A remote intelligent inspection system for substations

By combining equipment parameter monitoring and path optimization technology in the substation remote intelligent inspection system, the optimal inspection path is generated, which solves the problem of failing to comprehensively consider equipment characteristics and status in the existing technology, and improves the inspection effect and operation and maintenance efficiency.

CN118381194BActive Publication Date: 2024-10-29SUDIAN HUARUI TECH CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410806138.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-21
Publication Date
2024-10-29
Estimated Expiration
2044-06-21

AI Technical Summary

Technical Problem

The existing remote intelligent inspection system of substations fails to comprehensively consider regional equipment characteristics and equipment status when selecting inspection paths, resulting in unreasonable inspection paths and affecting the overall inspection effect.

Method used

Basic information is obtained through the substation information acquisition unit. The regional patrol analysis unit divides areas and marks equipment. The patrol path analysis unit simulates and generates multiple paths and optimizes them. It uses the risk prediction model to evaluate changes in equipment parameters and generates the optimal patrol path and based on obstacles. Adjust the path according to the influence of objects.

Benefits of technology

Through equipment parameter monitoring and path optimization, the optimization of the inspection path is ensured, the inspection effect is improved, and the efficiency of substation operation and maintenance and the accuracy of equipment fault handling are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118381194B_ABST
    Figure CN118381194B_ABST
Patent Text Reader

Abstract

The invention discloses a remote intelligent inspection system for a substation, comprising a substation information collection unit, a regional inspection analysis unit, a inspection path analysis unit, a path optimization analysis unit and a inspection result output unit. The invention relates to the technical field of substation inspection, and solves the technical problem that the overall inspection is affected by the lack of comprehensive analysis of regional equipment characteristics and equipment status. The invention analyzes the equipment in the substation area, monitors and analyzes according to parameter changes and equipment status of the substation equipment, and classifies the equipment as normal or abnormal according to the equipment parameters, further generates paths according to the own parameters of the abnormal equipment, and optimizes the path based on the overall path, thereby ensuring the optimization of the overall inspection path and improving the effect of the overall inspection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of substation inspection, and in particular to a remote intelligent inspection system for a substation. Background Art

[0002] Electricity plays an increasingly important role in today's society. Not only production and scientific research cannot be separated from electricity, but also the basic life of the people cannot be separated from electricity. Various substations are an important part of the power grid, which strictly requires the stable and reliable operation of power equipment.

[0003] According to Chinese patent application number CN202311658510.3, a remote intelligent patrol system is disclosed. The above patent system includes: a regional patrol host, an intelligent analysis host and different patrol devices; the regional patrol host is used to set different patrol subtasks according to different patrol devices; and obtain the data of the corresponding patrol subtasks collected by the patrol device; the intelligent analysis host is connected to the regional patrol host; the intelligent analysis host is used to store the recognition model corresponding to the patrol subtask of the patrol device; the regional patrol host is also used to use the corresponding recognition model to perform defect identification based on the data of the corresponding patrol subtask collected by the patrol device.

[0004] The above patent sets different patrol subtasks according to different patrol equipment, and then controls the patrol subtasks in different forms (start, pause, continue, terminate); during the task execution, remote inspection of the substation is completed, the equipment in the substation is accurately controlled, early warning is generated in time, faults and defects are quickly handled, the operation and maintenance efficiency of the substation is improved, and the stable operation of the substation is ensured.

[0005] However, when selecting and analyzing the paths during the inspection process, the above patent does not conduct a comprehensive analysis based on the equipment characteristics and equipment status of the comprehensive area, which will further cause unreasonable inspection paths and affect the overall inspection effect. Summary of the invention

[0006] In view of the deficiencies in the prior art, the present invention provides a remote intelligent inspection system for a substation, which solves the problem that the overall inspection is affected by the lack of comprehensive analysis of regional equipment characteristics and equipment status.

[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions: A remote intelligent inspection system for a substation, comprising:

[0008] The substation information collection unit is responsible for collecting basic information about the substation, including structural diagrams, equipment distribution diagrams, and patrol tasks, and transmits this information to the regional patrol analysis unit;

[0009] The regional patrol analysis unit divides the area according to the basic information of the substation, marks the equipment and converts it into a two-dimensional plane map, and uses historical data and patrol starting point information to calculate the selection value of each starting point, select the best patrol starting point as the standard point, and generate standard point information at the same time, and pass this information to the patrol path analysis unit;

[0010] The patrol route analysis unit obtains standard points and end points, simulates and formulates multiple patrol routes and numbers them, selects the shortest route as the pre-selected route, numbers the equipment on the pre-selected route and collects parameters, analyzes the periodic changes of parameters and displays them in the form of charts, uses the risk prediction model to evaluate the change data, and automatically outputs the equipment risk prediction, with the results divided into normal and abnormal categories;

[0011] The device corresponding to the normal prediction result is marked as a normal device. Similarly, the marked abnormal device is obtained. The normal device is not processed, and the abnormal device is screened out and analyzed separately. The starting point and end point are determined according to the degree of abnormality to generate a stage path, which is matched with the pre-selected path to generate a secondary analysis signal or a path analysis signal. For the path analysis signal, the impact of obstacles is judged. If there is an obstacle impact, it is re-analyzed, and the path is optimized based on the change value. A non-repetitive candidate path is selected, and the candidate path is integrated with the pre-selected path to generate patrol information, which is then transmitted to the patrol result output unit;

[0012] The path optimization analysis unit processes the secondary analysis signal, compares the total abnormal equipment inspection time and total consumption value of the stage path and the initial path. If the stage path is better, it is set as the standard and integrated with the pre-selected path for output. If the initial path is better and contains normal equipment inspections, the stage path is re-analyzed. If it does not contain normal equipment inspections, the initial path is used as the standard for integration and output of inspection information, and it is transmitted to the inspection result output unit at the same time.

[0013] As a further solution of the present invention: the specific method of generating standard point information by the area patrol analysis unit is:

[0014] Obtain the substation structure diagram, and divide the substation into regions to obtain regional division information. Specifically, the division can be based on the functions of different regions. For example, the first region is the substation working equipment area, the second region is the substation protection area, and so on. At the same time, obtain the substation equipment distribution map, then mark the substation equipment, and perform two-dimensional plane conversion on the marked substation equipment;

[0015] Then, the transmitted historical data is obtained, and the patrol starting point in the historical data is obtained at the same time. The patrol starting point indicates the corresponding patrol starting point in the past patrol record, and the patrol starting point is labeled as i, and i=1, 2, ..., j. At the same time, the number of selections corresponding to the patrol starting point is obtained and recorded as Ci, and the patrol duration corresponding to the patrol starting point i is obtained and recorded as Ti. The patrol duration obtained here is expressed as the time required to complete the entire patrol of the substation area from the patrol point, and is also expressed as the duration of a single patrol. Then, the obtained patrol starting point parameters are substituted into the formula The selected value Fi corresponding to the patrol starting point i is calculated, where a1 is a preset proportional coefficient, and its value is set by the operator;

[0016] At the same time, combined with the two-dimensional plan of the substation equipment, the patrol starting point with the smallest value Fi is selected and the selected patrol starting point is used as the standard point, and then the standard point information is generated and transmitted to the patrol path analysis unit.

[0017] As a further solution of the present invention: the specific method in which the patrol path analysis unit generates the prediction result is:

[0018] Obtain the standard point and the patrol endpoint, and simulate and generate the patrol path according to the standard point and the patrol endpoint, and label the patrol path as n, where n=1, 2, ..., m, then obtain the patrol time corresponding to the patrol path n as Tn, and select the patrol path corresponding to the minimum patrol time Tn as the pre-selected path, and analyze the substation equipment on the pre-selected path;

[0019] For the substation equipment on the preselected path, the corresponding equipment parameters of the substation equipment are obtained, and the changes in the equipment parameters are analyzed. The changes in the equipment parameters within the time period t are obtained, and the changes are represented in the form of a graph. Then the changes are judged, and the judgment here is made using a risk prediction model. The equipment parameters are input into the risk prediction model. The risk prediction model will automatically predict the working risk of the equipment according to the input parameters and generate corresponding prediction results. The prediction results include: normal results and abnormal results.

[0020] As a further solution of the present invention: the specific method in which the patrol path analysis unit analyzes the abnormal result is:

[0021] The substation equipment corresponding to the normal result is marked as normal equipment, and the substation equipment corresponding to the abnormal result is marked as abnormal equipment. All substation equipment is processed in the same way, and then the pre-selected path is comprehensively analyzed according to the normal equipment and the abnormal equipment;

[0022] Normal devices on the pre-selected path are not processed. Abnormal devices on the pre-selected path are screened and analyzed separately. The specific analysis method is as follows:

[0023] All abnormal devices are obtained, and a phase path is generated according to the abnormal devices. The phase path here is represented as a patrol path corresponding to the abnormal device. First, the path starting point of the abnormal device is determined. The specific determination method is determined according to the device parameter change value of the abnormal device. The abnormal device with the largest device parameter change value is used as the path starting point, and the abnormal device with the smallest device parameter change value is used as the path end point. Then, the phase path is generated according to the path starting point and the path end point.

[0024] Then the stage path is matched with the preselected path, and the matching here means matching the stage path with the path of the abnormal device in the preselected path, specifically a part of the path in the preselected path, and judging whether the stage path is the same as the preselected path. When the stage path is the same as the preselected path, a path analysis signal is generated. Otherwise, when the stage path is different from the preselected path, a secondary analysis signal is generated, and the generated secondary analysis signal is transmitted to the path optimization analysis unit, and the stage path is further analyzed according to the generated path analysis signal.

[0025] As a further solution of the present invention: the specific method of analyzing the path analysis signal is:

[0026] Judge the stage path. If the existing obstacles have no effect on the overall stage path, there is no need to process the stage path. On the contrary, if the existing obstacles have an effect on the overall stage path, the stage path needs to be re-analyzed.

[0027] All abnormal devices on the stage path are obtained, and the device parameter change values ​​corresponding to the abnormal devices are obtained. Then, a path is generated from large to small according to the device parameter change values, and the generated path is recorded as a secondary generated path. The path without repeated patrols in the secondary generated path is obtained, and it is recorded as a candidate path.

[0028] As a further solution of the present invention: the specific manner in which the path optimization analysis unit analyzes the secondary analysis signal is:

[0029] Get the stage path, and at the same time get the path corresponding to the abnormal device in the pre-selected path, record it as the initial path, get the duration of the stage path, record it as T1, get the number of patrol tasks corresponding to the abnormal device in the stage path, record it as k, and k=1, 2, …, h, get the patrol duration Tk corresponding to patrol task k, then calculate the total patrol duration of the abnormal device corresponding to the stage path, record it as Tz, and calculate the total consumption value T1*a2+Tz corresponding to the stage path, where a2 is the preset proportional coefficient;

[0030] Then, the total patrol time of the abnormal equipment corresponding to the initial path is analyzed and recorded as Tz1, and the duration of the initial path is obtained and recorded as T2. The total consumption value T2*a2+Tz1 corresponding to the initial path is further calculated, and the total consumption value of the initial path is compared with the total consumption value of the stage path. When the total consumption value of the initial path is greater than the total consumption value of the stage path, the stage path is used as the standard and integrated with the pre-selected path to generate a patrol path, and the patrol path information is generated at the same time.

[0031] As a further solution of the present invention: the specific way in which the path optimization analysis unit analyzes the situation where the total consumption value of the initial path is less than the total consumption value of the stage path is:

[0032] Analyze whether the initial path includes normal equipment inspection. When the initial path includes inspection of normal equipment, re-analyze the further stage path and generate a re-analysis signal. On the contrary, when the initial path does not include inspection of the generated equipment, the initial path is used as the standard and integrated with the pre-selected path to generate the inspection path, and further generate the inspection path information.

[0033] According to the generated re-analysis signal, the patrol starting point of the stage path is re-determined, and the analysis path is generated from large to small according to the change value of the equipment parameter. Then the analysis path is integrated with the pre-selected path to generate the patrol path, and the patrol path information is generated at the same time.

[0034] The present invention provides a remote intelligent inspection system for substations. Compared with the prior art, it has the following beneficial effects:

[0035] The present invention analyzes the equipment in the substation area, monitors and analyzes according to the parameter changes and equipment status of the substation equipment, and classifies the equipment as normal or abnormal according to the equipment parameters. It further generates a path based on the parameters of the abnormal equipment itself, and optimizes the path based on the overall path, thereby ensuring the optimization of the overall patrol path and improving the overall patrol effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 It is the principle diagram of the system of the present invention;

[0037] Figure 2 It is a flow chart of the present invention. DETAILED DESCRIPTION

[0038] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0039] See also Figure 1 and Figure 2 The present application provides a substation remote intelligent patrol system, including: a substation information collection unit, a regional patrol analysis unit, a patrol path analysis unit, a path optimization analysis unit and a patrol result output unit.

[0040] As embodiment 1 of the present invention

[0041] The substation information collection unit is used to collect the basic information corresponding to the substation, and the collected basic information includes: substation structure diagram, substation equipment distribution diagram and substation patrol tasks, and then the acquired basic information is transmitted to the regional patrol analysis unit.

[0042] The regional patrol analysis unit is used to conduct patrol analysis on the substation based on the acquired basic information, and the specific patrol analysis method is as follows:

[0043] Obtain the substation structure diagram, and divide the substation into regions to obtain regional division information. Specifically, the division can be based on the functions of different regions. For example, the first region is the substation working equipment area, the second region is the substation protection area, and so on. At the same time, obtain the substation equipment distribution map, then mark the substation equipment, and perform two-dimensional plane conversion on the marked substation equipment;

[0044] Then, the transmitted historical data is obtained, and the patrol starting point in the historical data is obtained at the same time. The patrol starting point indicates the corresponding patrol starting point in the past patrol record, and the patrol starting point is labeled as i, and i=1, 2, ..., j. At the same time, the number of selections corresponding to the patrol starting point is obtained and recorded as Ci, and the patrol duration corresponding to the patrol starting point i is obtained and recorded as Ti. The patrol duration obtained here is expressed as the time required to complete the entire patrol of the substation area from the patrol point, and is also expressed as the duration of a single patrol. Then, the obtained patrol starting point parameters are substituted into the formula The selected value Fi corresponding to the patrol starting point i is calculated, where a1 is a preset proportional coefficient, and its value is set by the operator;

[0045] At the same time, combined with the two-dimensional plane diagram of the substation equipment, the patrol starting point with the smallest value Fi is selected, and the selected patrol starting point is used as the standard point, and then the standard point information is generated, and the generated standard point information is transmitted to the patrol path analysis unit. Specifically, for the generated standard point information, the corresponding patrol end point information will also be generated, and the two are in a corresponding relationship.

[0046] The patrol path analysis unit is used to generate a patrol path according to the acquired standard point information and analyze the generated patrol path at the same time. The specific analysis method is as follows:

[0047] Obtain standard points and patrol endpoints, and simulate and generate patrol paths based on the standard points and patrol endpoints, and label the patrol paths as n, where n=1, 2, ..., m. Then obtain the patrol time corresponding to patrol path n as Tn, and select the patrol path corresponding to the minimum patrol time Tn as the pre-selected path, and analyze the substation equipment on the pre-selected path. Specifically, the system here will generate different patrol paths according to the determined patrol starting point and patrol endpoint, and the automatic generation of paths is an existing technology, which will not be described in detail here.

[0048] For the substation equipment on the pre-selected path, the corresponding equipment parameters of the substation equipment are obtained, and the changes of the equipment parameters are analyzed, and the changes of the equipment parameters within the time period t are obtained, and the changes are represented in the form of a chart, and then the changes are judged, and the judgment here is made by using a risk prediction model. The equipment parameters are input into the risk prediction model, and the risk prediction model automatically predicts the working risk of the equipment according to the input parameters, and generates corresponding prediction results, and the prediction results include: normal results and abnormal results;

[0049] Combined with actual analysis, in the operation and maintenance management of smart substations, it is crucial to accurately monitor the equipment on the pre-selected patrol path. This process first involves the system labeling of the equipment in the substation to clearly identify and track the status of each device. Subsequently, the operation and maintenance system needs to collect parameter information of these devices, which may include key indicators such as voltage, current, temperature, vibration level, etc.

[0050] The collected equipment parameters are processed by data analysis tools to analyze their dynamic changes within a time period t. This time period may be a few hours, a few days or longer, depending on the operating characteristics of the equipment and monitoring requirements. The analysis results are presented in the form of charts, such as trend charts, scatter plots or heat maps, making the change trends intuitive and easy for professionals to understand and interpret.

[0051] The next step is to evaluate these changes and determine whether the equipment has potential risks. This evaluation does not rely on human intuition or empirical rules, but adopts a more scientific and objective method: risk prediction model. This model is usually trained by data scientists based on historical data and can accurately predict the working status of the equipment in the future.

[0052] The collected equipment parameters are input into the risk prediction model, and the model will automatically analyze the data based on its built-in algorithm to predict the working risk of the equipment. The prediction results are mainly divided into two categories: normal results and abnormal results. Normal results mean that the equipment works well under the current parameters and no obvious problems are found; while abnormal results prompt the operation and maintenance personnel that the equipment may have a certain degree of risk or a precursor to failure, which requires further inspection or intervention.

[0053] After obtaining the prediction results, the operation and maintenance system can take corresponding measures, such as arranging immediate or priority inspections for equipment predicted to be abnormal, adjusting maintenance plans, or notifying the maintenance team to prepare for intervention. This process that combines data collection, analysis, and risk prediction not only improves the efficiency and accuracy of substation equipment management, but also significantly reduces the safety and operational risks caused by sudden equipment failures.

[0054] The substation equipment corresponding to the normal result is marked as normal equipment, and the substation equipment corresponding to the abnormal result is marked as abnormal equipment. All substation equipment is processed in the same way, and then the pre-selected path is comprehensively analyzed according to the normal equipment and the abnormal equipment;

[0055] Normal devices on the pre-selected path are not processed. Abnormal devices on the pre-selected path are screened and analyzed separately. The specific analysis method is as follows:

[0056] All abnormal devices are obtained, and a phase path is generated according to the abnormal devices. The phase path here is represented as a patrol path corresponding to the abnormal device. First, the path starting point of the abnormal device is determined. The specific determination method is determined according to the device parameter change value of the abnormal device. The abnormal device with the largest device parameter change value is used as the path starting point, and the abnormal device with the smallest device parameter change value is used as the path end point. Then, the phase path is generated according to the path starting point and the path end point.

[0057] Then, the stage path is matched with the preselected path, and the matching here means matching the stage path with the path of the abnormal device in the preselected path, specifically a part of the path in the preselected path, and judging whether the stage path is the same as the preselected path. When the stage path is the same as the preselected path, a path analysis signal is generated. On the contrary, when the stage path is not the same as the preselected path, a secondary analysis signal is generated, and the generated secondary analysis signal is transmitted to the path optimization analysis unit, and the stage path is further analyzed for the generated path analysis signal, and the specific analysis method is as follows:

[0058] The stage path is judged to determine the obstacle situation in the stage path. If the existing obstacle has no effect on the overall stage path, the stage path does not need to be processed. On the contrary, if the existing obstacle has an effect on the overall stage path, the stage path needs to be re-analyzed.

[0059] All abnormal devices on the stage path are obtained, and the device parameter change values ​​corresponding to the abnormal devices are obtained. Then, a path is generated from large to small according to the device parameter change values, and the generated path is recorded as a secondary generated path. Specifically, the path generated here is a path obtained by avoiding obstacles. At the same time, the generation method is to use the device parameter with the largest change value as the starting point and the device parameter with the smallest change value as the end point. At the same time, the generated secondary generated path is screened to obtain a path without repeated patrols in the secondary generated path, and it is recorded as a candidate path;

[0060] Combined with actual analysis, for the secondary generated path, due to the different starting points, there will be repeated inspections on the secondary generated path, which means that there will be repeated inspections when inspecting abnormal equipment. Such inspection paths will be eliminated and not selected as paths.

[0061] Finally, the candidate path and the pre-selected path are integrated to generate a patrol path, and patrol path information is generated and transmitted to the patrol result output unit.

[0062] The patrol result output unit is used to display the acquired patrol path information to the operator.

[0063] As the second embodiment of the present invention, it is implemented on the basis of the first embodiment, and is different from the first embodiment in that.

[0064] The path optimization analysis unit is used to analyze the acquired secondary analysis signal, and the specific analysis method is as follows:

[0065] The stage path is obtained, and the path corresponding to the abnormal equipment in the pre-selected path is obtained and recorded as the initial path. The stage path and the initial path are analyzed separately, and the stage path and the initial path obtained by default do not have duplication. The duration of the stage path is obtained and recorded as T1, and the number of patrol tasks corresponding to the abnormal equipment in the stage path is obtained and recorded as k, and k=1, 2, ..., h. At the same time, the patrol duration Tk corresponding to patrol task k is obtained, and the patrol duration represents the average patrol duration of a single patrol task obtained according to historical data. Then the total patrol duration of the abnormal equipment corresponding to the stage path is calculated and recorded as Tz, and the total consumption value T1*a2+Tz corresponding to the stage path is calculated, where a2 is the preset proportional coefficient;

[0066] Then, the total patrol time of the abnormal equipment corresponding to the initial path is analyzed and recorded as Tz1, and the duration of the initial path is obtained and recorded as T2. The total consumption value T2*a2+Tz1 corresponding to the initial path is further calculated, and the total consumption value of the initial path is compared with the total consumption value of the stage path. When the total consumption value of the initial path is greater than the total consumption value of the stage path, the stage path is used as the standard and integrated with the pre-selected path to generate a patrol path, and the patrol path information is generated at the same time, and then the patrol path information is transmitted to the patrol result output unit;

[0067] When the total consumption value of the initial path is less than the total consumption value of the stage path, whether the initial path includes normal equipment inspection is analyzed. When the initial path includes the inspection of normal equipment, the further stage path is re-analyzed and a re-analysis signal is generated. On the contrary, when the initial path does not include the inspection of the generated equipment, the initial path is used as a standard and integrated with the pre-selected path to generate the inspection path, and the inspection path information is further generated and then transmitted to the inspection result output unit;

[0068] Combined with actual analysis, if the initial path includes patrols of devices marked as normal, this may mean that there is a risk of changes in the status of these devices, or there may be other unidentified problems. In this case, the system will re-analyze the path at this stage. This is to ensure the validity of the path and adjust the patrol strategy in time to deal with potential problems. At the same time, the system will generate a "re-analysis" signal to prompt the operator or related management system to pay attention to this change and prepare to review the new patrol plan.

[0069] On the contrary, if the initial route does not include patrols of devices marked as normal, this usually indicates that the initial route is based on very clear and stable device status judgments. In this case, the initial route can be used as a standard route and integrated with the pre-selected alternative routes to form the final patrol route. This integration process takes into account various factors, such as device importance, failure rate, and effective allocation of patrol resources.

[0070] In response to the generated re-analysis signal, the patrol starting point of the stage path is re-determined, and an analysis path is generated from large to small according to the change value of the equipment parameters. The analysis path generated here also does not include repeated patrols. The analysis path is then integrated with the pre-selected path to generate a patrol path. At the same time, patrol path information is generated and transmitted to the patrol result output unit.

[0071] The patrol result output unit is used to display the acquired patrol path information to the operator.

[0072] As the third embodiment of the present invention, the focus is on combining the implementation processes of the first embodiment and the second embodiment.

[0073] Some of the data in the above formulas are dimensionless and numerically calculated. Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.

[0074] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.

Claims

1. A remote intelligent inspection system for substations. It is characterized in that include: Substation information collection unit is responsible for collecting basic information of the substation, including structural diagrams, equipment distribution diagrams and patrol tasks, and transmitting these data to the regional patrol analysis unit; The regional patrol analysis unit is used to divide the area according to the basic information of the substation, mark the equipment and convert it into a two-dimensional plane map, and use the historical data and patrol starting point information to calculate the selection value of each starting point, select the best patrol starting point as the standard point, and generate standard point information at the same time, and pass this information to the patrol path analysis unit. The specific way for the regional patrol analysis unit to generate standard point information is: Obtain the substation structure diagram, divide the substation into regions to obtain the region division information, and obtain the substation equipment distribution diagram, then mark the substation equipment, and perform two-dimensional plane conversion on the marked substation equipment; Then, the transmitted historical data is obtained, and the patrol starting point in the historical data is obtained, and the patrol starting point is labeled as i, where i=1, 2, ..., j. At the same time, the number of selections corresponding to the patrol starting point is obtained, recorded as Ci, and the patrol duration corresponding to the patrol starting point i is obtained, recorded as Ti. Then, the obtained patrol starting point parameters are substituted into the formula Calculate and obtain the selected value Fi corresponding to the patrol starting point i, where a1 is the preset proportional coefficient; At the same time, combined with the two-dimensional plane diagram of the substation equipment, the patrol starting point with the smallest value Fi is selected, and the selected patrol starting point is used as the standard point, and the standard point information is generated at the same time; The patrol route analysis unit is used to obtain standard points and end points, simulate and formulate multiple patrol routes and number them, select the shortest route as the pre-selected route, number the equipment on the pre-selected route and collect parameters, analyze the periodic changes of parameters and display them in the form of charts, evaluate the change data using the risk prediction model, and automatically output the equipment risk prediction. The results are divided into normal and abnormal categories; The device corresponding to the normal prediction result is marked as a normal device. Similarly, the marked abnormal device is obtained. The normal device is not processed, and the abnormal device is screened out and analyzed separately. The starting point and end point are determined according to the degree of abnormality to generate a stage path, which is matched with the pre-selected path to generate a secondary analysis signal or a path analysis signal. For the path analysis signal, the impact of obstacles is judged. If there is an obstacle impact, it is re-analyzed, and the path is optimized based on the change value. A non-repetitive candidate path is selected, and the candidate path is integrated with the pre-selected path to generate patrol information, which is then transmitted to the patrol result output unit; The path optimization analysis unit is used to process the secondary analysis signal, compare the total duration and total consumption value of abnormal equipment inspections of the stage path and the initial path, and if the stage path is better, set it as the standard and integrate it with the pre-selected path for output; if the initial path is better and contains normal equipment inspections, re-analyze the stage path; if not, integrate and output the inspection information based on the initial path as the standard, and transmit it to the inspection result output unit at the same time. The specific way in which the path optimization analysis unit analyzes the secondary analysis signal is as follows: Get the stage path, and at the same time get the path corresponding to the abnormal device in the pre-selected path, record it as the initial path, get the duration of the stage path, record it as T1, get the number of patrol tasks corresponding to the abnormal device in the stage path, record it as k, and k=1, 2, …, h, get the patrol duration Tk corresponding to patrol task k, then calculate the total patrol duration of the abnormal device corresponding to the stage path, record it as Tz, and calculate the total consumption value T1*a2+Tz corresponding to the stage path, where a2 is the preset proportional coefficient; Then, the total patrol time of the abnormal equipment corresponding to the initial path is analyzed and recorded as Tz1, and the duration of the initial path is obtained and recorded as T2. The total consumption value T2*a2+Tz1 corresponding to the initial path is further calculated, and the total consumption value of the initial path is compared with the total consumption value of the stage path. When the total consumption value of the initial path is greater than the total consumption value of the stage path, the stage path is used as the standard and integrated with the pre-selected path to generate a patrol path, and the patrol path information is generated at the same time; The specific method for the path optimization analysis unit to analyze the situation where the total consumption value of the initial path is less than the total consumption value of the stage path is: Analyze whether the initial path includes normal equipment inspection. When the initial path includes inspection of normal equipment, re-analyze the further stage path and generate a re-analysis signal. On the contrary, when the initial path does not include inspection of the generated equipment, the initial path is used as the standard and integrated with the pre-selected path to generate the inspection path, and further generate the inspection path information. According to the generated re-analysis signal, the patrol starting point of the stage path is re-determined, and the analysis path is generated from large to small according to the change value of the equipment parameter. Then the analysis path is integrated with the pre-selected path to generate the patrol path, and the patrol path information is generated at the same time.

2. A remote intelligent inspection system for substations according to claim 1, It is characterized in that The specific method of generating the prediction result by the patrol path analysis unit is as follows: Obtain the standard point and the patrol endpoint, and simulate and generate a patrol path based on the standard point and the patrol endpoint, denoted as n, where n=1, 2, ..., m, and select the patrol path corresponding to the minimum patrol time Tn as the pre-selected path, and analyze the substation equipment on the pre-selected path; Preselect the substation equipment and equipment parameters on the path, obtain the changes in equipment parameters within the time period t, and represent the changes in the form of graphs, input the equipment parameters into the risk prediction model, and the risk prediction model will automatically predict the working risk of the equipment based on the input parameters and generate corresponding prediction results, and the prediction results include: normal results and abnormal results.

3. A remote intelligent inspection system for substations according to claim 1, It is characterized in that The specific method in which the patrol path analysis unit analyzes the abnormal result is: The substation equipment corresponding to the abnormal result is marked as abnormal equipment, the abnormal equipment with the largest equipment parameter change value is taken as the path starting point, and the abnormal equipment with the smallest equipment parameter change value is taken as the path end point, and then the stage path is generated according to the path starting point and path end point.

4. A remote intelligent inspection system for substations according to claim 1, It is characterized in that The specific method in which the patrol path analysis unit analyzes the stage path and generates different signals is as follows: Then the stage path is matched with the pre-selected path. When the stage path is the same as the pre-selected path, a path analysis signal is generated. Otherwise, when the stage path is different from the pre-selected path, a secondary analysis signal is generated and transmitted to the path optimization analysis unit.

5. A remote intelligent inspection system for substations according to claim 4, It is characterized in that The specific method of analyzing the path analysis signal is as follows: Judge the stage path. If the existing obstacles have no effect on the overall stage path, there is no need to process the stage path. On the contrary, if the existing obstacles have an effect on the overall stage path, the stage path needs to be re-analyzed. All abnormal devices on the stage path are obtained, and the device parameter change values ​​corresponding to the abnormal devices are obtained. Then, a path is generated from large to small according to the device parameter change values, and the generated path is recorded as a secondary generated path. The path without repeated patrols in the secondary generated path is obtained, and it is recorded as a candidate path.

Citation Information

Patent Citations

  • Remote intelligent patrol system

    CN117578736A

  • Substation inspection system

    CN103580285A

  • Power grid intelligent operation and maintenance method and system based on machine patrol and AI fusion

    CN117332347A