Reference power grid planning method, system and medium based on optimal consumption
By adopting the optimal consumption method in power grid planning, combining the multi-objective planning priority method and CPLEX solver, the problems of economic and cost imbalance in the existing technology are solved, and investment costs, operating costs and reliability costs are realized. The balanced optimization improves the safety and economicality of power grid planning.
Patent Information
- Application Number
- CN202410790036.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-19
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-06-19
AI Technical Summary
The existing grid planning scheme only considers economics, fails to balance investment costs, internal operating costs and external reliability costs, and cannot optimize investment costs and network loss costs at the same time.
Using the reference grid planning method based on optimal consumption, by obtaining the minimized annualized objective function and preset constraint formula, combined with the multi-objective planning priority method, the CPLEX solver is used to calculate the minimized annual value to ensure investment costs and operating costs. and balance of reliability costs.
It realizes the balanced optimization of investment costs, internal operating costs and external reliability costs, solves the problem of investment costs and grid loss costs that only consider economics in the existing technology, and improves the safety and economics of power grid planning. sex.
Smart Images

Figure CN118365178B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of reference power grid planning, and in particular to a reference power grid planning method, system and medium based on optimal consumption. Background Art
[0002] The large-scale grid connection of renewable energy has become an important trend in the development of the power system. Due to the uncertainty factors such as randomness, intermittency, volatility and uncontrollability of renewable energy power generation, the difficulty of transmission network planning has increased. While taking into account the uncertainty factors brought by the integration of renewable energy into the transmission network, it is particularly urgent and important to establish a safe, economical and reliable transmission network planning model.
[0003] Reference grid planning is one of the basic contents in the power system. An important difference from traditional transmission network planning is that reference grid planning does not optimize the capacity of one or several new lines, but is applied to the entire transmission network system, including new and existing lines. The main goal of reference grid planning is to reasonably determine the capacity of transmission lines based on the accurate prediction of load growth during the planning period and the existing transmission network topology, quantify the optimal investment cost and line congestion cost, and compare with the real network to find new investment needs and stranded investments, so as to ensure that the power system develops in a safer, more economical and more reliable direction.
[0004] Existing power grid planning schemes always take "nearby power supply" as the goal and minimizing line investment costs as the objective function. They only consider economic efficiency and fail to strike a balance among investment costs, internal operating costs, and external reliability costs, and are unable to optimize both investment costs and network loss costs at the same time. Summary of the invention
[0005] In view of the above-mentioned deficiencies in the prior art, the present application provides a reference power grid planning method, system and medium based on optimal absorption to solve the problem that the existing solutions only consider economy, fail to strike a balance between economy and safety, and fail to optimize investment costs and network loss costs at the same time.
[0006] In a first aspect, the present application provides a reference power grid planning method based on optimal consumption, the method comprising: obtaining a minimized annualized objective function; obtaining a preset constraint formula corresponding to a parameter in the objective function; and determining a minimized annual value corresponding to the minimized annualized objective function based on a multi-objective planning priority method and a preset constraint formula.
[0007] Furthermore, the annualized objective function is minimized, including:
[0008] Get the minimized annualized objective function: ;in, represents the investment cost, and , i represents the i-th transmission line, NL represents the total number of transmission lines, represents the investment cost per unit length and unit capacity of the ith transmission line, represents the transmission capacity of the i-th transmission line; represents the length of the ith transmission line; d is the number of days in a typical year; Indicates the operating cost; represents the reliability cost, and: , Indicates the load shedding penalty unit price, represents the unit price of wind curtailment cost penalty, y represents the yth node, NY represents the total number of nodes; t represents the tth preset optimization time period, and NT represents the total number of preset optimization time periods; Indicates that the net load disturbance of the yth node in the tth preset optimization time period exceeds the expected power shortage amount of the preset upper and lower limits of the acceptable domain; It indicates the expected wind energy abandoned when the net load disturbance of the yth node in the tth preset optimization time period exceeds the upper and lower limits of the preset acceptable domain.
[0009] Further, ;
[0010] .in, represents the upper limit of the net load that can be accepted by the yth node on the sth segment during the tth preset optimization time period; s represents the sth segment, Indicates the total number of segments, Indicates the preset first slope of the yth node on the sth segment during the tth preset optimization time period represents the preset second slope of the yth node on the sth segment within the tth preset optimization time period, It represents the preset first intercept of the yth node on the sth segment in the tth preset optimization time period. It represents the preset second intercept of the yth node on the sth segment in the tth preset optimization time period. A 0 / 1 variable indicating that the upper limit of the actual admissible domain of the yth node in the tth preset optimization time period is located on the sth segment, A 0 / 1 variable indicating that the lower limit of the actual acceptable region of the yth node in the tth preset optimization time period is located on the sth segment Represents the output power of the yth node in the tth preset optimization time period.
[0011] Further, ;
[0012] in,
[0013] ; ;
[0014] = ;
[0015] ;
[0016] ;
[0017] ;
[0018] ;
[0019] Wherein, m represents the mth segment; and the value range of m is [1, 2, 3]; represents the operating cost of the g-th generator set when its output is at the lower limit; It represents the slope of the g-th generator set in the m-th segment; represents the preset state parameter value of the g-th generator set in the t-th preset optimization time period; represents the preset state parameter value of the g-th generator set in the m-th segment of the t-th preset optimization time period; represents the active power of the g-th generator set in the m-th segment of the t-th preset optimization time period; represents the minimum active power of the g-th generator set; It represents the minimum active power of the g-th generator set in the m-th section; , , are the preset cost coefficient items of the g-th generator set respectively; represents the maximum active power of the g-th generator set; It represents the maximum active power of the g-th generator set in the m-th section.
[0020] Furthermore, the preset constraint formula includes at least: operating base point power balance constraint, generator set maximum adjustment constraint, generator set preset constraint; obtaining the preset constraint formula corresponding to the linear expression specifically includes: obtaining the operating base point power balance constraint:
[0021] ; Where g is the g-th generator set, NG is the number of all generator sets; y is the y-th node; NY is the number of all nodes; represents the expected value of active power output from the g-th generator set, and The value range of is [the minimum value of the net load downward acceptable domain, the maximum value of the net load upward acceptable domain]; represents the expected net load value of the yth node, and The value range of is [lower limit of active net load disturbance, upper limit of active net load disturbance].
[0022] Get the maximum adjustment constraint of the generator set:
[0023] and, ;in, represents the participation factor, and ; It represents the maximum upward adjustment of the load of the g-th generator set in the t-th time interval; It represents the maximum downward adjustment of the load of the g-th generator set in the t-th time interval; represents the upper limit of the active net load disturbance on the yth node in the tth time interval; represents the lower limit of the active net load disturbance on the yth node in the tth time interval;
[0024] Get the preset constraints of the generator set:
[0025] ,
[0026] ,
[0027] .
[0028] in, Indicates the lower limit of the active power generated by the g-th generator set; Indicates the upper limit of active power generated by the g-th generator set; Indicates the output active power; Indicates the upward climbing rate of the g-th generator set; represents the downward climbing rate of the fth generator set; represents the duration of the tth time interval; represents the upward reserve rate of the g-th generator in the t-th time interval; It represents the downward reserve rate of the g-th generator in the t-th time interval.
[0029] Further, obtaining a preset constraint formula corresponding to the linear expression specifically includes: obtaining a branch power flow constraint formula:
[0030] ,h=1,2,...,NL;
[0031] , h=1,2,......,NL; where, represents the net load disturbance of the yth node, and y=1,2,...,NY; represents the expected value of the net load of the yth node; h represents the hth branch line; NL represents the total number of branch lines; represents the power transfer distribution factor of the net load of the yth node to the hth branch line; represents the power transfer distribution factor of the net load of the g-th generator set to the h-th branch line; represents the upper limit of the branch power flow of the h-th branch line.
[0032] Furthermore, the method also includes: performing calculations to minimize the annual value using a CPLEX solver.
[0033] In the second aspect, the present application provides a reference power grid planning system based on optimal consumption, the system including: a function acquisition module for obtaining a minimized annualized objective function; a constraint acquisition module for obtaining preset constraint formulas corresponding to parameters in the objective function; and a calculation module for determining the minimized annual value corresponding to the minimized annualized objective function based on a multi-objective planning priority method and a preset constraint formula.
[0034] Furthermore, the function acquisition module includes an acquisition unit for acquiring the minimized annualized objective function:
[0035] ;in, represents the investment cost, and , i represents the i-th transmission line, NL represents the total number of transmission lines, represents the investment cost per unit length and unit capacity of the ith transmission line, represents the transmission capacity of the i-th transmission line; represents the length of the ith transmission line; d is the number of days in a typical year; Indicates operating cost
[0036] represents the reliability cost, and:
[0037] , Indicates the load shedding penalty unit price, represents the unit price of wind curtailment cost penalty, y represents the yth node, NY represents the total number of nodes; t represents the tth preset optimization time period, and NT represents the total number of preset optimization time periods; Indicates that the net load disturbance of the yth node in the tth preset optimization time period exceeds the expected power shortage amount of the preset upper and lower limits of the acceptable domain; It indicates the expected wind energy abandoned when the net load disturbance of the yth node in the tth preset optimization time period exceeds the upper and lower limits of the preset acceptable domain.
[0038] Further, the acquisition unit includes a first acquisition subunit, which is used to obtain:
[0039] ;
[0040] .
[0041] in, represents the upper limit of the net load that can be accepted by the yth node on the sth segment during the tth preset optimization time period; s represents the sth segment, Indicates the total number of segments, Indicates the preset first slope of the yth node on the sth segment during the tth preset optimization time period represents the preset second slope of the yth node on the sth segment within the tth preset optimization time period, It represents the preset first intercept of the yth node on the sth segment in the tth preset optimization time period. It represents the preset second intercept of the yth node on the sth segment in the tth preset optimization time period. A 0 / 1 variable indicating that the upper limit of the actual admissible domain of the yth node in the tth preset optimization time period is located on the sth segment, A 0 / 1 variable indicating that the lower limit of the actual acceptable region of the yth node in the tth preset optimization time period is located on the sth segment Represents the output power of the yth node in the tth preset optimization time period.
[0042] Further, the acquisition unit includes a second acquisition subunit, which is used to obtain:
[0043] ;
[0044] in, ;
[0045] ; = ;
[0046] ;
[0047] ;
[0048] ;
[0049] ;
[0050] Wherein, m represents the mth segment; and the value range of m is [1, 2, 3]; represents the operating cost of the g-th generator set when its output is at the lower limit; It represents the slope of the g-th generator set in the m-th segment; represents the preset state parameter value of the g-th generator set in the t-th preset optimization time period; represents the preset state parameter value of the g-th generator set in the m-th segment of the t-th preset optimization time period; represents the active power of the g-th generator set in the m-th segment of the t-th preset optimization time period; represents the minimum active power of the g-th generator set; It represents the minimum active power of the g-th generator set in the m-th section; , , are the preset cost coefficient items of the g-th generator set respectively; represents the maximum active power of the g-th generator set; It represents the maximum active power of the g-th generator set in the m-th section.
[0051] Furthermore, the preset constraint formula includes at least: an operating base point power balance constraint, a generator set maximum adjustment constraint, and a generator set preset constraint; the constraint acquisition module includes a first acquisition unit for acquiring an operating base point power balance constraint:
[0052] ; Where g is the g-th generator set, NG is the number of all generator sets; y is the y-th node; NY is the number of all nodes; represents the expected value of active power output from the g-th generator set, and The value range of is [the minimum value of the net load downward acceptable domain, the maximum value of the net load upward acceptable domain]; represents the expected net load value of the yth node, and The value range of is [lower limit of active net load disturbance, upper limit of active net load disturbance]; obtain the maximum adjustment constraint of the generator set:
[0053] and, ;in, represents the participation factor, and ; It represents the maximum upward adjustment of the load of the g-th generator set in the t-th time interval; It represents the maximum downward adjustment of the load of the g-th generator set in the t-th time interval; represents the upper limit of the active net load disturbance on the yth node in the tth time interval; Represents the lower limit of the active net load disturbance at the yth node in the tth time interval; obtain the preset constraints of the generator set:
[0054] ,
[0055] ,
[0056] ;
[0057] in, Indicates the lower limit of the active power generated by the g-th generator set; Indicates the upper limit of active power generated by the g-th generator set; Indicates the output active power; Indicates the upward climbing rate of the g-th generator set; represents the downward climbing rate of the fth generator set; represents the duration of the tth time interval; represents the upward reserve rate of the g-th generator in the t-th time interval; It represents the downward reserve rate of the g-th generator in the t-th time interval.
[0058] Furthermore, it is characterized in that the constraint acquisition module includes a second acquisition unit, which is used to obtain the branch power flow constraint formula:
[0059] ,h=1,2,...,NL;
[0060] ,h=1,2,...,NL;
[0061] in, represents the net load disturbance of the yth node, and y=1,2,...,NY; represents the expected value of the net load of the yth node; h represents the hth branch line; NL represents the total number of branch lines; represents the power transfer distribution factor of the net load of the yth node to the hth branch line; represents the power transfer distribution factor of the net load of the g-th generator set to the h-th branch line; represents the upper limit of the branch power flow of the h-th branch line.
[0062] Furthermore, the system includes a solver calculation module; used for performing calculations to minimize annual values through a CPLEX solver.
[0063] In a third aspect, the present application provides a non-volatile computer storage medium having computer instructions stored thereon, which, when executed, implement a reference power grid planning method based on optimal consumption as described above.
[0064] Those skilled in the art can understand that the present application has at least the following beneficial effects:
[0065] The present disclosure designs a reference grid planning for optimal absorption of new energy based on feasible domain projection. Based on minimizing the annualized objective function, it handles the net load disturbance inside the acceptable domain and calls on system resources to fully absorb it. Since the net load disturbance outside the acceptable domain is affected by the investment cost, internal operating cost, and external reliability cost, the minimization annualized objective function involved in this application involves investment cost, internal operating cost, and external reliability cost, achieving a compromise optimization. Furthermore, this application can calculate EENS and EWS and multiply them with the penalty price as the reliability cost, and further introduce an objective function for soft punishment. It solves the problem of only considering economic efficiency, not balancing the investment cost, internal operating cost, and external reliability cost, and being unable to optimize the investment cost and network loss cost at the same time. BRIEF DESCRIPTION OF THE DRAWINGS
[0066] Some embodiments of the present disclosure are described below with reference to the accompanying drawings, in which:
[0067] Figure 1 It is a flow chart of a reference power grid planning method based on optimal consumption provided in an embodiment of the present application.
[0068] Figure 2 It is a schematic diagram of the internal structure of a reference power grid planning system based on optimal consumption provided in an embodiment of the present application. DETAILED DESCRIPTION
[0069] It should be understood by those skilled in the art that the embodiments described below are only preferred embodiments of the present disclosure, and do not mean that the present disclosure can only be implemented through the preferred embodiments. The preferred embodiments are only used to explain the technical principles of the present disclosure, and are not used to limit the protection scope of the present disclosure. Based on the preferred embodiments provided by the present disclosure, all other embodiments obtained by ordinary technicians in this field without creative work should still fall within the protection scope of the present disclosure.
[0070] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0071] The technical solution proposed in the embodiments of the present application is described in detail below with reference to the accompanying drawings.
[0072] The present application embodiment provides a reference power grid planning method based on optimal consumption, such as Figure 1 As shown, the method provided in the embodiment of the present application mainly includes the following steps:
[0073] Step 110: Obtain the minimized annualized objective function.
[0074] This step can be specifically as follows:
[0075] Get the minimized annualized objective function: ;
[0076] in, represents the investment cost, and , i represents the i-th transmission line, NL represents the total number of transmission lines, represents the investment cost per unit length and unit capacity of the ith transmission line, represents the transmission capacity of the i-th transmission line; represents the length of the ith transmission line; d is the number of days in a typical year (365 days); Indicates the running cost.
[0077] represents the reliability cost, and:
[0078] , Indicates the load shedding penalty unit price, represents the unit price of wind curtailment cost penalty, y represents the yth node, NY represents the total number of nodes; t represents the tth preset optimization time period, and NT represents the total number of preset optimization time periods; Indicates that the net load disturbance of the yth node in the tth preset optimization time period exceeds the expected power shortage amount of the preset upper and lower limits of the acceptable domain; It indicates the expected wind energy abandoned when the net load disturbance of the yth node in the tth preset optimization time period exceeds the upper and lower limits of the preset acceptable domain.
[0079] Specifically, and The specific content can be:
[0080] ;
[0081] .
[0082] in, represents the upper limit of the net load that can be accepted by the yth node on the sth segment during the tth preset optimization time period; s represents the sth segment, Indicates the total number of segments, Indicates the preset first slope of the yth node on the sth segment during the tth preset optimization time period represents the preset second slope of the yth node on the sth segment within the tth preset optimization time period, It represents the preset first intercept of the yth node on the sth segment in the tth preset optimization time period. It represents the preset second intercept of the yth node on the sth segment in the tth preset optimization time period. A 0 / 1 variable indicating that the upper limit of the actual admissible domain of the yth node in the tth preset optimization time period is located on the sth segment, A 0 / 1 variable indicating that the lower limit of the actual acceptable region of the yth node in the tth preset optimization time period is located on the sth segment Represents the output power of the yth node in the tth preset optimization time period.
[0083] It should be noted that s is the number of times the preset upper disturbance domain is evenly divided. The maximum value of is determined by those skilled in the art according to actual conditions.
[0084] in, The specific calculation scheme can be:
[0085] At the upper limit of the preset upper disturbance domain, the probability density function curve Pr( ) is truncated, and then the segmentation point is introduced s(s=1,2,…, ) divide the truncated preset upper disturbance domain equally, first make the upper limit of the acceptable domain ( + ) coincides with the upper disturbance value of the segmentation point, and then the upper limit of the acceptable domain is obtained to obtain the EENS value of the yth node at the sth segmentation point in the tth preset optimization time period ( ).in, It represents the upper limit of the acceptable range of the net load of the yth node in the tth preset optimization time period. It represents the upper disturbance value of the segment point of the y-th node on the 1st segment during the t-th preset optimization time period.
[0086] By formula: , calculate ;
[0087] By formula: + , calculate .
[0088] in, It represents the EENS value of the y-th node at the next segmentation point of the s-th segmentation point in the t-th preset optimization time period; The upper disturbance value of the segment point at the next segment point of the s segment point of the y-th node in the t-th preset optimization time period. Similarly, we can calculate and .
[0089] It should be noted that the present application introduces segmentation points into the disturbance domain, and then calculates the expected load shedding and wind abandonment cost values at the segmentation points by integral formula, thereby obtaining a piecewise linear expression of the reliability cost.
[0090] in, The specific formula for operating cost can be:
[0091] ;
[0092] in, ;
[0093] ;
[0094] = ;
[0095] ;
[0096] ;
[0097] ;
[0098] .
[0099] Wherein, m represents the mth segment; and the value range of m is [1, 2, 3]; represents the operating cost of the g-th generator set when its output is at the lower limit; It represents the slope of the g-th generator set in the m-th segment; represents the preset state parameter value of the g-th generator set in the t-th preset optimization time period; represents the preset state parameter value of the g-th generator set in the m-th segment of the t-th preset optimization time period; represents the active power of the g-th generator set in the m-th segment of the t-th preset optimization time period; represents the minimum active power of the g-th generator set; It represents the minimum active power of the g-th generator set in the m-th section; , , are the preset cost coefficient items of the g-th generator set respectively; represents the maximum active power of the g-th generator set; It represents the maximum active power of the g-th generator set in the m-th section.
[0100] It should be noted that the existing The running cost is a quadratic polynomial, and this application uses three-piece linearization to approximate it, so the value range of m here is [1, 2, 3].
[0101] It can be understood by those skilled in the art that the solution disclosed in the present application herein takes into account reliability indicators such as the expected load shedding cost and the expected wind abandonment cost of the system to quantify the impact of uncertain factors on the system, thereby improving the reliability and economy of the reference grid planning. In addition, the EENS and EWS are linearized using a piecewise linearization method to reduce the complexity of the model, increase the solution speed, and enhance the application value of the model in the planning field.
[0102] Step 120: Obtain preset constraint formulas corresponding to parameters in the objective function.
[0103] It should be noted that the preset constraint formula includes at least: operating base point power balance constraint, generator set maximum adjustment constraint, and generator set preset constraint.
[0104] As an example, the preset constraint formula corresponding to the linear expression is obtained, which can be specifically:
[0105] Get the operating base point power balance constraint: ;
[0106] Among them, g is the g-th generator set, NG is the number of all generator sets; y is the y-th node; NY is the number of all nodes; represents the expected value of active power output from the g-th generator set, and The value range of is [the minimum value of the net load downward acceptable domain, the maximum value of the net load upward acceptable domain]; represents the expected net load value of the yth node, and The value range of is [lower limit of active net load disturbance, upper limit of active net load disturbance];
[0107] Get the maximum adjustment constraint of the generator set:
[0108] and ;
[0109] in, represents the participation factor, and ; It represents the maximum upward adjustment of the load of the g-th generator set in the t-th time interval; It represents the maximum downward adjustment of the load of the g-th generator set in the t-th time interval; represents the upper limit of the active net load disturbance on the yth node in the tth time interval; represents the lower limit of the active net load disturbance on the yth node in the tth time interval;
[0110] Get the preset constraints of the generator set:
[0111] ,
[0112] ,
[0113] .
[0114] in, Indicates the lower limit of the active power generated by the g-th generator set; Indicates the upper limit of active power generated by the g-th generator set; Indicates the output active power; Indicates the upward climbing rate of the g-th generator set; represents the downward climbing rate of the fth generator set; represents the duration of the tth time interval; represents the upward reserve rate of the g-th generator in the t-th time interval; It represents the downward reserve rate of the g-th generator in the t-th time interval.
[0115] As a second example, obtaining a preset constraint formula corresponding to a linear expression may further include:
[0116] Get the branch power flow constraint formula:
[0117] ,h=1,2,...,NL;
[0118] ,h=1,2,......,NL.
[0119] in, represents the net load disturbance of the yth node, and y=1,2,...,NY; represents the expected value of the net load of the yth node; h represents the hth branch line; NL represents the total number of branch lines; represents the power transfer distribution factor of the net load of the yth node to the hth branch line; represents the power transfer distribution factor of the net load of the g-th generator set to the h-th branch line; represents the upper limit of the branch power flow of the h-th branch line.
[0120] Step 130: Based on the multi-objective programming priority method and the preset constraint formula, determine the minimized annual value corresponding to the minimized annualized objective function.
[0121] It should be noted that, based on the multi-objective planning priority method and the preset constraint formula, the specific method for determining the minimized annual value corresponding to the minimized annualized objective function can be achieved by existing means, and this application does not limit it here.
[0122] In addition, after the application is converted into a mixed integer linear programming model, the minimum annual value can be solved by the CPLEX solver.
[0123] besides, Figure 2 A reference power grid planning system based on optimal consumption is provided in the embodiment of the present application. Figure 2 As shown, the system provided in the embodiment of the present application mainly includes:
[0124] The function acquisition module 210 is used to acquire the minimized annualized objective function.
[0125] The function acquisition module 210 includes an acquisition unit for acquiring the minimized annualized objective function:
[0126] ;
[0127] in, represents the investment cost, and , i represents the i-th transmission line, NL represents the total number of transmission lines, represents the investment cost per unit length and unit capacity of the ith transmission line, represents the transmission capacity of the i-th transmission line; represents the length of the ith transmission line; d is the number of days in a typical year; Indicates the running cost.
[0128] represents the reliability cost, and:
[0129] , Indicates the load shedding penalty unit price, represents the unit price of wind curtailment cost penalty, y represents the yth node, NY represents the total number of nodes; t represents the tth preset optimization time period, and NT represents the total number of preset optimization time periods; Indicates that the net load disturbance of the yth node in the tth preset optimization time period exceeds the expected power shortage amount of the preset upper and lower limits of the acceptable domain; It indicates the expected wind energy abandoned when the net load disturbance of the yth node in the tth preset optimization time period exceeds the upper and lower limits of the preset acceptable domain.
[0130] The acquisition unit includes a first acquisition subunit, which is used to obtain:
[0131] ;
[0132] .
[0133] in, represents the upper limit of the net load that can be accepted by the yth node on the sth segment during the tth preset optimization time period; s represents the sth segment, Indicates the total number of segments, Indicates the preset first slope of the yth node on the sth segment during the tth preset optimization time period represents the preset second slope of the yth node on the sth segment within the tth preset optimization time period, It represents the preset first intercept of the yth node on the sth segment in the tth preset optimization time period. It represents the preset second intercept of the yth node on the sth segment in the tth preset optimization time period. A 0 / 1 variable indicating that the upper limit of the actual admissible domain of the yth node in the tth preset optimization time period is located on the sth segment, A 0 / 1 variable indicating that the lower limit of the actual acceptable region of the yth node in the tth preset optimization time period is located on the sth segment Represents the output power of the yth node in the tth preset optimization time period.
[0134] The acquisition unit includes a second acquisition subunit, which is used to obtain:
[0135] ;
[0136] in, ;
[0137] ; = ;
[0138] ;
[0139] ;
[0140] ;
[0141] .
[0142] Wherein, m represents the mth segment; and the value range of m is [1, 2, 3]; represents the operating cost of the g-th generator set when its output is at the lower limit; It represents the slope of the g-th generator set in the m-th segment; represents the preset state parameter value of the g-th generator set in the t-th preset optimization time period; represents the preset state parameter value of the g-th generator set in the m-th segment of the t-th preset optimization time period; represents the active power of the g-th generator set in the m-th segment of the t-th preset optimization time period; represents the minimum active power of the g-th generator set; It represents the minimum active power of the g-th generator set in the m-th section; , , are the preset cost coefficient items of the g-th generator set respectively; represents the maximum active power of the g-th generator set; It represents the maximum active power of the g-th generator set in the m-th section.
[0143] The constraint acquisition module 220 is used to obtain preset constraint formulas corresponding to parameters in the objective function.
[0144] The preset constraint formula includes at least: operating base point power balance constraint, generator set maximum adjustment constraint, and generator set preset constraint.
[0145] The constraint acquisition module 220 includes a first acquisition unit, which is used to acquire the operating base point power balance constraint:
[0146] ; Where g is the g-th generator set, NG is the number of all generator sets; y is the y-th node; NY is the number of all nodes; represents the expected value of active power output from the g-th generator set, and The value range of is [the minimum value of the net load downward acceptable domain, the maximum value of the net load upward acceptable domain]; represents the expected net load value of the yth node, and The value range of is [lower limit of active net load disturbance, upper limit of active net load disturbance].
[0147] Get the maximum adjustment constraint of the generator set:
[0148] and ;
[0149] in, represents the participation factor, and ; It represents the maximum upward adjustment of the load of the g-th generator set in the t-th time interval; It represents the maximum downward adjustment of the load of the g-th generator set in the t-th time interval; represents the upper limit of the active net load disturbance on the yth node in the tth time interval; It represents the lower limit of the active net load disturbance on the yth node in the tth time interval.
[0150] Get the preset constraints of the generator set:
[0151] ,
[0152] ,
[0153] .
[0154] in, Indicates the lower limit of the active power generated by the g-th generator set; Indicates the upper limit of active power generated by the g-th generator set; Indicates the output active power; Indicates the upward climbing rate of the g-th generator set; represents the downward climbing rate of the fth generator set; represents the duration of the tth time interval; represents the upward reserve rate of the g-th generator in the t-th time interval; It represents the downward reserve rate of the g-th generator in the t-th time interval.
[0155] The constraint acquisition module 220 includes a second acquisition unit,
[0156] Used to obtain branch power flow constraint formula:
[0157] ,h=1,2,...,NL;
[0158] ,h=1,2,......,NL.
[0159] in, represents the net load disturbance of the yth node, and y=1,2,...,NY; represents the expected value of the net load of the yth node; h represents the hth branch line; NL represents the total number of branch lines; represents the power transfer distribution factor of the net load of the yth node to the hth branch line; represents the power transfer distribution factor of the net load of the g-th generator set to the h-th branch line; represents the upper limit of the branch power flow of the h-th branch line.
[0160] The calculation module 230 is used to determine the minimized annual value corresponding to the minimized annualized objective function based on the multi-objective programming priority method and the preset constraint formula.
[0161] The system includes a solver calculation module, which is used for performing calculation of minimizing annual values through a CPLEX solver.
[0162] In addition, an embodiment of the present application further provides a non-volatile computer storage medium on which executable instructions are stored. When the executable instructions are executed, a reference power grid planning method based on optimal consumption as described above is implemented.
[0163] So far, the technical solutions of the present disclosure have been described in combination with the above multiple embodiments, but it is easy for those skilled in the art to understand that the protection scope of the present disclosure is not limited to these specific embodiments. Without departing from the technical principles of the present disclosure, those skilled in the art can split and combine the technical solutions in the above-mentioned various embodiments, and can also make equivalent changes or replacements to the relevant technical features. Any changes, equivalent replacements, improvements, etc. made within the technical concept and / or technical principle of the present disclosure will fall within the protection scope of the present disclosure.
Claims
1. A reference grid planning method based on optimal consumption, It is characterized in that The method comprises: Get the minimized annualized objective function, including: Get the minimized annualized objective function: ; in, represents the investment cost, and , i represents the i-th transmission line, NL represents the total number of transmission lines, represents the investment cost per unit length and unit capacity of the ith transmission line, represents the transmission capacity of the i-th transmission line; represents the length of the ith transmission line; d is the number of days in a typical year; Indicates the operating cost; represents the reliability cost, and: , represents the load shedding penalty unit price, represents the unit price of wind curtailment cost penalty, y represents the yth node, NY represents the total number of nodes; t represents the tth preset optimization time period, and NT represents the total number of preset optimization time periods; Indicates that the net load disturbance of the yth node in the tth preset optimization time period exceeds the expected power shortage amount of the preset upper and lower limits of the acceptable domain; It indicates the expected wind energy abandoned when the net load disturbance of the yth node in the tth preset optimization time period exceeds the upper and lower limits of the preset acceptable domain; ; ; in, represents the upper limit of the net load that can be accepted by the yth node on the sth segment during the tth preset optimization time period; s represents the sth segment, Indicates the total number of segments, Indicates the preset first slope of the yth node on the sth segment during the tth preset optimization time period represents the preset second slope of the yth node on the sth segment within the tth preset optimization time period, It represents the preset first intercept of the yth node on the sth segment in the tth preset optimization time period. It represents the preset second intercept of the yth node on the sth segment in the tth preset optimization time period. A 0 / 1 variable indicating that the upper limit of the actual admissible domain of the yth node in the tth preset optimization time period is located on the sth segment, A 0 / 1 variable indicating that the lower limit of the actual acceptable region of the yth node in the tth preset optimization time period is located on the sth segment represents the output power of the yth node in the tth preset optimization time period; Obtain preset constraint formulas corresponding to parameters in the objective function; The preset constraint formula includes at least: operating base point power balance constraint, generator set maximum adjustment constraint, generator set preset constraint; Get the preset constraint formula corresponding to the linear expression, including: Get the operating base point power balance constraint: ; Where g is the g-th generator set, NG is the number of all generator sets; y is the y-th node; NY is the number of all nodes; represents the expected value of active power output from the g-th generator set, and The value range of is [the minimum value of the net load downward acceptable domain, the maximum value of the net load upward acceptable domain]; represents the expected net load value of the yth node, and The value range of is [lower limit of active net load disturbance, upper limit of active net load disturbance]; Get the maximum adjustment constraint of the generator set: ; in, represents the participation factor, and ; It represents the maximum upward adjustment of the load of the g-th generator set in the t-th time interval; It represents the maximum downward adjustment of the load of the g-th generator set in the t-th time interval; represents the upper limit of the active net load disturbance on the yth node in the tth time interval; represents the lower limit of the active net load disturbance on the yth node in the tth time interval; Get the preset constraints of the generator set: 、 、 ; in, Indicates the lower limit of active power generated by the g-th generator set; Indicates the upper limit of active power generated by the g-th generator set; Indicates the output active power; Indicates the upward climbing rate of the g-th generator set; represents the downward climbing rate of the fth generator set; represents the duration of the tth time interval; represents the upward reserve rate of the g-th generator in the t-th time interval; represents the downward reserve rate of the g-th generator in the t-th time interval; Based on the multi-objective planning priority method and the preset constraint formula, the minimized annual value corresponding to the minimized annualized objective function is determined.
2. According to the reference grid planning method based on optimal consumption according to claim 1, It is characterized in that ; in, ; ; = ; ; ; ; ; Wherein, m represents the mth segment; and the value range of m is [1, 2, 3]; represents the operating cost of the g-th generator set when its output is at the lower limit; It represents the slope of the g-th generator set in the m-th segment; represents the preset state parameter value of the g-th generator set in the t-th preset optimization time period; represents the preset state parameter value of the g-th generator set in the m-th segment of the t-th preset optimization time period; represents the active power of the g-th generator set in the m-th segment of the t-th preset optimization time period; represents the minimum active power of the g-th generator set; It represents the minimum active power of the g-th generator set in the m-th section; , , are the preset cost coefficient items of the g-th generator set respectively; represents the maximum active power of the g-th generator set; It represents the maximum active power of the g-th generator set in the m-th section.
3. The reference grid planning method based on optimal consumption according to claim 1, It is characterized in that Get the preset constraint formula corresponding to the linear expression, including: Get the branch power flow constraint formula: ,h=1,2,......,NL; ,h=1,2,......,NL; in, represents the net load disturbance of the yth node, and y=1,2,...,NY; represents the expected value of the net load of the yth node; h represents the hth branch line; NL represents the total number of branch lines; represents the power transfer distribution factor of the net load of the yth node to the hth branch line; represents the power transfer distribution factor of the net load of the g-th generator set to the h-th branch line; represents the upper limit of the branch power flow of the h-th branch line.
4. The reference grid planning method based on optimal consumption according to claim 1, It is characterized in that The method further comprises: The CPLEX solver is used to calculate the minimum annual value.
5. A reference grid planning system based on optimal consumption, It is characterized in that The system comprises: Function acquisition module, used to obtain the minimized annualized objective function; Among them, the function acquisition module includes an acquisition unit, Used to obtain the minimized annualized objective function: ; in, represents the investment cost, and , i represents the i-th transmission line, NL represents the total number of transmission lines, represents the investment cost per unit length and unit capacity of the ith transmission line, represents the transmission capacity of the i-th transmission line; represents the length of the ith transmission line; d is the number of days in a typical year; Indicates the operating cost; represents the reliability cost, and: , Indicates the load shedding penalty unit price, represents the unit price of wind curtailment cost penalty, y represents the yth node, NY represents the total number of nodes; t represents the tth preset optimization time period, and NT represents the total number of preset optimization time periods; Indicates that the net load disturbance of the yth node in the tth preset optimization time period exceeds the expected power shortage amount of the preset upper and lower limits of the acceptable domain; It indicates the expected wind energy abandoned when the net load disturbance of the yth node in the tth preset optimization time period exceeds the upper and lower limits of the preset acceptable domain; The acquisition unit comprises a first acquisition subunit, Used to obtain: ; ; in, represents the upper limit of the net load that can be accepted by the yth node on the sth segment during the tth preset optimization time period; s represents the sth segment, Indicates the total number of segments, Indicates the preset first slope of the yth node on the sth segment during the tth preset optimization time period represents the preset second slope of the yth node on the sth segment within the tth preset optimization time period, It represents the preset first intercept of the yth node on the sth segment in the tth preset optimization time period. It represents the preset second intercept of the yth node on the sth segment in the tth preset optimization time period. A 0 / 1 variable indicating that the upper limit of the actual admissible domain of the yth node in the tth preset optimization time period is located on the sth segment, A 0 / 1 variable indicating that the lower limit of the actual acceptable region of the yth node in the tth preset optimization time period is located on the sth segment represents the output power of the yth node in the tth preset optimization time period; A constraint acquisition module is used to obtain a preset constraint formula corresponding to a parameter in an objective function; the preset constraint formula includes at least: an operating base point power balance constraint, a generator set maximum adjustment constraint, and a generator set preset constraint; The constraint acquisition module includes a first acquisition unit, Used to obtain the operating base point power balance constraints: ; Where g is the g-th generator set, NG is the number of all generator sets; y is the y-th node; NY is the number of all nodes; represents the expected value of active power output from the g-th generator set, and The value range of is [the minimum value of the net load downward acceptable domain, the maximum value of the net load upward acceptable domain]; represents the expected net load value of the yth node, and The value range of is [lower limit of active net load disturbance, upper limit of active net load disturbance]; Get the maximum adjustment constraint of the generator set: and, ; in, represents the participation factor, and ; It represents the maximum upward adjustment of the load of the g-th generator set in the t-th time interval; It represents the maximum downward adjustment of the load of the g-th generator set in the t-th time interval; represents the upper limit of the active net load disturbance on the yth node in the tth time interval; represents the lower limit of the active net load disturbance on the yth node in the tth time interval; Get the preset constraints of the generator set: 、 、 ; in, Indicates the lower limit of the active power generated by the g-th generator set; Indicates the upper limit of active power generated by the g-th generator set; Indicates the output active power; Indicates the upward climbing rate of the g-th generator set; represents the downward climbing rate of the fth generator set; represents the duration of the tth time interval; represents the upward reserve rate of the g-th generator in the t-th time interval; represents the downward reserve rate of the g-th generator in the t-th time interval; The calculation module is used to determine the minimized annual value corresponding to the minimized annualized objective function based on the multi-objective planning priority method and the preset constraint formula.
6. The reference power grid planning system based on optimal consumption according to claim 5, It is characterized in that The acquisition unit comprises a second acquisition subunit, Used to obtain: ; in, ; ; = ; ; ; ; ; Wherein, m represents the mth segment; and the value range of m is [1, 2, 3]; represents the operating cost of the g-th generator set when its output is at the lower limit; It represents the slope of the g-th generator set in the m-th segment; represents the preset state parameter value of the g-th generator set in the t-th preset optimization time period; represents the preset state parameter value of the g-th generator set in the m-th segment of the t-th preset optimization time period; represents the active power of the g-th generator set in the m-th segment of the t-th preset optimization time period; represents the minimum active power of the g-th generator set; It represents the minimum active power of the g-th generator set in the m-th section; , , are the preset cost coefficient items of the g-th generator set respectively; represents the maximum active power of the g-th generator set; It represents the maximum active power of the g-th generator set in the m-th section.
7. The reference power grid planning system based on optimal consumption according to claim 5, It is characterized in that The constraint acquisition module includes a second acquisition unit, Used to obtain branch power flow constraint formula: ,h=1,2,......,NL; ,h=1,2,......,NL; in, represents the net load disturbance of the yth node, and y=1,2,...,NY; represents the expected value of the net load of the yth node; h represents the hth branch line; NL represents the total number of branch lines; represents the power transfer distribution factor of the net load of the yth node to the hth branch line; represents the power transfer distribution factor of the net load of the g-th generator set to the h-th branch line; represents the upper limit of the branch power flow of the h-th branch line.
8. The reference grid planning system based on optimal consumption according to claim 5, It is characterized in that The system includes a solver computation module; Used to minimize annual value calculations using the CPLEX solver.
9. A non-volatile computer storage medium, It is characterized in that Computer instructions are stored thereon, and when the computer instructions are executed, a reference power grid planning method based on optimal consumption is implemented as described in any one of claims 1-4.