A method, system and medium for analyzing energy consumption of a port crane in the whole process

Through the whole-process energy consumption analysis method of port cranes, the energy consumption in the standby, waiting, dispatching and operation phases is detected, the actual unit consumption is calculated, and the proportion of non-operation time is adjusted to solve the problem that the standby energy consumption is ignored in the existing technology. problem, achieving accurate statistics and reduction of energy consumption of port cranes.

CN118379159BActive Publication Date: 2024-10-11广州港股份有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410650815.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-24
Publication Date
2024-10-11
Estimated Expiration
2044-05-24

AI Technical Summary

Technical Problem

The existing port crane energy consumption analysis method ignores the standby energy consumption of the equipment and cannot effectively analyze the unit consumption, leading to misleading cost analysis and budget, and cannot effectively reduce the actual unit consumption.

Method used

This paper proposes a method for analyzing the energy consumption of the whole process of port cranes. By detecting the energy consumption in the standby, waiting, dispatching and operation stages, the actual energy consumption and unit consumption are calculated, and the energy consumption is reduced by adjusting the time proportion of non-operation links.

Benefits of technology

It achieves accurate statistics on energy consumption in each link of port cranes, identifies high-consumption electrical appliances, reduces energy consumption, and effectively reduces the unit consumption of port cranes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118379159B_ABST
    Figure CN118379159B_ABST
Patent Text Reader

Abstract

The present invention proposes a method for analyzing the energy consumption of a port crane in the whole process: S1, performing a machine static energy consumption detection on the crane standby electrical appliance combination in the control off stage, thereby obtaining the total static energy consumption of the machine; performing a machine standby energy consumption detection on the crane action auxiliary electrical appliance combination in the control on stage, thereby obtaining the total standby energy consumption of the machine; performing a machine dispatching energy consumption detection on the first driving electrical appliance combination of the driving transfer mechanism in the action stage before reaching the working position, thereby obtaining the total machine dispatching energy consumption; performing a machine operation energy consumption detection on the second driving electrical appliance combination of the driving lifting mechanism in the cargo lifting operation stage, thereby obtaining the total machine operation energy consumption; S2, obtaining the actual energy consumption of the port crane during the working time of the port crane and the unit consumption of the port crane operation; the present invention also proposes a system for analyzing the energy consumption of a port crane in the whole process. The present invention can efficiently obtain more accurate actual unit consumption of the port crane.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of crane energy management, and in particular to a whole-process energy consumption analysis method and system for a port crane and a medium thereof. Background Art

[0002] The existing methods for analyzing the energy consumption of port cranes are generally divided into measurement methods and theoretical methods, and they mainly focus on the energy consumption analysis of the port crane during the lifting process or the energy consumption analysis of other main operating mechanisms. For example, when analyzing the energy consumption of the trolley mechanism and the pitch mechanism, such measurement or calculation methods ignore the "standby" energy consumption of the port crane and cannot replace the energy consumption of the entire process of the equipment, which is easy to mislead the unit cost analysis and budget of the port.

[0003] At the same time, since the energy consumption of the whole process of port cranes has not been deconstructed, it is impossible to effectively analyze the reasons for the high actual unit consumption of port cranes. The actual unit consumption of port cranes is generally the ratio of the energy consumption of port cranes over a period of time to the number of operating boxes of port cranes, such as the impact of port crane attendance rate, equipment scheduling, operation plan and other factors on the unit consumption of port cranes;

[0004] The major mechanisms of port cranes generally adopt constant power output. When the motor power is constant, it is only related to the lifting weight. That is, for the port cranes in actual operation, the motors of various mechanisms are fixed. Only focusing on the energy consumption of the major mechanisms of the port cranes can only realize the statistics and calculation of the energy consumption of the relevant mechanisms of the port cranes during operation, and cannot effectively reduce the actual unit consumption of the port cranes. Summary of the invention

[0005] In view of this, it is necessary to propose a method, system and medium for analyzing the energy consumption of the whole process of port cranes to address the above-mentioned problems, so as to overcome several shortcomings in the above-mentioned background technology and solve the technical problem of how to conveniently and efficiently obtain the actual unit consumption of port cranes to provide data support for energy management.

[0006] To achieve the above object, the present invention adopts the following technical solutions:

[0007] The present invention proposes a whole-process energy consumption analysis method for a port crane, which is applied to a port crane including a crane standby electrical assembly, a crane action auxiliary electrical assembly, a transfer mechanism, a lifting mechanism, a first driving electrical assembly for driving the transfer mechanism, and a second driving electrical assembly for driving the lifting mechanism. The crane standby electrical assembly includes communication electrical appliances, status display electrical appliances, lighting electrical appliances, and detection electrical appliances of the port crane. The first driving electrical assembly for driving the transfer mechanism includes a motor for driving the transfer mechanism to move. The second driving electrical assembly for driving the lifting mechanism includes a motor for driving the lifting mechanism to move. The crane action auxiliary electrical assembly includes a plurality of fans, a plurality of rectifiers, a plurality of frequency converters, and a plurality of brakes for dissipating heat for each motor. The lifting mechanism is used for lifting cargo. The transfer mechanism is used for making the port crane and the crane operating parts reach the operating position. The brake is used for braking the corresponding lifting mechanism / transfer mechanism before the action. The energy consumption analysis method includes the following steps S1-S2 executed in sequence:

[0008] S1, perform a machine static energy consumption detection on the crane standby electrical appliance combination of the port crane in the control-off stage, so as to obtain the total machine static energy consumption; perform a machine standby energy consumption detection on the crane action auxiliary electrical appliance combination of the port crane in the control-on stage, so as to obtain the total machine standby energy consumption; perform a machine dispatching energy consumption detection on the first driving electrical appliance combination of the driving transfer mechanism of the port crane in the action stage before reaching the working position, so as to obtain the total machine dispatching energy consumption; perform a machine operation energy consumption detection on the second driving electrical appliance combination of the driving lifting mechanism of the port crane in the cargo lifting operation stage, so as to obtain the total machine operation energy consumption;

[0009] S2, according to the sum of the static energy consumption of the machine, the sum of the waiting energy consumption of the machine, the sum of the scheduling energy consumption of the machine and the sum of the operating energy consumption of the machine obtained in S1, obtain the actual energy consumption of the port crane during the working hours of the port crane and the unit energy consumption of the port crane during the working hours of the port crane;

[0010] In S2, the calculation formula for obtaining the actual energy consumption of the port crane during the working time of the port crane is:

[0011] Q=Q 作业 ×P×t 作业 +∑Q i t i Formula (1)

[0012] In formula (1), Q is the actual energy consumption of the port crane during the working hours of the port crane, Q 作业 is the total energy consumption of machine operation, P is the operating efficiency of port cranes, t 作业 is the operating time of the port crane in the cargo lifting operation phase, Q iIt is one of the sum of the static energy consumption of the machine, the sum of the waiting energy consumption of the machine and the sum of the scheduling energy consumption of the machine; t i It is one of the time spent by the port crane in the control disconnection stage, the time spent by the port crane in the control closing stage and the time spent by the port crane in the action stage before reaching the operating position; Q i With t i correspond to each other;

[0013] In S2, the calculation formula for obtaining the unit consumption of the port crane operation during the port crane working time is:

[0014]

[0015] In formula (2), E is the unit consumption of the port crane operation during the working time of the port crane, Q is the actual energy consumption of the port crane during the working time of the port crane, U is the workload of the port crane during the working time of the port crane, and Q 作业 is the total energy consumption of the machine operation, Q 静态 is the total static energy consumption of the machine, t 静态 is the time spent by the port crane in the control break stage, Q 控制合 is the total energy consumption of the machine waiting for action, t 控制合 is the time spent by the port crane in the control phase, Q 调度 is the total energy consumption of machine scheduling, t 调度 It is the time that the port crane spends in the action phase before reaching the operating position.

[0016] Furthermore, the formula for the total static energy consumption of the machine is:

[0017]

[0018] In formula (3), Q 静态i It is the energy consumption of each appliance in the crane standby electrical combination when the port crane is in the control off stage.

[0019] Furthermore, the formula for the total energy consumption of the machine in standby mode is:

[0020]

[0021] In formula (4), Q 控制合i It is the energy consumption of each appliance in the crane action auxiliary electrical combination when the port crane is in the control stage.

[0022] Furthermore, the formula for the total energy consumption of machine scheduling is:

[0023]

[0024] In formula (5), Q 调度i is the energy consumption of each electrical appliance in the first driving electrical appliance combination of the driving transfer mechanism when the port crane is in the action stage before reaching the operating position, η i It is the transmission efficiency of each electrical appliance in the first driving electrical appliance combination of the drive transfer mechanism when the port crane is in the action stage before reaching the operating position, Q 调度i With η i Correspond to each other.

[0025] Furthermore, the formula for the total energy consumption of machine operation is:

[0026]

[0027] In formula (6), Q 作业i It is the energy consumption of each electrical appliance in the second driving electrical appliance combination that drives the lifting mechanism when the port crane is in the cargo lifting operation stage.

[0028] Furthermore, the port crane working time t=t corresponding to the port crane workload U within the port crane working time 静态 +t 控制合 +t 调度 +t 作业 ;t 作业 is the operation time of the port crane in the cargo lifting operation phase, t 静态 is the time spent by the port crane in the control break stage, t 控制合 is the time spent by the port crane in the control phase, t 调度 It is the time spent by the port crane in the action phase before reaching the operating position;

[0029] t 静态 The control time is recorded by the control button; 控制合 Control time recording by controlling the button; 调度 By recording the release time of the brake used to limit the movement of the transfer mechanism; t 作业 Used to restrict port crane status and position.

[0030] Furthermore, the energy consumption analysis method further includes a sequentially executed step S3: S3, by controlling the time proportion of the port crane control breaking stage, control closing stage, action stage before reaching the operation position, and cargo lifting operation stage, thereby reducing the time proportion of the operation stage with high energy consumption;

[0031] In S1, when the port crane is in the control-off stage, the first driving electrical assembly of the driving transfer mechanism and the second driving electrical assembly of the driving lifting mechanism do not work; in S1, when the port crane is in the control-on stage, the first driving electrical assembly of the driving transfer mechanism and the second driving electrical assembly of the driving lifting mechanism do not work; in S1, when the port crane is in the action stage before reaching the working position, the second driving electrical assembly of the driving lifting mechanism does not work.

[0032] The present invention further proposes a whole-process energy consumption analysis system for a port crane, which includes a port crane and a software control system; the port crane includes a crane standby electrical assembly, a crane action auxiliary electrical assembly, a transfer mechanism, a lifting mechanism, a first driving electrical assembly for driving the transfer mechanism, and a second driving electrical assembly for driving the lifting mechanism; the crane standby electrical assembly includes communication electrical appliances, status display electrical appliances, lighting electrical appliances, and detection electrical appliances of the port crane; the first driving electrical assembly for driving the transfer mechanism includes a motor for driving the transfer mechanism to move; the second driving electrical assembly for driving the lifting mechanism includes a motor for driving the lifting mechanism to move; the crane action auxiliary electrical assembly includes a plurality of fans, a plurality of rectifiers, a plurality of frequency converters, and a plurality of brakes for dissipating heat for each motor; the lifting mechanism is used to lift cargo; the transfer mechanism is used to enable the port crane and the crane operating components to reach the operating position; and the brake is used to brake the corresponding lifting mechanism / transfer mechanism before moving;

[0033] The software control system includes a machine static energy consumption detection module, a machine standby energy consumption detection module, a machine scheduling energy consumption detection module, a machine operation energy consumption detection module, a port crane actual energy consumption acquisition module, a port crane operation unit consumption acquisition module and an energy consumption stage time ratio adjustment module;

[0034] The machine static energy consumption detection module is used to detect the machine static energy consumption of the crane standby electrical appliance combination of the port crane in the control off stage, so as to obtain the total static energy consumption of the machine;

[0035] The machine standby energy consumption detection module is used to detect the machine standby energy consumption of the crane action auxiliary electrical appliance combination of the port crane in the control closing stage, so as to obtain the total machine standby energy consumption;

[0036] The machine dispatching energy consumption detection module is used to detect the machine dispatching energy consumption of the first driving electrical appliance combination of the driving transfer mechanism of the port crane in the action stage before reaching the working position, so as to obtain the total machine dispatching energy consumption;

[0037] The machine operation energy consumption detection module is used to detect the machine operation energy consumption of the second driving electrical appliance combination of the driving hoisting mechanism of the port crane in the cargo lifting operation stage, so as to obtain the total machine operation energy consumption;

[0038] The calculation formula of the actual energy consumption acquisition module of the port crane to obtain the actual energy consumption of the port crane during the working time of the port crane is:

[0039] Q=Q 作业 ×P×t 作业 +∑Q i t i Formula (1)

[0040] In formula (1), Q is the actual energy consumption of the port crane during the working hours of the port crane, Q 作业 is the total energy consumption of machine operation, P is the operating efficiency of port cranes, t 作业 is the operating time of the port crane in the cargo lifting operation phase, Q i It is one of the sum of the static energy consumption of the machine, the sum of the waiting energy consumption of the machine and the sum of the scheduling energy consumption of the machine; t i It is one of the time spent by the port crane in the control disconnection stage, the time spent by the port crane in the control closing stage and the time spent by the port crane in the action stage before reaching the operating position; Q i With t i correspond to each other;

[0041] The calculation formula of the port crane operation unit consumption acquisition module to obtain the port crane operation unit consumption during the port crane working time is:

[0042]

[0043] In formula (2), E is the unit consumption of the port crane operation during the working time of the port crane, Q is the actual energy consumption of the port crane during the working time of the port crane, U is the workload of the port crane during the working time of the port crane, and Q 作业 is the total energy consumption of the machine operation, Q 静态 is the total static energy consumption of the machine, t 静态 is the time spent by the port crane in the control break stage, Q 控制合 is the total energy consumption of the machine waiting for action, t 控制合 is the time spent by the port crane in the control phase, Q 调度 is the total energy consumption of machine scheduling, t 调度 It is the time spent by the port crane in the action phase before reaching the operating position;

[0044] The energy consumption stage time proportion adjustment module is used to control the time proportion of the port crane's control disconnection stage, control closing stage, action stage before reaching the operating position, and cargo lifting operation stage, thereby reducing the time proportion of the operation stage with higher energy consumption.

[0045] Furthermore, the port crane working time t=t corresponding to the port crane workload U within the port crane working time 静态 +t 控制合 +t 调度 +t 作业 ;t 作业 is the operation time of the port crane in the cargo lifting operation phase, t 静态 is the time spent by the port crane in the control break stage, t 控制合 is the time spent by the port crane in the control phase, t 调度 It is the time spent by the port crane in the action phase before reaching the operating position;

[0046] t 静态 The control time is recorded by the control button; 控制合 Control time recording by controlling the button; 调度 By recording the release time of the brake used to limit the movement of the transfer mechanism; t 作业 Used to restrict port crane status and position.

[0047] The present invention further proposes a computer-readable medium, which is provided with a program, and the program executes the whole-process energy consumption analysis method of the port crane as described in any one of the above items.

[0048] The beneficial effects of the present invention are:

[0049] The present invention deconstructs the energy consumption of each link of the port crane, counts the actual energy consumption of the operating link and non-operating link of the port crane, and is convenient for counting the actual energy consumption of the port crane, so as to efficiently obtain more accurate actual unit consumption of the port crane; by counting the operating energy consumption of each link of the port crane, it is helpful to identify the specific electrical appliances in each link, and by effectively managing some electrical appliances or control methods that can be turned on at any time, it is helpful to reduce the energy consumption of each operating link of the port crane, thereby reducing the energy consumption of the port crane; because the energy consumption of each link of the port crane is different, but the operating time of each stage is mutually restricted, the present invention can effectively reduce the operating unit consumption of the port crane by adjusting the time proportion of the non-operating link; the present invention effectively reduces the time proportion of each energy link of the port crane by decomposing each link of the port crane and improving the analysis of the energy consumption link of the port crane, thereby reducing the operating unit consumption of the port crane. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] Figure 1 A work flow chart of a whole-process energy consumption analysis method for a port crane of the present invention;

[0051] Figure 2 This is a front view of the gantry crane in Example 2 of the present invention during operation. DETAILED DESCRIPTION

[0052] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be further clearly and completely described in combination with the embodiments of the present invention. It should be noted that the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0053] It should be understood that the directions or positional relationships indicated by terms such as "upper", "lower", "front", "back", "left", and "right" are based on the directions or positional relationships shown in the accompanying drawings and are only for the convenience of describing the present invention and simplifying the description. They do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, they should not be understood as limitations on the present invention.

[0054] The terms "first", "second", "third", "fourth", etc. are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the definition of "first", "second", "third", "fourth" features may explicitly or implicitly include one or more of the features.

[0055] Example 1

[0056] The port crane involved in this embodiment is mainly divided into a control-off stage, a control-on stage, an action stage before reaching the operating position, and a cargo lifting operation stage according to the driver's operating behavior and corresponding operations; after the crane driver enters the cab and does not perform any operation, the equipment is in the control-off stage, and the main mechanism of the equipment cannot be operated, but some auxiliary functions such as lighting, air conditioning, and defrosting can be started as needed; after pressing the control-on button, the equipment enters the control-on stage, at which time the main mechanism of the equipment can be operated according to the operation needs, and at the same time, as the equipment enters the control-on button, the pre-start function of the relevant mechanism will also be started, such as the main engine The equipment will be equipped with power supply systems (converters, frequency converters, etc.), emergency braking systems, hoisting equipment systems, and related auxiliary systems. According to the operation instructions, the equipment enters the operation phase, and the port crane driver will operate the operation-related mechanisms (hoisting mechanism / trolley mechanism of gantry crane, hoisting mechanism / rotation mechanism / pitch mechanism of portal crane) to realize the cargo hoisting process, the front equipment completes the cargo loading and unloading operations, and the yard equipment completes the cargo entry and exit operations. According to the equipment dispatching instructions, the equipment enters the dispatching operation phase, such as operating the trolley mechanism to move the equipment to the specified position, or coordinating the berthing and unberthing of the ship to complete the lifting and lowering processes of the quay crane. The above process has a relatively obvious stage division in the operation of the crane. At the same time, each electrical appliance in the above operation stage also has a relatively obvious start-up and shutdown state. Therefore, the energy consumption of each stage is relatively fixed. This embodiment calculates the energy consumption of the relevant stages by counting the electrical appliances. In this embodiment, according to the composition of electrical appliances in each operation stage, the energy consumption of the cargo lifting operation stage per unit time is greater than the energy consumption of the action stage before reaching the operation position > the control closing stage > the control breaking stage. However, when the time proportion of each operation link is different, it has a greater impact on the unit (ton / box) energy consumption. Therefore, this embodiment cannot ignore the above stages when calculating the energy consumption of the port crane. The reasonable structure of the crane's operation links is of great significance in the statistics of crane energy consumption.

[0057] like Figure 1As shown, this embodiment proposes a method for analyzing the energy consumption of a port crane throughout the entire process, which is applied to a port crane including a crane standby electrical assembly, a crane action auxiliary electrical assembly, a transfer mechanism, a lifting mechanism, a first driving electrical assembly for driving the transfer mechanism, and a second driving electrical assembly for driving the lifting mechanism. The crane standby electrical assembly includes communication electrical appliances, status display electrical appliances, lighting electrical appliances, and detection electrical appliances of the port crane. The first driving electrical assembly for driving the transfer mechanism includes a motor for driving the transfer mechanism to move. The second driving electrical assembly for driving the lifting mechanism includes a motor for driving the lifting mechanism to move. The crane action auxiliary electrical assembly includes a plurality of fans, a plurality of rectifiers, a plurality of frequency converters, and a plurality of brakes for dissipating heat for each motor. The lifting mechanism is used to lift cargo. The transfer mechanism is used to make the port crane and the crane operating parts reach the operating position. The brake is used to brake the corresponding lifting mechanism / transfer mechanism before moving. The energy consumption analysis method includes the following steps S1-S2 executed in sequence:

[0058] S1, perform a machine static energy consumption detection on the crane standby electrical appliance combination of the port crane in the control-off stage, so as to obtain the total machine static energy consumption; perform a machine standby energy consumption detection on the crane action auxiliary electrical appliance combination of the port crane in the control-on stage, so as to obtain the total machine standby energy consumption; perform a machine dispatching energy consumption detection on the first driving electrical appliance combination of the driving transfer mechanism of the port crane in the action stage before reaching the working position, so as to obtain the total machine dispatching energy consumption; perform a machine operation energy consumption detection on the second driving electrical appliance combination of the driving lifting mechanism of the port crane in the cargo lifting operation stage, so as to obtain the total machine operation energy consumption;

[0059] S2, according to the sum of the static energy consumption of the machine, the sum of the waiting energy consumption of the machine, the sum of the scheduling energy consumption of the machine and the sum of the operating energy consumption of the machine obtained in S1, obtain the actual energy consumption of the port crane during the working hours of the port crane and the unit energy consumption of the port crane during the working hours of the port crane;

[0060] In S2, the calculation formula for obtaining the actual energy consumption of the port crane during the working time of the port crane is:

[0061] Q=Q 作业 ×P×t 作业 +∑Q i t i Formula (1)

[0062] In formula (1), Q is the actual energy consumption of the port crane during the working hours of the port crane, Q 作业 is the total energy consumption of machine operation, P is the operating efficiency of port cranes, t 作业 is the operating time of the port crane in the cargo lifting operation phase, Q iIt is one of the sum of the static energy consumption of the machine, the sum of the waiting energy consumption of the machine and the sum of the scheduling energy consumption of the machine; t i It is one of the time spent by the port crane in the control disconnection stage, the time spent by the port crane in the control closing stage and the time spent by the port crane in the action stage before reaching the operating position; Q i With t i correspond to each other;

[0063] In S2, the calculation formula for obtaining the unit consumption of the port crane operation during the port crane working time is:

[0064]

[0065] In formula (2), E is the unit consumption of the port crane operation during the working time of the port crane, Q is the actual energy consumption of the port crane during the working time of the port crane, U is the workload of the port crane during the working time of the port crane, and Q 作业 is the total energy consumption of the machine operation, Q 静态 is the total static energy consumption of the machine, t 静态 is the time spent by the port crane in the control break stage, Q 控制合 is the total energy consumption of the machine waiting for action, t 控制合 is the time spent by the port crane in the control phase, Q 调度 is the total energy consumption of machine scheduling, t 调度 It is the time that the port crane spends in the action phase before reaching the operating position.

[0066] Optimally, the formula for the total static energy consumption of the machine is:

[0067]

[0068] In formula (3), Q 静态i It is the energy consumption of each appliance in the crane standby electrical combination when the port crane is in the control off stage.

[0069] Optimally, the formula for the total energy consumption of the machine waiting for action is:

[0070]

[0071] In formula (4), Q 控制合i It is the energy consumption of each appliance in the crane action auxiliary electrical combination when the port crane is in the control stage.

[0072] Optimally, the formula for the total energy consumption of machine scheduling is:

[0073]

[0074] In formula (5), Q 调度i is the energy consumption of each electrical appliance in the first driving electrical appliance combination of the driving transfer mechanism when the port crane is in the action stage before reaching the operating position, η i It is the transmission efficiency of each electrical appliance in the first driving electrical appliance combination of the drive transfer mechanism when the port crane is in the action stage before reaching the operating position, Q 调度i With η i Correspond to each other.

[0075] Specifically, when the port crane is a gantry crane, the transfer mechanism is the trolley mechanism of the gantry crane; when the port crane is a portal crane, the transfer mechanism is the rotation mechanism and / or pitch mechanism of the portal crane.

[0076] Specifically, in S1, the static energy consumption of each appliance in the crane standby electrical assembly of the port crane in the control-off stage is detected; the standby energy consumption of each appliance in the crane action auxiliary electrical assembly of the port crane in the control-on stage is detected; the dispatching energy consumption of each appliance in the first driving electrical assembly of the drive transfer mechanism of the port crane in the action stage before reaching the working position is detected; the operating energy consumption of each appliance in the second driving electrical assembly of the drive lifting mechanism of the port crane in the cargo lifting operation stage is detected.

[0077] Optimally, the formula for the total energy consumption of machine operation is:

[0078]

[0079] In formula (6), Q 作业i It is the energy consumption of each electrical appliance in the second driving electrical appliance combination that drives the lifting mechanism when the port crane is in the cargo lifting operation stage.

[0080] Optimally, the port crane working time t = t corresponding to the port crane workload U within the port crane working time 静态 +t 控制合 +t 调度 +t 作业 ;t 作业 is the operation time of the port crane in the cargo lifting operation phase, t 静态 is the time spent by the port crane in the control break stage, t 控制合 is the time spent by the port crane in the control phase, t 调度 It is the time spent by the port crane in the action phase before reaching the operating position;

[0081] t 静态 The control time is recorded by the control button;控制合 Control time recording by controlling the button; 调度 By recording the release time of the brake used to limit the movement of the transfer mechanism; t 作业 Used to restrict port crane status and position.

[0082] Specifically, if the port crane is a gantry crane, since the operation process of the port crane is the joint operation of the trolley mechanism and the lifting mechanism, one operation cycle includes lifting and lowering (no load) - lifting and rising (loaded) - trolley forward (loaded) - lifting and lowering (loaded) - lifting and rising (no load) - trolley backward (no load), and recording only the lifting mechanism will cause part of the operation time and energy consumption to be lost. Therefore, the status and position of the port crane can be used to accurately count the cargo lifting operation process.

[0083] Optimally, the energy consumption analysis method further comprises a step S3 which is executed sequentially: S3, by controlling the time proportion of the port crane control breaking stage, the control closing stage, the action stage before reaching the operation position, and the cargo lifting operation stage, thereby reducing the time proportion of the operation stage with high energy consumption;

[0084] In S1, when the port crane is in the control-off stage, the first driving electrical assembly of the driving transfer mechanism and the second driving electrical assembly of the driving lifting mechanism do not work; in S1, when the port crane is in the control-on stage, the first driving electrical assembly of the driving transfer mechanism and the second driving electrical assembly of the driving lifting mechanism do not work; in S1, when the port crane is in the action stage before reaching the working position, the second driving electrical assembly of the driving lifting mechanism does not work.

[0085] Specifically, since the energy consumption of each link of the port crane is different, but the operating time of each stage is mutually restricted, the present invention can effectively reduce the operating unit consumption of the port crane by adjusting the time proportion of the non-operating link; for example, within a month, although the energy consumption of operating a single container is relatively small, the number of operating containers in a month is relatively small, then the non-operating link (control disconnection stage, control closing stage, and action stage before reaching the operating position) time proportion is relatively long, because the container volume this month shares the energy consumption of other non-operating links, the energy consumption of a single container for the entire month will still be relatively high. On the contrary, if the non-operating link time can be effectively controlled, the operating unit consumption of the port crane can be effectively reduced.

[0086] Specifically, the energy consumption factors in various links of the port crane are different, and are directly related to the port crane operators (drivers) and port crane planners (dispatchers). For example, the control break stage and the control closing stage are related to the driver's working habits, while the movement of large vehicles is related to the port crane dispatchers. Decomposing each link of the port crane can improve the analysis of the energy consumption links of the port crane, and corresponding analysis settings can be made for the influencing factors of different links, effectively reducing the time proportion of each energy consumption link of the port crane, thereby reducing the unit consumption of the port crane operation; for example, in the port where the present invention is tested, the electrical There are four air conditioners in the room. After analysis, the four air conditioners will continue to run during the control interruption stage. After actual testing in July and August, the air conditioners are started in rotation, that is, in the first six hours, No. 1 and No. 2 air conditioners are operated. During this period, if No. 1 air conditioner fails, No. 3 air conditioner is started, and if No. 2 air conditioner fails, No. 4 air conditioner is started; in the next six hours, No. 3 and No. 4 air conditioners are operated. During this period, if No. 3 air conditioner fails, No. 1 air conditioner is started, and if No. 4 air conditioner fails, No. 2 air conditioner is started, and this cycle is repeated every six hours; the cooling power of a single air conditioner is 1.16KW. According to the saved control time, the average monthly power saving is:

[0087] 23.02*720*1.16=192.26KWH; the unit power consumption of heavy-box rail crane can be reduced by 0.052KWH / UNIT, and the annual power saving of 36 heavy-box rail cranes is 192.26*36*12=83056.32KWH; according to the electricity price of 0.78 yuan per kilowatt-hour in 2023, the annual cost saving can be 64783.93 yuan; for example, port cranes are generally equipped with automatic control off function, which is mainly to prevent the port cranes from being in the control-on state all the time and causing unnecessary waste of energy. The logic is that if no operation is performed in the control-on state for more than fifteen minutes, it will automatically enter the control-off state. In order to facilitate the driver to control the equipment in time, the automatic port equipment cancels the automatic control off function. According to on-site investigations, some drivers have imperfect operating habits. Even if they know that there will be no operation needs in the future, they will not actively press the control-off button to put the equipment into the control-off state, resulting in high equipment unit consumption; at the same time, even if the automated equipment enters the control-off function, it can receive tasks on time and automatically enter the control-on state; from 2022 to May 2023, in the port where the present invention was tested, the control-on time ratio of the heavy-box rail crane was 95.27%. Since May, the control-on time of the heavy-box rail crane has been rectified. If the equipment does not receive an instruction for ten minutes or the driver does not operate it, the equipment will automatically control off. After the rectification, the control-on time ratio of the heavy-box rail crane from June 2023 to October 2023 was 72.25%, and the monthly average control-on time ratio decreased by 23.02%. According to statistics, the unit consumption per hour in the control-on stage is about 2.3KWH higher than that in the control-off stage. The average monthly power saving of a single machine is

[0088] 23.02%*720*2.3=381.21KWH

[0089] The average operating box volume from June to October is calculated as 3719.76 UNIT, so the unit power consumption of heavy-box rail crane can be reduced by 0.102KWH / UNIT, and the annual power saving of 36 heavy-box rail cranes is

[0090] 381.21*36*12=164682.72KWH

[0091] If the electricity price in 2023 is calculated at 0.78 yuan per kilowatt-hour, the annual savings can be 128,452.52 yuan.

[0092] Specifically, the present invention establishes a theoretical model and an actual model of the actual unit consumption of port cranes. The model of the actual unit consumption E is a theoretical calculation model obtained based on statistically related electrical appliances. At the same time, combined with the above analysis, the actual energy consumption model of the port crane can also be obtained using existing data, which helps to improve the work level of port planners and improve the port's throughput capacity. In addition, according to the operating routes of the port cranes, the operating time of non-operating mechanisms such as large vehicles can be reasonably reduced to make the operation of port cranes more reasonable. At the same time, when the operating time of non-operating mechanisms such as large vehicles is reduced, the moving range of large vehicles will also be reduced, so that containers or other cargoes can be stored in a concentrated manner, releasing part of the yard, and containers or other cargoes can be stored separately, thereby improving the port's throughput capacity and increasing revenue. It is helpful to analyze the reasons for the high unit consumption of the port, find the crux, and effectively reduce the energy consumption cost of the port, reduce the carbon emissions of the terminal, and enhance the soft power of the green port.

[0093] Example 2

[0094] This embodiment proposes a whole-process energy consumption analysis system for a port crane, which includes a port crane and a software control system; the port crane includes a crane standby electrical assembly, a crane action auxiliary electrical assembly, a transfer mechanism, a lifting mechanism, a first driving electrical assembly for driving the transfer mechanism, and a second driving electrical assembly for driving the lifting mechanism; the crane standby electrical assembly includes communication electrical appliances, status display electrical appliances, lighting electrical appliances, and detection electrical appliances of the port crane; the first driving electrical assembly for driving the transfer mechanism includes a motor for driving the transfer mechanism to move; the second driving electrical assembly for driving the lifting mechanism includes a motor for driving the lifting mechanism to move; the crane action auxiliary electrical assembly includes a plurality of fans, a plurality of rectifiers, a plurality of frequency converters, and a plurality of brakes for dissipating heat for each motor; the lifting mechanism is used to lift cargo; the transfer mechanism is used to make the port crane and the crane operating components reach the operating position; and the brake is used to brake the corresponding lifting mechanism / transfer mechanism before moving;

[0095] The software control system includes a machine static energy consumption detection module, a machine standby energy consumption detection module, a machine scheduling energy consumption detection module, a machine operation energy consumption detection module, a port crane actual energy consumption acquisition module, a port crane operation unit consumption acquisition module and an energy consumption stage time ratio adjustment module;

[0096] The machine static energy consumption detection module is used to detect the machine static energy consumption of the crane standby electrical appliance combination of the port crane in the control off stage, so as to obtain the total static energy consumption of the machine;

[0097] The machine standby energy consumption detection module is used to detect the machine standby energy consumption of the crane action auxiliary electrical appliance combination of the port crane in the control closing stage, so as to obtain the total machine standby energy consumption;

[0098] The machine dispatching energy consumption detection module is used to detect the machine dispatching energy consumption of the first driving electrical appliance combination of the driving transfer mechanism of the port crane in the action stage before reaching the working position, so as to obtain the total machine dispatching energy consumption;

[0099] The machine operation energy consumption detection module is used to detect the machine operation energy consumption of the second driving electrical appliance combination of the driving hoisting mechanism of the port crane in the cargo lifting operation stage, so as to obtain the total machine operation energy consumption;

[0100] The calculation formula of the actual energy consumption acquisition module of the port crane to obtain the actual energy consumption of the port crane during the working time of the port crane is:

[0101] Q=Q 作业 ×P×t 作业 +∑Q i t i Formula (1)

[0102] In formula (1), Q is the actual energy consumption of the port crane during the working hours of the port crane, Q 作业 is the total energy consumption of machine operation, P is the operating efficiency of port cranes, t 作业 is the operating time of the port crane in the cargo lifting operation phase, Q i It is one of the sum of the static energy consumption of the machine, the sum of the waiting energy consumption of the machine and the sum of the scheduling energy consumption of the machine; t i It is one of the time spent by the port crane in the control disconnection stage, the time spent by the port crane in the control closing stage and the time spent by the port crane in the action stage before reaching the operating position; Q i With t i correspond to each other;

[0103] The calculation formula of the port crane operation unit consumption acquisition module to obtain the port crane operation unit consumption during the port crane working time is:

[0104]

[0105] In formula (2), E is the unit consumption of the port crane operation during the working time of the port crane, Q is the actual energy consumption of the port crane during the working time of the port crane, U is the workload of the port crane during the working time of the port crane, and Q 作业 is the total energy consumption of the machine operation, Q 静态 is the total static energy consumption of the machine, t 静态 is the time spent by the port crane in the control break stage, Q 控制合 is the total energy consumption of the machine waiting for action, t 控制合 is the time spent by the port crane in the control phase, Q 调度 is the total energy consumption of machine scheduling, t 调度 It is the time spent by the port crane in the action phase before reaching the operating position;

[0106] The energy consumption stage time proportion adjustment module is used to control the time proportion of the port crane's control disconnection stage, control closing stage, action stage before reaching the operating position, and cargo lifting operation stage, thereby reducing the time proportion of the operation stage with higher energy consumption.

[0107] Specifically, the control process of the time proportion is as follows: in the four operating stages of the port crane, the sum of the time of the four operating stages is equal to the calendar time, and the energy consumption per unit time in each stage is quite different (taking a certain yard equipment as an example, its control interruption hourly energy consumption is 7.54kwh, the control combination hourly energy consumption is 12.22kwh, the trolley mechanism hourly energy consumption is 34.96kwh, and the operation stage hourly energy consumption is 59.27kwh). Taking reasonable measures can effectively reduce the time proportion of high-energy consumption operating stages, and can effectively reduce the energy consumption of equipment.

[0108] Specifically, the operating time t of the port crane in the cargo lifting operation phase is 作业 It is determined by the number of operating containers (operating time = operating efficiency × operating container volume). When the operating level of the operators remains consistent, the operating efficiency is only related to the lifting distance during the lifting process. The shorter the lifting distance, the less operating time, the higher the operating efficiency, and the less overall operating time. The specific approach is to concentrate the containers near the operating lane (such as Figure 2 As shown, the gantry crane operates on double lanes and containers can be arranged on Figure 2 The dotted rectangular frame in the figure shows that the lifting and trolley running distances are reduced, the lifting time is reduced, and the energy consumption during the operation is reduced.

[0109] Specifically, the time t that the port crane spends in the action phase before reaching the operating position is 调度By rationally planning the yard layout and effectively compressing the yard, the equipment can be concentrated in a certain area to avoid frequent movement of large carts or long-distance movement of large carts, thereby reducing the operating time of the large cart mechanism and the proportion of the large cart mechanism operating time, thereby achieving the goal of reducing equipment energy consumption.

[0110] Specifically, if the energy consumption per unit time in the control-on stage is higher than that in the control-off stage, the equipment can be switched to the control-off state in a timely manner after each lifting operation is completed, reducing the control-on time and increasing the control-off time, which can effectively reduce the equipment's control-on energy consumption and achieve the purpose of reducing equipment energy consumption.

[0111] In the present embodiment, the port crane working time t corresponding to the port crane workload U within the port crane working time is optimized. 静态 +t 控制合 +t 调度 +t 作业 ;t 作业 is the operation time of the port crane in the cargo lifting operation phase, t 静态 is the time spent by the port crane in the control break stage, t 控制合 is the time spent by the port crane in the control phase, t 调度 It is the time spent by the port crane in the action phase before reaching the operating position;

[0112] t 静态 The control time is recorded by the control button; 控制合 Control time recording by controlling the button; 调度 By recording the release time of the brake used to limit the movement of the transfer mechanism; t 作业 Used to restrict port crane status and position.

[0113] Further optimized, a port crane full-process energy consumption analysis system of this embodiment executes the port crane full-process energy consumption analysis method as described in any one of Example 1.

[0114] Example 3

[0115] This embodiment proposes a computer-readable medium, which is provided with a program, and the program executes the whole process energy consumption analysis method of the port crane as described in any technical solution in Example 1.

[0116] Further optimized, the computer readable medium may also be a program memory of an electronic device.

[0117] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.

Claims

1. A method for analyzing energy consumption of a port crane during the whole process, which is applied to a port crane including a crane standby electrical assembly, a crane action auxiliary electrical assembly, a transfer mechanism, a lifting mechanism, a first driving electrical assembly for driving the transfer mechanism, and a second driving electrical assembly for driving the lifting mechanism. The crane standby electrical assembly includes communication electrical appliances, status display electrical appliances, lighting electrical appliances, and detection electrical appliances of the port crane. The first driving electrical assembly for driving the transfer mechanism includes a motor for driving the transfer mechanism to move. The second driving electrical assembly for driving the lifting mechanism includes a motor for driving the lifting mechanism to move. The crane action auxiliary electrical assembly includes a fan for cooling each motor, a rectifier, a frequency converter, and a plurality of brakes. The lifting mechanism is used to lift cargo. The transfer mechanism is used to make the port crane and the crane operating parts reach the operating position. The brake is used to brake the corresponding lifting mechanism / transfer mechanism before the action. It is characterized in that: The energy consumption analysis method includes the following steps S1-S3 performed in sequence: S1, perform a machine static energy consumption detection on the crane standby electrical appliance combination of the port crane in the control-off stage, so as to obtain the total machine static energy consumption; perform a machine standby energy consumption detection on the crane action auxiliary electrical appliance combination of the port crane in the control-on stage, so as to obtain the total machine standby energy consumption; perform a machine dispatching energy consumption detection on the first driving electrical appliance combination of the driving transfer mechanism of the port crane in the action stage before reaching the working position, so as to obtain the total machine dispatching energy consumption; perform a machine operation energy consumption detection on the second driving electrical appliance combination of the driving lifting mechanism of the port crane in the cargo lifting operation stage, so as to obtain the total machine operation energy consumption; S2, according to the sum of the static energy consumption of the machine, the sum of the waiting energy consumption of the machine, the sum of the scheduling energy consumption of the machine and the sum of the operating energy consumption of the machine obtained in S1, obtain the actual energy consumption of the port crane during the working hours of the port crane and the unit energy consumption of the port crane during the working hours of the port crane; S3, by controlling the time proportion of the port crane's control disconnection stage, control closing stage, action stage before reaching the operating position, and cargo lifting operation stage, the time proportion of the operation stage with high energy consumption can be reduced; In S2, the calculation formula for obtaining the actual energy consumption of the port crane during the working hours of the port crane is: Q=Q 作业 xP xt 作业 + ∑Q i t i Formula(1) In formula (1), Q is the actual energy consumption of the port crane during the working hours of the port crane, Q 作业 is the total energy consumption of machine operation, P is the operating efficiency of port cranes, t 作业 is the operating time of the port crane in the cargo lifting operation phase, Q i It is one of the sum of the static energy consumption of the machine, the sum of the waiting energy consumption of the machine and the sum of the scheduling energy consumption of the machine; t i It is one of the time spent by the port crane in the control disconnection stage, the time spent by the port crane in the control closing stage and the time spent by the port crane in the action stage before reaching the operating position; Q i With t i correspond to each other; In S2, the calculation formula for obtaining the unit consumption of the port crane operation during the port crane working time is: In formula (2), E is the unit consumption of the port crane operation during the working time of the port crane, Q is the actual energy consumption of the port crane during the working time of the port crane, U is the workload of the port crane during the working time of the port crane, and Q 作业 is the total energy consumption of the machine operation, Q 静态 is the total static energy consumption of the machine, t 静态 is the time spent by the port crane in the control break stage, Q 控制合 is the total energy consumption of the machine waiting for action, t 控制合 Q is the time spent by the port crane in the control phase, 调度 is the total energy consumption of machine scheduling, t 调度 It is the time that the port crane spends in the action phase before reaching the operating position.

2. The whole process energy consumption analysis method of a port crane according to claim 1 is characterized in that: The formula for the total static energy consumption of the machine is: In formula (3), Q 静态i It is the energy consumption of each appliance in the crane standby electrical combination when the port crane is in the control off stage.

3. The whole process energy consumption analysis method of a port crane according to claim 1 is characterized in that: The formula for the total energy consumption of the machine when waiting for action is: In formula (4), Q 控制合i It is the energy consumption of each appliance in the crane action auxiliary electrical combination when the port crane is in the control stage.

4. The whole process energy consumption analysis method of a port crane according to claim 1 is characterized in that: The formula for the total energy consumption of machine scheduling is: In formula (5), Q 调度i is the energy consumption of each electrical appliance in the first driving electrical appliance combination of the driving transfer mechanism when the port crane is in the action stage before reaching the operating position, η i It is the transmission efficiency of each electrical appliance in the first driving electrical appliance combination of the drive transfer mechanism when the port crane is in the action stage before reaching the operating position, Q 调度i With η i Correspond to each other.

5. The whole process energy consumption analysis method of a port crane according to claim 1 is characterized in that: The formula for the total energy consumption of machine operation is: In formula (6), Q 作业i It is the energy consumption of each electrical appliance in the second driving electrical appliance combination that drives the lifting mechanism when the port crane is in the cargo lifting operation stage.

6. The whole process energy consumption analysis method of a port crane according to claim 1 is characterized in that: The port crane working time t corresponds to the port crane workload U within the port crane working time = t 静态 +t 控制合 +t 调度 +t 作业 ;t 作业 is the operation time of the port crane in the cargo lifting operation phase, t 静态 is the time spent by the port crane in the control break stage, t 控制合 is the time spent by the port crane in the control phase, t 调度 It is the time spent by the port crane in the action phase before reaching the operating position; t 静态 The control time is recorded by the control button; 控制合 Control time recording by controlling the button; 调度 By recording the release time of the brake used to limit the movement of the transfer mechanism; t 作业 Used to restrict port crane status and position.

7. The whole process energy consumption analysis method of a port crane according to claim 1 is characterized in that: In S1, when the port crane is in the control-off stage, the first driving electrical assembly of the driving transfer mechanism and the second driving electrical assembly of the driving lifting mechanism do not work; in S1, when the port crane is in the control-on stage, the first driving electrical assembly of the driving transfer mechanism and the second driving electrical assembly of the driving lifting mechanism do not work; in S1, when the port crane is in the action stage before reaching the working position, the second driving electrical assembly of the driving lifting mechanism does not work.

8. A whole process energy consumption analysis system for port cranes, characterized in that: The energy consumption analysis system includes a port crane and a software control system; the port crane includes a crane standby electrical assembly, a crane action auxiliary electrical assembly, a transfer mechanism, a lifting mechanism, a first driving electrical assembly for driving the transfer mechanism, and a second driving electrical assembly for driving the lifting mechanism; the crane standby electrical assembly includes communication electrical appliances, status display electrical appliances, lighting electrical appliances, and detection electrical appliances of the port crane; the first driving electrical assembly for driving the transfer mechanism includes a motor for driving the transfer mechanism to move; the second driving electrical assembly for driving the lifting mechanism includes a motor for driving the lifting mechanism to move; the crane action auxiliary electrical assembly includes a plurality of fans, a plurality of rectifiers, a plurality of frequency converters, and a plurality of brakes for cooling each motor; the lifting mechanism is used to lift cargo; the transfer mechanism is used to enable the port crane and the crane operating components to reach the operating position; and the brake is used to brake the corresponding lifting mechanism / transfer mechanism before moving; The software control system includes a machine static energy consumption detection module, a machine standby energy consumption detection module, a machine scheduling energy consumption detection module, a machine operation energy consumption detection module, a port crane actual energy consumption acquisition module, a port crane operation unit consumption acquisition module and an energy consumption stage time ratio adjustment module; The machine static energy consumption detection module is used to detect the machine static energy consumption of the crane standby electrical appliance combination of the port crane in the control off stage, so as to obtain the total static energy consumption of the machine; The machine standby energy consumption detection module is used to detect the machine standby energy consumption of the crane action auxiliary electrical appliance combination of the port crane in the control closing stage, so as to obtain the total machine standby energy consumption; The machine dispatching energy consumption detection module is used to detect the machine dispatching energy consumption of the first driving electrical appliance combination of the driving transfer mechanism of the port crane in the action stage before reaching the working position, so as to obtain the total machine dispatching energy consumption; The machine operation energy consumption detection module is used to detect the machine operation energy consumption of the second driving electrical appliance combination of the driving hoisting mechanism of the port crane in the cargo lifting operation stage, so as to obtain the total machine operation energy consumption; The calculation formula of the actual energy consumption acquisition module of the port crane to obtain the actual energy consumption of the port crane during the working time of the port crane is: Q=Q 作业 xP xt 作业 + ∑Q i t i Formula(1) In formula (1), Q is the actual energy consumption of the port crane during the working hours of the port crane, Q 作业 is the total energy consumption of machine operation, P is the operating efficiency of port cranes, t 作业 is the operating time of the port crane in the cargo lifting operation phase, Q i It is one of the sum of the static energy consumption of the machine, the sum of the waiting energy consumption of the machine and the sum of the scheduling energy consumption of the machine; t i It is one of the time spent by the port crane in the control disconnection stage, the time spent by the port crane in the control closing stage and the time spent by the port crane in the action stage before reaching the operating position; Q i With t i correspond to each other; The calculation formula of the port crane operation unit consumption acquisition module to obtain the port crane operation unit consumption during the port crane working time is: In formula (2), E is the unit consumption of the port crane operation during the working time of the port crane, Q is the actual energy consumption of the port crane during the working time of the port crane, U is the workload of the port crane during the working time of the port crane, and Q 作业 is the total energy consumption of the machine operation, Q 静态 is the total static energy consumption of the machine, t 静态 is the time spent by the port crane in the control break stage, Q 控制合 is the total energy consumption of the machine waiting for action, t 控制合 Q is the time spent by the port crane in the control phase, 调度 is the total energy consumption of machine scheduling, t 调度 It is the time spent by the port crane in the action phase before reaching the operating position; The energy consumption stage time proportion adjustment module is used to control the time proportion of the port crane's control disconnection stage, control closing stage, action stage before reaching the operating position, and cargo lifting operation stage, thereby reducing the time proportion of the operation stage with higher energy consumption.

9. The whole process energy consumption analysis system of the port crane according to claim 8 is characterized in that: The port crane working time t corresponds to the port crane workload U within the port crane working time = t 静态 +t 控制合 +t 调度 +t 作业 ;t 作业 is the operation time of the port crane in the cargo lifting operation phase, t 静态 is the time spent by the port crane in the control break stage, t 控制合 is the time spent by the port crane in the control phase, t 调度 It is the time spent by the port crane in the action phase before reaching the operating position; t 静态 The control time is recorded by the control button; 控制合 Control time recording by controlling the button; 调度 By recording the release time of the brake used to limit the movement of the transfer mechanism; t 作业 Used to restrict port crane status and position.

10. A computer-readable medium, characterized in that A program is provided, which executes the whole-process energy consumption analysis method of a port crane as described in any one of claims 1 to 7.