An intelligent street lamp data information management system and method based on artificial intelligence

By dividing urban street lights into sub-regions, collecting data and establishing an analysis model, the problem of inconvenient street light brightness adjustment and management in the existing technology is solved, automatic adjustment and unified management are realized, and night travel experience and management efficiency are improved.

CN118433970BActive Publication Date: 2024-11-29JIANGSU QIAOSHUO OPTOELECTRONICS CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410878282.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-11-29
Estimated Expiration
2044-07-02

AI Technical Summary

Technical Problem

The existing technology is difficult to adjust the brightness of urban street lights according to actual needs, resulting in poor night travel experience. At the same time, due to different street light models and specifications, it is difficult to manage them uniformly, and failures cannot be discovered in time.

Method used

By dividing urban street lights into sub-regions, collecting current and voltage data and traffic flow data, establishing a brightness determination and analysis model, calculating the required transmission power, and controlling the power grid for power transmission, while judging the street light fault and alarming.

Benefits of technology

It realizes automatic adjustment of street light brightness, improves citizens' night travel experience, eliminates management inconvenience caused by different models and specifications, improves the efficiency of street light management, and reduces the system data analysis load.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118433970B_ABST
    Figure CN118433970B_ABST
Patent Text Reader

Abstract

The present invention discloses an intelligent street lamp data information management system and method based on artificial intelligence, belonging to the field of intelligent street lamp technology. The system includes a regional planning management module, a flow collection and analysis module, an intelligent calculation module, a power transmission management module and a fault warning module; the regional planning management module is used to divide the urban street lamps into various sub-areas, determine the number of street lamps and the model specifications of street lamps in each sub-area, and collect the current and voltage data of each sub-area; the flow collection and analysis module is used to collect traffic flow data through cameras on urban road sections, determine the traffic flow changes in each sub-area, and calculate the required brightness of each sub-area section; the intelligent calculation module is used to calculate the required transmission power of each sub-area; the power transmission management module is used to control the power grid to transmit electricity; the fault warning module is used to determine whether there is a street lamp fault and alarm the faulty street lamp.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of intelligent street lamps, and in particular to an intelligent street lamp data information management system and method based on artificial intelligence. Background Art

[0002] Intelligent street light data information management is an important part of smart city construction. It involves remote monitoring of street light facilities, energy consumption management, fault detection, maintenance scheduling and other aspects. It is of great significance to improve energy utilization efficiency, reduce operating costs, enhance urban safety and promote sustainable development. In the existing technology, urban street lights often adjust the brightness of street lights according to time periods, but the impact of some regional activities may cause a short-term increase in pedestrian flow on a certain section of the road. At this time, it is difficult for urban street lights to adjust the brightness of street lights according to actual needs, resulting in a poor night travel experience for urban residents. At the same time, the models and specifications of street lights in the city are different, which often makes it difficult to manage them in a unified manner and it is impossible to detect street light failures in time. Summary of the invention

[0003] The purpose of the present invention is to provide an intelligent street lamp data information management system and method based on artificial intelligence to solve the problems raised in the above background technology.

[0004] In order to solve the above technical problems, the present invention provides the following technical solutions: an intelligent street lamp data information management method based on artificial intelligence, the method comprising the following steps:

[0005] S10, dividing the urban street lamps into sub-areas, determining the number of street lamps and the model specifications of the street lamps in each sub-area, and collecting current and voltage data of each sub-area; wherein the model specifications of the street lamps in each sub-area are the same;

[0006] S20, collecting traffic flow data through cameras on urban road sections, determining traffic flow changes in each sub-area, and calculating the required brightness of each sub-area road section; wherein the traffic flow changes in each sub-area are determined by comprehensive weight analysis, and the brightness of each sub-area under different traffic flow changes is analyzed based on the traffic flow change values ​​determined for each sub-area and a brightness determination analysis model is constructed;

[0007] S30, calculating the required transmission power of each sub-area according to the required brightness of each sub-area road section, the number of street lamps and the model specifications of the street lamps;

[0008] S40, controlling the power grid to transmit electricity according to the calculated required transmission power of each sub-area;

[0009] S50. Determine whether there is a street lamp failure based on the collected current and voltage data and transmission power of each sub-area; when there is a street lamp failure, determine the faulty street lamp, alarm the faulty street lamp, and send the street lamp failure information to the management personnel.

[0010] Further, according to the street lamp model specifications, the road section area where the street lamps with the same model specifications are located is divided into a sub-area; the number of divided sub-areas N is determined; a remote terminal control device is installed in each of the sub-areas; the remote terminal control device is used to collect current and voltage data of the corresponding sub-area, calculate the required transmission power, and perform street lamp fault judgment;

[0011] Among them, street lamps of the same model and specification in each divided sub-area are connected to each other.

[0012] Furthermore, the method steps of step S20 are as follows:

[0013] S201: Monitor the traffic flow changes in each sub-area using the cameras on the urban road sections to determine the changes in the flow of people in each sub-area. and traffic flow changes

[0014] ; Wherein, t represents a timestamp; the traffic flow includes pedestrian flow and vehicle flow;

[0015] S202, determining the traffic flow change of each sub-area according to the pedestrian flow change data and the vehicle flow change data, and calculating according to the formula:

[0016] ;

[0017] in, represents the flow of people in the ith sub-area at time t; represents the traffic flow of the ith sub-area at time t; represents the traffic flow of the ith sub-area at time t; and Respectively represent the traffic flow weights of pedestrian flow and vehicle flow; i=1, 2, ..., N;

[0018] S203, establish a brightness determination analysis model, analyze the brightness required for each sub-area under different traffic flows, and calculate according to the formula:

[0019] ;

[0020] Where B represents the required brightness when the traffic flow in the sub-area is Z; a represents the coefficient value; Indicates the brightness value of the road section when the street lamp in the sub-area displays the lowest brightness; Indicates the brightness value of the road section when the street lamp in the sub-area displays the highest brightness;

[0021] Based on the historical traffic flow data, the required brightness under different traffic flows is determined to obtain the coefficient value a; the time corresponding to the road section brightness value is nighttime;

[0022] The Logistic function formula is used to analyze the required brightness of each sub-area under different traffic flows. When the traffic volume reaches a certain threshold, the brightness of the street lights in the sub-area is adjusted to the highest, so that the brightness of the street lights can be automatically adjusted according to changes in traffic flow, improving the citizens' experience of going out at night.

[0023] Furthermore, the method steps of step S30 are as follows:

[0024] S301: Determine the required brightness of each sub-region road section ; Determine the area of ​​each sub-region And the number of street lights in each area ;

[0025] S302, according to the required brightness of each sub-region road section, the corresponding area and the number of street lamps, respectively calculate the required luminous flux of each sub-region street lamp, and calculate the required transmission power of each sub-region according to the street lamp model specifications of each sub-region, according to the calculation formula:

[0026] ;

[0027] in, represents the required transmission power of the calculated i-th sub-area; Indicates the required brightness of the road section in the ith sub-area; represents the area of ​​the i-th sub-region; represents the number of street lights in the i-th sub-area; represents the impact of street lamp model specifications on the transmission power in the i-th sub-area;

[0028] S303, sending the calculated required transmission power of each sub-area to the power grid;

[0029] By controlling the display brightness of street lamps in different sub-areas separately, the unified management efficiency of urban street lamps is improved, eliminating the management inconvenience caused by different models and specifications.

[0030] Furthermore, the method steps of step S50 are as follows:

[0031] S501. Based on the historical data of current and voltage changes of street lamps in different life cycles, a power model is established to analyze the normal working state of street lamps, and the maximum power threshold K of street lamps in normal working state is determined. maxand the minimum power threshold K min ;

[0032] S502, determining the current change and voltage change of each street lamp in each sub-area according to the collected current and voltage data of each sub-area, and obtaining the actual power consumption of each street lamp in each sub-area;

[0033] S503, determine whether there is a street lamp failure; if there is When the street light is normal, or When a street lamp failure occurs, it is determined that a sub-area corresponding to the street lamp failure occurs, and step S504 is executed;

[0034] Where j = 1, 2, ..., H i ; represents the actual power consumption of the jth street lamp in the i-th sub-area;

[0035] S504, iteratively select the street lamps in the corresponding sub-area, and perform the calculation of step S503 again on the actual power consumption of the remaining street lamps after the selection, to determine whether the street lamp is normal, until the street lamp normal condition is met, and determine that the street lamp in the corresponding sub-area selected when the street lamp normal condition is met is a faulty street lamp, and alarm the faulty street lamp, and send the street lamp fault information to the management personnel;

[0036] Due to the huge amount of current and voltage data, it is difficult for the system to make timely judgments. By analyzing the power consumption of street lamps, it is determined whether there is a street lamp failure, which reduces the system data analysis load. At the same time, through variance calculation, the accuracy of system safety fault judgment is improved, and the efficiency of street lamp supervision is improved.

[0037] An intelligent street lamp data information management system based on artificial intelligence, the system includes a regional planning management module, a flow collection and analysis module, an intelligent calculation module, a power transmission management module and a fault warning module;

[0038] The regional planning management module is used to divide the city street lights into sub-areas, determine the number of street lights and the model specifications of the street lights in each sub-area, and collect current and voltage data of each sub-area; wherein the model specifications of the street lights in each sub-area are the same; the traffic collection and analysis module is used to collect traffic flow data through cameras on urban road sections, determine the traffic flow changes in each sub-area, and calculate the required brightness of each sub-area section; the intelligent calculation module is used to calculate the required transmission power of each sub-area according to the required brightness of each sub-area section, the number of street lights and the model specifications of street lights; the power transmission management module is used to control the power grid to transmit electricity according to the calculated required transmission power of each sub-area; the fault warning module is used to determine whether there is a street light fault according to the collected current and voltage data and transmission power of each sub-area, and alarm the faulty street light.

[0039] Furthermore, the regional planning management module includes a remote terminal control unit, a street light management confirmation unit and an area confirmation unit;

[0040] The remote terminal control unit includes a remote terminal control device for collecting current and voltage data of the corresponding sub-area, calculating the required transmission power, and performing street lamp fault judgment;

[0041] The street lamp management confirmation unit is used to determine the number of street lamps in each sub-area and the model specifications of the street lamps;

[0042] The area confirmation unit is used to determine the area of ​​each sub-area.

[0043] Furthermore, the traffic collection and analysis module includes a human flow analysis unit, a vehicle flow analysis unit, a traffic flow confirmation unit and a brightness value confirmation unit;

[0044] The human flow analysis unit is used to determine the change of human flow in each sub-area;

[0045] The vehicle flow analysis unit is used to determine each sub-area;

[0046] The traffic flow confirmation unit is used to determine the traffic flow change of each sub-area;

[0047] The brightness value confirmation unit is used to establish a brightness determination analysis model to analyze the brightness required for each sub-area under different traffic flows.

[0048] Further, the intelligent computing module includes a transmission power calculation unit and a data sending unit;

[0049] The transmission power calculation unit is used to calculate the required luminous flux of the street lamps in each sub-area according to the required brightness of each sub-area road section, the corresponding area and the number of street lamps, and calculate the required transmission power of each sub-area according to the street lamp model specifications of each sub-area;

[0050] The data sending unit is used for sending the calculated required transmission power of each sub-area to the power grid.

[0051] Further, the fault warning module includes a threshold confirmation unit, a fault judgment unit and an alarm sending unit;

[0052] The threshold confirmation unit is used to establish a power model for analyzing the normal operation of the street lamp based on the historical data of the current and voltage changes of the street lamp in different life cycles, and to determine the maximum power threshold and the minimum power threshold of the street lamp in normal operation respectively;

[0053] The fault judgment unit is used to determine the actual power consumption of each street lamp in each sub-area and to judge whether there is a street lamp fault;

[0054] The alarm sending unit is used to determine the faulty street lamp when there is a street lamp failure, send an alarm to the faulty street lamp, and send the street lamp failure information to the management personnel.

[0055] Compared with the prior art, the beneficial effects achieved by the present invention are: providing an intelligent street lamp data information management system and method based on artificial intelligence, automatically coordinating the street lamp brightness by analyzing the brightness required for each sub-area under different traffic flows, thereby improving the travel experience of citizens; by separately managing street lamp data, eliminating the management inconvenience caused by different models and specifications, improving the management efficiency of urban street lamps, and reducing the system data analysis load. BRIEF DESCRIPTION OF THE DRAWINGS

[0056] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0057] Figure 1 It is a structural schematic diagram of an intelligent street lamp data information management system based on artificial intelligence in the present invention. DETAILED DESCRIPTION

[0058] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0059] See also Figure 1 The present invention provides a technical solution: an intelligent street lamp data information management method based on artificial intelligence, the method comprising the following steps:

[0060] S10, dividing the urban street lamps into sub-areas, determining the number of street lamps and the model specifications of the street lamps in each sub-area, and collecting current and voltage data of each sub-area; wherein the model specifications of the street lamps in each sub-area are the same;

[0061] S20, collecting traffic flow data through cameras on urban road sections, determining traffic flow changes in each sub-area, and calculating the required brightness of each sub-area road section; wherein the traffic flow changes in each sub-area are determined by comprehensive weight analysis, and the brightness of each sub-area under different traffic flow changes is analyzed based on the traffic flow change values ​​determined for each sub-area and a brightness determination analysis model is constructed;

[0062] S30, calculating the required transmission power of each sub-area according to the required brightness of each sub-area road section, the number of street lamps and the model specifications of the street lamps;

[0063] S40, controlling the power grid to transmit electricity according to the calculated required transmission power of each sub-area;

[0064] S50. Determine whether there is a street lamp failure based on the collected current and voltage data and transmission power of each sub-area; when there is a street lamp failure, determine the faulty street lamp, alarm the faulty street lamp, and send the street lamp failure information to the management personnel.

[0065] According to the street lamp model specifications, the road section area where the street lamps with the same model specifications are located is divided into a sub-area; the number of divided sub-areas N is determined; a remote terminal control device is installed in each sub-area; the remote terminal control device is used to collect current and voltage data of the corresponding sub-area, calculate the required transmission power, and perform street lamp fault judgment;

[0066] Among them, street lamps of the same model and specification in each divided sub-area are connected to each other.

[0067] The method steps of step S20 are:

[0068] S201: Monitor the traffic flow changes in each sub-area using the cameras on the urban road sections to determine the changes in the flow of people in each sub-area. and traffic flow changes

[0069] ; Wherein, t represents a timestamp; the traffic flow includes pedestrian flow and vehicle flow;

[0070] S202, determining the traffic flow change of each sub-area according to the pedestrian flow change data and the vehicle flow change data, and calculating according to the formula:

[0071] ;

[0072] in, represents the flow of people in the ith sub-area at time t; represents the traffic flow of the ith sub-area at time t; represents the traffic flow of the ith sub-area at time t; and Respectively represent the traffic flow weights of pedestrian flow and vehicle flow; i=1, 2, ..., N;

[0073] S203, establish a brightness determination analysis model, analyze the brightness required for each sub-area under different traffic flows, and calculate according to the formula:

[0074] ;

[0075] Where B represents the required brightness when the traffic flow in the sub-area is Z; a represents the coefficient value; Indicates the brightness value of the road section when the street lamp in the sub-area displays the lowest brightness; Indicates the brightness value of the road section when the street lamp in the sub-area displays the highest brightness;

[0076] Based on historical traffic flow data, the required brightness under different traffic flows is determined to obtain the coefficient value a; the time corresponding to the road section brightness value is night time.

[0077] The method steps of step S30 are:

[0078] S301: Determine the required brightness of each sub-region road section ; Determine the area of ​​each sub-region And the number of street lights in each area ;

[0079] S302, according to the required brightness of each sub-region road section, the corresponding area and the number of street lamps, respectively calculate the required luminous flux of each sub-region street lamp, and calculate the required transmission power of each sub-region according to the street lamp model specifications of each sub-region, according to the calculation formula:

[0080] ;

[0081] in, represents the required transmission power of the calculated i-th sub-area; Indicates the required brightness of the road section in the ith sub-area; represents the area of ​​the i-th sub-region; represents the number of street lights in the i-th sub-area; represents the impact of street lamp model specifications on the transmission power in the i-th sub-area;

[0082] S303: Send the calculated required transmission power of each sub-area to the power grid.

[0083] The method steps of step S50 are:

[0084] S501. Based on the historical data of current and voltage changes of street lamps in different life cycles, a power model is established to analyze the normal working state of street lamps, and the maximum power threshold K of street lamps in normal working state is determined. max and the minimum power threshold K min ;

[0085] S502, determining the current change and voltage change of each street lamp in each sub-area according to the collected current and voltage data of each sub-area, and obtaining the actual power consumption of each street lamp in each sub-area;

[0086] S503, determine whether there is a street lamp failure; if there is When the street light is normal, or When a street lamp failure occurs, it is determined that a sub-area corresponding to the street lamp failure occurs, and step S504 is executed;

[0087] Where j = 1, 2, ..., H i ; represents the actual power consumption of the jth street lamp in the i-th sub-area;

[0088] S504. Iteratively select the street lights in the corresponding sub-area, and perform the calculation of step S503 again on the actual power consumption of the remaining street lights after the selection to determine whether the street lights are normal, until the normal conditions of the street lights are met, and determine that the street lights in the corresponding sub-area selected when the normal conditions of the street lights are met are faulty street lights, and alarm the faulty street lights, and send the street light fault information to the management personnel.

[0089] An intelligent street lamp data information management system based on artificial intelligence, the system includes a regional planning management module, a flow collection and analysis module, an intelligent calculation module, a power transmission management module and a fault warning module;

[0090] The regional planning management module is used to divide the city street lights into sub-areas, determine the number of street lights and the model specifications of the street lights in each sub-area, and collect current and voltage data of each sub-area; wherein the model specifications of the street lights in each sub-area are the same; the traffic collection and analysis module is used to collect traffic flow data through cameras on urban road sections, determine the traffic flow changes in each sub-area, and calculate the required brightness of each sub-area section; the intelligent calculation module is used to calculate the required transmission power of each sub-area according to the required brightness of each sub-area section, the number of street lights and the model specifications of street lights; the power transmission management module is used to control the power grid to transmit electricity according to the calculated required transmission power of each sub-area; the fault warning module is used to determine whether there is a street light fault according to the collected current and voltage data and transmission power of each sub-area, and alarm the faulty street light.

[0091] The regional planning management module includes a remote terminal control unit, a street light management confirmation unit and an area confirmation unit;

[0092] The remote terminal control unit includes a remote terminal control device for collecting current and voltage data of the corresponding sub-area, calculating the required transmission power, and performing street lamp fault judgment;

[0093] The street lamp management confirmation unit is used to determine the number of street lamps in each sub-area and the model specifications of the street lamps;

[0094] The area confirmation unit is used to determine the area of ​​each sub-area.

[0095] The flow collection and analysis module includes a human flow analysis unit, a vehicle flow analysis unit, a traffic flow confirmation unit and a brightness value confirmation unit;

[0096] The human flow analysis unit is used to determine the change of human flow in each sub-area;

[0097] The vehicle flow analysis unit is used to determine each sub-area;

[0098] The traffic flow confirmation unit is used to determine the traffic flow change of each sub-area;

[0099] The brightness value confirmation unit is used to establish a brightness determination analysis model to analyze the brightness required for each sub-area under different traffic flows.

[0100] The intelligent computing module includes a transmission power calculation unit and a data sending unit;

[0101] The transmission power calculation unit is used to calculate the required luminous flux of the street lamps in each sub-area according to the required brightness of each sub-area road section, the corresponding area and the number of street lamps, and calculate the required transmission power of each sub-area according to the street lamp model specifications of each sub-area;

[0102] The data sending unit is used for sending the calculated required transmission power of each sub-area to the power grid.

[0103] The fault warning module includes a threshold confirmation unit, a fault judgment unit and an alarm sending unit;

[0104] The threshold confirmation unit is used to establish a power model for analyzing the normal operation of the street lamp based on the historical data of the current and voltage changes of the street lamp in different life cycles, and to determine the maximum power threshold and the minimum power threshold of the street lamp in normal operation respectively;

[0105] The fault judgment unit is used to determine the actual power consumption of each street lamp in each sub-area and to judge whether there is a street lamp fault;

[0106] The alarm sending unit is used to determine the faulty street lamp when there is a street lamp failure, send an alarm to the faulty street lamp, and send the street lamp failure information to the management personnel.

[0107] In this embodiment:

[0108] The system is specifically an intelligent urban street lamp data information management system; in the system, according to the street lamp model specifications, the road section where the street lamps with the same model specifications are located is divided into a sub-area, and the number of divided sub-areas N=30 is determined; remote terminal control equipment is installed in each sub-area;

[0109] Traffic flow data is collected by cameras on urban roads, and changes in traffic flow in each sub-area are monitored to determine changes in passenger flow in each sub-area. and traffic flow changes ;

[0110] According to the pedestrian flow change data and vehicle flow change data, the traffic flow change of each sub-area is determined according to the calculation formula:

[0111] ;

[0112] A brightness determination analysis model is established to analyze the brightness required for each sub-area under different traffic flows. According to the calculation formula:

[0113] ;

[0114] Based on historical traffic flow data, the required brightness under different traffic flows is determined to obtain the coefficient value a;

[0115] Determine the required brightness of each sub-area road section ; Determine the area of ​​each sub-region And the number of street lights in each area ; Calculate the required luminous flux of the street lamps in each sub-area respectively, and calculate the required transmission power of each sub-area according to the street lamp model specifications of each sub-area, according to the calculation formula:

[0116] ;

[0117] The calculated required transmission power of each sub-area is sent to the power grid, and the power grid is controlled to transmit electricity;

[0118] Based on the historical data of current and voltage changes of street lamps in different life cycles, a power model for analyzing the normal operation of street lamps is established to determine the maximum power threshold K of street lamps in normal operation. max and the minimum power threshold K min ;

[0119] Collecting current and voltage data of each sub-area, determining the current change and voltage change of each street lamp in each sub-area according to the collected current and voltage data of each sub-area, and obtaining the actual power consumption of each street lamp in each sub-area;

[0120] Determine whether there is a street light failure. At a certain time t, there is , determine whether there is a street light failure, determine that the sub-area corresponding to the street light failure is sub-area 1, iteratively select the street lights in the corresponding sub-area, calculate the actual power consumption of the remaining street lights after the selection, and determine whether the street lights are normal until the normal conditions of the street lights are met. At this time, the corresponding faulty street light is street light No. 2, an alarm is issued for the faulty street light, and the street light failure information is sent to the management personnel.

[0121] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0122] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. An intelligent street lamp data information management method based on artificial intelligence, characterized in that: The method comprises the following steps: S10, dividing the urban street lamps into sub-areas, determining the number of street lamps and the model specifications of the street lamps in each sub-area, and collecting current and voltage data of each sub-area; wherein the model specifications of the street lamps in each sub-area are the same; S20, collecting traffic flow data through cameras on urban road sections, determining traffic flow changes in each sub-area, and calculating the required brightness of each sub-area road section; wherein the traffic flow changes in each sub-area are determined by comprehensive weight analysis, and the brightness of each sub-area under different traffic flow changes is analyzed based on the traffic flow change values ​​determined for each sub-area and a brightness determination analysis model is constructed; S30, calculating the required transmission power of each sub-area according to the required brightness of each sub-area road section, the number of street lamps and the model specifications of the street lamps; S40, controlling the power grid to transmit electricity according to the calculated required transmission power of each sub-area; S50, judging whether there is a street lamp fault according to the collected current and voltage data and transmission power of each sub-area; when there is a street lamp fault, determining the faulty street lamp, alarming the faulty street lamp, and sending the street lamp fault information to the management personnel; The method steps of step S20 are: S201: Monitor the traffic flow changes in each sub-area using the cameras on the urban road sections to determine the changes in the flow of people in each sub-area. and traffic flow changes ; Wherein, t represents a timestamp; the traffic flow includes pedestrian flow and vehicle flow; S202, determining the traffic flow change of each sub-area according to the pedestrian flow change data and the vehicle flow change data, and calculating according to the formula: ; in, represents the flow of people in the ith sub-area at time t; represents the traffic flow of the ith sub-area at time t; represents the traffic flow of the ith sub-area at time t; and Respectively represent the traffic flow weights of pedestrian flow and vehicle flow; i=1, 2, ..., N; S203, establish a brightness determination analysis model, analyze the brightness required for each sub-area under different traffic flows, and calculate according to the formula: ; Where B represents the required brightness when the traffic flow in the sub-area is Z; a represents the coefficient value; Indicates the brightness value of the road section when the street lamp in the sub-area displays the lowest brightness; Indicates the brightness value of the road section when the street lamp in the sub-area displays the highest brightness; Based on the historical traffic flow data, the required brightness under different traffic flows is determined to obtain the coefficient value a; the time corresponding to the road section brightness value is nighttime; The method steps of step S30 are: S301: Determine the required brightness of each sub-region road section ; Determine the area of ​​each sub-region And the number of street lights in each area ; S302, according to the required brightness of each sub-region road section, the corresponding area and the number of street lamps, respectively calculate the required luminous flux of each sub-region street lamp, and calculate the required transmission power of each sub-region according to the street lamp model specifications of each sub-region, according to the calculation formula: ; in, represents the required transmission power of the calculated i-th sub-area; Indicates the required brightness of the road section in the ith sub-area; represents the area of ​​the i-th sub-region; represents the number of street lights in the i-th sub-area; represents the impact of street lamp model specifications on the transmission power in the i-th sub-area; S303, sending the calculated required transmission power of each sub-area to the power grid; The method steps of step S50 are: S501. Based on the historical data of current and voltage changes of street lamps in different life cycles, a power model is established to analyze the normal working state of street lamps, and the maximum power threshold K of street lamps in normal working state is determined. max and the minimum power threshold K min ; S502, determining the current change and voltage change of each street lamp in each sub-area according to the collected current and voltage data of each sub-area, and obtaining the actual power consumption of each street lamp in each sub-area; S503, determine whether there is a street lamp failure; if there is When the street light is normal, or When a street lamp failure occurs, it is determined that a sub-area corresponding to the street lamp failure occurs, and step S504 is executed; Where j = 1, 2, ..., H i ; represents the actual power consumption of the jth street lamp in the i-th sub-area; S504. Iteratively select the street lights in the corresponding sub-area, and perform the calculation of step S503 again on the actual power consumption of the remaining street lights after the selection to determine whether the street lights are normal, until the normal conditions of the street lights are met, and determine that the street lights in the corresponding sub-area selected when the normal conditions of the street lights are met are faulty street lights, and alarm the faulty street lights, and send the street light fault information to the management personnel.

2. According to claim 1, an intelligent street lamp data information management method based on artificial intelligence is characterized in that: According to the street lamp model specifications, the road section area where the street lamps with the same model specifications are located is divided into a sub-area; the number of divided sub-areas N is determined; a remote terminal control device is installed in each sub-area; the remote terminal control device is used to collect current and voltage data of the corresponding sub-area, calculate the required transmission power, and perform street lamp fault judgment; Among them, street lamps of the same model and specification in each divided sub-area are connected to each other.

3. An intelligent street light data information management system based on artificial intelligence, applied to an intelligent street light data information management method based on artificial intelligence as described in any one of claims 1-2, characterized in that: The system includes a regional planning management module, a flow collection and analysis module, an intelligent calculation module, a power transmission management module and a fault warning module; The regional planning management module is used to divide the city street lights into sub-areas, determine the number of street lights and the model specifications of the street lights in each sub-area, and collect current and voltage data of each sub-area; wherein the model specifications of the street lights in each sub-area are the same; the traffic collection and analysis module is used to collect traffic flow data through cameras on urban road sections, determine the traffic flow changes in each sub-area, and calculate the required brightness of each sub-area section; the intelligent calculation module is used to calculate the required transmission power of each sub-area according to the required brightness of each sub-area section, the number of street lights and the model specifications of street lights; the power transmission management module is used to control the power grid to transmit electricity according to the calculated required transmission power of each sub-area; the fault warning module is used to determine whether there is a street light fault according to the collected current and voltage data and transmission power of each sub-area, and alarm the faulty street light.

4. The intelligent street lamp data information management system based on artificial intelligence according to claim 3 is characterized by: The regional planning management module includes a remote terminal control unit, a street light management confirmation unit and an area confirmation unit; The remote terminal control unit includes a remote terminal control device for collecting current and voltage data of the corresponding sub-area, calculating the required transmission power, and making a street lamp fault judgment; The street lamp management confirmation unit is used to determine the number of street lamps in each sub-area and the model specifications of the street lamps; The area confirmation unit is used to determine the area of ​​each sub-area.

5. The intelligent street lamp data information management system based on artificial intelligence according to claim 4 is characterized by: The flow collection and analysis module includes a human flow analysis unit, a vehicle flow analysis unit, a traffic flow confirmation unit and a brightness value confirmation unit; The human flow analysis unit is used to determine the change of human flow in each sub-area; The vehicle flow analysis unit is used to determine each sub-area; The traffic flow confirmation unit is used to determine the traffic flow change of each sub-area; The brightness value confirmation unit is used to establish a brightness determination analysis model to analyze the brightness required for each sub-area under different traffic flows.

6. The intelligent street lamp data information management system based on artificial intelligence according to claim 5 is characterized by: The intelligent computing module includes a transmission power calculation unit and a data sending unit; The transmission power calculation unit is used to calculate the required luminous flux of the street lamps in each sub-area according to the required brightness of each sub-area road section, the corresponding area and the number of street lamps, and calculate the required transmission power of each sub-area according to the street lamp model specifications of each sub-area; The data sending unit is used for sending the calculated required transmission power of each sub-area to the power grid.

7. The intelligent street lamp data information management system based on artificial intelligence according to claim 6 is characterized by: The fault warning module includes a threshold confirmation unit, a fault judgment unit and an alarm sending unit; The threshold confirmation unit is used to establish a power model for analyzing the normal operation of the street lamp based on the historical data of the current and voltage changes of the street lamp in different life cycles, and to determine the maximum power threshold and the minimum power threshold of the street lamp in normal operation respectively; The fault judgment unit is used to determine the actual power consumption of each street lamp in each sub-area and to judge whether there is a street lamp fault; The alarm sending unit is used to determine the faulty street lamp when there is a street lamp failure, send an alarm to the faulty street lamp, and send the street lamp failure information to the management personnel.

Citation Information

Patent Citations

  • Urban and rural road lighting adjustment and control cloud system based on big data analysis and artificial intelligence

    CN113099589A

  • Intelligent control system and method for urban intelligent street lamps

    CN115551154A