A building materials supply chain management system

Through the digital model-based building materials supply chain management system, the problems of information asymmetry and supply chain opacity in the construction industry are solved, efficient management and transparency of the supply chain are achieved, operating costs and risks are reduced, and customer satisfaction and market are improved. Competitiveness.

CN118469669BActive Publication Date: 2024-11-22SHANGHAI JIANPU IMP & EXP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410699330.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-31
Publication Date
2024-11-22
Estimated Expiration
2044-05-31

AI Technical Summary

Technical Problem

Building materials supply chain management in the construction industry has problems such as information asymmetry, supply chain opacity and delivery delays, resulting in decision-making errors, increased management difficulty and increased risks.

Method used

Adopt a digital model-based building materials supply chain management system to build digital models through demand portraits and supplier portrait modules, integrate suppliers and warehouse geographic locations, realize real-time monitoring and early warning, optimize inventory and logistics management, and improve supply chain transparency and responsiveness. .

Benefits of technology

It improves the efficiency, transparency and responsiveness of the supply chain, reduces the risks of inventory backlog and out of stock, reduces operating costs, ensures on-time delivery of projects and customer satisfaction, and enhances market competitiveness and brand image.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118469669B_ABST
    Figure CN118469669B_ABST
Patent Text Reader

Abstract

This paper proposes a building materials supply chain management system. When the task information is received, the project is confirmed to start. When the project starts, the catalog of building materials products to be used is obtained according to the project content, and a list of suitable and capable suppliers is found based on the catalog or list. The suppliers, warehouse locations, and end-of-use locations are drawn together in the same digital map. According to the project plan, the usage forecast of each building material is obtained to complete the construction of the digital model in the project construction process. Compared with traditional management methods, the system collects and analyzes a large amount of data, making the decision-making process more dependent on data and facts rather than intuition or guesswork, thereby reducing unnecessary steps and delays and reducing overall operating costs. It also allows for rapid adjustment and adaptation to changing market and environmental conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This article relates to a building materials supply chain management system. Background Art

[0002] Currently, there are many problems in the supply chain management of building materials in the construction industry, including information asymmetry, supply chain opacity, and delivery delays.

[0003] Supply chain risk management also faces challenges. Every link in the supply chain may become a source of risk. How to identify, analyze and manage these risks is the key to ensuring the stable operation of the supply chain.

[0004] Information asymmetry is a major problem in supply chain management. Since the supply chain involves multiple parties, including suppliers, manufacturers, distributors, retailers, and end users, each party may have different information and data. This fragmentation and inconsistency of information may lead to wrong decisions and affect the overall performance of the supply chain. For example, if suppliers cannot provide inventory information in a timely and accurate manner, manufacturers may not be able to accurately predict demand, resulting in confusion in production plans.

[0005] Supply chain opacity is also an important issue. In many cases, there is a lack of effective communication and information sharing mechanisms between various links in the supply chain. This may result in participants in the supply chain not being able to fully understand the entire process of the product from raw materials to end users. An opaque supply chain not only increases the difficulty of management, but may also lead to moral risks in the supply chain, such as suppliers may conceal quality problems in order to obtain higher profits.

[0006] Warehouse pressure is another common problem in supply chain management in the construction industry. Due to the complexity of the supply chain, delays in any link may affect the operation of the entire supply chain. For example, if the supplier of raw materials cannot deliver on time, the manufacturer's production plan may be affected, which in turn affects the delivery time of the entire supply chain. Delivery delays will not only lead to project delays, but may also increase inventory costs and even affect the company's reputation and customer satisfaction. Summary of the invention

[0007] In order to solve the above problems, this paper proposes a building materials supply chain management system based on digital model, which can effectively solve the problem of low management level of existing supply chain management module.

[0008] A building materials supply chain management system, including the following components and operation steps:

[0009] First, after receiving the task information, the project is confirmed to start. When the project starts, the catalog of building materials products to be used is obtained according to the project content, and a list of suitable and capable suppliers is found based on the catalog or list. The suppliers, warehouse locations, and end-of-use locations are drawn together on the same digital map.

[0010] In addition, according to the project plan, the usage forecast of each building material is obtained, and the construction of the digital model in the project construction process has been completed.

[0011] At this point, the demand portrait module and supplier portrait module are involved in the calculation:

[0012] Supplier portrait module: obtain supplier names a, b, c, d, e, f, etc. according to the supplier list, and obtain supplier product information, equipment information, production capacity information, yield information, and transportation capacity information; build a digital model of the supplier through modeling and add it to the map, which also has the address of the warehouse or the user end;

[0013] Demand profile module: includes products A, B, C, D, E, F, etc., each of which includes the existing inventory T 存量 , consumption T i , damage probability η, failure frequency O, severity S, discovery probability D, emergency factor κ;

[0014] Of which the inventory is T 存量 is the current inventory level, and the consumption T i is the minimum usage on a specified date, and the damage probability η is the probability of damage of the product during use;

[0015] The failure frequency O is the probability of shortage of the product in the previous building materials supply process, which is evaluated by 0-9. The larger the number, the greater the probability.

[0016] Severity S is the degree of impact of the product on construction, which is evaluated from 0 to 9. The larger the number, the greater the impact.

[0017] The discovery probability D is the probability that the product can be found to be short in daily inventory, and is evaluated from 0 to 9. The larger the number, the smaller the probability.

[0018] The contingency factor κ is the probability that the product can be purchased within 0-3 days in a warehouse or within 0-20 kilometers of the user end, represented by 0-100. The larger the number, the lower the purchase probability.

[0019] The purchasing strategy for this product is:

[0020]

[0021] When the purchase strategy is (0-30), the value of mn is confirmed to be 5. When the purchase strategy is [30,80), the value of mn is confirmed to be 10. When the purchase strategy is [80,infinity), the value of mn is confirmed to be 30. Then, according to the value of mn, the interval demand of the product is confirmed. The specific calculation method of the interval demand of the product is as follows:

[0022] The interval demand of a product is the sum of the minimum inventory levels Slow on several usage days. The calculation formula is as follows:

[0023]

[0024] Where T total is the decomposed interval demand, T i It is the minimum usage on a specified date, i is the specific date, n is the starting date, and m is the last date.

[0025] After calculation, an order is placed. After the order is completed, the supplier's logistics information and warehousing management are confirmed based on the digital map, so as to obtain information in three dimensions of time, space and quantity, and simultaneously introduce an early warning module to manage logistics information and warehousing information.

[0026] Preferably, the rationality of the delivery route can be further confirmed to screen out non-compliant suppliers. After the interval demand is sent to the designated supplier, the delivery route information is generated according to the map. The delivery route information includes the starting point, key points and end point, and the supplier is required to respond in real time at the starting point, key points and end point.

[0027] The end point is a warehouse or a user end. An inventory allocation rule is set, and the inventory allocation rule is that a single warehouse corresponds to multiple user ends, or multiple warehouses correspond to a single user end, or multiple warehouses correspond to multiple user ends.

[0028] The building materials supply chain management system includes a price module, which audits the unit price according to the name and category of building materials. The building materials supply chain management system is provided with a fixed interface and a mobile interface. The mobile interface includes a WeChat port. Customers access the mobile interface through WeChat and connect to the server to obtain real-time information of the building materials supply chain management system. The building materials supply chain management system includes a client, a purchasing end, a logistics end, a sales end, an order end and a query end. The information of the supply chain management system is stored in the cloud server. Users of the client, the purchasing end, the logistics end, the sales end and the order end verify the logistics information through the data collector.

[0029] The building materials supply chain management system is a highly integrated and automated platform that achieves comprehensive management and optimization of the building materials supply chain through a series of carefully designed modules and interfaces. In this system, the price module plays a vital role. It can accurately audit the unit price according to the name and category of building materials to ensure the accuracy and fairness of the price. This function is of great significance for maintaining market order, preventing price manipulation and improving supply chain transparency.

[0030] The design of the system takes into account the needs and usage habits of different users, so two access methods are set up: fixed interface and mobile interface. Fixed interface is usually suitable for offices or fixed workplaces, and users can access the system through computers or other fixed devices. The mobile interface provides users with greater flexibility, especially the setting of WeChat port, which allows customers to easily access the mobile interface through WeChat, a widely used social platform, connect to the server anytime and anywhere, and obtain real-time information of the building materials supply chain management system, which greatly improves the accessibility and user experience of the system.

[0031] The building materials supply chain management system includes multiple subsystems such as the client, procurement, logistics, sales, order and query, and each subsystem has specific functions and tasks. The client provides users with various services and operation interfaces related to supply chain management; the procurement end is responsible for managing supplier information, purchase orders and procurement strategies; the logistics end is responsible for monitoring the logistics process to ensure the timely delivery of goods; the sales end manages sales orders and customer relationships; the order end handles operations such as order generation, modification and cancellation; and the query end provides users with query and report functions to facilitate users to obtain the required information and data.

[0032] In order to improve the reliability and scalability of the system, the information of the supply chain management system is stored in the cloud server. The cloud server provides powerful data storage and processing capabilities, ensuring the stable operation of the system and the security of data. Users on the client, procurement, logistics, sales, and order sides can check and verify logistics information through data collectors, which not only improves the accuracy of logistics management, but also enhances the transparency and traceability of the supply chain.

[0033] In addition, the building materials supply chain management system may also include the following extended functions:

[0034] Data analysis and reporting: The system can conduct in-depth analysis of the collected data and generate various reports to help users gain insight into market trends, predict demand changes, evaluate supplier performance, etc.

[0035] Risk management and early warning: The system can monitor various risk factors in the supply chain in real time, such as price fluctuations, supply disruptions, demand changes, etc., and issue early warnings when necessary to help users take timely response measures.

[0036] Supply chain collaboration: The system can promote collaborative work among all parties involved in the supply chain, and improve the efficiency and responsiveness of the entire supply chain by sharing information, coordinating plans and synchronizing operations.

[0037] Customer relationship management: The system can manage customer information, track customer behavior, and analyze customer preferences, thereby providing personalized services and product recommendations and enhancing customer satisfaction and loyalty.

[0038] Supply chain optimization: The system can continuously optimize various links of the supply chain, such as inventory management, transportation routes, production plans, etc., based on real-time data and predictive models to reduce costs and improve efficiency.

[0039] Mobile application support: In addition to the WeChat port, the system can also develop dedicated mobile applications to provide users with richer and more convenient mobile office and information access functions.

[0040] Environmental impact assessment: The system can evaluate the impact of supply chain activities on the environment, help companies achieve green supply chain management, and enhance corporate social responsibility and brand image.

[0041] Regulatory compliance checking: The system can help companies ensure that their supply chain activities comply with relevant laws and regulations and reduce compliance risks.

[0042] Through the organic combination of these functions and modules, the building materials supply chain management system can provide users with a comprehensive, efficient, transparent and intelligent management platform to help enterprises optimize supply chain management, improve market competitiveness and achieve sustainable development.

[0043] Beneficial effects:

[0044] The building materials supply chain management system proposed in this application can improve the efficiency, transparency and responsiveness of the supply chain through integrated and digital means. Through the demand portrait and supplier portrait modules, the system can provide detailed data analysis and prediction to help managers make more accurate decisions quickly.

[0045] At the same time, the system can automatically adjust inventory levels based on real-time data and forecasting models, reduce inventory backlogs and out-of-stock risks, and thus reduce costs. It can also enhance supply chain transparency, integrate the geographic locations of suppliers, warehouses, and end-users on digital maps, monitor all aspects of the supply chain in real time, and improve supply chain transparency.

[0046] At the same time, the system can quickly adjust procurement strategies and logistics plans according to changes in demand and supply conditions, and improve the response speed to market changes. The system provides a shared platform that enables all parties involved in the supply chain to work together better, improve the operational efficiency of the entire supply chain, allocate resources reasonably, ensure the most effective use of key resources, ensure on-time delivery of projects, and thus enhance customer satisfaction.

[0047] Moreover, compared with traditional management methods, the system collects and analyzes a large amount of data, making the decision-making process more dependent on data and facts rather than intuition or guesswork, thereby reducing unnecessary steps and delays, reducing overall operating costs, and allowing rapid adjustment and adaptation to changing market and environmental conditions. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Figure 1 It is the whole process of the overall supply chain management system;

[0049] Figure 2 is a daily usage prediction 1 of product A of embodiment 1;

[0050] Figure 3 This is the second daily usage prediction of product A in embodiment one. DETAILED DESCRIPTION

[0051] In order to deepen the understanding of the present invention, the present invention will be further described in detail below in conjunction with embodiments and drawings. The embodiments are only used to explain the present invention and do not constitute a limitation on the protection scope of the present invention.

[0052] Embodiment 1:

[0053] A building materials supply chain management system, such as Figure 1 As shown, it includes the following components and operation steps:

[0054] First, after receiving the task information, the project is confirmed to start. When the project starts, the catalog of building materials products to be used is obtained according to the project content, and a list of suitable and capable suppliers is found based on the catalog or list. The suppliers, warehouse locations, and end-of-use locations are drawn together on the same digital map.

[0055] In addition, according to the project plan, the usage forecast of each building material is obtained, and the construction of the digital model in the project construction process has been completed.

[0056] At this point, the demand portrait module and the supplier portrait module intervene in the calculation to obtain the purchasing strategy.

[0057]

[0058] T of Product A存量 T i When η is 0.3, the product of SOD failure modes is 1, κ is 30, and it is a test that is easy to damage, has a certain inventory, and is not easy to purchase. Its purchase strategy is 41.02 at this time, and the value of mn is 10. According to the building materials management system, we only need to purchase the usage of the future interval for 10 days to meet the usage standards of this building material, and the inventory pressure and supply chain management pressure are also low.

[0059] At this time Figure 2 As shown, we find that m is 14 and n is 4 for product A, and we get the total usage in ten days. The final calculated interval demand is 122, and then you can place an order with the supplier for the quantity of 122 and manage the supply chain in real time.

[0060] Of course, the usage forecast for product A could also be Figure 3 As shown in the figure, at this time, according to the value of mn being 10, we can get two interval demands and place orders separately. At this time, product A has two supply relationships. However, the supply chain is still controllable.

[0061] For example, non-wearing parts, when T 存量 T i When it is 1 times, η is 0.01, the product of SOD failure modes is 1, κ is 30, and its purchase strategy is 5.51 at this time. It only needs to purchase the usage of the future interval for 5 days to meet the usage standard of this building material, and the inventory pressure and supply chain management pressure are also low.

[0062] Through carefully designed component modules and operation steps, the operation management system can solve many problems of supply chain management in the construction industry, such as information asymmetry, supply chain opacity, delivery delays, etc., thereby improving the efficiency and stability of the entire supply chain.

[0063] The system first confirms the start of the project after receiving the task information, and simultaneously obtains a catalog of building materials products predicted to be used based on the project content, looks for a list of suitable and capable suppliers, and draws the suppliers together with warehouse locations and end-of-use locations on the same digital map to achieve visual management of the supply chain.

[0064] The demand portrait module and the supplier portrait module are respectively involved in the calculation. By obtaining the supplier's product information, equipment information, production capacity information, yield information, and transportation capacity information, a digital model of the supplier is constructed and added to the map. It also includes detailed information such as the existing inventory, consumption, damage probability, failure frequency, severity, detection probability, emergency factor, etc. of products A, B, C, D, E, F, etc., and then formulates a scientific purchasing strategy. By calculating the range demand of products, accurate data support is provided for supply chain management.

[0065] After the order is placed, the system confirms the supplier's logistics information and warehousing management based on the digital map, obtains information in three dimensions: time, space and quantity, and simultaneously introduces the early warning module to manage logistics information and warehousing information, thereby achieving real-time monitoring and risk early warning of the supply chain. The beneficial effects that this system may bring include improving decision-making efficiency, optimizing inventory management, enhancing supply chain transparency, improving response speed, reducing risks, improving supply chain collaboration, optimizing resource allocation, supporting sustainable development, enhancing customer satisfaction, promoting innovation, improving data-driven decision-making, reducing operating costs, enhancing brand image, supporting compliance, and enhancing the adaptability of the supply chain. These effects can not only improve the overall performance of building materials supply chain management, but also bring long-term competitive advantages and market positions to enterprises.

[0066] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A building materials supply chain management system, characterized in that: Includes the following modules: Supplier portrait module: obtains the supplier's product information, equipment information, production capacity information, yield information, and transportation capacity information; builds a digital model of the supplier through modeling and adds it to the map, which also has the address of the warehouse or user end; Demand profile module: includes products A, B, C, D, E, F, etc., each of which includes the existing inventory T 存量 , consumption T i , damage probability η, failure frequency O, severity S, discovery probability D, emergency factor κ; Of which the inventory is T 存量 is the current inventory level, and the consumption T i is the minimum usage on a specified date, and the damage probability η is the probability of damage of the product during use; The failure frequency O is the probability of shortage of the product in the previous building materials supply process, which is evaluated by 0-9. The larger the number, the greater the probability. Severity S is the degree of impact of the product on construction, which is evaluated from 0 to 9. The larger the number, the greater the impact. The discovery probability D is the probability that the product can be found to be short in daily inventory, and is evaluated from 0 to 9. The larger the number, the smaller the probability. The contingency factor κ is the probability that the product can be purchased within 0-3 days in a warehouse or within 0-20 kilometers of the user end, represented by 0-100. The larger the number, the lower the purchase probability. The purchasing strategy for this product is: When the purchase strategy is (0-30), the value of mn is confirmed to be 5. When the purchase strategy is [30,80), the value of mn is confirmed to be 10. When the purchase strategy is [80,infinity), the value of mn is confirmed to be 30. Then, according to the value of mn, the interval demand of the product is confirmed. The specific calculation method of the interval demand of the product is as follows: The interval demand of a product is the sum of the minimum inventory levels Slow on several usage days. The calculation formula is as follows: Where T total is the decomposed interval demand, T i It is the minimum usage on a specified date, i is the specific date, n is the starting date, and m is the last date.

2. A building materials supply chain management system according to claim 1, characterized in that: After confirming the start of the project, a list of building materials products predicted to be used is obtained based on the project content, and suppliers are found based on the list. At the same time, the suppliers, warehouse locations, and end-of-use locations are drawn together on the same digital map.

3. A building materials supply chain management system according to claim 1, characterized in that: After the interval demand is issued to the designated supplier, the delivery route information is generated according to the map. The delivery route information includes the starting point, key points and end point, and the supplier is required to respond in real time at the starting point, key points and end point.

4. A building materials supply chain management system according to claim 3, characterized in that: The end point is a warehouse or a user end.

5. A building materials supply chain management system according to claim 1, characterized in that: Set inventory allocation rules. The inventory allocation rules are: a single warehouse corresponds to multiple users, or multiple warehouses correspond to a single user, or multiple warehouses correspond to multiple users.

6. A building materials supply chain management system according to claim 1, characterized in that: The building materials supply chain management system includes a price module, which audits the unit price by building materials name and category.

7. A building materials supply chain management system according to claim 1, characterized in that: The building materials supply chain management system is provided with a fixed interface and a mobile interface. The mobile interface includes a WeChat port. Customers access the mobile interface through WeChat and connect to the server to obtain real-time information of the building materials supply chain management system.

8. A building materials supply chain management system according to claim 7, characterized in that: The building materials supply chain management system includes the client side, procurement side, logistics side, sales side, order side and inquiry side.

9. A building materials supply chain management system according to claim 7 or 8, characterized in that: The information of the supply chain management system is stored in the cloud server.

10. A building materials supply chain management system according to claim 8, characterized in that: Users at the client side, purchasing side, logistics side, sales side, and order side verify the logistics information through the data collector.