A method and system for optimizing power grid risk configuration based on island node analysis
By constructing the power system node topology diagram and an improved multi-objective particle swarm algorithm, the problems of island node judgment and new energy timing scheduling in the power grid are solved, and the rapid and accurate judgment and stability improvement of the power grid are achieved.
Patent Information
- Application Number
- CN202410910083.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-09
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-07-09
AI Technical Summary
The existing technology is difficult to quickly and accurately judge island nodes and effectively deal with island phenomena in the power grid, resulting in the impact of grid stability and the difficulty of ensuring economical and safety in extreme disasters.
By building the power system node topology diagram, defining the node association matrix and branch connection matrix, using an improved multi-objective particle swarm algorithm to judge island nodes and construct a new energy timing adjustment model to ensure the stable operation of the power grid in the N-1 fault scenario. .
It realizes rapid and accurate judgment of island nodes, improves the economy and security of the power grid, avoids the stability problems caused by the island phenomenon of the power grid, and improves the accuracy and stability of new energy timing scheduling.
Smart Images

Figure CN118473010B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of power grid island processing, and in particular relates to a power grid risk optimization configuration method and system based on island node analysis. Background Art
[0002] With the large-scale integration of new energy in the power system, the timing regulation of new energy has become one of the important challenges to ensure the stable operation of the power grid. However, the uncontrollability and instability of new energy can easily lead to a dynamic balance between the load and power supply of the power grid, especially when faced with sudden failures caused by drastic changes in power demand. In this case, the power grid may experience an island phenomenon. After the island is formed, if it is not detected and processed in time, it may cause the internal voltage, frequency and other parameters to be out of control, thereby affecting the stability of other parts of the power grid. Therefore, it is necessary to improve the speed and accuracy of the island detection method and the effectiveness of the island processing method. In addition, when there is an island situation, in the traditional distribution network planning, the new energy scheduling method is due to economic considerations. At present, there is little research on the analysis of the risk of power system failure. When faced with power grid failures caused by extreme disasters, the obtained scheduling effect is poor, which is easy to cause certain losses.
[0003] In summary, how to effectively, quickly and accurately determine isolated nodes and correctly handle them, as well as formulate a new energy timing adjustment strategy that takes into account the economy and safety of the power grid, is an issue that needs to be urgently addressed in the field of power grid technology. Summary of the invention
[0004] The present invention provides a power grid risk optimization configuration method and system based on island node analysis, which are used to solve the technical problems of being unable to quickly and accurately determine island nodes and correctly handle island nodes and formulate new energy timing adjustment strategies that take into account the economy and safety of the power grid.
[0005] In a first aspect, the present invention provides a method for optimizing power grid risk configuration based on island node analysis, comprising:
[0006] Constructing a power system node topology diagram, and defining a node association matrix and a branch connection matrix in the power system node topology diagram according to a preset islanding discrimination condition, wherein the power system node topology diagram includes load nodes and power station nodes;
[0007] An island node identification rule of the power system is constructed according to the association matrix and the connection matrix, and at least one island node in the power system node topology diagram is determined according to the island node identification rule, wherein the expression of the island node identification rule is:
[0008] ,
[0009] In the formula, is the relationship value of all nodes connected to node n, is the weight factor of the connection matrix, is the branch relationship value between all nodes and the judgment node n, is the node relationship value between all nodes and the judgment node n, is the connection matrix of the branch with i as the starting node and j as the end node, Number the branch. is the total number of branches, is the weight factor of the correlation matrix, is the node association matrix with m as system node and n as judgment node, is the total number of system nodes;
[0010] The power system node topology map is updated according to the at least one island node to obtain a target power system node topology map;
[0011] Considering the system N-1 fault scenario, a new energy timing regulation strategy is introduced to construct a new energy timing regulation model of the target power system node topology diagram, and an improved multi-objective particle swarm algorithm is used to solve the new energy timing regulation model to obtain the new energy timing regulation result.
[0012] In a second aspect, the present invention provides a power grid risk optimization configuration system based on island node analysis, comprising:
[0013] A construction module is configured to construct a power system node topology map, and define a node association matrix and a branch connection matrix in the power system node topology map according to a preset islanding discrimination condition, wherein the power system node topology map includes load nodes and power station nodes;
[0014] A determination module is configured to construct an island node identification rule of the power system according to the association matrix and the connection matrix, and determine at least one island node in the power system node topology diagram according to the island node identification rule, wherein the expression of the island node identification rule is:
[0015] ,
[0016] In the formula, is the relationship value of all nodes connected to node n, is the weight factor of the connection matrix, is the branch relationship value between all nodes and the judgment node n, is the node relationship value between all nodes and the judgment node n, is the connection matrix of the branch with i as the starting node and j as the end node, Number the branch. is the total number of branches, is the weight factor of the correlation matrix, is the node association matrix with m as system node and n as judgment node, is the total number of system nodes;
[0017] An updating module, configured to update the power system node topology map according to the at least one island node to obtain a target power system node topology map;
[0018] The solution module is configured to consider the system N-1 fault scenario, introduce a new energy timing regulation strategy to construct a new energy timing regulation model of the target power system node topology diagram, and use an improved multi-objective particle swarm algorithm to solve the new energy timing regulation model to obtain a new energy timing regulation result.
[0019] According to a third aspect, an electronic device is provided, comprising: at least one processor, and a memory communicatively connected to the at least one processor, wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can perform the steps of the power grid risk optimization configuration method based on island node analysis according to any embodiment of the present invention.
[0020] In a fourth aspect, the present invention further provides a computer-readable storage medium having a computer program stored thereon, wherein when the program instructions are executed by a processor, the processor executes the steps of the method for optimizing power grid risk configuration based on island node analysis according to any embodiment of the present invention.
[0021] The power grid risk optimization configuration method and system based on island node analysis of the present application have the following beneficial effects:
[0022] Compared with the existing technology, the island node identification rule can quickly and accurately determine the total number of island nodes and the corresponding node numbers in the node island system;
[0023] In traditional distribution network planning, new energy dispatching methods have little research on power system fault risk analysis due to economic considerations. Considering the system N-1 fault scenario, introducing a new energy timing adjustment strategy to construct a new energy timing adjustment model of the target power system node topology diagram can improve the economy of the power grid while also improving its safety.
[0024] Compared with the traditional multi-objective particle swarm algorithm for solving the new energy timing regulation model, the improved multi-objective particle swarm algorithm can ensure the convergence speed of the algorithm, prevent falling into the local optimal solution, and improve the accuracy and stability of the solution. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0026] Figure 1 A flowchart of a power grid risk optimization configuration method based on island node analysis provided by one embodiment of the present invention;
[0027] Figure 2 A standard 69-node system diagram of a specific embodiment is provided for an embodiment of the present invention;
[0028] Figure 3 A schematic diagram of node islands in a standard 69-node system is provided for an embodiment of the present invention;
[0029] Figure 4 A structural block diagram of a power grid risk optimization configuration system based on island node analysis provided by an embodiment of the present invention;
[0030] Figure 5 It is a schematic diagram of the structure of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0031] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] See also Figure 1 , which shows a flow chart of a power grid risk optimization configuration method based on island node analysis of the present application.
[0033] like Figure 1 As shown in FIG. 1 , the power grid risk optimization configuration method based on island node analysis specifically includes the following steps:
[0034] Step S101, constructing a power system node topology map, and defining a node association matrix and a branch connection matrix in the power system node topology map according to a preset islanding determination condition, wherein the power system node topology map includes load nodes and power station nodes.
[0035] In this step, the island determination condition is that a power system has formed two or more systems, and there is only one node in the formed new system, and the node has no branch connection with the adjacent node.
[0036] The node association matrix and branch connection matrix of the power system node topology diagram are defined according to the preset islanding judgment conditions, including:
[0037] The association matrix of the nodes in the power system node topology diagram is defined as a real symmetric matrix of size n×n. The expression of the association matrix is:
[0038] ,
[0039] In the formula, is the system node, is the judgment node;
[0040] The size of the connection matrix of the branch in the power system node topology diagram is defined as n×n, and the expression of the connection matrix is:
[0041] ,
[0042] In the formula, is the starting node, is the terminal node.
[0043] Furthermore, initialize the incidence matrix and the connection matrix : If nodes a and b are connected to form a branch, where a is the starting node and b is the end node, then the node association matrix The elements in the ath row and bth column and the bth row and ath column are 1; the branch connection matrix The element in row a and column b is 1.
[0044] Update the incidence matrix and the connection matrix :If a trip signal occurs on the circuit breaker on the line connected by two nodes a and b, where a is the starting node and b is the end node, then the node association matrix The elements in the ath row and bth column and the bth row and ath column change from 1 to 0; the branch connection matrix The element in row a and column b changes from 1 to 0.
[0045] Step S102: constructing an island node identification rule for the power system according to the association matrix and the connection matrix, and determining at least one island node in the power system node topology diagram according to the island node identification rule.
[0046] In this step, the expression of the island node identification rule is:
[0047] ,
[0048] In the formula, is the relationship value of all nodes connected to node n, is the weight factor of the connection matrix, is the branch relationship value between all nodes and the judgment node n, is the node relationship value between all nodes and the judgment node n, is the connection matrix of the branch with i as the starting node and j as the end node, Number the branch. is the total number of branches, is the weight factor of the correlation matrix, is the node association matrix with m as system node and n as judgment node, is the total number of system nodes;
[0049] Step S103: updating the power system node topology map according to the at least one island node to obtain a target power system node topology map.
[0050] In this step, it is determined whether at least one island node is a balancing node; if all island nodes are not balancing nodes, then each island node is directly deleted from the power system node topology map to obtain an updated target power system node topology map; if a certain island node is a balancing node, then a target generator node in the power system node topology map is used as a balancing node, and each island node is deleted from the power system node topology map to obtain an updated target power system node topology map, wherein a target generator node is connected to a target load node, and a target load node is any load node in the power system node topology map excluding at least one island node.
[0051] Step S104, considering the system N-1 fault scenario, introducing a new energy timing regulation strategy to construct a new energy timing regulation model of the target power system node topology diagram, and using an improved multi-objective particle swarm algorithm to solve the new energy timing regulation model to obtain a new energy timing regulation result.
[0052] In this step, the renewable energy timing adjustment strategy includes: selecting the target power system in the target power system node topology diagram, analyzing the renewable energy output of the target power system, and determining the upper and lower limits of renewable energy output in the target power system; performing a safety test of the power grid N-1 (ensuring that the power system can still operate safely after any key component fails) by defining the over-limit rate, checking whether the active power of the branch exceeds the safety limit value, and then determining the possible N-1 faults in the target power system, wherein the power grid N-1 safety test includes the generator N-1 safety test and the branch N-1 safety test; the generator N-1 safety test is: when performing the generator N-1 safety test, disconnect one generator at a time and record the corresponding power flow situation, and then observe whether there is any power over-limit in each branch;
[0053] The safety check of branch N-1 is:
[0054] Scenario 1: After disconnecting a branch, the overall target power system is not affected, the target power system is not divided into two unconnected target power systems, and there are no isolated nodes in the target power system. At this time, normal power flow calculation and analysis is performed;
[0055] Scenario 2: After disconnecting a branch, the target power system is divided into a large target power system and isolated points, and nodal islands appear. It is necessary to identify and process the nodal islands before performing normal power flow calculation and analysis.
[0056] Specifically, the expression of the objective function of the new energy timing regulation model under the preset constraints is:
[0057] ,
[0058] ,
[0059] ,
[0060] ,
[0061] In the formula, , , is a set of variables, and All are constraints. is the maximum operating power of wind power at time t, is the operating power of wind power at time t, is the wind abandonment penalty factor, is the time interval, is the light abandonment penalty factor, is the total number of time periods, is the number of distributed generation in the distribution network, The operation and maintenance cost of wind power. is the operation and maintenance cost of photovoltaic power generation, is the output power of the new energy at time t, is the new energy cost coefficient, is the cost coefficient of conventional units, is the output power of the conventional unit at time t, is the total risk of the power grid at time t, is the sum of the number of all branches in the distribution network, is the maximum operating power of the photovoltaic at time t, is the operating power of the photovoltaic at time t.
[0062] The preset constraints include wind power and photovoltaic constraints, conventional unit capacity constraints, power balance constraints, and grid security constraints;
[0063] The expressions for wind power and photovoltaic constraints are:
[0064] ,
[0065] ,
[0066] In the formula, is the operating power of wind power at time t, Real-time prediction of wind power, is the operating power of the photovoltaic at time t, Real-time power forecasting for photovoltaics;
[0067] The expression of conventional unit capacity constraint is:
[0068] ,
[0069] In the formula, is the output power of the conventional unit at time t, is the maximum output power of the conventional unit at time t;
[0070] The expression of power balance constraint is:
[0071] ,
[0072] In the formula, is the total load of the power grid at time t, is the output power of the conventional unit at time t, is the output power of the new energy at time t;
[0073] The expression of power grid security constraint is:
[0074] ,
[0075] In the formula, is the total risk of the power grid at time t, is the active power of the line at time t, is the safety limit of branch transmission power, is the sum of the number of all branches in the distribution network.
[0076] It should be noted that the expression of inertia weight in the improved multi-objective particle swarm algorithm is:
[0077] ,
[0078] In the formula, is the maximum inertia weight, is the minimum inertia weight, is the maximum number of iterations, is the current iteration number, A parameter that controls the speed of updating the weight coefficient;
[0079] The expression of the learning factor in the improved multi-objective particle swarm optimization algorithm is:
[0080] ,
[0081] ,
[0082] In the formula, , are learning factors, for The maximum value of for The initial value of for The maximum value of for The initial value of
[0083] The expression for particle velocity update in the improved multi-objective particle swarm algorithm is:
[0084] ,
[0085] In the formula, is the velocity of the i-th particle at the k+1th iteration, is the shrinkage factor, is the inertia weight, is the velocity of the i-th particle at the k-th iteration, is a random number between [0,1], is the optimal position of an individual, is the position of the i-th particle at the k-th iteration, is a random number between [0,1], is the global optimal position;
[0086] in, , ,
[0087] In the formula, is the shrinkage coefficient.
[0088] In summary, the method of the present application adopts the island node identification rule to quickly and accurately determine the total number of island nodes and the corresponding node numbers in the node island system; considering the system N-1 fault scenario, the introduction of the new energy timing adjustment strategy to construct the new energy timing adjustment model of the target power system node topology diagram can improve the economy of the power grid while also improving its safety; and the use of the improved multi-objective particle swarm algorithm can ensure the algorithm convergence speed, prevent falling into the local optimal solution, and improve the accuracy and stability of the solution.
[0089] In a specific embodiment, the power grid risk optimization configuration method based on island node analysis is specifically as follows:
[0090] Step 1: Introduce the power system node topology, which includes: 74 branches, 69 nodes, 5 tie switches, and 48 distribution transformers, of which 12 are typical office building type loads, 4 are typical commercial type loads, and 32 are typical residential type loads.
[0091] Step 2: Initialize the incidence matrix and the connection matrix .
[0092] Step 3: Perform N-1 safety detection to detect the circuit breaker tripping signal on the system line.
[0093] Step 4: If no tripping signal is found, return to step 3; if a tripping signal is found on the line, go to step 5.
[0094] Step 5: Record the tripping information according to the line tripping situation.
[0095] Step 6: Update the correlation matrix based on line tripping information , the connection matrix .
[0096] Step 7: Initialize the island node counter, set the island node counter to 0, and initialize the judgment node n, n=1.
[0097] Step 8: Based on the updated correlation matrix and the connection matrix calculate and ,in is the incidence matrix The sum of the elements in the nth column, is the sum of the elements in the nth row and the nth column.
[0098] Step 9: Calculate the branch relationship values between all nodes and the judgment node n ,like If the value of is greater than 1, it is determined that node n is not an island node, and then the process goes to step 14; if If the value of is equal to 1, go to step 10.
[0099] Step 10: Calculate the node relationship values between all nodes and the judgment node n ,like If the value of is greater than 1, it is determined that node n is not an island node, and then the process goes to step 14; if If the value of is equal to 1, go to step 11.
[0100] Step 11: Calculate the weight factor of the connection matrix based on the total number of nodes T and the total number of branches b in the system and the weight factor of the correlation matrix The value of .
[0101] Step 12: Calculate the relationship values of all nodes connected to node n according to the island judgment formula ,like Minimum and 1, go to step 13, if If it is greater than 1, the node n is determined to be not an island node, and then the process goes to step 14.
[0102] Step 13: The node n is determined to be an island node, the island node counter is increased by 1, and the node n at this time is recorded.
[0103] Step 14: Determine whether node n increases by 1.
[0104] Step 15: When it is determined that the node n is less than or equal to the total number of nodes T, return to step 9, otherwise go to step 16.
[0105] Step 16: Record the island node counter value and the corresponding island node number, and proceed to step 17.
[0106] Step 17: For the island system determined to be formed, detect the node type of each island node.
[0107] Step 18: Check whether the island system contains a power station node. If the island system does not contain a power station node, proceed to step 19; if the island system contains a power station node, first set the status of the generator connected to the power station node to zero, and then proceed to step 20.
[0108] Step 19: Set all nodes in the island system to type IV (isolated nodes).
[0109] Step 20: Check whether there is a balancing node in the island system. If so, there is no need to process each island node; if not, one of the power station nodes needs to be set as a balancing node.
[0110] Step 22: After determining the island node and performing island processing, a new energy timing regulation strategy is introduced considering the system N-1 fault to construct a new energy timing regulation model of the target power system node topology diagram, and an improved multi-objective particle swarm algorithm is used to solve the new energy timing regulation model to obtain the new energy timing regulation result.
[0111] Step 23: Allocate new energy resources according to the solved new energy timing adjustment results to achieve the goal of minimizing the grid operation cost and the system operation risk.
[0112] Specifically, Figure 2 A standard 69-node system diagram is given, which includes 74 branches, 69 nodes, 5 tie switches, and 48 distribution transformers, of which 12 are typical office building type loads, 4 are typical commercial type loads, and 32 are typical residential type loads.
[0113] Using the island node identification rules, the node islands in the node system are as follows: Figure 3 shown.
[0114] According to the judgment results, the island nodes are configured to obtain the node topology diagram of the target power system.
[0115] See also Figure 4 , which shows a structural block diagram of a power grid risk optimization configuration system based on island node analysis of the present application.
[0116] like Figure 4 As shown, the power grid island processing system 200 includes a construction module 210 , a determination module 220 , an update module 230 and a solution module 240 .
[0117] The construction module 210 is configured to construct a power system node topology map, and define a node association matrix and a branch connection matrix in the power system node topology map according to a preset island determination condition, wherein the power system node topology map includes load nodes and power station nodes;
[0118] The determination module 220 is configured to construct an island node identification rule for the power system according to the association matrix and the connection matrix, and determine at least one island node in the power system node topology diagram according to the island node identification rule, wherein the expression of the island node identification rule is:
[0119] ,
[0120] In the formula, is the relationship value of all nodes connected to node n, is the weight factor of the connection matrix, is the branch relationship value between all nodes and the judgment node n, is the node relationship value between all nodes and the judgment node n, is the connection matrix of the branch with i as the starting node and j as the end node, Number the branch. is the total number of branches, is the weight factor of the correlation matrix, is the node association matrix with m as system node and n as judgment node, is the total number of system nodes;
[0121] An updating module 230 is configured to update the power system node topology map according to the at least one island node to obtain a target power system node topology map;
[0122] The solution module 240 is configured to introduce a new energy timing regulation strategy considering the system N-1 fault scenario to construct a new energy timing regulation model of the target power system node topology diagram, and use an improved multi-objective particle swarm algorithm to solve the new energy timing regulation model to obtain a new energy timing regulation result.
[0123] It should be understood that Figure 4 Modules and references documented in Figure 1 Therefore, the operations and features described above for the method and the corresponding technical effects are also applicable to Figure 4 The modules in it will not be described in detail here.
[0124] In some other embodiments, the embodiments of the present invention further provide a computer-readable storage medium having a computer program stored thereon, wherein when the program instructions are executed by a processor, the processor is caused to execute the power grid risk optimization configuration method based on island node analysis in any of the above method embodiments;
[0125] As an implementation mode, the computer-readable storage medium of the present invention stores computer-executable instructions, and the computer-executable instructions are configured as follows:
[0126] Constructing a power system node topology diagram, and defining a node association matrix and a branch connection matrix in the power system node topology diagram according to a preset islanding discrimination condition, wherein the power system node topology diagram includes load nodes and power station nodes;
[0127] An island node identification rule of the power system is constructed according to the association matrix and the connection matrix, and at least one island node in the power system node topology diagram is determined according to the island node identification rule, wherein the expression of the island node identification rule is:
[0128] ,
[0129] In the formula, is the relationship value of all nodes connected to node n, is the weight factor of the connection matrix, is the branch relationship value between all nodes and the judgment node n, is the node relationship value between all nodes and the judgment node n, is the connection matrix of the branch with i as the starting node and j as the end node, Number the branch. is the total number of branches, is the weight factor of the correlation matrix, is the node association matrix with m as system node and n as judgment node, is the total number of system nodes;
[0130] The power system node topology map is updated according to the at least one island node to obtain a target power system node topology map;
[0131] Considering the system N-1 fault scenario, a new energy timing regulation strategy is introduced to construct a new energy timing regulation model of the target power system node topology diagram, and an improved multi-objective particle swarm algorithm is used to solve the new energy timing regulation model to obtain the new energy timing regulation result.
[0132] The computer-readable storage medium may include a program storage area and a data storage area, wherein the program storage area may store an operating system and application programs required for at least one function; the data storage area may store data created according to the use of the power grid risk optimization configuration system based on island node analysis, etc. In addition, the computer-readable storage medium may include a high-speed random access memory, and may also include a memory, such as at least one disk storage device, a flash memory device, or other non-volatile solid-state storage device. In some embodiments, the computer-readable storage medium may optionally include a memory remotely disposed relative to the processor, and these remote memories may be connected to the power grid risk optimization configuration system based on island node analysis via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0133] Figure 5 is a schematic diagram of the structure of an electronic device provided by an embodiment of the present invention, such as Figure 5As shown, the device includes: a processor 310 and a memory 320. The electronic device may also include: an input device 330 and an output device 340. The processor 310, the memory 320, the input device 330 and the output device 340 may be connected via a bus or other means. Figure 5 In the example, the connection through the bus is taken as an example. The memory 320 is the computer-readable storage medium mentioned above. The processor 310 executes various functional applications and data processing of the server by running the non-volatile software programs, instructions and modules stored in the memory 320, that is, the power grid risk optimization configuration method based on island node analysis of the above method embodiment is realized. The input device 330 can receive input digital or character information, and generate key signal input related to user settings and function control of the power grid risk optimization configuration system based on island node analysis. The output device 340 may include display devices such as display screens.
[0134] The electronic device can execute the method provided by the embodiment of the present invention, and has the functional modules and beneficial effects corresponding to the execution method. For technical details not described in detail in this embodiment, please refer to the method provided by the embodiment of the present invention.
[0135] As an implementation mode, the electronic device is applied to a power grid risk optimization configuration system based on island node analysis, and is used for a client, and includes: at least one processor; and a memory connected to the at least one processor in communication; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can:
[0136] Constructing a power system node topology diagram, and defining a node association matrix and a branch connection matrix in the power system node topology diagram according to a preset islanding discrimination condition, wherein the power system node topology diagram includes load nodes and power station nodes;
[0137] An island node identification rule of the power system is constructed according to the association matrix and the connection matrix, and at least one island node in the power system node topology diagram is determined according to the island node identification rule, wherein the expression of the island node identification rule is:
[0138] ,
[0139] In the formula, is the relationship value of all nodes connected to node n, is the weight factor of the connection matrix, is the branch relationship value between all nodes and the judgment node n, is the node relationship value between all nodes and the judgment node n, is the connection matrix of the branch with i as the starting node and j as the end node, Number the branch. is the total number of branches, is the weight factor of the correlation matrix, is the node association matrix with m as system node and n as judgment node, is the total number of system nodes;
[0140] The power system node topology map is updated according to the at least one island node to obtain a target power system node topology map;
[0141] Considering the system N-1 fault scenario, a new energy timing regulation strategy is introduced to construct a new energy timing regulation model of the target power system node topology diagram, and an improved multi-objective particle swarm algorithm is used to solve the new energy timing regulation model to obtain the new energy timing regulation result.
[0142] Through the description of the above implementation modes, those skilled in the art can clearly understand that each implementation mode can be implemented by means of software plus a necessary general hardware platform, or of course by hardware. Based on such an understanding, the above technical solution can essentially or in other words be embodied in the form of a software product that contributes to the prior art. The computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a magnetic disk, an optical disk, etc., and includes a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods of each embodiment or some parts of the embodiment.
[0143] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for optimizing power grid risk configuration based on island node analysis, characterized in that: include: Constructing a power system node topology diagram, and defining a node association matrix and a branch connection matrix in the power system node topology diagram according to a preset islanding discrimination condition, wherein the power system node topology diagram includes load nodes and power station nodes; An island node identification rule of the power system is constructed according to the association matrix and the connection matrix, and at least one island node in the power system node topology diagram is determined according to the island node identification rule, wherein the expression of the island node identification rule is: , In the formula, is the relationship value of all nodes connected to the judgment node n, is the weight factor of the connection matrix, is the branch relationship value between all nodes and the judgment node n, is the node relationship value between all nodes and the judgment node n, is the connection matrix of the branch with i as the starting node and j as the end node, Number the branch. is the total number of branches, is the weight factor of the correlation matrix, is the node association matrix with m as system node and n as judgment node, is the total number of system nodes; The power system node topology map is updated according to the at least one island node to obtain a target power system node topology map; Considering the system N-1 fault scenario, a new energy timing regulation strategy is introduced to construct a new energy timing regulation model of the target power system node topology diagram, and an improved multi-objective particle swarm algorithm is used to solve the new energy timing regulation model to obtain a new energy timing regulation result, wherein the new energy timing regulation strategy includes: Select a target power system in the target power system node topology diagram, perform a new energy output analysis on the target power system, and determine the upper and lower limits of the new energy output in the target power system; By defining the over-limit rate, the N-1 safety detection of the power grid is performed to check whether the active power of the branch exceeds the safety limit value, and then determine the N-1 fault that may occur in the target power system, wherein the N-1 safety detection of the power grid includes the N-1 safety detection of the generator and the N-1 safety detection of the branch; The generator N-1 safety detection is as follows: when performing the generator N-1 safety detection, disconnect one generator at a time and record the corresponding power flow conditions, and then observe whether the power of each branch exceeds the limit; The safety detection of branch N-1 is as follows: Scenario 1: After disconnecting a branch, the overall target power system is not affected, the target power system is not divided into two unconnected target power systems, and there are no isolated nodes in the target power system. At this time, normal power flow calculation and analysis is performed; Scenario 2: After disconnecting a branch, the target power system is divided into a large target power system and isolated points, and node-like islands appear. It is necessary to identify and process the node-like islands before performing normal power flow calculation and analysis. The expression of the objective function of the new energy timing regulation model under the preset constraints is: , , , , In the formula, , , is a set of variables, and All are constraints. is the maximum operating power of wind power at time t, is the operating power of wind power at time t, is the wind abandonment penalty factor, is the time interval, is the light abandonment penalty factor, is the total number of time periods, is the number of distributed generation in the distribution network, The operation and maintenance cost of wind power. is the operation and maintenance cost of photovoltaic power generation, is the output power of the new energy at time t, is the new energy cost coefficient, is the cost coefficient of conventional units, is the output power of the conventional unit at time t, is the total risk of the power grid at time t, is the sum of the number of all branches in the distribution network, is the maximum operating power of the photovoltaic at time t, is the operating power of the photovoltaic at time t.
2. A method for optimizing power grid risk configuration based on island node analysis according to claim 1, characterized in that: The island determination condition is that a power system is formed into two or more systems, and there is only one node in one of the formed new systems, and the node has no branch connection with the adjacent nodes.
3. The node association matrix and branch connection matrix in the power system node topology diagram are defined according to the preset islanding discrimination conditions, including: The association matrix of the nodes in the power system node topology diagram is defined as a real symmetric matrix of size n×n. The expression of the association matrix is: , In the formula, is the system node, is the judgment node; The size of the connection matrix of the branch in the power system node topology diagram is defined as n×n, and the expression of the connection matrix is: , In the formula, is the starting node, is the terminal node.
4. The method for optimizing power grid risk configuration based on island node analysis according to claim 1, characterized in that: The updating of the power system node topology map according to the at least one isolated island node to obtain a target power system node topology map comprises: Determining whether the at least one island node is a balancing node; If all the isolated island nodes are not balanced nodes, directly delete the isolated island nodes from the power system node topology map to obtain an updated target power system node topology map; If an island node is a balancing node, a target generator node in the power system node topology map is used as the balancing node, and each of the island nodes is deleted from the power system node topology map to obtain an updated target power system node topology map, wherein the target generator node is connected to a target load node, and the target load node is any load node in the power system node topology map excluding the at least one island node.
5. The method for optimizing power grid risk configuration based on island node analysis according to claim 1, characterized in that: The preset constraints include wind power and photovoltaic constraints, conventional unit capacity constraints, power balance constraints and grid security constraints; The expressions of wind power and photovoltaic constraints are: , , In the formula, is the operating power of wind power at time t, Real-time prediction of wind power, is the operating power of the photovoltaic at time t, Real-time power forecasting for photovoltaics; The expression of the conventional unit capacity constraint is: , In the formula, is the output power of the conventional unit at time t, is the maximum output power of the conventional unit at time t; The expression of the power balance constraint is: , In the formula, is the total load of the power grid at time t, is the output power of the conventional unit at time t, is the output power of the new energy at time t; The expression of the power grid security constraint is: , In the formula, is the total risk of the power grid at time t, is the active power of the line at time t, is the safety limit of branch transmission power, is the sum of the number of all branches in the distribution network.
6. The method for optimizing power grid risk configuration based on island node analysis according to claim 1, characterized in that: The expression of inertia weight in the improved multi-objective particle swarm algorithm is: , In the formula, is the maximum inertia weight, is the minimum inertia weight, is the maximum number of iterations, is the current iteration number, A parameter that controls the speed of updating the weight coefficient; The expression of the learning factor in the improved multi-objective particle swarm algorithm is: , , In the formula, , are learning factors, for The maximum value of for The initial value of for The maximum value of for The initial value of The expression for updating particle velocity in the improved multi-objective particle swarm algorithm is: , In the formula, is the velocity of the i-th particle at the k+1th iteration, is the shrinkage factor, is the inertia weight, is the velocity of the i-th particle at the k-th iteration, is a random number between [0,1], is the optimal position of an individual, is the position of the i-th particle at the k-th iteration, is a random number between [0,1], is the global optimal position; in, , , In the formula, is the shrinkage coefficient.
7. A power grid risk optimization configuration system based on island node analysis, characterized in that: include: A construction module is configured to construct a power system node topology map, and define a node association matrix and a branch connection matrix in the power system node topology map according to a preset islanding discrimination condition, wherein the power system node topology map includes load nodes and power station nodes; A determination module is configured to construct an island node identification rule of the power system according to the association matrix and the connection matrix, and determine at least one island node in the power system node topology diagram according to the island node identification rule, wherein the expression of the island node identification rule is: , In the formula, is the relationship value of all nodes connected to the judgment node n, is the weight factor of the connection matrix, is the branch relationship value between all nodes and the judgment node n, is the node relationship value between all nodes and the judgment node n, is the connection matrix of the branch with i as the starting node and j as the end node, Number the branch. is the total number of branches, is the weight factor of the correlation matrix, is the node association matrix with m as system node and n as judgment node, is the total number of system nodes; An updating module, configured to update the power system node topology map according to the at least one island node to obtain a target power system node topology map; The solution module is configured to consider the system N-1 fault scenario to introduce a new energy timing regulation strategy to construct a new energy timing regulation model of the target power system node topology diagram, and use an improved multi-objective particle swarm algorithm to solve the new energy timing regulation model to obtain a new energy timing regulation result, wherein the new energy timing regulation strategy includes: Select a target power system in the target power system node topology diagram, perform a new energy output analysis on the target power system, and determine the upper and lower limits of the new energy output in the target power system; By defining the over-limit rate, the N-1 safety detection of the power grid is performed to check whether the active power of the branch exceeds the safety limit value, and then determine the N-1 fault that may occur in the target power system, wherein the N-1 safety detection of the power grid includes the N-1 safety detection of the generator and the N-1 safety detection of the branch; The generator N-1 safety detection is as follows: when performing the generator N-1 safety detection, disconnect one generator at a time and record the corresponding power flow conditions, and then observe whether the power of each branch exceeds the limit; The safety detection of branch N-1 is as follows: Scenario 1: After disconnecting a branch, the overall target power system is not affected, the target power system is not divided into two unconnected target power systems, and there are no isolated nodes in the target power system. At this time, normal power flow calculation and analysis is performed; Scenario 2: After disconnecting a branch, the target power system is divided into a large target power system and isolated points, and node-like islands appear. It is necessary to identify and process the node-like islands before performing normal power flow calculation and analysis. The expression of the objective function of the new energy timing regulation model under the preset constraints is: , , , , In the formula, , , is a set of variables, and All are constraints. is the maximum operating power of wind power at time t, is the operating power of wind power at time t, is the wind abandonment penalty factor, is the time interval, is the light abandonment penalty factor, is the total number of time periods, is the number of distributed generation in the distribution network, The operation and maintenance cost of wind power. is the operation and maintenance cost of photovoltaic power generation, is the output power of the new energy at time t, is the new energy cost coefficient, is the cost coefficient of conventional units, is the output power of the conventional unit at time t, is the total risk of the power grid at time t, is the sum of the number of all branches in the distribution network, is the maximum operating power of the photovoltaic at time t, is the operating power of the photovoltaic at time t.
8. An electronic device, characterized in that: include: At least one processor, and a memory communicatively connected to the at least one processor, wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to execute the method described in any one of claims 1 to 5.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the method according to any one of claims 1 to 5 is implemented.
