication link, such as signal strength, transmission rate, network delay, etc. The configuration of the selected M routing nodes is optimized, including adjusting the communication parameters of the nodes, optimizing the layout of the nodes, etc., to improve the overall performance of the communication link.

[0089] After the communication link simulation model is built, the network topology is self-organized and optimized to dynamically adjust the network structure. The optimization includes adjusting the connection relationship and the configuration of the routing nodes. Specifically, according to the real-time status of the communication link, the load of the node, the communication demand and other factors, the connection relationship between the nodes is dynamically adjusted to ensure that the data can be transmitted quickly and accurately. At the same time, the configuration of the routing nodes is optimized, the communication parameters of the nodes are adjusted, the layout of the nodes is optimized, etc., to improve the communication capability and coverage of the nodes.

[0090] In the process of self-organizing optimization of network topology, iterative direction correction is performed by comparing the abnormal data in the low-voltage power distribution monitoring and operation database. These abnormal data include communication failures, data loss, excessive delay, etc., which reflect the problems and deficiencies in the current network topology. By comparing the abnormal data, bottlenecks and weak links in the network topology are found and optimized in a targeted manner. Specifically, according to the type and location of the abnormal data, the corresponding connection relationship and routing node configuration are adjusted to eliminate or alleviate these problems. This process is an iterative process. The optimal network topology structure is found by continuously performing self-organizing optimization of the network topology and comparing abnormal data.

[0091] When the iterative calculation result meets the preset stop criteria, the first communication link architecture is determined. The preset stop criteria include the number of iterations reaching a preset value, the optimization effect reaching a preset threshold, etc. When these criteria are met, the current network topology reaches a relatively optimal state.

[0092] Furthermore, the method further comprises:

[0093] After each iteration, the output results of the first iteration before optimization and the output results of the second iteration after optimization are compared to obtain the performance index difference;

[0094] By means of the performance indicator difference, the stability of the communication link is evaluated to obtain a first evaluation result; by means of the performance indicator difference, the monitoring coverage is evaluated to obtain a second evaluation result;

[0095] The first evaluation result and the second evaluation result are input into an iterative direction correction model to perform iterative direction correction.

[0096] In the embodiment of the present application, after each iteration is completed, the optimized communication link architecture is obtained, that is, the second iteration output result. The key indicators such as the stability of the communication link and the monitoring coverage in the first iteration output result before optimization and the second iteration output result after optimization are compared to obtain the performance indicator difference. These indicator differences reflect the impact of the optimization measures on the performance of the communication link. For example, the stability of the communication link is improved or the monitoring coverage is increased.

[0097] The stability of the communication link is evaluated by using the difference in performance indicators. The stability evaluation is to evaluate the connectivity and reliability of the communication link under different conditions. If the optimized communication link can maintain a high connectivity when facing failures or interference, and the stability of data transmission is significantly improved, it is considered that the optimization measures have achieved positive results in improving the stability of the communication link. Through the evaluation, the first evaluation result is obtained.

[0098] The monitoring coverage rate reflects the coverage of the monitoring system to the low-voltage power distribution network. By comparing the monitoring coverage rates before and after optimization, it is determined whether the optimization measures have effectively expanded the monitoring scope and improved the comprehensiveness and accuracy of monitoring. Through the evaluation, the second evaluation result is obtained.

[0099] After obtaining the first and second evaluation results, the results are input into the iteration direction correction model. This model adjusts the current optimization direction according to the evaluation results to ensure that subsequent iterations can more accurately improve the performance and monitoring effect of the communication link.

[0100] In the embodiments of the present application, in summary, the embodiments of the present application have at least the following technical effects:

[0101] The present application designs a low-voltage distribution network architecture based on a target low-voltage distribution area and a wireless sensor network architecture based on ZigBee technology. The low-voltage distribution network architecture includes multiple key points. Based on the low-voltage distribution network architecture, a master station node set, a routing node set and a terminal sensor node set are determined. Based on the first master station node in the master station node set, a connectivity analysis is performed in comparison with the low-voltage distribution network architecture to determine a first predetermined low-voltage distribution partition. The first master station node is any master station node in the master station node set. In the routing node set, a communication link simulation is performed in comparison with the first predetermined low-voltage distribution partition, and M routing nodes are selected to form a structure. Combine the terminal sensor node set, build N simulated communication links from the first master station node to each terminal sensor node; based on the N simulated communication links and M routing nodes, use multiple key points as constraint information to perform self-organizing optimization of the network topology, and dynamically reconstruct in combination with the first predetermined low-voltage distribution partition to obtain the first communication link architecture; based on the first master station node and the first communication link architecture, traverse the master station node set to obtain multiple communication link architectures, combine the remote monitoring needs, perform adaptability evaluation on the multiple communication link architectures, obtain adaptability evaluation results, and determine the remote monitoring operation and maintenance deployment plan based on the adaptability evaluation results. The present invention solves the technical problems that the prior art lacks real-time monitoring of the entire distribution system, is difficult to quickly locate the problem, and affects the efficiency of fault handling. The technical effect of improving the efficiency of fault handling is achieved by designing a low-voltage distribution network architecture for connectivity analysis to determine the low-voltage distribution partition.

[0102] Embodiment 2

[0103] Based on the same inventive concept as the low-voltage power distribution system remote monitoring and operation method based on ZigBee technology in the aforementioned embodiment, Figure 2 As shown, the present application provides a low-voltage power distribution system remote monitoring and operation and maintenance system based on ZigBee technology. The system and method embodiments in the present application are based on the same inventive concept. The system includes:

[0104] A low-voltage power distribution network architecture design module 11, which designs a low-voltage power distribution network architecture based on a target low-voltage power distribution area and a wireless sensor network architecture based on ZigBee technology, and the low-voltage power distribution network architecture includes multiple key points;

[0105] A node set determination module 12, wherein the node set determination module 12 determines a master station node set, a routing node set and a terminal sensor node set based on the low-voltage power distribution network architecture;

[0106] A connectivity analysis module 13, wherein the connectivity analysis module 13 performs connectivity analysis based on a first master station node in the master station node set and compares the low-voltage power distribution network architecture to determine a first predetermined low-voltage power distribution partition, wherein the first master station node is any master station node in the master station node set;

[0107] A simulated communication link construction module 14, wherein the simulated communication link construction module 14 performs a communication link simulation in the routing node set and compares the first predetermined low-voltage power distribution partition, selects M routing nodes, and combines the terminal sensor node set to construct N simulated communication links from the first master station node to each terminal sensor node;

[0108] A first communication link architecture acquisition module 15, which performs network topology self-organization optimization based on the N simulated communication links and the M routing nodes, and dynamically reconstructs the network topology in combination with the first predetermined low-voltage power distribution partition to obtain a first communication link architecture;

[0109] A remote monitoring and operation and maintenance deployment plan determination module 16, the remote monitoring and operation and maintenance deployment plan determination module 16 is based on the first master station node and the first communication link architecture, traverses the master station node set, obtains multiple communication link architectures, combines the remote monitoring needs, performs adaptability evaluation on the multiple communication link architectures, obtains adaptability evaluation results, and determines the remote monitoring and operation and maintenance deployment plan through the adaptability evaluation results.

[0110] Furthermore, the system also includes:

[0111] Performing connectivity assessment based on the low-voltage power distribution network architecture to determine overall connectivity performance indicators, wherein the connectivity performance indicators include signal strength, transmission rate, and network delay;

[0112] Based on the low-voltage power distribution network architecture, a first master station node in the master station node set is used as a starting point for connectivity evaluation to determine a local connectivity performance index;

[0113] The first predetermined low-voltage power distribution zone is determined by the overall connectivity performance index and the local connectivity performance index.

[0114] Furthermore, the system also includes:

[0115] Based on the first predetermined low-voltage power distribution partition, setting simulation parameters, the simulation parameters including communication distance data, signal attenuation data, communication rate data, and power consumption data;

[0116] Based on the simulation parameters, in the routing node set, in comparison with the first predetermined low-voltage power distribution partition, a communication link simulation is performed, and communication coverage information and communication delay information under different candidate routing node combinations are recorded;

[0117] Based on the communication coverage information and communication delay information, determine one by one whether the combination of multiple random routing nodes in the communication link simulation process meets the preset communication performance index requirements;

[0118] If a first random routing node combination among the multiple random routing node combinations meets the preset communication performance indicator requirement, the first random routing node combination is used as a candidate routing node combination, and M routing nodes are selected from the candidate routing node combinations.

[0119] Furthermore, the system also includes:

[0120] Normalizing the communication distance data, signal attenuation data, communication rate data, and power consumption data in the simulation parameters to obtain a basic evaluation index;

[0121] Taking the minimum basic evaluation index as a constraint, M routing nodes are selected from the candidate routing node combination.

[0122] Furthermore, the system also includes:

[0123] Get remote monitoring tasks;

[0124] Based on the remote monitoring history records, the remote monitoring tasks are allocated to obtain a first remote monitoring allocation task corresponding to a first predetermined low-voltage power distribution partition;

[0125] Taking the minimum of the basic evaluation index as a constraint and the first remote monitoring assignment task as a goal, M routing nodes are selected.

[0126] Furthermore, the system also includes:

[0127] The N simulated communication links are used as an initial state, the selected M routing nodes are used as intermediate nodes, and a communication link simulation model is constructed;

[0128] The network topology is self-organized and optimized through the communication link simulation model, and the iterative direction is corrected by comparing the abnormal data in the low-voltage power distribution monitoring and operation database;

[0129] When the iteration output result meets a preset stop criterion, a first communication link architecture is determined.

[0130] Furthermore, the system also includes:

[0131] After each iteration, the output results of the first iteration before optimization and the output results of the second iteration after optimization are compared to obtain the performance index difference;

[0132] By means of the performance indicator difference, the stability of the communication link is evaluated to obtain a first evaluation result; by means of the performance indicator difference, the monitoring coverage is evaluated to obtain a second evaluation result;

[0133] The first evaluation result and the second evaluation result are input into an iterative direction correction model to perform iterative direction correction.

[0134] It should be noted that the above-mentioned sequence of the embodiments of the present application is only for description and does not represent the advantages and disadvantages of the embodiments. And the above-mentioned specific embodiments of this specification are described. Other embodiments are within the scope of the attached claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0135] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.

[0136] This specification and drawings are merely exemplary illustrations of the present application and are deemed to cover any and all modifications, variations, combinations or equivalents within the scope of the present application. Obviously, a person skilled in the art may make various modifications and variations to the present application without departing from the scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the present application and its equivalents, the present application intends to include these modifications and variations.

Claims

1. A remote monitoring and operation method for a low-voltage power distribution system based on ZigBee technology, characterized in that: The method comprises: Based on the target low-voltage power distribution area and the wireless sensor network architecture based on ZigBee technology, a low-voltage power distribution network architecture is designed, wherein the low-voltage power distribution network architecture includes multiple key points; Based on the low-voltage power distribution network architecture, determining a master station node set, a routing node set and a terminal sensor node set; Based on the first master station node in the master station node set, a connectivity analysis is performed in comparison with the low-voltage power distribution network architecture to determine a first predetermined low-voltage power distribution partition, wherein the first master station node is any master station node in the master station node set; In the routing node set, in comparison with the first predetermined low-voltage power distribution partition, a communication link simulation is performed, M routing nodes are selected, and N simulated communication links from the first master station node to each terminal sensor node are constructed in combination with the terminal sensor node set; Based on the N simulated communication links and the M routing nodes, the multiple key points are used as constraint information to perform self-organizing optimization of the network topology, and dynamically reconstructed in combination with the first predetermined low-voltage power distribution partition to obtain a first communication link architecture; Based on the first master station node and the first communication link architecture, the master station node set is traversed to obtain multiple communication link architectures, and in combination with remote monitoring requirements, the multiple communication link architectures are evaluated for adaptability to obtain adaptability evaluation results, and the remote monitoring operation and maintenance deployment plan is determined based on the adaptability evaluation results.

2. The remote monitoring and operation method for a low-voltage power distribution system based on ZigBee technology as claimed in claim 1, characterized in that: Based on the first master station node in the master station node set, a connectivity analysis is performed in comparison with the low-voltage power distribution network architecture to determine a first predetermined low-voltage power distribution partition, the method comprising: Performing connectivity assessment based on the low-voltage power distribution network architecture to determine overall connectivity performance indicators, wherein the connectivity performance indicators include signal strength, transmission rate, and network delay; Based on the low-voltage power distribution network architecture, a first master station node in the master station node set is used as a starting point for connectivity evaluation to determine a local connectivity performance index; The first predetermined low-voltage power distribution zone is determined by the overall connectivity performance index and the local connectivity performance index.

3. The remote monitoring and operation method for a low-voltage power distribution system based on ZigBee technology as claimed in claim 1, characterized in that: In the routing node set, in accordance with the first predetermined low-voltage power distribution partition, a communication link simulation is performed, and M routing nodes are selected, the method comprising: Based on the first predetermined low-voltage power distribution partition, setting simulation parameters, the simulation parameters including communication distance data, signal attenuation data, communication rate data, and power consumption data; based on the simulation parameters, in the routing node set, in comparison with the first predetermined low-voltage power distribution partition, performing communication link simulation, and recording communication coverage information and communication delay information under different candidate routing node combinations; Based on the communication coverage information and communication delay information, determine one by one whether the combination of multiple random routing nodes in the communication link simulation process meets the preset communication performance index requirements; If a first random routing node combination among the multiple random routing node combinations meets the preset communication performance indicator requirement, the first random routing node combination is used as a candidate routing node combination, and M routing nodes are selected from the candidate routing node combinations.

4. The remote monitoring and operation method for a low-voltage power distribution system based on ZigBee technology as claimed in claim 3, characterized in that: Selecting M routing nodes from the candidate routing node combination by best merit, the method comprising: Normalizing the communication distance data, signal attenuation data, communication rate data, and power consumption data in the simulation parameters to obtain a basic evaluation index; Taking the minimum basic evaluation index as a constraint, M routing nodes are selected from the candidate routing node combination.

5. The remote monitoring and operation method for a low-voltage power distribution system based on ZigBee technology as claimed in claim 4, characterized in that: Taking the minimum basic evaluation index as a constraint, M routing nodes are selected from the candidate routing node combination by merit, the method comprising: Get remote monitoring tasks; Based on the remote monitoring history records, the remote monitoring tasks are allocated to obtain a first remote monitoring allocation task corresponding to a first predetermined low-voltage power distribution partition; Taking the minimum of the basic evaluation index as a constraint and the first remote monitoring assignment task as a goal, M routing nodes are selected.

6. The remote monitoring and operation method for a low-voltage power distribution system based on ZigBee technology as claimed in claim 1, characterized in that: Based on the N simulated communication links and the M routing nodes, the multiple key points are used as constraint information to perform self-organizing optimization of network topology, and the first predetermined low-voltage power distribution partition is combined for dynamic reconstruction to obtain a first communication link architecture, the method comprising: The N simulated communication links are used as an initial state, the selected M routing nodes are used as intermediate nodes, and a communication link simulation model is constructed; The network topology is self-organized and optimized through the communication link simulation model, and the iterative direction is corrected by comparing the abnormal data in the low-voltage power distribution monitoring and operation database; When the iteration output result meets a preset stop criterion, a first communication link architecture is determined.

7. The remote monitoring and operation method for a low-voltage power distribution system based on ZigBee technology as claimed in claim 6, characterized in that: The method of iteratively correcting the abnormal data in the low-voltage power distribution monitoring and operation database includes: After each iteration, the output results of the first iteration before optimization and the output results of the second iteration after optimization are compared to obtain the performance index difference; By means of the performance indicator difference, the stability of the communication link is evaluated to obtain a first evaluation result; by means of the performance indicator difference, the monitoring coverage is evaluated to obtain a second evaluation result; The first evaluation result and the second evaluation result are input into an iterative direction correction model to perform iterative direction correction.

8. Low voltage power distribution system remote monitoring and operation and maintenance system based on ZigBee technology, characterized by: The system comprises: A low-voltage power distribution network architecture design module, wherein the low-voltage power distribution network architecture design module designs a low-voltage power distribution network architecture based on a target low-voltage power distribution area and a wireless sensor network architecture based on ZigBee technology, wherein the low-voltage power distribution network architecture includes multiple key points; A node set determination module, wherein the node set determination module determines a master station node set, a routing node set and a terminal sensor node set based on the low-voltage power distribution network architecture; A connectivity analysis module, wherein the connectivity analysis module performs connectivity analysis based on a first master station node in the master station node set and in comparison with the low-voltage power distribution network architecture to determine a first predetermined low-voltage power distribution partition, wherein the first master station node is any master station node in the master station node set; A simulated communication link construction module, wherein the simulated communication link construction module performs communication link simulation in the routing node set and compares the first predetermined low-voltage power distribution partition, selects M routing nodes, and combines the terminal sensor node set to construct N simulated communication links from the first master station node to each terminal sensor node; A first communication link architecture acquisition module, which performs self-organization optimization of network topology based on the N simulated communication links and the M routing nodes, and dynamically reconstructs the network topology in combination with the first predetermined low-voltage power distribution partition to obtain a first communication link architecture; A remote monitoring and operation and maintenance deployment plan determination module, based on the first master station node and the first communication link architecture, traverses the master station node set to obtain multiple communication link architectures, and performs adaptability evaluation on the multiple communication link architectures in combination with remote monitoring requirements to obtain adaptability evaluation results, and determines the remote monitoring and operation and maintenance deployment plan through the adaptability evaluation results.

Citation Information

Patent Citations

  • Distribution monitoring system based on ZigBee and Beidou communication

    CN104993595A

  • Collaborative positioning

    EP3967087A1