A low-consumption operation method for rural domestic sewage treatment stations based on historical data
Through the design of the operation plan of rural domestic sewage treatment stations based on historical data, the problem of high energy consumption caused by seasonal changes in water volume has been solved, low-carbon operation and balanced operation of membrane modules have been achieved, pollution has been controlled, and effluent quality has been improved.
Patent Information
- Application Number
- CN202410874001.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-02
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-07-02
AI Technical Summary
Rural domestic sewage treatment stations have difficulty in optimizing energy consumption due to large seasonal changes in water volume and pollutant concentration, resulting in high energy consumption and low load operation, poor stability of activated sludge, increased MBR membrane pollution, and discontinuous water output. .
Design different operation plans based on historical data, and achieve intermittent water inflow and intermittent aeration by collecting daily water volume, calculating water pumping and water production cycles, determining the aeration intermittent period, and adjusting the liquid level of the MBR membrane tank and the starting level of the water pump. Optimize process operation energy consumption.
It reduces operating costs, achieves low-carbon operation, keeps the MBR membrane module in a balanced low-flux operating state, controls membrane fouling, and improves the stability of effluent quality.
Smart Images

Figure CN118420098B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of sewage treatment, and in particular relates to a low-consumption operation method for a rural domestic sewage treatment station based on historical data. Background Art
[0002] Rural domestic sewage inflow has significant seasonality, that is, the inflow and pollutant concentration vary greatly in different seasons. Generally speaking, the inflow is small in winter and the pollutant concentration is high. In spring, the inflow gradually increases and the pollutant concentration gradually decreases. In summer, the inflow is the largest and the pollutant concentration is the lowest. In autumn, the inflow gradually decreases and the pollutant concentration gradually increases. 2 O+MBR process can efficiently degrade organic matter and remove pollutants such as nitrogen and phosphorus, and the effluent quality is stable and controllable. Based on this characteristic of rural domestic sewage treatment, many rural domestic sewage treatment stations adopt A 2 O+MBR process treats sewage. It is precisely because of the unstable characteristics of rural domestic sewage that it is difficult to make targeted energy consumption optimization plans in a short period of time during the design stage when detailed historical data is relatively lacking.
[0003] During the operation phase, the operation and maintenance units lack systematic ideas and precedents as guidance, and find it difficult to make systematic adjustments. They either conduct local trial adjustments based on the operation experience of the operation and maintenance personnel, or adopt constant flux operation according to the design operating parameters. This results in water production when there is water and empty exposure when there is no water. This leads to a lack of correlation between the cyclic water production intensity and the changes in water inflow and pollutant concentration. In seasons with small water inflow, except for a short period of water production, most of the time is in an empty exposure state. The process system is in high-energy consumption and low-load operation for a long time, which not only causes operating problems such as poor stability of activated sludge, aggravated MBR membrane pollution, and discontinuous effluent, but also causes huge waste of energy. Summary of the invention
[0004] In view of this, the present invention aims to propose a low-consumption operation method for a rural domestic sewage treatment station based on historical data, in order to solve at least one of the above-mentioned technical problems.
[0005] To achieve the above object, the technical solution of the present invention is achieved as follows:
[0006] A first aspect of the present invention provides a low-consumption operation method for a rural domestic sewage treatment station based on historical data, comprising the following steps:
[0007] S1. Collect historical data, design different operation plans according to the daily water volume in the historical data, and set a daily water volume set value for each operation plan;
[0008] S2. Calculate the pumping cycle corresponding to different operation plans according to the daily water volume setting value. The pumping cycle is the same as the water production cycle;
[0009] S3. Calculate the middle liquid level of the MBR membrane pool by the maximum working flow rate of the pump under different operation schemes;
[0010] S4. Determine the number of aeration interval cycles under different operation schemes according to the number of pumping cycles, and determine the duration of the aeration cycle;
[0011] S5. Calculate and determine the starting liquid level of the regulating tank pump based on the maximum daily pumping capacity of the pump in different operation plans.
[0012] Furthermore, in S1, historical water inflow data is collected, and the dates on which the historical continuous daily water inflow fluctuation is less than the water inflow threshold are divided into a group of operation plans;
[0013] Each operation plan sets a daily water volume set value, and the daily water volume set value shall not be less than 85% of the historical daily water volume values in the historical data of this group of operation plans.
[0014] Further, the S2 comprises the following steps:
[0015] S21, calculating the working flow rate of the water pump of each scheme according to the designed rated working flow rate of the water pump and the number of operation schemes;
[0016] S22, calculating the total time required for daily pumping under each operation scheme according to the daily water inflow setting value of each operation scheme and the working flow rate of the pump calculated in S21;
[0017] S23, calculating the number of pumping cycles for each operation scheme according to the total time required for daily pumping, and the number of water production cycles is the same as the number of pumping cycles;
[0018] S24, calculating the pumping cycle duration of each operation scheme according to the number of pumping cycles and the total duration required for daily pumping, wherein the water production cycle duration is the same as the pumping cycle duration;
[0019] S25. Calculate the working flow rate of the water production pump of each operation scheme according to the water pump flow rate of each operation scheme obtained in S21.
[0020] Further, the S3 comprises the following steps:
[0021] S31, calculating the water volume value of the water pump running at the maximum working flow rate for a fixed time under each operation scheme;
[0022] S32. Calculate the height that satisfies the water volume value stored in S31 according to the length and width values of the MBR membrane pool, add the calculated height to the low liquid level of the membrane pool, and obtain the middle liquid level of the MBR membrane pool under each operation scheme.
[0023] The S4 comprises the following steps:
[0024] S41, designing the number of aeration interval cycles to be the same as the number of pumping cycles and the number of water production cycles;
[0025] S42, before the membrane tank liquid level reaches the intermediate liquid level for the first specified time, the MBR membrane tank starts aeration;
[0026] S43, after each water production cycle ends, aeration continues for a second specified time period;
[0027] S44. When the aeration of the MBR membrane pool is started, it is backwashed online once, and the backwashing time is less than the time required for the membrane pool liquid level to reach the intermediate liquid level.
[0028] Furthermore, the regulating tank is provided with a bottom liquid level D, a start liquid level C, a high liquid level B, and a warning liquid level A from bottom to top;
[0029] When the liquid level in the regulating tank drops to the guaranteed bottom level D, the pump stops pumping water;
[0030] When the liquid level in the regulating tank reaches the starting liquid level C, the pump starts pumping water and runs the operation plan for the current period;
[0031] When the liquid level in the regulating tank reaches the high liquid level B, it switches to an operation plan with a higher pumping volume;
[0032] If the liquid level in the regulating tank continues to rise and reaches the warning level A, the water pump and the water production pump will both operate at full load according to the rated power;
[0033] The starting liquid level C of the regulating pool pump is adjusted as the operation plan changes. The capacity between the starting liquid level C and the guaranteed bottom liquid level D of the regulating pool under each operation plan is greater than the maximum daily pumping capacity of the pump under this operation plan.
[0034] When the liquid level in the MBR membrane pool reaches the high liquid level G, the water pump in the regulating tank stops pumping water, and continues pumping water when the liquid level in the MBR membrane pool drops back to the middle level F.
[0035] Furthermore, when the water flow rate displayed by the water production flow meter is lower than the preset threshold percentage of the water production flow rate, the operating frequency of the variable frequency water production pump is increased until the water flow rate displayed by the water production flow meter is consistent with the preset water production flow rate.
[0036] A second aspect of the present invention provides an electronic device, comprising a processor and a memory communicatively connected to the processor and used to store instructions executable by the processor, wherein the processor is used to execute the method described in the first aspect above.
[0037] The third aspect of the present invention provides a server, comprising at least one processor and a memory communicatively connected to the processor, the memory storing instructions executable by the at least one processor, the instructions being executed by the processor so that the at least one processor executes the method described in the first aspect.
[0038] A fourth aspect of the present invention provides a computer-readable storage medium storing a computer program, wherein the computer program, when executed by a processor, implements the method described in the first aspect.
[0039] Compared with the prior art, the present invention provides an A based on historical data 2 The O+MBR sewage treatment operation method has the following beneficial effects:
[0040] The low-consumption operation method of a rural domestic sewage treatment station based on historical data described in the present invention can make full use of historical water inflow and pollutant concentration change data during the operation and maintenance period, and optimize the process operation energy consumption in a targeted manner through intermittent water inlet and intermittent aeration, thereby reducing operation costs and achieving low-carbon operation. By distributing sewage as evenly as possible in each water production cycle, the MBR membrane component is always in a relatively balanced low-flux operation under each operation scheme, which is beneficial to controlling membrane pollution. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:
[0042] Figure 1 It is a schematic flow chart of the low-consumption operation method of a sewage treatment plant according to an embodiment of the present invention. DETAILED DESCRIPTION
[0043] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.
[0044] The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments.
[0045] Embodiment 1:
[0046] like Figure 1 As shown, a low-consumption operation method for a rural domestic sewage treatment station based on historical data includes the following steps:
[0047] S1. Collect historical data and design different operation plans based on the daily water volume change patterns in the historical data.
[0048] Collect historical water inflow data and divide the days with water inflow fluctuations less than the water inflow threshold into a group of operation plans;
[0049] The specific steps are to divide the dates with relatively close water inflows in consecutive days into a group. The number of groups is determined according to the regular characteristics of the water inflow, and they are respectively recorded as operation plan 1, operation plan 2, ..., operation plan n. Using the PLC logic controller, the starting date of each operation plan after division is set as the variable frequency pumping flow change adjustment date.
[0050] Each operation plan sets a daily water volume set value V 进 ; Daily water volume setting value V 进 Not less than 85% of the historical daily water inflow values in the historical data of this group of operation plans.
[0051] S2. Calculate the pumping cycle corresponding to different operation plans according to the daily water volume setting value. The pumping cycle is the same as the water production cycle;
[0052] The S2 comprises the following steps:
[0053] S21, calculating the working flow rate of the water pump of each scheme according to the designed rated working flow rate of the water pump and the number of operation schemes;
[0054] Specifically considering the unforeseen sudden large flow of water and pump energy reserve, the design rated working flow of the variable frequency pump is equally divided according to the principle of adding 2 to the number of operation plans, and the working flow of the pump under different operation plans is calculated according to the following formula, recorded as Q 抽i ; The formula is as follows:
[0055] Q 抽i =iQ 抽 / (n+2);
[0056] S22, calculate the total time required for daily pumping under each operation scheme according to the daily water volume setting value of each operation scheme and the pumping pump working flow calculated by S21; the calculation formula is as follows:
[0057] ;
[0058] Where: i is the number of the operation plan;
[0059] H 总i : The total time required for daily pumping under each operation plan. Unit: h;
[0060] V 进i : The daily water volume parameter value under a certain operation plan determined based on the historical daily water volume. Unit: m³;
[0061] Q 抽i: The working flow rate of the variable frequency water pump under this operation scheme, unit: m³ / h;
[0062] S23. Calculate the number of pumping cycles for each operation plan based on the total time required for daily pumping. The number of water production cycles is the same as the number of pumping cycles. The calculation formula is as follows:
[0063] ;
[0064] in:
[0065] T ci : Number of pumping (water production) cycles under each operation scheme, unit: number;
[0066] H 总i : The total time required for daily water pumping (water production) under each operation plan. Unit: h;
[0067] γ: The interval between each operation cycle (determined according to operation experience, initially 0.35-0.65) Unit: h;
[0068] S24. Calculate the duration of the pumping cycle for each operation plan according to the number of pumping cycles and the total duration required for daily pumping. The duration of the water production cycle is the same as the duration of the pumping cycle. The calculation formula is as follows:
[0069] ;
[0070] in:
[0071] H ci : The duration of a pumping cycle under each operation scheme, unit: h;
[0072] H 总i : The total time required for daily water pumping (water production) under each operation plan. Unit: h;
[0073] T ci : Number of pumping (water production) cycles under each operation scheme, unit: number;
[0074] S25. Calculate the working flow rate of the water production pump of each operation scheme according to the water pump flow rate of each operation scheme obtained in S21.
[0075] The number of water production cycles is consistent with the number of pumping cycles. A liquid level sensor L is set in the MBR membrane pool. After the pumping pump is working, when the membrane pool liquid level reaches the middle position F, the variable frequency water production pump starts to produce water. Since the MBR membrane components will continue to work for a period of time to separate pollutants and organisms in the water, the surface of the membrane will gradually be blocked by pollutants and organisms. In order to control the degree of membrane pollution, it is necessary to stop producing water for a short period of time after running for a short period of time (such as running continuously for 8 minutes and stopping for 2 minutes). During this short period of stopping water production, the pollutants attached to the membrane surface are cleaned with purge gas. Therefore, while ensuring the consistency of the number of water production cycles and the number of pumping cycles, the relative stability of the membrane pool liquid level is also required, and the effective duration of MBR membrane water production needs to be considered.
[0076] The flow calculation formula of the variable frequency water production pump is:
[0077] ;
[0078] in:
[0079] Q 产i : Working flow value of variable frequency water production pump under each operation scheme, unit: m³ / h.
[0080] Q 抽i : Working flow value of variable frequency water pump under each operation scheme, unit: m³ / h;
[0081] α: MBR membrane water production effective time coefficient, α= (MBR membrane continuous operation time + stop time) / MBR membrane continuous operation time.
[0082] β: Guarantee coefficient (β is determined based on operating experience and can be initially taken as 1.05-1.15).
[0083] S3, calculating the maximum working flow rate of the pump under different operation schemes and determining the middle liquid level of the MBR membrane pool;
[0084] The S3 comprises the following steps:
[0085] S31, calculating the water volume value of the water pump running at the maximum working flow rate in each operation scheme for a fixed time;
[0086] S32. Calculate the height that satisfies the water volume value stored in S31 based on the length and width of the MBR membrane pool, add the calculated height to the low liquid level of the membrane pool to obtain the middle liquid level of the MBR membrane pool. The calculation formula is as follows:
[0087] ;
[0088] Where:
[0089] D F-E: The distance between the middle liquid level F and the low liquid level E, unit: m;
[0090] Q 抽im : The maximum working flow rate of the water pump in each operation scheme, unit: m³ / h;
[0091] n: water pump with Q 抽im The set running time, unit: min
[0092] L: membrane pool length, unit: m;
[0093] H: membrane pool width, unit: m;
[0094] S4. Determine the number of aeration interval cycles under different operation schemes according to the number of pumping cycles, and further determine the duration of each aeration cycle.
[0095] The S3 further comprises the following steps:
[0096] The low liquid level of the MBR membrane pool is higher than the liquid level threshold of the upper surface of the MBR module; the liquid level threshold value range is 10-30cm, preferably 20cm;
[0097] The S4 comprises the following steps:
[0098] S41, designing the number of aeration interval cycles to be the same as the number of pumping cycles and the number of water production cycles;
[0099] S42, before the membrane pool liquid level reaches the intermediate liquid level for the first specified time, the MBR membrane pool starts aeration, and the value range of the first specified time is 1-20 minutes, preferably 5 minutes.
[0100] S43, after each water production cycle ends, aeration is continued for a second specified time period. The second specified time period ranges from 1 to 10 minutes, preferably 5 minutes.
[0101] S44. When the aeration of the MBR membrane pool is started, it is backwashed online once, and the backwashing time is less than the time required for the membrane pool liquid level to reach the intermediate liquid level.
[0102] The setting time of online backwashing ranges from 1 to 5 minutes, preferably 3 minutes. The setting backwashing time is shorter than the time required for the membrane pool liquid level to reach the intermediate level. The backwashing water flows through the membrane in the reverse direction to slightly expand the membrane pores and remove the solid particles adhering to the membrane surface. At the same time, the air bubble disturbance generated during aeration is used to purge the pollutants on the membrane surface. Each action is regulated by the PLC automatic control system.
[0103] Due to the complexity of the sewage treatment process, even if the pumping flow rate is set to be basically the same as the water production flow rate, the membrane pool liquid level will inevitably change during system operation due to the influence of many factors. Therefore, it is necessary to set the following logic in the PLC: when the membrane pool liquid level drops to the low liquid level E, the water production pump stops producing water; when the membrane pool liquid level reaches the high liquid level G, the pumping pump stops pumping water.
[0104] MBR membrane pool front biochemical section (A 2 Sludge load and hydraulic retention time have an important influence on the total amount of organic pollutants entering the membrane pool. 2 The O+MBR process separates the biochemical and physical separations and optimizes the biochemical section (A 2 The hydraulic retention time and sludge load of section O are important factors to ensure that the effluent meets the standards and delay the MBR membrane pollution.
[0105] Therefore, before implementing this plan, in order to better exert the biochemical process management capabilities, it is advisable to optimize the layout and maintenance of the biochemical pool according to the characteristics of different operation plans to ensure that the biochemical pool has matching biochemical capabilities.
[0106] The S4 further comprises the following steps:
[0107] In the MBR membrane pool, the air intake needs to form a cross flow on the membrane surface to generate shear force and disturbance force, so that macromolecules such as bioagglomerates can be separated from the membrane surface under its action, and the concentration polarization and cake layer formation on the membrane surface can be controlled to increase the membrane flux and extend the membrane operation cycle. Therefore, the MBR membrane flushing air volume is mainly considered.
[0108] Using high aeration intensity in the MBR membrane pool is conducive to the removal of pollutants attached to the surface of the MBR membrane, but too high aeration intensity will also increase the concentration of soluble substances and the viscosity of the mixed liquid in the membrane pool, thereby aggravating membrane pollution. In addition, high-intensity aeration increases the total amount of extracellular polymers (EPS) in the pool. With continuous operation, it is tightly bound to the membrane in the form of chemical bonds, reducing the filtration flux of the membrane. Intermittent aeration is used to optimize the aeration intensity of the MBR membrane pool and extend the service life of the membrane. The purge gas volume is determined by conventional calculation methods, and then the number of aeration intermittent cycles is designed to be the same as the number of pumping cycles and water production cycles.
[0109] The regulating tank is provided with a bottom liquid level D, a starting liquid level C, a high liquid level B, and a warning liquid level A from bottom to top; a liquid level sensor M is arranged in the regulating tank to detect the liquid level in the regulating tank.
[0110] When the liquid level in the regulating tank drops to the guaranteed bottom level D, the pump stops pumping water;
[0111] When the liquid level in the regulating tank reaches the starting liquid level C, the pump starts pumping water and runs the operation plan for the current period;
[0112] When the liquid level in the regulating tank reaches the high liquid level B, it switches to an operation plan with a higher pumping volume and sends a prompt message to the smart supervision platform;
[0113] If the liquid level in the regulating tank continues to rise and reaches the warning level A, the water pump and the water production pump will both operate at full load at rated power, and an alarm will be sent to the smart supervision platform at the same time;
[0114] S5. Calculate and determine the starting liquid level of the regulating tank pump based on the maximum daily pumping capacity of the pump in different operation plans.
[0115] The starting liquid level C of the regulating tank pump is adjusted as the operation plan changes. The capacity between the starting liquid level C and the bottom liquid level D of the regulating tank under each operation plan is greater than the maximum daily pumping capacity of the pump under this operation plan.
[0116] A liquid level sensor L is set in the MBR membrane pool. When the liquid level in the MBR membrane pool reaches the high liquid level G, the water pump in the regulating pool stops pumping water, and continues pumping water when the liquid level in the MBR membrane pool drops back to the middle level F.
[0117] When the water flow rate displayed by the water flow meter is lower than the preset water flow rate threshold percentage, the PLC intervenes to increase the frequency of the variable frequency water pump until the water flow rate displayed by the water flow meter is consistent with the preset water flow rate. The threshold percentage ranges from 1% to 10%, preferably 5%.
[0118] When the negative pressure gauge shows that the trans-membrane pressure difference in the MBR membrane pool reaches the offline cleaning value, the site smart management platform will issue an alarm and carry out offline cleaning.
[0119] The duration of the pumping (water production) cycle in this embodiment is only used to determine the number of intermittent cycles and PLC control parameters, and is not the actual operating duration of the pumping pump (or water production pump). During actual operation, the duration will be automatically and dynamically adjusted according to the setting logic of this solution.
[0120] If the liquid level in the regulating tank continues to rise to the warning level A, the online backwash program is shut down. At this time, the system only produces water without backwashing.
[0121] At the end of each year, a statistical analysis should be conducted on the annual water inflow data and changes in pollutant concentrations, and the plan should be calibrated and dynamically adjusted.
[0122] Beneficial effects:
[0123] During the operation and maintenance period, we can make full use of historical water inflow and pollutant concentration change data to optimize process operation energy consumption, reduce operating costs and achieve low-carbon operation.
[0124] By distributing the sewage as evenly as possible in each water production cycle, the MBR membrane components are always in a relatively balanced low-flux operation under each operation plan, which is beneficial to controlling membrane pollution.
[0125] Different aeration schemes are adopted for the biochemical pool according to the concentration of pollutants in the discharged water and the amount of water in different operation plans, which avoids the problem of difficulty in coordinating the air volume required for flushing the MBR membrane pool and the biological oxygen demand of the biochemical pool, and realizes the supply of optimal biochemical oxygen demand.
[0126] Take a sewage treatment plant as an example:
[0127] A rural domestic sewage treatment station in North China adopts A 2 O+MBR process, the maximum designed treatment capacity is 100m 3 / d, the membrane pool size is 2.5m x 1.5m x 3.45m, and the design rated maximum working flow of the variable frequency pump is 7.5m³ / h. From the water flow data for two consecutive years, the daily water flow is 10-25m 3 / d, 87% of which are concentrated in 13-22m 3 / d; from early May to mid-June, the daily water flow is 18-40m 3 / d, 85% of which are concentrated in 23-35m 3 / d; from mid-June to late September, the daily water flow is 35-65m 3 / d, 89% of which are concentrated in 40-60m 3 / d; from early October to late December, the daily water flow is 16-35m 3 / d, of which 86% are concentrated in 20-25m 3 / d.
[0128] S1. Determine the number of operation plans and the pump operation control value V based on the daily water volume data for two consecutive years. 进 ;
[0129] Historical data table
[0130]
[0131] S21, according to the principle of adding 2 to the number of operation schemes, divide the design rated working flow of the variable frequency pump equally (Q 抽 ), calculate Q under each operation scheme 抽i .
[0132] This embodiment plans to implement three operation plans each year, so:
[0133] Q 抽1 =7.5 / 5=1.5m³ / h;
[0134] Q 抽2 =2ⅹ7.5 / 5=3m³ / h;
[0135] Q 抽3 =3ⅹ7.5 / 5=4.5m³ / h;
[0136] S22, calculation of the total time required for daily pumping;
[0137] ;
[0138] The calculation results are:
[0139] V 进1 Take 25m³; Q 抽1 =1.5m³ / h;
[0140] H 总1 =25 / 1.5, the value is 16.5h;
[0141] V 进2 Take 40m³; Q 抽2 =3m³ / h;
[0142] H 总2 =40 / 3=13.5h
[0143] V 进3 Take 60m³; Q 抽3 =4.5m³ / h;
[0144] H 总3 =60 / 4.5=13.5h;
[0145] S23, calculation of the number of pumping (water production) cycles;
[0146] ;
[0147] Take γ=0.5h;
[0148] The calculation results are:
[0149] T c1 = (24-16.5) / 0.5=15;
[0150] T c2 =T c3 = (24-13.5) / 0.5=21;
[0151] S24. Calculation of duration of each pumping (water production) cycle;
[0152] ;
[0153] H c1=16.5 / 15=1.1h;
[0154] H c2 =H c3 =13.5 / 21, take 0.65h;
[0155] According to the above calculation results, it is preliminarily determined that the operation scheme 1 of this embodiment is that the water pump runs continuously for 1.1 hours and rests for 0.5 hours, for a total of 15 cycles.
[0156] In the operation scheme 2 and the operation scheme 3 of this embodiment, the water pump runs continuously for 0.65 hours and rests for 0.5 hours, for a total of 21 cycles.
[0157] S25, determining the working flow rate of the variable frequency water production pump under different operation schemes;
[0158] Q 产i =Q 抽i ⅹαⅹβ;
[0159] α=(MBR membrane continuous operation time + stop time) / MBR membrane continuous operation time.
[0160] In this embodiment, the MBR membrane assembly was operated continuously for 8 minutes and then stopped for 2 minutes.
[0161] β: guarantee coefficient (β is determined based on operating experience and can be initially 1.05-1.15);
[0162] The calculation results are:
[0163] Q 产1 =Q 抽1 ⅹαⅹβ=1.5ⅹ(10 / 8)ⅹ1.1≈2.1(m³ / h);
[0164] Q 产2 =Q 抽2 ⅹαⅹβ=3ⅹ(10 / 8)ⅹ1.1≈4.1(m³ / h);
[0165] Q 产3 =Q 抽2 ⅹαⅹβ=4.5ⅹ(10 / 8)ⅹ1.1≈6.2(m³ / h);
[0166] S32, determination of the middle liquid level F of the MBR membrane tank;
[0167] ;
[0168] The membrane pool length L = 2.5m, the membrane pool width H = 1.5m, and the maximum working flow rate of the pump in each operation scheme is Q 抽3 =4.5m³ / h, n value is set to 5min;
[0169] The calculation results are:
[0170] D F-E =0.375 / 3.75=0.1m;
[0171] In this embodiment, the number of pumping cycles in Operation Scheme 1 is 15 cycles, and the duration of each cycle is set to 1.1 hours, so the aeration cycle of the MBR membrane pool in Operation Scheme 1 is also 15. 抽1 =1.5m³ / h. Through calculation, it can be known that after the pump is started, the time for the MBR membrane pool liquid level to reach the intermediate starting liquid level F is 15min. Therefore, it is set that the MBR membrane pool starts aeration 10min after the pump is started.
[0172] The number of pumping cycles in Operation Scheme 2 is 21 cycles, and the duration of each cycle is set to 0.65 hours, so the aeration cycle of the MBR membrane pool in Operation Scheme 2 is also 21. 抽2 =3m³ / h. Through calculation, it can be known that after the pump is started, the time for the MBR membrane pool liquid level to reach the intermediate starting liquid level F is 7.5min. Therefore, it is set that the MBR membrane pool starts aeration 2.5min after the pump is started.
[0173] The number of pumping cycles in Operation Scheme 3 is 21, and the set duration of each cycle is 0.65 hours. Therefore, the aeration cycle of the MBR membrane pool in Operation Scheme 3 is also 21. Since the middle liquid level F of the MBR membrane pool is calculated and determined according to the working flow rate of the pumping pump in Operation Scheme 3, when Operation Scheme 3 is run, the MBR membrane pool starts aeration while the pumping pump is pumping water.
[0174] Embodiment 2:
[0175] A second aspect of the present invention provides an electronic device, comprising a processor and a memory that is communicatively connected to the processor and is used to store instructions executable by the processor, wherein the processor is used to execute the method described in the first embodiment above.
[0176] Embodiment three:
[0177] A third aspect of the present invention provides a server, comprising at least one processor, and a memory communicatively connected to the processor, the memory storing instructions executable by the at least one processor, the instructions being executed by the processor so that the at least one processor executes the method described in Example 1.
[0178] Embodiment 4:
[0179] A fourth aspect of the present invention provides a computer-readable storage medium storing a computer program, wherein the computer program, when executed by a processor, implements the method described in the first embodiment.
[0180] Those of ordinary skill in the art will appreciate that the units and method steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition and steps of each example have been generally described in terms of function in the above description. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0181] In the several embodiments provided in the present application, it should be understood that the disclosed methods and systems can be implemented in other ways. For example, the division of the units described above is only a logical function division, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. The above-mentioned units may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the embodiments of the present invention.
[0182] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and specification of the present invention.
[0183] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A low-consumption operation method for rural domestic sewage treatment stations based on historical data, characterized in that: The following steps are involved: S1. Collect historical data, design different operation plans according to the daily water volume in the historical data, and set a daily water volume set value for each operation plan; S2. Calculate the pumping cycle corresponding to different operation plans according to the daily water volume setting value. The pumping cycle is the same as the water production cycle; S3. Calculate the middle liquid level of the MBR membrane pool by the maximum working flow rate of the pump under different operation schemes; S4. Determine the number of aeration interval cycles under different operation schemes according to the number of pumping cycles, and determine the duration of the aeration cycle; S5. Calculate and determine the starting liquid level of the regulating tank pump according to the maximum daily pumping volume of the pump in different operation plans; The S2 comprises the following steps: S21. Calculate the pump flow rate of each scheme according to the designed rated working flow rate of the pump and the number of operation schemes. The calculation formula is as follows: Q 抽i =iQ 抽 / (n+2); Among them, Q 抽 : The design rated working flow of the variable frequency water pump is divided equally, in m3 / h; Q 抽i : The working flow rate of the variable frequency water pump under this operation scheme, in m3 / h; The dates with relatively close water inflow in consecutive days in history are divided into a group. The number of groups is determined according to the regular characteristics of the water inflow, and they are recorded as operation plan 1, operation plan 2, ..., operation plan n. The start date of each operation plan after division is set as the variable frequency pumping flow change adjustment date by using the PLC logic controller; S22, calculate the total time required for daily pumping under each operation scheme according to the daily water volume setting value of each operation scheme and the pumping pump working flow calculated by S21, and the calculation formula is as follows: Among them, H 总i : The total time required for daily pumping under each operation plan, in hours; V 进i ; The daily water volume parameter value under a certain operation plan determined based on the historical daily water volume, in m3; S23. Calculate the number of pumping cycles for each operation plan based on the total time required for daily pumping. The number of water production cycles is the same as the number of pumping cycles. The calculation formula is as follows: Among them, T ci : The number of pumping cycles under each operation scheme, in units; γ: The interval between each operation cycle, in units of h; S24. Calculate the duration of the pumping cycle for each operation plan based on the number of pumping cycles and the total duration required for daily pumping. The duration of the water production cycle is the same as the duration of the pumping cycle. The calculation formula is as follows: Among them, H ci : The duration of a pumping cycle under each operation scheme, in h; S25. Calculate the working flow rate of the water production pump of each operation scheme according to the water pump flow rate of each operation scheme obtained in S21. The calculation formula is as follows: Q 产i =Q 抽i ⅹαⅹβ; Among them, Q 产i : The working flow value of the variable frequency water production pump under each operation scheme, the unit is m3 / h; α: MBR membrane water production effective time coefficient, α = (MBR membrane continuous operation time + stop time) / MBR membrane continuous operation time; β: guarantee coefficient, initially taken as 1.05-1.15; In order to control the degree of membrane contamination, it is necessary to stop producing water for a short period of time after running for a short period of time. During this short period of stopping water production, the pollutants attached to the membrane surface are cleaned with purge gas; The S3 comprises the following steps: S31, calculating the water volume value of the water pump running at the maximum working flow rate for a fixed time under each operation scheme; S32. Calculate the height that meets the water volume value of S31 based on the length and width of the MBR membrane pool. Add the calculated height to the low liquid level of the membrane pool to obtain the middle liquid level of the MBR membrane pool under each operation scheme. The calculation formula is as follows: Among them, D F-E : The distance between the middle liquid level F and the low liquid level E, in meters; Q 抽im : The maximum working flow rate of the pump in each operation scheme, in m3 / h; n: The maximum working flow rate of the pump in Q 抽im The set operation time, in min; L: membrane pool length, in m; H: membrane pool width, in m; The S4 comprises the following steps: S41, designing the number of aeration interval cycles to be the same as the number of pumping cycles and the number of water production cycles; S42, before the membrane tank liquid level reaches the intermediate liquid level for the first specified time, the MBR membrane tank starts aeration; S43, after each water production cycle ends, aeration continues for a second specified time period; S44. When the MBR membrane pool starts aeration, it is backwashed online once, and the backwashing time is less than the time required for the membrane pool liquid level to reach the intermediate liquid level; From bottom to top, the regulating tank is equipped with bottom liquid level D, start liquid level C, high liquid level B, and warning liquid level A; When the liquid level in the regulating tank drops to the guaranteed bottom level D, the pump stops pumping water; When the liquid level in the regulating tank reaches the starting liquid level C, the pump starts pumping water and runs the operation plan for the current period; When the liquid level in the regulating tank reaches the high liquid level B, it switches to an operation plan with a higher pumping volume; If the liquid level in the regulating tank continues to rise and reaches the warning level A, the water pump and the water production pump will operate at full load at rated power.
2. According to claim 1, a low-consumption operation method for a rural domestic sewage treatment station based on historical data is characterized in that: In S1, historical water inflow data is collected, and the dates with water inflow fluctuations less than the water inflow threshold on consecutive days in history are divided into a group of operation plans; Each operation plan sets a daily water volume set value, and the daily water volume set value is not less than 85% of the historical daily water volume values in the historical data of this group of operation plans.
3. The low-consumption operation method of a rural domestic sewage treatment station based on historical data according to claim 1 is characterized in that: The starting liquid level C of the regulating pool pump is adjusted as the operation plan changes. The capacity between the starting liquid level C and the guaranteed bottom liquid level D of the regulating pool under each operation plan is greater than the maximum daily pumping capacity of the pump under this operation plan. When the liquid level in the MBR membrane pool reaches the high liquid level G, the water pump in the regulating tank stops pumping water, and continues pumping water when the liquid level in the MBR membrane pool drops back to the middle level F.
4. The low-consumption operation method of a rural domestic sewage treatment station based on historical data according to claim 1 is characterized in that: When the water flow rate displayed by the water production flow meter is lower than the preset threshold percentage of the water production flow rate, the operating frequency of the variable frequency water production pump is increased until the water flow rate displayed by the water production flow meter is consistent with the preset water production flow rate.