A method, device, system and storage medium for estimating transmission and distribution coordination state

By dividing the distribution network historical status data into operating status categories and generating equivalent load pseudo-measurements, collaborative status estimation of the transmission network and distribution network is achieved, which solves the data barriers and calculation accuracy problems in traditional methods, and improves calculation efficiency and timeliness. sex.

CN118381024BActive Publication Date: 2024-10-22STATE GRID JIANGSU ELECTRIC POWER CO LTD RESEARCH INSTITUTE +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410825186.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-25
Publication Date
2024-10-22
Estimated Expiration
2044-06-25

AI Technical Summary

Technical Problem

The traditional transmission and distribution network status calculation method is fragmented, resulting in data barriers and high maintenance costs, and it is impossible to achieve unified scheduling and management. Especially after large-scale renewable energy is connected, traditional assumptions are no longer applicable, causing calculation accuracy and synchronization to be affected. .

Method used

By dividing the distribution network historical status data into operating status categories, identifying equivalent load models, generating equivalent load pseudo-measurements of boundary nodes for transmission network status estimation, and using the transmission network operating status as voltage pseudo-measurements, The distribution network performs state estimation to realize transmission and distribution coordinated state calculation.

Benefits of technology

It improves calculation efficiency, reduces the number of interactive iterations between transmission and distribution networks, meets timeliness requirements, has the same error level as the alternating iteration method, and reduces system construction and maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118381024B_ABST
    Figure CN118381024B_ABST
Patent Text Reader

Abstract

The present invention discloses a transmission and distribution coordinated state estimation method, device, system and storage medium, belonging to the technical field of power system state estimation, the method includes: dividing the distribution network historical state data into several operating state categories, each operating state category corresponds to an equivalent load model; identifying the values ​​of the parameters of the equivalent load model corresponding to each operating state category; using the equivalent load model corresponding to the operating state category to which the current state data of the distribution network belongs to generate the equivalent load pseudo-measurement of the boundary node; based on the equivalent load pseudo-measurement of the boundary node, the state of the transmission network is estimated to obtain the transmission network operating state; using the transmission network operating state as the voltage pseudo-measurement of the boundary node, the state of the distribution network is estimated to obtain the distribution network operating state. This method can improve the computational efficiency of the existing transmission and distribution coordinated state estimation method based on the alternating iteration method, reduce the number of interactive iterations between the transmission and distribution networks, and the error order of magnitude is the same as that of the alternating iteration method.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a transmission and distribution coordination state estimation method, device, system and storage medium, belonging to the technical field of power system state estimation. Background Art

[0002] The power grid management system has always adopted a hierarchical and zoning system, with dispatching agencies at different levels governing power grids of different voltage levels. This management method creates data barriers between dispatching systems at all levels, resulting in high system construction and maintenance costs, and the entire power grid cannot be uniformly dispatched, managed, and monitored. Dispatching centers at all levels independently model and perform power system analysis and calculations, which will lead to synchronization and coordination problems in traditional advanced application algorithms, and have a certain impact on convergence and calculation accuracy.

[0003] The traditional transmission and distribution network state is calculated separately, that is, when calculating the transmission network, the distribution network is equivalent to a constant power load, and when calculating the distribution network, the transmission network is equivalent to a constant voltage source. Under the new situation, this state calculation method is obviously no longer applicable. The premise of the traditional method of using independent models to calculate the transmission network and the distribution network separately is that the transmission network is stable enough and the fluctuation of the distribution network will not affect the transmission network. However, in recent years, with the large-scale access of renewable energy to the distribution network, the proportion of distributed power sources in the distribution network has increased. While providing active power, reactive power may be provided, which may generate a two-way power flow between the transmission and distribution networks. The distribution network can also send power back to the transmission network, and the coupling relationship between the transmission and distribution networks is getting stronger and stronger. At this time, the assumptions in the traditional analysis and calculation that the fluctuation of the distribution network does not affect the transmission network may not be true, and the distribution network may have an impact on the node voltage of the transmission network. Therefore, it is inevitable to conduct an integrated analysis based on the comprehensive transmission and distribution network model.

[0004] In engineering practice, state estimation is a basic tool for energy management systems and distribution management systems. The basic idea is to collect the operating status of the system through measuring devices, obtain a set of measurement values, eliminate bad data through mathematical algorithms, and filter out errors in the measurement set, so as to estimate the operating status of the power system.

[0005] There are two ways to achieve transmission and distribution collaborative computing. One is to splice the transmission and distribution network models together and then perform unified calculations. However, since the transmission and distribution networks often belong to different management centers and the characteristics of the power grids are completely different, there will be various problems in performing state calculations after splicing the transmission and distribution networks. Therefore, the second idea is to first calculate the power flow independently of the transmission and distribution networks, and then achieve coordinated calculations through an interactive mechanism, that is, transmission and distribution collaborative distributed state calculations. Distributed state calculations can effectively overcome the defects of unified calculations and are an important research direction for transmission and distribution collaborative power flow calculations. Summary of the invention

[0006] The object of the present invention is to provide a transmission and distribution coordinated state estimation method, device, system and storage medium, which can improve computing efficiency and reduce the number of interaction iterations between transmission and distribution networks.

[0007] In order to achieve the above object, the present invention provides the following technical solutions:

[0008] In a first aspect, the present invention provides a method for estimating a transmission and distribution coordination state, comprising:

[0009] The historical state data of the distribution network is divided into several operating state categories, each of which corresponds to an equivalent load model;

[0010] Identify the values ​​of the parameters of the equivalent load model corresponding to each operating state category;

[0011] Generate pseudo-measurement of equivalent load of boundary nodes by using equivalent load model corresponding to the operation status category to which the current status data of the distribution network belongs;

[0012] Based on the pseudo-measurement of equivalent loads at the boundary nodes, the state of the transmission network is estimated to obtain the operation status of the transmission network;

[0013] The transmission network operation status is used as the voltage pseudo-measurement of the boundary node to estimate the state of the distribution network and obtain the distribution network operation status.

[0014] In combination with the first aspect, further, the distribution network historical status data is divided into several operating status categories including:

[0015] Based on the number of preset operating status categories , select from the distribution network historical status data data points as the initial centroid;

[0016] Based on the distance between the distribution network historical status data and each initial centroid, the distribution network historical status data is assigned to the cluster represented by the nearest initial centroid;

[0017] The mean of all data points in each cluster is taken as the new centroid. Based on the distance between the distribution network historical status data and each new centroid, the distribution network historical status data is assigned to the cluster represented by the nearest new centroid, and the iteration is repeated until the preset iteration termination condition is reached. The cluster represented by each centroid is taken as the operating status category divided by the distribution network historical status data.

[0018] Combined with the first aspect, further, the historical status data of the distribution network With Centroid Distance The calculation formula is:

[0019] ;

[0020] in, Indicates the historical status data of the distribution network Middle The injected power state of each boundary node is Indicates Centroid No. attribute values, and Correspondingly, Indicates the historical status data of the distribution network Dimension.

[0021] In combination with the first aspect, further, the preset iteration termination condition is: the centroid of this iteration changes compared with the centroid of the previous iteration by less than a preset threshold or reaches a preset maximum number of iterations.

[0022] In combination with the first aspect, further, The equivalent load model corresponding to the operating status category is:

[0023] ;

[0024] in, , Indicates the active power and reactive power transmitted from the transmission network to the distribution network. represents the voltage at the boundary node, , , , , , Indicates Parameters to be identified of the equivalent load model corresponding to the operating status category;

[0025] Identification , , , , , The values ​​are:

[0026] From Select the one with the smallest distance to the centroid from the running status categories Distribution network historical status data;

[0027] Calculate the acquisition The historical status data of the distribution network satisfies the identification formula , , , , , The value of

[0028] Wherein, the identification formula is:

[0029] ;

[0030] in, , , Indicates that from Select the smallest distance from the centroid among the running status categories. The boundary node voltage, active power and reactive power in the historical status data of the distribution network.

[0031] In combination with the first aspect, further, based on the pseudo-measurement of equivalent loads of the boundary nodes, the state of the transmission network is estimated, and the operation state of the transmission network is obtained, including:

[0032] Based on the pseudo-measurement of equivalent loads of boundary nodes, a first objective function is constructed;

[0033] Iteratively solving the first objective function to obtain the transmission network operation status;

[0034] Wherein, the first objective function is:

[0035] ;

[0036] in, Represents the equivalent load pseudo-measurement of the boundary node, including the active power transmitted from the transmission network to the distribution network , reactive power , Indicates the operation status of the transmission network to be solved, including the voltage amplitude and voltage phase angle of the boundary nodes. express The corresponding measured calculated value is, Indicates The square of the standard deviation of is the measurement error variance matrix with diagonal elements;

[0037] Iteratively solving the first objective function to obtain the grid operation status includes:

[0038] right Make a linear assumption, assuming for An approximate value of exist The Taylor expansion nearby is:

[0039] ;

[0040] in, express The corresponding measured calculated value is, represents the first Jacobian matrix, , represents the first state error, ;

[0041] Will exist The Taylor expansion near the first objective function is combined, expanded and balanced to obtain the new first objective function:

[0042] ;

[0043] in, represents the first measurement error, , represents the first information matrix, ;

[0044] Iteratively solving the new first objective function to obtain the transmission network operation status;

[0045] Among them, the iterative equation for iteratively solving the new first objective function is:

[0046] ;

[0047] in, Indicates The first state error at iteration, Indicates The network operation status at the iteration, Indicates At iteration An approximate value of Indicates At iteration The corresponding measured calculated value, where Indicates The network operation status at the iteration, Indicates The first Jacobian matrix at iteration ;

[0048] The iterative termination condition for iteratively solving the new first objective function is:

[0049] ;

[0050] in, Indicates the first preset iteration accuracy.

[0051] In combination with the first aspect, further, the operation state of the transmission network is used as the voltage pseudo-measurement of the boundary node to estimate the state of the distribution network. Obtaining the operation state of the distribution network includes:

[0052] Based on the voltage pseudo-measurement of the boundary nodes, a second objective function is constructed;

[0053] Iteratively solving the second objective function to obtain the distribution network operation status;

[0054] Wherein, the second objective function is:

[0055] ;

[0056] in, Represents the voltage pseudo-measurement of the boundary nodes, including the voltage of the boundary nodes , Indicates the distribution network operation status to be solved, including the voltage amplitude and voltage phase angle of the boundary nodes. express The corresponding measured calculated value is, Indicates The square of the standard deviation of is the measurement error variance matrix with diagonal elements;

[0057] Iteratively solving the second objective function to obtain the distribution network operation status includes:

[0058] right Make a linear assumption, assuming for An approximate value of exist The Taylor expansion nearby is:

[0059] ;

[0060] in, express The corresponding measured calculated value is, represents the second Jacobian matrix, , represents the second state error, ;

[0061] Will exist The Taylor expansion near the second objective function is combined, expanded and balanced to obtain the new second objective function:

[0062] ;

[0063] in, represents the second measurement error, , represents the second information matrix, ;

[0064] Iteratively solve the new second objective function to obtain the distribution network operation status;

[0065] Among them, the iterative equation for iteratively solving the new second objective function is:

[0066] ;

[0067] in, Indicates The second state error at the iteration, Indicates The distribution network operation status at the iteration, Indicates At iteration An approximate value of Indicates At iteration The corresponding measured calculated value, where Indicates The distribution network operation status at the iteration, Indicates The second Jacobian matrix at iteration ;

[0068] The iterative termination condition for iteratively solving the new second objective function is:

[0069] ;

[0070] in, Indicates the second preset iteration precision.

[0071] In a second aspect, the present invention provides a transmission and distribution coordination state estimation device, comprising:

[0072] Classification module: used to divide the distribution network historical status data into several operating status categories, each operating status category corresponds to an equivalent load model;

[0073] Parameter identification module: used to identify the values ​​of parameters of the equivalent load model corresponding to each operating state category;

[0074] Pseudo-measurement generation module: used to generate equivalent load pseudo-measurement of boundary nodes by using the equivalent load model corresponding to the operating state category to which the current state data of the distribution network belongs;

[0075] Transmission network state estimation module: used to estimate the state of the transmission network based on pseudo-measurement of equivalent loads at boundary nodes and obtain the operation status of the transmission network;

[0076] Distribution network state estimation module: It is used to use the transmission network operation state as the voltage pseudo-measurement of the boundary node, estimate the state of the distribution network, and obtain the distribution network operation state.

[0077] In a third aspect, the present invention provides a computer system, comprising:

[0078] Storage medium: used to store computer programs;

[0079] Processor: used to execute the computer program to implement the steps of the transmission and distribution coordination state estimation method described in any one of the first aspects.

[0080] In a fourth aspect, the present invention provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the method for estimating the transmission and distribution coordinated state as described in any one of the first aspects.

[0081] Fifthly, the present invention provides a computer program product, comprising a computer program, which, when executed by a processor, implements the steps of the method for estimating the transmission and distribution coordinated state as described in any one of the first aspects.

[0082] Compared with the prior art, the present invention has the following beneficial effects:

[0083] The transmission and distribution coordinated state estimation method provided by the present invention generates an equivalent load pseudo-measurement of a boundary node by utilizing an equivalent load model corresponding to the operating state category to which the current state data of the distribution network belongs, estimates the state of the transmission network, obtains the transmission network operating state as the voltage pseudo-measurement of the boundary node, estimates the state of the distribution network, and obtains the distribution network operating state. It can cope with the scenario where the operating state changes due to frequent fluctuations in the distribution network load, and meets the timeliness of the coordinated calculation of the transmission and distribution network. Compared with the existing transmission and distribution coordinated state estimation method based on the alternating iteration method, it can improve the calculation efficiency and reduce the number of interactive iterations between the transmission and distribution networks, and the error order of magnitude is the same as that of the alternating iteration method. BRIEF DESCRIPTION OF THE DRAWINGS

[0084] Figure 1 is a flow chart of a method for estimating a transmission and distribution coordination state provided by an embodiment of the present invention;

[0085] Figure 2 is a flow chart of transmission and distribution coordination state estimation solution provided by an embodiment of the present invention;

[0086] Figure 3 It is a schematic diagram of classification results of active power measurement of the first branch of the distribution network connected to the 23 boundary nodes provided in an embodiment of the present invention;

[0087] Figure 4 It is a schematic diagram of classification results of reactive power measurement of the first branch of the distribution network connected to the 23 boundary nodes provided in an embodiment of the present invention;

[0088] Figure 5 It is an enlarged schematic diagram of active power curves of five types of equivalent load models of the distribution network connected to 23 boundary nodes provided in an embodiment of the present invention;

[0089] Figure 6It is an enlarged schematic diagram of reactive power curves of five types of equivalent load models of the distribution network connected to 23 boundary nodes provided in an embodiment of the present invention;

[0090] Figure 7 It is a schematic diagram of voltage amplitude results and errors obtained by using the transmission and distribution coordination state estimation method provided by an embodiment of the present invention;

[0091] Figure 8 It is a schematic diagram of voltage amplitude results and errors obtained by using an alternating iteration method provided by an embodiment of the present invention;

[0092] Fig. 9 It is a schematic diagram for comparing voltage amplitude results of boundary nodes under the same measurement data provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0093] The technical solution of the present application is further described in detail below in conjunction with specific implementation methods.

[0094] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements with the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and should not be construed as limitations on the present application. In the absence of conflict, the embodiments of the present application and the technical features in the embodiments may be combined with each other.

[0095] Embodiment 1:

[0096] Figure 1 is a flow chart of a transmission and distribution coordination state estimation method provided in this embodiment. This flow chart only shows the logical sequence of the method in this embodiment. Different methods can be used without conflict. Figure 1 The steps shown or described are accomplished in the order shown.

[0097] The transmission and distribution coordination state estimation method provided in this embodiment can be applied to a terminal, and can be executed by a transmission and distribution coordination state estimation device, which can be implemented by software and / or hardware, and can be integrated in a terminal, for example: any tablet computer or computer device with communication function.

[0098] See also Figure 1 The transmission and distribution coordination state estimation method of this embodiment specifically includes the following steps:

[0099] Step 1: Divide the distribution network historical status data into several operating status categories, each operating status category corresponds to an equivalent load model;

[0100] In this embodiment, dividing the distribution network historical status data into several operating status categories specifically includes the following steps:

[0101] Step 1: Based on the number of preset operating status categories , select from the distribution network historical status data data points as the initial centroid;

[0102] Step 2: Based on the distance between the distribution network historical status data and each initial centroid, the distribution network historical status data is assigned to the cluster represented by the nearest initial centroid;

[0103] Step 3: Take the mean of all data points in each cluster as the new centroid. Based on the distance between the distribution network historical status data and each new centroid, assign the distribution network historical status data to the cluster represented by the closest new centroid, and repeat the iteration until the preset iteration termination condition is reached. The cluster represented by each centroid is used as the operating status category divided by the distribution network historical status data.

[0104] In this embodiment, the distribution network historical status data With Centroid Distance The calculation formula is:

[0105] ;

[0106] in, Indicates the historical status data of the distribution network Middle The injected power state of each boundary node is Indicates Centroid No. attribute values, and Correspondingly, Indicates the historical status data of the distribution network Dimension.

[0107] The preset iteration termination condition is: the centroid of this iteration changes from the centroid of the previous iteration by less than a preset threshold or reaches a preset maximum number of iterations.

[0108] This embodiment divides 100 distribution network historical status data into 20 operating status categories.

[0109] No. The equivalent load model corresponding to the operating status category is:

[0110] ;

[0111] in, , Indicates the active power and reactive power transmitted from the transmission network to the distribution network. represents the voltage at the boundary node, , , , , , Indicates The parameters to be identified of the equivalent load model corresponding to the operating status category.

[0112] Step 2: Identify the values ​​of the parameters of the equivalent load model corresponding to each operating state category;

[0113] In this embodiment, identification , , , , , The specific steps include:

[0114] Step 1: From Select the one with the smallest distance to the centroid from the running status categories Distribution network historical status data;

[0115] Step 2: Calculate and obtain The historical status data of the distribution network satisfies the identification formula , , , , , The value of .

[0116] In this embodiment, the identification formula is:

[0117] ;

[0118] in, , , Indicates that from Select the smallest distance from the centroid among the running status categories. The boundary node voltage, active power and reactive power in the historical status data of the distribution network.

[0119] In this embodiment, 20 distribution network historical status data with the smallest distance to the centroid are selected from each operating status category for identification, that is, .

[0120] Step 3: Generate an equivalent load pseudo-measurement of the boundary node using the equivalent load model corresponding to the operating state category to which the current state data of the distribution network belongs;

[0121] In this embodiment, after the distribution network collects the current state data, it first determines the operating state category to which the current state data belongs, and uses the equivalent load model corresponding to the operating state category to which the current state data belongs to generate the equivalent load pseudo-measurement of the boundary node.

[0122] The current state data collected by the distribution network is the voltage of the boundary node The equivalent load pseudo-measurement of the boundary node generated by the equivalent load model corresponding to the operating state category to which the current state data belongs is the active power transmitted from the transmission network to the distribution network. , reactive power .

[0123] In this embodiment, a main distribution integrated power grid includes a transmission network and a distribution network. There is a data barrier between the transmission network and the distribution network, and the models are not shared. In both the transmission network and the distribution network, the voltage amplitude and voltage phase angle of the boundary nodes are used as state variables. The optimization problem of the transmission and distribution integrated power grid can be decoupled as follows:

[0124] ;

[0125] Step 4: Based on the pseudo-measurement of equivalent loads at the boundary nodes, the state of the transmission network is estimated to obtain the operation state of the transmission network;

[0126] In this embodiment, based on the pseudo-measurement of equivalent loads of boundary nodes, the state of the transmission network is estimated, and the operation state of the transmission network is obtained, which specifically includes the following steps:

[0127] Step 1: Construct the first objective function based on the pseudo measurement of equivalent loads at the boundary nodes;

[0128] In this embodiment, the first objective function is:

[0129] ;

[0130] in, Represents the equivalent load pseudo-measurement of the boundary node, including the active power transmitted from the transmission network to the distribution network , reactive power , Indicates the operation status of the transmission network to be solved, including the voltage amplitude and voltage phase angle of the boundary nodes. express The corresponding measured calculated value is, Indicates The square of the standard deviation of is the measurement error variance matrix with diagonal elements, which plays the role of weight.

[0131] Step 2: Iteratively solve the first objective function to obtain the transmission network operation status.

[0132] In this embodiment, yes The nonlinear vector function cannot be solved directly , iteratively solving the first objective function to obtain the transmission network operation status specifically includes the following steps:

[0133] Step 1: Make a linear assumption, assuming for An approximation of , ignoring the quadratic and higher-order terms, is obtained exist The Taylor expansion nearby is:

[0134] ;

[0135] in, express The corresponding measured calculated value is, represents the first Jacobian matrix, , represents the first state error, ;

[0136] Step 2: exist The Taylor expansion near the first objective function is combined, expanded and balanced to obtain the new first objective function:

[0137] ;

[0138] in, represents the first measurement error, , when they are independent and conform to a Gaussian distribution with a mean of 0, the maximum likelihood estimation is used to solve the state quantity. represents the first information matrix, ;

[0139] Step ③: Iteratively solve the new first objective function to obtain the transmission network operation status.

[0140] In this embodiment, if the first objective function is to be satisfied, the second term of the first objective function should be 0, then:

[0141] ;

[0142] Then the iterative equation for iteratively solving the new first objective function is:

[0143] ;

[0144] in, Indicates The first state error at iteration, Indicates The network operation status at the iteration, Indicates At iteration An approximate value of Indicates At iteration The corresponding measured calculated value, where Indicates The network operation status at the iteration, Indicates The first Jacobian matrix at iteration .

[0145] The iterative termination condition for iteratively solving the new first objective function is:

[0146] ;

[0147] in, Indicates the first preset iteration accuracy.

[0148] like Figure 2 As shown, iteratively solving the new first objective function to obtain the transmission network operation status specifically includes the following steps:

[0149] Step a: Program initialization: Form the boundary node admittance matrix, read in the measurement data, and set the initial value of the state quantity ;

[0150] Step b: The state quantity of this iteration calculate Corresponding measured calculated value and the first Jacobian matrix ;

[0151] Step c: Calculate pseudo-measurements and Corresponding measured calculated value The difference between Calculate the first information matrix and the first free vector ;

[0152] Step d: Solve the linear equations: Solve the first state error of this iteration ;

[0153] Step e: Convergence judgment: Select The one with the largest absolute value As a convergence criterion, the first preset iteration accuracy Set to ,when When , it means that the convergence condition is met and the calculation ends. Otherwise, the state quantity is corrected: , return to step b.

[0154] To avoid infinite loops, set a maximum number of iterations.

[0155] Step 5: Use the transmission network operation status as the voltage pseudo-measurement of the boundary node to estimate the state of the distribution network and obtain the distribution network operation status.

[0156] In this embodiment, the operation state of the transmission network is used as the voltage pseudo-measurement of the boundary node to estimate the state of the distribution network. The specific steps of obtaining the operation state of the distribution network include:

[0157] Step 1: construct the second objective function based on the voltage pseudo-measurement of the boundary nodes;

[0158] In this embodiment, the second objective function is:

[0159] ;

[0160] in, Represents the voltage pseudo-measurement of the boundary nodes, including the voltage of the boundary nodes , Indicates the distribution network operation status to be solved, including the voltage amplitude and voltage phase angle of the boundary nodes. express The corresponding measured calculated value is, Indicates The square of the standard deviation of is the measurement error variance matrix with diagonal elements, which plays the role of weight.

[0161] Step 2: Iterate and solve the second objective function to obtain the distribution network operation status.

[0162] In this embodiment, yes The nonlinear vector function cannot be solved directly , iteratively solving the second objective function to obtain the distribution network operation status specifically includes the following steps:

[0163] Step 1: Make a linear assumption, assuming for An approximation of , ignoring the quadratic and higher-order terms, is obtained exist The Taylor expansion nearby is:

[0164] ;

[0165] in, express The corresponding measured calculated value is, represents the second Jacobian matrix, , represents the second state error, ;

[0166] Step 2: exist The Taylor expansion near the second objective function is combined, expanded and balanced to obtain the new second objective function:

[0167] ;

[0168] in, represents the second measurement error, ,when When they are independent of each other and conform to a Gaussian distribution with a mean of 0, the maximum likelihood estimation is used to solve the state quantity. represents the second information matrix, ;

[0169] Step ③: Iteratively solve the new second objective function to obtain the distribution network operation status.

[0170] In this embodiment, if the second objective function is to be satisfied, the second term of the second objective function should be 0, then:

[0171] ;

[0172] Then the iterative equation for iteratively solving the new second objective function is:

[0173] ;

[0174] in, Indicates The second state error at the iteration, Indicates The distribution network operation status at the iteration, Indicates At iteration An approximate value of Indicates At iteration The corresponding measured calculated value, where Indicates The distribution network operation status at the iteration, Indicates The second Jacobian matrix at iteration .

[0175] The iterative termination condition for iteratively solving the new second objective function is:

[0176] ;

[0177] in, Indicates the second preset iteration precision.

[0178] like Figure 2 As shown, iteratively solving the new second objective function to obtain the distribution network operation status specifically includes the following steps:

[0179] Step a: Program initialization: Form the boundary node admittance matrix, read in the measurement data, and set the initial value of the state quantity ;

[0180] Step b: The state quantity of this iteration calculate Corresponding measured calculated value and the second Jacobian matrix ;

[0181] Step c: Calculate pseudo-measurements and Corresponding measured calculated value The difference is given by the second Jacobian matrix Calculate the second information matrix and the second free vector ;

[0182] Step d: Solve the linear equations: Solve the second state error of this iteration ;

[0183] Step e: Convergence judgment: Select The one with the largest absolute value As a convergence criterion, the second preset iteration accuracy Set to ,when When , it means that the convergence condition is met and the calculation ends. Otherwise, the state quantity is corrected: , return to step b.

[0184] To avoid infinite loops, set a maximum number of iterations.

[0185] In this embodiment, when calculating Corresponding measured calculated value or calculate Corresponding measured calculated value , it is calculated according to the measurement equation. The measurement equation includes:

[0186] (1) Boundary node voltage amplitude measurement equation:

[0187] ;

[0188] in, Represents a boundary node The complex voltage, Represents a boundary node The voltage amplitude, Represents a boundary node The voltage phase angle.

[0189] (2) Boundary node injection power measurement equation:

[0190] ;

[0191] in, Represents a boundary node The complex current, , Represents a boundary node The injected active power and injected reactive power, Represents a boundary node The complex voltage, Represents a boundary node The voltage amplitude, Indicates the corresponding boundary node in the boundary node admittance matrix With boundary nodes The elements between ,in, , Represents a boundary node With boundary nodes The conductance and susceptance between Represents a boundary node With boundary nodes The voltage phase angle difference between ,in, Represents a boundary node The voltage phase angle.

[0192] (3) Branch power measurement equation:

[0193] ;

[0194] in, , Represents a boundary node With boundary nodes The branch active power and branch reactive power between Represents a boundary node With boundary nodes The branch conductance between Represents a boundary node With boundary nodes The branch susceptance between Represents a boundary node With boundary nodes The capacitance between the branches to ground.

[0195] In order to verify the effectiveness of the transmission and distribution coordinated state estimation method provided in this embodiment, the transmission and distribution coordinated state estimation method provided in this embodiment is verified. The development environment of the example test integration of this embodiment is MATLAB, and the computer operating hardware condition is CPUi7-8550U (1.8GHz).

[0196] Firstly, an integrated transmission and distribution system is constructed, with the IEEE30-node system as the transmission network system. The 23rd, 24th, 26th, 29th, and 30th nodes of the transmission network are selected as nodes connected to the distribution network, and are connected to the IEEE33-node distribution network respectively. The loads of the connected nodes are removed, and the root node of the distribution network coincides with the load node of the transmission network. In order not to change the original power flow of the transmission network as much as possible, the power transmitted to the distribution network needs to be close to the original load of the transmission network. Therefore, the overall load of the distribution network needs to be multiplied by a multiple k.

[0197] Selection of k value: The load power at the transmission grid connection point is defined as S d =P d +jQ d ; The root node generator power in the IEEE 33-node distribution network power flow result is defined as S G =P G +jQ G At this time, the active power and reactive power are defined by a multiple k respectively. p and k q , k p =P d / P G , k q =Q d / Q G ; Considering the matching of active power, k=0.7k p +0.3k q .

[0198] In this system, all loads of each distribution network are multiplied by 0.8, 0.9, 1.0, 1.1, and 1.2 respectively to simulate five types of operating states of the distribution network. The measured data is generated by adding noise on the basis of the power flow in each state. The power standard deviation is 0.01, and the voltage standard deviation is 0.005. 200 historical state data are generated for each state, for a total of 1000 historical state data.

[0199] Firstly, the node injection power measurement data of 1000 sections of the distribution network are classified, and the distribution network status is divided into five categories. For each category, the 20 historical status data closest to the centroid are selected from the historical status data.

[0200] Secondly, the power of the branch connecting the distribution network to the transmission network is regarded as the equivalent load model of the transmission network related to the boundary node voltage. The parameters of the equivalent load model are fitted in 20 historical state data using the weighted least squares method. The classification results of active power and the equivalent load model curve are shown in Figure 3 , Figure 5 As shown in the figure, the classification results of reactive power and the equivalent load model curve are as follows Figure 4 , Figure 6 shown.

[0201] Then, the current status data of the distribution network only needs to pass the equivalent model parameters to the transmission network according to the category to which it belongs, and the transmission network can obtain the equivalent load.

[0202] Finally, after all connected distribution networks have been equalized, the state estimation calculation of the transmission network is performed to obtain the state of the boundary node. The distribution network then performs state estimation based on the state quantity of the boundary point to obtain the state of the integrated transmission and distribution system. The voltage amplitude of the integrated transmission and distribution system is as follows: Figure 7 As shown; in contrast, the voltage amplitude using the alternating iteration method is as follows Figure 8 The two methods were run on two historical state data for comparison, and the time taken by the two methods is shown in Table 1. Under the same measurement data, the voltage amplitude results of the boundary nodes obtained by the two methods are compared. Fig. 9 shown.

[0203] Table 1 Running time results of this embodiment and the alternating iteration method

[0204]

[0205] From Table 1 and Figure 7 , Figure 8 , Fig. 9 It can be seen that the voltage amplitude errors calculated by this embodiment and the alternating iteration method are in the same order of magnitude, but the calculation time is greatly reduced, which verifies the superiority of this embodiment in calculation efficiency compared with the alternating iteration method.

[0206] Embodiment 2:

[0207] This embodiment provides a transmission and distribution coordination state estimation device, including:

[0208] Classification module: used to divide the distribution network historical status data into several operating status categories, each operating status category corresponds to an equivalent load model;

[0209] Parameter identification module: used to identify the values ​​of parameters of the equivalent load model corresponding to each operating state category;

[0210] Pseudo-measurement generation module: used to generate equivalent load pseudo-measurement of boundary nodes by using the equivalent load model corresponding to the operating state category to which the current state data of the distribution network belongs;

[0211] Transmission network state estimation module: used to estimate the state of the transmission network based on pseudo-measurement of equivalent loads at boundary nodes and obtain the operation status of the transmission network;

[0212] Distribution network state estimation module: It is used to use the transmission network operation state as the voltage pseudo-measurement of the boundary node, estimate the state of the distribution network, and obtain the distribution network operation state.

[0213] The transmission and distribution coordination state estimation device provided in the embodiment of the present application can execute the transmission and distribution coordination state estimation method provided in Example 1 of the present application, and has the corresponding functional modules and beneficial effects of the execution method.

[0214] Embodiment 3:

[0215] This embodiment provides a computer system, including:

[0216] Storage medium: used to store computer programs;

[0217] Processor: used to execute computer programs to implement the steps of the transmission and distribution coordination state estimation method in Example 1.

[0218] Embodiment 4:

[0219] This embodiment provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the steps of the transmission and distribution coordination state estimation method in Embodiment 1 are implemented.

[0220] Embodiment 5:

[0221] This embodiment provides a computer program product, including a computer program, which, when executed by a processor, implements the steps of the transmission and distribution coordination state estimation method in Embodiment 1.

[0222] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.

[0223] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0224] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0225] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0226] The above are only preferred implementations of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.

Claims

1. A method for estimating transmission and distribution coordination state, characterized in that: include: The historical state data of the distribution network is divided into several operating state categories, each of which corresponds to an equivalent load model; Identify the values ​​of the parameters of the equivalent load model corresponding to each operating state category; Generate pseudo-measurement of equivalent load of boundary nodes by using equivalent load model corresponding to the operation status category to which the current status data of the distribution network belongs; Based on the pseudo-measurement of equivalent loads at the boundary nodes, the state of the transmission network is estimated to obtain the operation status of the transmission network; The transmission network operation status is used as the voltage pseudo-measurement of the boundary node to estimate the state of the distribution network and obtain the distribution network operation status; No. The equivalent load model corresponding to the operating status category is: ; in, , Indicates the active power and reactive power transmitted from the transmission network to the distribution network. represents the voltage at the boundary node, , , , , , Indicates Parameters to be identified of the equivalent load model corresponding to the operating status category; Identification , , , , , The values ​​are: From Select the one with the smallest distance to the centroid from the running status categories Distribution network historical status data; Calculate the acquisition The historical status data of the distribution network satisfies the identification formula , , , , , The value of Wherein, the identification formula is: ; in, , , Indicates that from Select the smallest distance from the centroid among the running status categories. The boundary node voltage, active power and reactive power in the historical status data of the distribution network; Based on the pseudo-measurement of equivalent loads at the boundary nodes, the state of the transmission network is estimated and the operation state of the transmission network is obtained, including: Based on the pseudo-measurement of equivalent loads of boundary nodes, a first objective function is constructed; Iteratively solving the first objective function to obtain the transmission network operation status; Wherein, the first objective function is: ; in, Represents the equivalent load pseudo-measurement of the boundary node, including the active power transmitted from the transmission network to the distribution network , reactive power , Indicates the operation status of the transmission network to be solved, including the voltage amplitude and voltage phase angle of the boundary nodes. express The corresponding measured calculated value is, Indicates The square of the standard deviation of is the measurement error variance matrix with diagonal elements; Iteratively solving the first objective function to obtain the grid operation status includes: right Make a linear assumption and assume for An approximate value of exist The Taylor expansion nearby is: ; in, express The corresponding measured calculated value is, represents the first Jacobian matrix, , represents the first state error, ; Will exist The Taylor expansion near the first objective function is combined, expanded and balanced to obtain the new first objective function: ; in, represents the first measurement error, , represents the first information matrix, ; Iteratively solving the new first objective function to obtain the transmission network operation status; Among them, the iterative equation for iteratively solving the new first objective function is: ; in, Indicates The first state error at iteration, Indicates The network operation status at the iteration, Indicates At iteration An approximate value of Indicates At iteration The corresponding measured calculated value, where Indicates The network operation status at the iteration, Indicates The first Jacobian matrix at iteration ; The iterative termination condition for iteratively solving the new first objective function is: ; in, Indicates the first preset iteration accuracy; The transmission network operation status is used as the voltage pseudo-measurement of the boundary node to estimate the state of the distribution network. The distribution network operation status is obtained including: Based on the voltage pseudo-measurement of the boundary nodes, a second objective function is constructed; Iteratively solving the second objective function to obtain the distribution network operation status; Wherein, the second objective function is: ; in, Represents the voltage pseudo-measurement of the boundary nodes, including the voltage of the boundary nodes , Indicates the distribution network operation status to be solved, including the voltage amplitude and voltage phase angle of the boundary nodes. express The corresponding measured calculated value is, Indicates The square of the standard deviation of is the measurement error variance matrix with diagonal elements; Iteratively solving the second objective function to obtain the distribution network operation status includes: right Make a linear assumption and assume for An approximate value of exist The Taylor expansion nearby is: ; in, express The corresponding measured calculated value is, represents the second Jacobian matrix, , represents the second state error, ; Will exist The Taylor expansion near the second objective function is combined, expanded and balanced to obtain the new second objective function: ; in, represents the second measurement error, , represents the second information matrix, ; Iteratively solve the new second objective function to obtain the distribution network operation status; Among them, the iterative equation for iteratively solving the new second objective function is: ; in, Indicates The second state error at the iteration, Indicates The distribution network operation status at the iteration, Indicates At iteration An approximate value of Indicates At iteration The corresponding measured calculated value, where Indicates The distribution network operation status at the iteration, Indicates The second Jacobian matrix at iteration ; The iterative termination condition for iteratively solving the new second objective function is: ; in, Indicates the second preset iteration precision.

2. The method for estimating the state of transmission and distribution coordination according to claim 1, characterized in that: The distribution network historical status data is divided into several operating status categories including: Based on the number of preset operating status categories , select from the distribution network historical status data data points as the initial centroid; Based on the distance between the distribution network historical status data and each initial centroid, the distribution network historical status data is assigned to the cluster represented by the nearest initial centroid; The mean of all data points in each cluster is taken as the new centroid. Based on the distance between the distribution network historical status data and each new centroid, the distribution network historical status data is assigned to the cluster represented by the nearest new centroid, and the iteration is repeated until the preset iteration termination condition is reached. The cluster represented by each centroid is taken as the operating status category divided by the distribution network historical status data.

3. The method for estimating the transmission and distribution coordination state according to claim 2, characterized in that: Distribution network historical status data With Centroid Distance The calculation formula is: ; in, Indicates the historical status data of the distribution network Middle The injected power state of each boundary node is Indicates Centroid No. attribute values, and Correspondingly, Indicates the historical status data of the distribution network Dimension.

4. The method for estimating the transmission and distribution coordination state according to claim 2, characterized in that: The preset iteration termination condition is: the centroid of this iteration changes from the centroid of the previous iteration by less than a preset threshold or reaches a preset maximum number of iterations.

5. A transmission and distribution coordination state estimation device, characterized in that: include: Classification module: used to divide the distribution network historical status data into several operating status categories, each operating status category corresponds to an equivalent load model; Parameter identification module: used to identify the values ​​of parameters of the equivalent load model corresponding to each operating state category; Pseudo-measurement generation module: used to generate equivalent load pseudo-measurement of boundary nodes by using the equivalent load model corresponding to the operating state category to which the current state data of the distribution network belongs; Transmission network state estimation module: used to estimate the state of the transmission network based on pseudo-measurement of equivalent loads at boundary nodes and obtain the operation status of the transmission network; Distribution network state estimation module: used to use the transmission network operation state as the voltage pseudo-measurement of the boundary node, estimate the distribution network state, and obtain the distribution network operation state; No. The equivalent load model corresponding to the operating status category is: ; in, , Indicates the active power and reactive power transmitted from the transmission network to the distribution network. represents the voltage at the boundary node, , , , , , Indicates Parameters to be identified of the equivalent load model corresponding to the operating status category; Identification , , , , , The values ​​are: From Select the one with the smallest distance to the centroid from the running status categories Distribution network historical status data; Calculate the acquisition The historical status data of the distribution network satisfies the identification formula , , , , , The value of Wherein, the identification formula is: ; in, , , Indicates that from Select the smallest distance from the centroid among the running status categories. The boundary node voltage, active power and reactive power in the historical status data of the distribution network; Based on the pseudo-measurement of equivalent loads at the boundary nodes, the state of the transmission network is estimated and the operation state of the transmission network is obtained, including: Based on the pseudo-measurement of equivalent loads of boundary nodes, a first objective function is constructed; Iteratively solving the first objective function to obtain the transmission network operation status; Wherein, the first objective function is: ; in, Represents the equivalent load pseudo-measurement of the boundary node, including the active power transmitted from the transmission network to the distribution network , reactive power , Indicates the operation status of the transmission network to be solved, including the voltage amplitude and voltage phase angle of the boundary nodes. express The corresponding measured calculated value is, Indicates The square of the standard deviation of is the measurement error variance matrix with diagonal elements; Iteratively solving the first objective function to obtain the grid operation status includes: right Make a linear assumption, assuming for An approximate value of exist The Taylor expansion nearby is: ; in, express The corresponding measured calculated value is, represents the first Jacobian matrix, , represents the first state error, ; Will exist The Taylor expansion near the first objective function is combined, expanded and balanced to obtain the new first objective function: ; in, represents the first measurement error, , represents the first information matrix, ; Iteratively solving the new first objective function to obtain the transmission network operation status; Among them, the iterative equation for iteratively solving the new first objective function is: ; in, Indicates The first state error at iteration, Indicates The network operation status at the iteration, Indicates At iteration An approximate value of Indicates At iteration The corresponding measured calculated value, where Indicates The network operation status at the iteration, Indicates The first Jacobian matrix at iteration ; The iterative termination condition for iteratively solving the new first objective function is: ; in, Indicates the first preset iteration accuracy; The transmission network operation status is used as the voltage pseudo-measurement of the boundary node to estimate the state of the distribution network. The distribution network operation status is obtained including: Based on the voltage pseudo-measurement of the boundary nodes, a second objective function is constructed; Iteratively solving the second objective function to obtain the distribution network operation status; Wherein, the second objective function is: ; in, Represents the voltage pseudo-measurement of the boundary nodes, including the voltage of the boundary nodes , Indicates the distribution network operation status to be solved, including the voltage amplitude and voltage phase angle of the boundary nodes. express The corresponding measured calculated value is, Indicates The square of the standard deviation of is the measurement error variance matrix with diagonal elements; Iteratively solving the second objective function to obtain the distribution network operation status includes: right Make a linear assumption, assuming for An approximate value of exist The Taylor expansion nearby is: ; in, express The corresponding measured calculated value is, represents the second Jacobian matrix, , represents the second state error, ; Will exist The Taylor expansion near the second objective function is combined, expanded and balanced to obtain the new second objective function: ; in, represents the second measurement error, , represents the second information matrix, ; Iteratively solve the new second objective function to obtain the distribution network operation status; Among them, the iterative equation for iteratively solving the new second objective function is: ; in, Indicates The second state error at the iteration, Indicates The distribution network operation status at the iteration, Indicates At iteration An approximate value of Indicates At iteration The corresponding measured calculated value, where Indicates The distribution network operation status at the iteration, Indicates The second Jacobian matrix at iteration ; The iterative termination condition for iteratively solving the new second objective function is: ; in, Indicates the second preset iteration precision.

6. A computer system, characterized in that: include: Storage medium: used to store computer programs; Processor: used to execute the computer program to implement the steps of the transmission and distribution coordination state estimation method described in any one of claims 1 to 4.

7. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the transmission and distribution coordination state estimation method described in any one of claims 1 to 4 are implemented.