An information control system and method based on natural gas safety production

By introducing online decision-making and relay formal processing modules into the information control system of the natural gas production site, and using visual review models and simulation models to assist processing, the difficulty and timeliness problems of processing complex abnormal events are solved, and a more efficient and safer process is achieved. processing flow.

CN118469260BActive Publication Date: 2024-10-11HEBEI NATURAL GAS CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202410926181.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-10-11
Estimated Expiration
2044-07-11

AI Technical Summary

Technical Problem

In the case of complex abnormal events at natural gas production sites, the existing information control system cannot properly preprocess, which may cause the situation to worsen, increase the difficulty and risk of processing, and the timeliness of experts is insufficient, resulting in high labor costs.

Method used

An information control system based on natural gas safety production is designed, including an online decision-making module, a pre-processing module and a relay formal processing module. It assists experts in pre-processing and formal processing through online decision-making and visual review models and simulation models, reducing labor costs. , improve the timeliness of processing.

Benefits of technology

It effectively avoids the deterioration of abnormal events, reduces the difficulty and risk of processing, improves the timeliness and efficiency of processing, and reduces labor costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118469260B_ABST
    Figure CN118469260B_ABST
Patent Text Reader

Abstract

The present invention provides an information control system and method based on natural gas production safety, wherein the system includes: an online decision-making module, which is used to make online decisions on the pre-processing scheme of abnormal events in the natural gas production site when the complexity of the abnormal events in the field is greater than or equal to a threshold; a pre-processing module, which is used to pre-process the abnormal events in the field based on the information control platform of the natural gas production site according to the pre-processing scheme; a relay formal processing module, which is used to assist online experts in relaying the formal processing of abnormal events in the field based on the information control platform. The present invention is based on the information control platform, and according to the pre-processing scheme, it properly pre-processes the abnormal events in the field, so as to avoid the deterioration of the situation of the abnormal events in the field and increase the difficulty and risk of processing. Experts can relay the formal processing of abnormal events in the field online based on the information control platform with the assistance of the system, which reduces the labor cost and improves the timeliness of processing.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of information control management, and in particular to an information control system and method based on natural gas safe production. Background Art

[0002] At present, natural gas production sites mostly use information control systems, which are mainly based on monitoring and early warning. For example, based on the Internet of Things technology, the operating status of each production equipment on site is collected and summarized to analyze whether the operating status is abnormal. If so, corresponding early warning is issued.

[0003] However, when a more complex abnormal event occurs on site, it is necessary to dispatch experts to the site for processing. While waiting for the experts to arrive at the site for processing, the information control system cannot properly pre-process the abnormal event, which may cause the situation of the abnormal event to deteriorate and increase the difficulty and risk of processing. In addition, the manpower cost of experts going to the site for processing is high, and the timeliness of the processing is insufficient.

[0004] Therefore, a solution is urgently needed. Summary of the invention

[0005] One of the purposes of the present invention is to provide an information control system based on natural gas production safety. When the complexity of abnormal events on site in the natural gas production site is greater than or equal to a threshold, an online decision-making preprocessing plan for the abnormal events on site is made. Based on the information control platform, the abnormal events on site are properly preprocessed according to the preprocessing plan to avoid the deterioration of the situation of the abnormal events on site and increase the difficulty and risk of processing. Experts can, with the assistance of the system, relay the formal processing of the abnormal events on site based on the information control platform online, reducing labor costs and improving the timeliness of processing.

[0006] An information control system based on natural gas safety production provided by an embodiment of the present invention includes:

[0007] An online decision-making module, used for making online decisions on pre-processing solutions for abnormal events at the natural gas production site when the complexity of the abnormal events at the site is greater than or equal to a threshold;

[0008] The pre-processing module is used to pre-process abnormal events on site based on the information control platform of the natural gas production site according to the pre-processing plan;

[0009] The relay formal processing module is used to assist online experts in relaying formal processing of on-site abnormal events based on the information control platform.

[0010] Preferably, the online decision-making module makes online decisions on the pre-processing scheme of abnormal events on site, including:

[0011] Determine the solution decision knowledge applicable to the abnormal event at the decision site from the solution decision knowledge base;

[0012] Determine the pretreatment plan based on the plan decision knowledge.

[0013] Preferably, the relay formal processing module assists online experts in relaying formal processing of on-site abnormal events based on the information control platform, including:

[0014] Obtain multiple implemented plans, pre-processing progress and event progress status for on-site abnormal events;

[0015] Generate and create a visual review model based on each implemented plan, pre-processing progress and event progress status;

[0016] Displaying visual review models to online experts;

[0017] Determine whether the online expert meets the trigger condition within a first time period; wherein the first time period is any time period of a first preset time period after the time period for which the online expert views the visual review model is equal to the time period threshold;

[0018] When the conditions are met, when the online expert pre-inputs the pre-implementation plan within the second time period, a visual simulation model for creating the pre-implementation plan is generated; wherein the second time period is a time period after the first time period and adjacent to the first time period for a second preset time period;

[0019] Displaying visual simulation models to online experts;

[0020] When the online expert inputs the relay formal processing plan, the on-site abnormal event is relayed and formally processed according to the relay formal processing plan based on the information control platform;

[0021] The trigger conditions include:

[0022] The matching degree between the model operation sequence generated when the online expert views the visual review model and the standard model operation sequence is greater than or equal to the matching degree threshold.

[0023] Preferably, the relay formal processing module generates and creates a visual review model based on each implemented plan, pre-processing progress and event progress status, including:

[0024] Sort the implemented plans according to the order of implementation to obtain the implementation plan sequence;

[0025] Based on the sequence division condition, the implementation plan sequence is divided into a plurality of local sequences;

[0026] Traverse each local sequence in turn;

[0027] Each time a local sequence is traversed, each implemented solution in the traversed local sequence is mapped to a field model of a natural gas production site to obtain a first mapping content;

[0028] Based on the perspective creation condition, create a panoramic perspective of the first mapping content;

[0029] Based on the panoramic perspective and the sub-progress and sub-state of each implemented solution in the traversed local sequence in the pre-processing progress and event progress state, a functional component is formed and associated with the sequence order of the traversed local sequence in the implementation sequence;

[0030] After traversing each local sequence, the functional components formed each time the local sequence is traversed are sorted in the order of the sequence order to obtain a functional component sequence;

[0031] Generate and create a visual review model based on the scene model and functional component sequence;

[0032] The sequence division conditions include:

[0033] The implementation types of the implemented solutions at the beginning and end of the sequence in the local sequence are all active implementation;

[0034] and / or,

[0035] The number of implemented solutions in the local sequence is greater than or equal to a number threshold;

[0036] and / or,

[0037] In the local sequence, all the implemented solutions are actively implemented and have standard solution association relationships between them.

[0038] Preferably, the relay formal processing module generates a visual simulation model for creating a preliminary implementation plan, including:

[0039] Mapping the preliminary implementation plan to a field model of a natural gas production site to obtain first mapping content;

[0040] A minimum local model including the first mapping content in the field model of the natural gas production site is used as a visualization simulation model.

[0041] An information-based control method for natural gas safety production provided by an embodiment of the present invention includes:

[0042] When the complexity of the abnormal events in the natural gas production site is greater than or equal to the threshold, the pre-processing scheme of the abnormal events in the field is decided online;

[0043] Based on the information control platform of the natural gas production site, pre-process the abnormal events on site according to the pre-processing plan;

[0044] Assist online experts to formally handle abnormal events on site based on the information control platform.

[0045] Preferably, the pre-processing scheme for abnormal events at the online decision-making site includes:

[0046] Determine the solution decision knowledge applicable to the abnormal event at the decision site from the solution decision knowledge base;

[0047] Determine the pretreatment plan based on the plan decision knowledge.

[0048] Preferably, the auxiliary online expert takes over the formal processing of the on-site abnormal events based on the information control platform, including:

[0049] Obtain multiple implemented plans, pre-processing progress and event progress status for on-site abnormal events;

[0050] Generate and create a visual review model based on each implemented plan, pre-processing progress and event progress status;

[0051] Displaying visual review models to online experts;

[0052] Determine whether the online expert meets the trigger condition within a first time period; wherein the first time period is any time period of a first preset time period after the time period for which the online expert views the visual review model is equal to the time period threshold;

[0053] When the conditions are met, when the online expert pre-inputs the pre-implementation plan within the second time period, a visual simulation model for creating the pre-implementation plan is generated; wherein the second time period is a time period after the first time period and adjacent to the first time period for a second preset time period;

[0054] Displaying visual simulation models to online experts;

[0055] When the online expert inputs the relay formal processing plan, the on-site abnormal event is relayed and formally processed according to the relay formal processing plan based on the information control platform;

[0056] The trigger conditions include:

[0057] The matching degree between the model operation sequence generated when the online expert views the visual review model and the standard model operation sequence is greater than or equal to the matching degree threshold.

[0058] Preferably, the generating and creating a visual review model based on each implemented solution, pre-processing progress and event progress status includes:

[0059] Sort the implemented plans according to the order of implementation to obtain the implementation plan sequence;

[0060] Based on the sequence division condition, the implementation plan sequence is divided into a plurality of local sequences;

[0061] Traverse each local sequence in turn;

[0062] Each time a local sequence is traversed, each implemented solution in the traversed local sequence is mapped to a field model of a natural gas production site to obtain a first mapping content;

[0063] Based on the perspective creation condition, create a panoramic perspective of the first mapping content;

[0064] Based on the panoramic perspective and the sub-progress and sub-state of each implemented solution in the traversed local sequence in the pre-processing progress and event progress state, a functional component is formed and associated with the sequence order of the traversed local sequence in the implementation sequence;

[0065] After traversing each local sequence, the functional components formed each time the local sequence is traversed are sorted in the order of the sequence order to obtain a functional component sequence;

[0066] Generate and create a visual review model based on the scene model and functional component sequence;

[0067] The sequence division conditions include:

[0068] The implementation types of the implemented solutions at the beginning and end of the sequence in the local sequence are all active implementation;

[0069] and / or,

[0070] The number of implemented solutions in the local sequence is greater than or equal to a number threshold;

[0071] and / or,

[0072] In the local sequence, all the implemented solutions are actively implemented and have standard solution association relationships between them.

[0073] Preferably, the generating and creating a visual simulation model of a preliminary implementation plan includes:

[0074] Mapping the preliminary implementation plan to a field model of a natural gas production site to obtain first mapping content;

[0075] A minimum local model including the first mapping content in the field model of the natural gas production site is used as a visualization simulation model.

[0076] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings.

[0077] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0078] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0079] Figure 1 A schematic diagram of an information control system based on natural gas safety production in an embodiment of the present invention;

[0080] Figure 2 It is a schematic diagram of an information control method based on natural gas safe production in an embodiment of the present invention. DETAILED DESCRIPTION

[0081] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0082] The embodiment of the present invention provides an information control system based on natural gas safety production, such as Figure 1 As shown, including:

[0083] An online decision-making module 1 is used to make online decisions on a pre-processing solution for abnormal events at the natural gas production site when the complexity of the abnormal events at the site is greater than or equal to a threshold;

[0084] Preprocessing module 2, used for preprocessing abnormal events on site based on the information control platform of the natural gas production site according to the preprocessing scheme;

[0085] The relay formal processing module 3 is used to assist online experts in relaying formal processing of on-site abnormal events based on the information control platform.

[0086] In the above technical solution:

[0087] Field abnormal events refer to abnormal events of equipment in the natural gas production site, etc. The complexity of field abnormal events represents the complexity of handling field abnormal events. Technical personnel can comprehensively determine the complexity according to the actual handling difficulty, impact scope, etc. of different field abnormal events, and set the corresponding complexity. The complexity threshold can be, for example: 8. When the complexity of the field abnormal event is greater than or equal to the threshold, it means that the complexity of the field abnormal event is relatively large.

[0088] Online decision-making on the pre-processing plan for on-site abnormal events. The pre-processing plan is a plan for experts to pre-process on-site abnormal events. For example, if the on-site abnormal event is multiple gas leaks in a certain equipment room, the online decision-making on-site abnormal event pre-processing plan is to dispatch the personnel in the equipment room to leave immediately and to urgently cut off the power to electrical equipment that may have electric sparks.

[0089] Each device in the natural gas production site is connected to the information control platform through the Internet of Things technology. The information control platform can perform online remote control of each device in the natural gas production site; therefore, based on the information control platform, abnormal events on site can be pre-processed according to the pre-processing plan.

[0090] Experts can conduct formal relay processing based on on-site abnormal events online, and the system will assist them during the processing.

[0091] In this application, when the complexity of an abnormal event on site in a natural gas production site is greater than or equal to a threshold, an online decision-making preprocessing plan for the abnormal event on site is made. Based on the information control platform, the abnormal event on site is properly preprocessed according to the preprocessing plan to avoid the deterioration of the situation of the abnormal event on site and increase the difficulty and risk of processing. With the assistance of the system, experts can relay the formal processing of the abnormal event on site based on the information control platform online, which reduces labor costs and improves the timeliness of processing.

[0092] In one embodiment, the online decision module 1 makes online decisions on the pre-processing scheme of abnormal events on site, including:

[0093] Determine the solution decision knowledge applicable to the abnormal event at the decision site from the solution decision knowledge base;

[0094] Determine the pretreatment plan based on the plan decision knowledge.

[0095] In the above technical solution:

[0096] The solution decision knowledge base contains solution decision knowledge applicable to different on-site abnormal events. The solution decision knowledge instructs the system how to make online decisions on pre-processing solutions for on-site abnormal events. The solution decision knowledge can provide experts with historical experience on how to make pre-processing solution decisions for different on-site abnormal events.

[0097] The embodiment of the present invention determines the solution decision knowledge applicable to the abnormal event at the decision site from the solution decision knowledge base, determines the preprocessing solution based on the solution decision knowledge, and improves the efficiency of the preprocessing solution decision.

[0098] In one embodiment, the relay formal processing module 3 assists online experts in relay formal processing of on-site abnormal events based on the information control platform, including:

[0099] Obtain multiple implemented plans, pre-processing progress and event progress status for on-site abnormal events;

[0100] Generate and create a visual review model based on each implemented plan, pre-processing progress and event progress status;

[0101] Displaying visual review models to online experts;

[0102] Determine whether the online expert meets the trigger condition within a first time period; wherein the first time period is any time period of a first preset time period after the time period for which the online expert views the visual review model is equal to the time period threshold;

[0103] When the conditions are met, when the online expert pre-inputs the pre-implementation plan within the second time period, a visual simulation model for creating the pre-implementation plan is generated; wherein the second time period is a time period after the first time period and adjacent to the first time period for a second preset time period;

[0104] Displaying visual simulation models to online experts;

[0105] When the online expert inputs the relay formal processing plan, the on-site abnormal event is relayed and formally processed according to the relay formal processing plan based on the information control platform;

[0106] The trigger conditions include:

[0107] The matching degree between the model operation sequence generated when the online expert views the visual review model and the standard model operation sequence is greater than or equal to the matching degree threshold.

[0108] In the above technical solution:

[0109] The implemented plan is the processing plan that has been implemented during the preprocessing of the on-site abnormal event; the preprocessing progress is the progress of the preprocessing of the on-site abnormal event, for example: 35%; the event progress status is the progress status of the on-site abnormal event, for example: the on-site abnormal event is a gas leak, the event progress status is the current total amount of gas leakage, the location of new gas leakage, etc.

[0110] If online experts want to take over the formal processing of on-site abnormal events, they first need to review the processing to understand the current pre-processing of on-site abnormal events and make decisions on taking over the formal processing; therefore, based on each implemented plan, pre-processing progress and event progress status, a visual review model is generated and created, and displayed to the online experts. The visual review model can help online experts understand the pre-processing of on-site abnormal events through visual information display.

[0111] The duration threshold may be, for example, 300 seconds. When the duration for which the online expert views the visualization review model is equal to the duration threshold, it indicates that the online expert has viewed the visualization review model for a long time and has basically understood the current preprocessing of abnormal events on site. The first preset duration may be, for example, 100 seconds.

[0112] When the online expert meets the triggering conditions within the first time period, it means that the online expert has begun to decide how to relay and formally handle the on-site abnormal event; in the triggering conditions, the model operation sequence generated when the online expert views the visual review model includes model operations in which the online expert successively operates the visual review model, and the matching threshold may be, for example, 85%. When the matching degree between the model operation sequence and the standard model operation sequence is greater than or equal to the matching threshold, it means that the online expert has begun to decide how to relay and formally handle the on-site abnormal event, for example, the model operations in the standard model operation sequence are successively viewing the control interface of a gas leakage equipment in the gas production site (may want to set control parameters), viewing the impact scope of the gas leakage in the gas production site (may want to determine the measures to reduce the impact based on the impact scope), etc.

[0113] The second time period is after the first time period and adjacent to the first time period, and the second preset duration may be, for example, 80 seconds; when the online expert inputs a pre-implementation plan within the second time period, the pre-implementation plan is a plan that the online expert wants the system to simulate and implement to formally handle on-site abnormal events, and a visual simulation model of the pre-implementation plan is generated and displayed to the online expert. The visual simulation model can help the online expert understand the simulated implementation of the pre-implementation plan through visual information display.

[0114] When the online expert completes the decision on the relay formal processing of the on-site abnormal event, the relay formal processing plan will be input. Similarly, based on the information control platform, the on-site abnormal event will be relayed and formally processed according to the relay formal processing plan.

[0115] The embodiment of the present invention introduces a visual review model to help online experts understand the pre-processing of on-site abnormal events, without the need for online experts to retrieve relevant situation information by themselves, thereby improving the humanization of assistance and improving the efficiency of online experts in handling on-site abnormal events; introducing a trigger condition to determine within a first time period whether the online expert has begun to decide how to take over the formal processing of the on-site abnormal event, and when so, obtaining and simulating the pre-implementation plan within the second time period, thereby reducing the system's working resources and improving the efficiency of obtaining and simulating the pre-implementation plan; finally, introducing a visual simulation model to help online experts understand the simulated implementation of the pre-implementation plan, further improving the humanization of assistance and further improving the efficiency of online experts in handling on-site abnormal events.

[0116] In one embodiment, the relay formal processing module 3 generates and creates a visual review model based on various implemented plans, pre-processing progress and event progress status, including:

[0117] Sort the implemented plans according to the order of implementation to obtain the implementation plan sequence;

[0118] Based on the sequence division condition, the implementation plan sequence is divided into a plurality of local sequences;

[0119] Traverse each local sequence in turn;

[0120] Each time a local sequence is traversed, each implemented solution in the traversed local sequence is mapped to a field model of a natural gas production site to obtain a first mapping content;

[0121] Based on the perspective creation condition, create a panoramic perspective of the first mapping content;

[0122] Based on the panoramic perspective and the sub-progress and sub-state of each implemented solution in the traversed local sequence in the pre-processing progress and event progress state, a functional component is formed and associated with the sequence order of the traversed local sequence in the implementation sequence;

[0123] After traversing each local sequence, the functional components formed each time the local sequence is traversed are sorted in the order of the sequence order to obtain a functional component sequence;

[0124] Generate and create a visual review model based on the scene model and functional component sequence;

[0125] The sequence division conditions include:

[0126] The implementation types of the implemented solutions at the beginning and end of the sequence in the local sequence are all active implementation;

[0127] and / or,

[0128] The number of implemented solutions in the local sequence is greater than or equal to a number threshold;

[0129] and / or,

[0130] In the local sequence, all the implemented solutions are actively implemented and have standard solution association relationships between them.

[0131] In the above technical solution:

[0132] The implementation sequence is the sequence in which the various implemented plans were implemented historically; according to the implementation sequence, the various implemented plans are sorted to obtain an implementation plan sequence; based on the sequence division condition, the implementation plan sequence is divided into multiple local sequences.

[0133] Each local sequence is traversed in turn. Each time a local sequence is traversed, each implemented plan in the traversed local sequence is mapped to the field model of the natural gas production site to obtain a first mapping content. The field model is a three-dimensional simulation model of the gas production site, which can be implemented based on BIM technology. The first mapping content is the effect information of each implemented plan in the traversed local sequence on the gas production site when implemented, which is reflected by the field model. For example, if the implemented plan is to perform emergency power-off on electrical equipment that may have electric sparks in the equipment room, the first mapping content is the equipment that is powered off and the power-off duration of different power-off equipment displayed in the field model.

[0134] Based on the perspective creation condition, a panoramic perspective of the first mapping content is created. The perspective creation condition is that the first mapping content can be clearly seen under the panoramic perspective. The definition of clarity here can be set according to actual needs during actual use.

[0135] The preprocessing progress has sub-progress corresponding to each implemented solution in the traversed local sequence, that is, the preprocessing progress of the on-site abnormal events when the implemented solution is implemented; the event progress status has sub-status corresponding to each implemented solution in the traversed local sequence, that is, the progress status of the on-site abnormal events when the implemented solution is implemented.

[0136] Based on the panoramic perspective and the preprocessing progress and event progress status corresponding to the sub-progress and sub-state of each implemented solution in the traversed local sequence, functional components are composed and associated with the sequence order of the traversed local sequence in the implementation plan sequence.

[0137] After traversing each local sequence, the functional components formed each time the local sequence is traversed are sorted in the order of the sequence order to obtain a functional component sequence.

[0138] A visual review model is generated based on the site model and the functional component sequence. When the online expert views the visual review model, he can browse the site model and the functional component sequence at the same time. When a panoramic perspective in the functional component sequence is selected, the corresponding first mapping content can be displayed to him. The online expert can also know the sub-progress and sub-status related to the first mapping content.

[0139] In the sequence division conditions, the implementation types of the implemented plans are divided into active implementation and passive implementation. Active implementation refers to the direct control of the gas production site based on the information control platform according to the pre-processing plan, and passive implementation refers to the temporary control of the gas production site by on-site personnel at the gas production site. When it is implemented, relevant records will be generated and received by the information control platform; therefore, setting the implementation type of the implemented plans at the beginning and end of the sequence in the local sequence to active implementation can make the online experts view the first mapping content from a panoramic perspective to reflect the implementation status of the actively implemented plans before and after the passively implemented plans, judge whether the passively implemented plans are reasonable, and improve the rationality of their understanding of the on-site processed situation;

[0140] The number threshold may be, for example, 3; setting the condition that the number of implemented solutions in the local sequence is greater than or equal to the number threshold may allow the online expert to view as much content in the first mapping content as possible through a panoramic perspective, thereby avoiding creating too many panoramic perspectives, causing inconvenience in perspective selection for the online expert, and saving system resources;

[0141] When two actively implemented solutions have a standard solution association relationship, it means that the implementation status of the two actively implemented solutions needs to be viewed by online experts at the same time from the same panoramic perspective; for example, the standard solution association relationship is an influence relationship (the implementation status of one solution directly affects whether the other solution can be implemented to achieve the best effect), etc. Therefore, setting the condition that all the solutions in the local sequence have a standard solution association relationship between them can enable online experts to view the implementation status of different solutions that need to be viewed at the same time from the same panoramic perspective, thereby further improving rationality.

[0142] When the embodiment of the present invention generates and creates a visualization review model, a sequence division condition is introduced to divide the implementation plan sequence into multiple local sequences, and each implemented plan in the same local sequence is mapped to the field model of the natural gas production site, so as to obtain the first mapping content, and create a panoramic perspective of the first mapping content, so that the online expert selects a panoramic perspective and can quickly view the first mapping content of how to make a decision to relay the formal processing of the abnormal event on the site; in addition, functional components are introduced, and the functional components are sorted in the order of the sequence order to obtain the functional component sequence, and the visualization review model is generated and created in conjunction with the field model, so that the online expert can select the panoramic perspective when viewing the visualization review model, understand the relationship between the first mapping content viewed from the panoramic perspective and the sub-progress and sub-state, and improve their decision-making efficiency; secondly, the sequence division condition is introduced to improve the rationality of the local sequence division and the subsequent creation of the panoramic perspective of the first mapping content.

[0143] In one embodiment, the relay formal processing module 3 generates a visual simulation model for creating a preliminary implementation plan, including:

[0144] Mapping the preliminary implementation plan to a field model of a natural gas production site to obtain first mapping content;

[0145] A minimum local model including the first mapping content in the field model of the natural gas production site is used as a visualization simulation model.

[0146] In the above technical solution:

[0147] The second mapping content is the information about the effect of the preliminary implementation plan on the gas production site when it is implemented, as reflected by the on-site model. For example, if the preliminary implementation plan is to perform an emergency power outage on all electrical equipment in the equipment room, then the second mapping content is the impact of the power outage on the normal gas production of all electrical equipment displayed in the on-site model. The minimum local model only contains the first mapping content.

[0148] The embodiment of the present invention uses the minimum local model containing the first mapping content in the field model of the natural gas production site as the visual simulation model, so that online experts can understand the relevant simulation situations in a targeted manner when viewing the visual simulation model.

[0149] The embodiment of the present invention provides an information control method based on natural gas safety production, such as Figure 2 As shown, including:

[0150] Step S1: when the complexity of the abnormal event at the natural gas production site is greater than or equal to a threshold, a pre-processing scheme for the abnormal event is decided online;

[0151] Step S2: Based on the information control platform of the natural gas production site, pre-process the abnormal events on site according to the pre-processing plan;

[0152] Step S3: assisting online experts to formally handle on-site abnormal events based on the information control platform.

[0153] The pre-processing scheme for abnormal events at the online decision-making site includes:

[0154] Determine the solution decision knowledge applicable to the abnormal event at the decision site from the solution decision knowledge base;

[0155] Determine the pretreatment plan based on the plan decision knowledge.

[0156] The auxiliary online experts take over the formal handling of on-site abnormal events based on the information control platform, including:

[0157] Obtain multiple implemented plans, pre-processing progress and event progress status for on-site abnormal events;

[0158] Generate and create a visual review model based on each implemented plan, pre-processing progress and event progress status;

[0159] Displaying visual review models to online experts;

[0160] Determine whether the online expert meets the trigger condition within a first time period; wherein the first time period is any time period of a first preset time period after the time period for which the online expert views the visual review model is equal to the time period threshold;

[0161] When the conditions are met, when the online expert pre-inputs the pre-implementation plan within the second time period, a visual simulation model for creating the pre-implementation plan is generated; wherein the second time period is a time period after the first time period and adjacent to the first time period for a second preset time period;

[0162] Displaying visual simulation models to online experts;

[0163] When the online expert inputs the relay formal processing plan, the on-site abnormal event is relayed and formally processed according to the relay formal processing plan based on the information control platform;

[0164] The trigger conditions include:

[0165] The matching degree between the model operation sequence generated when the online expert views the visual review model and the standard model operation sequence is greater than or equal to the matching degree threshold.

[0166] The visual review model is generated based on each implemented plan, pre-processing progress and event progress status, including:

[0167] Sort the implemented plans according to the order of implementation to obtain the implementation plan sequence;

[0168] Based on the sequence division condition, the implementation plan sequence is divided into a plurality of local sequences;

[0169] Traverse each local sequence in turn;

[0170] Each time a local sequence is traversed, each implemented solution in the traversed local sequence is mapped to a field model of a natural gas production site to obtain a first mapping content;

[0171] Based on the perspective creation condition, create a panoramic perspective of the first mapping content;

[0172] Based on the panoramic perspective and the sub-progress and sub-state of each implemented solution in the traversed local sequence in the pre-processing progress and event progress state, a functional component is formed and associated with the sequence order of the traversed local sequence in the implementation sequence;

[0173] After traversing each local sequence, the functional components formed each time the local sequence is traversed are sorted in the order of the sequence order to obtain a functional component sequence;

[0174] Generate and create a visual review model based on the scene model and functional component sequence;

[0175] The sequence division conditions include:

[0176] The implementation types of the implemented solutions at the beginning and end of the sequence in the local sequence are all active implementation;

[0177] and / or,

[0178] The number of implemented solutions in the local sequence is greater than or equal to a number threshold;

[0179] and / or,

[0180] In the local sequence, all the implemented solutions are actively implemented and have standard solution association relationships between them.

[0181] The generating and creating a visual simulation model of a preliminary implementation plan includes:

[0182] Mapping the preliminary implementation plan to a field model of a natural gas production site to obtain first mapping content;

[0183] A minimum local model including the first mapping content in the field model of the natural gas production site is used as a visualization simulation model.

[0184] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. An information control system based on natural gas safety production, characterized in that: include: An online decision-making module, used for making online decisions on pre-processing solutions for abnormal events at the natural gas production site when the complexity of the abnormal events at the site is greater than or equal to a threshold; The pre-processing module is used to pre-process abnormal events on site based on the information control platform of the natural gas production site according to the pre-processing plan; The relay formal processing module is used to assist online experts in relaying and formally processing on-site abnormal events based on the information control platform; The auxiliary online experts take over the formal handling of on-site abnormal events based on the information control platform, including: Obtain multiple implemented plans, pre-processing progress and event progress status for on-site abnormal events; Generate and create a visual review model based on each implemented plan, pre-processing progress and event progress status; Displaying visual review models to online experts; Determine whether the online expert meets the trigger condition within a first time period; wherein the first time period is any time period of a first preset time period after the time period for which the online expert views the visual review model is equal to the time period threshold; When the conditions are met, when the online expert pre-inputs the pre-implementation plan within the second time period, a visual simulation model for creating the pre-implementation plan is generated; wherein the second time period is a time period after the first time period and adjacent to the first time period for a second preset time period; Displaying visual simulation models to online experts; When the online expert inputs the relay formal processing plan, the on-site abnormal event is relayed and formally processed according to the relay formal processing plan based on the information control platform; The trigger conditions include: The matching degree between the model operation sequence generated when the online expert views the visual review model and the standard model operation sequence is greater than or equal to the matching degree threshold; The visual review model is generated based on each implemented plan, pre-processing progress and event progress status, including: Sort the implemented plans according to the order of implementation to obtain the implementation plan sequence; Based on the sequence division condition, the implementation plan sequence is divided into a plurality of local sequences; Traverse each local sequence in turn; Each time a local sequence is traversed, each implemented solution in the traversed local sequence is mapped to a field model of a natural gas production site to obtain a first mapping content; Based on the perspective creation condition, create a panoramic perspective of the first mapping content; Based on the panoramic perspective and the sub-progress and sub-state of each implemented solution in the traversed local sequence in the pre-processing progress and event progress state, a functional component is formed and associated with the sequence order of the traversed local sequence in the implementation sequence; After traversing each local sequence, the functional components formed each time the local sequence is traversed are sorted in the order of the sequence order to obtain a functional component sequence; Generate and create a visual review model based on the scene model and functional component sequence; The sequence division conditions include: The implementation types of the implemented solutions at the beginning and end of the sequence in the local sequence are all active implementation; and / or, The number of implemented solutions in the local sequence is greater than or equal to a number threshold; and / or, In the local sequence, all the implemented solutions are actively implemented and have standard solution association relationships between them.

2. The information control system based on natural gas safety production as claimed in claim 1, characterized in that: The pre-processing scheme for abnormal events at the online decision-making site includes: Determine the solution decision knowledge applicable to the abnormal event at the decision site from the solution decision knowledge base; Determine the pretreatment plan based on the plan decision knowledge.

3. The information control system based on natural gas safety production according to claim 1, characterized in that: The generating and creating a visual simulation model of a preliminary implementation plan includes: Mapping the preliminary implementation plan to a field model of a natural gas production site to obtain first mapping content; A minimum local model including the first mapping content in the field model of the natural gas production site is used as a visualization simulation model.

4. An information control method based on natural gas safety production, characterized in that: include: When the complexity of the abnormal events in the natural gas production site is greater than or equal to the threshold, the pre-processing scheme of the abnormal events in the field is decided online; Based on the information control platform of the natural gas production site, pre-process the abnormal events on site according to the pre-processing plan; Assist online experts to handle abnormal events on site based on the information control platform; The auxiliary online experts take over the formal handling of on-site abnormal events based on the information control platform, including: Obtain multiple implemented plans, pre-processing progress and event progress status for on-site abnormal events; Generate and create a visual review model based on each implemented plan, pre-processing progress and event progress status; Displaying visual review models to online experts; Determine whether the online expert meets the trigger condition within a first time period; wherein the first time period is any time period of a first preset time period after the time period for which the online expert views the visual review model is equal to the time period threshold; When the conditions are met, when the online expert pre-inputs the pre-implementation plan within the second time period, a visual simulation model for creating the pre-implementation plan is generated; wherein the second time period is a time period after the first time period and adjacent to the first time period for a second preset time period; Displaying visual simulation models to online experts; When the online expert inputs the relay formal processing plan, the on-site abnormal event is relayed and formally processed according to the relay formal processing plan based on the information control platform; The trigger conditions include: The matching degree between the model operation sequence generated when the online expert views the visual review model and the standard model operation sequence is greater than or equal to the matching degree threshold; The visual review model is generated based on each implemented plan, pre-processing progress and event progress status, including: Sort the implemented plans according to the order of implementation to obtain the implementation plan sequence; Based on the sequence division condition, the implementation plan sequence is divided into a plurality of local sequences; Traverse each local sequence in turn; Each time a local sequence is traversed, each implemented solution in the traversed local sequence is mapped to a field model of a natural gas production site to obtain a first mapping content; Based on the perspective creation condition, create a panoramic perspective of the first mapping content; Based on the panoramic perspective and the sub-progress and sub-state of each implemented solution in the traversed local sequence in the pre-processing progress and event progress state, a functional component is formed and associated with the sequence order of the traversed local sequence in the implementation sequence; After traversing each local sequence, the functional components formed each time the local sequence is traversed are sorted in the order of the sequence order to obtain a functional component sequence; Generate and create a visual review model based on the scene model and functional component sequence; The sequence division conditions include: The implementation types of the implemented solutions at the beginning and end of the sequence in the local sequence are all active implementation; and / or, The number of implemented solutions in the local sequence is greater than or equal to a number threshold; and / or, In the local sequence, all the implemented solutions are actively implemented and have standard solution association relationships between them.

5. The information control method based on natural gas safety production according to claim 4, characterized in that: The pre-processing scheme for abnormal events at the online decision-making site includes: Determine the solution decision knowledge applicable to the abnormal event at the decision site from the solution decision knowledge base; Determine the pretreatment plan based on the plan decision knowledge.

6. The information control method based on natural gas safety production according to claim 4, characterized in that: The generating and creating a visual simulation model of a preliminary implementation plan includes: Mapping the preliminary implementation plan to a field model of a natural gas production site to obtain first mapping content; A minimum local model including the first mapping content in the field model of the natural gas production site is used as a visualization simulation model.

Citation Information

Patent Citations

  • Intelligent substation warning and aid decision making system

    CN103679293A

  • Fault prevention and treatment method for textile mechanical equipment

    CN109234871A

  • Remote centralized control method and system for sewage treatment plant

    CN111675257A

  • Engineering fine decoration intelligent management platform and method based on Internet of Things

    CN114548590A

  • Forest fire detection, early warning and decision-making system based on sky-ground integration technology

    CN115348247A