Fault work order handling method, system and storage medium
Through fault work order handling methods and systems, fault response information is dynamically adjusted and fault analysis tools are used to solve the problems of difficult information sharing and low processing efficiency in traditional fault handling methods, and improve the efficiency and accuracy of fault handling.
Patent Information
- Application Number
- CN202410831191.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-26
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-06-26
AI Technical Summary
Traditional fault handling methods have problems such as difficulty in information sharing and low processing efficiency. Especially when multiple departments and systems are dispersed, it is difficult to quickly obtain the required knowledge and information, resulting in long fault processing time and untimely response.
Provide a method and system for handling fault work orders, by determining the information of the current process node, dynamically adjusting the fault response information, using fault analysis tools such as fishbone diagram, 5-question method and fault tree to generate target prompt instructions, iterative analysis and response information until failure response information for the overall process is determined.
It improves the efficiency and accuracy of fault handling, reduces manual intervention and decision-making time, reduces labor costs, and realizes the ability to share and process fault-related information.
Smart Images

Figure CN118396599B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of rail vehicle safety technology, and in particular to a fault work order handling method, system and storage medium. Background Art
[0002] In the process of modern production operation and maintenance, efficient fault handling is of great practical significance for ensuring the safe and stable operation of vehicles. However, traditional fault handling methods have many challenges, which seriously restrict the efficiency and quality of fault handling.
[0003] On the one hand, in most enterprises, fault-related information and knowledge are often scattered across multiple departments and systems. There is a lack of a unified platform to integrate and share fault handling information, which makes information sharing difficult and makes it difficult for fault handling personnel to quickly obtain the required knowledge and information, affecting the efficiency and accuracy of fault handling.
[0004] On the other hand, traditional fault handling methods have limited fault handling capabilities. Due to the limitations of traditional knowledge and technology, for new or complex faults that require multi-person collaboration, traditional methods are difficult to deal with due to the complexity of the root cause of the fault and / or the large number of participants leading to information fragmentation, resulting in long fault handling time and untimely response. Summary of the invention
[0005] One of the purposes of the present invention is to provide a method for handling fault work orders to solve the problem that the prior art cannot dynamically determine the final fault response measures using the processing flow of fault information, resulting in low fault handling efficiency.
[0006] One of the purposes of the present invention is to provide a fault work order handling system.
[0007] One of the objectives of the present invention is to provide an electronic device.
[0008] One of the objects of the present invention is to provide a computer-readable storage medium.
[0009] To achieve one of the above-mentioned purposes of the invention, an embodiment of the present invention provides a method for handling a fault work order, step S1, determining the current node information of the current process node; wherein the current node information includes at least one of the fault information and the fault analysis result; step S2, determining the fault response information of the current process node according to the current node information, and updating the fault response information to the current node information; step S3, determining the fault response information of the next process node according to the current node information, so as to determine the fault response information of the entire process.
[0010] As a further improvement of an embodiment of the present invention, step S2 specifically includes: determining the key elements of the current node information, and generating a target prompt instruction based on the key elements; wherein the key elements are used to determine at least one of the sub-fault information and the sub-fault cause in the current node information; according to the target prompt instruction, determining the corresponding fault analysis result, and updating the fault analysis result to the current node information.
[0011] As a further improvement of an embodiment of the present invention, the key elements of determining the current node information and generating target prompt instructions based on the key elements specifically include: dividing the current node information according to the hierarchical structure of the fault analysis tool, and determining the corresponding prompt instructions based on the sub-node information of each layer of nodes; wherein the fault analysis tool includes at least one of a fishbone diagram, a 5-question method, and a fault tree; and determining the prompt instructions of the next layer based on the execution results of the prompt instructions of the previous layer to determine the target prompt instructions of the overall hierarchical structure.
[0012] As a further improvement of an embodiment of the present invention, determining the fault response information of the next process node based on the current node information in step S3 specifically includes: judging whether the current process node is the first node of the process; if not, obtaining and generating a target prompt instruction based on the node information of the current process node, and determining the corresponding fault analysis result based on the target prompt instruction, and determining the fault response information of the next process node based on the fault analysis result.
[0013] As a further improvement of an embodiment of the present invention, after determining whether the current process node is the first node of the process, the method also includes: if so, determining the corresponding fault response information as the fault response information of the secondary node of the process based on the initial fault information.
[0014] As a further improvement of an embodiment of the present invention, before step S1, the method also includes: receiving a fault abnormality signal, and generating a fault work order according to the corresponding initial fault information; according to the initial fault information, querying the historical summary information of the fault knowledge base, and determining the processing flow of the fault work order according to the response information matching the historical summary information; the processing flow includes handling the fault work order by a number of fault handling experts; step S1 specifically includes: in the processing flow of the fault work order, determining the current node information of the current process node according to the initial fault information.
[0015] As a further improvement of an embodiment of the present invention, step S2 specifically includes: determining a number of fault subtasks according to the fault type and the node information, and transmitting the fault subtasks to the corresponding fault handling experts according to the processing flow of the fault work order; the fault handling expert determines the corresponding fault subtask response information based on the received fault subtasks, and updates the fault subtask response information to the node information of the current process node.
[0016] As a further improvement of an embodiment of the present invention, the fault handling expert determines the corresponding fault subtask response information based on the received fault subtask, which specifically includes: determining a prompt instruction based on the fault subtask; wherein the prompt instruction is used to guide the prompt information output by the pre-trained model; and guiding the pre-trained model according to the prompt instruction to generate response information for the fault subtask.
[0017] As a further improvement of an embodiment of the present invention, step S3 specifically includes: iteratively determining the fault response information of the next process node based on the node information of the current process node until the last node information of the last process node is determined; screening the valid node information in the last node information, and determining the fault response information of the entire process based on the valid node information.
[0018] As a further improvement of an embodiment of the present invention, the target fault response information includes at least one of first response information and second response information; the method also includes: determining the corresponding target fault response information based on the urgency and / or processing cost of the fault information; when the urgency of the fault information is greater than a set urgency threshold, and / or when the processing cost of the fault information is greater than a set processing cost threshold, determining that the first response information is the target fault response information; when the urgency of the fault information is less than the set urgency threshold, and / or when the processing cost of the fault information is less than the set processing cost threshold, determining that the second response information is the target fault response information.
[0019] To achieve one of the above-mentioned purposes of the invention, one embodiment of the present invention provides a fault work order handling system, including: a determination module, used to determine the current node information of the current process node; wherein the current node information includes at least one of the fault information and the fault analysis result; an update module, used to determine the fault response information of the current process node according to the current node information, and update the fault response information to the current node information; a processing module, used to determine the fault response information of the next process node according to the current node information, so as to determine the fault response information of the entire process.
[0020] As a further improvement of one embodiment of the present invention, the handling system also includes: a work order generation module, which is used to generate a corresponding fault work order based on the initial fault information of the product; a work order processing flow generation module, which is used to query the historical summary information of the fault knowledge base based on the initial fault information, and determine the processing flow of the fault work order based on the matching historical summary information; a display module, which is used to output and display the fault response information of the overall process.
[0021] To achieve one of the above-mentioned purposes of the invention, an embodiment of the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and is characterized in that when the computer program is executed by a processor, the steps of the fault work order handling method described in any of the above-mentioned technical solutions are executed.
[0022] Compared with the prior art, the fault work order handling method provided by the present invention utilizes the node information of the previous process node in the fault handling process to determine and dynamically adjust the fault response information of the next process node, thereby determining the fault response information of the entire process, and can quickly respond to fault information, reduce the time for manual intervention and decision-making, improve the efficiency of fault handling, and reduce labor costs; in addition, according to the processing flow of the fault work order, the fault information, fault analysis results and fault response information of each process node can be recorded to realize the sharing of fault-related information, improve the fault handling capability and the accuracy and efficiency of fault handling. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a structural schematic diagram of a fault work order handling system in one embodiment of the present invention.
[0024] Figure 2 It is a schematic diagram of the steps of a method for handling a fault work order in one embodiment of the present invention.
[0025] Figure 3 2 is a schematic diagram of step S2 in one embodiment of the present invention.
[0026] Figure 4 It is a schematic diagram of step S211 in a specific embodiment of an embodiment of the present invention.
[0027] Figure 5 It is a schematic diagram of the steps before step S1 in one embodiment of the present invention.
[0028] Figure 6 It is a schematic diagram of step S2 in another embodiment of the present invention.
[0029] Figure 7 It is a schematic diagram of step S3 in another embodiment of the present invention.
[0030] Figure 8It is a flowchart of a method for handling a fault work order in a preferred embodiment of the present invention. DETAILED DESCRIPTION
[0031] The present invention will be described in detail below in conjunction with the specific embodiments shown in the accompanying drawings. However, these embodiments do not limit the present invention, and any structural, methodological, or functional changes made by a person skilled in the art based on these embodiments are all within the scope of protection of the present invention.
[0032] It should be noted that the term "comprises" or any other variation thereof is intended to cover non-exclusive inclusion, so that a process, method, article or device that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In addition, the terms "first", "second", etc. are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0033] like Figure 1 As shown, an embodiment of the present invention provides a fault work order handling system 100.
[0034] In one embodiment, the fault work order handling system 100 determines target fault response information corresponding to the fault work order according to a fault work order handling method to assist maintenance personnel in determining the real cause and solution of the fault.
[0035] In a specific embodiment, the fault work order handling method can be implemented with reference to any technical solution provided below.
[0036] The fault work order handling system 100 comprises a determination module 11. The determination module 11 is used to determine the current node information of the current process node in the processing flow of the fault work order.
[0037] In one embodiment, the current node information may be fault information and a fault analysis result of the current process node. For different nodes in the processing flow of the fault work order, the corresponding fault information may be different, which is related to the fault analysis result of the process node.
[0038] In a specific embodiment, generating a fault ticket is included in the processing flow. When the current process node is the first node in the processing flow (i.e., generating a fault ticket), the node information of the first node is the initial fault information of the fault ticket (such as basic fault information description, fault occurrence time, impact scope, etc.).
[0039] In a specific embodiment, the creation of a fault work order is independent of the processing flow. When the current process node is the first node or other node in the processing flow, the current node information includes the initial fault information and the corresponding fault analysis result. The fault analysis result includes but is not limited to the cause analysis of the initial fault information, and may also include a newly added fault analysis result (different experts may give different conclusions, and a newly added fault analysis result may appear).
[0040] The fault work order handling system 100 includes an updating module 12. The updating module 12 is used to determine the fault response information of the current process node according to the current node information, and update the fault response information to the current node information.
[0041] In one embodiment, when the current node information includes only the first fault information, the first fault response information of the current process node is determined according to the first fault information, and the updated current node information includes the first fault information and the first fault response information;
[0042] In one embodiment, when the current node information includes first fault information and first fault response information, the second fault response information of the current process node is determined based on the first fault information, and the updated current node information includes the first fault information, the first fault response information and the second fault response information.
[0043] The fault work order handling system 100 includes a processing module 13. The processing module 13 is used to determine the fault response information of the next process node according to the current node information, so as to determine the fault response information of the entire process.
[0044] The fault work order handling system 100 further includes a work order generating module 14. The work order generating module 14 is used to generate a corresponding fault work order according to the initial fault information of the product.
[0045] In one embodiment, the work order generation module 14 is used to parse the initial fault information, determine key information that matches the fault work order template information, fill the key information into the fault work order template, and form a corresponding fault work order.
[0046] In one embodiment, the work order generation module 14 is used to parse the initial fault information and extract key fault elements, and generate a fault work order according to the key fault elements.
[0047] The fault work order handling system 100 further includes a work order processing flow generation module 15. The work order processing flow generation module 15 is used to query the historical summary information of the fault knowledge base according to the initial fault information, and determine the processing flow of the fault work order according to the matched historical summary information.
[0048] In one embodiment, a preset fault work order processing flow is used to match the initial fault information and determine the corresponding fault work order processing flow.
[0049] In one embodiment, the historical handling experience of handling work orders is used to extract key nodes for handling fault work orders and form a corresponding fault work order processing flow.
[0050] The fault work order handling system 100 further includes a display module 16. The display module 16 is used to output fault response information of the overall process. The display module 16 can be a display screen or the like.
[0051] In a specific embodiment, the display module 16 can also output and display all operation processes at nodes in the fault work order processing flow. Specifically, the fault handling expert or operator can display the corresponding operation steps performed at each node in the flow, such as clicking a button to confirm receiving a fault task, inputting a fault cause analysis, fault response information, and / or responding to an input prompt instruction or evaluation instruction, determining and outputting a fault analysis result, response information, etc.
[0052] In a specific embodiment, after receiving the fault work order, the fault work order handling system 100 determines the corresponding fault handling expert according to the specific information recorded in the fault work order, and divides the fault information into several fault subtasks. During the handling process of the fault subtasks, the handling expert can update the task progress status in real time through the interface of the fault work order handling system 100, such as determining the received task, entering the fault analysis cause, etc., and dynamically update the fault response information according to the information of each node in its handling process. In this way, the fault work order handling system 100 not only realizes the rapid detection and response of faults, but also realizes the sharing of fault information through multi-person collaboration, thereby improving the efficiency of fault handling.
[0053] The relationship between the modules and functions provided above in the present invention is not absolutely fixed. In some embodiments, the modules can be combined and integrated so that one module can assume the functions of multiple modules; in some embodiments, some functions can also be separated and implemented by several additional modules.
[0054] For example, the data determination module 11, the updating module 12, the processing module 13 and the display module 16 may be integrated into a control module, which carries all or part of the functions of the above modules.
[0055] like Figure 2 As shown, an embodiment of the present invention provides a method for handling a fault work order.
[0056] The fault work order handling method is applied to a fault work order handling system.
[0057] In one embodiment, the fault work order handling system can be as follows: Figure 1 And the configuration is performed as described above, and the corresponding technical solution is set and referenced in the disposal method provided by the present invention.
[0058] like Figure 2 As shown, a method for handling a fault work order provided in one embodiment of the present invention includes the following steps.
[0059] Step S1, determining current node information of a current process node; wherein the current node information includes at least one of fault information and fault analysis results;
[0060] Step S2, determining the fault response information of the current process node according to the current node information, and updating the fault response information to the current node information;
[0061] Step S3, determining the fault response information of the next process node according to the current node information, so as to determine the fault response information of the entire process.
[0062] In this way, by utilizing the node information of the previous process node in the fault handling process to determine and dynamically adjust the fault response information of the next process node, it is possible to quickly respond to fault information, reduce the time for manual intervention and decision-making, improve the efficiency of fault handling, and reduce labor costs; in addition, the processing flow of the fault work order can record the fault information, fault analysis results, and fault response information of each node, realize information sharing, and improve fault handling capabilities and the accuracy of fault handling.
[0063] A process node refers to a specific step or link in a complete business process or operation sequence. It is a basic unit in the process execution and represents a specific operation or task. For example, in the trouble ticket handling process, there may be multiple process nodes. For example, creating a trouble ticket, assigning tasks, executing tasks, etc.
[0064] Node information refers to the data and status related to the process node. Node information can be used to describe the current status of the process node during execution, the cause of the failure, and the failure response information.
[0065] like Figure 3 As shown, in one embodiment, step S2 of the present invention may specifically include the following steps.
[0066] Step S211, determining key elements of the current node information, and generating a target prompt instruction according to the key elements;
[0067] Step S212: determining a corresponding fault analysis result according to the target prompt instruction, and updating the fault analysis result to the current node information.
[0068] In this way, by determining the key elements of the current node information, the problem can be quickly identified, and target prompt instructions can be generated in a targeted manner based on the key elements, avoiding aimless analysis and troubleshooting, and improving the efficiency and accuracy of fault analysis.
[0069] The key elements of node information refer to data or information that are instructive for understanding the current status of the node, identifying potential problems or failures, and formulating corresponding strategies.
[0070] In one embodiment, the key element is used to determine at least one of the sub-fault information and the sub-fault cause in the current node information.
[0071] In a specific embodiment, key elements of the node information may include a description of the fault phenomenon, a location where the fault occurs, a time when the fault occurs, and a scope of impact of the fault.
[0072] Target prompt instructions refer to instructions with guiding or advisory nature generated based on key elements of node information to quickly respond to and handle faults.
[0073] In a specific embodiment, the target prompt instruction is proposed based on a pre-set rule, algorithm or expert experience. In this embodiment, for the same fault information, the analysis results of different experts may be different, and the determined target prompt instructions will also be different, so the results obtained will be even more different. In this way, the node information before the current process node can be shared through the propagation of process nodes, and the target prompt instruction of the current process node can be dynamically adjusted, so that the response information is more in line with the actual situation.
[0074] In a specific embodiment, the target prompt instruction is implemented by using prompt. In other words, a corresponding prompt instruction is generated according to the analysis result, and the corresponding fault response information is determined according to the prompt instruction.
[0075] In a specific embodiment, based on a prompt template library, a prompt instruction matching the analysis result is determined, and the pre-trained model is guided to output corresponding fault response information by executing the prompt instruction.
[0076] In a specific embodiment, the pre-trained model is a GPT (Generative Pre-Trained Transformer) model.
[0077] The prompt instruction may describe the fault information, and / or provide historical data or background information related to the fault, and / or clarify the tasks that the GPT model needs to complete (such as analysis, prediction, generating solutions, etc.), and / or clarify the output method of the GPT model, etc.
[0078] Fault analysis results refer to the conclusive summary obtained after investigating and evaluating the faults in the equipment, system or processing flow. The fault analysis results include the fault analysis process and the response measures or suggestions, including but not limited to at least one of emergency treatment measures, repair plans, and preventive measures.
[0079] In order to simplify the fault analysis process and ensure the comprehensiveness and accuracy of the fault analysis results, the present invention can also analyze the node information with the help of a fault analysis tool to determine the final target prompt instruction.
[0080] like Figure 4 As shown, in a specific embodiment, step S211 of the present invention may specifically include the following steps.
[0081] Step S2111, dividing the current node information according to the hierarchical structure of the fault analysis tool, and determining the corresponding prompt instruction according to the sub-node information of each level;
[0082] Step S2112, determining the prompt instruction of the next level according to the execution result of the prompt instruction of the previous level, so as to determine the target prompt instruction of the overall hierarchical structure.
[0083] In this way, by dividing the node information into different levels, the analysis process is made more structured and organized, reducing the overall complexity, reducing unnecessary duplication of work, and improving the efficiency of fault analysis.
[0084] In one embodiment, the fault analysis tool includes at least one of a fishbone diagram, a five-question method, and a fault tree.
[0085] Among them, the fishbone diagram illustrates the many reasons that lead to a certain conclusion in a systematic way, expressing the relationship between the results (characteristics) and causes (factors) in a form similar to a "fishbone" diagram.
[0086] The 5-question method, also known as the 5-why analysis method, asks five consecutive "whys" to a problem in order to find the root cause of the problem. Although it is called the 5-question method, there is no limit to the number of times it is actually used until the root cause of the problem is found. Sometimes it may be several times, sometimes it may be more than ten times.
[0087] A fault tree is a tree-like logical causal relationship diagram that is used to connect top events, intermediate events, and bottom events from top to bottom with appropriate logic gates to form a logical structure that can describe the causal relationship between various events in the system. Specifically, it can show the causal relationship between the input event (cause) and the output event (result) of the logic gate through event symbols, logic gate symbols, and transfer symbols.
[0088] In a specific embodiment, when the fault analysis tool is a fault tree, it starts from the initial fault information (top event) and is decomposed into multiple intermediate events and basic events step by step. Among them, the basic event is an event that cannot be divided in the fault tree and can be the direct cause of the intermediate event. According to the event type and fault cause of each level, the corresponding prompt command is determined, iteratively executed, and the prompt instruction is executed layer by layer until the basic event of the fault tree is reached, and the target prompt instruction is determined.
[0089] In a specific embodiment, when the fault analysis tool is a fishbone diagram, the main fault information (or main fault problem) in the current node information is clarified; the main category or main factor of the fault information is determined according to the main fault information; each main category is analyzed to determine the sub-factors or sub-causes to form a hierarchical structure. According to the sub-factors of each hierarchical structure, the corresponding prompt command is determined, iteratively executed, and the target prompt instruction is determined.
[0090] In one embodiment, step S3 of the present invention may specifically include the following steps.
[0091] Step S31, determining whether the current process node is the first node of the processing process;
[0092] If not, jump to step S32A, obtain and generate a target prompt instruction according to the node information of the current process node, determine the corresponding fault analysis result according to the target prompt instruction, and determine the fault response information of the next process node according to the fault analysis result;
[0093] If yes, jump to step S32B, use the initial fault information as the node information of the first node of the process, and determine the corresponding fault response information as the fault response information of the next process node according to the node information of the first node.
[0094] In this way, by analyzing and accumulating node information of each node in the process, we can jointly analyze fault information and formulate response information, thereby improving the team's collaboration and overall response capabilities.
[0095] It should be noted that in the fault ticket processing process, the node information of the current process node can be used as reference information for the next process node. However, when the next process node determines the fault response information, it does not simply merge the node information of the current node with the fault response information of the next process node.
[0096] Specifically, the next process node determines fault response information based on business logic and rules in combination with node information of the current process node. The fault response information may be further processing of the node information of the current process node or a certain response based on the current process node.
[0097] In one embodiment, the node information of the next process node is a collection of all relevant information generated by the next process node during the processing.
[0098] In a specific embodiment, the node information of the next process node includes the node information obtained from the current node and the fault response information determined based on the node information.
[0099] In a specific embodiment, the node information of the next process node includes the node information obtained from the current node and the fault response information determined based on the node information, as well as the state of the next process node itself, data input, etc.
[0100] For example, assuming that the processing flow of a fault ticket includes three process nodes (node A, node B, and node C), a fault ticket is created at node A, and the generated initial fault information is used as the node information of node A.
[0101] When the fault work order is transferred to node B, the node information of node A is obtained, and the corresponding first fault analysis result and first fault response information are determined according to the node information of node A, and the corresponding first fault analysis result and first fault response information are updated to the node information of node B to obtain the node information of node B. In other words, the node information at node B includes but is not limited to the initial fault information, the first fault analysis result and the first fault response information, and may also include all operations performed by the operator at node B, such as clicking a button, typing a target prompt instruction, viewing a page, etc.
[0102] Similarly, when the fault work order is transferred to node C, the node information of node B is obtained, and the second fault analysis result and second fault response information corresponding to node B are generated according to the node information of node B, and updated to the node information of node B, and the updated result is used as the node information of node C. That is, the node information at node C includes but is not limited to the initial fault information, the first fault analysis result, the first fault response information, and the second fault analysis result and the second fault response information.
[0103] like Figure 5 As shown, in one embodiment, before step S1 of the present invention, the method further includes the following steps.
[0104] Step P11, receiving a fault abnormality signal, and generating a fault work order according to the corresponding initial fault information;
[0105] Step P12, based on the initial fault information, query the historical summary information of the fault knowledge base, and determine the processing flow of the fault work order based on the response information matching the historical summary information; the processing flow includes instruction information of fault handling experts corresponding to several fault work orders.
[0106] Based on this, step S1 may specifically include:
[0107] Step S1 ′: in the processing flow of the fault work order, current node information of the current process node is determined according to initial fault information.
[0108] In this way, by determining the processing flow of the fault work order through the initial fault information, it can be ensured that the fault is handled professionally, greatly improving the accuracy and quality of fault handling and improving processing efficiency; and the entire process from identifying abnormal fault signals to creating fault work orders and fault handling is highly intelligent, reducing the time and possible delays of manual intervention and improving response speed.
[0109] The initial fault information refers to a set of basic information provided by the monitoring system, operator or automatic diagnosis tool when the equipment or system detects a fault for the first time. The basic information includes fault type, fault location, fault time, fault level, related parameters, etc.
[0110] The processing flow in step P12 is an initial fault handling flow, which may be adjusted accordingly based on the currently equipped fault handling team to determine the final fault handling flow. Initially, by analyzing the historical summary information, historical cases similar to the current fault information are identified. Based on the matching results of historical cases, the most suitable fault expert can be recommended to ensure that the fault is handled accurately and efficiently.
[0111] Understandably, there may be many reasons for the fault information, such as unreasonable design drawings, non-compliant process operations, or errors in the system integration phase. Therefore, when a fault work order is received, it can be divided into multiple fault subtasks according to the fault type and handled separately.
[0112] like Figure 6 As shown, in one embodiment, step S2 of the present invention may specifically include the following steps.
[0113] Step S221, determining a number of fault subtasks according to the fault type and the node information, and transmitting the fault subtasks to corresponding fault handling experts according to the processing flow of the fault work order;
[0114] Step S222: The fault handling expert determines corresponding fault subtask response information according to the received fault subtask, and updates the fault subtask response information to the node information of the current process node.
[0115] In this way, by dividing the node information of the process nodes according to the fault type and transmitting it to the corresponding experts according to the processing flow, the fault handling process can be made more orderly and efficient, ensuring that the fault is handled in the most professional and accurate way, reducing misjudgment and erroneous handling, and enhancing team collaboration and communication.
[0116] In one embodiment, the fault type is pre-set and may correspond to the entire cycle of completing a product manufacturing, including but not limited to the product design stage (such as design drawing errors), industrial manufacturing stage (such as equipment failure), system integration stage (such as system configuration errors, interface mismatches), etc. In other embodiments, the fault type may also be the fault type of the fault work order itself.
[0117] In one embodiment, the fault information is divided according to professional fields to obtain a number of fault subtasks corresponding to the professional fields.
[0118] In one embodiment, the fault processing is divided into several fault subtasks corresponding to the processing stages.
[0119] In one embodiment, a number of fault handling experts matching the fault subtask in question are determined based on a fault knowledge base.
[0120] Specifically, data is obtained from the maintenance manual, operation manual and historical fault handling reports of the train braking system; the collected data is structured using natural language processing technology and stored in a braking system fault knowledge base.
[0121] In a specific embodiment, the part of "the fault handling expert determines the corresponding fault subtask response information according to the received fault subtask" in step S222 of the present invention may specifically include the following steps.
[0122] Step S2221, determining a prompt instruction according to the fault subtask; wherein the prompt instruction is used to guide the prompt information output by the pre-trained model;
[0123] Step S2222: Guide the pre-trained model according to the prompt instruction to generate response information for the fault subtask.
[0124] like Figure 7 As shown, in one embodiment, step S3 of the present invention specifically includes the following steps.
[0125] Step S31, iteratively determining the fault response information of the next process node according to the node information of the current process node, until the last node information of the last process node is determined;
[0126] Step S32, screening the valid node information in the last node information, and determining the fault response information of the whole process according to the valid node information.
[0127] In this way, by obtaining the last node information of the last process node and determining the fault response information of the entire process, the fault information can be dynamically adjusted at the global level, avoiding the limitations of processing single node information, achieving information sharing, traceability and integration, and improving the quality of fault response information.
[0128] In one embodiment, the corresponding data flag is determined based on the node information of each process node; the node information is filtered based on the data flag to obtain the valid node information of each process node; and the valid node information of the last process node is determined based on the valid node information of each process node.
[0129] In one embodiment, the last node information of the last process node is determined based on the node information of each process node; the valid node information is determined to be the fault response information of the whole process through screening based on the data flag bits in the last node information.
[0130] In one embodiment, an 8D report is used to display fault response information of the overall process.
[0131] Specifically, the fault work order handling system automatically collects all relevant information, including but not limited to fault information, fault analysis results, fault response information and effect verification, and generates a draft 8D report; the draft 8D report is reviewed and edited, and after the review is completed, the fault work order handling system outputs and displays the formal 8D report.
[0132] In one embodiment, the fault response information includes first response information; the first response information is used to temporarily solve the fault information. In this embodiment, the temporary solution may not completely solve the root cause of the fault, but stabilizes the system state in a short time, providing time for further troubleshooting and repair.
[0133] In one embodiment, the fault response information includes second response information; the second response information is used to permanently resolve the fault information.
[0134] In one embodiment, the fault response information may be determined according to a set threshold value, and the method of the present invention further includes the following steps.
[0135] Step S41, determining corresponding fault response information according to the urgency and / or processing cost of the fault information;
[0136] Step S42: when the urgency of the fault information is greater than a set urgency threshold, and / or when the processing cost of the fault information is greater than a set processing cost threshold, determining that the first response information is fault response information;
[0137] Step S43: when the urgency of the fault information is less than a set urgency threshold, and / or when the processing cost of the fault information is less than a set processing cost threshold, the second response information is determined to be fault response information.
[0138] In this way, appropriate fault response information is selected according to the urgency and / or processing cost of the fault information, with good adaptability.
[0139] Figure 8 A schematic diagram of a process flow of a method for handling a fault work order in a preferred embodiment is shown. Figure 8 The content shown summarizes the working process of the incident work order handling method.
[0140] When the fault ticket is created, the workflow is started. According to the fault information and expert team members on the fault ticket, the processing flow of the fault ticket is determined, and the fault information is assigned to the corresponding fault handling expert according to the processing flow.
[0141] When a fault handling expert receives a fault task, he / she determines whether the type of fault task matches the area in which he / she is responsible or good at; if so, he / she determines to accept the fault task, and uses a fault analysis tool to analyze the fault task and determine the fault response information.
[0142] When fault handling experts use fault analysis tools to handle fault tasks, they use fault analysis tools to analyze the fault causes and fault analysis process, and guide the GPT model to perform analysis and prediction through prompt instructions. Based on the output of the GPT model, fault experts can quickly locate the possible causes of the fault and provide corresponding fault response information.
[0143] Finally, the fault response information can be output and displayed in the form of an 8D report.
[0144] One embodiment of the present invention provides a computer-readable storage medium.
[0145] In one embodiment, a computer readable storage medium stores a computer program executed by the processor mentioned above, or a fault work order handling method in any of the technical solutions mentioned above.
[0146] When the processor executes the computer program, it can execute the description of the method for handling the fault work order in any of the above technical solutions, so it will not be repeated here. In addition, the description of the beneficial effects of adopting the same method will not be repeated.
[0147] The computer-readable storage medium may include: a flash drive, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, etc.
[0148] In summary, the fault work order handling method, system and storage medium provided by the present invention determine and dynamically adjust the fault response information of the next process node by utilizing the node information of the previous process node in the fault handling process, thereby determining the fault response information of the entire process, and can quickly respond to fault information, reduce the time for manual intervention and decision-making, improve the efficiency of fault handling, and reduce labor costs; in addition, according to the processing flow of the fault work order, the fault information, fault analysis results and fault response information of each process node can be recorded to realize the sharing of fault-related information, improve the fault handling capability and the accuracy and efficiency of fault handling.
[0149] In addition, by integrating the GPT model and the multi-dimensional fault knowledge base, the expert group can effectively complete task allocation and task tracking, promote node information sharing, accelerate the fault handling process, improve the quality of overall fault diagnosis, make the fault work order processing process intelligent, and improve work efficiency.
[0150] It should be understood that although this specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each implementation mode may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
[0151] The series of detailed descriptions listed above are only specific descriptions of feasible implementation methods of the present invention. They are not intended to limit the scope of protection of the present invention. Any equivalent implementation methods or changes that do not deviate from the technical spirit of the present invention should be included in the scope of protection of the present invention.
Claims
1. A method for handling a fault work order, characterized in that: The disposal method includes: Step S1, determining current node information of a current process node; wherein the current node information includes at least one of fault information and fault analysis results; Step S2, determining the fault response information of the current process node according to the current node information, and updating the fault response information to the current node information; Step S3, determining the fault response information of the next process node according to the current node information, so as to determine the fault response information of the entire process; Wherein, step S2 specifically includes: Determine key elements of the current node information, and generate target prompt instructions based on the key elements; wherein the key elements are used to determine at least one of the sub-fault information and the sub-fault cause in the current node information, including data or information that is instructive for understanding the current state of the node, identifying potential problems or faults, and formulating corresponding strategies; Determine a corresponding fault analysis result according to the target prompt instruction, and update the fault analysis result to the current node information; Step S2 further specifically includes: Determine a number of fault subtasks according to the fault type and the node information, and transmit the fault subtasks to corresponding fault handling experts according to the processing flow of the fault work order; The fault handling expert determines corresponding fault subtask response information according to the received fault subtask, and updates the fault subtask response information to the node information of the current process node; The fault handling expert determines, based on the received fault subtask, that the corresponding fault subtask response information specifically includes: Determine a prompt instruction according to the fault subtask; wherein the prompt instruction is used to guide the prompt information output by the pre-trained model; Generate a pre-trained model according to the prompt instructions and generate response information for the fault subtask.
2. The method for handling a fault work order according to claim 1, characterized in that: The determining of the key elements of the current node information and generating the target prompt instruction according to the key elements specifically include: Divide the current node information according to the hierarchical structure of the fault analysis tool, and determine the corresponding prompt instruction according to the sub-node information of each level; wherein the fault analysis tool includes at least one of a fishbone diagram, a five-question method, and a fault tree; According to the execution result of the prompt instruction of the previous level, the prompt instruction of the next level is determined to determine the target prompt instruction of the entire hierarchical structure.
3. The method for handling a fault work order according to claim 1, characterized in that: Determining the fault response information of the next process node according to the current node information in step S3 specifically includes: Determine whether the current process node is the first node of the process; If not, a target prompt instruction is obtained and generated according to the node information of the current process node, and a corresponding fault analysis result is determined according to the target prompt instruction, and fault response information of the next process node is determined according to the fault analysis result.
4. The method for handling a fault work order according to claim 3, characterized in that: After determining whether the current process node is the first process node, the method further includes: If so, the corresponding fault response information is determined according to the initial fault information as the fault response information of the next process node.
5. The method for handling a fault work order according to claim 1, characterized in that: Before step S1, the method further includes: Receive fault abnormality signals and generate fault work orders according to the corresponding initial fault information; According to the initial fault information, query the historical summary information of the fault knowledge base, and determine the processing flow of the fault work order according to the response information matching the historical summary information; the processing flow includes instruction information of fault handling experts corresponding to several fault work orders; Step S1 specifically includes: In the processing flow of the fault work order, the current node information of the current process node is determined according to the initial fault information.
6. The method for handling a fault work order according to claim 1, characterized in that: Step S3 specifically includes: Iteratively determine the fault response information of the next process node according to the node information of the current process node until the final node information of the final process node is determined; Filter the valid node information in the last node information, and determine the fault response information of the whole process according to the valid node information.
7. The method for handling a fault work order according to claim 1, characterized in that: The fault response information includes at least one of first response information and second response information; the method further includes: Determine corresponding fault response information according to the urgency and / or processing cost of the fault information; When the urgency of the fault information is greater than a set urgency threshold, and / or when the processing cost of the fault information is greater than a set processing cost threshold, determining that the first response information is fault response information; When the urgency of the fault information is less than a set urgency threshold, and / or when the processing cost of the fault information is less than a set processing cost threshold, the second response information is determined to be fault response information.
8. A fault work order handling system, characterized in that: include: A determination module, used to determine current node information of a current process node; wherein the current node information includes at least one of fault information and fault analysis results; An updating module, used to determine the fault response information of the current process node according to the current node information, and update the fault response information to the current node information; A processing module is used to determine the fault response information of the next process node based on the current node information to determine the fault response information of the entire process; wherein, the update module is used to determine the key elements of the current node information, and generate target prompt instructions based on the key elements; wherein, the key elements are used to determine at least one of the sub-fault information and sub-fault causes in the current node information; according to the target prompt instructions, the corresponding fault analysis results are determined, and the fault analysis results are updated to the current node information.
9. The fault work order handling system according to claim 8, characterized in that: The treatment system also includes: The work order generation module is used to generate the corresponding fault work order according to the initial fault information of the product; A work order processing flow generation module is used to query the historical summary information of the fault knowledge base according to the initial fault information, and determine the processing flow of the fault work order according to the matched historical summary information; The display module is used to output and display the fault response information of the overall process.
10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the fault work order handling method according to any one of claims 1 to 7 are performed.
Citation Information
Patent Citations
Information recommendation method and device applied to maintenance service and electronic equipment
CN115310637A
Fault solution query method, device and equipment
CN115952268A
Fault diagnosis guiding method, electronic equipment and storage medium
CN116205627A
Fault processing method, system and device and storage medium
CN116402493A
Vehicle fault diagnosis and prevention method
CN116414990A
