A beam yard production data management, supervision and processing system

By dividing beam field production data into sub-cycles and building related channels, the problem of inefficient data traceability in the existing technology is solved, and the rapid and accurate management and supervision and processing of beam field production data is achieved, and management efficiency is improved.

CN118428907BActive Publication Date: 2024-11-01CHINA RAILWAY SEVENTH BUREAU GRP XIAN RAILWAY ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410875190.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-11-01
Estimated Expiration
2044-07-02

AI Technical Summary

Technical Problem

When the existing beam yard production data management and supervision system traces dangerous data from massive and complicated data, data marking errors are prone to occur, resulting in reduced traceability efficiency and accuracy, and the inability to quickly and accurately identify and manage production data.

Method used

By dividing the planning cycle of prefabricated beams into sub-cycles, collecting comprehensive production data of sub-cycles, marking correlation points and building correlation channels, generating cycle reports, calculating management supervision coefficients, determining whether an exception traceability prompt is issued, and dangerous data is conducted Exception traceability, generate traceability data set.

Benefits of technology

It has achieved rapid and accurate correlation and traceability of massive production data, avoided the phenomenon of unclear traceability goals and inefficient efficiency, and improved the management and supervision efficiency of beam yard production data.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118428907B_ABST
    Figure CN118428907B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of data management, and discloses a beam yard production data management, supervision and processing system; the system comprises dividing a planning cycle into sub-cycles, collecting comprehensive production data of the sub-cycles, generating sub-data sets, constructing association channels between adjacent association points, generating a cycle report sheet, collecting verification parameters, calculating a management and supervision coefficient, and determining whether to issue an abnormal tracing prompt, performing abnormal tracing on dangerous data, and generating a tracing data set; compared with the prior art, after marking association points on the sub-data sets, an association channel for data transmission and tracing can be constructed, and the management and supervision coefficient of the production report sheet can be calculated according to the verification parameters, and at the same time, the comprehensive production data associated with the dangerous data can be traced in combination with the association channel, so that fast and accurate association tracing can be performed from massive and messy comprehensive production data, and the management and supervision processing of the beam yard production data can be conveniently performed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of data management, and more specifically, to a beam yard production data management, supervision and processing system. Background Art

[0002] A beam yard is a place specially used for prefabricating bridge components. By adopting modern production technology and intelligent management systems, the beam yard has achieved a significant increase in production efficiency and a significant reduction in labor costs. When prefabricated beams are produced in the beam yard, a large amount of production data such as materials, personnel, quality, and progress is involved, and the production data corresponding to different periods are also different. In order to integrate a large amount of complex production data and facilitate the traceability of production data, it is necessary to manage, supervise, and process the massive amount of production data.

[0003] The patent application with reference publication number CN116993092A discloses an intelligent scheduling system for production management of a prefabricated beam yard, including: a client, a security area management module, a beam making area management module, a beam storage area management module, a beam lifting area management module and a general scheduling module; the client is used for users to log in to their accounts and enter production specification data; the security area management module is used to store and manage the material data and resource data of the security area; the beam making area management module is used to store and manage the production data of the beam making area, the beam making pedestal data and the production area data; the beam storage area management module is used to store and manage the storage area The beam pedestal data and storage area data are stored; the beam lifting area management module is used to store and manage the beam lifting pedestal data and other data; the general scheduling module is used to perform intelligent scheduling of the production management of the prefabricated beam yard based on the data stored and managed by the client, the support area management module, the beam making area management module, the beam storage area management module and the beam lifting area management module, and perform zoning management and comprehensive scheduling of the prefabricated beam yard to achieve rational use of beam yard resources, and through the scheduling system, standardize the process flow and strictly supervise the production time, which greatly improves the work efficiency and energy utilization rate;

[0004] The prior art has the following deficiencies:

[0005] The existing data management, supervision and processing system collects the full-cycle data of the precast beam production process, summarizes the full-cycle data into a whole, and traces the abnormal production data by comparing one by one. Since the amount of production data of the precast beam full cycle is large and the types are complicated, when it is necessary to mark and trace dangerous data from massive and complicated overall data, it is easy for the production cycle of dangerous data tracing to be inconsistent, resulting in errors in dangerous data marking, which reduces the traceability efficiency and accuracy of dangerous data, and cannot quickly and accurately realize the identification and traceability of beam yard production data, thereby reducing the management and supervision efficiency of beam yard production data.

[0006] In view of this, the present invention proposes a beam yard production data management, supervision and processing system to solve the above problems. Summary of the invention

[0007] In order to overcome the above-mentioned defects of the prior art and to achieve the above-mentioned purpose, the present invention provides the following technical solutions: a beam yard production data management and supervision processing system, applied to a management and supervision platform, comprising:

[0008] The sub-period division module obtains the planning period of the precast beam and divides the planning period into sub-periods according to the period division criterion;

[0009] The data set generation module collects the comprehensive production data of the sub-period and generates a sub-data set after aggregating the comprehensive generated data;

[0010] The association channel construction module marks the association points of the sub-datasets, constructs association channels between adjacent association points, and generates a periodic report sheet;

[0011] The report generation module marks the identification features of the periodic report, and annotates the identification features on the feature bits to generate the production report. The identification features include bit features and row features.

[0012] The coefficient calculation module marks the safety data and dangerous data of the production report, collects verification parameters, calculates the management supervision coefficient, and determines whether to issue an abnormal traceability prompt. The verification parameters include the safety data ratio and the abnormal line ratio.

[0013] The anomaly tracing module identifies the target channel where the dangerous data is located, and performs anomaly tracing on the dangerous data to generate a tracing data set.

[0014] Furthermore, the cycle division criterion is: the critical moment between the previous production process and the next production process is used as the division point for division;

[0015] The sub-period division methods include:

[0016] Through the production order, all the processes for manufacturing precast beams within the planning period are queried to obtain i production processes;

[0017] The start and end manufacturing times of i production processes are queried through the timestamps to obtain i start times and i end times;

[0018] On the basis of the i starting moments, the preset first duration value is added forward to obtain the starting critical moment;

[0019] On the basis of the i end moments, the preset second duration value is added backward to obtain the end critical moment;

[0020] The period between the i+1th starting critical moment and the ith ending critical moment is recorded as the critical period, and the midpoint of the critical period is recorded as the critical moment, and i-1 critical moments are obtained;

[0021] The planning cycle is divided into i sub-cycles with i-1 critical moments as the dividing points.

[0022] Furthermore, the comprehensive production data includes material data, personnel data, quality data, equipment data, and schedule data;

[0023] The methods for generating sub-datasets include:

[0024] Establish i data sets with five data bits, and record the five data bits as the first station, the second station, the third station, the fourth station and the fifth station in sequence;

[0025] Import the material data, personnel data, quality data, equipment data and progress data in the i sub-period into the first station, the second station, the third station, the fourth station and the fifth station of the i data set one by one to form the material station, the personnel station, the quality station, the equipment station and the progress station;

[0026] Establish the first contour line at the front end of the material station, personnel station, quality station, equipment station and progress station, and establish the tail contour line at the back end to obtain a semi-closed contour;

[0027] The midpoints of the first contour line and the last contour line of two adjacent semi-closed contours are connected to form a contour chain and obtain i sub-data sets.

[0028] Further, the association point includes a first association point and a second association point;

[0029] The marking method of the first association point and the second association point includes:

[0030] Draw a first cutting line and a second cutting line in parallel at the upper end and the lower end of the semi-closed contour respectively, record the intersection of the first cutting line and the first contour line as the first intersection point, and record the intersection of the second cutting line and the last contour line as the last intersection point;

[0031] Eliminate the area outside the two first intersection points on the first contour line to obtain the first association line, and record the two ends of the first association line as the first association points;

[0032] The area outside the two tail intersection points on the tail contour line is eliminated to obtain the tail association line, and the two ends of the tail association line are recorded as the second association points.

[0033] Furthermore, the method for generating the periodic report includes:

[0034] Construct a blank report sheet with i data rows, import i sub-data sets into the i data rows of the blank report sheet in sequence, and obtain i report rows;

[0035] A first channel edge is established between first associated points of two adjacent report lines, a second channel edge is established between second associated points of two adjacent report lines, and the first channel edge and the second channel edge of the same semi-closed contour are enclosed to obtain an original channel;

[0036] A bottom frame and a top frame are constructed at the bottom and the top of the original channel respectively, and a parallel uplink and downlink are constructed between the bottom frame and the top frame to obtain an associated channel;

[0037] The blank report sheet for constructing the associated channel is recorded as the periodic report sheet.

[0038] Furthermore, the marking method of the bit feature and the row feature includes:

[0039] Through natural speech processing technology, the semantics of the data bits in the periodic report are identified one by one, and the bit keywords and bit key values ​​are obtained;

[0040] Record materials, personnel, quality, equipment and progress as target words;

[0041] The bit keywords containing the bit target words are recorded as valid keywords, and the bit keywords and bit key values ​​in the valid keywords are combined to obtain p bit features;

[0042] Query the production processes corresponding to the sub-data sets in the report rows one by one, and identify the keywords of the production processes through natural language processing technology;

[0043] The keywords of the production processes are numbered in ascending order according to the chronological order, and after combining the keywords with the corresponding numbers, i row features are obtained.

[0044] Furthermore, the method for generating the production report includes:

[0045] A feature position is drawn between a first correlation point and a second correlation point located on the same side of the correlation channel, and is recorded as a first feature position;

[0046] Annotate the p bit features one by one in the p first feature bits to obtain p first annotated feature bits;

[0047] Draw the characteristic bits at the end of each i report line one by one, and record them as the second characteristic bits;

[0048] Annotate the i row features one by one in the i second feature bits to obtain i second annotation feature bits;

[0049] The periodic report sheet with p first remark feature bits and i second remark feature bits as the remark is recorded as the production report sheet.

[0050] Furthermore, the method for obtaining the security data ratio includes:

[0051] Identify the specification type of precast beams in the production order and obtain the real-time specification type;

[0052] Filter out the standard report sheets whose stored specification types are consistent with the real-time specification types from the database, and mark k standard data in the standard report sheets;

[0053] Compare the p comprehensive production data in the production report with the k standard data in the standard report in turn for consistency;

[0054] The comprehensive production data that are consistent with the comparison shall be recorded as safe data, and the comprehensive production data that are inconsistent with the comparison shall be recorded as dangerous data;

[0055] Count the number of safety data to obtain the safety data value, compare the safety data value with the total amount of comprehensive production data, and obtain the safety data percentage;

[0056] The expression of the safety data ratio is:

[0057] ;

[0058] In the formula, is the proportion of security data, is a safe data value, It is the total amount of comprehensive production data.

[0059] Furthermore, the method for obtaining the abnormal row ratio value includes:

[0060] Number the i report rows in ascending order according to the chronological order;

[0061] Count the number of dangerous data in i report lines one by one, and mark the report lines with the number of dangerous data greater than or equal to 2 as abnormal lines;

[0062] Counting the number of abnormal rows whose numbers are in a non-continuous state, and obtaining a first abnormal value;

[0063] The abnormal rows with consecutive numbers are recorded as abnormal groups, and the number of abnormal groups is counted to obtain the second abnormal value;

[0064] The first outlier value and the second outlier value are assigned different weight factors and then added together, and compared with the total number of report rows to obtain the percentage of outlier rows;

[0065] The expression for the abnormal row ratio is:

[0066] ;

[0067] In the formula, is the abnormal row ratio, is the first outlier, is the second outlier, is the total number of report lines, , are weight factors that are all greater than 0;

[0068] The expression of management supervision coefficient is:

[0069] ;

[0070] In the formula, is the management supervision coefficient;

[0071] The determination method of whether to issue an abnormal tracing prompt includes:

[0072] Management supervision coefficient With preset management supervision threshold Compare;

[0073] when Greater than or equal to When the abnormality is detected, it is determined that no abnormal tracing prompt will be issued;

[0074] when Less than When an abnormal tracing prompt is issued.

[0075] Furthermore, the method for generating the traceability dataset includes:

[0076] Mark the data bits where the dangerous data are located in the production report, and record the semi-closed contour corresponding to the data bits where the dangerous data are located as the target contour;

[0077] The associated channel connected to the target contour is recorded as the target channel, and the abnormal rows connected at both ends of the target channel are recorded as the target rows;

[0078] Taking the dangerous data as the base point, the comprehensive production data in the semi-closed contour connected to the target contour in the target row is traced through the contour chain;

[0079] When the comprehensive production data tracing in the semi-closed contour in the target row is completed, the two adjacent reporting rows are traced in sequence through the uplink and downlink in the target channel;

[0080] After all the comprehensive production data in the production report sheet have been traced, the tracing is stopped and the comprehensive production data associated with the hazardous data are obtained;

[0081] The comprehensive production data that is associated with the hazardous data is recorded as traceability data, and the traceability data is aggregated to generate a traceability data set.

[0082] The technical effects and advantages of the beam yard production data management, supervision and processing system of the present invention are as follows:

[0083] The present invention obtains the planning cycle of prefabricated beams, divides the planning cycle into sub-cycles according to the cycle division criterion, collects the comprehensive production data of the sub-cycles, and generates sub-data sets after summarizing the comprehensive generated data, marks the association points of the sub-data sets, and constructs association channels between adjacent association points, generates a cycle report sheet, marks the identification features of the cycle report sheet, and annotates the identification features on the feature bits, generates a production report sheet, marks the safety data and danger data of the production report sheet, collects verification parameters, calculates the management supervision coefficient, and determines whether to issue an abnormal tracing prompt, identifies the target channel where the danger data is located, and performs abnormal tracing on the danger data to generate a tracing data set; compared with the prior art, the present invention can convert time into time, and can obtain the safety data and danger data of the production report sheet. The planning cycle with a long span is divided into multiple sub-cycles, and the comprehensive production data of precast beams in the sub-cycle is collected to establish a sub-data set. At the same time, after marking the associated points on the sub-data set, an associated channel for data transmission and traceability is constructed to generate a production report sheet, and the management and supervision coefficient of the production report sheet is calculated according to the verification parameters. At the same time, combined with the associated channel, the comprehensive production data associated with the dangerous data can be traced, so that fast and accurate associated traceability can be performed from massive and messy comprehensive production data, effectively avoiding the unclear traceability targets and low traceability efficiency that may occur during production data traceability, and facilitating the management and supervision of beam yard production data, thereby improving the management efficiency of beam yard production data. BRIEF DESCRIPTION OF THE DRAWINGS

[0084] Figure 1 A schematic diagram of a beam yard production data management, supervision and processing system provided in Example 1 of the present invention;

[0085] Figure 2 A flow chart of a beam yard production data management, supervision and processing method provided in Example 2 of the present invention. DETAILED DESCRIPTION

[0086] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0087] Example 1: Please refer to Figure 1As shown, the beam yard production data management, supervision and processing system described in this embodiment is applied to the management and supervision platform, including:

[0088] The sub-period division module obtains the planning period of the precast beam and divides the planning period into sub-periods according to the period division criterion;

[0089] The planning cycle refers to the planned time for manufacturing precast beams in the beam yard, which can represent the planning time of the precast beams in the production order and the whole production cycle of the precast beams. The planning cycle is obtained by querying the production order of precast beams in the database.

[0090] After obtaining the planning cycle, the time span of the prefabricated beam in the production process can be limited. Since the time span of the prefabricated beam planning cycle is relatively long, and the production process and the use of manpower and materials in different time periods will be different, the amount of production-related data contained in the planning cycle is relatively large. It is necessary to divide the planning cycle with a longer time span into sub-periods with smaller time spans, so as to break down the massive data in the planning cycle into smaller sub-periods.

[0091] When dividing the sub-periods, it is necessary to ensure the accuracy and independence of each sub-period division under the limitation of the period division criteria;

[0092] The cycle division criterion is: the critical moment between the previous production process and the next production process is used as the division point;

[0093] The sub-period division methods include:

[0094] Through the production order, all the processes for manufacturing precast beams within the planning period are queried to obtain i production processes;

[0095] The start and end manufacturing times of i production processes are queried through the timestamps to obtain i start times and i end times;

[0096] On the basis of i starting moments, the preset first duration value is added forward to obtain the starting critical moment; the preset first duration value is used to numerically represent the duration occupied by the pre-production process preparation time, which can ensure that the starting moment of the production process can be advanced forward to ensure the accuracy of the production process time;

[0097] On the basis of the i end moments, the preset second duration value is added backward to obtain the end critical moment; the preset second duration value is used to numerically represent the duration occupied by the end time of the production process, which can ensure that the end moment of the production process can be delayed backward to ensure the accuracy of the production process time;

[0098] The period between the i+1th starting critical moment and the ith ending critical moment is recorded as the critical period, and the midpoint of the critical period is recorded as the critical moment, and i-1 critical moments are obtained; the critical period is used for the time vacuum period between two adjacent production processes, so that the critical period does not belong to the cycle corresponding to any production process, so that the two adjacent production processes can be distinguished and independent in time;

[0099] Taking i-1 critical moments as the dividing points, the planning cycle is divided into i sub-cycles;

[0100] It should be noted that the duration corresponding to i sub-cycles may be consistent or inconsistent. The duration corresponding to i sub-cycles depends on the duration of each production process, but what is certain is that the production process within each sub-cycle is complete, and the same production process will not be distributed in two sub-cycles, thereby ensuring the independence of production-related data in each sub-cycle.

[0101] The data set generation module collects the comprehensive production data of the sub-period and generates a sub-data set after aggregating the comprehensive generated data;

[0102] Comprehensive production data refers to all kinds of data that can represent the production and manufacturing process of precast beams when the beam yard manufactures precast beams within a sub-period. It can comprehensively represent the data of precast beams in each sub-period and serve as the data basis for subsequent sub-data sets. The different data in the comprehensive production data are all stored in the comprehensive data repository.

[0103] Comprehensive production data includes material data, personnel data, quality data, equipment data and progress data;

[0104] Material data refers to the outbound data of manufacturing materials consumed and used when the beam yard manufactures precast beams within a sub-period. The amount of materials consumed and used in each sub-period will vary. Material data is obtained by querying the outbound data of materials in the material database.

[0105] Personnel data refers to the data of production personnel equipped when the beam yard manufactures precast beams in a sub-period. The data of corresponding production personnel in each sub-period will be different. Personnel data is obtained by querying the attendance management system.

[0106] Quality data refers to the quality grade data of the corresponding process when the beam yard manufactures precast beams in a sub-period. The corresponding quality grade in each sub-period will be different; quality data is obtained by querying the quality inspection system;

[0107] Equipment data refers to the operating data of the equipment involved in manufacturing precast beams in the beam yard within a sub-period. The operating data of the corresponding equipment in each sub-period will be different. Equipment data is obtained by querying the equipment control system.

[0108] Progress data refers to the data corresponding to the project progress when the beam yard manufactures precast beams within a sub-period. The data corresponding to the project progress in each sub-period will be different; the progress data is obtained by querying the progress management system.

[0109] After obtaining the comprehensive production data, the material data, personnel data, quality data, equipment data and progress data corresponding to the precast beam in each sub-period can be accurately collected. At this time, the corresponding comprehensive production data in the sub-period is summarized to form a complete and closed sub-data set;

[0110] The methods for generating sub-datasets include:

[0111] Establish i data sets with five data bits, and record the five data bits as the first work position, the second work position, the third work position, the fourth work position and the fifth work position in sequence; the data set is used to summarize the various manufacturing and processing data of the precast beam, so that the comprehensive production data in each sub-period can be summarized, and the data bit is the smallest unit constituting the data set, which is used to realize the import and collection of comprehensive production data;

[0112] Import the material data, personnel data, quality data, equipment data and progress data in the i sub-period into the first station, the second station, the third station, the fourth station and the fifth station of the i data set one by one to form the material station, the personnel station, the quality station, the equipment station and the progress station;

[0113] A first contour line is established at the front end of the material station, personnel station, quality station, equipment station and progress station, and a tail contour line is established at the back end to obtain a semi-closed contour; the semi-closed contour is a structure used to perform front and back protection restrictions on the data in the data bit, which can prevent the data in the data bit from being lost, and can also ensure the independence of the data between adjacent data bits;

[0114] The midpoints of the first contour line and the last contour line of two adjacent semi-closed contours are connected to form a contour chain to obtain i sub-data sets; the contour chain is a link used for data transmission and interaction between two adjacent semi-closed contours, ensuring that the data between different data bits in the same sub-data set can be linked front and back, thereby meeting subsequent traceability requirements.

[0115] The association channel construction module marks the association points of the sub-datasets, constructs association channels between adjacent association points, and generates a periodic report sheet;

[0116] The association point refers to the corresponding position between two adjacent semi-closed contours in two adjacent sub-datasets, and serves as the basis for the subsequent construction of the association channel to ensure that the association channel can associate the two adjacent semi-closed contours;

[0117] The association points include a first association point and a second association point; the first association point refers to a front end association point of the semi-closed contour, and the second association point refers to a rear end association point of the semi-closed contour;

[0118] The marking method of the first association point and the second association point includes:

[0119] Draw a first cutting line and a second cutting line in parallel at the upper end and the lower end of the semi-closed contour respectively, record the intersection of the first cutting line and the first contour line as the first intersection point, and record the intersection of the second cutting line and the last contour line as the last intersection point;

[0120] Eliminate the area outside the two first intersection points on the first contour line to obtain the first association line, and record the two ends of the first association line as the first association points;

[0121] The area outside the two tail intersection points on the tail contour line is eliminated to obtain the tail association line, and the two ends of the tail association line are recorded as the second association points.

[0122] The association channel refers to a channel built on the basis of the association point for realizing the transmission of production data within two adjacent semi-closed contours, which can realize the two-way interactive transmission of production data, and the cycle report sheet refers to the collection and summary of the cycle data set in the sub-cycle corresponding to the manufacturing of precast beams by the beam yard, which can represent all the data of the precast beams in the manufacturing process as a whole, thereby ensuring that the production data of the precast beams can be managed as a whole, and facilitating the subsequent supervision and processing of the production data of the precast beams;

[0123] The methods for generating periodic reports include:

[0124] Construct a blank report form with i data rows, import i sub-data sets into the i data rows of the blank report form in sequence, and obtain i report rows; a data row refers to a unit used to import and store data in a sub-data set, thereby realizing the one-by-one import of data in a sub-data set to ensure that each data row can correspond to a separate sub-data set;

[0125] A first channel edge is established between first associated points of two adjacent report lines, a second channel edge is established between second associated points of two adjacent report lines, and the first channel edge and the second channel edge of the same semi-closed contour are enclosed to obtain an original channel;

[0126] A bottom frame and a top frame are constructed at the bottom and the top of the original channel respectively, and a parallel uplink and downlink are constructed between the bottom frame and the top frame to obtain an associated channel; the uplink is used to achieve the effect of transmitting the data in the next reporting row to the previous reporting row, and the downlink is used to achieve the effect of transmitting the data in the previous reporting row to the next reporting row, thereby ensuring that the data in the reporting rows at both ends of the associated channel can be transmitted in both directions;

[0127] Record the blank report sheet that constructs the associated channel as a periodic report sheet;

[0128] It should be noted that the periodic report sheet is a report sheet that represents the production data of precast beams at the data level, so the periodic report sheet does not have a fast and direct query operation for production data, but serves as the basis for subsequent production data management and supervision.

[0129] The report generation module marks the identification features of the periodic report, and annotates the identification features on the feature bits to generate a production report;

[0130] The identification feature is used to represent the characteristics of the production data contained in the report line and data bit in the cycle report, that is, to directly represent the true meaning of each data line and data bit in the cycle report, and serve as the basis for the generation of subsequent production reports;

[0131] Identification features include bit features and row features; bit features are used to represent the features of data bits, and row features are used to represent the features of report rows;

[0132] The marking methods of bit features and row features include:

[0133] The semantics of the data bits in the periodic report are identified one by one through natural speech processing technology to obtain the bit keywords and bit key values; the bit keywords are used to represent the textual meaning of the data bits, and the bit key values ​​are used to represent the numerical meaning of the data bits;

[0134] Record materials, personnel, quality, equipment and progress as target words;

[0135] The bit keywords containing the bit target words are recorded as valid keywords, and the bit keywords and bit key values ​​in the valid keywords are combined to obtain p bit features;

[0136] The production processes corresponding to the sub-datasets in the report rows are queried in sequence, and the keywords of the production processes are identified through natural language processing technology; the keywords are used to represent the manufacturing means and measures represented by the production processes;

[0137] The keywords of the production processes are numbered in ascending order according to the chronological order, and after combining the keywords with the corresponding numbers, i row features are obtained.

[0138] After obtaining the bit features and row features, the corresponding bit features and row features can be matched, and the periodic report form can be annotated so that the periodic report form can be formed into a production report form, thereby ensuring that the production report form can directly and accurately manage, supervise and process the production data of precast beams;

[0139] The production report generation method includes:

[0140] A feature position is drawn between a first correlation point and a second correlation point located on the same side of the correlation channel, and is recorded as a first feature position;

[0141] Annotate the p bit features one by one in the p first feature bits to obtain p first annotated feature bits;

[0142] Draw the characteristic bits at the end of each i report line one by one, and record them as the second characteristic bits;

[0143] Annotate the i row features one by one in the i second feature bits to obtain i second annotation feature bits;

[0144] The periodic report sheet with p first remark feature bits and i second remark feature bits as the production report sheet;

[0145] It should be noted that once the production report is obtained, all data of the precast beam during the production process can be directly displayed, and it can serve as a basis for subsequent comparison of the production data of the precast beam in the beam yard.

[0146] The coefficient calculation module marks the safety data and hazard data of the production report, collects verification parameters, calculates the management supervision coefficient, and determines whether to issue an abnormal traceability prompt;

[0147] Verification parameters refer to the data that affects the safety verification management results generated during the safety management verification in the production report form. Based on the verification parameters, the management supervision coefficient is calculated so that the management supervision coefficient can numerically represent the stability and security of the production data in the production report form. The larger the management supervision coefficient, the higher the security and stability of the production data in the production report form, and the lower the probability of abnormal tracing, and vice versa.

[0148] Verification parameters include the percentage of safe data and the percentage of abnormal rows;

[0149] The safety data ratio refers to the ratio of the number of comprehensive production data that meet the preset production standards in each data position in the production report to all data. The larger the safety data ratio, the more comprehensive production data that meet the preset production standards, the stronger the safety and stability of the beam yard production data, and the greater the management and supervision coefficient;

[0150] Methods for obtaining the safety data ratio include:

[0151] Identify the specification type of precast beams in the production order and obtain the real-time specification type;

[0152] Filter out the standard report sheets whose stored specification types are consistent with the real-time specification types from the database, and mark the k standard data in the standard report sheets; the standard report sheet refers to the report sheet generated for manufacturing precast beams of the same specification type according to the beam yard history, which can be used as the basis for the comparison of the comprehensive production data of subsequent precast beams;

[0153] Compare the p comprehensive production data in the production report with the k standard data in the standard report in turn for consistency;

[0154] The comprehensive production data that are consistent with the comparison shall be recorded as safe data, and the comprehensive production data that are inconsistent with the comparison shall be recorded as dangerous data;

[0155] Count the number of safety data to obtain the safety data value, compare the safety data value with the total amount of comprehensive production data, and obtain the safety data percentage;

[0156] The expression of the safety data ratio is:

[0157] ;

[0158] In the formula, is the proportion of security data, is a safe data value, It is the total amount of comprehensive production data.

[0159] The abnormal line ratio value refers to the ratio of the report lines marked as abnormal lines in the production report to all the report lines. When the abnormal line ratio value is larger, it means that the report lines marked as abnormal lines in the production report account for a higher proportion of all the report lines, and the safety and stability of the beam yard production data is lower, and the management supervision coefficient is smaller;

[0160] Methods for obtaining the abnormal row ratio include:

[0161] Number the i report rows in ascending order according to the chronological order;

[0162] Count the number of dangerous data in i report lines one by one, and mark the report lines with the number of dangerous data greater than or equal to 2 as abnormal lines;

[0163] Counting the number of abnormal rows whose numbers are in a non-continuous state, and obtaining a first abnormal value;

[0164] The abnormal rows whose numbers are in a continuous state are recorded as abnormal groups, and the number of abnormal groups is counted to obtain a second abnormal value; the number of abnormal rows included in the abnormal group is at least 2, and illustratively, it can be 2, 3, 4, etc.;

[0165] The first outlier value and the second outlier value are assigned different weight factors and then added together, and compared with the total number of report rows to obtain the percentage of outlier rows;

[0166] The expression for the abnormal row ratio is:

[0167] ;

[0168] In the formula, is the abnormal row ratio, is the first outlier, is the second outlier, is the total number of report lines, , are weight factors that are all greater than 0.

[0169] After obtaining the percentage of security data and the percentage of abnormal rows, the management supervision coefficient can be calculated, which will serve as the numerical basis for whether to issue an abnormal tracing prompt in the future;

[0170] The expression of management supervision coefficient is:

[0171] ;

[0172] In the formula, It is the management supervision coefficient.

[0173] Issuing an abnormal tracing prompt is a measure used to analyze and judge the size of the management supervision coefficient, so as to evaluate the level of security and stability of the comprehensive production data in the production report, and to issue an abnormal tracing prompt when the security and stability are low, so as to carry out abnormal tracing processing on the comprehensive production data with low security and stability;

[0174] The determination method of whether to issue an abnormal tracing prompt includes:

[0175] Management supervision coefficient With preset management supervision threshold Comparison; The preset management supervision threshold is used to represent the minimum value of the management supervision coefficient when no abnormal tracing prompt is issued, which can effectively distinguish the size of the management supervision coefficient, so as to accurately identify whether it is necessary to issue an abnormal tracing prompt; The preset management supervision threshold is obtained by collecting a large number of historical minimum values ​​of the management supervision coefficients corresponding to no abnormal tracing prompt, and then calculating the average value;

[0176] when Greater than or equal to When the management supervision coefficient is greater than or equal to the preset management supervision threshold, the security and stability of the comprehensive production data in the production report sheet is high, and no data traceability operation is required, so it is determined that no abnormal traceability prompt will be issued;

[0177] when Less than When , it means that the management supervision coefficient is less than the preset management supervision threshold. At this time, the security and stability of the comprehensive production data in the production report is low, and data traceability operation is required, then it is determined to issue an abnormal tracing prompt.

[0178] The abnormality tracing module identifies the target channel where the dangerous data is located, and performs abnormal tracing on the dangerous data to generate a tracing data set;

[0179] When an abnormal tracing prompt is issued, it means that there is a certain amount of dangerous data in the production report. At this time, the distribution position and distribution structure of the dangerous data will also be different. Since the dangerous data in the production report are all derived from the sub-data set, and the comprehensive production data in each sub-data set corresponds to different sub-periods, in order to accurately trace the dangerous data and timely and accurately discover the unstable factors in the beam yard production data, it is necessary to trace other data associated with the dangerous data, so as to facilitate the subsequent management and supervision of the beam yard production data, and also facilitate the beam yard management personnel to carry out efficient safety management of dangerous data;

[0180] Traceability data refers to the comprehensive production data obtained from the database by tracing the original location of the dangerous data when dangerous data appears, which has data interaction or impact on the dangerous data. It can represent the original location and impact range of the dangerous data to ensure the comprehensiveness of the traceability of the dangerous data. The traceability data set is a collection of traceability data.

[0181] The methods for generating traceability datasets include:

[0182] Mark the data bits where the dangerous data are located in the production report, and record the semi-closed contour corresponding to the data bits where the dangerous data are located as the target contour;

[0183] The associated channel connected to the target contour is recorded as the target channel, and the abnormal rows connected at both ends of the target channel are recorded as the target rows;

[0184] Taking the dangerous data as the base point, the comprehensive production data in the semi-closed contour connected to the target contour in the target row is traced through the contour chain;

[0185] When the comprehensive production data tracing in the semi-closed contour in the target row is completed, the two adjacent reporting rows are traced in sequence through the uplink and downlink in the target channel;

[0186] After all the comprehensive production data in the production report sheet have been traced, the tracing is stopped and the comprehensive production data associated with the hazardous data are obtained;

[0187] The comprehensive production data that is associated with the hazardous data is recorded as traceability data, and the traceability data is aggregated to generate a traceability data set.

[0188] Each module in the above-mentioned beam yard production data management and supervision processing system is used and specifically applied to the beam yard for 100 experimental simulations. Through 100 experimental simulations to simulate the issuance of abnormal tracing prompts, the management and supervision platform marks the accuracy of dangerous data and the time used to generate the tracing data set, and records the two data as recognition accuracy and tracing time, and obtains 100 sets of recognition accuracy and tracing time based on 100 experimental simulations, thereby constructing the first tracing data table, as shown in Table 1 below;

[0189] Table 1: First traceability data table

[0190]

[0191] Based on the technical solution of the beam yard production data management supervision and processing system in the prior art, the experimental simulation was repeated 100 times, and the accuracy of the dangerous data and the time used to generate the traceability data set were marked when the abnormal traceability prompt was issued through 100 experimental simulations. The two data were recorded as the recognition accuracy and the traceability time, respectively, and 100 sets of recognition accuracy and traceability time were obtained based on the 100 experimental simulations, and the second traceability data table was constructed, as shown in Table 2 below;

[0192] Table 2: Second traceability data table

[0193]

[0194] In combination with Table 1 and Table 2 above, it can be seen that the beam yard production data management, supervision and processing system provided in this embodiment 1 can more accurately identify dangerous data, while shortening the time used to generate traceability data sets, thereby achieving fast and accurate beam yard production data management and supervision effects.

[0195] In this embodiment, the planning cycle of the precast beam is obtained, and the planning cycle is divided into sub-cycles according to the cycle division criteria, the comprehensive production data of the sub-cycle is collected, and the comprehensive generated data is summarized to generate a sub-data set, the association points of the sub-data set are marked, and an association channel is constructed between adjacent association points, a cycle report is generated, the identification features of the cycle report are marked, and the identification features are annotated on the feature bits, a production report is generated, the safety data and the dangerous data of the production report are marked, verification parameters are collected, the management supervision coefficient is calculated, and it is determined whether to issue an abnormal tracing prompt, the target channel where the dangerous data is located is identified, and the dangerous data is abnormally traced to generate a tracing data set; compared with the prior art, it can The planning cycle with a long time span is divided into multiple sub-cycles, and the comprehensive production data of precast beams in the sub-cycle is collected to establish a sub-data set. After marking the associated points on the sub-data set, an associated channel for data transmission and traceability is constructed to generate a production report sheet, and the management and supervision coefficient of the production report sheet is calculated based on the verification parameters. At the same time, combined with the associated channel, the comprehensive production data associated with the dangerous data can be traced, so that fast and accurate associated traceability can be performed from massive and messy comprehensive production data, effectively avoiding the unclear traceability targets and low traceability efficiency that may occur during production data tracing, and facilitating the management and supervision of beam yard production data, thereby improving the management efficiency of beam yard production data.

[0196] Example 2: Please refer to Figure 2 As shown, the part not described in detail in this embodiment is described in Example 1, which provides a beam yard production data management, supervision and processing method, which is applied to a management and supervision platform and is implemented based on a beam yard production data management, supervision and processing system, including:

[0197] S1: Obtain the planning period of the precast beam, and divide the planning period into sub-periods according to the period division criterion;

[0198] S2: Collect the comprehensive production data of the sub-period and generate a sub-dataset after aggregating the comprehensive production data;

[0199] S3: Mark the association points of the sub-datasets, build association channels between adjacent association points, and generate a periodic report sheet;

[0200] S4: Mark the identification features of the cycle report sheet, and annotate the identification features on the feature bits to generate a production report sheet. The identification features include bit features and row features.

[0201] S5: Mark the safety data and hazardous data of the production report, collect verification parameters, calculate the management supervision coefficient, and determine whether to issue an abnormal tracing prompt. The verification parameters include the safety data ratio and the abnormal line ratio. If an abnormal tracing prompt is issued, execute S6; if no abnormal tracing prompt is issued, repeat S5.

[0202] S6: Identify the target channel where the dangerous data is located, and trace the abnormalities of the dangerous data to generate a traceability data set.

[0203] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A beam yard production data management and supervision processing system, applied to a management and supervision platform, characterized in that: include: The sub-period division module obtains the planning period of the precast beam and divides the planning period into sub-periods according to the period division criterion; The data set generation module collects the comprehensive production data of the sub-period and generates a sub-data set after aggregating the comprehensive generated data; Comprehensive production data includes material data, personnel data, quality data, equipment data and progress data; The methods for generating sub-datasets include: Establish i data sets with five data bits, and record the five data bits as the first station, the second station, the third station, the fourth station and the fifth station in sequence; Import the material data, personnel data, quality data, equipment data and progress data in the i sub-period into the first station, the second station, the third station, the fourth station and the fifth station of the i data set one by one to form the material station, the personnel station, the quality station, the equipment station and the progress station; Establish the first contour line at the front end of the material station, personnel station, quality station, equipment station and progress station, and establish the tail contour line at the back end to obtain a semi-closed contour; Connect the midpoints of the first contour line and the last contour line of two adjacent semi-closed contours to form a contour chain, and obtain i sub-data sets; The association channel construction module marks the association points of the sub-datasets, constructs association channels between adjacent association points, and generates a periodic report sheet; The association points include a first association point and a second association point; The marking method of the first association point and the second association point includes: Draw a first cutting line and a second cutting line in parallel at the upper end and the lower end of the semi-closed contour respectively, record the intersection of the first cutting line and the first contour line as the first intersection point, and record the intersection of the second cutting line and the last contour line as the last intersection point; Eliminate the area outside the two first intersection points on the first contour line to obtain the first association line, and record the two ends of the first association line as the first association points; Eliminate the area outside the two tail intersection points on the tail contour line to obtain the tail association line, and record the two ends of the tail association line as the second association points; The methods for generating periodic reports include: Construct a blank report sheet with i data rows, import i sub-data sets into the i data rows of the blank report sheet in sequence, and obtain i report rows; A first channel edge is established between first associated points of two adjacent report lines, a second channel edge is established between second associated points of two adjacent report lines, and the first channel edge and the second channel edge of the same semi-closed contour are enclosed to obtain an original channel; A bottom frame and a top frame are constructed at the bottom and the top of the original channel respectively, and a parallel uplink and downlink are constructed between the bottom frame and the top frame to obtain an associated channel; Record the blank report sheet that constructs the associated channel as a periodic report sheet; The report generation module marks the identification features of the periodic report, and annotates the identification features on the feature bits to generate the production report. The identification features include bit features and row features. The coefficient calculation module marks the safety data and dangerous data of the production report, collects verification parameters, calculates the management supervision coefficient, and determines whether to issue an abnormal traceability prompt. The verification parameters include the safety data ratio and the abnormal line ratio. The anomaly tracing module identifies the target channel where the dangerous data is located, and performs anomaly tracing on the dangerous data to generate a tracing data set.

2. A beam yard production data management, supervision and processing system according to claim 1, characterized in that: The cycle division criterion is: the critical moment between the previous production process and the next production process is used as the division point; The sub-period division methods include: Through the production order, all the processes for manufacturing precast beams within the planning period are queried to obtain i production processes; The start and end manufacturing times of i production processes are queried through the timestamps to obtain i start times and i end times; On the basis of the i starting moments, the preset first duration value is added forward to obtain the starting critical moment; On the basis of the i end moments, the preset second duration value is added backward to obtain the end critical moment; The period between the i+1th starting critical moment and the ith ending critical moment is recorded as the critical period, and the midpoint of the critical period is recorded as the critical moment, and i-1 critical moments are obtained; The planning cycle is divided into i sub-cycles with i-1 critical moments as the dividing points.

3. A beam yard production data management, supervision and processing system according to claim 2, characterized in that: The marking method of the bit feature and the row feature includes: Through natural speech processing technology, the semantics of the data bits in the periodic report are identified one by one, and the bit keywords and bit key values ​​are obtained; Record materials, personnel, quality, equipment and progress as target words; The bit keywords containing the bit target words are recorded as valid keywords, and the bit keywords and bit key values ​​in the valid keywords are combined to obtain p bit features; Query the production processes corresponding to the sub-data sets in the report rows one by one, and identify the keywords of the production processes through natural language processing technology; The keywords of the production processes are numbered in ascending order according to the chronological order, and after combining the keywords with the corresponding numbers, i row features are obtained.

4. A beam yard production data management, supervision and processing system according to claim 3, characterized in that: The method for generating the production report sheet includes: A feature position is drawn between a first correlation point and a second correlation point located on the same side of the correlation channel, and is recorded as a first feature position; Annotate the p bit features one by one in the p first feature bits to obtain p first annotated feature bits; Draw the characteristic bits at the end of each i report line one by one, and record them as the second characteristic bits; Annotate the i row features one by one in the i second feature bits to obtain i second annotation feature bits; The periodic report sheet with p first remark feature bits and i second remark feature bits as the remark is recorded as the production report sheet.

5. A beam yard production data management, supervision and processing system according to claim 4, characterized in that: The method for obtaining the security data ratio value includes: Identify the specification type of precast beams in the production order and obtain the real-time specification type; Filter out the standard report sheets whose stored specification types are consistent with the real-time specification types from the database, and mark k standard data in the standard report sheets; Compare the p comprehensive production data in the production report with the k standard data in the standard report in turn for consistency; The comprehensive production data that are consistent with the comparison shall be recorded as safe data, and the comprehensive production data that are inconsistent with the comparison shall be recorded as dangerous data; Count the number of safety data to obtain the safety data value, compare the safety data value with the total amount of comprehensive production data, and obtain the safety data percentage; The expression of the safety data ratio is: ; In the formula, is the proportion of security data, is a safe data value, It is the total amount of comprehensive production data.

6. A beam yard production data management, supervision and processing system according to claim 5, characterized in that: The method for obtaining the abnormal row ratio value includes: Number the i report rows in ascending order according to the chronological order; Count the number of dangerous data in i report lines one by one, and mark the report lines with the number of dangerous data greater than or equal to 2 as abnormal lines; Counting the number of abnormal rows whose numbers are in a non-continuous state, and obtaining a first abnormal value; The abnormal rows with consecutive numbers are recorded as abnormal groups, and the number of abnormal groups is counted to obtain the second abnormal value; The first outlier value and the second outlier value are assigned different weight factors and then added together, and compared with the total number of report rows to obtain the percentage of outlier rows; The expression for the abnormal row ratio is: ; In the formula, is the abnormal row ratio, is the first outlier, is the second outlier, is the total number of report lines, , are weight factors that are all greater than 0; The expression of management supervision coefficient is: ; In the formula, is the management supervision coefficient; The determination method of whether to issue an abnormal tracing prompt includes: Management supervision coefficient With preset management supervision threshold Compare; when Greater than or equal to When the abnormality is detected, it is determined that no abnormal tracing prompt will be issued; when Less than When an abnormal tracing prompt is issued.

7. A beam yard production data management, supervision and processing system according to claim 6, characterized in that: The method for generating the traceability data set includes: Mark the data bits where the dangerous data are located in the production report, and record the semi-closed contour corresponding to the data bits where the dangerous data are located as the target contour; The associated channel connected to the target contour is recorded as the target channel, and the abnormal rows connected at both ends of the target channel are recorded as the target rows; Taking the dangerous data as the base point, the comprehensive production data in the semi-closed contour connected to the target contour in the target row is traced through the contour chain; When the comprehensive production data tracing in the semi-closed contour in the target row is completed, the two adjacent reporting rows are traced in sequence through the uplink and downlink in the target channel; After all the comprehensive production data in the production report sheet have been traced, the tracing is stopped and the comprehensive production data associated with the hazardous data are obtained; The comprehensive production data that is associated with the hazardous data is recorded as traceability data, and the traceability data is aggregated to generate a traceability data set.