Installation structure for marine equipment, installation method and storage container
By setting up a matching structure between the sleeve and the connecting rod on the sub-insulating module of the marine cargo tank, the problem of easy damage to the shielding film layer and easy collapse of the insulation module is solved, the resistance to lateral forces is enhanced, and the installation structure is ensured. Stability and durability.
Patent Information
- Application Number
- CN202410813702.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-24
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-06-24
AI Technical Summary
The shielding film layer of existing marine cargo tanks is easily damaged, the insulation module is easily collapsed, and the installation structure is easily deformed and broken, especially in low-temperature cold-condensing environments, it is difficult to resist lateral forces.
The mating structure between the sleeve and the connecting rod is provided on the secondary insulating module. The exposed load-bearing member of the sleeve and the connecting rod is used to support the main shielding layer, and is fixed with the glue through the first anchor and the second anchor, and the connecting rod is inserted. Sleeve in the sleeve to form a stroke space, adapt to cold shrinkage deformation, and avoid stress concentration.
It enhances the structure's resistance to lateral forces, reduces the risk of shielding film layer damage and insulating module collapse, avoids deformation and fracture of the installation structure, and ensures stability in low-temperature environments.
Smart Images

Figure CN118372922B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of marine equipment, and in particular to a mounting structure for marine equipment, a mounting method thereof and a storage container. Background Art
[0002] LNG usually needs to rely on transportation equipment, such as ships and other marine equipment for transportation. In related technologies, marine cargo tanks are usually used to store related media. The container wall of marine cargo tanks is usually a multi-layer structure, including insulation modules, film shielding layers, etc.
[0003] The typical structure of the relevant cargo tank mainly includes components such as the primary shielding film, primary insulation module, secondary shielding film, secondary insulation module and prestressed concrete or steel outer tank arranged from the inside to the outside, among which:
[0004] The main shielding film is a metal film that is in direct contact with the stored cryogenic liquefied gas;
[0005] The main insulation module is located outside the main shielding film, and the two together form the main shielding layer;
[0006] The secondary shielding film is a metal or composite film that comes into contact with the cryogenic liquefied gas when the primary shielding film leaks;
[0007] The secondary insulating module is located outside the secondary shielding film, and the two are combined to form a secondary shielding layer.
[0008] Regarding the installation of the primary shielding layer and the secondary shielding layer, the existing technology often uses door-type wedges to connect the layers, which has the following disadvantages: in the application scenario, when the cargo tank is subjected to a large external force, the shielding film layer is easily damaged; when the cargo tank is cold and shrinks, the insulation module is easily crushed; the installation is difficult and the installation efficiency is low. Especially for transport ships, the external environment they face is more complex and unstable than that of land-based storage tanks, and higher mechanical properties are required for the vessel wall.
[0009] Therefore, based on the above-mentioned defects, the following solutions have been gradually developed, but the defects are:
[0010] a. Figure 1 As shown, by slotting the secondary insulating module 1 of the secondary shielding layer, the anchor plate 11 is fixed to the secondary insulating module 1, and by providing a protruding stud 12 on the anchor plate 11 to bear external force, the connection between the main shielding layer and the secondary shielding layer is achieved. This solution still has the risk of the shielding film layer being easily damaged and the insulating module being easily crushed, and cannot resist lateral forces;
[0011] b. Figure 2 As shown, in Figure 1On the basis of the structure shown in FIG. 1 , a screw rod 13 is added, and the screw rod 13 penetrates the anchor plate 11 to enhance the ability to resist lateral force. Figure 3 As shown, the stress at the connection between the anchor plate 11 and the screw 13 is too concentrated, and deformation is likely to occur under long-term stress, and the screw 13 used to fix the insulation module is likely to break; and when the secondary insulation module 1 shrinks, the screw 13 cannot adaptively compensate for the shrinkage, and the secondary insulation module 1 is likely to be crushed.
[0012] Therefore, based on the defects in the prior art, the present invention develops a mounting structure for marine equipment, a mounting method thereof and a storage container. Summary of the invention
[0013] The purpose of the present invention is to provide a mounting structure for marine equipment, an mounting method thereof and a storage container, so as to solve the risk of easy damage to the shielding film layer of the liquid cargo tank and easy collapse of the insulation module in the prior art, and further overcome the problem that the mounting structure itself is easy to deform, be damaged or break.
[0014] The technical solution of the present invention is: an installation structure for marine equipment, which is arranged on a secondary insulating module corresponding to a secondary shielding layer, and the secondary insulating module has a first wall surface and a second wall surface; the installation structure includes a sleeve inserted into the secondary insulating module, and a connecting rod inserted into the sleeve; the end of the sleeve or the connecting rod exposed to the first wall surface has a protruding load-bearing component for the installation of the main shielding layer.
[0015] Preferably, the axial lengths of the sleeve and the connecting rod are both smaller than the thickness of the secondary insulating module, so that under normal conditions, after the connecting rod is inserted into the sleeve, a travel space is formed inside and outside the sleeve for the connecting rod to move axially relative to the sleeve when the secondary insulating module is in a cold-shrunk state.
[0016] Preferably, the sleeve and the connecting rod have a first anchor and a second anchor respectively, and the first anchor and the second anchor are attached to or embedded in any one of the different first wall surface and the second wall surface.
[0017] Preferably, the first anchor is fixed to a side biased toward the first wall surface, the sleeve is embedded in the secondary insulation module, and the bearing member and the sleeve are respectively arranged on both sides of the first anchor;
[0018] The second anchor is fixed to a side biased toward the second wall surface, and the connecting rod is inserted into the sleeve.
[0019] Preferably, the first anchor is fixed to a side biased toward the second wall surface, and the sleeve is embedded in the secondary insulation module;
[0020] The second anchor is fixed to a side biased toward the first wall surface, the bearing member and the connecting rod are arranged on both sides of the second anchor, and the connecting rod is inserted into the sleeve.
[0021] Preferably, adhesive parts are provided at the first wall surface and the second wall surface of the secondary insulation module, and the first anchor and the second anchor are respectively embedded in the adhesive parts on corresponding sides and fixed by bolts.
[0022] Preferably, connecting pieces are provided at the inner wall surface of the bonding piece opposite to the first anchor piece and / or the second anchor piece for connection and fixing by the bolts.
[0023] Preferably, a secondary shielding film is arranged on the outer side of the mounting structure and the secondary insulation module.
[0024] The present invention also discloses a method for installing a mounting structure for marine equipment, and the method is specifically as follows:
[0025] a. Select a secondary insulation module and determine the installation position of the installation structure on the secondary insulation module;
[0026] b. Determine the axial direction of the installation structure based on the thickness direction corresponding to the installation position, and open a notch on the secondary insulation module along the axial direction for the installation structure to be installed;
[0027] c. Pass the sleeve along the notch and fix it on the secondary insulation module;
[0028] d. Pass the connecting rod along the sleeve and fix it on the secondary insulation module.
[0029] On the other hand, the present application provides a storage container including a mounting structure for marine equipment, such as the mounting structure in any of the above embodiments, wherein the mounting structure forms a part of a container wall of the storage container.
[0030] Preferably, the storage container is a large land-based storage tank.
[0031] Compared with the prior art, the advantages of the present invention are:
[0032] (1) By arranging the sleeve and the connecting rod in the secondary insulation module, the ability of the structure to resist lateral force is enhanced, the risk of the structure being crushed is reduced, and the shielding film layer is not easily damaged.
[0033] (2) The connecting rod is inserted into the sleeve, which has sufficient assembly contact area to avoid deformation and fracture caused by local structural stress concentration.
[0034] (3) When the secondary insulation module shrinks in a low-temperature environment, the connecting rod can move axially relative to the sleeve to compensate for the shrinkage deformation of the secondary insulation module. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:
[0036] Figure 1 A cross-sectional view of a first installation structure of primary and secondary shielding layers provided in the prior art;
[0037] Figure 2 A cross-sectional view of a second installation structure of primary and secondary shielding layers provided in the prior art;
[0038] Figure 3 A stress analysis diagram of the second installation structure of the primary and secondary shielding layers provided in the prior art;
[0039] Figure 4 A cross-sectional view of a mounting structure of a primary and secondary shielding layer described in Embodiment 1 of the present invention;
[0040] Figure 5 A schematic diagram of an installation structure of a primary and secondary shielding layer described in Embodiment 1 of the present invention;
[0041] Figure 6 A stress analysis diagram of a mounting structure of a primary and secondary shielding layer described in Example 1 of the present invention;
[0042] Figure 7 A cross-sectional view of a mounting structure of a primary and secondary shielding layer described in Embodiment 2 of the present invention;
[0043] Figure 8 It is a cross-sectional view of an installation structure of a primary and secondary shielding layer described in Example 3 of the present invention.
[0044] Among them: 1. Secondary insulation module;
[0045] 101. first wall surface, 102. second wall surface, 11. anchor plate, 12. stud, 13. screw rod, 14. glued part;
[0046] 2. Sleeve, 21. First anchor;
[0047] 3. connecting rod, 31. second anchor;
[0048] 4. Load-bearing components;
[0049] 5. Travel space, 51. First space, 52. Second space;
[0050] 6. Connectors. DETAILED DESCRIPTION
[0051] The present invention is further described in detail below in conjunction with specific embodiments:
[0052] In the related art, the liquid cargo tank mainly includes a main shielding layer in the inner layer and a secondary shielding layer in the outer layer. The installation of the main shielding layer and the secondary shielding layer can be achieved by arranging a mounting structure on the secondary shielding layer. The mounting structure needs to support the main shielding layer. Therefore, the force applied to the mounting structure needs to avoid the secondary shielding layer from being crushed or damaged, and the mounting structure itself needs to be prevented from being deformed or broken.
[0053] Example 1
[0054] like Figure 4 As shown, a mounting structure for marine equipment is arranged on a secondary insulation module 1 corresponding to a secondary shielding layer, and the secondary insulation module 1 has a first wall surface 101 and a second wall surface 102. The secondary insulation module 1 adopts a reinforced polyurethane thermal insulation material.
[0055] It should be noted that Figure 4 Taking the direction shown as an example, the left side in the figure is the inner wall side of the secondary insulation module 1 and is defined as the first wall surface 101 , and the right side is the outer wall side of the secondary insulation module 1 and is defined as the second wall surface 102 .
[0056] In this embodiment, adhesive members 14 are disposed on both the first wall surface 101 and the second wall surface 102 of the secondary insulation module 1 .
[0057] like Figure 4 As shown, the installation structure includes a sleeve 2 inserted into the secondary insulation module 1, and a connecting rod 3 inserted into the sleeve 2; one end of the sleeve 2 exposed to the first wall 101 has a protruding bearing member 4 for the main shielding layer to be installed.
[0058] The axial lengths of the sleeve 2 and the connecting rod 3 are both smaller than the thickness of the secondary insulating module 1. Therefore, under normal conditions, after the connecting rod 3 is inserted into the sleeve 2, a travel space 5 is formed inside and outside the sleeve 2, allowing the connecting rod 3 to move axially relative to the sleeve 2 when the secondary insulating module 1 is in a cold-shrink state.
[0059] Specific, combined Figure 4 , Figure 5 As shown, the end portion of the sleeve 2 on one side biased toward the first wall 101 has a first anchor 21 that is integrally formed or welded and fixed. The first anchor 21 is embedded in the adhesive 14 at the first wall 101, the sleeve 2 is embedded in the secondary insulation module 1, and the load-bearing member 4 and the sleeve 2 are respectively arranged on both sides of the first anchor 21; the first anchor 21 is fixedly connected to the secondary insulation module 1 by bolts, thereby realizing the fixed installation of the sleeve 2.
[0060] The end portion of the connecting rod 3 on one side that is biased toward the second wall surface 102 has a second anchor 31 that is integrally formed or welded and fixed. The second anchor 31 is embedded in the adhesive component 14 at the second wall surface 102, and the connecting rod 3 is inserted in the sleeve 2; the second anchor 31 is fixedly connected to the secondary insulation module 1 by bolts, thereby realizing the fixed installation of the connecting rod 3.
[0061] In other embodiments, when the adhesive member 14 is not disposed on the first wall surface 101 and the second wall surface 102 , the first anchoring member 21 and the second anchoring member 31 can be directly attached to or embedded in the secondary insulation module 1 .
[0062] In actual application, after the installation structure is assembled, the secondary shielding film is encapsulated on the secondary insulation module 1 and the outside of the installation structure, and then combined to form a complete secondary shielding layer. The main shielding layer with the main shielding film and the main insulation module can be directly supported on the bearing member 4.
[0063] In the present application, based on the setting of the installation structure, the overall lengthened structure of the sleeve 2 and the connecting rod 3 can enhance the ability of the structure to resist lateral forces, reduce the risk of the structure being crushed, and the shielding film layer is not easily damaged. When storing cryogenic liquefied gas, the secondary insulation module 1 may shrink. At this time, since the first anchor 21 and the second anchor 31 are respectively fixed to the first wall 101 and the second wall 102, the connecting rod 3 can move axially relative to the sleeve 2 after the secondary insulation module 1 shrinks, thereby compensating for the shrinkage deformation of the secondary insulation module 1 and reducing the risk of damage to the secondary insulation module 1. Combined with Figure 6 As shown, based on the stress analysis diagram, it can be seen that by inserting the connecting rod 3 into the sleeve 2, there is a sufficient assembly contact area to avoid local structural stress concentration and deformation and fracture of the installation structure itself.
[0064] Example 2
[0065] like Figure 7 As shown, the installation structure includes a sleeve 2 inserted into the secondary insulation module 1, and a connecting rod 3 inserted into the sleeve 2; the end of the sleeve 2 exposed to the first wall 101 has a protruding bearing member 4 for the main shielding layer to be installed. In addition, the first wall 101 and the second wall 102 of the secondary insulation module 1 are both provided with a glued part 14.
[0066] The sleeve 2 has an integrally formed or welded first anchor 21 at one end portion thereof facing the first wall surface 101, and the first anchor 21 is fixedly connected to the secondary insulation module 1 by bolts, thereby achieving fixed installation of the sleeve 2. The connecting rod 3 has an integrally formed or welded second anchor 31 at one end portion thereof facing the second wall surface 102, and the second anchor 31 is fixedly connected to the secondary insulation module 1 by bolts, thereby achieving fixed installation of the connecting rod 3.
[0067] In this embodiment, the inner wall surface of the bonding member 14 opposite to the first anchor 21 is provided with a connecting member 6 for bolt connection and fixing. Of course, in other embodiments, the inner wall surface of the bonding member 14 opposite to the first anchor 21 can also be provided with a connecting member 6 for bolt connection and fixing.
[0068] Example 3
[0069] like Figure 8 As shown, the installation structure includes a sleeve 2 inserted into the secondary insulation module 1, and a connecting rod 3 inserted into the sleeve 2; one end of the connecting rod 3 exposed to the first wall 101 has a protruding bearing member 4 for the main shielding layer to be installed.
[0070] Specifically, the first anchor 21 is fixed to the side biased toward the second wall surface 102, and the sleeve 2 is embedded in the secondary insulation module 1; the first anchor 21 is fixedly connected to the secondary insulation module 1 by bolts, thereby realizing the fixed installation of the sleeve 2. The second anchor 31 is fixed to the side biased toward the first wall surface 101, the bearing member 4 and the connecting rod 3 are respectively arranged on both sides of the second anchor 31, and the connecting rod 3 is inserted in the sleeve 2, and the second anchor 31 is fixedly connected to the secondary insulation module 1 by bolts, thereby realizing the fixed installation of the connecting rod 3. After the secondary insulation module 1 is shrunk, relative axial movement can occur between the connecting rod 3 and the sleeve 2.
[0071] The present invention also discloses an installation method for an installation structure of a marine device. Taking the structure in Example 1 of the present application as an example, the installation method is specifically as follows:
[0072] a. Select the secondary insulation module 1, install the adhesive member 14 on the first wall surface 101 and the second wall surface 102 of the secondary insulation module 1, and determine the installation position point of the installation structure on the secondary insulation module 1;
[0073] b. Determine the axial direction of the installation structure based on the thickness direction corresponding to the installation position point, and open a notch for the installation structure to be installed on the secondary insulation module 1 along the axial direction; and at the same time, open a cavity for the first anchor 21 / second anchor 31 to be embedded on the glued component 14 corresponding to the installation position point;
[0074] c. Insert the sleeve 2 into the slot. The axial length of the sleeve 2 must be smaller than the thickness of the secondary insulating module 1. Insert the first anchor 21 into the concave cavity of the adhesive member 14. The first anchor 21 is fixedly connected to the secondary insulating module 1 by bolts, thereby achieving fixed installation of the sleeve 2.
[0075] d. Insert the connecting rod 3 into the sleeve 2. The axial length of the connecting rod 3 must be smaller than the thickness of the secondary insulating module 1. The second anchor 31 is embedded in the concave cavity of the adhesive component 14 on the other side. The second anchor 31 is fixedly connected to the secondary insulating module 1 by bolts, thereby realizing the fixed installation of the connecting rod 3.
[0076] Combined with Figure 4 It can be seen that based on the length setting of the sleeve 2 and the connecting rod 3, under normal conditions, it is necessary to ensure that a first space 51 is formed between the end of the sleeve 2 away from the first anchor 21 and the second anchor 31, and a second space 52 is formed between the end of the connecting rod 3 away from the second anchor 31 and the inner end surface of the sleeve 2. The first space 51 and the second space 52 are combined to form a travel space 5 for the connecting rod 3 to move axially relative to the sleeve 2 when the secondary insulating module 1 is in a cold-shrink state.
[0077] On the other hand, the present application also provides a storage container, which includes any of the above mounting structures for marine equipment, wherein the mounting structure forms a part of the container wall of the storage container. Specifically, the storage container can be used to store liquefied gas, such as liquefied natural gas, liquid nitrogen, liquid oxygen, liquid hydrogen, and liquid helium.
[0078] In some embodiments, the storage container is a large land-based storage tank. The storage container is suitable for marine equipment and also suitable for large land-based storage tanks.
[0079] The above embodiments are only for illustrating the technical concept and features of the present invention, and their purpose is to enable people familiar with this technology to understand the content of the present invention and implement it accordingly, and they cannot be used to limit the scope of protection of the present invention. For those skilled in the art, it is obvious that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is limited by the attached claims rather than the above description, and it is intended to include all changes within the meaning and scope of the equivalent elements of the claims in the present invention.
Claims
1. A mounting structure for marine equipment, arranged on a secondary insulation module (1) corresponding to a secondary shielding layer, the secondary insulation module (1) having a first wall surface (101) and a second wall surface (102), characterized in that: The mounting structure comprises a sleeve (2) inserted into the secondary insulating module (1), and a connecting rod (3) inserted into the sleeve (2); one end of the sleeve (2) or the connecting rod (3) exposed outside the first wall surface (101) has a protruding bearing member (4) for mounting the main shielding layer; The axial lengths of the sleeve (2) and the connecting rod (3) are both less than the thickness of the secondary insulating module (1), so that under normal conditions, after the connecting rod (3) is inserted into the sleeve (2), a travel space (5) is formed inside and outside the sleeve (2) to allow the connecting rod (3) to move axially relative to the sleeve (2) when the secondary insulating module (1) is in a cold-shrink state; The sleeve (2) and the connecting rod (3) respectively have a first anchor (21) and a second anchor (31), and the first anchor (21) and the second anchor (31) are attached to or embedded in any one of the first wall surface (101) and the second wall surface (102) which are different from each other; The installation method of the installation structure is specifically as follows: a. selecting a secondary insulation module (1), and determining an installation position point of the installation structure on the secondary insulation module (1); b. Determine the axial direction of the installation structure based on the thickness direction corresponding to the installation position point, and open a notch on the secondary insulation module (1) along the axial direction for the installation structure to be installed; c. Insert the sleeve (2) along the slot and fix it on the secondary insulation module (1); d. Pass the connecting rod (3) along the sleeve (2) and fix it on the secondary insulation module (1).
2. The installation structure for marine equipment according to claim 1, characterized in that: The first anchor (21) is fixed to a side biased towards the first wall surface (101), the sleeve (2) is embedded in the secondary insulation module (1), and the bearing member (4) and the sleeve (2) are respectively arranged on both sides of the first anchor (21); The second anchor (31) is fixed to a side biased towards the second wall surface (102), and the connecting rod (3) is inserted into the sleeve (2).
3. The installation structure for marine equipment according to claim 1, characterized in that: The first anchor (21) is fixed to a side biased towards the second wall surface (102), and the sleeve (2) is embedded in the secondary insulation module (1); The second anchor (31) is fixed to a side biased towards the first wall surface (101), the bearing member (4) and the connecting rod (3) are arranged on both sides of the second anchor (31), and the connecting rod (3) is inserted into the sleeve (2).
4. The installation structure for marine equipment according to claim 1, characterized in that: The first wall surface (101) and the second wall surface (102) of the secondary insulation module (1) are provided with adhesive parts (14), and the first anchoring piece (21) and the second anchoring piece (31) are respectively embedded in the adhesive parts (14) on the corresponding sides and fixed by bolts.
5. The installation structure for marine equipment according to claim 4, characterized in that: Connecting pieces (6) are provided on the inner wall surface of the bonding piece (14) opposite to the first anchor piece (21) and / or the second anchor piece (31) for connection and fixing by the bolts.
6. The installation structure for marine equipment according to claim 1, characterized in that: A secondary shielding film is arranged on the outer sides of the mounting structure and the secondary insulation module (1).
7. A storage container, characterized in that: The mounting structure comprises the mounting structure as claimed in any one of claims 1 to 5, wherein the mounting structure forms a part of a container wall of the storage container.
8. The storage container according to claim 7, characterized in that: The storage container is a large land-based storage tank.
