A dual-machine mirror processing control system and method for dual five-axis hybrid robots

Through the dual five-axis hybrid robot dual-machine mirror processing control system, intelligent control of axisymmetric parts and machining path monitoring and adjustment are realized, solving the problems of low machining efficiency and long cycle in the existing technology, and improving machining efficiency and quality .

CN118466372BActive Publication Date: 2024-11-01JIANGSU YANGTIAN ROBOT TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410920312.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2024-11-01
Estimated Expiration
2044-07-10

AI Technical Summary

Technical Problem

In the prior art, it is difficult to realize intelligent control and monitoring and adjustment of machining paths in the machining of axisymmetric parts, resulting in low machining efficiency and long cycles.

Method used

Adopt the dual-five-axis hybrid robot dual-machine mirror processing control system, including data acquisition module, part analysis module, database, parameter establishment module, path testing module, real-time monitoring module and quality analysis module, to collect and analyze data of machining parts in real time , generate part standard or special-shaped signals, determine processing parameters and paths, and conduct idle tests and real-time monitoring to adjust processing paths and processes.

Benefits of technology

It effectively improves the processing efficiency and quality of parts, selects the appropriate processing method according to the part type, controls and adjusts the path and method, and improves the processing efficiency and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118466372B_ABST
    Figure CN118466372B_ABST
Patent Text Reader

Abstract

The present invention discloses a dual-five-axis hybrid robot dual-machine mirror processing control system and method, which can effectively improve the processing efficiency, processing quality and precision of thin-walled parts by offsetting the axial force generated during processing. It relates to the field of processing control, solves the current problem that it is impossible to select an adaptive processing method in combination with the processed parts, and it is impossible to control the processing path. It includes a part analysis module, a parameter establishment module, a path testing module, a real-time monitoring module and a quality analysis module. The part analysis module is used to analyze the part shape of the processed parts, the parameter establishment module is used to establish the processing parameters and processing methods of the processed parts, and the path testing module is used to perform an idling test on the processing path to be tested of the processing part corresponding to the working robot. The present invention controls and adjusts the working robot based on the test error amount, the working error amount or the abnormal contour map.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to processing control technology, and in particular to a dual-machine mirror processing control system and method of a dual five-axis hybrid robot. Background Art

[0002] A five-axis robot is an automated mechanical device with high flexibility and precision. It has five motion axes, usually three for positioning and two for orientation, which enables the robot to accurately position and operate in three-dimensional space. The robot is widely used in aerospace, automobile manufacturing, mold processing, consumer goods manufacturing and other industries.

[0003] In the prior art, when axisymmetric parts are processed, a single five-axis robot is usually used using traditional processing methods. Not only is it impossible to select an appropriate processing method in combination with the processed parts, but it is also difficult to control and adjust the processing path, which leads to problems such as low processing efficiency and long processing cycle. To this end, we propose a dual five-axis hybrid robot dual-machine mirror processing control system and method. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention aims to provide a dual-five-axis hybrid robot dual-machine mirror processing control system and method.

[0005] The technical problems to be solved by the present invention are:

[0006] How to intelligently control the machining method based on the machined parts and how to monitor and adjust the machining path during the machining process.

[0007] The purpose of the present invention can be achieved through the following technical solutions:

[0008] A dual-five-axis hybrid robot dual-machine mirror processing control system, comprising a data acquisition module, a part analysis module, a database, a parameter establishment module, a path test module, an airborne terminal, a real-time monitoring module and a quality analysis module, wherein the database is used to store preset equipment data of working robots of different equipment models and standard processing data of processing parts of different part models processed by the working robots;

[0009] The data acquisition module includes a first acquisition unit, a second acquisition unit and a third acquisition unit, wherein the first acquisition unit is used to acquire real-time processing pictures of the processed parts at different viewing angles and send them to the part analysis module; the part analysis module is used to analyze the part shape of the processed parts, and generate a part standard signal or a part special-shaped signal through analysis and send it to the parameter establishment module; the parameter establishment module is used to establish the processing parameters and processing methods of the processed parts, and send the processing path to be tested, the length of the processing path to be tested, the path length range and the processing time range when the working robot processes the processed parts with different processing methods to the path testing module; the path testing module is used to perform an idling test on the processing path to be tested of the working robot corresponding to the processed part, and if a time abnormality signal or a path abnormality signal is generated, the signal and the corresponding test error amount are sent to the airborne terminal, and if a time normal signal and a path normal signal are generated at the same time, they are sent to the second acquisition unit;

[0010] When the processing part is being processed, the second acquisition unit is used to collect the real-time equipment data of the working robot during the processing of the processing part and send it to the real-time monitoring module; the real-time monitoring module is used to monitor the processing status of the working robot in real time, and if a work abnormality signal is generated, the work abnormality signal and the work error amount corresponding to the work abnormality signal are sent to the airborne terminal, and if a work normal signal is generated, it is sent to the third acquisition unit;

[0011] After the processing of the processed parts is completed, the third acquisition unit is used to collect multiple groups of real-time reference images of the reference parts and the real-time finished product images corresponding to the finished parts and send them to the quality analysis module; the quality analysis module is used to analyze the part quality of the finished parts processed by the working robot. If an abnormal quality signal is generated, the abnormal contour map is sent to the airborne terminal. If a qualified quality signal is generated, no operation is performed; the airborne terminal is used to display the test error amount, working error amount or abnormal contour map of the working robot, and control and adjust the working robot based on the test error amount, working error amount or abnormal contour map.

[0012] Furthermore, the standard processing data includes the path length allowable error value, the processing time allowable error value and the standard processing speed when the working robot processes processing parts of different part models;

[0013] The preset device data are the freeze count threshold, single freeze duration threshold, total freeze duration threshold, signal delay reception count threshold, single signal delay reception duration threshold, and total signal delay reception duration threshold of working robots of different device models;

[0014] The real-time pictures are the front view, rear view, top view, bottom view, left view and right view of the machined parts during processing.

[0015] Furthermore, the analysis process of the parts analysis module is as follows:

[0016] Get real-time pictures of the processed parts at different viewing angles, and obtain the front view, rear view, top view, bottom view, left view and right view of the processed parts during processing;

[0017] The front view and the rear view are overlapped and compared in pairs. Similarly, the top view and the bottom view are overlapped and compared in pairs, and the left view and the right view are overlapped and compared in pairs.

[0018] If any of the following three items occurs: the front view overlaps with the rear view, the top view overlaps with the bottom view, or the left view overlaps with the right view, a part standard signal is generated;

[0019] If the front view and the rear view do not overlap, the top view and the bottom view do not overlap, and the left view and the right view do not overlap, a part profile signal is generated.

[0020] Furthermore, the working process of the parameter establishment module is as follows:

[0021] If a signal indicating that the part is of a special shape is received, the two working robots use the first processing method to process the part separately. The first processing method is specifically:

[0022] A workpiece coordinate system is established with any point on the processed part as the origin, and multiple processing points on the processed part are regarded as processing coordinate points in the workpiece coordinate system. During processing, the origin of the workpiece coordinate system is used as the processing starting point, and the processing coordinate points corresponding to multiple processing points are connected according to the point sequence number, so as to obtain the processing path to be measured of the working robot;

[0023] If the standard signal of the part is received, the two working robots use the second processing method to perform synchronous mirror processing on the processed parts. The second processing method is specifically:

[0024] Determine the axisymmetric line of the processed part, and select any point on the axisymmetric line corresponding to the processed part as the origin to establish a working coordinate system, set a number of processing coordinate points according to the processing points of the processed part, and during processing, use the origin of the workpiece coordinate system as the processing starting point, connect the processing coordinate points corresponding to multiple processing points according to the point sequence number, so as to obtain the processing path to be tested of the master robot, and then mirror-flip the processing path to be tested of the master robot along the axisymmetric line to obtain the processing path to be tested of the slave robot;

[0025] The path length of the processing path to be measured is recorded to obtain the length of the processing path to be measured of the working robot under different processing methods;

[0026] According to the equipment model and the part model, the path length allowable error value when the working robot processes the part with different processing methods is obtained from the database;

[0027] The minimum path length of the working robot is obtained by subtracting the path length allowable error value from the processing path length to be measured, and the maximum path length of the working robot is obtained by adding the path length allowable error value to the processing path length to be measured. The path length range when the working robot processes the processing parts with different processing methods is obtained by taking the minimum path length as the left end point and the maximum path length as the right end point;

[0028] Similarly, the allowable error value of the processing time and the standard processing speed of the working robot are obtained from the database according to the equipment model and the part model. The length of the processing path to be measured is divided by the standard processing speed to obtain the estimated processing time when the working robot processes the processing part with different processing methods;

[0029] Then, the shortest processing time of the working robot is obtained by subtracting the allowable error of the processing time from the estimated processing time, and the longest processing time of the working robot is obtained by adding the allowable error of the processing time to the estimated processing time. The shortest processing time is used as the left endpoint and the longest processing time is used as the right endpoint to obtain the processing time range when the working robot processes parts using different processing methods.

[0030] Furthermore, the idling test process of the path test module is specifically as follows:

[0031] Obtaining a processing path to be tested of the working robot, performing an idling test on the working robot according to the processing path to be tested to obtain an idling processing path when the working robot is idling, and recording the idling processing path length of the idling processing path, the start time when the idling test of the working robot starts, and the end time when the idling test ends;

[0032] Obtaining a processing path to be measured, a path length range, and a processing time range when the working robot processes the processing parts using different processing methods;

[0033] Determine whether the idling processing path length belongs to the path length range. If the idling processing path length does not belong to the path length range, calculate the path length difference of the working robot and generate a path abnormality signal. If the idling processing path length belongs to the path length range, visualize the idling processing path and the processing path to be tested according to the processing points to obtain the idling processing path diagram corresponding to the idling processing path and the processing path diagram to be tested corresponding to the processing path to be tested.

[0034] The idling processing path diagram and the processing path diagram to be tested are stacked and placed. If there is no non-overlapping area between the idling processing path diagram and the processing path diagram to be tested or the non-overlapping area between the idling processing path diagram and the processing path diagram to be tested does not exceed the preset area, a normal path signal is generated. If there is a non-overlapping area between the idling processing path diagram and the processing path diagram to be tested, and the non-overlapping area exceeds the preset area, the area exceeding the non-overlapping area of ​​the working robot is calculated and a path abnormality signal is generated.

[0035] At the same time, the idling processing time of the working robot during the idling test is obtained by subtracting the starting time from the ending time at the end of the idling test;

[0036] Determine whether the idling processing time is within the processing time range. If the idling processing time is not within the processing time range, calculate the processing time difference of the working robot to generate a time abnormality signal. If the idling processing time is within the processing time range, generate a time normal signal.

[0037] Among them, if the idle processing time is less than the left end point of the processing time range, the idle processing time is subtracted from the left end point of the processing time range to obtain the processing time difference; if the idle processing time is greater than the right end point of the processing time range, the idle processing time is subtracted from the right end point of the processing time range to obtain the processing time difference.

[0038] Furthermore, the real-time equipment data includes the real-time number of freezes when the working robot processes parts and the real-time freeze duration when each freeze occurs, the real-time number of delayed signal receptions and the real-time signal delayed reception duration when each signal is delayed.

[0039] Furthermore, the real-time monitoring process of the real-time monitoring module is as follows:

[0040] Obtain the real-time freezing duration of the working robot when it freezes during operation. If the current freezing duration exceeds the single freezing duration threshold, subtract the single freezing duration threshold from the freezing duration to obtain the single freezing duration of the working robot and generate a work abnormality signal. If the current freezing duration does not exceed the single freezing duration threshold, proceed to the next step.

[0041] Record the number of freezes that occur during the working process of the working robot and the duration of each freeze. The number of freezes is recorded as the real-time freeze number, and the duration of each freeze is recorded as the real-time freeze duration.

[0042] If the real-time jamming times exceed the jamming times threshold, the real-time jamming times are subtracted from the jamming times threshold to obtain the jamming times of the working robot and generate a work abnormality signal. If the real-time jamming times do not exceed the jamming times threshold, the real-time jamming duration of each jamming event is added together to obtain the total real-time jamming duration of the working robot when it is working, and the total real-time jamming duration is compared with the total jamming duration threshold. If the total real-time jamming duration exceeds the total jamming duration threshold, the total real-time jamming duration is subtracted from the total jamming duration threshold to obtain the total jamming duration of the working robot and generate a work abnormality signal. If the total real-time jamming duration does not exceed the total jamming duration threshold, proceed to the next step.

[0043] Obtain the real-time signal delay reception duration when the signal is delayed during the working process of the working robot. If the current real-time signal delay reception duration exceeds the single signal delay reception duration threshold, subtract the single signal delay reception duration threshold from the real-time signal delay reception duration to obtain the single signal delay reception excess duration of the working robot and generate a work abnormality signal. If the current real-time signal delay reception duration does not exceed the single signal delay reception duration threshold, proceed to the next step.

[0044] Record the number of delayed reception times of real-time signals during the working process of the working robot and the delayed reception duration of the real-time signals at each delayed reception time;

[0045] If the number of delayed real-time signal reception times exceeds the signal delay reception times threshold, the number of real-time signal delay reception times minus the signal delay reception times threshold is used to obtain the number of signal delay receptions exceeded by the working robot and a work abnormality signal is generated; if the number of real-time signal delay reception times does not exceed the signal delay reception times threshold, the real-time signal delay reception duration of each signal delay reception is added together to obtain the total real-time signal delay reception duration when the working robot is working, and the total real-time signal delay reception duration is compared with the signal delay reception total duration threshold; if the total real-time signal delay reception duration exceeds the signal delay reception total duration threshold, the total real-time signal delay reception duration minus the signal delay reception total duration threshold is used to generate the signal delay reception exceeded total duration and a work abnormality signal for the working robot; if the total real-time signal delay reception duration does not exceed the signal delay reception total duration threshold, a normal work signal is generated.

[0046] Furthermore, the test error quantities are processing time difference, path length difference and area excess;

[0047] The working error amounts include the duration of a single jam, the number of jams, the total duration of jams, the duration of a single signal delay reception, the number of signal delay receptions and the total duration of signal delay reception.

[0048] Furthermore, the analysis process of the quality analysis module is as follows:

[0049] Performing contour strokes on the real-time finished product image and the real-time reference image according to the edge positions, obtaining a finished product contour image corresponding to the real-time finished product image and a reference contour image corresponding to the real-time reference image;

[0050] Compare the reference contour map with the finished product contour map;

[0051] If the current reference contour image matches the corresponding finished product contour image, the next set of reference contour images and their corresponding finished product contour images will be compared until the comparison is completed;

[0052] When all reference profiles match the corresponding finished product profiles, a quality acceptance signal is generated;

[0053] When any reference contour image does not match the corresponding finished product contour image, the unmatched finished product contour image is marked as an abnormal contour image and a quality abnormality signal is generated.

[0054] In the second aspect, a dual-machine mirror processing control method of a dual five-axis hybrid robot is provided, and the method is specifically as follows:

[0055] Step S100, collecting real-time processing pictures of the processed parts at different viewing angles, and analyzing the part shapes of the processed parts, thereby generating part standard signals or part special-shaped signals;

[0056] Step S200, establishing processing parameters and processing methods for processing parts according to the part standard signal or the part special-shaped signal;

[0057] Step S300, performing an idling test on the machining path to be tested of the working robot corresponding to the machining part in combination with the established machining parameters, and if an abnormality occurs, sending the test error to the onboard terminal, and controlling and adjusting the machining path of the working robot based on the test error, otherwise collecting the real-time equipment data of the working robot during machining of the machining part;

[0058] Step S400, real-time monitoring of the processing status of the working robot, if an abnormal situation occurs, the working error amount is sent to the onboard terminal, and the processing process of the working robot is controlled and adjusted based on the working error amount, otherwise multiple groups of real-time reference pictures of the reference parts and real-time finished product pictures corresponding to the finished parts are collected;

[0059] Step S500, analyze the part quality of the finished parts processed by the working robot. If a quality qualified signal is generated, no operation is performed. If an abnormal quality signal is generated, the abnormal contour map is sent to the onboard terminal, and the processing process of the working robot is adjusted in combination with the abnormal contour map.

[0060] Compared with the prior art, the present invention has the following beneficial effects:

[0061] The present invention first processes the part shape of the part, and then generates a part standard signal or a part special-shaped signal, establishes the processing parameters and processing methods of the processed parts according to the part standard signal or the part special-shaped signal, and performs an idling test on the processing path to be tested of the working robot corresponding to the processed part in combination with the established processing parameters. If an abnormal situation occurs, the test error amount is sent to the airborne terminal, and the processing path of the working robot is controlled and adjusted based on the test error amount. Otherwise, processing is performed and the processing situation of the working robot is monitored in real time. If an abnormal situation occurs, the working error amount is sent to the airborne terminal, and the processing process of the working robot is controlled and adjusted based on the working error amount. Otherwise, the part quality of the finished parts processed by the working robot is analyzed, and no operation is performed if a quality qualified signal is generated. If a quality abnormality signal is generated, an abnormal contour map is sent to the airborne terminal, and the processing process of the working robot is adjusted in combination with the abnormal contour map. The present invention selects an adaptive processing method according to the part type, and controls and adjusts the processing path and processing method of the part, effectively improving the processing efficiency and processing quality of the part. BRIEF DESCRIPTION OF THE DRAWINGS

[0062] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.

[0063] Figure 1 is the overall system block diagram of the present invention;

[0064] Figure 2 A schematic diagram of a tool tip coordinate system for a structural schematic diagram of a standard machining part in the present invention;

[0065] Figure 3 It is a structural schematic diagram of the idling processing path diagram and the processing path diagram to be tested in the present invention;

[0066] Figure 4 The figure is a flow chart of the method of the present invention. DETAILED DESCRIPTION

[0067] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0068] For example, see Figure 1-Figure 3As shown, the technical solution provided by the present invention is: a dual-machine mirror processing control system of a dual-five-axis hybrid robot, including a data acquisition module, a part analysis module, a database, a parameter establishment module, a path testing module, an airborne terminal, a real-time monitoring module and a quality analysis module. In practice, the airborne terminal can be an audible and visual alarm, a display screen, a control panel and other related equipment that can be airborne on the dual-five-axis hybrid robot;

[0069] In this embodiment, for the convenience of description, the dual five-axis hybrid robot is now unified as a working robot, and the working robot includes a master robot and a slave robot. At the same time, the parts processed on the working robot are calibrated as processing parts, and multiple processing points and point sequence numbers of the processing points are set on the processing parts;

[0070] The database is used to store preset equipment data of working robots of different equipment models and standard processing data of working robots processing parts of different part models; wherein the standard processing data are the allowable error value of the path length, the allowable error value of the processing time and the standard processing speed when the working robots process parts of different part models, and the preset equipment data are the threshold value of the number of freezes, the threshold value of a single freeze duration, the threshold value of the total freeze duration, the threshold value of the number of signal delay receptions, the threshold value of a single signal delay reception duration and the threshold value of the total signal delay reception duration of working robots of different equipment models;

[0071] The data acquisition module includes a first acquisition unit, a second acquisition unit and a third acquisition unit. The first acquisition unit is used to collect real-time processing pictures of the processed parts at different viewing angles, and send the real-time pictures of the processed parts at different viewing angles to the part analysis module; wherein the real-time pictures are the front view, rear view, top view, bottom view, left view and right view of the processed parts during processing. In practice, firstly, any shooting point is selected on the processed parts, and the shooting point is used as the front view, and then the rear view, top view, bottom view, left view and right view of the processed parts are photographed in sequence. Similarly, shooting points are selected on the processed parts for multiple times to obtain multiple groups of real-time processing pictures at different viewing angles, and then the part analysis module is used to analyze the multiple groups of real-time processing pictures one by one to determine whether the processed parts are standard processed parts. The standard processed parts are axisymmetric processed parts.

[0072] In this embodiment, the part analysis module is used to analyze the part shape of the processed part, and the analysis process is as follows:

[0073] Get real-time pictures of the processed parts at different viewing angles, and obtain the front view, rear view, top view, bottom view, left view and right view of the processed parts during processing;

[0074] The front view and the rear view are overlapped and compared in pairs. Similarly, the top view and the bottom view are overlapped and compared in pairs, and the left view and the right view are overlapped and compared in pairs.

[0075] If any of the following three items occurs: the front view overlaps with the rear view, the top view overlaps with the bottom view, or the left view overlaps with the right view, a part standard signal is generated;

[0076] If the front view and the rear view do not overlap, the top view and the bottom view do not overlap, and the left view and the right view do not overlap, a part profile signal is generated;

[0077] The part analysis module sends the part standard signal or the part special-shaped signal to the parameter establishment module; the parameter establishment module is used to establish the processing parameters and processing methods of the processed parts after receiving the part standard signal or the part special-shaped signal. The establishment process is as follows:

[0078] If a signal indicating that the part is of a special shape is received, the two working robots use the first processing method to process the part separately. The first processing method is specifically:

[0079] A workpiece coordinate system is established with any point on the processed part as the origin, and multiple processing points on the processed part are regarded as processing coordinate points in the workpiece coordinate system. During processing, the origin of the workpiece coordinate system is used as the processing starting point, and the processing coordinate points corresponding to multiple processing points are connected according to the point sequence number, so as to obtain the processing path to be measured of the working robot;

[0080] If the standard signal of the part is received, the two working robots use the second processing method to perform synchronous mirror processing on the processed parts. The second processing method is specifically:

[0081] Determine the axisymmetric line of the processed part, and select any point on the axisymmetric line corresponding to the processed part as the origin to establish a working coordinate system, set a number of processing coordinate points according to the processing points of the processed part, and during processing, use the origin of the workpiece coordinate system as the processing starting point, connect the processing coordinate points corresponding to multiple processing points according to the point sequence number, so as to obtain the processing path to be tested of the master robot, and then mirror-flip the processing path to be tested of the master robot along the axisymmetric line to obtain the processing path to be tested of the slave robot;

[0082] Among them, the first processing method is a single robot traditional processing method, that is, the two working robots can operate independently, and the second processing method is a working robot synchronous mirror processing method, that is, the actions performed by the two working robots are synchronous and mirror-symmetrical;

[0083] The path length of the processing path to be measured is recorded to obtain the length of the processing path to be measured of the working robot under different processing methods;

[0084] According to the equipment model and the part model, the path length allowable error value when the working robot processes the part with different processing methods is obtained from the database;

[0085] The minimum path length of the working robot is obtained by subtracting the path length allowable error value from the processing path length to be measured, and the maximum path length of the working robot is obtained by adding the path length allowable error value to the processing path length to be measured. The path length range when the working robot processes the processing parts with different processing methods is obtained by taking the minimum path length as the left end point and the maximum path length as the right end point;

[0086] Similarly, the allowable error value of the processing time and the standard processing speed of the working robot are obtained from the database according to the equipment model and the part model. The length of the processing path to be measured is divided by the standard processing speed to obtain the estimated processing time when the working robot processes the processing part with different processing methods;

[0087] Then, the shortest processing time of the working robot is obtained by subtracting the allowable error value of the processing time from the estimated processing time, and the longest processing time of the working robot is obtained by adding the allowable error value of the processing time to the estimated processing time. The shortest processing time is used as the left endpoint and the longest processing time is used as the right endpoint to obtain the processing time range when the working robot processes the processing parts using different processing methods;

[0088] The parameter establishment module sends the processing path to be tested, the processing path length to be tested, the path length range and the processing time range when the working robot processes the processing parts with different processing methods to the path testing module.

[0089] Furthermore, the path testing module is used to perform an idling test on the processing path to be tested of the working robot corresponding to the processing part, and the idling test process is specifically as follows:

[0090] Obtaining a processing path to be tested of the working robot, performing an idling test on the working robot according to the processing path to be tested to obtain an idling processing path when the working robot is idling, and recording the idling processing path length of the idling processing path, the start time when the idling test of the working robot starts, and the end time when the idling test ends;

[0091] Obtaining a processing path to be measured, a path length range, and a processing time range when the working robot processes the processing parts using different processing methods;

[0092] Determine whether the idling processing path length belongs to the path length range. If the idling processing path length does not belong to the path length range, calculate the path length difference of the working robot and generate a path abnormality signal. If the idling processing path length belongs to the path length range, proceed to the next step.

[0093] Visualize the idle machining path and the machining path to be tested according to the machining points, and obtain an idle machining path diagram corresponding to the idle machining path and a machining path diagram corresponding to the machining path to be tested;

[0094] like Figure 3 As shown, the idling processing path diagram and the processing path diagram to be tested are stacked and placed. If there is no non-overlapping area between the idling processing path diagram and the processing path diagram to be tested or the non-overlapping area between the idling processing path diagram and the processing path diagram to be tested does not exceed the preset area, a normal path signal is generated. If there is a non-overlapping area between the idling processing path diagram and the processing path diagram to be tested, and the non-overlapping area exceeds the preset area, the area exceeding the non-overlapping area of ​​the working robot corresponding to the non-overlapping area is calculated and a path abnormality signal is generated.

[0095] At the same time, the idling processing time of the working robot during the idling test is obtained by subtracting the starting time from the ending time at the end of the idling test;

[0096] Determine whether the idling processing time is within the processing time range. If the idling processing time is not within the processing time range, calculate the processing time difference of the working robot to generate a time abnormality signal. If the idling processing time is within the processing time range, generate a time normal signal.

[0097] If the idle processing time is less than the left end point of the processing time range, the processing time difference is obtained by subtracting the idle processing time from the left end point of the processing time range; if the idle processing time is greater than the right end point of the processing time range, the processing time difference is obtained by subtracting the right end point of the processing time range from the idle processing time;

[0098] If the path test module generates a time anomaly signal or a path anomaly signal, the path test module sends the time anomaly signal or the path anomaly signal, and the test error amount corresponding to the time anomaly signal or the path anomaly signal to the airborne terminal; if the path test module generates a time normal signal and a path normal signal at the same time, the path test module sends the time normal signal and the path normal signal to the second acquisition unit;

[0099] The onboard terminal is used to issue an abnormal alarm and display the test error of the working robot after receiving the time abnormality signal or the path abnormality signal, and control and adjust the processing path of the working robot based on the test error;

[0100] In practice, when an abnormality occurs, the sound and light alarm flashes red, and the display screen is used to display the test error amount of the working robot idling test. The test error amount is the difference in processing time, path length and area exceeded.

[0101] Further, when the processing part is being processed, the second acquisition unit is used to collect the real-time device data of the working robot when the processing part is being processed after receiving the time normal signal and the path normal signal, and send the real-time device data to the real-time monitoring module;

[0102] It should be specifically stated that the real-time equipment data includes the number of real-time freezes when the working robot processes the parts and the real-time freeze duration when each freeze occurs, the number of real-time signal delay receptions and the real-time signal delay reception duration when each signal delay occurs;

[0103] In practice, the number of jams can be determined by the processing time of the processed parts. For example, the processing time of the first processing point is 10:01, and the processing time of the second processing point is 10:02. It takes one minute to process from the first processing point to the second processing point. The actual processing time of the second processing point is 10:03. Ignoring other factors such as delayed signal reception, it can be determined that the processing robot has a jam. 10:03 minus 10:02 can get the jam duration of this jam.

[0104] The real-time monitoring module is used to monitor the processing status of the working robot in real time. The real-time monitoring process is as follows:

[0105] Obtain the real-time freezing duration of the working robot when it freezes during operation. If the current freezing duration exceeds the single freezing duration threshold, subtract the single freezing duration threshold from the freezing duration to obtain the single freezing duration of the working robot and generate a work abnormality signal. If the current freezing duration does not exceed the single freezing duration threshold, proceed to the next step.

[0106] Record the number of freezes that occur during the working process of the working robot and the duration of each freeze. The number of freezes is recorded as the real-time freeze number, and the duration of each freeze is recorded as the real-time freeze duration.

[0107] If the real-time jamming times exceed the jamming times threshold, the real-time jamming times are subtracted from the jamming times threshold to obtain the jamming times of the working robot and generate a work abnormality signal. If the real-time jamming times do not exceed the jamming times threshold, the real-time jamming duration of each jamming event is added together to obtain the total real-time jamming duration of the working robot when it is working, and the total real-time jamming duration is compared with the total jamming duration threshold. If the total real-time jamming duration exceeds the total jamming duration threshold, the total real-time jamming duration is subtracted from the total jamming duration threshold to obtain the total jamming duration of the working robot and generate a work abnormality signal. If the total real-time jamming duration does not exceed the total jamming duration threshold, proceed to the next step.

[0108] Obtain the real-time signal delay reception duration when the signal is delayed during the working process of the working robot. If the current real-time signal delay reception duration exceeds the single signal delay reception duration threshold, subtract the single signal delay reception duration threshold from the real-time signal delay reception duration to obtain the single signal delay reception excess duration of the working robot and generate a work abnormality signal. If the current real-time signal delay reception duration does not exceed the single signal delay reception duration threshold, proceed to the next step.

[0109] Record the number of delayed reception times of real-time signals during the working process of the working robot and the delayed reception duration of the real-time signals at each delayed reception time;

[0110] If the number of delayed real-time signal reception times exceeds the signal delay reception times threshold, the number of real-time signal delay reception times minus the signal delay reception times threshold is used to obtain the number of signal delay reception times exceeded by the working robot and a work abnormality signal is generated; if the number of real-time signal delay reception times does not exceed the signal delay reception times threshold, the real-time signal delay reception duration of each signal delay reception is added together to obtain the total real-time signal delay reception duration when the working robot is working, and the total real-time signal delay reception duration is compared with the signal delay reception total duration threshold; if the total real-time signal delay reception duration exceeds the signal delay reception total duration threshold, the total real-time signal delay reception duration minus the signal delay reception total duration threshold is used to generate the signal delay reception total duration exceeded by the working robot and a work abnormality signal is generated; if the total real-time signal delay reception duration does not exceed the signal delay reception total duration threshold, a normal work signal is generated;

[0111] If the real-time monitoring module generates a working abnormality signal, the working abnormality signal and the working error amount corresponding to the working abnormality signal are sent to the airborne terminal. The airborne terminal is used to issue an abnormal alarm and display the working error amount of the working robot after receiving the working abnormality signal, and control and adjust the processing process of the working robot based on the working error amount. If the real-time monitoring module generates a working normal signal, the working normal signal is sent to the third acquisition unit;

[0112] Among them, the working error amount specifically includes the word jamming time, the number of jamming times, the total jamming time, the single signal delay reception time, the number of signal delay reception times and the total signal delay reception time.

[0113] As a further solution of the present invention, after the processing of the processed part is completed, the processed part is calibrated as a finished part, and at the same time, a finished part with the same part model as the finished part and having passed the inspection is selected as a reference object and recorded as a reference part;

[0114] The third acquisition unit is used to acquire multiple sets of real-time reference pictures of reference parts and real-time finished product pictures corresponding to finished parts, and send the multiple sets of real-time reference pictures and real-time finished product pictures to the quality analysis module;

[0115] It should be specifically explained that when taking a set of real-time reference pictures and their corresponding real-time finished product pictures, the finished product parts and the reference parts are placed at the same angle and position, and then the finished product parts and the reference parts are photographed at a fixed shooting position, thereby obtaining the real-time finished product pictures and the real-time reference pictures;

[0116] The quality analysis module is used to analyze the quality of the finished parts processed by the working robot. The analysis process is as follows:

[0117] Performing contour strokes on the real-time finished product image and the real-time reference image according to the edge positions, obtaining a finished product contour image corresponding to the real-time finished product image and a reference contour image corresponding to the real-time reference image;

[0118] Compare the reference contour map with the finished product contour map. The comparison process can refer to the comparison method after the idle machining path map and the machining path map to be tested are stacked and placed;

[0119] If the current reference contour image matches the corresponding finished product contour image, the next set of reference contour images and their corresponding finished product contour images will be compared until the comparison is completed;

[0120] When all reference profiles match the corresponding finished product profiles, a quality acceptance signal is generated;

[0121] When any one of the reference contour images does not match the corresponding finished product contour image, the unmatched finished product contour image is marked as an abnormal contour image and a quality abnormality signal is generated;

[0122] If the quality analysis module generates a quality abnormality signal, the abnormal contour map is sent to the airborne terminal; if the quality analysis module generates a quality qualified signal, no operation is performed;

[0123] The onboard terminal is used to display the abnormal contour map, prompting the administrator to adjust the processing process of the working robot in combination with the abnormal contour map;

[0124] In this application, if corresponding calculation formulas appear, the above calculation formulas are all dimensionless and take their numerical calculations. The weight coefficients, proportional coefficients and other coefficients in the formulas are set to a result value obtained by quantifying each parameter. The size of the weight coefficient and the proportional coefficient can be determined as long as it does not affect the proportional relationship between the parameter and the result value.

[0125] For example 2, please refer to Figure 4As shown, based on another concept of the same invention, a dual-machine mirror processing control method of a dual five-axis hybrid robot is now proposed, comprising the following steps:

[0126] Step S100, collecting real-time processing pictures of the processed parts at different viewing angles, and analyzing the part shapes of the processed parts, thereby generating part standard signals or part special-shaped signals;

[0127] Step S200, establishing processing parameters and processing methods for processing parts according to the part standard signal or the part special-shaped signal;

[0128] Step S300, performing an idling test on the machining path to be tested of the working robot corresponding to the machining part in combination with the established machining parameters, and if an abnormality occurs, sending the test error to the onboard terminal, and controlling and adjusting the machining path of the working robot based on the test error, otherwise collecting the real-time equipment data of the working robot during machining of the machining part;

[0129] Step S400, real-time monitoring of the processing status of the working robot, if an abnormal situation occurs, the working error amount is sent to the onboard terminal, and the processing process of the working robot is controlled and adjusted based on the working error amount, otherwise multiple groups of real-time reference pictures of the reference parts and real-time finished product pictures corresponding to the finished parts are collected;

[0130] Step S500, analyzing the quality of the finished parts processed by the working robot, if a quality qualified signal is generated, no operation is performed, if an abnormal quality signal is generated, an abnormal contour map is sent to the onboard terminal, and the processing process of the working robot is adjusted in combination with the abnormal contour map;

[0131] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. A dual-five-axis hybrid robot dual-machine mirror processing control system, characterized in that: It includes a data acquisition module, a parts analysis module, a database, a parameter establishment module, a path testing module, an onboard terminal, a real-time monitoring module and a quality analysis module, wherein the database is used to store preset equipment data of working robots of different equipment models and standard processing data of processing parts of different parts models processed by the working robots; The data acquisition module includes a first acquisition unit, a second acquisition unit and a third acquisition unit, wherein the first acquisition unit is used to acquire real-time processing pictures of the processed parts at different viewing angles; the part analysis module is used to analyze the part shape of the processed parts, and generate a part standard signal or a part special-shaped signal by analysis; the parameter establishment module is used to establish the processing parameters and processing methods of the processed parts, and obtain the processing path to be tested, the length of the processing path to be tested, the path length range and the processing time range when the working robot processes the processed parts with different processing methods; the path test module is used to perform an idling test on the processing path to be tested of the working robot corresponding to the processed part, generate a time abnormality signal, a path abnormality signal and obtain the corresponding test error, or generate a time normal signal and a path normal signal; When the processing part is being processed, the second acquisition unit is used to collect the real-time equipment data of the working robot during the processing of the processing part and send it to the real-time monitoring module; the real-time monitoring module is used to monitor the processing status of the working robot in real time, generate a work abnormality signal and obtain a corresponding work error amount, or generate a work normal signal; After the processing of the parts is completed, the third acquisition unit is used to collect multiple groups of real-time reference images of the reference parts and real-time finished product images corresponding to the finished parts; the quality analysis module is used to analyze the part quality of the finished parts processed by the working robot, generate quality abnormality signals and obtain corresponding abnormal contour maps, or generate quality qualified signals; the onboard terminal is used to control and adjust the working robot.

2. According to the dual five-axis hybrid robot dual-machine mirror processing control system of claim 1, it is characterized in that: The standard processing data includes the path length allowable error value, processing time allowable error value and standard processing speed when the working robot processes different part models; The preset device data are the freeze count threshold, single freeze duration threshold, total freeze duration threshold, signal delay reception count threshold, single signal delay reception duration threshold, and total signal delay reception duration threshold of working robots of different device models; The real-time pictures are the front view, rear view, top view, bottom view, left view and right view of the machined parts during processing.

3. A dual five-axis hybrid robot dual-machine mirror processing control system according to claim 2, characterized in that: The analysis process of the parts analysis module is as follows: Get real-time pictures of the processed parts at different viewing angles, and obtain the front view, rear view, top view, bottom view, left view and right view of the processed parts during processing; The front view and the rear view are overlapped and compared in pairs. Similarly, the top view and the bottom view are overlapped and compared in pairs, and the left view and the right view are overlapped and compared in pairs. If any of the following three items occurs: the front view overlaps with the rear view, the top view overlaps with the bottom view, or the left view overlaps with the right view, a part standard signal is generated; If the front view and the rear view do not overlap, the top view and the bottom view do not overlap, and the left view and the right view do not overlap, a part profile signal is generated.

4. A dual five-axis hybrid robot dual-machine mirror processing control system according to claim 3, characterized in that: The working process of the parameter establishment module is as follows: If a signal indicating that the part is of a special shape is received, the two working robots use the first processing method to process the part separately. The first processing method is specifically: A workpiece coordinate system is established with any point on the processed part as the origin, and multiple processing points on the processed part are regarded as processing coordinate points in the workpiece coordinate system. During processing, the origin of the workpiece coordinate system is used as the processing starting point, and the processing coordinate points corresponding to multiple processing points are connected according to the point sequence number, so as to obtain the processing path to be measured of the working robot; If the standard signal of the part is received, the two working robots use the second processing method to perform synchronous mirror processing on the processed parts. The second processing method is specifically: Determine the axisymmetric line of the processed part, and select any point on the axisymmetric line corresponding to the processed part as the origin to establish a working coordinate system, set a number of processing coordinate points according to the processing points of the processed part, and during processing, use the origin of the workpiece coordinate system as the processing starting point, connect the processing coordinate points corresponding to multiple processing points according to the point sequence number, so as to obtain the processing path to be tested of the master robot, and then mirror-flip the processing path to be tested of the master robot along the axisymmetric line to obtain the processing path to be tested of the slave robot; The path length of the processing path to be measured is recorded to obtain the length of the processing path to be measured of the working robot under different processing methods; According to the equipment model and the part model, the path length allowable error value when the working robot processes the part with different processing methods is obtained from the database; The minimum path length of the working robot is obtained by subtracting the path length allowable error value from the processing path length to be measured, and the maximum path length of the working robot is obtained by adding the path length allowable error value to the processing path length to be measured. The path length range when the working robot processes the processing parts with different processing methods is obtained by taking the minimum path length as the left end point and the maximum path length as the right end point; Similarly, the allowable error value of the processing time and the standard processing speed of the working robot are obtained from the database according to the equipment model and the part model. The length of the processing path to be measured is divided by the standard processing speed to obtain the estimated processing time when the working robot processes the processing part with different processing methods; Then, the shortest processing time of the working robot is obtained by subtracting the allowable error of the processing time from the estimated processing time, and the longest processing time of the working robot is obtained by adding the allowable error of the processing time to the estimated processing time. The shortest processing time is used as the left endpoint and the longest processing time is used as the right endpoint to obtain the processing time range when the working robot processes parts using different processing methods.

5. A dual five-axis hybrid robot dual-machine mirror processing control system according to claim 4, characterized in that: The idling test process of the path test module is as follows: Obtaining a processing path to be tested of the working robot, performing an idling test on the working robot according to the processing path to be tested to obtain an idling processing path when the working robot is idling, and recording the idling processing path length of the idling processing path, the start time when the idling test of the working robot starts, and the end time when the idling test ends; Obtaining a processing path to be measured, a path length range, and a processing time range when the working robot processes the processing parts using different processing methods; Determine whether the idling processing path length belongs to the path length range. If the idling processing path length does not belong to the path length range, calculate the path length difference of the working robot and generate a path abnormality signal. If the idling processing path length belongs to the path length range, visualize the idling processing path and the processing path to be tested according to the processing points to obtain the idling processing path diagram corresponding to the idling processing path and the processing path diagram to be tested corresponding to the processing path to be tested. The idling processing path diagram and the processing path diagram to be tested are stacked and placed. If there is no non-overlapping area between the idling processing path diagram and the processing path diagram to be tested or the non-overlapping area between the idling processing path diagram and the processing path diagram to be tested does not exceed the preset area, a normal path signal is generated. If there is a non-overlapping area between the idling processing path diagram and the processing path diagram to be tested, and the non-overlapping area exceeds the preset area, the area exceeding the non-overlapping area of ​​the working robot is calculated and a path abnormality signal is generated. At the same time, the idling processing time of the working robot during the idling test is obtained by subtracting the starting time from the ending time at the end of the idling test; Determine whether the idling processing time is within the processing time range. If the idling processing time is not within the processing time range, calculate the processing time difference of the working robot to generate a time abnormality signal. If the idling processing time is within the processing time range, generate a time normal signal. Among them, if the idle processing time is less than the left end point of the processing time range, the idle processing time is subtracted from the left end point of the processing time range to obtain the processing time difference; if the idle processing time is greater than the right end point of the processing time range, the idle processing time is subtracted from the right end point of the processing time range to obtain the processing time difference.

6. A dual five-axis hybrid robot dual-machine mirror processing control system according to claim 1, characterized in that: The real-time equipment data includes the real-time number of freezes when the working robot processes parts and the real-time freeze duration when each freeze occurs, the real-time number of delayed signal receptions and the real-time signal delay reception duration when each signal is delayed.

7. A dual five-axis hybrid robot dual-machine mirror processing control system according to claim 6, characterized in that: The real-time monitoring process of the real-time monitoring module is as follows: Obtain the real-time freezing duration of the working robot when it freezes during operation. If the current freezing duration exceeds the single freezing duration threshold, subtract the single freezing duration threshold from the freezing duration to obtain the single freezing duration of the working robot and generate a work abnormality signal. If the current freezing duration does not exceed the single freezing duration threshold, proceed to the next step. Record the number of freezes that occur during the working process of the working robot and the duration of each freeze. The number of freezes is recorded as the real-time freeze number, and the duration of each freeze is recorded as the real-time freeze duration. If the real-time jamming times exceed the jamming times threshold, the real-time jamming times are subtracted from the jamming times threshold to obtain the jamming times of the working robot and generate a work abnormality signal. If the real-time jamming times do not exceed the jamming times threshold, the real-time jamming duration of each jamming event is added together to obtain the total real-time jamming duration of the working robot when it is working, and the total real-time jamming duration is compared with the total jamming duration threshold. If the total real-time jamming duration exceeds the total jamming duration threshold, the total real-time jamming duration is subtracted from the total jamming duration threshold to obtain the total jamming duration of the working robot and generate a work abnormality signal. If the total real-time jamming duration does not exceed the total jamming duration threshold, proceed to the next step. Obtain the real-time signal delay reception duration when the signal is delayed during the working process of the working robot. If the current real-time signal delay reception duration exceeds the single signal delay reception duration threshold, subtract the single signal delay reception duration threshold from the real-time signal delay reception duration to obtain the single signal delay reception excess duration of the working robot and generate a work abnormality signal. If the current real-time signal delay reception duration does not exceed the single signal delay reception duration threshold, proceed to the next step. Record the number of delayed reception times of real-time signals during the working process of the working robot and the delayed reception duration of the real-time signals at each delayed reception time; If the number of delayed real-time signal reception times exceeds the signal delay reception times threshold, the number of real-time signal delay reception times minus the signal delay reception times threshold is used to obtain the number of signal delay receptions exceeded by the working robot and a work abnormality signal is generated; if the number of real-time signal delay reception times does not exceed the signal delay reception times threshold, the real-time signal delay reception duration of each signal delay reception is added together to obtain the total real-time signal delay reception duration when the working robot is working, and the total real-time signal delay reception duration is compared with the signal delay reception total duration threshold; if the total real-time signal delay reception duration exceeds the signal delay reception total duration threshold, the total real-time signal delay reception duration minus the signal delay reception total duration threshold is used to generate the signal delay reception exceeded total duration and a work abnormality signal for the working robot; if the total real-time signal delay reception duration does not exceed the signal delay reception total duration threshold, a normal work signal is generated.

8. The dual-five-axis hybrid robot dual-machine mirror processing control system according to claim 1 is characterized in that: The test error quantities are processing time difference, path length difference and area excess; The working error amounts include the duration of a single jam, the number of jams, the total duration of jams, the duration of a single signal delay reception, the number of signal delay receptions and the total duration of signal delay reception.

9. A dual five-axis hybrid robot dual-machine mirror processing control system according to claim 1, characterized in that: The analysis process of the quality analysis module is as follows: Performing contour strokes on the real-time finished product image and the real-time reference image according to the edge positions, obtaining a finished product contour image corresponding to the real-time finished product image and a reference contour image corresponding to the real-time reference image; Compare the reference contour map with the finished product contour map; If the current reference contour image matches the corresponding finished product contour image, the next set of reference contour images and their corresponding finished product contour images will be compared until the comparison is completed; When all reference profiles match the corresponding finished product profiles, a quality acceptance signal is generated; When any one of the reference contour images does not match the corresponding finished product contour image, the unmatched finished product contour image is marked as an abnormal contour image and a quality abnormality signal is generated.

10. A dual-machine mirror processing control method for dual five-axis hybrid robots, characterized in that: Based on a dual-five-axis hybrid robot dual-machine mirror processing control system according to any one of claims 1 to 9, the method is as follows: Step S100, collecting real-time processing pictures of the processed parts at different viewing angles, and analyzing the part shapes of the processed parts, thereby generating part standard signals or part special-shaped signals; Step S200, establishing processing parameters and processing methods for processing parts according to the part standard signal or the part special-shaped signal; Step S300, performing an idling test on the machining path to be tested of the working robot corresponding to the machining part in combination with the established machining parameters, and if an abnormality occurs, sending the test error to the onboard terminal, and controlling and adjusting the machining path of the working robot based on the test error, otherwise collecting the real-time equipment data of the working robot during machining of the machining part; Step S400, real-time monitoring of the processing status of the working robot, if an abnormal situation occurs, the working error amount is sent to the onboard terminal, and the processing process of the working robot is controlled and adjusted based on the working error amount, otherwise multiple groups of real-time reference pictures of the reference parts and real-time finished product pictures corresponding to the finished parts are collected; Step S500, analyze the part quality of the finished parts processed by the working robot. If a quality qualified signal is generated, no operation is performed. If an abnormal quality signal is generated, the abnormal contour map is sent to the onboard terminal, and the processing process of the working robot is adjusted in combination with the abnormal contour map.