A distributed photovoltaic hierarchical coordinated dispatching method and system for power grid peak regulation
Through the hierarchical coordinated dispatching method of distributed photovoltaic, the three-layer AGC model is used to decompose and allocate the regulation demand of distributed photovoltaic, which solves the problem of insufficient consumption capacity of distributed photovoltaic and realizes the flexibility and accuracy of grid balance and peak regulation control. sex.
Patent Information
- Application Number
- CN202410873832.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-02
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-07-02
AI Technical Summary
The continuous high-speed grid connection of distributed photovoltaics has led to insufficient absorption capacity during special periods, which has brought challenges to the power balance and operation control of the entire network. The traditional centralized power acquisition control model is difficult to adapt to the precise control of wide-area, massive, and dispersed objects, and it is difficult to meet the needs of new Grid balancing requirements in power systems.
A distributed photovoltaic hierarchical collaborative dispatching method for power grid peak regulation is proposed. It adopts a three-layer distributed AGC model, including regions, groups and control units. By obtaining distributed photovoltaic collaborative interaction information, it combines automatic power generation control regions, groups and control units. The control mode of the control unit realizes the step-by-step decomposition and distribution of adjustment requirements to ensure precise regulation of distributed photovoltaics.
It achieves precise regulation of distributed photovoltaics, meets the grid balancing needs under the new power system, improves the access and regulation capabilities of georegional resources, adapts to the interactive needs of distributed resources, and ensures the flexibility and diversity of grid peak regulation control.
Smart Images

Figure CN118412936B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of distributed photovoltaic technology, and in particular to a distributed photovoltaic hierarchical coordinated scheduling method and system for power grid peak regulation. Background Art
[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.
[0003] The continuous high-speed grid connection of distributed photovoltaic power generation has led to an increasingly prominent problem of insufficient absorption capacity during special periods, posing severe challenges to the power balance and operation control of the entire network. Distributed photovoltaic power generation is urgently needed to participate in the peak load control of the power grid. If the traditional centralized power supply acquisition and control mode continues to be used, the provincial EMS (Energy Management System) will "directly collect and control" it, which will be unsustainable in terms of the carrying capacity of the main station system and the communication carrying capacity. At the same time, the local (county) dispatch, as the dispatching and jurisdiction agency of distributed photovoltaic power generation, lacks the necessary means of regulation and control. The traditional model cannot adapt to the precise regulation of wide-area, massive, and dispersed objects, and it is difficult to meet the grid balance needs under the new power system. Summary of the invention
[0004] In order to solve the above problems, the present invention provides a distributed photovoltaic hierarchical collaborative scheduling method and system for power grid peak regulation. In order to ensure the flexibility of distributed photovoltaic regulation and the multi-objective control requirements generated by diverse regulation requirements, distributed AGCs are deployed in dispatching centers at all levels, and a three-layer distributed AGC model including regional, group and control units is proposed. A corresponding control mode is deployed for each layer to achieve step-by-step decomposition of regulation requirements, thereby realizing precise regulation of distributed photovoltaics and meeting the grid balance requirements under the new power system.
[0005] In order to achieve the above object, the present invention adopts the following technical solution:
[0006] A first aspect of the present invention provides a distributed photovoltaic hierarchical coordinated scheduling method for power grid peak regulation, comprising:
[0007] Obtain distributed photovoltaic collaborative interaction information;
[0008] Based on the distributed photovoltaic collaborative interaction information, combined with the distributed automatic power generation control area control mode at this level, the total regulation demand of the distributed photovoltaic area at this level is generated;
[0009] Based on the total regulation demand of the distributed photovoltaic area, the total regulation demand of each group is generated according to the group control mode and the inter-group allocation strategy;
[0010] Based on the total regulation demand of each group, the regulation demand within the group is allocated according to the control mode of the control unit and the allocation strategy within the group, and the regulation demand allocated to each control unit is obtained;
[0011] The regulation requirements assigned to each control unit are corrected according to the regulation step and the operating limit to obtain the control target of each control unit.
[0012] Furthermore, the acquisition of the distributed photovoltaic collaborative interaction information relies on a hierarchical collaborative control architecture, which includes a dispatching side, a marketing side, and a resource layer. The dispatching side includes provincial dispatching and local dispatching, and the resource layer includes 10kV and above distributed photovoltaic stations and low-voltage distributed users.
[0013] The distributed photovoltaic collaborative interaction information includes: provincial and local collaborative status information, 10kV and above distributed aggregation information received by the provincial dispatch from the local dispatch, low-voltage distributed aggregation information received by the provincial dispatch from the marketing side, 10kV and above distributed photovoltaic collaborative control targets sent by the provincial dispatch to the local dispatch, and low-voltage distributed peak-shaving total demand sent by the provincial dispatch to the marketing side.
[0014] Furthermore, if the current level is provincial adjustment, the region is a province, the grouping is determined according to the control priority of the resource, and the control unit is a regional aggregation unit;
[0015] If the current level is local dispatching, the region is divided according to whether it participates in provincial and local coordinated control, the grouping is based on districts or counties, and the control unit is a distributed station of 10kV and above.
[0016] Furthermore, the group control mode includes regional adjustment, manual setting, maximum batch size and minimum batch size;
[0017] If the group control mode is regional regulation, each group obtains the total regulation demand of each group by decomposing and allocating the total regulation demand of the distributed photovoltaic area; otherwise, each group calculates the total regulation demand of each group separately;
[0018] The control modes of the control unit include local, waiting, automatic, highest and lowest;
[0019] If the control mode of the control unit is automatic, each control unit obtains the regulation demand allocated to each control unit by decomposing and allocating the total regulation demand of each group; otherwise, each control unit calculates the total regulation demand separately;
[0020] If the control mode of the distributed group of 10kV and above in the provincial distributed automatic power generation control is switched to regional regulation first, the control mode of the regional aggregation units participating in the provincial and local coordinated control within the group will be automatic; if the control mode of the group participating in the provincial and local coordinated control in the local distributed automatic power generation control is regional regulation, the control mode of the stations participating in the provincial and local coordinated control within the group will be automatic; after the regulation of the distributed group of 10kV and above is completed, the provincial distributed automatic power generation control will switch the control mode of the low-voltage distributed group.
[0021] Furthermore, if the current level is provincial dispatch, the regional control mode includes free power generation, peak load control and manual setting point; if the current level is local dispatch, the regional control mode includes free power generation, manual setting point and coordinated control;
[0022] If the regional control mode is free power generation, there is no regulation demand;
[0023] If the regional control mode is peak load control, the total regulation demand of the distributed photovoltaic area follows the reserve calculation of the thermal power units participating in frequency regulation, and a buffer segment is set to prevent frequent switching between peak load regulation and power restriction and recovery and additional generation;
[0024] If the regional control mode is manual setting, the total regulation demand of the distributed photovoltaic region is the difference between the input control target and the actual output;
[0025] If the regional control mode is collaborative control, the total regulation demand of the distributed photovoltaic area is the difference between the forwarding control target and the actual output of the area.
[0026] Furthermore, the inter-group allocation strategy and the intra-group allocation strategy both include a priority allocation strategy and a proportional allocation strategy;
[0027] The priority allocation strategy includes a load rate ranking strategy and a power generation cost ranking strategy;
[0028] The load rate sorting and allocation strategy is: in each instruction cycle, the downward adjustment demand is sorted and allocated according to the load rate from high to low, and the upward adjustment demand is sorted and allocated according to the load rate from low to high, until all the adjustment demands are allocated; the load rate is calculated according to the real-time output and installed capacity;
[0029] The power generation cost sorting and allocation strategy is: in each instruction cycle, the downward adjustment demand is sorted and allocated according to the power generation cost from high to low, and the upward adjustment demand is sorted and allocated according to the power generation cost from low to high, until all the adjustment demands are allocated;
[0030] The proportion allocation strategy includes an installed capacity proportion allocation strategy and an adjustable capacity proportion allocation strategy;
[0031] The installed capacity proportion allocation strategy is: in each instruction cycle, each controlled object bears the total regulation demand in proportion according to the installed capacity sharing factor;
[0032] The adjustable capacity proportion allocation strategy is: in each instruction cycle, each controlled object bears the total adjustment demand in proportion according to the adjustable capacity sharing factor.
[0033] Furthermore, it also includes: evaluating the response of all control units, and initiating the transfer of adjustment requirements according to set conditions, and suspending the control units that are not tracked, and restoring automatic control according to the recovery conditions.
[0034] Furthermore, the response situation adopts the response rate: ; In the formula, is the control unit i response rate, is the actual adjustment amount of control unit i; is the expected adjustment amount of object i;
[0035] The setting condition is: the control unit's response does not meet a first setting threshold value in two consecutive cycles;
[0036] The method for transferring the regulation demand is as follows: for a certain control unit, based on the revised regulation demand, the expected response amount is calculated, and after deducting the expected response amount of the control unit from the total regulation demand, the total regulation demand is allocated to other control units.
[0037] Furthermore, the control unit that does not track is a control unit whose response condition does not meet a second set threshold value for more than two consecutive set periods;
[0038] The suspension method is: the control unit does not participate in the allocation of the total regulation demand, and the control target of the control unit is to reduce a step size based on the current output;
[0039] The recovery condition is: the control unit adjusts the total adjustment demand of the group to which it belongs in the reverse direction or the control unit restores the tracking state.
[0040] A second aspect of the present invention provides a distributed photovoltaic hierarchical coordinated dispatching system for power grid peak regulation, comprising:
[0041] A data acquisition module is configured to: acquire distributed photovoltaic collaborative interaction information;
[0042] A total regulation demand generation module is configured to: generate a distributed photovoltaic regional total regulation demand based on the distributed photovoltaic collaborative interaction information and in combination with a distributed automatic power generation control regional control mode at this level;
[0043] A group control module is configured to: generate a total regulation demand of each group based on the total regulation demand of the distributed photovoltaic area according to the group control mode and the inter-group allocation strategy;
[0044] The intra-group control module is configured to: allocate the intra-group regulation requirements based on the total regulation requirements of each group, according to the control mode of the control unit and the intra-group allocation strategy, and obtain the regulation requirements allocated to each control unit;
[0045] The correction module is configured to correct the adjustment demand allocated to each control unit according to the adjustment step and the operation limit value to obtain the control target of each control unit.
[0046] Furthermore, it also includes: a suspension module, which is configured to: evaluate the response of all control units, and start the adjustment demand transfer according to the set conditions, and suspend the control units that are not tracked, and resume automatic control according to the recovery conditions.
[0047] Compared with the prior art, the present invention has the following beneficial effects:
[0048] In order to ensure the flexibility of distributed photovoltaic regulation and the multi-objective control requirements generated by diverse regulation requirements, the present invention deploys distributed AGCs at all levels of dispatching centers, proposes a three-layer distributed AGC model including regional, group and control units, and deploys corresponding control modes and inter-layer allocation strategies for each layer to achieve step-by-step decomposition of regulation requirements, realize precise regulation of distributed photovoltaics, and meet the grid balance requirements under the new power system.
[0049] The present invention evaluates and tracks the situation in real time, proposes correction and transfer strategies for regulation demand, ensures the overall execution effect when the regulation performance of some resources is insufficient, and promptly eliminates distributed stations that do not have regulation capabilities according to the response situation, thereby achieving overall optimization control of distributed photovoltaics under peak regulation scenarios.
[0050] The present invention constructs a multi-level collaborative control architecture. On the basis of the original provincial control, it improves the local (county) resource access and control capabilities, realizes provincial, local and distribution coordinated dispatch and coordinated connection of dispatch and marketing systems, adapts to the interactive needs of distributed resources, can be expanded to distributed photovoltaic and other distributed resource control scenarios, and improves the collaborative interaction capabilities of distributed resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] The accompanying drawings, which constitute a part of the specification of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention, but do not constitute limitations of the present invention.
[0052] Figure 1 A hierarchical collaborative control architecture diagram of a distributed photovoltaic hierarchical collaborative scheduling method for power grid peak regulation according to the first embodiment of the present invention;
[0053] Figure 2 This is a structural diagram of a distributed AGC control model according to the first embodiment of the present invention;
[0054] Figure 3 This is a flow chart of the transfer allocation strategy of the first embodiment of the present invention;
[0055] Figure 4 This is a suspension strategy flow chart of the first embodiment of the present invention. DETAILED DESCRIPTION
[0056] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0057] It should be noted that the following detailed descriptions are exemplary and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0058] In the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other. The present invention is further described below with reference to the accompanying drawings and embodiments.
[0059] Embodiment 1
[0060] The purpose of this first embodiment is to provide a distributed photovoltaic hierarchical coordinated scheduling method for power grid peak regulation.
[0061] This embodiment provides a distributed photovoltaic hierarchical coordinated scheduling method for power grid peak regulation, which is based on a hierarchical coordinated control architecture to achieve distributed photovoltaic precise regulation and control to meet the power grid balance requirements.
[0062] This embodiment provides a distributed photovoltaic hierarchical coordinated scheduling method for power grid peak load regulation, including the following steps:
[0063] Step 1: Build a hierarchical collaborative control architecture, deploy distributed AGC (Automatic Generation Control) at each level of dispatching center, and establish hierarchical control models respectively.
[0064] In this embodiment, the control centers are classified into: provincial control centers (abbreviated as provincial control centers) and prefecture-level control centers (abbreviated as prefecture-level control centers).
[0065] (1) Provincial, municipal and county hierarchical collaborative control framework (i.e. hierarchical collaborative control framework).
[0066] The constructed hierarchical collaborative control architecture includes the provincial dispatching layer (provincial dispatching side), the local dispatching layer (local dispatching side, distribution dispatching side), and the resource layer (including 10kV and above distributed photovoltaic stations, low-voltage distributed users) vertically, and connects the dispatching side and the marketing side (including the electricity consumption information collection system and the load control management system) horizontally.
[0067] like Figure 1 As shown in the figure, the safety zone I on the provincial dispatching side is equipped with a smart grid dispatching technical support system (D5000 system), and deploys thermal power AGC (Automatic Generation Control), SCADA (Supervisory Control And Data Acquisition) and distributed AGC. The safety zone I on the local dispatching side is equipped with an EMS system, and SCADA and distributed AGC are deployed. The safety zone I on the dispatching side is equipped with a distribution automation system. The marketing side is equipped with an electricity usage information collection system and a load control management system.
[0068] Based on the above-mentioned hierarchical collaborative control architecture, there are three paths for information interaction between the local dispatching layer and 10kV and above distributed stations: ① Using the dispatching data network to realize the direct collection of distributed information and the issuance of control instructions; ② Using the 5G wireless private network through the secure access area to realize the direct collection of distributed information and the issuance of control instructions; ③ Through the distribution automation system on the dispatching side, wireless collection is used and then forwarded to the local dispatching side to realize distributed information collection. Information interaction between the local dispatching side and the provincial dispatching side: The local dispatching side sends the regional distributed aggregation information to the provincial dispatching side and receives the control instructions issued by the provincial dispatching side, thereby realizing the dispatching (provincial dispatching, local dispatching) of 10kV and above distributed photovoltaic observation and control.
[0069] The information interaction between the dispatching side and the low-voltage distributed is realized through the through-dispatching D5000 system and the marketing electricity information collection system and load control management system. The electricity information collection system collects low-voltage distributed data and forwards it to the multi-coordinated management system on the provincial dispatching side (deployed in the safety zone III control cloud). After the multi-coordinated management system on the provincial dispatching side aggregates the low-voltage distributed power in each region and the whole province, on the one hand, the province's low-voltage distributed aggregated information (the total output of the province's low-voltage distributed power) is sent to the provincial dispatching, and the total low-voltage distributed peak-shaving demand generated by the provincial dispatching is received, and forwarded to the marketing side load control management system for distribution to low-voltage distributed users; on the other hand, the low-voltage distributed aggregated information of each region is sent to the local dispatching side EMS system through the corresponding local dispatching side multi-coordinated management system (safety zone III control cloud), realizing the dispatching (provincial dispatching, local dispatching) observation and regulation of low-voltage distributed photovoltaics.
[0070] The hierarchical collaborative control architecture can meet two types of control requirements at the same time: one is the centralized and unified control requirements of the provincial dispatching, such as the peak load regulation of the entire network. The provincial dispatching distributed AGC generates the distributed total regulation requirements, decomposes and sends the 10kV and above distributed photovoltaic regulation requirements to local dispatching, and then decomposes and sends them to the 10kV and above distributed photovoltaic stations for execution; the low-voltage distributed regulation requirements are forwarded to the marketing side load control management system, and then decomposed and sent to the low-voltage distributed photovoltaic users by the marketing side load control management system. The second is the regional control requirements such as regional section flow control, which are generated by the local dispatching distributed AGC and decomposed and sent to the distributed photovoltaic stations / users (resource layer) for execution.
[0071] (2) Provincial and regional distributed AGC hierarchical modeling.
[0072] like Figure 2 As shown in the figure, in order to ensure the flexibility of control and the multi-objective control requirements generated by various adjustment requirements, provincial and local distributed AGCs adopt a three-layer model, namely, region, group, and control unit, and there is an inclusion relationship in sequence: the region aggregates the operating information of all groups in the region; the group aggregates the operating information of the control units in the group; the control unit is the smallest unit for distributed AGC monitoring and control, which can be a separate photovoltaic station or a distributed aggregation point. Such objects can set their control modes individually to achieve flexible scheduling management.
[0073] The models of provincial and local distributed AGC layers can be set according to the needs of regulation and management. The provincial distributed AGC area is the provincial dispatch. In order to achieve provincial and local coordinated control in the full network peak-shaving scenario, the provincial distributed AGC grouping method is determined according to the control priority of the resources. In the full network peak-shaving scenario, distributed photovoltaics participate in peak-shaving in the order of high voltage level first and low voltage level later, that is, 10kV and above distributed photovoltaics participate in peak-shaving first, and low-voltage distributed photovoltaics participate in peak-shaving later. Therefore, the provincial distributed AGC grouping can be divided into 10kV and above distributed photovoltaic groups and low-voltage distributed photovoltaic groups. The provincial distributed AGC control unit is a regional aggregation unit. The local distributed AGC area is divided according to whether it participates in provincial and local coordinated control. Each area is set separately whether to participate in provincial coordinated control, that is, the distributed that can participate in provincial and local coordinated control is regarded as a separate area, and the distributed that cannot participate in provincial and local coordinated control is regarded as other separate areas; the local distributed AGC grouping can be divided according to the district (county), that is, each management area is regarded as a separate group. The local distributed AGC control unit is a 10kV and above distributed station.
[0074] The three-layer control modes of distributed AGC correspond to regional control mode, group control mode and regional (station) control mode. Regional control modes include free power generation, manual setting, peak load control and coordinated control (region). Group control modes include maximum batch, minimum batch, regional regulation and manual setting. Control modes of control unit (region / station) include local, highest, lowest, waiting, pause, automatic and base point.
[0075] When the regional control mode is free power generation, its subordinate group control mode automatically switches to the largest batch, and the control mode of the control unit in the group is switched to the highest batch, and the instructions issued are the regional (station) installed capacity, thereby achieving full absorption.
[0076] When the regional control mode is manual setting, the control target of the region comes from the set value input by the personnel, and the regional regulation demand is the difference between the input control target and the actual output; when the regional control mode is peak load control, the regional regulation demand is automatically calculated based on the standby information and reserved standby threshold of the thermal power units participating in frequency regulation (hereinafter referred to as R-mode units); when the local AGC regional control mode is collaborative control, the control target of the region comes from the target value issued by the superior dispatcher, and the regional regulation demand is the difference between the forwarded provincial and local collaborative control target and the actual output of the region. The allocation of regional regulation demand is decomposed into the group set as the regional regulation mode under the region according to a certain allocation strategy. The allocation strategy includes: adjustable capacity ratio, installed capacity ratio, priority sequence, cost sequence and load rate sequence. Groups in non-regional regulation modes (largest batch, minimum batch, manual setting) do not bear the allocation of regional regulation demand, and the control target of this group is calculated separately according to the set control mode.
[0077] When the group control mode is regional regulation, it bears the regional regulation demand; when the group control mode is manual setting, the control target of the group comes from the set value input by the dispatching operator, and the regulation demand is the difference between the input control target and the actual output. The obtained group regulation demand is decomposed into the areas (stations) set to the automatic control mode under the group according to a certain allocation strategy; the group regulation demand allocation strategy includes: adjustable capacity ratio, installed capacity ratio, priority sequence, cost sequence and load rate sequence. Areas (stations) in non-automatic control mode (on-site, highest, lowest, waiting to be put into operation, suspended, base point) do not bear the allocation of group regulation demand, and the control target of this control unit is calculated separately according to the set control mode.
[0078] Step 2: Based on the hierarchical collaborative control architecture, the provincial dispatching, local dispatching and marketing sides exchange distributed photovoltaic collaborative information in real time.
[0079] Distributed photovoltaic collaborative interaction information, according to the classification of interaction objects, includes provincial and local collaborative interaction information as well as dispatching and marketing side collaborative interaction information.
[0080] The provincial and local coordinated interaction information includes the 10kV and above distributed aggregation information received by the provincial dispatch from the local dispatch, the provincial and local coordinated status information, and the 10kV and above distributed photovoltaic coordinated control targets sent by the provincial dispatch to the local dispatch.
[0081] (1) The provincial dispatching station receives distributed aggregation information of 10 kV and above from the local dispatching station.
[0082] The local adjustment aggregates the distributed photovoltaic information of 10kV and above in the region (distributed aggregation information of 10kV and above), including the total adjustable sum and non-adjustable sum of distributed power of 10kV and above. The total adjustable sum of distributed power of 10kV and above is the distributed aggregation information of 10kV and above in the region that can participate in the provincial and local coordination, including adjustable installed capacity, adjustable real-time output, adjustable upper limit (consistent with adjustable installed capacity), adjustable lower limit, etc.; the total non-adjustable sum of distributed power of 10kV and above is the distributed aggregation information of 10kV and above in the region that cannot participate in the provincial and local coordination, including non-adjustable installed capacity and non-adjustable real-time output.
[0083] (2) Provincial and local coordination status information.
[0084] The provincial-local coordination status information includes the "provincial-local coordination ready" and "provincial-local coordination input" signals of the local dispatching distributed AGC sent by the local dispatching to the provincial dispatching, and the "provincial-local coordination request" signal sent by the provincial dispatching to the local dispatching.
[0085] The "provincial and local coordination ready" signal of the local distributed AGC sent to the provincial dispatch by the local dispatch is generated based on the regional closed-loop status and operation status of the local distributed AGC. That is, when the regional closed-loop status is "yes" and the regional operation status is "normal operation", the "provincial and local coordination ready" status is "yes"; otherwise, it is "no".
[0086] The "provincial-local coordination input" signal of the local dispatching distributed AGC sent to the provincial dispatching indicates whether the local dispatching distributed AGC is in the provincial-local coordination mode. The status is "yes", that is, the local dispatching distributed AGC area is in the provincial-local coordination mode, and is uniformly controlled by the provincial dispatching distributed AGC, and receives the overall control target of the area issued by the provincial dispatching distributed AGC.
[0087] The "provincial and local coordination request" signal sent by the provincial dispatching station to the local dispatching station indicates whether there is a need for provincial and local coordinated control. When centralized and unified control by the provincial dispatching station is required, the provincial dispatching station initiates a provincial and local coordination request, and the status of the "provincial and local coordination request" signal is "yes".
[0088] The coordinated interactive information between the dispatching side and the marketing side includes the low-voltage distributed aggregation information received by the provincial dispatching side from the marketing side. The low-voltage distributed data collected by the marketing power procurement system is aggregated by the provincial dispatching side's multi-coordinated management and control system (Zone III Control Cloud) for low-voltage distributed aggregation in each region and the whole province, and then sent to the provincial dispatching distributed AGC to obtain low-voltage distributed aggregation information (total output of low-voltage distributed power in the whole province). The low-voltage distributed aggregation information mainly includes: total low-voltage distributed flexible load, total low-voltage distributed rigid load, low-voltage distributed flexible installed capacity, low-voltage distributed rigid installed capacity, etc.
[0089] The collaborative interaction information between the dispatching side and the marketing side also includes the total low-voltage distributed peak-shaving demand sent by the provincial dispatching to the marketing side, which is decomposed by the load control management system on the marketing side and sent to low-voltage distributed users for execution.
[0090] Step 3: The provincial and local distributed AGCs generate the total regional regulation demand of the distributed AGC at this level based on the coordinated interaction information of distributed PV and the regional control mode set by the distributed AGC at this level.
[0091] (1) Provincial distributed AGC regional control mode and regulation demand calculation.
[0092] The provincial distributed AGC regional control mode includes free power generation, peak-shaving control, and manual point setting, which correspond to the distributed photovoltaic full absorption scenario, participation in peak-shaving scenario, and target control scenario respectively.
[0093] ① When the regional control mode is free power generation, the target instructions of all control objects in the region are installed capacity, so as to achieve full absorption. That is, the regional total control target is the total installed capacity of distributed power in the province, which is the total sum of the 10kV and above adjustable installed capacity sent from various places. The distributed photovoltaic power in the region can be fully generated, which can be understood as no regulation demand.
[0094] ② When the regional control mode is peak load control, the regional total regulation demand follows the real-time calculation of the reserve of the thermal power units participating in frequency regulation (hereinafter referred to as R-mode units).
[0095] When the reserve of thermal power R-mode units is lower than the low threshold value, distributed photovoltaics begin to decrease, and the expression is: , , where: is the total regulation demand of distributed photovoltaics (i.e. the total regulation demand of distributed photovoltaic regions); It is the real-time standby value of thermal power R-mode units; It is the lower standby threshold value for thermal power R-mode units.
[0096] In addition, in order to avoid frequent switching between peak load regulation and power restriction and restoration of additional generation of distributed photovoltaic power, a high threshold value for reserve under R-mode thermal power units is set at the same time. When the reserve under R-mode thermal power units is higher than the high threshold value, distributed photovoltaic power starts to resume upward regulation, and the regulation demand is still calculated according to the low threshold value. The expression is: , , where: It is the high standby threshold value for thermal power R-mode units.
[0097] When the reserve of thermal power R-mode units is between two threshold values, that is, < < It is the buffer zone, which is neither increased nor decreased.
[0098] ③ When the regional control mode is manual set point, the regional total control target is the manually input set value, and the regional adjustment demand is the difference between the input control target and the actual output, expressed as: , where: P set Setting goals for humans; P rt It is the total current output (i.e., the total price of the adjustable real-time output sent from various places).
[0099] (2) Calculation of regional control mode and regulation demand of distributed AGC.
[0100] The regional control modes of the local distributed AGC include free power generation, manual setting, and coordinated control, which correspond to the distributed photovoltaic full consumption scenario, target control scenario, and provincial and local coordinated control scenario. Among them, in the free power generation and manual setting modes, the calculation method of the regional total regulation demand is the same as that of the provincial distributed AGC, the difference lies in the coordinated control mode.
[0101] When the regional control mode is coordinated control, the regional total control target is the provincial and local coordinated control target issued by the provincial regulator. The regional total regulation demand is the difference between the provincial and local coordinated control target and the actual output, expressed as: , where: P ref It is the provincial and local coordinated control target issued by the provincial coordination department.
[0102] The regional control mode of the local dispatching distributed AGC is switched from other modes to collaborative control. When the provincial dispatching initiates a provincial-local collaborative request, it is automatically switched according to whether the local dispatching distributed AGC meets the collaborative control conditions.
[0103] Specifically, in the full network peak load scenario, the provincial dispatching system initiates a request for provincial and local coordination, and the status of the "provincial and local coordination request" signal sent by the provincial dispatching system is "yes". When a local dispatching distributed AGC operates normally and the regional closed loop, that is, "provincial and local coordination ready" is "yes", it receives the "provincial and local coordination request" issued by the provincial dispatching system, and automatically switches to the coordinated control mode. At this time, the "provincial and local coordination input" signal switches to "yes" and is sent to the provincial dispatching system. The provincial dispatching distributed AGC receives the "provincial and local coordination input" signal sent by the local dispatching system, determines that the area can accept provincial dispatching control, and switches the control mode of the corresponding regional aggregation unit to automatic. Then the aggregation unit in the area participates in the decomposition and allocation of the total regulation demand of the provincial dispatching system.
[0104] Step 4: The provincial dispatching distributed AGC decomposes the regional total regulation demand into the total regulation demand of each group according to the group control mode and the inter-group allocation strategy, and then distributes and corrects the total regulation demand of each group according to the control mode of the control unit within the group (i.e. the control mode of the regional aggregation unit) and the intra-group allocation strategy, generates the provincial and local coordinated control targets of each region participating in the provincial and local coordination, and forwards them to each local dispatching; at the same time, the total low-voltage distributed peak-shaving demand is forwarded to the marketing side load control and management system. The local dispatching participating in the provincial and local coordination receives the provincial and local coordinated control targets forwarded by the provincial dispatching as the local 10kV and above distributed photovoltaic regional total control targets, calculates the total regulation demand, and then decomposes and sends it to the 10kV and above distributed photovoltaic stations layer by layer for execution according to the group control mode and the inter-group allocation strategy, the control mode of the control unit within the group (i.e. the control mode of the station) and the intra-group allocation strategy; the marketing side load control and management system receives the low-voltage distributed peak-shaving total demand forwarded by the provincial dispatching distributed AGC, decomposes and sends it to the low-voltage distributed users for execution.
[0105] (1) Provincial and local distributed AGC group control mode.
[0106] The group control objects can also switch the control targets by setting different control modes, including regional regulation, manual set point, maximum batch and minimum batch. Among them, the groups in the group control mode of regional regulation participate in the decomposition and allocation of the total regional regulation demand, and the groups in other control modes calculate the group regulation demand separately.
[0107] According to the priority of distributed photovoltaic participation in peak regulation in the full network peak regulation scenario, the control mode of 10kV and above distributed groups in the provincial distributed AGC will be switched to regional regulation first, and bear the total regulation demand of provincial distributed areas; the local distributed AGC will participate in the provincial and local coordinated control in the group control mode of regional regulation, and participate in the decomposition and allocation of the total regulation demand of local distributed areas. After the regulation of 10kV and above distributed groups is completed, the provincial distributed AGC will switch to the low-voltage distributed group control mode, and forward the total low-voltage distributed peak regulation demand to the marketing side load control management system for execution.
[0108] (2) Control unit control mode.
[0109] The control modes of the control unit include local, waiting, automatic, maximum, minimum, etc. Among them, the control unit in the automatic mode participates in the decomposition and allocation of the regulation demand of this group, and the control unit in other control modes calculates the control target of the control unit separately.
[0110] In the full-network peak-shaving scenario, under the 10kV and above distributed groups in the provincial distributed AGC, the control mode of the regional aggregation units participating in the provincial and local coordinated control is automatic, and they participate in the decomposition and allocation of regulation demands of the 10kV and above distributed groups; under the grouping of regional regulation modes of the local distributed AGC, the control mode of the stations participating in the provincial and local coordinated control is automatic, and they participate in the decomposition and allocation of regulation demands of the group.
[0111] (3) Provincial and regional distributed AGC inter-group and intra-group allocation strategies.
[0112] Both the inter-group allocation strategy and the intra-group allocation strategy include two categories: priority allocation and proportional allocation. The priority allocation strategy mainly includes load rate ranking, power generation cost ranking, etc., and the proportional allocation strategy mainly includes installed capacity ratio, adjustable capacity ratio, etc.
[0113] ① Load rate sorting and allocation.
[0114] Under this allocation strategy, the load rate of each controlled object is calculated in real time in each instruction cycle, and the downward adjustment demand is allocated in order from high to low load rate, and the upward adjustment demand is allocated in order from low to high load rate until all the adjustment demands are allocated. In the long-term dynamic allocation and adjustment process, the sorting strategy can achieve a relative balance of load rates.
[0115] The load rate of the controlled object (regional aggregation unit, station) is calculated based on the real-time output and installed capacity, and the expression is: , where: is the load rate of object i; is the current output value of object i; is the installed capacity of object i.
[0116] ② Ranking and allocation of power generation costs
[0117] Under this allocation strategy, in each instruction cycle, according to the power generation cost obtained in advance from the spot market technical support system, the downward adjustment demand is allocated in descending order of power generation cost, and the upward adjustment demand is allocated in descending order of power generation cost, until all the adjustment demands are allocated.
[0118] ③Allocation of installed capacity ratio.
[0119] Under this allocation strategy, in each instruction cycle, each controlled object bears the total regulation demand in proportion according to the calculated installed capacity sharing factor, and the expression is: , where: The reconciliation demand allocated to object i, is the total regulation demand; is the installed capacity of object i; N is the number of objects.
[0120] ④Adjustable capacity ratio allocation.
[0121] Under this allocation strategy, in each instruction cycle, each controlled object bears the total adjustment demand in proportion according to the calculated adjustable capacity sharing factor, which is expressed as: , where: The reconciliation demand allocated to object i, is the total regulation demand, is the predicted power of object i, is the current output value of object i, and N is the number of objects. This method relies heavily on the accuracy of distributed photovoltaic power prediction.
[0122] (4) Adjustment demand / control instruction constraints.
[0123] In each instruction cycle, the regulation amount shared by each control unit (regional aggregation unit, distributed site) is subject to the constraints of its regulation step and operating limit, and the control instruction of each control unit is obtained after correction according to the grid frequency conditions.
[0124] First, the regional total regulation demand is constrained by the set regional total regulation step, that is, when the regional total regulation demand is greater than the regional total regulation step, the regional total regulation demand is corrected to the regional total regulation step, thereby limiting the total amount of single regulation and preventing the large and rapid fluctuations in distributed output caused by AGC adjustment from affecting the power grid. Secondly, the regulation demand shared by each control unit is constrained by its regulation step, and the expression is: , where: is the adjustment step length of control unit i. That is, the adjustment demand allocated to object i Update to min( , ).
[0125] At the same time, the control instructions of each control unit should be within the preset adjustment range. If the real-time output of each control unit plus the allocated adjustment demand is higher than the upper limit, it is limited to the upper limit value; if it is lower than the lower limit, it is limited to the lower limit value.
[0126] Step 5: During the execution of the command, the provincial and local distributed AGCs will count the command responses of the control objects at each layer in real time, and adjust the demand transfer, non-tracking judgment and suspension according to the set conditions to achieve overall optimized control.
[0127] (1) Response situation statistics.
[0128] The response situation of the control object instruction is reflected by the response rate, and the expression is: , where: n i is the instruction response rate of object i in the previous cycle; is the actual adjustment amount of object i in the previous cycle; is the desired adjustment amount of object i in the previous cycle (the difference between the issued control target and the actual output at the time of instruction issuance).
[0129] If the change directions of the actual adjustment amount and the expected adjustment amount are opposite, the response rate is recorded as zero.
[0130] (2) Adjustment demand transfer.
[0131] To ensure the overall execution effect, an adjustment demand transfer strategy is adopted: according to the response rate of the control object, when the response rate of the control object N ranked in the front is lower than the first set threshold value K1 for two consecutive cycles, the adjustment demand transfer allocation strategy is started. When lowering, fully utilize the stations with good adjustment performance, and when raising, allow the stations with sufficient power generation capacity to occupy the sending space first. The process of the transfer allocation strategy is as Figure 3 shown. In the next control cycle, for the control object with a low response rate, the adjustment demand is normally allocated. After deducting the expected response amount of this control object (the product of the response rate in the previous control cycle and the allocated adjustment demand) from the total adjustment demand, it is then allocated to other control objects. The expression is: , until the remaining demand is 0 or there are no remaining objects. Among them, is the total adjustment demand in the next control cycle after demand transfer, is the total adjustment demand in the next control cycle before demand transfer, is the adjustment demand allocated to the control object j with a low response rate in the next control cycle, is the response rate of the control object j in the previous control cycle.
[0132] (3) Non-tracking judgment and suspension.
[0133] When the response rate of the control object (control unit) M is lower than the second set threshold value K2 (K2 < K1) by n% in consecutive set cycles (greater than 2), it is judged that this control object (station) does not track, and the suspension strategy is started to prevent the station without adjustment ability from always occupying the adjustment demand, as Figure 4 shown. In the suspended state, the control object does not participate in the decomposition and allocation of the total adjustment demand, and its control target is to lower by one step based on the current output, that is, the adjustment target of object M = the current actual output of object M - the adjustment step of object M.
[0134] When any of the following recovery conditions is met, the control mode automatically resumes from suspension and participates in the decomposition and allocation of regulation requirements normally:
[0135] ① The total regulation demand of the group to which the control object belongs is reversed, that is, the regulation direction of the group to which the next control cycle belongs is opposite to that of the previous control cycle;
[0136] ② The control object resumes the tracking state, that is, the command response rate of the control object in the suspended state is higher than the set threshold value, and the object M resumes automatic control from the suspended state and participates in the decomposition and allocation of the total regulation demand.
[0137] This embodiment provides a distributed photovoltaic hierarchical collaborative dispatching method for power grid peak regulation. In order to ensure the flexibility of distributed photovoltaic regulation and the multi-objective control requirements generated by various regulation requirements, distributed AGC is deployed in dispatching centers at all levels, and a three-layer distributed AGC model including regional, group and control units is proposed. A corresponding control mode is deployed for each layer to achieve step-by-step decomposition of regulation requirements, and the decomposed regulation requirements are corrected and transferred, thereby achieving precise regulation of distributed photovoltaics and meeting the grid balance requirements under the new power system.
[0138] Embodiment 2
[0139] The purpose of the second embodiment is to provide a distributed photovoltaic hierarchical coordinated dispatching system for power grid peak regulation, including:
[0140] The provincial dispatching distributed AGC is based on the active power control demand under the current control scenario of the power grid, and decomposes and distributes the control demand among the control objects after aggregation of equal values in the group control systems of local dispatching groups according to certain strategies, so as to realize the centralized management of controllable resources of local dispatching groups across the province; at the same time, it also provides a manual intervention interface to meet the scenario requirements of dispatching personnel to manually set control targets.
[0141] The local dispatching distributed AGC statistically aggregates the regulation capabilities of the local dispatching direct procurement and the adjustable resources of each county dispatching, and reports to the distributed AGC on the provincial dispatching side in real time, providing data support for the coordinated decision-making of the province and the local governments; at the same time, it has the ability to comprehensively consider target factors such as economy, reliability, and fairness, and designs target decomposition methods such as regulation performance priority, regulation margin priority, and regulation cost priority based on different focuses, and supports the strategy decomposition function of direct procurement objects and county dispatching aggregated objects.
[0142] Both provincial and local distributed AGCs are equipped with:
[0143] A data acquisition module is configured to: acquire distributed photovoltaic collaborative interaction information;
[0144] A total regulation demand generation module is configured to: generate a distributed photovoltaic regional total regulation demand based on the distributed photovoltaic collaborative interaction information and in combination with a distributed automatic power generation control regional control mode at this level;
[0145] A group control module is configured to: generate a total regulation demand of each group based on the total regulation demand of the distributed photovoltaic area according to the group control mode and the inter-group allocation strategy;
[0146] The intra-group control module is configured to: allocate the intra-group regulation requirements based on the total regulation requirements of each group, according to the control mode of the control unit and the intra-group allocation strategy, and obtain the regulation requirements allocated to each control unit;
[0147] The correction module is configured to correct the adjustment demand allocated to each control unit according to the adjustment step and the operation limit value to obtain the control target of each control unit.
[0148] The suspension module is configured to: evaluate the response of all control units, initiate the transfer of regulation requirements according to set conditions, suspend the control units that are not tracked, and resume automatic control according to the recovery conditions.
[0149] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
[0150] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the scope of protection of the present invention.
Claims
1. A distributed photovoltaic hierarchical coordinated dispatching method for power grid peak regulation, characterized in that: include: Obtain distributed photovoltaic collaborative interaction information; Based on the distributed photovoltaic collaborative interaction information, combined with the distributed automatic power generation control area control mode at this level, the total regulation demand of the distributed photovoltaic area at this level is generated; Based on the total regulation demand of the distributed photovoltaic area, the total regulation demand of each group is generated according to the group control mode and the inter-group allocation strategy; Based on the total regulation demand of each group, the regulation demand within the group is allocated according to the control mode of the control unit and the allocation strategy within the group, and the regulation demand allocated to each control unit is obtained; The regulation requirements assigned to each control unit are corrected according to the regulation step and the operating limit to obtain the control target of each control unit; If the current level is provincial dispatch, the regional control mode includes free power generation, peak load control and manual setting point; if the current level is local dispatch, the regional control mode includes free power generation, manual setting point and coordinated control; If the regional control mode is free power generation, there is no regulation demand; If the regional control mode is peak load control, the total regulation demand of the distributed photovoltaic area follows the reserve calculation of the thermal power units participating in frequency regulation, and a buffer segment is set to prevent frequent switching between peak load regulation and power restriction and recovery and additional generation; If the regional control mode is manual setting, the total regulation demand of the distributed photovoltaic region is the difference between the input control target and the actual output; If the regional control mode is collaborative control, the total regulation demand of the distributed photovoltaic area is the difference between the forwarding control target and the actual output of the area.
2. A distributed photovoltaic hierarchical coordinated dispatching method for power grid peak load regulation according to claim 1, characterized in that: The acquisition of the distributed photovoltaic collaborative interaction information relies on a hierarchical collaborative control architecture, which includes a dispatching side, a marketing side, and a resource layer. The dispatching side includes provincial dispatching and local dispatching, and the resource layer includes 10kV and above distributed photovoltaic stations and low-voltage distributed users; The distributed photovoltaic collaborative interaction information includes: provincial and local collaborative status information, 10kV and above distributed aggregation information received by the provincial dispatch from the local dispatch, low-voltage distributed aggregation information received by the provincial dispatch from the marketing side, 10kV and above distributed photovoltaic collaborative control targets sent by the provincial dispatch to the local dispatch, and low-voltage distributed peak-shaving total demand sent by the provincial dispatch to the marketing side.
3. A distributed photovoltaic hierarchical coordinated dispatching method for power grid peak load regulation according to claim 1, characterized in that: If the current level is provincial adjustment, the region is the province, the grouping is determined according to the control priority of the resource, and the control unit is the regional aggregation unit; If the current level is local dispatching, the region is divided according to whether it participates in provincial and local coordinated control, the grouping is based on districts or counties, and the control unit is a distributed station of 10kV and above.
4. A distributed photovoltaic hierarchical coordinated dispatching method for power grid peak load regulation according to claim 3, characterized in that: The group control modes include regional adjustment, manual setting, maximum batch size and minimum batch size; If the group control mode is regional regulation, each group obtains the total regulation demand of each group by decomposing and allocating the total regulation demand of the distributed photovoltaic area; otherwise, each group calculates the total regulation demand of each group separately; The control modes of the control unit include local, waiting, automatic, highest and lowest; If the control mode of the control unit is automatic, each control unit obtains the regulation demand allocated to each control unit by decomposing and allocating the total regulation demand of each group; otherwise, each control unit calculates the total regulation demand separately; If the control mode of the distributed group of 10kV and above in the provincial distributed automatic power generation control is switched to regional regulation first, the control mode of the regional aggregation units participating in the provincial and local coordinated control within the group will be automatic; if the control mode of the group participating in the provincial and local coordinated control in the local distributed automatic power generation control is regional regulation, the control mode of the stations participating in the provincial and local coordinated control within the group will be automatic; after the regulation of the distributed group of 10kV and above is completed, the provincial distributed automatic power generation control will switch the control mode of the low-voltage distributed group.
5. A distributed photovoltaic hierarchical coordinated dispatching method for power grid peak load regulation according to claim 1, characterized in that: The inter-group allocation strategy and the intra-group allocation strategy both include a priority allocation strategy and a proportional allocation strategy; The priority allocation strategy includes a load rate ranking strategy and a power generation cost ranking strategy; The load rate sorting and allocation strategy is: in each instruction cycle, the downward adjustment demand is sorted and allocated according to the load rate from high to low, and the upward adjustment demand is sorted and allocated according to the load rate from low to high, until all the adjustment demands are allocated; the load rate is calculated according to the real-time output and installed capacity; The power generation cost sorting and allocation strategy is: in each instruction cycle, the downward adjustment demand is sorted and allocated according to the power generation cost from high to low, and the upward adjustment demand is sorted and allocated according to the power generation cost from low to high, until all the adjustment demands are allocated; The proportion allocation strategy includes an installed capacity proportion allocation strategy and an adjustable capacity proportion allocation strategy; The installed capacity proportion allocation strategy is: in each instruction cycle, each controlled object bears the total regulation demand in proportion according to the installed capacity sharing factor; The adjustable capacity proportion allocation strategy is: in each instruction cycle, each controlled object bears the total adjustment demand in proportion according to the adjustable capacity sharing factor.
6. A distributed photovoltaic hierarchical coordinated dispatching method for power grid peak load regulation according to claim 1, characterized in that: Also includes: Evaluate the response of all control units, initiate the transfer of regulation requirements according to the set conditions, suspend the control units that are not tracked, and resume automatic control according to the recovery conditions.
7. A distributed photovoltaic hierarchical coordinated dispatching method for power grid peak load regulation according to claim 6, characterized in that: The response rate is as follows: ; In the formula, is the control unit i response rate, is the actual adjustment amount of control unit i; is the desired adjustment amount of control unit i; The setting condition is: the control unit's response does not meet a first setting threshold value in two consecutive cycles; The method for transferring the regulation demand is as follows: for a certain control unit, based on the revised regulation demand, the expected response amount is calculated, and after deducting the expected response amount of the control unit from the total regulation demand, the total regulation demand is allocated to other control units.
8. A distributed photovoltaic hierarchical coordinated dispatching method for power grid peak load regulation according to claim 6, characterized in that: The non-tracking control unit is a control unit whose response condition does not meet the second set threshold value for more than two consecutive set periods; The suspension method is: the control unit does not participate in the allocation of the total regulation demand, and the control target of the control unit is to reduce a step size based on the current output; The recovery condition is: the control unit adjusts the total adjustment demand of the group to which it belongs in the reverse direction or the control unit restores the tracking state.
9. A distributed photovoltaic hierarchical coordinated dispatching system for power grid peak regulation, characterized in that: include: A data acquisition module is configured to: acquire distributed photovoltaic collaborative interaction information; A total regulation demand generation module is configured to: generate a distributed photovoltaic regional total regulation demand based on the distributed photovoltaic collaborative interaction information and in combination with a distributed automatic power generation control regional control mode at this level; A group control module is configured to: generate a total regulation demand of each group based on the total regulation demand of the distributed photovoltaic area according to the group control mode and the inter-group allocation strategy; The intra-group control module is configured to: allocate the intra-group regulation requirements based on the total regulation requirements of each group, according to the control mode of the control unit and the intra-group allocation strategy, and obtain the regulation requirements allocated to each control unit; A correction module is configured to: correct the adjustment demand allocated to each control unit according to the adjustment step and the operation limit value to obtain the control target of each control unit; If the current level is provincial dispatch, the regional control mode includes free power generation, peak load control and manual setting point; if the current level is local dispatch, the regional control mode includes free power generation, manual setting point and coordinated control; If the regional control mode is free power generation, there is no regulation demand; If the regional control mode is peak load control, the total regulation demand of the distributed photovoltaic area follows the reserve calculation of the thermal power units participating in frequency regulation, and a buffer segment is set to prevent frequent switching between peak load regulation and power restriction and recovery and additional generation; If the regional control mode is manual setting, the total regulation demand of the distributed photovoltaic region is the difference between the input control target and the actual output; If the regional control mode is collaborative control, the total regulation demand of the distributed photovoltaic area is the difference between the forwarding control target and the actual output of the area.
10. A distributed photovoltaic hierarchical coordinated dispatching system for power grid peak load regulation according to claim 9, characterized in that: Also includes: The suspension module is configured to: evaluate the response of all control units, initiate the transfer of regulation requirements according to set conditions, suspend the control units that are not tracked, and resume automatic control according to the recovery conditions.