Integrated control system of progress, quality and cost based on BIM and blockchain
The integrated progress, quality, and cost management and control system that combines BIM and blockchain technology solves the problems of data isolation and information asymmetry in traditional project management, achieves data transparency and non-tamperability, and improves the transparency of project management. and efficiency to ensure projects run smoothly within budget and schedule.
Patent Information
- Application Number
- CN202410804515.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-21
- Publication Date
- 2024-10-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In traditional project management, the automated test platform and the test management platform are independent, which makes it difficult to visually display and close-loop management the test progress and quality status. The automated test platform operating environment is limited, the test efficiency is low, resources are insufficiently utilized, and there is a lack of objective quality control methods. .
An integrated management and control system for progress, quality, and cost based on BIM and blockchain. Project data is obtained through BIM model establishment and blockchain integration subsystems. The real-time monitoring and analysis subsystem monitors progress, quality, and cost, and the management and control subsystem adopts adjustments. Measures, the storage subsystem records the adjustment process, realizes data transparency and non-tamperability, and automates contract transaction processing.
It achieves data transparency and non-tamperability, improves the transparency and security of project management, improves project execution efficiency through real-time monitoring and dynamic adjustment, ensures that the project is carried out within the budget and plan, and improves the overall level of project management and Traceability.
Smart Images

Figure CN118378953B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of project management and control, and specifically to an integrated management and control system of progress, quality and cost based on BIM and blockchain. Background Art
[0002] In modern construction and engineering project management, effective control of progress, quality and cost is the key to project success. However, traditional project management methods face many challenges. Traditional project management usually uses decentralized systems and tools to handle design, construction, quality monitoring and cost control. This isolated system architecture prevents data from flowing efficiently between different links, and the problem of information asymmetry is serious. It is difficult for managers to fully understand the overall situation of the project. Due to the lack of a unified data management platform and real-time monitoring methods, traditional project management often fails to discover and solve problems in a timely manner when faced with progress delays, quality problems and cost overruns, resulting in project delays and increased costs. In traditional project management, data is easily tampered with and lacks effective protection mechanisms, making it difficult to ensure the credibility and security of data. This not only affects the transparency of project management, but also increases the trust cost of all parties.
[0003] Prior art, such as the invention patent application with announcement number: CN115617672A, discloses an integrated project quality control platform, control system and control method, including: providing a unified entry and exit for project quality control, creating and executing test tasks, generating test case database files, and presenting project quality control results; automation platform: used to create test plans, build task management and upload to the quality control platform; use case library management system: used to synchronize test case database files during the test process; working time management system: used to manage the working hours of each test task. The beneficial effects of the present invention are: intuitively facing various fields to reflect project test rounds, test cycles, test progress, labor costs and product quality, can realize the integration of project quality control, and make testing more efficient and convenient.
[0004] Based on the above solution, it is found that the automated testing platform and test management platform in the prior art are independent of each other, and it is difficult to effectively integrate manual testing and automated testing results, which makes it difficult to intuitively present and close-loop manage the test progress and quality status. In addition, the operating environment of the automated testing platform is limited, making it difficult to call remotely, and the scope of processing thread tasks is limited, resulting in low testing efficiency and insufficient resource utilization. Defective code submission and quality control mainly rely on the subjective judgment of software developers, and lack objective quality control measures. Summary of the invention
[0005] In view of the shortcomings of the prior art, the present invention provides an integrated progress, quality and cost management and control system based on BIM and blockchain, which solves the problems in the prior art that the automated testing platform and the test management platform are independent of each other, and the manual testing and automated testing results are difficult to effectively integrate, which makes it difficult to intuitively present the test progress and quality status and to manage them in a closed loop. In addition, the operating environment of the automated testing platform is limited, making it difficult to call it remotely, and the scope of processing thread tasks is limited, resulting in low testing efficiency and insufficient resource utilization. The submission of defective codes and quality control mainly rely on the subjective judgment of software developers, and lack objective quality control measures.
[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: a progress, quality, and cost integrated control system based on BIM and blockchain, including: a BIM model establishment and blockchain integration subsystem, a real-time monitoring and analysis subsystem, a control subsystem, and a storage subsystem; the BIM model establishment and blockchain integration subsystem is used to obtain project data, and establish a project BIM model based on the project data, and integrate the project BIM data into the blockchain platform at the same time, the project data includes design drawing data, engineering measurement data, material list data, and engineering progress plan data; the real-time monitoring and analysis subsystem is used to monitor and analyze the project progress, project quality, and project cost in real time, and obtain the real-time progress index of the project, the real-time quality index of the project, and the real-time cost index of the project respectively; the control subsystem is used to take progress adjustment measures, quality adjustment measures, and cost adjustment measures respectively with the minimization of cost as a constraint when the real-time progress index of the project, the real-time quality index of the project, and the real-time cost index of the project do not meet the expected standards; the storage subsystem is used to record and store the progress adjustment measures, quality adjustment measures, and cost adjustment measures. Furthermore, the design drawing data includes design drawing data of buildings, structures and mechanical and electrical engineering, the engineering measurements include land measurement data, building size data, and terrain feature data, the material list data includes data of various building materials required for the project, and the engineering progress plan includes the project's construction plan and schedule information.
[0007] Furthermore, the BIM model establishment and blockchain integration subsystem includes a data acquisition model, a BIM model establishment module, and a blockchain integration module; the data acquisition model is used to acquire design drawing data, engineering measurement data, material list data, and engineering progress plan data; the BIM model establishment module is used to establish a project BIM model based on the design drawing data, engineering measurement data, material list data, and engineering progress plan data; the blockchain integration module is used to integrate the project BIM data into the blockchain platform and process preset contract transactions based on smart contract rules, which is specifically: when the project progress and quality reach the set stage thresholds, the stage payment conditions are triggered, the stage payment automatic settlement operation is executed, and the relevant staff are notified. After the execution is completed, the relevant information of the transaction is recorded on the blockchain.
[0008] Furthermore, the specific steps for establishing a project BIM model based on design drawing data, engineering measurement data, material list data, and engineering progress plan data are: read the design drawing data, engineering measurement data, material list data, and establish a digital three-dimensional model based on ArchiCAD; apply the collected engineering measurement data to the model; input the material list data into the model, and mark the detailed material properties of each component in the model; set a construction timeline for the model according to the engineering progress plan; perform model verification on the established project BIM model; integrate the data of the established BIM model, including the properties of the components and the construction progress information, into the blockchain platform.
[0009] Furthermore, the specific process of obtaining the real-time progress index of the project is as follows: obtain the total number of engineering tasks of the project and the actual completion amount, expected completion amount, actual consumption time, and expected consumption time of each engineering task at the current time point; normalize the total number of engineering tasks of the project and the actual completion amount, expected completion amount, actual consumption time, and expected consumption time of each engineering task at the current time point, and perform a comprehensive analysis based on the normalization results to obtain the real-time progress index of the project; the specific calculation formula of the real-time progress index of the project is as follows: Among them, JD is the real-time progress indicator of the project, A i is the actual completion amount of the i-th engineering task at the current time point after normalization, E i is the expected completion amount of the i-th engineering task at the current time point after normalization, α i is the adjustment coefficient of the ratio of the actual completion amount to the expected completion amount of the i-th engineering task at the preset current time point, T i is the actual time consumed by the i-th engineering task at the current time point after normalization, D i is the expected time consumed by the i-th engineering task at the current time point after normalization, β iis the adjustment coefficient of the ratio of the actual consumption time to the expected consumption time of the i-th engineering task at the preset current time point, W i is the weight value of the i-th engineering task at the current time point, i=1,2,3,…,N, and N is the total number of engineering tasks of the acquired project.
[0010] Furthermore, the specific process of obtaining the real-time quality index of the project is as follows: read the total number of engineering tasks of the project, and obtain the total number of components of each engineering task at the current time point; perform quality analysis on each component of each engineering task at the current time point, and obtain the total number of components with unqualified quality in the total number of components of each engineering task at the current time point; perform a comprehensive analysis based on the total number of components of each engineering task and the total number of components with unqualified quality in the total number of components, and obtain the real-time quality index of the project.
[0011] Furthermore, the specific process of obtaining the real-time cost index of the project is as follows: read the total number of engineering tasks of the project, and obtain the actual expenditure amount and budget amount of each engineering task at the current time point; perform an amount analysis on each engineering task based on the actual expenditure amount and budget amount, and obtain the overspending amount and savings amount of each engineering task; perform a comprehensive analysis based on the actual expenditure amount, budget amount, overspending amount and savings amount of each engineering task at the current time point to obtain the real-time cost index of the project.
[0012] Furthermore, the specific calculation formula of the project real-time cost indicator is as follows: Among them, CB is the real-time progress indicator of the project, SJ i is the actual cost of the i-th engineering task at the current time point, CZ i is the overspending amount of the i-th engineering task at the current time point, YS i is the budget amount of the i-th engineering task at the current time point, κ i is the adjustment coefficient of the ratio of the overspending amount to the budget amount of the i-th engineering task at the preset current time point, JS i is the savings of the i-th engineering task at the current time point, φ i is the adjustment coefficient of the ratio of the savings amount of the i-th engineering task at the preset current time point to the budget amount, i=1,2,3,…,N, N is the total number of engineering tasks of the acquired project.
[0013] Furthermore, the specific processes of taking progress adjustment measures and quality adjustment measures are as follows: when the real-time progress indicators of the project do not meet the expected project progress indicators, the project is delayed, that is, the tasks whose actual completion amount is lower than the expected completion amount and the actual consumption time exceeds the expected consumption time. For each delayed task, the reasons for the delay are analyzed separately. According to the reasons for the delay and the constraint of minimizing the cost, the resources, that is, manpower, equipment, and materials, are reallocated to speed up the progress of the delayed tasks. For the tasks on the preset critical path, resources are allocated preferentially, the construction schedule is updated, the start and end time of the tasks are adjusted to ensure that the adjusted plan is still completed within the overall construction period, and the implementation of the adjusted plan is monitored in real time, that is, the progress of the tasks is monitored to ensure that they are executed according to the new plan; when the real-time quality indicators of the project do not meet the expected project quality indicators, the total number of components and the number of unqualified components of all engineering tasks at the current time point are read, and the tasks with prominent quality problems, that is, the tasks with a high proportion of unqualified components are identified. For the tasks with prominent quality problems, corrective measures are sent to relevant staff with the constraint of minimizing the cost, and quality inspection and acceptance are carried out after the implementation of the corrective measures to ensure the effectiveness of the corrective measures and strengthen the quality control during the construction process.
[0014] Furthermore, the specific process of taking cost adjustment measures is as follows: read the actual expenditure, budget, overspending and savings of all engineering tasks at the current time point, and identify deviations to obtain tasks with cost deviations higher than the set deviation threshold, that is, tasks with higher overspending and lower savings; for tasks with cost deviations higher than the set deviation threshold, send deviation analysis instructions to relevant staff to determine the cause of the deviation; based on the cause of the deviation and with minimizing cost as a constraint, send cost optimization measures to relevant staff to ensure that project costs are within the budget; update project budgets and plans, adjust resource allocation and use, and ensure that the adjusted budgets and plans can achieve cost minimization.
[0015] The present invention has the following beneficial effects:
[0016] (1) This integrated progress, quality and cost control system based on BIM and blockchain achieves high transparency and immutability of data by combining BIM models with blockchain technology, effectively solving the problems of data isolation and information asymmetry in traditional project management. The blockchain integration module not only ensures the security and integrity of project data, but also realizes automated contract transaction processing through smart contract rules. When the project progress and quality reach the preset threshold, the stage payment conditions can be automatically triggered and the transaction information can be recorded on the blockchain.
[0017] (2) The progress, quality and cost integrated control system based on BIM and blockchain realizes dynamic adjustment and optimization of project management through real-time monitoring and analysis of project progress, quality and cost through the real-time monitoring and analysis subsystem. By obtaining and analyzing data such as the actual completion volume, time consumed, component quality and amount spent on the project, the system can timely discover and warn of problems in the project. Especially when the real-time indicators of the project do not meet expectations, the system can quickly take corresponding adjustment measures with the constraint of minimizing costs. This real-time and proactive management method not only improves the execution efficiency of the project, but also ensures that the project proceeds smoothly within the budget and plan, and improves the overall level of project management.
[0018] (3) The integrated progress, quality and cost management and control system based on BIM and blockchain provides a complete feedback and improvement mechanism through the combination of the management and control subsystem and the storage subsystem. When the real-time progress, quality and cost indicators of the project deviate from the expected standards, the system can take the best adjustment measures according to the specific situation to ensure that the project returns to the right track. All adjustment measures and process data are recorded in detail through the storage subsystem, forming a complete data closed-loop management. This not only improves the traceability and transparency of project management, but also provides valuable data support and experience reference for subsequent projects, further enhancing the company's project management capabilities and competitiveness.
[0019] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a block diagram of the progress, quality and cost integrated control system based on BIM and blockchain in the present invention.
[0021] Figure 2 This is a flowchart of the specific steps for obtaining real-time quality indicators of a project in the progress, quality, and cost integrated control system based on BIM and blockchain in the present invention. DETAILED DESCRIPTION
[0022] The embodiments of the present application solve the problems in the prior art that the automated testing platform and the test management platform are independent of each other, and the results of manual testing and automated testing are difficult to effectively integrate, which makes it difficult to intuitively present and close-loop manage the test progress and quality status. In addition, the operating environment of the automated testing platform is limited, making it difficult to call it remotely, and the scope of processing thread tasks is limited, resulting in low testing efficiency and insufficient resource utilization. The submission of defective code and quality control mainly rely on the subjective judgment of software developers, and lack of objective quality control methods.
[0023] The overall idea of the problem in the embodiment of this application is as follows:
[0024] First, establish a BIM model and integrate it into the blockchain platform. Through the BIM model, establish a subsystem integrated with the blockchain to obtain and integrate project data, including design drawing data, engineering measurement data, material list data and engineering schedule data. These data are used to create the project BIM model and integrate it into the blockchain platform to ensure the transparency and immutability of the data. Then, carry out real-time monitoring and analysis. Through the real-time monitoring and analysis subsystem, monitor the project progress, quality and cost in real time. According to the real-time data, calculate the real-time progress indicators, real-time quality indicators and real-time cost indicators of the project to ensure that all project indicators operate within the expected range. Finally, implement linkage adjustment and storage. Through the management and control subsystem, when the project indicators do not meet the expected standards, with the minimization of costs as the constraint, take progress adjustment measures, quality adjustment measures and cost adjustment measures respectively. All adjustment measures and related data are recorded and stored through the storage subsystem to ensure the traceability of the adjustment process and the integrity of the data.
[0025] See also Figure 1 , an embodiment of the present invention provides a technical solution: a progress, quality, and cost integrated control system based on BIM and blockchain, including: a BIM model establishment and blockchain integration subsystem, a real-time monitoring and analysis subsystem, a control subsystem, and a storage subsystem; the BIM model establishment and blockchain integration subsystem is used to obtain project data, and establish a project BIM model based on the project data, and integrate the project BIM data into the blockchain platform at the same time, and the project data includes design drawing data, engineering measurement data, material list data, and engineering progress plan data; the real-time monitoring and analysis subsystem is used to monitor and analyze the project progress, project quality, and project cost in real time, and obtain the real-time progress index of the project, the real-time quality index of the project, and the real-time cost index of the project respectively; the control subsystem is used to take progress adjustment measures, quality adjustment measures, and cost adjustment measures respectively with the minimization of cost as a constraint when the real-time progress index of the project, the real-time quality index of the project, and the real-time cost index of the project do not meet the expected standards; the storage subsystem is used to record and store the progress adjustment measures, quality adjustment measures, and cost adjustment measures.
[0026] Design drawing data includes design drawing data of buildings, structures and electromechanical engineering, including floor plans, elevations, sections, etc. These drawings provide the overall layout and construction information of the project. Engineering measurements include land measurement data, building size data, terrain feature data, etc., which are used to accurately establish the physical space model of the project. These data are obtained through on-site measurements or geographic information systems (GIS). Material list data includes data on various building materials required for the project, such as steel, cement, glass, etc. The material list data includes information such as the name, specification, quantity, etc. of the materials, which are used to construct the material properties of the BIM model. The engineering schedule includes information such as the construction plan and schedule of the project. The engineering schedule data can be used to integrate with the BIM model to achieve project progress management and monitoring.
[0027] Specifically, the BIM model establishment and blockchain integration subsystem includes a data acquisition model, a BIM model establishment module, and a blockchain integration module; the data acquisition model is used to acquire design drawing data, engineering measurement data, material list data, and engineering progress plan data; the BIM model establishment module is used to establish a project BIM model based on design drawing data, engineering measurement data, material list data, and engineering progress plan data; the blockchain integration module is used to integrate the project BIM data into the blockchain platform and process preset contract transactions based on smart contract rules, which are specifically: when the project progress and quality reach the set stage thresholds, the stage payment conditions are triggered, the stage payment automatic settlement operation is executed, and the relevant staff are notified. After the execution is completed, the relevant information of the transaction is recorded on the blockchain, including the time, amount, and participants of the transaction. The specific smart contract rules are: first read the smart contract code written by the developer using the smart contract programming language Solidity, convert the contract terms into an executable smart contract, and then use the smart contract code to write a smart contract code. Smart contracts need to define the various conditions of the contract, the identity authentication and permissions of the participants, and the execution logic of the contract. The written smart contracts should be fully tested, including unit testing and integration testing, to ensure the correctness and security of the smart contracts. At the same time, smart contracts also need to be reviewed and verified to meet legal and compliance requirements. Contract participants need to register an account on the blockchain platform and conduct identity authentication to ensure the authenticity and security of the account. Contract submission is usually completed through the contract management system on the blockchain platform. Participants can upload contract documents and review and modify them on the contract management system. Contract review requires negotiation and confirmation by both parties to ensure the consistency and accuracy of various terms. Once the terms of the contract are agreed upon and passed the review, the contract participants use digital signature technology to sign the contract. Digital signatures are based on asymmetric encryption algorithms and are used to verify the identity of the signatory and ensure the integrity of the contract. The execution conditions of the contract are set in the smart contract, such as the time point when the contract takes effect, the trigger conditions for payment, and the confirmation conditions for delivery.
[0028] In this implementation plan, the data acquisition model is used to acquire design drawing data, engineering measurement data, material list data, and engineering schedule data. This module ensures the integrity and consistency of information by centrally acquiring and integrating various types of project data, and provides a solid data foundation for the accurate construction of subsequent BIM models. This data integration method can reduce the risk of data loss or erroneous transmission, and improve data reliability and availability. This module solves the problems of data isolation and information asymmetry, ensures that various types of project data can be centrally managed and used, and improves the overall efficiency of project management. The BIM model establishment module establishes a project BIM model based on design drawing data, engineering measurement data, material list data, and engineering schedule data. This module By integrating multiple data sources, the block constructs a detailed and accurate BIM model, which can more intuitively and accurately reflect the actual situation of the project. This helps all parties in the project to coordinate and make decisions in a visual environment, reducing misunderstandings and communication costs. This module provides a comprehensive and dynamic project display platform, improves the accuracy of project planning and management, and helps to promptly discover and solve potential problems. The blockchain integration module integrates the project BIM data into the blockchain platform and processes preset contract transactions based on smart contract rules. This module ensures the transparency and immutability of the data by integrating BIM data into the blockchain. The automated execution and recording functions of smart contracts make the contract transaction process more efficient and secure, reducing human intervention. The possibility of intervention and errors. This module solves the problems of data tampering and opacity. It realizes automated and reliable contract execution through smart contracts, improves the security and trust of project management, and uses Solidity to write smart contract code, converts contract terms into executable smart contracts, and conducts comprehensive testing and review. Smart contracts execute contract terms programmatically to ensure the accurate implementation of contract terms. Through comprehensive testing and review, the correctness and security of smart contracts are guaranteed, and the risks in the execution process are reduced. This method provides an automated and reliable contract execution mechanism, reduces interference and errors caused by human factors, ensures that contract terms are accurately executed, and the contract participants register accounts on the blockchain platform and authenticate themselves. The method enhances the security of the system, ensures that only verified users can participate in the execution of the contract, and protects the interests of all parties. The contract management system on the blockchain platform submits, reviews and modifies the contract. The contract management system provides a centralized contract management platform, which is convenient for the parties to submit, review and modify the contract, ensuring the consistency and accuracy of the contract terms. This method improves the efficiency and accuracy of contract management, reduces the manual operation and error risks in traditional contract management, uses digital signature technology to sign the contract, and sets the execution conditions of the contract in the smart contract.Digital signature technology is based on asymmetric encryption algorithms to ensure the identity of the signatory and the integrity of the contract, prevent the contract content from being tampered with, and set execution conditions to make contract execution more automated and transparent. This method improves the security and reliability of contract signing and execution and ensures that the contract terms are strictly enforced.
[0029] Specifically, the specific steps for establishing a project BIM model based on design drawing data, engineering measurement data, material list data, and engineering progress plan data are as follows: read the design drawing data, engineering measurement data, material list data, and establish a digital three-dimensional model based on ArchiCAD; apply the collected engineering measurement data to the model to ensure that the geographical location, direction, and scale of the model are accurate; input the material list data into the model and annotate the detailed material properties of each component in the model; set a construction timeline for the model according to the engineering progress plan, and simulate the construction process to predict possible conflicts and problems; perform model verification on the established project BIM model to ensure that all information in the model is consistent with the actual design, materials, and construction plan; integrate the data of the established BIM model, including component properties, construction progress, and other information, into the blockchain platform; create a digital identity for the project on the blockchain to ensure that all data cannot be tampered with and is updated in real time; set permissions and access control to ensure that all parties involved in the project can safely access and update BIM model data.
[0030] In this implementation plan, data acquisition tools are used to read design drawing data, engineering measurement data, and material list data from different sources. This step ensures that the collected data is comprehensive and accurate, providing a reliable basis for subsequent model building. The unified data source reduces data inconsistency and errors, and improves the credibility of the data. This step solves the problem of information inconsistency caused by scattered data sources, ensuring that the basic data for model building is accurate and reliable. The read data is imported into ArchiCAD software to establish a three-dimensional digital model of the project. This step uses professional BIM software to accurately create and manage the three-dimensional model of the project, provide a visual project display, and help all parties understand the specific situation of the project. This step provides an intuitive visualization The tool solves the problem that traditional two-dimensional drawings are difficult to understand, improves the efficiency of communication and collaboration, applies the collected engineering measurement data to the three-dimensional model, ensures that the geographical location, direction and scale of the model are accurate, this step ensures the precise positioning of the model so that it can truly reflect the actual geographical environment of the project and provide an accurate reference for construction and management. This step solves the problem of mismatch between the model and the actual geographical location, ensures the authenticity and practicality of the model, inputs the material list data into the model, and annotates the detailed material properties of each component, including material type, quantity, specifications, etc. The detailed material property annotation in this step helps material management and cost control, ensuring that the material information of each component can be accurately traced, this step solves the material The problems of decentralized management and difficult traceability are solved, and the accuracy and efficiency of material management are improved. According to the project schedule, a construction timeline is set for the model to simulate the construction process and predict possible conflicts and problems. This step can discover and solve potential problems in advance through construction simulation, optimize the construction plan, and reduce risks and delays in the construction process. This step provides a tool to foresee and solve construction problems, ensuring a smoother and more efficient construction process. The established BIM model is fully verified to ensure that all information in the model is consistent with the actual design, materials and construction plan. This step can discover and correct errors and inconsistencies in the model through verification, improving the accuracy and reliability of the model. This step solves the problem of inconsistent and incorrect model data and ensures that the model The model can accurately guide construction and management, integrate model data, including component attributes, construction progress and other information into the blockchain platform, and create a digital identity for the project. The immutability and transparency of the blockchain in this step ensure the security and credibility of the data. Digital identity makes data management more efficient and convenient. This step solves the risks of data security and tampering, and provides a trusted data management platform. Permissions and access control are set on the blockchain platform to ensure that all parties involved in the project can safely access and update BIM model data. This step can prevent unauthorized access and operations through permission control, protect data security, and ensure that relevant parties can collaborate efficiently. This step solves the problem of data access permission management to ensure data security and collaboration efficiency.
[0031] Specifically, the specific process of obtaining the real-time progress index of the project is as follows: obtain the total number of engineering tasks of the project and the actual completion amount, expected completion amount, actual consumed time, and expected consumed time of each engineering task at the current time point; normalize the total number of engineering tasks of the project and the actual completion amount, expected completion amount, actual consumed time, and expected consumed time of each engineering task at the current time point, and conduct a comprehensive analysis based on the normalization results to obtain the real-time progress index of the project, in which the actual consumed time and expected consumed time are both counted in minutes.
[0032] The specific calculation formula for the project real-time progress indicator is as follows: Among them, JD is the real-time progress indicator of the project, A i is the actual completion amount of the i-th engineering task at the current time point after normalization, E i is the expected completion amount of the i-th engineering task at the current time point after normalization, α i is the adjustment coefficient of the ratio of the actual completion amount to the expected completion amount of the i-th engineering task at the preset current time point, T i is the actual time consumed by the i-th engineering task at the current time point after normalization, D i is the expected time consumed by the i-th engineering task at the current time point after normalization, β i is the adjustment coefficient of the ratio of the actual consumption time to the expected consumption time of the i-th engineering task at the preset current time point, W i is the weight value of the i-th engineering task at the current time point, i=1,2,3,…,N, and N is the total number of engineering tasks of the acquired project.
[0033] In this implementation scheme, the actual completion amount, expected completion amount, actual consumed time and expected consumed time of each engineering task at the current time point are extracted from the project management system. All time data are counted in minutes. This step ensures the real-time and accuracy of the data and provides a basis for subsequent analysis and calculation. By unifying the time unit, i.e., minutes, the standardization and comparability of the data are ensured. This step solves the problem of untimely and inaccurate data collection and ensures the reliability of the basic data for analysis. All acquired data are normalized and the normalized actual completion amount of each task is calculated. This step standardizes the data of different tasks so that they can be compared on the same scale, eliminating the dimensional differences between the data and improving the comparability of the data and the accuracy of the analysis. This step solves the problem of dimensional inconsistency between the data so that the data of different tasks can be compared on the same scale, improving the accuracy of the analysis. Using the normalized data, the calculation formula for the real-time progress indicator of the project is , through the setting of weights and adjustment coefficients, the completion status and time consumption of each task are comprehensively considered. This formula provides a comprehensive progress evaluation indicator that can reflect the overall progress of the project, which is convenient for project managers to discover and solve problems in a timely manner. This step provides a scientific and comprehensive project progress evaluation method, which solves the problem of relying on a single indicator for evaluation in traditional progress monitoring, and improves the scientificity and reliability of project progress management. The calculation process of the real-time progress indicator of the project realizes a comprehensive and accurate evaluation of the project progress through detailed data acquisition, normalization processing and comprehensive analysis steps. By acquiring real-time data and performing standardized processing, the consistency and comparability of the data are ensured; through comprehensive analysis and calculation, a comprehensive progress indicator is provided to reflect the overall progress of the project. This method solves the problems of inconsistent data and single indicators in traditional progress monitoring, improves the scientificity and reliability of project management, and provides a solid foundation and guarantee for the smooth implementation of the project.
[0034] Specifically, Figure 2 As shown, the specific process of obtaining the real-time quality index of the project is as follows: read the total number of engineering tasks of the project, and obtain the total number of components of each engineering task at the current time point; perform quality analysis on each component of each engineering task at the current time point, and obtain the total number of components with unqualified quality in the total number of components of each engineering task at the current time point; perform comprehensive analysis based on the total number of components of each engineering task and the total number of components with unqualified quality in the total number of components, and obtain the real-time quality index of the project.
[0035] In this implementation scheme, the total number of components and components with unqualified quality for each engineering task at the current time point are extracted from the project management system. This step ensures the real-time and accuracy of the data and provides a basis for subsequent analysis and calculation. By obtaining detailed data for each engineering task, the comprehensiveness of the quality analysis is ensured. This step solves the problem of incomplete and untimely data collection and ensures the reliability of the basic data for analysis. Quality analysis is performed on each component of each engineering task, components with unqualified quality are identified, and the severity of their defects is recorded. This step can identify all quality problems in the project through detailed quality analysis and ensure that the quality status of each component is evaluated. This step solves the problem that quality problems are difficult to fully identify and ensures that the quality status of each component can be discovered and handled in a timely manner. Based on the number of unqualified components and the severity of defects, a comprehensive analysis is performed to calculate the real-time quality indicators of the project. This step can comprehensively evaluate the overall quality status of the project through comprehensive analysis to ensure the accuracy and reliability of quality indicators. This step provides a scientific and comprehensive quality assessment method, which solves the problem of single and incomplete indicators in traditional quality assessment and improves project quality management. The calculation formula of the real-time quality index of the project provides a comprehensive quality assessment index by comprehensively considering the number of components, the severity and weight of defects, ensuring the accuracy and reliability of the quality assessment results. The formula provides a scientific and comprehensive quality assessment method, which solves the problem of single and incomplete indicators in traditional quality assessment, and improves the scientificity and reliability of project quality management. The calculation process of the real-time quality index of the project realizes a comprehensive and accurate assessment of project quality through detailed data acquisition, quality analysis and comprehensive analysis steps. By acquiring real-time data and conducting detailed quality analysis, the consistency and comparability of the data are ensured; through comprehensive analysis and calculation, a comprehensive quality index is provided to reflect the overall quality status of the project. This method solves the problems of inconsistent data and single indicators in traditional quality assessment, improves the scientificity and reliability of project quality management, and provides a solid foundation and guarantee for the smooth implementation of the project.
[0036] Specifically, the specific process of obtaining the real-time cost index of the project is as follows: read the total number of engineering tasks of the project, and obtain the actual expenditure amount and budget amount of each engineering task at the current time point; perform an amount analysis on each engineering task based on the actual expenditure amount and budget amount, and obtain the overspending amount and savings amount of each engineering task; perform a comprehensive analysis based on the actual expenditure amount, budget amount, overspending amount and savings amount of each engineering task at the current time point to obtain the real-time cost index of the project.
[0037] The specific calculation formula of the project real-time cost indicator is as follows: Among them, CB is the real-time progress indicator of the project, SJi is the actual cost of the i-th engineering task at the current time point, CZ i is the overspending amount of the i-th engineering task at the current time point, YS i is the budget amount of the i-th engineering task at the current time point, κ i is the adjustment coefficient of the ratio of the overspending amount to the budget amount of the i-th engineering task at the preset current time point, JS i is the savings of the i-th engineering task at the current time point, φ i is the adjustment coefficient of the ratio of the savings amount of the i-th engineering task at the preset current time point to the budget amount, i=1,2,3,…,N, N is the total number of engineering tasks of the acquired project.
[0038] In this implementation scheme, the actual expenditure amount and budget amount of each engineering task at the current time point are extracted from the project management system. This step ensures the real-time and accuracy of the data, and provides a basis for subsequent analysis and calculation. By obtaining detailed cost data for each engineering task, the comprehensiveness of the cost analysis is ensured. This step solves the problem of incomplete and untimely data collection, and ensures the reliability of the basic data for analysis. The specific formula of the project's real-time progress indicator can identify all overspending and savings in the project through detailed amount analysis, ensuring that the cost status of each task is evaluated. This formula solves the budget control problem in cost management, ensuring that the actual cost of each task can be discovered and handled in a timely manner after comparison with the budget. Based on the cost data, a comprehensive analysis is performed to calculate the project's real-time cost indicator. This step comprehensively considers the actual expenditure, overspending amount and savings The amount and the weight of each task provide a comprehensive cost evaluation indicator to ensure the accuracy and reliability of the cost evaluation results. This step provides a scientific and comprehensive cost evaluation method, which solves the problem of single and incomplete indicators in traditional cost evaluation and improves the scientificity and reliability of project cost management. The calculation process of the project's real-time cost indicators realizes a comprehensive and accurate evaluation of project costs through detailed data acquisition, amount analysis and comprehensive analysis steps. By acquiring real-time data and conducting detailed amount analysis, the consistency and comparability of the data are ensured; through comprehensive analysis and calculation, a comprehensive cost indicator is provided to reflect the overall cost status of the project. This method solves the problems of inconsistent data and single indicators in traditional cost evaluation, improves the scientificity and reliability of project cost management, and provides a solid foundation and guarantee for the smooth implementation of the project.
[0039] Specifically, the specific processes of taking progress adjustment measures and quality adjustment measures are as follows: When the real-time progress indicators of the project do not meet the expected project progress indicators, the project is delayed, that is, the tasks whose actual completion volume is lower than the expected completion volume and the actual consumption time exceeds the expected consumption time. For each delayed task, the reasons for the delay are analyzed separately, including insufficient resources, process problems, weather and other external factors. According to the reasons for the delay and the constraints of minimizing costs, resources, that is, manpower, equipment, and materials are reallocated to speed up the progress of delayed tasks. For tasks on the preset critical path, resources are allocated first, the construction schedule is updated, and the start and end times of the tasks are adjusted to ensure that the adjusted plan is still Complete it within the overall construction period, and conduct real-time monitoring of the adjusted plan, that is, monitor the progress of the tasks to ensure execution according to the new plan; when the real-time quality indicators of the project do not meet the expected project quality indicators, read the total number of components and the number of components with unqualified quality for all engineering tasks at the current time point, and identify tasks with prominent quality problems, that is, tasks with a high proportion of unqualified components. For tasks with prominent quality problems, with minimizing costs as a constraint, send corrective measures to relevant staff, such as replacing unqualified materials, improving construction technology, training workers, etc., and conduct quality inspection and acceptance after the implementation of the corrective measures to ensure the effectiveness of the corrective measures and strengthen quality control during the construction process.
[0040] In this implementation plan, when the real-time progress indicators of the project do not meet the expected project progress indicators, the project is first identified for delays to check whether the actual completion of the task is lower than the expected completion, and whether the actual consumption time exceeds the expected consumption time. This step promptly discovers and identifies delayed tasks in the project schedule to ensure that corresponding measures can be taken quickly to make adjustments. This step solves the lag problem in project progress monitoring and ensures that delay problems can be discovered and handled in a timely manner. For the identified delayed tasks, a detailed analysis of the causes of delay is conducted. Possible reasons include insufficient resources, process problems, weather and other external factors. This step can take targeted measures to solve actual problems and prevent similar delays from happening again by analyzing the causes of delays. This step solves the problem of unclear causes of delays and provides a basis for solving delay problems through detailed analysis. According to the causes of delays, resources, including manpower, equipment and materials, are reallocated.Prioritize the allocation of resources for tasks on the preset critical path. This step speeds up the progress of delayed tasks through reasonable resource allocation to ensure that the project can proceed as planned. This step solves the problem of unreasonable resource allocation and improves the efficiency of project execution by optimizing resource allocation. According to the new resource allocation and task adjustment, the construction schedule is updated and the start and end time of the task is adjusted to ensure that the overall construction period is not affected. This step ensures the real-time update and adjustment of the project schedule to reduce the impact of delays on the overall construction period. This step solves the problem of inflexible construction schedule. The flexibility and adaptability of project management are improved by updating the plan in real time. The adjusted plan is monitored in real time to ensure that the task is executed according to the new plan and new problems are discovered and handled in a timely manner. This step ensures the effective implementation of project schedule adjustment measures through real-time monitoring and improves the dynamic control ability of project management. This step solves the problem of lack of follow-up monitoring after the project schedule is adjusted. The effectiveness of the adjustment measures is ensured through real-time monitoring. When the real-time quality indicators of the project do not meet the expected project quality indicators, the total number of components of all engineering tasks at the current time point and the number of components with unqualified quality are read to identify tasks with prominent quality problems. This step promptly discovers the problems in the project. Quality problems, ensure that corrective measures can be taken quickly. This step solves the problem of untimely identification of quality problems and ensures that quality problems can be quickly discovered and handled. For tasks with outstanding quality problems identified, corrective measures are sent to relevant staff with the constraint of minimizing costs, such as replacing unqualified materials, improving construction processes, and training workers. This step quickly solves quality problems and improves construction quality through targeted corrective measures. This step solves the problem of unclear corrective measures for quality problems and improves the effectiveness of quality management through detailed corrective measures. After the implementation of corrective measures, quality inspection and acceptance are carried out to ensure the effectiveness of corrective measures. This step ensures the effective implementation of corrective measures through quality inspection and acceptance to prevent the recurrence of similar quality problems. This step solves the problem of lack of verification after quality problems are corrected. The reliability of quality management is improved through quality inspection and acceptance. Strengthen quality control during the construction process, increase the frequency of inspections, and ensure that each link meets quality requirements. This step prevents the occurrence of quality problems by strengthening quality control and ensures the overall quality of the project. This step solves the problem of inadequate quality control during the construction process and improves the preventive nature of project quality management by strengthening quality control.
[0041] Specifically, the specific process of taking cost adjustment measures is as follows: read the actual expenditure, budget, overspending and savings of all engineering tasks at the current time point, and identify deviations to obtain tasks with cost deviations higher than the set deviation threshold, that is, tasks with higher overspending and lower savings; for tasks with cost deviations higher than the set deviation threshold, send deviation analysis instructions to relevant staff to determine the cause of the deviation, including waste of resources, unreasonable planning, market price fluctuations, etc.; based on the cause of the deviation and with minimizing costs as a constraint, send cost optimization measures to relevant staff, such as improving procurement processes, finding alternative suppliers, optimizing resource utilization, etc., to ensure that project costs are within the budget; update project budgets and plans, adjust resource allocation and utilization, and ensure that the adjusted budgets and plans can achieve cost minimization; implement adjusted cost control measures and monitor actual spending; set up cost control checkpoints to promptly discover and resolve emerging cost issues.
[0042] In this implementation scheme, the actual expenditure amount, budget amount, overspending amount and savings amount of all engineering tasks at the current time point are read. This step ensures that the cost data of all engineering tasks are accurately collected, providing a comprehensive data basis for subsequent cost analysis. This step solves the problem of incomplete data collection and ensures that the basic data for subsequent analysis is accurate and comprehensive. Based on the actual expenditure amount and budget amount, the overspending amount and savings amount of each engineering task are calculated, and tasks with cost deviations higher than the set deviation threshold are identified. This step promptly discovers tasks with large cost deviations to ensure that corresponding measures can be taken quickly to make adjustments. This step solves the problem of untimely discovery of cost deviations and ensures that cost problems can be quickly discovered and handled. For tasks with cost deviations higher than the set deviation threshold, deviation analysis instructions are sent to relevant staff members to analyze the causes of the deviations. Through detailed deviation cause analysis, targeted measures can be taken to solve actual problems and prevent similar deviations from occurring again. This step solves the problem of unclear causes of cost deviations and provides a basis for solving cost problems through detailed analysis. Based on the causes of the deviations and with the minimization of costs as a constraint, cost optimization measures are sent to relevant staff members. This step can effectively control through optimization measures. Cost, ensure that the project is carried out within the budget. This step solves the budget control problem in cost management. By optimizing cost control measures, the efficiency of project execution is improved. According to the cost optimization measures, the project budget and plan are updated, and the resource allocation and use are adjusted to ensure that the adjusted budget and plan can minimize costs. This step ensures the real-time update and adjustment of the project budget and plan to reduce the impact of cost deviations on the overall project. This step solves the problem of inflexible project budgets and plans. By updating the plan in real time, the flexibility and adaptability of project management are improved. Implement the adjusted cost control measures, monitor the actual expenditure, and ensure that it is executed according to the new budget and plan. This step ensures the effective implementation of cost control measures through implementation and monitoring, and promptly discovers and solves new cost problems. This step solves the problem of lack of monitoring after the implementation of cost control measures. The effectiveness of adjustment measures is ensured through real-time monitoring. Cost control checkpoints are set up to regularly check the actual expenditure of the project, and promptly discover and solve new cost problems. This step ensures the continued effectiveness of cost control through regular inspections to prevent the accumulation of new cost problems. This step solves the problem of lack of continuous monitoring in the cost control process, and improves the continuity and effectiveness of cost management through regular inspections.
[0043] In summary, this application has at least the following effects:
[0044] By combining the BIM model with blockchain technology, a high degree of data transparency and immutability is achieved, effectively solving the problems of data isolation and information asymmetry in traditional project management. The blockchain integration module not only ensures the security and integrity of project data, but also realizes automated contract transaction processing through smart contract rules. When the project progress and quality reach the preset threshold, the stage payment conditions can be automatically triggered and the transaction information can be recorded on the blockchain.
[0045] The real-time monitoring and analysis subsystem realizes the dynamic adjustment and optimization of project management through real-time monitoring and analysis of project progress, quality and cost. By obtaining and analyzing data such as the actual completion volume, time consumed, component quality and amount spent on the project, the system can timely discover and warn of problems in the project. Especially when the real-time indicators of the project do not meet expectations, the system can quickly take corresponding adjustment measures with the constraint of minimizing costs. This real-time and proactive management method not only improves the execution efficiency of the project, but also ensures that the project proceeds smoothly within the budget and plan, and improves the overall level of project management.
[0046] Through the combination of the management and control subsystem and the storage subsystem, a complete feedback and improvement mechanism is provided. When the real-time progress, quality and cost indicators of the project deviate from the expected standards, the system can take the best adjustment measures according to the specific situation to ensure that the project returns to the right track. All adjustment measures and process data are recorded in detail through the storage subsystem, forming a complete data closed-loop management. This not only improves the traceability and transparency of project management, but also provides valuable data support and experience reference for subsequent projects, further enhancing the company's project management capabilities and competitiveness.
[0047] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.
[0048] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. Integrated control system of progress, quality and cost based on BIM and blockchain, It is characterized in that include: BIM model establishment and blockchain integration subsystem, real-time monitoring and analysis subsystem, management and control subsystem, and storage subsystem; The BIM model establishment and blockchain integration subsystem is used to obtain project data, establish a project BIM model based on the project data, and integrate the project BIM data into the blockchain platform. The project data includes design drawing data, engineering measurement data, material list data, and engineering schedule data; The real-time monitoring and analysis subsystem is used to monitor and analyze the project progress, project quality, and project cost in real time, and obtain the real-time project progress index, real-time project quality index, and real-time project cost index respectively; The control subsystem is used to take progress adjustment measures, quality adjustment measures, and cost adjustment measures respectively based on minimizing costs when the real-time progress indicators, real-time quality indicators, and real-time cost indicators of the project do not meet the expected standards; The storage subsystem is used to record and store progress adjustment measures, quality adjustment measures, and cost adjustment measures; The design drawing data includes design drawing data of buildings, structures and electromechanical engineering, the engineering survey includes land survey data, building size data, and terrain feature data, the material list data includes data of various building materials required for the project, and the engineering schedule includes construction plan and schedule information of the project; The BIM model building and blockchain integration subsystem includes a data acquisition model, a BIM model building module, and a blockchain integration module; The data acquisition model is used to acquire design drawing data, engineering measurement data, material list data, and engineering schedule data; The BIM model building module is used to build a project BIM model based on design drawing data, engineering measurement data, material list data, and engineering schedule data; The blockchain integration module is used to integrate the project BIM data into the blockchain platform and process the preset contract transactions based on the smart contract rules. Specifically, when the project progress and quality reach the set stage threshold, the stage payment conditions are triggered, the stage payment automatic settlement operation is executed, and the relevant staff are notified. After the execution is completed, the relevant information of the transaction is recorded on the blockchain; The specific process of obtaining the real-time progress indicator of the project is as follows: Get the total number of engineering tasks of the project and the actual completion amount, expected completion amount, actual consumption time, and expected consumption time of each engineering task at the current time point; Normalize the total number of engineering tasks of the project and the actual completion amount, expected completion amount, actual consumption time, and expected consumption time of each engineering task at the current time point, and conduct a comprehensive analysis based on the normalization results to obtain the real-time progress indicator of the project; The specific calculation formula for the project real-time progress indicator is as follows: Among them, JD is the real-time progress indicator of the project, A i is the actual completion amount of the i-th engineering task at the current time point after normalization, E i is the expected completion amount of the i-th engineering task at the current time point after normalization, α i is the adjustment coefficient of the ratio of the actual completion amount to the expected completion amount of the i-th engineering task at the preset current time point, T i is the actual time consumed by the i-th engineering task at the current time point after normalization, D i is the expected time consumed by the i-th engineering task at the current time point after normalization, β i is the adjustment coefficient of the ratio of the actual consumption time to the expected consumption time of the i-th engineering task at the preset current time point, W i is the weight value of the i-th engineering task at the current time point, i = 1, 2, 3, ..., N, N is the total number of engineering tasks for the acquired project; The specific process of obtaining the real-time quality indicators of the project is as follows: Read the total number of engineering tasks of the project and obtain the total number of components of each engineering task at the current time point; Performing quality analysis on each component of each engineering task at the current time point, respectively, to obtain the total number of components with unqualified quality among the total number of components of each engineering task at the current time point; Comprehensive analysis is performed based on the total number of components of each engineering task and the total number of components with unqualified quality in the total number of components to obtain the real-time quality index of the project; The specific calculation formula for the project real-time quality index is as follows: Among them, ZL is the real-time quality indicator of the project, ZS i is the total number of components in the i-th engineering task at the current time point, M is the total number of components with unqualified quality in the total number of components in the i-th engineering task at the current time point, and YZ ij is the defect severity of the jth component in the total number of unqualified components in the i-th engineering task at the current time point, and the defect severity is determined by the appearance recognition model, and its judgment standard is a score from 1 to 10, χ ij is the adjustment coefficient of the jth component in the total number of unqualified components in the i-th engineering task at the preset current time point, Q ij is the weight coefficient of the jth component in the total number of components with unqualified quality in the i-th engineering task at the current time point, i = 1, 2, 3, ..., N, N is the total number of engineering tasks of the acquired project, j = 1, 2, 3, ..., M, M is the total number of components with unqualified quality in the total number of components; The specific process of obtaining the real-time cost indicator of the project is as follows: Read the total number of engineering tasks in the project and obtain the actual cost and budget amount of each engineering task at the current time point; Perform a monetary analysis on each engineering task based on the actual expenditure and budget to obtain the overspending and savings of each engineering task; Based on the actual expenditure, budget, overspending and savings of each engineering task at the current time point, a comprehensive analysis is conducted to obtain the real-time cost index of the project; The specific calculation formula of the project real-time cost indicator is as follows: Among them, CB is the real-time progress indicator of the project, SJ i is the actual cost of the i-th engineering task at the current time point, CZ i is the overspending amount of the i-th engineering task at the current time point, YS i is the budget amount of the i-th engineering task at the current time point, κ i is the adjustment coefficient of the ratio of the overspending amount to the budget amount of the i-th engineering task at the preset current time point, JS i is the savings of the i-th engineering task at the current time point, φ i is the adjustment coefficient of the ratio of the savings amount of the i-th engineering task at the preset current time point to the budget amount, i=1,2,3,…,N, N is the total number of engineering tasks of the acquired project; The specific steps to establish a project BIM model based on design drawing data, engineering measurement data, material list data, and engineering schedule data are as follows: Read design drawing data, engineering measurement data, and material list data, and build a digital 3D model based on ArchiCAD; Apply collected engineering survey data to the model; Input the bill of materials data into the model and annotate the detailed material properties for each component in the model; Set up a construction timeline for the model based on the project schedule; Carry out model verification on the established project BIM model; Integrate the established BIM model data, including component attributes and construction progress information, into the blockchain platform; The specific processes of taking progress adjustment measures and quality adjustment measures are as follows: When the real-time progress indicators of the project do not meet the expected project progress indicators, the project is delayed, that is, the tasks whose actual completion volume is lower than the expected completion volume and the actual consumption time exceeds the expected consumption time. For each delayed task, the reasons for the delay are analyzed separately. According to the reasons for the delay and the constraints of minimizing costs, resources, that is, manpower, equipment, and materials, are reallocated to speed up the progress of delayed tasks. For tasks on the preset critical path, resources are allocated first, the construction schedule is updated, and the start and end time of the tasks are adjusted to ensure that the adjusted plan is still completed within the overall construction period. The implementation of the adjusted plan is monitored in real time, that is, the progress of the tasks is monitored to ensure that they are executed according to the new plan; When the real-time quality indicators of the project do not meet the expected project quality indicators, read the total number of components and the number of unqualified components of all engineering tasks at the current time point, and identify tasks with prominent quality problems, that is, tasks with a high proportion of unqualified components. For tasks with prominent quality problems, minimize costs as a constraint, send corrective measures to relevant staff, and conduct quality inspection and acceptance after the implementation of the corrective measures to ensure the effectiveness of the corrective measures and strengthen quality control during the construction process; The specific process of taking cost adjustment measures is as follows: Read the actual cost, budget, overspending and savings of all engineering tasks at the current time point, identify deviations, and obtain tasks with cost deviations higher than the set deviation threshold, i.e., tasks with higher overspending and lower savings. For tasks with cost deviations higher than the set deviation threshold, deviation analysis instructions are sent to relevant staff to determine the cause of the deviation; Based on the causes of deviations and with the constraint of minimizing costs, cost optimization measures are sent to relevant staff to ensure that project costs are within budget; Update project budgets and plans, adjust resource allocation and utilization, and ensure that the adjusted budgets and plans can minimize costs.
Citation Information
Patent Citations
Project quality management and control integrated platform, management and control system and management and control method
CN115617672A
Intelligent construction management and control platform based on BIM technology
CN114493137A
Informatization software project measurement whole process management and evaluation system
CN117035627A
Engineering cost consultation service management system based on BIM technology
CN117829781A