A forecasting method for material pre-purchase based on time series allocation
Through the material pre-purchase prediction method based on time series allocation, combined with real-time data processing at the intersection and efficient calculation of the remote data center, the problem of long material pre-purchase prediction time span and poor flexibility in the existing technology is solved, and efficient and accurate material pre-purchase prediction is achieved. Pre-order forecasting and delivery efficiency improvements.
Patent Information
- Application Number
- CN202410629309.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-21
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-05-21
AI Technical Summary
Existing material pre-purchase forecasting methods have shortcomings in considering material distribution efficiency and real-time performance, resulting in long forecast time spans, poor flexibility, short risk aversion time limits, and fixed warehouse allocations, which cannot adapt to the needs of rapid updates.
Adopt a material pre-purchase prediction method based on time-series allocation, through initial statistics of material information and pre-delivery path generation, using the task subsystem at the intersection to pre-process and predict material information, combined with the efficient processing capabilities of the remote data center, dynamic adjustment Delivery routes and vehicle tasks to improve forecast accuracy and efficiency.
It achieves efficient forecasting of material pre-purchase, improves forecast accuracy and real-time performance, improves material distribution efficiency, can better adapt to rapidly changing needs, and reduces the risk of inventory backlog and fund stagnation.
Smart Images

Figure CN118333237B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of information technology processing, and in particular to a forecasting method for material pre-purchase based on time sequence allocation. Background Art
[0002] Procurement forecasting is a process of measuring the supply and demand of commodity markets and their changing trends in a certain period of time in the future based on the data obtained from the investigation of commodity procurement markets, through analysis and research, and using scientific methods, so as to provide a scientific basis for commodity procurement decisions and the formulation of commodity procurement plans, and achieve a series of goals such as sales profits. Procurement time and procurement volume determine the efficiency of material circulation and the key to capital return. Procurement volume determines inventory volume, and excessive or insufficient procurement volume will inevitably lead to the accumulation of material inventory and stagnation of funds. Scientific and reasonable procurement forecasting is of great significance. Procurement volume is also affected by the material circulation rate, and the distribution efficiency of materials also directly affects procurement time and procurement volume.
[0003] At present, there are many theories and methods for procurement forecasting, which are divided into qualitative methods and quantitative methods according to objective factors. Among them, quantitative methods are divided into time series method, seasonal forecasting and causal analysis method. Among them, the commonly used ones include weighted moving average method, exponential smoothing method and linear regression analysis in causal analysis method in time series method. In the material warehouse management based on time series, the predicted procurement content is mainly based on the accurate prediction of future storage demand. Usually it involves time series analysis technology, which predicts future trends and patterns by organizing and analyzing historical data. Time series analysis technology can determine a forecasting model, which is based on historical demand data and uses methods such as autoregressive moving average model to analyze various factors affecting storage demand. This process will identify the accurate factors affecting storage demand and establish a forecasting model accordingly. After the forecasting model is established, the error range of the forecast can be calculated and determined by analyzing historical data and measuring the accuracy of the forecasting model, ultimately ensuring the reliability of the analysis model and providing support for subsequent material procurement decisions.
[0004] Then, the impact of material distribution efficiency and real-time performance on procurement forecasts is rarely considered, resulting in a longer forecast time span for material pre-purchase, poor flexibility, and a shorter risk avoidance period. In addition, the allocation of material storage space (warehouse) is relatively fixed, which cannot meet the increasingly accelerated update speed and adaptability requirements. Summary of the invention
[0005] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a forecasting method for material pre-purchase based on time series allocation, through which efficient forecasting of material pre-purchase can be achieved. At the same time, combined with the setting method of material distribution efficiency, the accuracy of material pre-purchase forecasting can be improved while improving efficiency and real-time performance.
[0006] The present invention provides a method for predicting material pre-purchase based on time sequence allocation, comprising the following steps performed in sequence:
[0007] (1) Perform initial statistics on the material information in the material warehouse, obtain material allocation information through a preset database, associate the initial statistical results with the allocation information, store them locally, and send them to a remote data center at the same time;
[0008] (2) According to the scene information of material distribution, pre-distribution information is allocated and multiple pre-distribution paths are generated, and multiple distribution sub-paths are generated as candidate distribution paths of the pre-distribution paths according to the material assembly conditions and the scene information;
[0009] (3) Adjust the pre-delivery path and candidate delivery path so that within a certain material delivery distance interval period, the pre-delivery path and candidate delivery path of each material delivery vehicle have an intersection with its two adjacent delivery vehicles, and configure the task subsystem network point at the intersection;
[0010] (4) Setting a total mission value of the material distribution vehicle, obtaining a delivery completion rate of the total mission value of the distribution vehicle at a preset time interval, and adjusting the distribution of materials and replanning the route of the distribution vehicle at the intersection within the next distribution distance interval period based on the completion rate;
[0011] (5) At the intersection, the material information of the delivery vehicles on the way is counted, and the material information of this intersection is predicted by time series processing at the subsystem network point to obtain the sub-material prediction information, which is synchronously sent to the remote data center;
[0012] (6) In the remote data center, material information is predicted through time series processing, and the prediction results are used to allocate materials.
[0013] Furthermore, the step (2) further includes, when assembling the materials, following the steps below:
[0014] (2.1) Pre-classify the distribution materials based on historical distribution data, and use the pre-classification results and scene information to partition the internal loading area of the material distribution vehicle;
[0015] (2.2) Assemble materials according to the pre-classification results and material distribution vehicle partitions.
[0016] Furthermore, the allocation information in step (1) includes reservation information, time information and queuing information.
[0017] Furthermore, the total mission value of the material distribution vehicle in step (4) is set by calculating the average duration of the pre-distribution route and the candidate distribution route, and is set based on historical distribution data and the average duration.
[0018] Furthermore, the delivery completion rate of the total value of the delivery vehicle task obtained in step (4) is obtained by setting corresponding weight coefficients after partitioning the internal loading area of the material distribution vehicle, and calculating the proportion of material delivery completed in each partition within a preset time interval or material distribution by using the weight coefficient and the proportion.
[0019] Furthermore, the method further includes step (7): repeating steps (1)-(6) to dynamically predict the material information, and using the dynamic prediction results to allocate materials.
[0020] Furthermore, in step (4), the distribution material is adjusted at the intersection and the route is replanned, which specifically includes the following steps:
[0021] (4.1) Evaluate the delivery completion rate, compare the delivery completion rates of multiple material delivery vehicles, and calculate the difference percentage between the delivery completion rates;
[0022] (4.2) When the difference percentage exceeds the threshold, the materials on the material distribution vehicles with low delivery completion rates are adjusted to the material distribution vehicles with high delivery completion rates by partition;
[0023] (4.3) Re-plan the pre-delivery route and candidate delivery route based on the above steps, and deliver according to the latest delivery route.
[0024] The forecasting method of material pre-purchase based on time sequence allocation of the present invention can achieve:
[0025] (1) Material assembly and deployment are realized by pre-classification and zoning. Material deployment and route planning are carried out by combining task completion rate with time interval and route intersection, which can efficiently complete distribution and improve distribution effect;
[0026] (2) Preprocessing is performed at the intersection to consider the prediction of material information in transit, and preprocessing is performed to improve efficiency. At the same time, the advantages of remote processing are used to make overall predictions, which are efficient and real-time. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 The flowchart is a diagram of the forecasting method for material pre-purchase based on time-series allocation. DETAILED DESCRIPTION
[0028] The specific implementation of the present invention is described in detail below. It is necessary to point out that the following implementation is only used for further explanation of the present invention and cannot be understood as limiting the scope of protection of the present invention. Some non-essential improvements and adjustments made to the present invention by persons skilled in the art based on the above-mentioned content of the present invention still fall within the scope of protection of the present invention.
[0029] The present invention provides a method for predicting material pre-purchase based on time sequence allocation, and its specific implementation method is as shown in the attached Figure 1 As shown, Figure 1 The figure is a flow chart of the forecasting method for pre-purchase of materials based on time series deployment. The following is a detailed introduction to the flow of the forecasting method for pre-purchase of materials based on time series deployment.
[0030] The present invention provides a forecasting method for material pre-purchase based on time sequence allocation, and its specific implementation process is as shown in the attached figure. Figure 1 As shown. Figure 1 As shown, the forecasting method for material pre-purchase based on time sequence allocation provided by the present invention includes the following steps performed in sequence:
[0031] First, the material information in the material warehouse is initially counted, and the material allocation information is obtained through the preset database. The initial statistical results and the allocation information are associated and stored locally, and sent to the remote data center at the same time. The material information includes the quantity, type, warranty period and other related information of the materials, and the allocation information can include material demand information, such as reservation information, time information, queue information, etc.
[0032] First, according to the scene information of material distribution, pre-distribution information is allocated and multiple pre-distribution paths are generated. According to the material assembly situation and scene information, multiple distribution sub-paths are generated as candidate distribution paths of the pre-distribution path. The generation of candidate distribution paths is based on the corresponding multiple pre-distribution paths. Among them, the scene information includes information reflecting the distribution object information such as the distribution address, time, and material type. The pre-distribution information is information obtained based on the scene information and historical distribution data.
[0033] When assembling materials, the following method is used: pre-classify the distribution materials based on historical distribution data (such as historical distribution material types, quantities, efficiency, etc.), use the pre-classification results and scene information to partition the internal loading area of the material distribution vehicle, and assemble the materials according to the pre-classification results and the material distribution vehicle partitions. The pre-classification is based on scene information and the type, quantity and volume of materials. When multiple material distribution vehicles are partitioned into loading areas, their regional spaces can be adjusted based on the pre-classification of materials, so that the materials have certain regularity and convenience when assembled, and are convenient for transportation and adjustment in subsequent steps. It should be noted that when assembling existing material distribution vehicles, they are basically based on distribution objects and centralized destination areas, and then they are distributed in sequence after centralized assembly. The scheduling and distribution adjustment between each distribution vehicle are all at the initial outlets, which is inefficient and inconvenient to deploy. When assembling the vehicle, the present invention pre-classifies it, and combines the adjustment of subsequent steps to effectively improve the distribution efficiency and completion rate, and applies it to the prediction of material pre-purchase, which is more real-time and efficient.
[0034] Then, the pre-distribution path and the candidate distribution path are adjusted so that within a certain material distribution distance interval period, the pre-distribution path and the candidate distribution path of each material distribution vehicle have an intersection with its two adjacent distribution vehicles, that is, within a certain distribution distance interval period, the pre-distribution path and the candidate distribution path corresponding to each material distribution vehicle, and the pre-distribution paths and the candidate distribution paths of the two distribution vehicles adjacent to its pre-distribution path respectively have an intersection. For example, during the material distribution process, each material distribution vehicle can meet with other adjacent material distribution vehicles at at least one point in the planned pre-distribution path and the candidate distribution path within a certain distance interval (for example, 5km, 10km, etc.).
[0035] The intersection of the task subsystem is configured at the intersection, that is, a node that can perform real-time distributed data storage, processing and transmission is set at the intersection, so that real-time statistical calculation, data storage and data transmission can be performed at this node. In this way, the material situation in transit can be analyzed and counted in real time and quickly, and combined with other steps of the present invention, real-time prediction of material situation can be achieved, and material procurement and deployment can be carried out in advance and efficiently.
[0036] Next, the total task value of the material distribution vehicle is set, and the delivery completion rate of the total task value of the distribution vehicle is obtained at preset time intervals. Based on the completion rate, the distribution vehicle is adjusted at the intersection and the route is replanned within the next distribution distance interval cycle range.
[0037] When obtaining the delivery completion rate of the total value of the delivery vehicle task, specifically:
[0038] Calculate the average duration based on the proposed delivery route and candidate delivery routes, and set the total value of the delivery task based on historical delivery data and the average duration.
[0039] According to the zoning of the internal loading area of the material distribution vehicle, the weight coefficient corresponding to each partition is set respectively; at the preset time interval period, the proportion of material distribution completed in each partition in the material distribution is calculated, and the task value of material distribution completed in the material distribution vehicle is calculated using the weight coefficient and the proportion.
[0040] Calculate the completion rate of the total task value, and based on the completion rate, adjust the distribution materials at the intersection and re-plan the route for the distribution vehicle in the next distribution distance interval cycle range.
[0041] Among them, the setting of the total task value is to facilitate the calculation of the completion of material distribution. Specifically, when setting it, you can use the calculated average time, consider the historical road conditions, receipt conditions, etc., set a standard total task value, and then evaluate the progress of task completion later. The setting of the total task value reflects the degree of completion of material distribution during the material distribution process. If the total values of each task are compared horizontally at a certain time, the degree of completion on each material distribution path can be reflected, and the completion efficiency of each can be reflected after comparison. When calculating the task value of material distribution completion, by calculating the completion of material distribution in each partition of the material distribution vehicle, and then multiplying them by the corresponding weight coefficients and adding them, you can get the task value of material distribution completion in the material distribution vehicle.
[0042] At a preset time, using the obtained task value, calculate the proportion of the task value to the total task value to obtain the delivery completion rate at this time; evaluate the delivery completion rate, compare the delivery completion rates of multiple material distribution vehicles, and calculate the difference percentage between the delivery completion rates; when the difference percentage exceeds the threshold, the materials on the material distribution vehicle with a low delivery completion rate are adjusted to the material distribution vehicle with a high delivery completion rate by partition as a whole; based on the above method, re-plan the pre-delivery path and the candidate distribution path, and deliver according to the latest distribution path. Specifically, at a preset time, using the task value obtained in the above steps, calculate the proportion of the task value to the total task value to obtain the delivery completion rate at this time, wherein the preset time can be set according to the situation of the delivery task, or can be set based on the historical delivery situation; evaluate the delivery completion rate, compare the delivery completion rates of multiple material distribution vehicles, and calculate the difference percentage between the delivery completion rates; when the difference percentage exceeds the threshold, the materials on the material distribution vehicle with a low delivery completion rate are adjusted to the material distribution vehicle with a high delivery completion rate by partition as a whole; after adjustment, re-plan the pre-delivery path and the candidate distribution path based on the above steps, and deliver according to the latest distribution path.
[0043] It should be emphasized that different vehicles and delivery personnel have different completion efficiencies during distribution. If the high efficiency can be well compensated for the low efficiency, the overall distribution effect can be improved. When comparing the distribution completion rates of multiple material distribution vehicles and making adjustments, the present invention mainly compares the distribution completion rates of the material distribution vehicle and its two adjacent distribution vehicles. In this way, the reallocation of goods can be completed at the intersection of the paths (pre-distribution paths or candidate distribution paths). During allocation, overall allocation based on classified areas to achieve classified adjustments can improve the distribution efficiency in subsequent distribution processes. On this basis, path planning is performed again to efficiently complete the distribution. Further, repeating the above steps to achieve dynamic adjustments can effectively improve the distribution efficiency and reduce costs.
[0044] On this basis, the material information of the distribution vehicles on the way of distribution is counted at the intersection, and the material information of this intersection is predicted by time series processing at the subsystem network point, and the sub-material prediction information is obtained and sent to the remote data center synchronously. The intersection is used as a node to make real-time statistics on the material situation of the distribution vehicles, and the prediction is used as the material prediction information of this node. At the same time, the integrated processing and prediction are completed in the remote data center, which can make predictions and statistics more efficient. Among them, the remote data center has higher data processing efficiency, which improves the efficiency of data processing and storage. Time series prediction usually involves a large amount of historical data and time series patterns, which requires strong computing power and efficient data processing capabilities. The remote data center can process and analyze these historical data faster by providing high-performance computing resources and optimized data processing processes, so as to more accurately predict future material information. Therefore, setting up preprocessing at the intersection can consider predicting the material information in transit while performing preprocessing to improve efficiency, and at the same time take advantage of remote processing to make overall predictions, which is efficient and real-time.
[0045] Although exemplary embodiments of the present invention have been described for the purpose of illustration, it will be understood by those skilled in the art that various modifications, additions and substitutions may be made in form and detail without departing from the scope and spirit of the invention disclosed in the appended claims, and all such changes shall fall within the scope of protection of the appended claims of the present invention, and the various steps in the various departments and methods of the products claimed by the present invention may be combined together in any combination. Therefore, the description of the embodiments disclosed in the present invention is not intended to limit the scope of the present invention, but is used to describe the present invention. Accordingly, the scope of the present invention is not limited by the above embodiments, but is defined by the claims or their equivalents.
Claims
1. A forecasting method for material pre-purchase based on time sequence allocation, characterized in that: The method comprises the following steps in sequence: (1) Perform initial statistics on the material information in the material warehouse, obtain material allocation information through a preset database, associate the initial statistical results with the allocation information, store them locally, and send them to a remote data center at the same time; (2) According to the scene information of material distribution, pre-distribution information is allocated and multiple pre-distribution paths are generated, and multiple distribution sub-paths are generated as candidate distribution paths of the pre-distribution paths according to the material assembly conditions and the scene information; (3) Adjust the pre-delivery path and candidate delivery path so that within a certain material delivery distance interval period, the pre-delivery path and candidate delivery path of each material delivery vehicle have an intersection with its two adjacent delivery vehicles, and configure the task subsystem network point at the intersection; (4) Setting a total mission value of the material distribution vehicle, obtaining a delivery completion rate of the total mission value of the distribution vehicle at a preset time interval, and adjusting the distribution of materials and replanning the route of the distribution vehicle at the intersection within the next distribution distance interval period based on the completion rate; (5) At the intersection, the material information of the delivery vehicles on the way is counted, and the material information of this intersection is predicted by time series processing at the subsystem network point to obtain the sub-material prediction information, which is synchronously sent to the remote data center; (6) In the remote data center, material information is predicted through time series processing, and the prediction results are used to allocate materials.
2. The method according to claim 1, characterized in that: The step (2) also includes, when assembling the materials, following the steps: (2.1) Pre-classify the distribution materials based on historical distribution data, and use the pre-classification results and scene information to partition the internal loading area of the material distribution vehicle; (2.2) Assemble materials according to the pre-classification results and material distribution vehicle partitions.
3. The method according to claim 2, characterized in that: The dispatching information in step (1) includes reservation information, time information and queuing information.
4. The method according to claim 1 or 2, characterized in that: The total mission value of the material distribution vehicle in step (4) is set by calculating the average duration of the pre-distribution route and the candidate distribution route, and is set based on historical distribution data and the average duration.
5. The method according to claim 4, characterized in that: The delivery completion rate of the total value of the delivery vehicle task obtained in step (4) is obtained by setting corresponding weight coefficients after partitioning the internal loading area of the material distribution vehicle, and calculating the proportion of material distribution completed in each partition in a preset time interval or material distribution by using the weight coefficient and the proportion.
6. The method according to claim 1, characterized in that The method further includes step (7): repeating steps (1)-(6) to dynamically predict material information, and using the dynamic prediction results to allocate materials.
7. The method according to claim 6, characterized in that In step (4), the distribution of materials is adjusted at the intersection and the route is replanned, which specifically includes the following steps: (4.1) Evaluate the delivery completion rate, compare the delivery completion rates of multiple material delivery vehicles, and calculate the difference percentage between the delivery completion rates; (4.2) When the difference percentage exceeds the threshold, the materials on the material distribution vehicles with low delivery completion rates are adjusted to the material distribution vehicles with high delivery completion rates by partition; (4.3) Re-plan the pre-delivery route and candidate delivery route based on the above steps, and deliver according to the latest delivery route.
Citation Information
Patent Citations
Distribution vehicle scheduling method and device for electric power measurement materials
CN114881361A
Purchase risk management and control method and system based on cloud computing
CN117875724A
Cost allocation method based on power grid project spare parts, medium and system
CN117934042A