Ground wire layout optimization system and method based on ground wire and ground column

By using the Voronoi diagram algorithm and the grounding pole recommendation model in the grounding wire and grounding pole layout optimization system, combined with the group optimization algorithm, the grounding pole and grounding wire layout is automatically planned, which solves the problem of poor grounding performance in the traditional method. , achieving efficient and reliable grounding system design, reducing costs and resource waste.

CN118378396BActive Publication Date: 2024-10-18深圳市鸿万科电子有限公司
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410813482.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2024-10-18
Estimated Expiration
2044-06-24

AI Technical Summary

Technical Problem

Traditional grounding wire layout methods fail to effectively consider terrain complexity, resulting in poor grounding performance, waste of resources, and increased construction costs.

Method used

A grounding wire layout optimization system based on grounding wires and grounding posts is used to obtain the location of the power facilities at the target location, use the Voronoi diagram algorithm to construct a layout map, and combine the grounding post recommendation model and the group optimization algorithm to automatically plan the location of the grounding posts and grounding wires. Layout, evaluate and adjust.

Benefits of technology

It significantly improves the efficiency and reliability of the grounding system, reduces design time and construction costs, enhances the safety and flexibility of the system, and ensures the reasonable distribution and adaptability of power facilities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118378396B_ABST
    Figure CN118378396B_ABST
Patent Text Reader

Abstract

The present invention discloses a ground wire layout optimization system and method based on ground wires and grounding posts, and relates to the field of ground wire positioning technology. The ground wire layout optimization system based on ground wires and grounding posts includes: a grounding post planning module, a ground wire planning module and a grounding system evaluation module. The present invention collects the locations of all major power facilities in the target location and converts them into a layout diagram using a Voronoi diagram algorithm, thereby achieving accurate positioning and optimal configuration of power facilities. This method ensures the rational allocation and utilization of power resources and greatly improves the service coverage and efficiency of power facilities; the overlapping analysis of the power facility layout diagram constructed using the Voronoi diagram algorithm and the target location layout diagram, coupled with subsequent grounding post location recommendations and ground wire layout planning, can significantly reduce potential risks during the operation of the power system and enhance the safety and reliability of the entire system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of ground wire positioning, and in particular to a ground wire layout optimization system and method based on ground wires and ground posts. Background Art

[0002] The traditional grounding wire layout method is mainly based on rules and empirical formulas, as well as simplified geographical and site conditions. This method is widely used in power engineering, telecommunications and construction engineering. Among them, specific wiring strategies include straight line arrangement, mesh arrangement, radial arrangement and other arrangement methods. Traditional methods often do not consider the impact of complex geographical conditions such as terrain on the performance of the grounding system, which may lead to poor actual grounding performance; at the same time, the length and layout of the grounding wire are not optimized, which may lead to waste of resources and increase in construction costs.

[0003] Therefore, we urgently need to provide a ground wire layout optimization system and method based on ground wires and grounding poles that are automatically planned according to the target location. Summary of the invention

[0004] The present invention aims to provide a ground wire layout optimization system and method based on ground wires and grounding poles that are automatically planned according to target locations, which significantly improves the efficiency and reliability of the grounding system while reducing design time and construction costs.

[0005] The ground wire layout optimization method based on the ground wire and the ground column includes:

[0006] S1. Obtain the locations of all major power facilities in the target location to obtain a point set of the major power facility locations; convert the point set of the major power facility locations into a layout diagram of the major power facilities using a Voronoi diagram algorithm; overlay the layout diagram of the major power facilities and the layout diagram of the target location to obtain a layout diagram of the target location to be planned; perform analysis based on the layout diagram of the target location to be planned and a grounding column recommendation model to obtain recommended grounding column locations; perform screening based on the recommended grounding column locations to obtain a grounding column location set;

[0007] S2. Plan the ground wire layout based on the grounding column location set and the target location layout diagram to obtain the planned target location ground wire layout; the planned target location ground wire layout includes wire diameter, wire material selection and wiring plan; perform preliminary wiring according to the planned target location ground wire layout to obtain the planned target location ground wire to be tested; evaluate the planned target ground wire to be tested to obtain a ground wire evaluation result; if the ground wire evaluation result is passed, the planned target location ground wire to be tested is used as the target location ground wire planning; otherwise, adjust the planned target location ground wire layout.

[0008] As a preferred technical solution of the present invention, the ground post recommendation model in step S1 includes a data preprocessing layer, a region segmentation layer, a feature selection layer and a result output layer;

[0009] The data preprocessing layer is used to preprocess the layout map of the target location to be planned to obtain a preprocessed layout map of the target location to be planned;

[0010] The area segmentation layer is used to segment the pre-processed target location layout map according to the main power facility layout map and the target location layout map to obtain n grounding column area maps to be planned; combine the n grounding column area maps to be planned to obtain a set of grounding column area maps to be planned; n is the number of power facility areas where the main power facility layout map and the target location layout map intersect;

[0011] The feature selection layer is used to analyze the recommended grounding column positions of each grounding column area map to be planned according to the grounding column area map set to be planned, and obtain the recommended grounding column positions;

[0012] The resulting output layer is used to output the recommended ground post locations.

[0013] As a preferred technical solution of the present invention, the specific steps of training the feature selection layer in the ground post recommendation model include:

[0014] Collect several grounding post area maps with marked grounding post positions, combine several grounding post area maps to obtain a grounding post recommendation training set, and use the marked grounding post positions as recommended target values ​​of the grounding post recommendation training set;

[0015] The grounding post recommendation training set is input into the grounding post recommendation model to train the feature selection layer, and the model is trained with the recommended target value as the target to obtain the initial feature selection layer; the model is evaluated on the initial feature selection layer to obtain the model evaluation result; if the model evaluation result is passed, the trained initial feature selection layer is output, and the initial feature selection layer is used as the feature selection layer in the grounding post recommendation model; otherwise, the feature selection layer is continued to be trained using the grounding post recommendation training set.

[0016] As a preferred technical solution of the present invention, the specific steps of performing ground line layout planning based on the grounding column location set and the target location layout diagram in step S2 include:

[0017] T1. Project the grounding column location set onto the target location layout map to obtain the target location layout map of the ground line to be planned;

[0018] T2. Obtain the grounding system conditions of the target location and obtain the environmental parameters of the target location; perform feature extraction on the environmental parameters of the target location and obtain the environmental characteristics of the target location;

[0019] T3. Based on the environmental characteristics of the target location and the layout map of the target location to be planned, the ground wire is planned to obtain a simulated ground wire planning layout; the simulated ground wire planning layout includes wire diameter, wire material selection and wiring plan; the group optimization algorithm is used to screen the simulated ground wire planning layout to obtain the optimal ground wire planning layout, and the optimal ground wire planning layout is used as the planning target location ground wire layout.

[0020] As a preferred technical solution of the present invention, the specific steps of using the group optimization algorithm to screen the simulated ground line planning layout in step T3 include:

[0021] According to the simulated ground line planning layout, M ground line planning layout individuals G are constructed. m , m=1, 2, ..., M; each ground line planning layout individual G m contains a set of simulated ground line layouts for the target location, and M ground line layout individuals G m Combine to obtain the iterative population of ground line planning layout; set the maximum number of iterations;

[0022] According to the landline planning layout iteration population, the landline planning layout individual G m Perform simulation calculation to obtain the ground wire evaluation index P m , the ground line evaluation index P m As the ground line planning layout individual G m The fitness Y m ;

[0023] Based on all ground line planning and layout individual G m The fitness Y m Select and reorganize the iterative population of the ground line planning layout, and update all the iterative populations of the ground line planning layout;

[0024] When the maximum number of iterations is reached, the output is the ground planning layout individual G corresponding to the maximum fitness m , the ground line planning layout individual G corresponding to the maximum fitness m As the optimal ground line planning layout individual, the simulated ground line planning layout in the optimal ground line planning layout individual is taken as the optimal ground line planning layout to obtain the ground line layout of the planning target location.

[0025] As a preferred technical solution of the present invention, according to the ground line planning layout iteration population, the ground line planning layout individual G m The specific steps for simulation calculation include:

[0026] According to the formula Calculate the ground line evaluation index P m , R m K is the simulated ground resistance evaluation index. mis the simulated conductivity evaluation index, α is the resistance weight of the simulated ground resistance evaluation index, and γ is the conductivity weight of the simulated conductivity evaluation index; the sum of α and γ is 1;

[0027] Using the formula Calculate the simulated ground resistance evaluation index R m , R max is the expected maximum value of the grounding resistance of the grounding wire, R min is the expected minimum value of the grounding resistance of the grounding wire, R i is the grounding resistance of the i-th grounding wire, i=1, 2, …, I; I is the grounding layout individual G m The number of ground wires in the simulated ground wire planning layout;

[0028] Using the formula Calculation of simulated conductivity evaluation index K m ; K is the simulated conductivity of the target location; K min K is the minimum expected conductivity of the target location; max is the expected maximum conductivity at the target location.

[0029] As a preferred technical solution of the present invention, the group optimization algorithm used in step T3 to screen the simulated ground line planning layout is a genetic algorithm.

[0030] The ground wire layout optimization system based on ground wires and ground posts includes:

[0031] The grounding pole planning module is used to deploy the grounding pole recommendation model, obtain the locations of all major power facilities in the target location, and obtain the location point set of the major power facilities; convert the location point set of the major power facilities into a layout diagram of the major power facilities using the Voronoi diagram algorithm; stack the layout diagram of the major power facilities and the layout diagram of the target location to obtain the layout diagram of the target location to be planned; analyze the layout diagram of the target location to be planned and the grounding pole recommendation model to obtain the recommended grounding pole locations; screen according to the recommended grounding pole locations to obtain the grounding pole location set;

[0032] The grounding wire planning module is used to project the grounding column location set onto the target location layout map to obtain the target location layout map of the ground wire to be planned; obtain the grounding system conditions of the target location to obtain the target location environmental parameters; extract the characteristics of the target location environmental parameters to obtain the target location environmental characteristics; perform ground wire planning based on the target location environmental characteristics and the target location layout map of the ground wire to be planned to obtain a simulated ground wire planning layout; the simulated ground wire planning layout includes wire diameter, wire material selection and wiring scheme; use the group optimization algorithm to screen the simulated ground wire planning layout to obtain the optimal ground wire planning layout, and use the optimal ground wire planning layout as the planning target location ground wire layout;

[0033] The grounding system evaluation module is used to perform preliminary wiring according to the ground wire layout of the planned target location to obtain the ground wire of the planned target location to be tested; evaluate the planned target ground wire to be tested to obtain the ground wire evaluation result; if the ground wire evaluation result is passed, the ground wire of the planned target location to be tested is used as the ground wire planning of the target location; otherwise, the ground wire layout of the planned target location is adjusted.

[0034] The present invention has the following advantages:

[0035] 1. The present invention collects the locations of all major power facilities in the target location and converts them into a layout diagram using the Voronoi diagram algorithm, thereby achieving accurate positioning and optimal configuration of power facilities. This method ensures the rational allocation and utilization of power resources and greatly improves the service coverage and efficiency of power facilities. The overlapping analysis of the power facility layout diagram constructed using the Voronoi diagram algorithm and the target location layout diagram, coupled with subsequent grounding column location recommendations and ground wire layout planning, can significantly reduce potential risks during the operation of the power system and enhance the safety and reliability of the entire system. By evaluating and continuously adjusting the ground wire layout, this process supports rapid and effective response to changes in actual conditions, thereby enhancing the flexibility and adaptability of the overall power planning.

[0036] 2. The present invention adopts an iterative evolutionary approach to evaluate and optimize the ground wire layout, and gradually selects planning schemes with stronger adaptability. This process imitates the natural selection mechanism to ensure that the final ground wire layout scheme can better meet the actual needs of the target location; by considering different wire diameters, materials and wiring strategies, the solution space can be widely explored, thereby avoiding falling into local optimal solutions and approaching the global optimal solution; by adjusting parameters such as wire diameter, wire type and wiring method, it can flexibly adapt to diverse planning needs and on-site conditions of the target location, ensuring the applicability and adjustment ability of the planning scheme; using simulation to calculate the evaluation indicators and corresponding fitness values ​​of the ground wire, the advantages and disadvantages of each wiring scheme can be judged more scientifically. This planning method based on data and scientific computing significantly improves the accuracy and credibility of the planning output. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 It is a structural schematic diagram of a ground wire layout optimization system based on ground wires and ground posts adopted in an embodiment of the present invention. DETAILED DESCRIPTION

[0038] In order to enable persons skilled in the art to better understand the technical solutions in the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0039] In Example 1, grounding wires and grounding poles need to be planned in hospitals to ensure the safe operation of medical equipment, prevent electric shock or equipment damage caused by electrical faults, and protect the safety of patients and medical staff. Taking the target location as a hospital as an example, a grounding wire layout optimization method based on grounding wires and grounding poles is adopted, including:

[0040] S1. Obtain the locations of all major power facilities in the target location to obtain a point set of the major power facility locations; convert the point set of the major power facility locations into a layout diagram of the major power facilities using a Voronoi diagram algorithm; overlay the layout diagram of the major power facilities and the layout diagram of the target location to obtain a layout diagram of the target location to be planned; perform analysis based on the layout diagram of the target location to be planned and a grounding column recommendation model to obtain recommended grounding column locations; perform screening based on the recommended grounding column locations to obtain a grounding column location set;

[0041] The location of the main power facilities is set by professional technicians according to the actual terrain conditions; the layout map of the target location is drawn by professional technicians according to the actual terrain of the target location; the grounding pole location set is confirmed by professional technicians after field investigation, and after screening the appropriate recommended grounding pole locations, the grounding pole location set is obtained; the selection of grounding pole locations must meet the actual needs of the target location, such as multiple grounding poles need to be set in each area of ​​the target location to meet the needs of different personnel;

[0042] The Voronoi diagram is composed of a set of continuous polygons composed of perpendicular bisectors connecting two adjacent points. The Voronoi diagram divides the plane into several polygonal domains, each of which has only one seed point. By using the location of the main power facilities in the target location as the seed point of the Voronoi diagram, the generated Voronoi polygon can be divided into regions according to the location of the main power facilities, ensuring that all grounding poles in the area divided by the location of the main power facilities are closest to the seed point, thereby effectively improving the coverage and uniformity of the grounding system; the Voronoi diagram defines the service area of ​​each main power facility, which helps to evaluate the grounding needs of different geographical locations, determine the location of the grounding poles in the area, and plan the ground line accordingly;

[0043] In step S1, the ground post recommendation model includes a data preprocessing layer, a region segmentation layer, a feature selection layer and a result output layer;

[0044] The data preprocessing layer is used to preprocess the layout map of the target location to be planned to obtain a preprocessed layout map of the target location to be planned;

[0045] The area segmentation layer is used to segment the pre-processed target location layout map according to the main power facility layout map and the target location layout map to obtain n grounding column area maps to be planned; combine the n grounding column area maps to be planned to obtain a set of grounding column area maps to be planned; n is the number of power facility areas where the main power facility layout map and the target location layout map intersect;

[0046] The feature selection layer is used to analyze the recommended grounding column positions of each grounding column area map to be planned according to the grounding column area map set to be planned, and obtain the recommended grounding column positions;

[0047] The result output layer is used to output the recommended ground post locations;

[0048] The data preprocessing layer can optimize the original data and ensure the quality of the input data by removing noise and processing missing data. This can improve the accuracy of subsequent processing; by segmenting the preprocessed target site layout map into regions, the areas where power facilities are located can be more effectively identified and refined, which helps to focus resources and attention on key areas and improve planning efficiency and quality; the feature selection layer can analyze the geographical and electrical characteristics of each area and recommend appropriate grounding pole locations to ensure the performance and safety of the grounding system; by analyzing the requirements of each area for the location of the grounding pole, cost expenditures can be optimized while ensuring system performance, such as reducing the amount of grounding materials and construction costs;

[0049] The map of the area of ​​grounding posts to be planned is a map of the area of ​​grounding posts to be planned that is divided based on the layout of the main power facilities and the layout of the target location. For example, the Voronoi diagram generated based on a main power facility is a polygon, and the area based on the main power facility in the layout map of the target location is a quadrilateral; the area intersected by the polygon and the quadrilateral is taken as the map of the area of ​​grounding posts to be planned, which meets the requirements of setting grounding posts around the main power facilities and the actual layout of the target location;

[0050] The specific steps for training the feature selection layer within the ground post recommendation model include:

[0051] Collect several grounding post area maps with marked grounding post positions, combine several grounding post area maps to obtain a grounding post recommendation training set, and use the marked grounding post positions as recommended target values ​​of the grounding post recommendation training set;

[0052] The grounding post recommendation training set is input into the grounding post recommendation model to train the feature selection layer, and the model training is performed with the recommended target value as the target to obtain the initial feature selection layer; the model evaluation is performed on the initial feature selection layer to obtain the model evaluation result; if the model evaluation result is passed, the trained initial feature selection layer is output, and the initial feature selection layer is used as the feature selection layer in the grounding post recommendation model; otherwise, the feature selection layer is continued to be trained using the grounding post recommendation training set;

[0053] The CNN model is used as the initial model for training the feature selection layer. The steps of model evaluation for the initial feature selection layer are as follows: the recommended grounding post position to be evaluated is obtained according to the grounding post recommendation training set and the initial feature selection layer; the recommended grounding post position to be evaluated is compared with the recommended target value to obtain the recommendation accuracy; if the recommendation accuracy reaches the error standard range, the model evaluation result is passed; otherwise, it is failed; the error standard range is set by professional technicians according to actual conditions;

[0054] S2. Based on the grounding column location set and the target location layout diagram, the ground line layout of the planned target location is planned; the ground line layout of the planned target location includes wire diameter, wire material selection and wiring scheme; preliminary wiring is performed according to the ground line layout of the planned target location to obtain the ground line of the planned target location to be tested; the planned target ground line to be tested is evaluated to obtain the ground line evaluation result; if the ground line evaluation result is passed, the ground line of the planned target location to be tested is used as the ground line planning of the target location; otherwise, the ground line layout of the planned target location is adjusted;

[0055] The ground wire assessment result is obtained after professional technicians conduct on-site inspections of the ground wires at the planned target location to be inspected after preliminary wiring. When the ground wire assessment result is unqualified, the ground wire layout of the planned target location is adjusted in a timely manner, the corresponding unqualified ground wires are modified, and the ground wire assessment is re-performed; in actual use, there may be discrepancies between the actual ground wire layout and the planned target location ground wire layout, which is a normal phenomenon;

[0056] The specific steps of performing ground line layout planning based on the grounding column location set and the target location layout diagram in step S2 include:

[0057] T1. Project the grounding column location set onto the target location layout map to obtain the target location layout map of the ground line to be planned;

[0058] T2. Obtain the grounding system conditions of the target location and obtain the environmental parameters of the target location; perform feature extraction on the environmental parameters of the target location and obtain the environmental characteristics of the target location;

[0059] T3. Based on the environmental characteristics of the target location and the layout diagram of the target location to be planned, the ground wire is planned to obtain a simulated ground wire planning layout; the simulated ground wire planning layout includes wire diameter, wire material selection and wiring scheme; the simulated ground wire planning layout is screened by using a swarm optimization algorithm to obtain the optimal ground wire planning layout, and the optimal ground wire planning layout is used as the ground wire layout of the planned target location;

[0060] According to the environmental characteristics of the target site and the layout map of the target site to be planned, the layout of the ground wire is simulated and optimized in a professional geographic information system combined with electrical engineering calculations; during the simulation process, multiple "hypothesis and verification" cycles can be implemented, such as different wire diameters, wire material selection and wiring schemes, to generate multiple simulated ground wire planning layouts; then the group optimization algorithm is used to screen multiple simulated ground wire planning layouts to obtain the optimal ground wire planning layout;

[0061] The group optimization algorithm used in step T3 to screen the simulated ground line planning layout is a genetic algorithm;

[0062] The specific steps of using the group optimization algorithm to screen the simulated ground line planning layout in step T3 include:

[0063] According to the simulated ground line planning layout, M ground line planning layout individuals G are constructed. m , m=1, 2, ..., M; each ground line planning layout individual G m contains a set of simulated ground line layouts for the target location, and M ground line layout individuals G m The combination obtains the iterative population of the ground line planning layout; sets the maximum number of iterations; the maximum number of iterations is set by professional technicians based on actual conditions;

[0064] Each ground line planning layout individual G m The wire diameter, wire material selection and wiring scheme are different. For example, the ground wire layout is different for each G a The wire diameter used is 2 mm, and the ground wire layout is individual G b The wire diameter used is 5 mm, etc. Different ground wire layouts are planned for individual G m Ground wire evaluation index P m different;

[0065] According to the landline planning layout iteration population, the landline planning layout individual G m Perform simulation calculation to obtain the ground wire evaluation index P m , the ground line evaluation index P m As the ground line planning layout individual G m The fitness Y m ;

[0066] According to the landline planning layout iteration population, the landline planning layout individual G m The specific steps for simulation calculation include:

[0067] According to the formula Calculate the ground line evaluation index P m , R m K is the simulated ground resistance evaluation index. m is the simulated conductivity evaluation index, α is the resistance weight of the simulated ground resistance evaluation index, and γ is the conductivity weight of the simulated conductivity evaluation index; the sum of α and γ is 1;

[0068] Using the formula Calculate the simulated ground resistance evaluation index R m , R max is the expected maximum value of the grounding resistance of the grounding wire, R min is the expected minimum value of the grounding resistance of the grounding wire, R i is the grounding resistance of the i-th grounding wire, i=1, 2, …, I; I is the grounding layout individual G m The number of ground wires in the simulated ground wire planning layout;

[0069] Using the formula Calculation of simulated conductivity evaluation index K m ; K is the simulated conductivity of the target location; K min K is the minimum expected conductivity of the target location; max is the expected maximum conductivity of the target location;

[0070] R i The specific value of the individual G is based on the ground line planning layout m The wire diameter and wire material selection of the simulated ground wire planning layout are determined in the simulation software. m The simulated ground line planning layout simulates the calculation of the resistance value; R max and R min The specific value of is determined by professional and technical personnel based on the expected target; the specific value of K is determined by professional and technical personnel based on the on-site conditions of the target location; K max and K min The specific value of is determined by professional and technical personnel according to the expected target; the specific values ​​of α and γ are set by professional and technical personnel according to the actual situation;

[0071] Based on all ground line planning and layout individual G m The fitness Y m Select and reorganize the iterative population of the ground line planning layout, and update all the iterative populations of the ground line planning layout;

[0072] Select the operation to plan and layout individual G in the ground line m The fitness Y m Based on this, the roulette wheel selection algorithm is used to select the individual G in the iterative population of landline planning and layout. m Make a selection and choose a better ground plan layout individual G m Form a new iterative population of ground line planning layout;

[0073] The reorganization operation is to randomly select two landline layout individuals G in the landline layout iteration population. m Perform multi-point crossover changes, that is, randomly select different parameters, such as different wire diameters and wire materials; randomly plan the layout of two ground wires m Interchange elements by selecting different parameters;

[0074] When the maximum number of iterations is reached, the output is the ground planning layout individual G corresponding to the maximum fitness m , the ground line planning layout individual G corresponding to the maximum fitness m As the optimal land line planning layout individual, the simulated land line planning layout in the optimal land line planning layout individual is taken as the optimal land line planning layout to obtain the land line layout of the planning target location;

[0075] By evaluating, selecting and reorganizing the iterative population of ground wire planning and layout, planning individuals with higher fitness can be gradually screened out; this process simulates the principle of natural selection, so that the final ground wire planning and layout is more suitable for the actual environment and requirements of the target location. By generating multiple ground wire planning and layout individuals with different wire diameters, wire material selections and wiring schemes, the space of solutions can be fully explored to ensure that the optimal solution found is not a local optimal solution, but close to the global optimal solution; through parameter settings such as wire diameter, wire material, wiring scheme, etc., it can flexibly adapt to different planning needs and actual conditions, which ensures the flexibility and adaptability of the planning results; through simulation calculation of the ground wire evaluation index and the corresponding fitness value, the advantages and disadvantages of the ground wire planning and layout individuals can be evaluated more scientifically. This method based on data and scientific calculation improves the accuracy and reliability of the planning results.

[0076] Example 2, ground line layout optimization system based on ground line and ground post, see Figure 1 As shown, including:

[0077] The grounding pole planning module is used to deploy the grounding pole recommendation model, obtain the locations of all major power facilities in the target location, and obtain the location point set of the major power facilities; convert the location point set of the major power facilities into a layout diagram of the major power facilities using the Voronoi diagram algorithm; stack the layout diagram of the major power facilities and the layout diagram of the target location to obtain the layout diagram of the target location to be planned; analyze the layout diagram of the target location to be planned and the grounding pole recommendation model to obtain the recommended grounding pole locations; screen according to the recommended grounding pole locations to obtain the grounding pole location set;

[0078] The grounding wire planning module is used to project the grounding column location set onto the target location layout map to obtain the target location layout map of the ground wire to be planned; obtain the grounding system conditions of the target location to obtain the target location environmental parameters; extract the characteristics of the target location environmental parameters to obtain the target location environmental characteristics; perform ground wire planning based on the target location environmental characteristics and the target location layout map of the ground wire to be planned to obtain a simulated ground wire planning layout; the simulated ground wire planning layout includes wire diameter, wire material selection and wiring scheme; use the group optimization algorithm to screen the simulated ground wire planning layout to obtain the optimal ground wire planning layout, and use the optimal ground wire planning layout as the planning target location ground wire layout;

[0079] The grounding system evaluation module is used to perform preliminary wiring according to the ground wire layout of the planned target location to obtain the ground wire of the planned target location to be tested; evaluate the planned target ground wire to be tested to obtain the ground wire evaluation result; if the ground wire evaluation result is passed, the ground wire of the planned target location to be tested is used as the ground wire planning of the target location; otherwise, the ground wire layout of the planned target location is adjusted.

[0080] It should be understood that those skilled in the art can make improvements or changes based on the above description, and all such improvements and changes should fall within the scope of protection of the appended claims of the present invention. Parts not described in detail in this specification belong to the prior art known to those skilled in the art.

Claims

1. A ground wire layout optimization method based on ground wires and ground posts, characterized in that: include: S1. Obtain the locations of all major power facilities in the target location to obtain a point set of the major power facility locations; convert the point set of the major power facility locations into a layout diagram of the major power facilities using a Voronoi diagram algorithm; overlay the layout diagram of the major power facilities and the layout diagram of the target location to obtain a layout diagram of the target location to be planned; perform analysis based on the layout diagram of the target location to be planned and a grounding column recommendation model to obtain recommended grounding column locations; perform screening based on the recommended grounding column locations to obtain a grounding column location set; S2. Perform ground line layout planning based on the ground post location set and the target location layout diagram to obtain the planned target location ground line layout; The ground wire layout of the planned target location includes wire diameter, wire material selection and wiring scheme; preliminary wiring is performed according to the ground wire layout of the planned target location to obtain the ground wire of the planned target location to be tested; the ground wire of the planned target location to be tested is evaluated to obtain a ground wire evaluation result; if the ground wire evaluation result is passed, the ground wire of the planned target location to be tested is used as the ground wire planning of the target location; otherwise, the ground wire layout of the planned target location is adjusted; In step S1, the ground post recommendation model includes a data preprocessing layer, a region segmentation layer, a feature selection layer and a result output layer; The data preprocessing layer is used to preprocess the layout map of the target location to be planned to obtain a preprocessed layout map of the target location to be planned; The area segmentation layer is used to segment the pre-processed target location layout map according to the main power facility layout map and the target location layout map to obtain n grounding column area maps to be planned; combine the n grounding column area maps to be planned to obtain a set of grounding column area maps to be planned; n is the number of power facility areas where the main power facility layout map and the target location layout map intersect; The feature selection layer is used to analyze the recommended grounding column positions of each grounding column area map to be planned according to the grounding column area map set to be planned, and obtain the recommended grounding column positions; The result output layer is used to output the recommended ground post locations; The specific steps of performing ground line layout planning based on the grounding column location set and the target location layout diagram in step S2 include: T1. Project the grounding column location set onto the target location layout map to obtain the target location layout map of the ground line to be planned; T2. Obtain the grounding system conditions of the target location and obtain the environmental parameters of the target location; perform feature extraction on the environmental parameters of the target location and obtain the environmental characteristics of the target location; T3. Based on the environmental characteristics of the target location and the layout diagram of the target location to be planned, the ground wire is planned to obtain a simulated ground wire planning layout; the simulated ground wire planning layout includes wire diameter, wire material selection and wiring scheme; the simulated ground wire planning layout is screened by using a swarm optimization algorithm to obtain the optimal ground wire planning layout, and the optimal ground wire planning layout is used as the ground wire layout of the planned target location; The specific steps of using the group optimization algorithm to screen the simulated ground line planning layout in step T3 include: According to the simulated ground line planning layout, M ground line planning layout individuals G are constructed. m , m=1, 2, ..., M; each ground line planning layout individual G m contains a set of simulated ground line layouts for the target location, and M ground line layout individuals G m Combine to obtain the iterative population of ground line planning layout; set the maximum number of iterations; According to the landline planning layout iteration population, the landline planning layout individual G m Perform simulation calculation to obtain the ground wire evaluation index P m , the ground line evaluation index P m As the ground line planning layout individual G m The fitness Y m ; Based on all ground line planning and layout individual G m The fitness Y m Select and reorganize the iterative population of the ground line planning layout, and update all the iterative populations of the ground line planning layout; When the maximum number of iterations is reached, the output is the ground planning layout individual G corresponding to the maximum fitness m , the ground line planning layout individual G corresponding to the maximum fitness m As the optimal land line planning layout individual, the simulated land line planning layout in the optimal land line planning layout individual is taken as the optimal land line planning layout, and the optimal land line planning layout is taken as the land line layout of the planning target location; According to the landline planning layout iteration population, the landline planning layout individual G m The specific steps for simulation calculation include: According to the formula Calculate the ground line evaluation index P m , R m K is the simulated ground resistance evaluation index. m is the simulated conductivity evaluation index, α is the resistance weight of the simulated ground resistance evaluation index, and γ is the conductivity weight of the simulated conductivity evaluation index; the sum of α and γ is 1; Using the formula Calculate the simulated ground resistance evaluation index R m , R max is the expected maximum value of the grounding resistance of the grounding wire, R min is the expected minimum value of the grounding resistance of the grounding wire, R i is the grounding resistance of the i-th grounding wire, i=1, 2, …, I; I is the grounding layout individual G m The number of ground wires in the simulated ground wire planning layout; Using the formula Calculation of simulated conductivity evaluation index K m ; K is the simulated conductivity of the target location; K min K is the minimum expected conductivity of the target location; max is the expected maximum conductivity at the target location.

2. The ground line layout optimization method based on ground lines and ground posts according to claim 1, characterized in that: The specific steps for training the feature selection layer within the ground post recommendation model include: Collect several grounding post area maps with marked grounding post positions, combine several grounding post area maps to obtain a grounding post recommendation training set, and use the marked grounding post positions as recommended target values ​​of the grounding post recommendation training set; The grounding post recommendation training set is input into the grounding post recommendation model to train the feature selection layer, and the model is trained with the recommended target value as the target to obtain the initial feature selection layer; the model is evaluated on the initial feature selection layer to obtain the model evaluation result; if the model evaluation result is passed, the trained initial feature selection layer is output, and the initial feature selection layer is used as the feature selection layer in the grounding post recommendation model; otherwise, the feature selection layer is continued to be trained using the grounding post recommendation training set.

3. The ground line layout optimization method based on ground lines and ground posts according to claim 1, characterized in that: The group optimization algorithm used in step T3 to screen the simulated ground line planning layout is a genetic algorithm.

4. A ground wire layout optimization system based on ground wires and ground posts, characterized in that: The system applies the ground wire layout optimization method based on ground wires and ground posts as described in any one of claims 1 to 3, including: The grounding pole planning module is used to deploy the grounding pole recommendation model, obtain the locations of all major power facilities in the target location, and obtain the location point set of the major power facilities; convert the location point set of the major power facilities into a layout diagram of the major power facilities using the Voronoi diagram algorithm; stack the layout diagram of the major power facilities and the layout diagram of the target location to obtain the layout diagram of the target location to be planned; analyze the layout diagram of the target location to be planned and the grounding pole recommendation model to obtain the recommended grounding pole locations; screen according to the recommended grounding pole locations to obtain the grounding pole location set; The grounding wire planning module is used to project the grounding column location set onto the target location layout map to obtain the target location layout map of the ground wire to be planned; obtain the grounding system conditions of the target location to obtain the target location environmental parameters; extract the characteristics of the target location environmental parameters to obtain the target location environmental characteristics; perform ground wire planning based on the target location environmental characteristics and the target location layout map of the ground wire to be planned to obtain a simulated ground wire planning layout; the simulated ground wire planning layout includes wire diameter, wire material selection and wiring scheme; use the group optimization algorithm to screen the simulated ground wire planning layout to obtain the optimal ground wire planning layout, and use the optimal ground wire planning layout as the planning target location ground wire layout; The grounding system evaluation module is used to perform preliminary wiring according to the ground wire layout of the planned target location to obtain the ground wire of the planned target location to be tested; evaluate the ground wire of the planned target location to be tested to obtain the ground wire evaluation result; if the ground wire evaluation result is passed, the ground wire of the planned target location to be tested is used as the ground wire planning of the target location; otherwise, the ground wire layout of the planned target location is adjusted.

Citation Information

Patent Citations

  • Cable connection layout method for multi-substation wind power plant and computer storage medium

    CN113011090A

  • Data management device and data management method for grounding electrode construction work

    JP2006216278A