A method and system for predicting aluminum material demand based on order information

Through the aluminum consumption demand prediction method based on order information, the regular algorithm is used to analyze candidate aluminum projects and predict the secondary aluminum demand for orders, which solves the accuracy problem of aluminum consumption demand prediction in construction projects and improves the accuracy of prediction results. sex and efficiency.

CN118365375BActive Publication Date: 2024-10-01GUANGDONG ROSERY BATH EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410794352.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-19
Publication Date
2024-10-01
Estimated Expiration
2044-06-19

AI Technical Summary

Technical Problem

Existing technology makes it difficult to accurately predict the demand for aluminum materials in construction projects, resulting in reduced timeliness, poor order experience, and increased losses.

Method used

An aluminum consumption demand forecasting method based on order information is adopted. By collecting order information, a verified regular algorithm is used to analyze candidate aluminum projects and predicted secondary aluminum demand for orders, and the prediction results are screened out from the target order set based on similar weights. .

Benefits of technology

It realizes intelligent demand forecasting for aluminum project orders, improves the accuracy and efficiency of forecasting results, ensures the reliability of forecasting results, and enables more comprehensive collection of demand information.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118365375B_ABST
    Figure CN118365375B_ABST
Patent Text Reader

Abstract

The present application relates to the field of Internet technology, and in particular to a method and system for predicting the demand for aluminum usage based on order information, collecting order information, the order information including the first aluminum demand of the order analyzed, analyzing the candidate aluminum projects that can meet the first aluminum demand of the order, predicting the second aluminum demand of the order based on the analysis of the candidate aluminum projects, and predicting the second aluminum demand of the order to the project corresponding to the order. The present invention can intelligently predict the demand for aluminum project orders, so that the aluminum project orders can be further improved based on the prediction results to improve efficiency; determine the predicted demand related to the input order demand based on the target project, that is, the demand that meets the current situation of the order can be introduced for the order self-check, and the prediction result is reliable, so that more comprehensive demand information can be collected, and the accuracy of the result can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of Internet technology, and in particular to a method and system for predicting aluminum material usage demand based on order information. Background Art

[0002] With the continuous development of Internet technology, more and more platforms have begun to enter the construction bidding business. At the same time, bidders can also undertake construction bidding business from multiple platforms.

[0003] Currently, the same bidder can also take on other orders on other platforms during a single order process to gain more benefits. However, this phenomenon will not only reduce the timeliness of the current order and the order experience, but also cause losses to the platform where the current order is located.

[0004] However, the demand for related materials in the construction process generally relies solely on the preliminary calculations of cost engineers and other personnel, and cannot accurately and objectively determine the exact material usage in the later stage of the project, especially for subsequent maintenance.

[0005] Therefore, there is an urgent need for an accurate prediction solution for the demand for aluminum materials in construction projects. Summary of the invention

[0006] To achieve the above objectives, this application provides the following technical solutions:

[0007] According to a first aspect of the present invention, the present invention claims protection for a method for predicting aluminum material usage demand based on order information, comprising:

[0008] Collecting order information; the order information includes the first aluminum demand of the order analyzed;

[0009] Analyze candidate aluminum projects that can meet the first aluminum demand of the order, including:

[0010] The candidate aluminum-using projects that can meet the first aluminum-using demand of the order are analyzed by a verified project prediction algorithm; the project prediction algorithm is a regular algorithm verified by multiple verified order information; each of the verified order information includes information on the first aluminum-using demand of multiple orders and information on projects that meet the first aluminum-using demand of the multiple orders; the regular algorithm is: P b =W b0 +W b1 S1+W b2 S2+W b3 S3+…+W bn S n ; Among them, W ba represents the similarity weight between the bth target item and the second aluminum demand of the ath target order, S arepresents the second aluminum demand of the ath target order, P b represents the similarity confidence of the bth target item, a=1,2…n,b=1…,n represents the total number of the second aluminum demand of the target order, m represents the total number of the target items, W b0 represents the target intercept of the regular equation corresponding to the b-th target project, the candidate aluminum project is a project in the project set composed of the target projects; the candidate aluminum project that can meet the first aluminum demand of the order is analyzed by the verified project prediction algorithm, comprising: parsing the first aluminum demand of the order by the regular algorithm to obtain similarity confidences corresponding to each of the target projects; analyzing the candidate aluminum project from the project set according to the similarity confidences;

[0011] Analyzing and predicting the second aluminum demand of the order according to the candidate aluminum project includes: analyzing the similarity weights between each of the candidate aluminum project and each of the target order second aluminum demand; analyzing the predicted second aluminum demand of the order from the set of second aluminum demands of the order composed of the second aluminum demands of each of the target orders according to the similarity weights;

[0012] The analyzing the similarity weights between each of the candidate aluminum use projects and each of the second aluminum use requirements of the target orders includes:

[0013] Collecting similarity weights between each of the candidate aluminum-using items and each of the second aluminum-using requirements of the target orders from the regular algorithm;

[0014] The second aluminum demand forecast for the predicted order is assigned to the item corresponding to the order.

[0015] Further, the step of analyzing the predicted order second aluminum demand from the order second aluminum demand set consisting of the target order second aluminum demand according to the similarity weight includes:

[0016] For each of the candidate aluminum items, the order second aluminum demands that meet the target quantity are screened out from the order second aluminum demands set in order of similarity weights from large to small, and the predicted order second aluminum demands are analyzed from the screened order second aluminum demands.

[0017] According to a second aspect of the present invention, the present invention claims protection for a system for predicting aluminum material usage demand based on order information, comprising:

[0018] A collection unit, used for collecting order information; the order information includes the first aluminum demand of the order analyzed;

[0019] The first analysis unit is used to analyze the candidate aluminum-using projects that can meet the first aluminum-using demand of the order; specifically, it is used to analyze the candidate aluminum-using projects that can meet the first aluminum-using demand of the order through a verified project prediction algorithm; the project prediction algorithm is a regular algorithm verified by multiple verified order information; each of the verified order information includes information on the first aluminum-using demand of multiple orders and information on projects that meet the first aluminum-using demand of the multiple orders; the regular algorithm is: P b = b0 + b1 S1+ b2 S2+ b3 S3+…+W bn S n ; Among them, W ba represents the similarity weight between the bth target item and the second aluminum demand of the ath target order, S a represents the second aluminum demand of the ath target order, P b represents the similarity confidence of the bth target item, a=1,2…n,b=1…,n represents the total number of the second aluminum demand of the target order, m represents the total number of the target items, W b0 represents the target intercept of the regular equation corresponding to the b-th target project, the candidate aluminum project is a project in the project set composed of the target projects; specifically used to parse the first aluminum demand of the order by the regular algorithm to obtain the similarity confidence corresponding to each target project; and analyze the candidate aluminum project from the project set according to the similarity confidence;

[0020] The second analysis unit is used to analyze and predict the second aluminum demand of the order according to the candidate aluminum project; specifically, it is used to analyze the similarity weights between each of the candidate aluminum projects and the second aluminum demand of each of the target orders; according to the similarity weights, it analyzes the predicted second aluminum demand of the order from the set of second aluminum demands of the order composed of the second aluminum demands of each of the target orders; specifically, it is used to collect the similarity weights between each of the candidate aluminum projects and the second aluminum demand of each of the target orders from the regular algorithm;

[0021] The forecasting unit is used to forecast the second aluminum demand of the forecast order to the item corresponding to the order.

[0022] The present application relates to the field of Internet technology, and in particular to a method and system for predicting the demand for aluminum usage based on order information, collecting order information, the order information including the first aluminum demand of the order analyzed, analyzing the candidate aluminum projects that can meet the first aluminum demand of the order, predicting the second aluminum demand of the order based on the analysis of the candidate aluminum projects, and predicting the second aluminum demand of the order to the project corresponding to the order. The present invention can intelligently predict the demand for aluminum project orders, so that the aluminum project orders can be further improved based on the prediction results to improve efficiency; determine the predicted demand related to the input order demand based on the target project, that is, the demand that meets the current situation of the order can be introduced for the order self-check, and the prediction result is reliable, so that more comprehensive demand information can be collected, and the accuracy of the result can be improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 A workflow diagram of a method for predicting aluminum material usage demand based on order information as claimed in an embodiment of the present application;

[0024] Figure 2 This is a structural unit diagram of an aluminum material usage demand forecasting system based on order information as claimed in an embodiment of the present application. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. All other embodiments obtained by ordinary technicians in this field without creative work through the embodiments in the present application are within the scope of protection of this application.

[0026] Several embodiments will be provided below to specifically introduce the aluminum material usage demand forecasting method, system, device and storage medium based on order information.

[0027] Embodiment 1

[0028] In order to solve the problem in the prior art that the second aluminum demand of the power grid cable for its own order is not comprehensive enough, which affects the prediction accuracy, the embodiment of the present application provides a method for predicting the aluminum usage demand based on order information. The method for predicting the aluminum usage demand based on order information provided by the embodiment of the present application can be applied to electronic devices, including but not limited to PC (Personal Computer), mobile phones, tablet computers, laptops, etc.

[0029] See also Figure 1 As shown, the method provided in the embodiment of the present application may include the following steps:

[0030] S101: Collect order information, where the order information includes the first aluminum demand of the order analyzed.

[0031] The order in steps S101-S104 is usually a power grid cable order, for example, it can be the power grid cable itself, or it can be a relevant person familiar with the materials used in the power grid cable, such as a power grid cable seller. The order can be parsed through the application on the electronic device according to its actual situation. The order information here includes the first aluminum demand of the order, and can also include the order cycle, cost and other information that can assist forecasters in making predictions.

[0032] S102: Analyze candidate aluminum projects that can meet the first aluminum demand of the order.

[0033] In step S102, the candidate aluminum projects that can meet the first aluminum demand of the order can be analyzed through a verified project prediction algorithm.

[0034] The project prediction algorithm in the embodiment of the present application is an algorithm obtained by verifying multiple verified order information. Each verified order information may include order information and information about projects that meet the first aluminum demand of multiple orders in the order information, with the order information being used as the analysis of the algorithm and the project information being used as the output of the algorithm.

[0035] In a first optional implementation, the collected order information is parsed by the project prediction algorithm, and the algorithm can directly output candidate aluminum projects that can meet the first aluminum demand of the corresponding order based on the order information.

[0036] In a second optional implementation, the collected order information is parsed into the project prediction algorithm, which can output a corresponding similarity confidence for each target project. At this time, candidate aluminum projects can be screened out from the project set consisting of the target projects according to the similarity confidence corresponding to each target project.

[0037] The second optional implementation method mentioned above is introduced in detail below.

[0038] The regularization algorithm in this implementation can be:

[0039] P b =W b0 +W b1 S1+W b2 S2+W b3 S3+…+W bn S n ; Among them, W ba represents the similarity weight between the bth target item and the second aluminum demand of the ath target order, S a represents the second aluminum demand of the ath target order, P brepresents the similarity confidence of the bth target item, a=1,2…n,b=1…,n represents the total number of the second aluminum demand of the target order, m represents the total number of the target items, W b0 represents the target intercept of the regular equation corresponding to the bth target item, and the candidate aluminum-using items are items in the item set consisting of the target items.

[0040] At this time, for step S102, the collected first aluminum demand of the order can be parsed by the above regular algorithm to obtain the similarity confidence corresponding to each target project, and then the candidate aluminum project can be analyzed from the project set according to the similarity confidence. The similarity confidence in the embodiment of the present application characterizes the similarity between the corresponding project and the first aluminum demand of the order parsed by the order, so the target number of projects can be screened out from the project set as candidate aluminum projects according to the order of similarity confidence from high to low. For example, the top five projects can be screened out as candidate aluminum projects. Projects with similarity confidence greater than or equal to the target similarity confidence threshold can also be screened out as candidate aluminum projects.

[0041] S103: Analyze and predict the second aluminum demand of the order based on the candidate aluminum projects.

[0042] In a first optional implementation, in step S103, the similarity weights between each candidate aluminum item and each target order's second aluminum demand can be analyzed, and then the predicted order's second aluminum demand can be analyzed from the order's second aluminum demand set consisting of each target order's second aluminum demand based on the similarity weights.

[0043] In this embodiment, for each candidate aluminum item, the second aluminum demand of the order that meets the target quantity can be screened out from the set of second aluminum demand of the order in descending order of similarity weights with the second aluminum demand of each target order, and the predicted second aluminum demand of the order can be analyzed from the screened second aluminum demand of the order. Specifically, the screened second aluminum demand of the order can be filtered to obtain the final predicted second aluminum demand of the order. For example, the first aluminum demand of the order that has been resolved can be filtered, the second aluminum demand of the order that is mutually exclusive with the first aluminum demand of the order that has been resolved can be filtered, the second aluminum demand of the order that does not belong to the age group of the order can be filtered, the second aluminum demand of the order that does not belong to the gender of the order can be filtered, and the positive second aluminum demand of the order that corresponds to the negative second aluminum demand of the first aluminum demand of the order that has been resolved can be filtered.

[0044] In this implementation, corresponding weight values ​​can be assigned to each candidate aluminum project in descending order of similarity confidence, and different weight values ​​correspond to different quantities of the second aluminum demand of the order that needs to be screened out for prediction, that is, different weight values ​​correspond to different target quantity values. For example, for the candidate aluminum project ranked first in similarity confidence, it has a high correlation with the first aluminum demand of the order analyzed, and its corresponding target quantity value can be greater than the target quantity values ​​corresponding to other candidate aluminum projects.

[0045] In the first example of the first optional implementation, the similarity weights between each candidate aluminum project and each target order's second aluminum demand can be directly collected from the regular algorithm. For example, the corresponding Wba can be directly collected from the regular algorithm as the similarity weight between the candidate aluminum project and the target order's second aluminum demand.

[0046] The solution provided in this example uses the regular algorithm twice. The regular algorithm is first used to analyze the candidate aluminum projects, and then the similarity weights in the regular algorithm are used to analyze the second aluminum demand of the predicted order related to the candidate aluminum projects. Since the same regular algorithm is used to analyze the candidate aluminum projects and then analyze the second aluminum demand of the predicted order, the obtained prediction results are more reliable. In addition, since the similarity weights can be directly collected from the regular algorithm, there is no need to equip other resources to store or calculate the similarity weights, which can save resource consumption in electronic devices.

[0047] In the second example of the first optional implementation method described above, the predicted second aluminum demand for the order corresponding to the candidate aluminum project can be analyzed based on the candidate aluminum project and the verified second aluminum demand prediction algorithm for the order. The second aluminum demand prediction algorithm for the order is an algorithm obtained by verification through multiple verification order information. Each verification order information may include multiple projects and information about the second aluminum demand for the order targeted by the project. The verification order information can be collected from the project record information library, which includes a large number of project record documents, and each project record document records the first aluminum demand for the order and the project that meets the first aluminum demand for the order. When verifying the algorithm, the project is parsed as the algorithm, and the second aluminum demand for the order is output as the algorithm. The order second aluminum demand prediction algorithm in this example can be verified by using different basic algorithms compared with the above-mentioned project prediction algorithm. For example, the above-mentioned project prediction algorithm is verified by using a regular algorithm, and a non-regular algorithm can be used for verification here to obtain the order second aluminum demand prediction algorithm. That is, the candidate aluminum project is first obtained by the project prediction algorithm, and then the order second aluminum demand prediction algorithm is used to analyze the predicted order second aluminum demand related to the candidate aluminum project, and the final predicted order second aluminum demand is output through diversified algorithms, so that the results are more accurate, reliable and comprehensive.

[0048] In a second optional implementation, in step S103, the candidate aluminum items can be taken as a set of candidate aluminum items, and then for each target order second aluminum demand, its similarity weight with the candidate aluminum item set is analyzed, and then the predicted order second aluminum demand is analyzed from the order second aluminum demand set composed of the target order second aluminum demand according to the similarity weight. Specifically, the candidate aluminum items can be parsed into a verified regular algorithm for predicting the order second aluminum demand, and the regular algorithm for predicting the order second aluminum demand is an algorithm verified by a regular algorithm. Parsing the candidate aluminum items into the regular algorithm for predicting the order second aluminum demand can obtain similarity confidences corresponding to the second aluminum demands of each target order, and the similarity confidences are used as the similarity weights between the corresponding target order second aluminum demand and the candidate aluminum item set, and the predicted order second aluminum demand is analyzed from the order second aluminum demand set composed of the target order second aluminum demand according to the similarity weight. For example, the second aluminum demand of orders that meet the target quantity can be screened out according to the similarity weights from high to low, and the predicted second aluminum demand of orders can be analyzed from the screened second aluminum demand of orders.

[0049] S104: Forecast the second aluminum demand of the forecast order to the item corresponding to the order.

[0050] After the predicted second aluminum demand of the order is predicted to the project corresponding to the order, the new first aluminum demand of the order can be re-parsed by the predicted second aluminum demand of the order, and then the second aluminum demand information of the order confirmed by the order can be sent to another order. For example, the information can be pushed to the evaluator through the application, and the evaluator makes a prediction based on the information parsed by the order.

[0051] It should be noted that some evaluators who are not very skilled in business technology, such as evaluators in the internship stage, may not be able to skillfully guide the power grid cables to describe their second aluminum demand for all orders during the prediction of the power grid cables. Therefore, in step S104, the predicted second aluminum demand of the order can also be predicted to the evaluator's order, and the evaluator can inquire about the power grid cables according to the predicted second aluminum demand of the order, which can improve the prediction efficiency of the evaluator.

[0052] After analyzing the predicted second aluminum demand of the order that needs to be predicted, the predicted second aluminum demand of the order can be randomly sampled, and the predicted second aluminum demand of the order can be divided into two groups according to whether the sampled predicted second aluminum demand of the order is characteristic information. One group of labels is named "related features", which contains all characteristic second aluminum demands of the order in the predicted second aluminum demand, and the other group of labels is named "related second aluminum demand of the order" which contains all non-characteristic second aluminum demands of the order in the second aluminum demand. When predicting the order, the "related features" and "related second aluminum demand of the order" labels and the second aluminum demands of the order contained in each are introduced.

[0053] The characteristic order second aluminum demand in the embodiment of the present application refers to the order second aluminum demand that can be objectively checked by others. It is an objectively existing order second aluminum demand and does not change with the subjective consciousness of the power grid cable. The others here can be anyone other than the power grid cable, such as an evaluator, or a manufacturer of the power grid cable, etc. The inspection here refers to the prediction method of others through non-direct inquiry methods such as naked eyes or touch. For example, for the order second aluminum demand related to the inner wall texture, surface curve, and inner wall protrusion, the developer can set a corresponding label for the target order second aluminum demand. For example, a "characteristic" label can be set for the order second aluminum demand related to the body shape to indicate that the order second aluminum demand belongs to the characteristic order second aluminum demand. After analyzing the predicted order second aluminum demand, the corresponding predicted order second aluminum demand can be analyzed according to the label corresponding to the predicted order second aluminum demand. Whether it is a characteristic order second aluminum demand or a non-characteristic order second aluminum demand.

[0054] The aluminum material usage demand prediction method based on order information provided in the embodiment of the present application can predict the second aluminum demand of the order that has a high similarity with the prediction result of the project prediction algorithm to the project corresponding to the order, can guide the order to confirm whether it has the predicted second aluminum demand of the order, can improve the comprehensiveness of the collected second aluminum demand of the order, and thus can improve the accuracy of the prediction result.

[0055] Embodiment 2

[0056] This application embodiment provides a system for predicting aluminum material usage demand based on order information. Figure 2 As shown, including:

[0057] The collecting unit 301 is used to collect order information; the order information includes the first aluminum demand of the order analyzed.

[0058] The first analysis unit 302 is used to analyze candidate aluminum items that can meet the first aluminum demand of the order.

[0059] The second analysis unit 303 is used to analyze and predict the second aluminum demand of the order based on the candidate aluminum items.

[0060] The prediction unit 304 is used to predict the second aluminum demand of the predicted order to the item corresponding to the order.

[0061] In an exemplary embodiment, the project prediction algorithm is a regular algorithm obtained by verifying multiple verified order information; each verified order information includes information on the first aluminum demand of multiple orders and information on projects that meet the first aluminum demand of the multiple orders.

[0062] In an exemplary embodiment, the regularization algorithm is:

[0063] P b =W b0 +W b1 S1+W b2 S2+W b3 S3+…+W bn S n ; Among them, W ba represents the similarity weight between the bth target item and the second aluminum demand of the ath target order, S a represents the second aluminum demand of the ath target order, P b represents the similarity confidence of the bth target item, a=1,2…n,b=1…,n represents the total number of the second aluminum demand of the target order, m represents the total number of the target items, W b0 represents the target intercept of the regular equation corresponding to the bth target item, and the candidate aluminum-using items are items in the item set consisting of the target items.

[0064] The first analysis unit 302 is used to parse the first aluminum demand of the order using the regular algorithm to obtain the similarity confidence corresponding to each target project; and analyze the candidate aluminum projects from the project set according to the similarity confidence.

[0065] In an exemplary embodiment, the second analysis unit 303 is used to analyze the similarity weights between each candidate aluminum item and each target order second aluminum demand, and analyze the predicted order second aluminum demand from the order second aluminum demand set consisting of the target order second aluminum demand according to the similarity weights.

[0066] In an exemplary embodiment, the second analysis unit 303 is used to collect similarity weights between each candidate aluminum item and the second aluminum demand of each target order from the regular algorithm.

[0067] In an exemplary embodiment, the second analysis unit 303 is used to filter out the order second aluminum demands that meet the target quantity from the order second aluminum demands set for each candidate aluminum item in descending order of similarity weights between the candidate aluminum item and each target order second aluminum demand, and analyze the predicted order second aluminum demand from the filtered order second aluminum demands.

[0068] In an exemplary embodiment, the second analysis unit 303 is used to treat the candidate aluminum-using items as a candidate aluminum-using item set, and then analyze the similarity weight of each target order second aluminum demand with the candidate aluminum-using item set, and then analyze the predicted order second aluminum demand from the order second aluminum demand set composed of the target order second aluminum demands based on the similarity weight.

[0069] The specific implementation methods of the invention are described in detail above, but they are only examples, and the present application is not limited to the specific implementation methods described above. For those skilled in the art, any equivalent modification or substitution of the invention is also within the scope of the present application, and therefore, the equalization, modification, and improvement made without departing from the spirit and principle of the present application should be included in the scope of the present application.

Claims

1. A method for predicting aluminum material demand based on order information, characterized in that: include: Collect forecast order information; The predicted order information includes the first aluminum demand of the order analyzed; Analyze candidate aluminum projects that can meet the first aluminum demand of the order, including: The candidate aluminum-using projects that can meet the first aluminum-using demand of the order are analyzed by a verified project prediction algorithm; the project prediction algorithm is a regular algorithm verified by multiple verified order information; each of the verified order information includes information on the first aluminum-using demand of multiple verified orders and information on projects that meet the first aluminum-using demand of the multiple verified orders; the regular algorithm is: P b =W b0 +W b1 S1+W b2 S2+W b3 S3+…+W bn S n ; Among them, W ba represents the similarity weight between the bth target item and the second aluminum demand of the ath target order, S a represents the second aluminum demand of the ath target order, P b represents the similarity confidence of the bth target item, a=1,2…n, b=1,2…m, n represents the total number of the second aluminum demand of the target order, m represents the total number of the target items, W b0 represents the target intercept of the regular equation corresponding to the b-th target project, the candidate aluminum project is a project in the project set composed of the target projects; the candidate aluminum project that can meet the first aluminum demand of the order is analyzed by the verified project prediction algorithm, comprising: parsing the first aluminum demand of the order by the regular algorithm to obtain similarity confidences corresponding to each of the target projects; analyzing the candidate aluminum project from the project set according to the similarity confidences; The project prediction algorithm is an algorithm obtained by verifying multiple verification order information; Each verification order information includes the verification order information and the information of the project that meets the first aluminum demand of multiple orders in the verification order information, and the order information is used as the analysis of the algorithm, and the project information is used as the output of the algorithm; The collected forecast order information is parsed into the forecast algorithm of the project, and the algorithm directly outputs the candidate aluminum project that meets the first aluminum demand of the corresponding order according to the forecast order information; Analyzing the second aluminum demand of the forecasted order according to the candidate aluminum project includes: analyzing the similarity weights between each of the candidate aluminum project and each target order second aluminum demand of the forecasted order; analyzing the forecasted order second aluminum demand from the order second aluminum demand set consisting of each target order second aluminum demand of the forecasted order according to the similarity weights; The analyzing the similarity weights between each of the candidate aluminum use items and each target second aluminum use demand of the forecast order includes: Collecting similarity weights between each of the candidate aluminum items and each target second aluminum demand of the forecast order from the regular algorithm; Forecasting the second aluminum demand of the forecast order to the project corresponding to the forecast order; The step of analyzing the predicted order second aluminum demand from the order second aluminum demand set consisting of the second aluminum demand of each target order of the predicted order according to the similarity weight comprises: For each of the candidate aluminum items, the order second aluminum demands that meet the target quantity are screened out from the order second aluminum demands set in order of similarity weights from large to small between the order second aluminum demands and the target order second aluminum demands of each predicted order, and the predicted order second aluminum demands are analyzed from the screened order second aluminum demands.

2. A device for predicting aluminum material demand based on order information, characterized in that: include: A collection unit, used for collecting forecast order information; The predicted order information includes the first aluminum demand of the predicted order analysis; The first analysis unit is used to analyze the candidate aluminum-using projects that can meet the first aluminum-using demand of the order; specifically, it is used to analyze the candidate aluminum-using projects that can meet the first aluminum-using demand of the order through a verified project prediction algorithm; the project prediction algorithm is a regular algorithm verified by multiple verification order information; each of the verification order information includes information on the first aluminum-using demand of multiple verification orders and information on projects that meet the first aluminum-using demand of the multiple verification orders; the regular algorithm is: P b = b0 + b1 S1+ b2 S2+ b3 S3+…+W bn S n ; Among them, W ba represents the similarity weight between the bth target item and the second aluminum demand of the ath target order, S a represents the second aluminum demand of the ath target order, P b represents the similarity confidence of the bth target item, a=1,2…n, b=1,2…m, n represents the total number of the second aluminum demand of the target order, m represents the total number of the target items, W b0 represents the target intercept of the regular equation corresponding to the b-th target project, the candidate aluminum project is a project in the project set composed of the target projects; specifically used to parse the first aluminum demand of the order by the regular algorithm to obtain the similarity confidence corresponding to each target project; and analyze the candidate aluminum project from the project set according to the similarity confidence; The second analysis unit is used to analyze the second aluminum demand of the forecast order according to the candidate aluminum project; specifically used to analyze the similarity weights between each of the candidate aluminum projects and the second aluminum demand of each target order of the forecast order; according to the similarity weights, the second aluminum demand of the forecast order is analyzed from the set of second aluminum demands of the order composed of the second aluminum demands of each target order of the forecast order; specifically used to collect the similarity weights between each of the candidate aluminum projects and the second aluminum demand of each target order of the forecast order from the regular algorithm; A forecasting unit, configured to forecast the second aluminum demand of the forecast order to the item corresponding to the forecast order; The device for predicting the demand for aluminum material usage based on order information is used to execute the method for predicting the demand for aluminum material usage based on order information as described in claim 1.