Tunnel bulge deformation control method and device and drilling tool
By replacing dry mixed aggregates with boreholes drilled on both sides of the tunnel surface, the problems of long construction cycle and high cost in controlling tunnel uplift deformation were solved, and the stability and safety of the tunnel structure were achieved. This method is applicable to various geological conditions.
Patent Information
- Application Number
- CN202410576953.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-10
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2044-05-10
AI Technical Summary
Tunnel uplift and deformation is difficult to control effectively during soil unloading, leading to tunnel structural damage and operational safety risks. Existing methods have drawbacks such as long construction cycles, high costs, and difficulty in quality control.
By determining the target borehole locations on the ground surface on both sides of the tunnel, drilling is carried out using drilling tools to replace the underground soil with dry mixed aggregate, and the boreholes are sealed to form an isolation zone to reduce or offset tunnel uplift deformation.
It enables proactive control of tunnel uplift deformation, reduces construction time and costs, and ensures the stability and operational safety of the tunnel structure. It is widely applicable and easy to operate.
Smart Images

Figure CN118327465B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of tunnel and underground engineering technology, and in particular to a method, device and drilling tool for controlling tunnel uplift deformation. Background Technology
[0002] Currently, the operation of subway lines drives the development of businesses along the lines, leading to an increasing number of urban underground space development and urban renewal projects. This results in numerous adjacent construction projects around subway lines, such as excavation and unloading of soil above and excavation and unloading of nearby foundation pits. Consequently, many external work projects near or across subway lines have a certain impact on subway operations. To address this, national and local governments have issued technical standards and specifications for subway protection and management. For example, Appendix B.0.2 of the "Technical Specification for Structural Safety Protection of Urban Rail Transit" (CJJ / T202-2013) stipulates that the warning value for vertical displacement of tunnels is 10mm, and the control value is 20mm.
[0003] Earthwork excavation and unloading disrupts the original soil balance, inevitably releasing stress in the unexcavated soil. This leads to stress redistribution in the surrounding soil and tunnel structure, causing horizontal or vertical displacement of the soil. The surrounding buildings and the underlying tunnel, due to the disruption of their original stress balance, experience additional stress and deformation, inevitably causing rebound in the surrounding soil and rock layers. This, in turn, causes the underlying tunnel to heave and deform. Especially in mudstone strata, the heave of existing operating tunnels exhibits a delayed effect; often, no significant heave occurs during the unloading process, but over time, it manifests as a noticeable, overall abnormal heave. In severe cases, this can lead to cracking, damage, and leakage in the tunnel structure, and may even affect the safety of subway operations. According to actual engineering cases, if no protective measures are taken when a large area of soil is unloaded above the tunnel, the vertical displacement of the tunnel will show an overall bulging trend after construction. The vertical displacement of the tunnel in the corresponding soil unloading area exceeds the deformation control value by 10mm, and the maximum vertical displacement of the tunnel in the core area exceeds the control value by 20mm, which will damage the tunnel structure and affect the safety of train operation.
[0004] Currently, research on tunnel uplift deformation control measures mainly includes: ① excavation control measures such as separation, block division, segmentation, and layering based on the theory of spatial-temporal effect of tunnel earthwork excavation and unloading; ② grouting reinforcement of the soil at the bottom of the foundation pit or the soil around the tunnel; ③ using structures such as anti-uplift piles to control the displacement of the soil around the tunnel.
[0005] The first method is to adopt excavation control measures such as separation, segmentation, and layering based on the spatiotemporal effect theory. This method can implement information-based feedback construction operations while ensuring safety monitoring and inspection, so as to ensure that the tunnel's upward deformation is within the allowable range. It is usually only applicable to situations where the tunnel excavation involves small-scale unloading or a small amount of unloading.
[0006] The second method involves grouting reinforcement of the soil at the bottom of the foundation pit or around the tunnel. This typically involves reinforcing the soil around the tunnel. The essence of soil reinforcement is to increase soil strength by changing the internal friction angle and cohesion, thereby reducing deformation of the soil around the tunnel. Common methods for soil reinforcement include: 1) constructing triaxial cement-soil mixing piles or high-pressure jet grouting piles within a certain depth range from the bottom of the pit to the tunnel perimeter; 2) for projects where the tunnel passes over or under an existing tunnel, using MJS horizontal piles to treat the soil around the existing tunnel; and 3) grouting the soil within a certain range from the bottom of the pit to the tunnel perimeter. The main disadvantages are long construction period, difficulty in quality control, and high cost. Furthermore, this type of grouting reinforcement requires strict control of the grouting volume and pressure to prevent secondary disasters such as upward deformation and structural damage to the tunnel due to high-pressure grouting.
[0007] The third method is the portal frame anti-buoyancy frame, which is a tunnel deformation control measure adopted in recent years. The form of the portal frame anti-buoyancy frame reinforcement structure can be determined through engineering design and numerical calculation. The stress mechanism of the tunnel and the reinforcement structure is clear. It is gradually being applied to the anti-buoyancy control of earthwork excavation above the tunnel. By interacting with the surrounding rock and soil, a portal frame is formed above the tunnel, thereby constraining the rebound deformation of the rock and soil around the tunnel within the frame and ensuring that the tunnel deformation is within the allowable range. Its main disadvantages are long construction period and high cost.
[0008] In summary, the external soil unloading operation above the tunnel must consider not only the economy and feasibility of tunnel structure or soil and rock reinforcement, but also the stability and safety of the tunnel structure.
[0009] Therefore, a new technical solution is urgently needed to solve the above-mentioned technical problems. Summary of the Invention
[0010] The main purpose of this application is to provide a method, device and drilling tool for controlling tunnel heave deformation, which aims to solve the technical problem of tunnel heave deformation caused by soil unloading.
[0011] To achieve the above objectives, this application provides a method for controlling tunnel heave deformation, the method comprising the following steps:
[0012] Determine the locations of target boreholes on the surface on both sides of the tunnel;
[0013] Drilling is carried out along the target borehole location using drilling tools to replace the underground soil with dry mixed aggregate;
[0014] After the soil removal and replacement at the target borehole location is completed, the borehole is sealed.
[0015] Optionally, the step of determining the target borehole locations on the surface on both sides of the tunnel includes:
[0016] Determine the surface areas on both sides of the tunnel;
[0017] Determine the inclination angle of the borehole and the safe distance between the borehole and the outside of the tunnel;
[0018] Based on the tilt angle and the safety distance, the target borehole location in the surface area is determined.
[0019] Optionally, the step of drilling along the target borehole location using a drill bit includes:
[0020] Symmetrical drilling is performed along the target borehole location using a drilling tool;
[0021] During symmetrical drilling, the spacing between surface boreholes and the number of borehole rows are dynamically adjusted according to the degree of tunnel uplift and deformation.
[0022] Optionally, the drilling tool includes a drill bit and a drill pipe; the drill bit and the drill pipe are fixedly connected.
[0023] The step of drilling along the target borehole location using a drill bit includes:
[0024] The drill rod is tilted at a preset angle and drilled along the target hole position until the drilling length reaches the estimated length.
[0025] Optionally, the step of determining the estimated length includes:
[0026] Obtain the diameter and burial depth of the tunnel;
[0027] The estimated length is determined based on the diameter and the burial depth.
[0028] Optionally, the drill string includes a casing; the step of replacing the underground soil with dry mixed aggregate includes:
[0029] During the drilling process, the broken underground soil is blown away to remove slag and the casing is then installed.
[0030] Remove the drill rod from the borehole;
[0031] The dry mixed aggregate is pushed and compacted by using drill rods and vibrators, and the casing is withdrawn simultaneously.
[0032] Optionally, the target borehole positions include a quincunx pattern, with a horizontal spacing of m between target borehole positions, a spacing of n between adjacent rows of boreholes on the ground surface, and a minimum spacing of l between upper and lower rows of boreholes; where m = 2n, n = l / sinφ, and φ represents the drill rod inclination angle.
[0033] Furthermore, to achieve the above objectives, this application also provides a tunnel heave deformation control device, the tunnel heave deformation control device comprising:
[0034] The borehole location calibration module is used to determine the location of target boreholes on the ground surface on both sides of the tunnel;
[0035] The drilling module is used to drill along the target borehole location using a drilling tool to replace the underground soil with dry mixed aggregate;
[0036] The borehole sealing module is used to seal the borehole after the soil removal and backfilling at the target borehole location has been completed.
[0037] This application also provides a drilling tool for implementing the tunnel uplift deformation control method described above; the drilling tool includes: casing, shoe, down-the-hole hammer, drill bit, drill rod and pipe puller.
[0038] Optionally, the drill bit includes an eccentric drill bit with a diameter of [200mm, 300mm], and the drill rod includes a hollow drill rod.
[0039] The tunnel uplift deformation control method in this application involves determining the target borehole locations on both sides of the tunnel surface; drilling along these target borehole locations using drilling tools to replace the underground soil with dry mixed aggregate; and sealing the boreholes after the soil removal and replacement at the target borehole locations is completed. This method replaces easily deformable soil (such as mudstone) affected by underground conditions with less deformable dry mixed aggregate, utilizing the principle of overall tunnel settlement to reduce or offset tunnel uplift deformation. This achieves soil removal and replacement through boreholes on both sides, forming a relatively weak isolation zone in the surrounding rock. This indirectly isolates the continuous rebound deformation of the surrounding soil and rock mass caused by large-area unloading. Under the weight of the tunnel structure and soil mass above the isolation zone, a certain degree of compaction settlement or lateral compression deformation occurs, which can reduce or offset the upward rebound deformation of the tunnel. This method has the advantages of wide applicability to geological formations, simple operation, convenient construction, short construction period, and low cost. Attached Figure Description
[0040] Figure 1 This is a schematic cross-sectional view of the drilling construction scenario involved in the tunnel uplift deformation control method of this application;
[0041] Figure 2 This is a schematic diagram of the drill bit and casing layout involved in the tunnel uplift deformation control method of this application.
[0042] Figure 3 This is a top view of the drilling construction scenario involved in the tunnel uplift deformation control method of this application;
[0043] Figure 4 This is a flowchart illustrating the first embodiment of the tunnel heave deformation control method of this application;
[0044] Figure 5 This is a schematic diagram of the construction process framework involved in the tunnel heave deformation control method of this application;
[0045] Figure 6 This is a schematic diagram of the frame structure of the tunnel heave deformation control device of this application.
[0046] The realization of the purpose, functional features and advantages of this application will be further explained in conjunction with the embodiments and with reference to the accompanying drawings. Detailed Implementation
[0047] It should be understood that the specific embodiments described herein are merely illustrative of this application and are not intended to limit this application.
[0048] The inventive concept of this application is as follows:
[0049] This study explores a safe, economical, and applicable method for controlling tunnel uplift deformation during earthwork unloading by using oblique drilling for soil removal and replacement, leveraging the overall settlement of the tunnel to reduce or offset its upward deformation. The method involves internal tunnel reinforcement to ensure the integrity and stability of the tunnel structure. Simultaneously, eccentric drill bits and casings are used to create oblique drilling for soil removal and replacement on both sides of the surrounding rock and soil, forming a relatively weak isolation zone. This indirectly isolates the continuous rebound deformation of the surrounding rock and soil caused by large-area unloading. The tunnel structure and the self-weight of the rock and soil above the isolation zone undergo some compaction settlement or lateral compression deformation, which can reduce or offset the upward rebound deformation of the tunnel.
[0050] The process flow of this application may generally include:
[0051] Determine the borehole location → Erect the drilling rig operation scaffold → Install and position the drilling rig → Install the drilling tools → Drill the hole → Blow and remove slag after drilling → Remove the drilling tools and drill rods → Push and place the replacement aggregate → Push the aggregate in the casing while pulling out the casing → Until the casing is completely pulled out → Sealing the hole.
[0052] Based on the above-mentioned inventive concept and process, this application proposes a drilling tool that can be used in conjunction with a drilling rig to complete drilling work.
[0053] The drilling tools include: casing (including standard sections and adjusting sections, with threaded connections for extension), casing shoe, down-the-hole hammer, drill bit, drill pipe, and casing puller. The drill bit can be an eccentric drill bit, and the drill pipe can be a hollow drill pipe.
[0054] Working principle:
[0055] On both sides of the tunnel, an eccentric drill bit and casing are used to create boreholes to replace the underground soil. Soil that is easily deformed by underground conditions (such as mudstone) is replaced with dry mixed aggregate that is less easily deformed by underground conditions. The borehole-forming process uses an eccentric drill bit and casing. The eccentric drill bit has linear guidance and does not deviate from the borehole. The use of casing ensures that the borehole does not collapse and the surrounding soil does not deform.
[0056] A field down-the-hole eccentric drilling rig can be used, with the drill bit diameter selected accordingly. Its characteristics include high torque and lifting pressure, strong adaptability to drilling tools, and deep and high-quality hole drilling. The supporting drilling tools are down-the-hole hammer and eccentric drill bit for casing drilling. The down-the-hole hammer uses high-pressure air as power to do work.
[0057] Casing advance is achieved by hammering a shoe attached to the casing with a down-the-hole hammer, advancing synchronously. The main function of the casing is to protect the borehole wall and prevent disturbance and rockfall during drilling; another function is that, with a larger diameter than the drill pipe, the casing has better rigidity, preventing drill pipe bending and improving borehole quality. Casing is manufactured as a standardized product that can be reused multiple times to reduce costs.
[0058] Based on the aforementioned drilling tools or other drilling tools capable of achieving similar functions, various embodiments of the tunnel heave deformation control method of this application are proposed.
[0059] Before developing the tunnel uplift deformation control method of this application, some basic engineering and geological surveys and explorations are required to ensure construction safety and smooth project progress. Based on the survey and exploration results, a borehole replacement scheme will be designed, and monitoring items during the borehole construction process will be clarified. Specifically, this may include:
[0060] 1. Current Status Survey of Existing Tunnels
[0061] Before construction, it is necessary to investigate the current situation of tunnel leakage, tunnel cracks, etc., and to understand the existing defects of the existing operating tunnel.
[0062] 2. Supplementary geological survey
[0063] Based on the existing geotechnical engineering investigation report of the tunnel section, supplementary investigations were conducted on the engineering geological and hydrogeological conditions of the borehole area.
[0064] 3. Underground pipeline detection
[0065] Based on the provided underground pipeline data, we will understand the distribution of underground pipelines in the drilling area, conduct underground pipeline exploration in the drilling area, and ensure that the drilling avoids underground pipelines to prevent secondary disasters.
[0066] 4. Drilling and Replacement Scheme Design
[0067] After understanding the geological conditions of the drilling area and investigating underground pipelines, and combining the existing tunnel defects with the tunnel design drawings, a drilling replacement scheme can be designed. A trial drilling should be conducted according to the design scheme. Based on the soil sampling results, the engineering geological and hydrogeological conditions should be verified, drilling parameters should be selected, and sand and gravel should be replaced in a timely manner. The preliminary construction experience should be summarized before proceeding with subsequent construction.
[0068] 5. Real-time, full-process information monitoring
[0069] A combination of automated monitoring and manual verification is used to monitor the development of surface displacement, tunnel displacement, and convergence deformation in real time before and after soil unloading and drilling replacement construction.
[0070] This application provides a method for controlling tunnel uplift deformation.
[0071] Please refer to Figure 4 , Figure 4 This is a flowchart illustrating the first embodiment of the tunnel heave deformation control method of this application; in the first embodiment of this application, the tunnel heave deformation control method includes the following steps:
[0072] Step S10: Determine the locations of the target boreholes on the surface on both sides of the tunnel;
[0073] To gain a clearer understanding of the engineering application scenarios targeted by the technical solution in this embodiment, please refer to... Figure 1 , Figure 1 This is a cross-sectional schematic diagram of the drilling construction scenario involved in the tunnel uplift deformation control method of this application.
[0074] As shown in the figure, this example uses two existing tunnels and does not represent a limitation on the number of tunnels. There is unloading soil on the ground surface above the tunnels, which corresponds to the unloading operations before, after, and during construction.
[0075] Before the soil unloading operation, monitoring points are set up, monitoring point prisms are installed inside the tunnel, benchmark points are selected, and initial values are collected. A combination of automated monitoring and manual verification is used to monitor the development of surface displacement, tunnel displacement, and convergence deformation before and after the soil unloading and drilling replacement operations in real time.
[0076] By combining tunnel construction drawings and underground pipeline exploration data, a high-precision RTK (Real-time kinematic, carrier phase differential technology) positioning and measurement system can be used to determine the locations of surface boreholes (target borehole locations) on both sides of the tunnel, mark them on the ground, and conduct regular measurement verification to ensure the accuracy of the measurement and layout.
[0077] In one embodiment, the step of determining the target borehole locations on the surface on both sides of the tunnel includes:
[0078] Determine the surface areas on both sides of the tunnel;
[0079] Determine the inclination angle of the borehole and the safe distance between the borehole and the outside of the tunnel;
[0080] Based on the tilt angle and the safety distance, the target borehole location in the surface area is determined.
[0081] Continue to refer to Figure 1 The areas on both sides of the tunnel can be understood as the regions on both sides of the tunnel that will not be touched during vertical drilling, i.e., certain areas on the radial sides of the tunnel. This area can also be represented as the ground surface on both sides of the interval from the location of the maximum tunnel uplift to the point where the tunnel uplift exceeds the deformation control value.
[0082] A trial drilling can be conducted first. Based on the soil samples obtained from the trial drilling, the engineering geological and hydrogeological conditions can be verified, and various drilling parameters can be selected, including the borehole inclination angle φ and the safety distance d. The inclination angle φ is actually the same as the inclination angle φ of the drill rod during construction. This inclination angle φ ensures that the drill rod and drill bit will not hit the tunnel. Then, based on the corresponding appropriate safety distance d, the target borehole location in the surface area is determined and marked. In this way, the needs of safe construction can be met, and the smooth progress of construction can be ensured, achieving the final construction requirements to reduce or offset tunnel uplift deformation.
[0083] Step S20: Drill along the target borehole location using a drilling tool to replace the underground soil with dry mixed aggregate;
[0084] Open-pit down-the-hole eccentric drilling rigs, drilling tools, and other equipment, along with dry mixed aggregates, sand and gravel, and cement, are brought to the site. After installing the drill bit and drill rod, drilling is carried out at a certain inclination angle φ along the target borehole position. During the drilling process, in complex sections, light pressure, slow drilling, and repeated blowing to remove slag are employed, proceeding slowly. If any sudden advances or stuck drill bits are found, the cause must be identified and the fault eliminated before construction can continue. The drilling rate should also be strictly controlled during the soil removal process. After each section is drilled, the casing should be promptly advanced to prevent borehole collapse and abnormal tunnel subsidence. After removing the broken underground soil, the drill bit needs to be withdrawn. When withdrawing the drill bit, the movement must be slow to prevent excessive force from damaging the eccentric drill bit and drill shoe.
[0085] The replacement of underground soil is then achieved by pushing dry aggregate mixture into the borehole. The raw materials for this dry aggregate mixture can include cement, quartz sand, polymer additives, etc., and can also be some recycled aggregate, thereby further saving resources and energy.
[0086] In addition, before formal construction, the drilling scaffolding must meet the requirements for safe operation and be able to withstand the loads such as vibration and impact during the drilling process. The drilling rig, drilling tools, and casing must be repeatedly inspected before construction, and drill rods and casings with cracks or stripped threads must not be used.
[0087] In one embodiment, the step of drilling along the target borehole location using a drill bit includes:
[0088] Symmetrical drilling is performed along the target borehole location using a drilling tool;
[0089] During symmetrical drilling, the spacing between surface boreholes and the number of borehole rows are dynamically adjusted according to the degree of tunnel uplift and deformation.
[0090] Symmetrical construction is carried out on both sides of the ground along the section from the maximum value of tunnel uplift to the section where the tunnel uplift exceeds the deformation control value. The spacing and number of boreholes on the surface are dynamically adjusted according to real-time monitoring information. The borehole spacing can be adjusted by drilling and filling in a skip-hole manner. The borehole density is gradually increased in the core area of uplift deformation to achieve the purpose of slowly adjusting or controlling the tunnel uplift deformation by "sparse first and then dense", so as to prevent sudden changes in tunnel deformation that could cause damage.
[0091] In another embodiment, the step of drilling along the target borehole location using a drill bit includes:
[0092] The drill rod is tilted at a preset angle and drilled along the target hole position until the drilling length reaches the estimated length.
[0093] Specifically, the step of determining the estimated length includes:
[0094] Obtain the diameter and burial depth of the tunnel;
[0095] The estimated length is determined based on the diameter and the burial depth.
[0096] Continue to refer to Figure 1 And further refer to Figure 2 and Figure 3The drill rod inclination angle φ is determined (preferably, it can be preset to 45°~60°), and the minimum spacing between the upper and lower rows of drill holes is l (preferably, it can be preset to 0.5m~2.0m). This design can reduce interference and influence between drill holes during drilling construction and improve the stability of the drill hole structure. Alternatively, the drill holes can be divided into 2 to 3 rows, arranged in a quincunx pattern, with a horizontal spacing of m for surface drill holes and a spacing of n between adjacent rows of surface drill holes, m=2n, n=l / sinφ. This arrangement provides better spatial uniformity, reduces uneven settlement, improves the stability of tunnel settlement, and avoids abnormal collapse. The drill hole length L (estimated length) is determined by the spatial relationship between the tunnel diameter D and the burial depth H. The drill hole length should preferably exceed the center lines of the left and right tunnels, forming a triangular core area to ensure the stability of the surrounding structure and to ensure that the drill hole maintains a certain safe distance d (d≥1m) from the outside of the tunnel to avoid direct damage to the tunnel during drilling construction.
[0097] In one embodiment, the step of replacing the underground soil with dry mixed aggregate includes:
[0098] During the drilling process, the broken underground soil is blown away to remove slag and the casing is then installed.
[0099] Remove the drill rod from the borehole;
[0100] The dry mixed aggregate is pushed and compacted by using drill rods and vibrators, and the casing is withdrawn simultaneously.
[0101] During drilling, the broken underground soil is blown away to remove slag, thus forming the borehole (cavity). After each section is drilled, the casing is promptly advanced. After the drill bit is withdrawn, a vibratory compactor is used to push the replacement aggregate onto the drill rod, compacting the replacement material. Finally, the casing is pulled out while compacting, ensuring that the bottom of the casing does not detach from the replacement material during extraction. These methods ensure the structural stability during aggregate replacement, preventing abnormal collapse and settlement. Additionally, when pulling out the casing, the hydraulic jacks should be used slowly and with even force to prevent the casing from breaking at the threads.
[0102] Step S30: After the soil removal and replacement at the target borehole location is completed, the borehole is sealed.
[0103] When the borehole replacement construction achieves the goal of settlement control, it can be considered that the soil removal and replacement of the target borehole location is completed. Cement grout is used to seal the borehole opening after replacement to prevent surface water from flowing into the strata along the borehole. Then, the construction work of adjacent boreholes can be carried out.
[0104] Furthermore, in order to achieve the settlement control objectives and the amount of settlement control in the tunnel, the tunnel settlement rate is controlled by adjusting the borehole replacement rate, and the final settlement of the tunnel is controlled by adjusting the number of boreholes to be replaced. At the same time, the final settlement of the tunnel is predicted based on the monitoring data. When the tunnel settlement rate is too high or the predicted final settlement of the tunnel is close to the design requirements, the borehole replacement rate and number are reduced. When the final settlement of the tunnel reaches the design requirements, the borehole replacement operation is stopped.
[0105] The tunnel uplift deformation control method in this application involves determining the target borehole locations on both sides of the tunnel surface; drilling along these target borehole locations using drilling tools to replace the underground soil with dry mixed aggregate; and sealing the boreholes after the soil replacement is completed. This method replaces easily deformable soil (such as mudstone) affected by underground conditions with less deformable dry mixed aggregate, utilizing the principle of reducing or offsetting tunnel uplift deformation through overall tunnel settlement. This achieves soil removal and replacement through boreholes on both sides, forming a relatively weak isolation zone in the surrounding rock. This indirectly isolates the continuous rebound deformation of the surrounding soil and rock mass caused by large-area unloading. Under the weight of the tunnel structure and soil mass above the isolation zone, a certain degree of compaction settlement or lateral compression deformation occurs, which can reduce or offset the upward rebound deformation of the tunnel. This method has the advantages of wide applicability to different geological formations, simple operation, convenient construction, short construction period, and low cost.
[0106] Furthermore, for a clearer understanding of the entire construction process, please refer to... Figure 5 As shown in the figure, the overall construction process can be as follows:
[0107] First, a current status survey of the existing tunnel is conducted, followed by supplementary geological investigation and exploration of underground pipelines. Then, borehole replacement construction is carried out. At the same time, the surface displacement, tunnel displacement, and deformation are monitored in real time to determine whether the settlement control objective has been achieved. If not, construction continues; if so, the borehole is sealed. In addition, for the safety of the project and to achieve the objectives, the surface displacement, tunnel displacement, and deformation can continue to be monitored in real time until the requirements for stopping monitoring are met, at which point the tunnel uplift treatment is considered to be completed.
[0108] The overall and preferred technical solutions of this application have the following technical effects:
[0109] 1. The passive constraint of unloading and heave deformation of the soil above the existing tunnel is transformed into active control. A relatively weak isolation zone is formed by directional drilling and replacement of the soil and rock around the tunnel. The self-weight settlement above the isolation zone is used to reduce or offset the unloading rebound deformation, so as to ensure that the overall deformation of the existing tunnel is controllable.
[0110] 2. This method is not limited by the "maintenance window" of subway track area operations. Without affecting normal subway operation and earthwork unloading operations, directional down-the-hole drilling rigs are set up on the ground on both sides of the tunnel unloading area to drill holes and casings to follow up with sand and gravel replacement operations. It has wide applicability to strata, is simple to operate, fast to construct, not easy to deviate from the hole, and has low cost.
[0111] 3. Based on the information feedback from automated and manual monitoring of tunnels, open-pit down-the-hole eccentric drilling rigs can adjust the drilling angle, length, spacing, number of hole rows, and replacement materials. The eccentric drill bit and casing directional drilling can ensure the quality of the hole formation, maintain a certain safe distance from the outside of the tunnel, and the replacement sand and gravel filler inside the casing is filled and vibrated to achieve a dense state, actively adjusting or controlling the overall deformation of the tunnel, and ensuring the safe operation of the tunnel.
[0112] In summary, the method described in this application can be applied to pre-, post-, and concurrent construction operations above tunnels during soil unloading. Based on feedback from automated monitoring of operating tunnels and combined with the progress of soil unloading operations above the tunnel, by adjusting factors such as drilling angle, length, spacing, number of borehole rows, and filling materials, the boreholes are less prone to deviation and can maintain a certain safe distance from the outer side of the existing tunnel. The vibratory filling of sand and gravel can ensure the bearing capacity of the tunnel foundation, ensuring the stability of the tunnel structure and operational safety. This method has the advantages of wide applicability to geological formations, simple operation, convenient construction, short construction period, and low cost.
[0113] In addition, refer to Figure 6 , Figure 6 This is a schematic diagram of the frame structure of the tunnel heave deformation control device of this application. This application also proposes a tunnel heave deformation control device, comprising:
[0114] The borehole location calibration module A10 is used to determine the location of target boreholes located on the ground surface on both sides of the tunnel;
[0115] Drilling module A20 is used to drill along the target borehole location using a drilling tool to replace the underground soil with dry mixed aggregate;
[0116] The borehole sealing module A30 is used to seal the borehole after the soil removal and replacement at the target borehole location has been completed.
[0117] Optionally, the hole position calibration module A10 is further used for:
[0118] Determine the surface areas on both sides of the tunnel;
[0119] Determine the inclination angle of the borehole and the safe distance between the borehole and the outside of the tunnel;
[0120] Based on the tilt angle and the safety distance, the target borehole location in the surface area is determined.
[0121] Optionally, the drilling module A20 is further used for:
[0122] Symmetrical drilling is performed along the target borehole location using a drilling tool;
[0123] During symmetrical drilling, the spacing between surface boreholes and the number of borehole rows are dynamically adjusted according to the degree of tunnel uplift and deformation.
[0124] Optionally, the drilling module A20 is further used for:
[0125] The step of drilling along the target borehole location using a drill bit includes:
[0126] The drill rod is tilted at a preset angle and drilled along the target hole position until the drilling length reaches the estimated length.
[0127] Optionally, the drilling module A20 is further used for:
[0128] Obtain the diameter and burial depth of the tunnel;
[0129] The estimated length is determined based on the diameter and the burial depth.
[0130] Optionally, the drilling module A20 is further used for:
[0131] During the drilling process, the broken underground soil is blown away to remove slag and the casing is then installed.
[0132] Remove the drill rod from the borehole;
[0133] The dry mixed aggregate is pushed and compacted by using drill rods and vibrators, and the casing is withdrawn simultaneously.
[0134] The specific implementation of the tunnel heave deformation control device of the present invention is basically the same as the embodiments of the tunnel heave deformation control method described above, and will not be repeated here.
[0135] Those skilled in the art will understand that embodiments of this application can be provided as methods, apparatus, or computer program products. Therefore, this application can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, this application can take the form of a computer program product embodied on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0136] This application is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (devices), and computer program products according to embodiments of this application. It will be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.
[0137] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.
[0138] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.
[0139] It should be noted that any reference signs placed between parentheses in the claims should not be construed as limiting the claims. The word "comprising" does not exclude the presence of components or steps not listed in the claims. The word "a" or "an" preceding a component does not exclude the presence of a plurality of such components. This application can be implemented by means of hardware comprising several different components and by means of a suitably programmed computer. In a unit claim enumerating several means, several of these means may be embodied by the same item of hardware. The use of the words first, second, and third, etc., does not indicate any order. These words can be interpreted as names.
[0140] Although preferred embodiments of this application have been described, those skilled in the art, upon learning the basic inventive concept, can make other changes and modifications to these embodiments. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments as well as all changes and modifications falling within the scope of this application.
[0141] The above description is merely a preferred embodiment of this application and does not limit the patent scope of this application. Any equivalent structural transformations made based on the inventive concept of this application and the contents of the specification and drawings of this application, or direct / indirect applications in other related technical fields, are included within the patent protection scope of this application.
Claims
1. A method for controlling tunnel heave deformation, characterized in that, The tunnel heave deformation control method includes the following steps: Determine the locations of target boreholes on the surface on both sides of the tunnel; Drilling is carried out along the target borehole location using drilling tools to replace the underground soil with dry mixed aggregate; After the soil removal and replacement at the target borehole location is completed, the borehole is sealed. The step of determining the target borehole locations on the surface on both sides of the tunnel includes: Determine the surface areas on both sides of the tunnel; Determine the inclination angle of the borehole and the safe distance between the borehole and the outside of the tunnel; Based on the tilt angle and the safety distance, the target borehole location in the surface area is determined; The drilling tool includes a drill bit and a drill rod; the drill bit and the drill rod are fixedly connected. The step of drilling along the target borehole location using a drill bit includes: The drill rod is tilted at a preset angle and drilled along the target hole position until the drilling length reaches the estimated length. The step of determining the estimated length includes: Obtain the diameter and burial depth of the tunnel; The estimated length is determined based on the diameter and the burial depth. The drilling tool includes a casing; the step of replacing the underground soil with dry mixed aggregate includes: During the drilling process, the broken underground soil is blown away to remove slag and the casing is then installed. Remove the drill rod from the borehole; The dry mixed aggregate is pushed and compacted by using drill rods and vibrators, and the casing is withdrawn simultaneously. Soil extraction and cavity replacement are carried out by drilling holes on both sides of the tunnel to form a relatively weak isolation zone in the surrounding rock of the tunnel. This indirectly isolates the continuous rebound deformation of the surrounding rock and soil due to large-area unloading. Under the weight of the tunnel structure and rock and soil above the isolation zone, a certain degree of compaction settlement or lateral compression deformation occurs, which can reduce or offset the upward rebound deformation of the tunnel.
2. The tunnel heave deformation control method as described in claim 1, characterized in that, The step of drilling along the target borehole location using a drill bit includes: Symmetrical drilling is performed along the target borehole location using a drilling tool; During symmetrical drilling, the spacing between surface boreholes and the number of borehole rows are dynamically adjusted according to the degree of tunnel uplift and deformation.
3. The tunnel heave deformation control method as described in claim 1, characterized in that, The target borehole positions include a quincunx pattern, with a horizontal spacing of m between target borehole positions, a spacing of n between adjacent rows of boreholes on the ground surface, and a minimum spacing of l between upper and lower rows of boreholes; where m = 2n, n = l / sinφ, and φ represents the drill rod inclination angle.
Citation Information
Patent Citations
Reinforced structure for controlling existing shield tunnel deformation and construction method
CN107956484A
Implementation method for simultaneously recovering upheaval deformation and horizontal deformation of tunnel
CN115977180A