Pump station drainage control method and device, electronic equipment, and storage medium
By selecting an appropriate control strategy based on water level data and dynamically adjusting a variety of influencing factors, the problem that the drainage control method of the water pumping station cannot adapt to complex needs is solved, the drainage efficiency and energy consumption are optimized, and the efficiency and safety of the water pumping station are ensured. , environmentally friendly operation.
Patent Information
- Application Number
- CN202410933180.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-12
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-07-12
AI Technical Summary
The existing drainage control methods of water pumping stations cannot accurately adapt to complex and changing drainage needs, resulting in untimely or excessive drainage, affecting drainage efficiency and stability.
By selecting the target control strategy based on the water level data of the water pumping station, using a variety of influencing factors (such as water level height, rainfall, evaporation, drainage capacity of the water pumping station, etc.) to dynamically adjust, select the first control strategy or the second control strategy to Achieve fast response or optimize energy consumption.
It achieves precise control of the drainage process, quickly responds to water level changes, optimizes energy consumption, ensures drainage efficiency and energy saving, and improves the efficient, safe and environmentally friendly operation of the water pump station.
Smart Images

Figure CN118481971B_ABST
Abstract
Description
Technical Field
[0001] The present disclosure belongs to the technical field of drainage control, and more specifically, relates to a drainage control method and device for a water pump station, electronic equipment, and storage medium. Background Art
[0002] In the prior art, the drainage control of water pumping stations usually adopts simple liquid level control or timing control strategies. However, these methods have many limitations and cannot accurately adapt to the complex and changing drainage needs, which easily leads to untimely drainage or excessive drainage, thus affecting the drainage efficiency and stability of the water pumping station. Summary of the invention
[0003] The purpose of the present disclosure is to provide a water pump station drainage control method and device, electronic equipment, and storage medium to improve the drainage efficiency of the water pump station and reduce energy consumption.
[0004] A first aspect of an embodiment of the present disclosure provides a water pump station drainage control method, comprising:
[0005] selecting a target control strategy from the drainage control strategies of the water pumping station according to the water level data of the water pumping station;
[0006] The drainage control strategy of the water pump station includes a first control strategy and a second control strategy, the number of influencing factors of the first control strategy is less than the number of influencing factors of the second control strategy, and the power consumption of the second control strategy is less than the power consumption of the first control strategy;
[0007] The second control strategy includes a first sub-strategy and a second sub-strategy; the water level data includes a water level height;
[0008] The method of selecting a target control strategy from the drainage control strategies of the water pumping station according to the water level data of the water pumping station comprises:
[0009] In response to the water level being less than a first threshold and greater than a second threshold, determining the first sub-strategy as a target control strategy; in response to the water level being less than a second threshold, determining the second sub-strategy as a target control strategy;
[0010] The target control strategy is the first control strategy or the second control strategy;
[0011] The water pump station is controlled to drain water according to the target control strategy.
[0012] A second aspect of the embodiments of the present disclosure provides a water pump station drainage control device, comprising:
[0013] A strategy selection module, used for selecting a target control strategy from the drainage control strategies of the water pumping station according to the water level data of the water pumping station; the drainage control strategy of the water pumping station includes a first control strategy and a second control strategy, the number of influencing factors of the first control strategy is less than the number of influencing factors of the second control strategy, and the power consumption of the second control strategy is less than the power consumption of the first control strategy; the second control strategy includes a first sub-strategy and a second sub-strategy; the water level data includes a water level height;
[0014] The method of selecting a target control strategy from the drainage control strategies of the water pumping station according to the water level data of the water pumping station comprises:
[0015] In response to the water level being less than a first threshold and greater than a second threshold, determining the first sub-strategy as a target control strategy; in response to the water level being less than a second threshold, determining the second sub-strategy as a target control strategy;
[0016] The target control strategy is the first control strategy or the second control strategy;
[0017] A drainage module is used to control the water pump station to drain water according to the target control strategy.
[0018] According to a third aspect of an embodiment of the present disclosure, an electronic device is provided, comprising a memory, a processor, and a computer program stored in the memory and running on the processor, wherein the processor implements the steps of the above-mentioned water pump station drainage control method when executing the computer program.
[0019] According to a fourth aspect of the embodiments of the present disclosure, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the above-mentioned water pump station drainage control method are implemented.
[0020] The beneficial effects of the water pump station drainage control method and device, electronic equipment, and storage medium provided by the embodiments of the present disclosure are:
[0021] On the one hand, the present disclosure can achieve precise control of the drainage process by selecting a target control strategy based on the water level data of the water pump station. Under the first control strategy, it can quickly respond to water level changes and effectively avoid potential risks; while under the second control strategy, it can optimize energy consumption and achieve energy conservation and environmental protection.
[0022] On the other hand, the disclosure takes into account a variety of influencing factors, such as rainfall, evaporation, and the drainage capacity of the water pump station, making drainage control more scientific and reasonable. Through real-time monitoring and data analysis, the system can dynamically adjust the drainage strategy to ensure the smooth progress of the drainage process.
[0023] In summary, the water pump station drainage control method provided by the present invention not only ensures drainage efficiency but also reduces energy consumption, providing a strong guarantee for the efficient, safe and environmentally friendly operation of the water pump station. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the technical solutions in the embodiments of the present disclosure, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present disclosure. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0025] Figure 1 A schematic flow chart of a water pump station drainage control method provided in an embodiment of the present disclosure;
[0026] Figure 2 A structural block diagram of a water pump station drainage control device provided in an embodiment of the present disclosure;
[0027] Figure 3 A schematic block diagram of an electronic device provided by an embodiment of the present disclosure. DETAILED DESCRIPTION
[0028] In the following description, specific details such as specific system structures and technologies are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present disclosure. However, it should be clear to those skilled in the art that the present disclosure may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to avoid obstructing the description of the present disclosure with unnecessary details.
[0029] In order to make the purpose, technical solutions and advantages of the present disclosure more clear, specific embodiments will be described below in conjunction with the accompanying drawings.
[0030] Please refer to Figure 1 , Figure 1 A flow chart of a water pump station drainage control method provided in an embodiment of the present disclosure, the method comprising:
[0031] S101: Select a target control strategy from the drainage control strategies of the water pumping station according to the water level data of the water pumping station; the drainage control strategies of the water pumping station include a first control strategy and a second control strategy, the number of influencing factors of the first control strategy is less than the number of influencing factors of the second control strategy, and the power consumption of the second control strategy is less than the power consumption of the first control strategy; the target control strategy is the first control strategy or the second control strategy.
[0032] In this embodiment, the water level data of the water pump station generally refers to the real-time measurement value or historical record data of the water level in the water pump station, which is crucial for the operation and management of the water pump station. The water level data can reflect the water storage capacity, drainage demand and possible flood risk of the water pump station. Through real-time monitoring and analysis of water level data, water resources can be effectively dispatched and managed.
[0033] Influencing factors refer to various factors that can affect the drainage control strategy of the water pumping station. In the drainage control strategy of the water pumping station, the influencing factors may include but are not limited to: water level data, rainfall, evaporation, drainage capacity of the water pumping station, environmental factors, etc. Water level data includes water level height: the height of the water level in the water pumping station directly affects the drainage demand. Rainfall: Rainfall is an important factor affecting water level changes, especially in the rainy season. Evaporation: In dry or rainy seasons, evaporation may affect the water level. Drainage capacity of the water pumping station: including the energy consumption, quantity and operating efficiency of the water pump. Environmental factors: such as temperature and humidity may affect the operating efficiency and energy consumption of the water pump.
[0034] The drainage control strategy of the water pump station includes the first control strategy and the second control strategy. The first control strategy has a small number of influencing factors, such as water level data, drainage time, etc. For example, only the real-time water level and the preset water level threshold are considered, and the water pump can be automatically started and stopped when the water level reaches a certain height. The control logic of the first control strategy is relatively simple and can respond to changes in water levels more quickly, but because energy consumption optimization is not considered, the energy consumption of the first control strategy is relatively high. For example, the real-time water level is monitored, and once the water level reaches the preset high water level threshold, the water pump is automatically started for drainage. When the water level drops to the low water level threshold, the water pump is automatically stopped to save energy and prevent excessive drainage.
[0035] The second control strategy can include more influencing factors. In addition to the water level data in the first control strategy, it can also include the energy consumption, efficiency, operating time, water inlet flow, fault status, etc. of the water pump. The second control strategy takes energy consumption optimization into consideration when it is formulated, so the overall energy consumption can be lower than that of the first control strategy. The second control strategy can dynamically adjust the operation of the water pump based on a variety of factors to adapt to different environmental conditions. For example: adjust the operation mode of the water pump according to seasonal changes, such as increasing the drainage frequency in the rainy season and reducing drainage in the dry season to save energy.
[0036] The target control strategy refers to an optimal or most suitable control strategy selected from the pre-set drainage control strategies based on the current water level data of the water pumping station. The drainage control strategies here include at least two types: the first control strategy and the second control strategy. The selection of the target control strategy is based on the current water level data, which means that the system will select the appropriate control strategy based on the real-time water level conditions. If the water level is greater than the first threshold, it may be necessary to drain quickly to avoid potential risks. At this time, the first control strategy can be selected; if the water level is lower than the first threshold, the more energy-saving second control strategy can be selected. The first threshold can be a value determined by the staff of the water pumping station based on the historical water level changes of the water pumping station and the operating status of the water pump.
[0037] Therefore, the target control strategy is to select the most suitable drainage control strategy from two or more predefined drainage control strategies under specific water level conditions in order to achieve the optimal drainage effect (which may be fast drainage, energy saving or other goals).
[0038] S102: Control the water pump station to drain water according to the target control strategy.
[0039] In this embodiment, after determining the target control strategy, the system will generate corresponding operation instructions. These instructions may include turning on or off a specific number of water pumps, adjusting the speed of the water pumps, setting the running time of the water pumps, etc. During the execution of the target control strategy, the system can make real-time adjustments based on real-time water level data, water pump status, and other relevant factors. This ensures that the drainage process can be carried out in accordance with the requirements of the target control strategy and adapt to various situations that may arise.
[0040] For example, when the water level is greater than the first threshold, the drainage control strategy of the water pump station is the first control strategy, and the influencing factors may be the water level and the drainage time. In order to drain the water quickly, the water pump station may start all water pumps to drain water at the same time.
[0041] When the water level is less than the first threshold, the drainage control strategy of the water pump station is the second control strategy, and the influencing factors may be the water level, drainage time, energy consumption of the water pump, and operating efficiency. When the water level is less than the first threshold, the drainage efficiency and drainage energy consumption of the water pump may be the most important considerations. Therefore, only water pumps with high drainage efficiency or low energy consumption may be started (the number of water pumps started under the second control strategy is less than the number of water pumps started under the first control strategy) for drainage. The operating efficiency is the drainage efficiency of the water pump.
[0042] While performing the drainage operation, the system monitors the entire drainage process and collects relevant data. These data include water level changes, pump operating status, energy consumption, etc. By analyzing these data, the system can evaluate the drainage effect and adjust the target control strategy when necessary.
[0043] From the above, it can be concluded that, on the one hand, the present disclosure can achieve precise control of the drainage process by selecting the target control strategy according to the water level data of the water pump station. Under the first control strategy, it can quickly respond to water level changes and effectively avoid potential risks; and under the second control strategy, it can optimize energy consumption and achieve energy saving and environmental protection.
[0044] On the other hand, the disclosure takes into account a variety of influencing factors, such as rainfall, evaporation, and the drainage capacity of the water pump station, making drainage control more scientific and reasonable. Through real-time monitoring and data analysis, the system can dynamically adjust the drainage strategy to ensure the smooth progress of the drainage process.
[0045] In summary, the water pump station drainage control method provided by the present invention not only ensures drainage efficiency but also reduces energy consumption, providing a strong guarantee for the efficient, safe and environmentally friendly operation of the water pump station.
[0046] In one embodiment of the present disclosure, the second control strategy includes a first sub-strategy and a second sub-strategy; the water level data includes a water level height;
[0047] Select the target control strategy from the drainage control strategies of the pumping station according to the water level data of the pumping station, including:
[0048] In response to the water level being less than a first threshold and greater than a second threshold, the first sub-strategy is determined as the target control strategy; in response to the water level being less than the second threshold, the second sub-strategy is determined as the target control strategy.
[0049] In this embodiment, the second control strategy includes a first sub-strategy and a second sub-strategy, and the selection of these two sub-strategies is based on the water level data of the water pump station, especially the parameter of the water level height. The first sub-strategy is a sub-strategy for the water pump group, and the second sub-strategy is a sub-strategy for each water pump. The first threshold is greater than the second threshold, and the first threshold and the second threshold can be determined by the staff of the water pump station according to the historical water level height data of the water pump station.
[0050] When the water level of the pump station is less than the preset first threshold but greater than the second threshold, the system will automatically select the first sub-strategy as the target control strategy. When the pump station is running under the first sub-strategy, the drainage efficiency of the pump group can be maximized first, and then the energy consumption of the pump group can be adjusted to the lowest state. The first sub-strategy can focus on optimizing the energy consumption of the pump station as much as possible while ensuring drainage efficiency, so as to achieve the goal of balancing drainage and energy saving.
[0051] When the water level drops further and is less than the second threshold, the system switches to the second sub-strategy. When the pump station operates under the second sub-strategy, the energy consumption of each pump can be minimized first, and then the drainage efficiency of the pump can be adjusted to the highest state. The second sub-strategy can focus more on energy saving, and further reduce energy consumption by adjusting the operating mode or number of pumps. This strategy is suitable for situations where the water level is low and the drainage demand is small, ensuring that the pump station can achieve high efficiency and energy saving even when operating at low load.
[0052] It can be concluded from the above that the present disclosure realizes the flexibility and efficiency of drainage control of the water pump station by dynamically selecting the first sub-strategy or the second sub-strategy according to the water level. This method not only ensures the timeliness and efficiency of drainage, but also significantly reduces energy consumption and improves the economy and environmental protection of the operation of the water pump station.
[0053] In one embodiment of the present disclosure, a water pump station includes multiple groups of water pumps, each group of water pumps includes multiple water pumps; and controlling the water pump station to drain water according to a target control strategy includes:
[0054] In response to the target control strategy being the first sub-strategy, the water pump group in the water pump station is controlled to drain water according to the efficiency and energy consumption of the water pump; in response to the target control strategy being the second sub-strategy, the water pump in the water pump station is controlled to drain water according to the efficiency and energy consumption of the water pump.
[0055] In this embodiment, the water pump station is composed of multiple groups of water pumps, each group of water pumps contains multiple water pumps, and such a design enables the water pump station to flexibly adjust its working state when facing different drainage requirements. The drainage control strategy of the water pump station includes a first control strategy and a second control strategy, and the second control strategy includes a first sub-strategy and a second sub-strategy.
[0056] When the target control strategy is determined as the first sub-strategy, the system will accurately control the pump groups in the pump station according to the efficiency and energy consumption data of the pumps. This means that when the target control strategy is the first sub-strategy, the system will calculate the power consumption and efficiency of the entire group of pumps, and reasonably control the working state of each group of pumps according to the power consumption and efficiency of each group of pumps, in order to optimize the drainage efficiency by adjusting the number of running pump groups or working modes, while maintaining a low energy consumption level.
[0057] When the target control strategy is determined as the second sub-strategy, the system will accurately control the individual pumps in the pump station according to the efficiency and energy consumption data of the pumps. This means that when the target control strategy is the second sub-strategy, the system will calculate the power consumption and efficiency of each pump in each group of pumps, and reasonably control the working state of each pump according to the power consumption and efficiency of each pump, in order to achieve a lower energy consumption level by reducing the operating power of a single pump, increasing the intermittent time, etc.
[0058] It can be concluded that the first sub-strategy focuses more on improving drainage efficiency by optimizing the working state of the water pump group, while the second sub-strategy focuses more on achieving energy saving goals by finely controlling the operation of a single water pump. This flexible control strategy design enables the water pump station to perform efficient and energy-saving drainage operations according to actual needs.
[0059] In one embodiment of the present disclosure, according to the efficiency and energy consumption of the water pump, controlling the water pump group in the water pump station to drain water includes:
[0060] According to the efficiency and energy consumption of each group of water pumps in the water pumping station, control each water pump group in the water pumping station to drain water;
[0061] Control the pumps in the pumping station to drain water according to the efficiency and energy consumption of the pumps, including:
[0062] According to the efficiency and energy consumption of each pump in the pumping station, each pump in the pumping station is controlled to drain water.
[0063] In this embodiment, the various pump groups in the pump station are controlled to drain water according to the efficiency and energy consumption of each group of pumps in the pump station. It can be understood that after determining the target control strategy (such as the first sub-strategy), the system will evaluate the efficiency and energy consumption of each group of pumps in the pump station. Each group of pumps can include multiple pumps, and these pumps can have different performance parameters, such as flow, head, efficiency, etc. The system will determine the operating status of each group of pumps based on these parameters and real-time energy consumption data, such as turning on or off certain pump groups, adjusting the operating speed or power of certain pump groups, etc., to achieve the best drainage effect and energy consumption control.
[0064] According to the efficiency and energy consumption of each pump in the pump station, the individual pumps in the pump station are controlled to drain water. It can be understood that when the target control strategy is another (such as the second sub-strategy), the system will evaluate the efficiency and energy consumption of each individual pump in the pump station. This means that the system will take into account the performance and real-time working status of each pump, and then perform fine control based on this information. Compared with controlling a group of pumps, this control method is more detailed and can more accurately adjust the operating status of each pump to further reduce energy consumption or optimize drainage effects.
[0065] In this embodiment, the water power of each water pump can be calculated according to the water power formula by collecting the operating data of each water pump in the water pump group over a period of time, such as flow rate, head, etc. The water power calculation formula is:
[0066]
[0067] Among them, P is the water power, H is the head, and Q is the flow rate.
[0068] According to the formula Calculate the shaft power of each pump, where is the shaft power, is the input power of the motor, is the motor efficiency.
[0069] According to the formula Calculate the operating efficiency of each water pump, and then calculate the average operating efficiency of all water pumps in a group of water pumps to obtain the operating efficiency of each group of water pumps (where, for operational efficiency).
[0070] The energy consumption of each water pump is determined according to the operating efficiency and operating time of each water pump, and the energy consumption of each water pump group is obtained according to the average value of the energy consumption of all water pumps in each water pump group.
[0071] From the above, it can be concluded that both control strategies are based on the efficiency and energy consumption of the water pump, but the difference lies in the different granularity of control. The first method is to control the water pump group as a unit, and the second method is to control the individual water pump as a unit. These two control methods can be selected and switched according to different drainage requirements and energy-saving goals to achieve the best drainage effect and energy consumption control.
[0072] In one embodiment of the present disclosure, the water pump station drainage control method further includes:
[0073] In response to the current drainage control strategy being the second control strategy, when the operating efficiency of the water pumps in the water pump station is greater than a preset efficiency threshold, each water pump is controlled to drain water according to the operating efficiency of the water pump;
[0074] In response to the current drainage control strategy being the second control strategy, when the operating efficiency of the water pumps in the water pumping station is less than a preset efficiency threshold, each water pump is controlled to drain water according to the energy consumption of the water pump.
[0075] In this embodiment, the preset efficiency threshold can be an efficiency threshold set by the staff of the water pump station according to the historical operation of the water pump station. When the drainage control strategy of the water pump station is the second control strategy, the drainage mode of the water pump will be adjusted according to the relationship between the operating efficiency of the water pump and the preset efficiency threshold.
[0076] The operating efficiency of a water pump refers to the average operating efficiency of all water pumps in the entire water pumping station. When the operating efficiency of a water pump is greater than the preset efficiency threshold, the control system will give priority to the operating efficiency of each water pump. This means that the control system will try to keep the water pump running at a high efficiency to maximize the drainage effect and efficiency. For example, sort the operating efficiency of all water pumps from high to low, and give priority to the first n (n is a positive integer) water pumps with higher operating efficiency for drainage.
[0077] When the operating efficiency of the water pump is greater than the preset efficiency threshold, the control system can also make fine adjustments to the operating parameters of the water pump based on real-time data, such as adjusting the speed, flow rate, etc., to maintain the efficient operation of the water pump.
[0078] When the pump's operating efficiency falls below a preset efficiency threshold, the control system prioritizes reducing energy consumption. This can involve reducing the pump's operating time, speed, or flow rate to reduce unnecessary energy consumption. The control system may also issue an alarm to prompt staff to troubleshoot and maintain the pump that is running less efficiently, which can include checking the pump's mechanical components, electrical system, or control system.
[0079] When the operating efficiency of the water pump is lower than the preset efficiency threshold, if the efficiency of a water pump continues to be low and cannot be restored by adjusting parameters, the control system can also start a backup water pump to share the drainage task to ensure the stable operation of the overall drainage system.
[0080] From the above, it can be concluded that under the second control strategy, the drainage method of the water pump station will be flexibly adjusted according to the operating efficiency of the water pump. When the water pump operates efficiently, the control system will give priority to maintaining its efficient operation state; when the water pump operates at a low efficiency, the control system will ensure the smooth completion of the drainage task by reducing energy consumption, troubleshooting and maintenance, or starting a standby water pump. This control method can achieve efficient, stable, and energy-saving operation of the water pump station.
[0081] In one embodiment of the present disclosure, the water pump station drainage control method further includes:
[0082] When the water pump station is operated according to the second control strategy, the water pump station is controlled to drain water at an optimal operating frequency; the optimal operating frequency of the water pump station is calculated according to the operating status data of the water pump station and the first formula;
[0083] The first formula includes:
[0084]
[0085] in, is the optimal operating frequency of the water pump, is the maximum power of the pump, is the current pump power, is an adjustment factor, is the predicted drainage demand, is the current discharge, and t is the prediction time interval.
[0086] In this embodiment, when the water pump station chooses to operate with the second control strategy, the control system will first calculate the optimal operating frequency of the water pump according to the actual operating status data and predicted demand of the water pump station. The first formula comprehensively considers the power, predicted demand and current operating status of the water pump, and calculates an optimal operating frequency so that the water pump can meet the drainage demand while minimizing energy consumption and operating costs.
[0087] When the optimal operating frequency is calculated, the control system will adjust the operating parameters of the water pump so that it runs at the optimal frequency. This usually involves adjusting parameters such as the speed of the water pump and the valve opening. The control system will monitor the operating status of the water pump in real time and dynamically adjust the optimal operating frequency as needed to adapt to changes in drainage demand.
[0088] From the above, it can be concluded that by adopting this drainage control method based on the optimal operating frequency, the water pump station can achieve more efficient and energy-saving operation while meeting the drainage demand. This is of great significance for improving the overall operating efficiency of the water pump station and reducing costs.
[0089] In one embodiment of the present disclosure, controlling a water pump station to drain water according to a target control strategy includes:
[0090] In response to the current drainage control strategy of the water pumping station being the same as the target control strategy, keeping the current drainage control strategy of the water pumping station unchanged; controlling the water pumping station to drain water according to the current drainage control strategy;
[0091] In response to the current drainage control strategy of the water pumping station being different from the target control strategy, the water pumping station is controlled to switch to the target control strategy for drainage.
[0092] In this embodiment, the control system of the water pump station monitors and records the drainage control strategy currently being executed in real time. The drainage control strategy of the water pump station includes a first control strategy and a second control strategy, and the target control strategy is the first control strategy or the second control strategy.
[0093] If the current drainage control strategy of the water pumping station is the same as the target control strategy, the current drainage control strategy of the water pumping station is kept unchanged; and the water pumping station is controlled to drain water according to the current drainage control strategy.
[0094] If the current drainage control strategy of the pump station is different from the target control strategy, and the current drainage control strategy is the first control strategy, but the target control strategy is the second control strategy (a strategy with lower power consumption), it is necessary to switch to the second control strategy. This usually occurs in situations where energy costs are high or energy saving is required.
[0095] If the current strategy is the second control strategy, but the target strategy is the first control strategy (the strategy with fewer influencing factors), it is necessary to switch to the first control strategy. This may be because the current drainage demand is more urgent and requires a faster response or adjustment.
[0096] During the execution of the drainage control strategy, the system will continuously monitor the operation status of the pump station and the drainage effect. If any abnormal situation is found or the strategy does not meet the expected effect, the system will promptly adjust the strategy or issue an alarm to notify the staff to deal with it.
[0097] For example, suppose the current drainage control strategy of the water pump station is the first control strategy, and the goal is to reduce energy costs. If the system detects that the energy cost is already very high and predicts that the energy cost will continue to rise in the future, the target control strategy can be switched to the second control strategy. The system will adjust the operation mode or parameters of the water pump so that the water pump station can drain water according to the second control strategy, thereby reducing power consumption.
[0098] It can be concluded from the above that the present disclosure can effectively ensure that the operation of the water pump station is consistent with the expected target by switching the drainage control strategy. When the target control strategy changes, the system can respond and adjust quickly, improving the drainage efficiency and resource utilization efficiency, while also ensuring the stability and reliability of the drainage system.
[0099] In one embodiment of the present disclosure, the drainage control strategy of the water pump station further includes a third control strategy; the third control strategy is a drainage control strategy determined according to historical operation status information of the water pump station;
[0100] The water pump station drainage control method further includes:
[0101] In response to the current drainage control strategy of the water pumping station being the first control strategy or the second control strategy, the current drainage control strategy of the water pumping station is switched to a third control strategy.
[0102] In this embodiment, the third control strategy is formulated based on the historical operating status information of the water pump station. Such historical operating status information may include, but is not limited to: historical records of water level changes, accumulated data of water pump operation time, historical data of water pump operation efficiency, historical data of energy consumption, frequency and type of faults, etc. By analyzing these historical data, the optimal operating parameters or modes of the water pump station under different conditions can be identified. For example, based on the historical water level change data, the water level trend in the future period can be predicted, and the operation strategy of the water pump can be adjusted accordingly.
[0103] When the current drainage control strategy of the water pump station is the first control strategy or the second control strategy, the system will decide whether to switch to the third control strategy based on preset conditions or trigger events. These conditions or trigger events may include: the current strategy cannot meet the drainage demand or is inefficient; a system or equipment failure or abnormality is detected; a manual switching instruction or a remote scheduling instruction is received, etc. Before switching the drainage strategy, the system may perform a series of checks and verifications to ensure that the third control strategy is feasible and effective under the current conditions. For example, the system may check whether the historical data is sufficiently complete and accurate, and whether the third control strategy matches the current environmental conditions.
[0104] It can be concluded from the above that the present disclosure introduces a third control strategy based on historical operation status information and allows switching to this strategy according to conditions, making the drainage control of the water pump station more flexible and efficient. This method can predict future operation trends, optimize drainage efficiency, reduce energy consumption and failure rate, and thus significantly improve the management level and operation efficiency of the water pump station.
[0105] Corresponding to the water pump station drainage control method of the above embodiment, Figure 2 This is a structural block diagram of a water pump station drainage control device provided by an embodiment of the present disclosure. For ease of description, only the parts related to the embodiment of the present disclosure are shown. Figure 2 The water pump station drainage control device 20 includes: a strategy selection module 21 and a drainage module 22.
[0106] Wherein, the strategy selection module 21 is used to select a target control strategy from the drainage control strategies of the water pumping station according to the water level data of the water pumping station; the drainage control strategy of the water pumping station includes a first control strategy and a second control strategy, the number of influencing factors of the first control strategy is less than the number of influencing factors of the second control strategy, and the power consumption of the second control strategy is less than the power consumption of the first control strategy; the target control strategy is the first control strategy or the second control strategy;
[0107] The drainage module 22 is used to control the water pump station to drain water according to the target control strategy.
[0108] In one embodiment of the present disclosure, the second control strategy includes a first sub-strategy and a second sub-strategy.
[0109] The strategy selection module 21 is specifically used for:
[0110] In response to the water level data being less than a first threshold and greater than a second threshold, the first sub-strategy is determined to be the target control strategy; in response to the water level data being less than the second threshold, the second sub-strategy is determined to be the target control strategy.
[0111] In one embodiment of the present disclosure, a water pump station includes multiple groups of water pumps, and each group of water pumps includes multiple water pumps.
[0112] The drainage module 22 is specifically used for:
[0113] In response to the target control strategy being the first sub-strategy, the water pump group in the water pump station is controlled to drain water according to the efficiency and energy consumption of the water pump; in response to the target control strategy being the second sub-strategy, the water pump in the water pump station is controlled to drain water according to the efficiency and energy consumption of the water pump.
[0114] In one embodiment of the present disclosure, the drainage module 22 is specifically used for:
[0115] According to the efficiency and energy consumption of each group of water pumps in the water pumping station, each water pump group in the water pumping station is controlled to drain water.
[0116] According to the efficiency and energy consumption of each pump in the pumping station, each pump in the pumping station is controlled to drain water.
[0117] In one embodiment of the present disclosure, the water pump station drainage control device 20 further includes: a second drainage module.
[0118] The second drainage module is used to control each water pump to drain water according to the operating efficiency of the water pump in the water pump station in response to the current drainage control strategy being the second control strategy when the operating efficiency of the water pump in the water pump station is greater than a preset efficiency threshold.
[0119] The second drainage module is also used to control each water pump to drain water according to the energy consumption of the water pump in response to the current drainage control strategy being the second control strategy when the operating efficiency of the water pump in the water pump station is less than a preset efficiency threshold.
[0120] In one embodiment of the present disclosure, the water pump station drainage control device 20 further includes: a frequency calculation module.
[0121] A frequency calculation module, used for controlling the water pumping station to drain water at an optimal operating frequency when the water pumping station operates according to the second control strategy; and calculating the optimal operating frequency of the water pumping station according to the operating status data of the water pumping station and the first formula;
[0122] The first formula includes:
[0123]
[0124] in, is the optimal operating frequency of the water pump, is the maximum power of the pump, is the current pump power, is an adjustment factor, is the predicted drainage demand, is the current discharge, and t is the prediction time interval.
[0125] In one embodiment of the present disclosure, the drainage module 22 is specifically used for:
[0126] In response to the current drainage control strategy of the water pumping station being the same as the target control strategy, keeping the current drainage control strategy of the water pumping station unchanged; controlling the water pumping station to drain water according to the current drainage control strategy;
[0127] In response to the current drainage control strategy of the water pumping station being different from the target control strategy, the water pumping station is controlled to switch to the target control strategy for drainage.
[0128] See also Figure 3 , Figure 3 A schematic block diagram of an electronic device provided by an embodiment of the present disclosure. Figure 3 The electronic device 300 in the embodiment shown may include: one or more processors 301, one or more input devices 302, one or more output devices 303 and one or more memories 304. The processors 301, input devices 302, output devices 303 and memories 304 communicate with each other via a communication bus 305. The memory 304 is used to store computer programs, which include program instructions. The processor 301 is used to execute the program instructions stored in the memory 304. The processor 301 is configured to call the program instructions to execute the functions of each module / unit in the above-mentioned device embodiments, such as Figure 2 The functions of modules 21 to 22 are shown.
[0129] It should be understood that in the embodiment of the present disclosure, the processor 301 may be a central processing unit (CPU), and the processor may also be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or the processor may also be any conventional processor, etc.
[0130] The input device 302 may include a touch panel, a fingerprint collection sensor (for collecting the user's fingerprint information and fingerprint direction information), a microphone, etc., and the output device 303 may include a display (LCD, etc.), a speaker, etc.
[0131] The memory 304 may include a read-only memory and a random access memory, and provide instructions and data to the processor 301. A portion of the memory 304 may also include a non-volatile random access memory. For example, the memory 304 may also store information about the device type.
[0132] In a specific implementation, the processor 301, input device 302, and output device 303 described in the embodiments of the present disclosure can execute the implementation methods described in the first and second embodiments of the water pump station drainage control method provided in the embodiments of the present disclosure, and can also execute the implementation methods of the electronic device described in the embodiments of the present disclosure, which will not be repeated here.
[0133] In another embodiment of the present disclosure, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores a computer program, wherein the computer program includes program instructions, and when the program instructions are executed by the processor, all or part of the processes in the above-mentioned embodiment method are implemented, and the computer program can also be completed by instructing the relevant hardware through the computer program. The computer program can be stored in a computer-readable storage medium, and when the computer program is executed by the processor, the steps of each of the above-mentioned method embodiments can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form, etc. The computer-readable medium can include: any entity or device capable of carrying computer program code, recording medium, U disk, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium, etc.
[0134] The computer-readable storage medium may be an internal storage unit of the electronic device of any of the aforementioned embodiments, such as a hard disk or memory of the electronic device. The computer-readable storage medium may also be an external storage device of the electronic device, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (SecureDigital, SD) card, a flash card (Flash Card), etc. equipped on the electronic device. Furthermore, the computer-readable storage medium may also include both an internal storage unit of the electronic device and an external storage device. The computer-readable storage medium is used to store computer programs and other programs and data required by the electronic device. The computer-readable storage medium may also be used to temporarily store data that has been output or is to be output.
[0135] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition and steps of each example have been generally described in terms of function in the above description. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this disclosure.
[0136] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the electronic devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0137] In the several embodiments provided in the present application, it should be understood that the disclosed electronic devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of units is only a logical function division, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. In addition, the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces or units, or it can be an electrical, mechanical or other form of connection.
[0138] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the embodiments of the present disclosure.
[0139] In addition, each functional unit in each embodiment of the present disclosure may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0140] The above are only specific embodiments of the present disclosure, but the protection scope of the present disclosure is not limited thereto. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed in the present disclosure, and these modifications or replacements should be included in the protection scope of the present disclosure. Therefore, the protection scope of the present disclosure should be based on the protection scope of the claims.
Claims
1. A water pump station drainage control method, characterized in that: include: selecting a target control strategy from the drainage control strategies of the water pumping station according to the water level data of the water pumping station; The drainage control strategy of the water pump station includes a first control strategy and a second control strategy, the number of influencing factors of the first control strategy is less than the number of influencing factors of the second control strategy, and the power consumption of the second control strategy is less than the power consumption of the first control strategy; The second control strategy includes a first sub-strategy and a second sub-strategy; the water level data includes a water level height; The method of selecting a target control strategy from the drainage control strategies of the water pumping station according to the water level data of the water pumping station comprises: In response to the water level being less than a first threshold and greater than a second threshold, determining the first sub-strategy as a target control strategy; in response to the water level being less than a second threshold, determining the second sub-strategy as a target control strategy; The target control strategy is the first control strategy or the second control strategy; the first control strategy is the control strategy when the water level is greater than the first threshold; In response to the current drainage control strategy being the second control strategy, when the operating efficiency of the water pumps in the water pump station is greater than a preset efficiency threshold, each water pump is controlled to drain water according to the operating efficiency of the water pump; the control system of the water pump station is used to sort the operating efficiency of all water pumps from high to low, and preferentially select the first n water pumps with higher operating efficiency for drainage; In response to the current drainage control strategy being the second control strategy, when the operating efficiency of the water pumps in the water pump station is less than a preset efficiency threshold, each water pump is controlled to drain water according to the energy consumption of the water pump; the control system of the water pump station is used to reduce the operating time of the water pump, reduce the speed or flow rate, so as to reduce unnecessary energy consumption; The water pump station is controlled to drain water according to the target control strategy.
2. The water pump station drainage control method according to claim 1, characterized in that: The water pump station includes multiple groups of water pumps, each group of water pumps includes multiple water pumps; and controlling the water pump station to drain water according to the target control strategy includes: In response to the target control strategy being the first sub-strategy, the water pump group in the water pump station is controlled to drain water according to the efficiency and energy consumption of the water pump; in response to the target control strategy being the second sub-strategy, the water pump in the water pump station is controlled to drain water according to the efficiency and energy consumption of the water pump; According to the efficiency and energy consumption of the water pump, controlling the water pump group in the water pump station to drain water includes: According to the efficiency and energy consumption of each group of water pumps in the water pumping station, control each water pump group in the water pumping station to drain water; When the target control strategy is the first sub-strategy, the control system calculates the power consumption and efficiency of the entire group of water pumps, and reasonably controls the working state of each water pump group according to the power consumption and efficiency of each water pump group, so as to optimize the drainage efficiency by adjusting the running number or working mode of the water pump group, while maintaining a low energy consumption level; The method of controlling the water pump in the water pump station to drain water according to the efficiency and energy consumption of the water pump comprises: Controlling each water pump in the water pump station to drain water according to the efficiency and energy consumption of each water pump in the water pump station; When the target control strategy is the second sub-strategy, the control system will calculate the power consumption and efficiency of each pump in each group of pumps, and control the working state of each pump according to the power consumption and efficiency of each pump, so as to achieve a lower energy consumption level by reducing the operating power of a single pump and increasing the intermittent time.
3. The water pump station drainage control method according to claim 1, characterized in that: Also includes: When the water pump station operates according to the second control strategy, controlling the water pump station to drain water at an optimal operating frequency; Calculating the optimal operating frequency of the water pumping station according to the operating status data of the water pumping station and the first formula; The first formula includes: in, is the optimal operating frequency of the water pump, is the maximum power of the pump, is the current pump power, is an adjustment factor, is the predicted drainage demand, is the current discharge, and t is the prediction time interval.
4. The water pump station drainage control method according to claim 1, characterized in that: The step of controlling the water pump station to drain water according to the target control strategy includes: In response to the current drainage control strategy of the water pumping station being the same as the target control strategy, keeping the current drainage control strategy of the water pumping station unchanged; and controlling the water pumping station to drain water according to the current drainage control strategy; In response to the current drainage control strategy of the water pumping station being different from the target control strategy, the water pumping station is controlled to switch to the target control strategy for drainage.
5. An electronic device comprising a memory, a processor, and a computer program stored in the memory and running on the processor, characterized in that: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 4 are implemented.
6. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 4 are implemented.
Citation Information
Patent Citations
Method and device for determining energy efficiency influence factors of oilfield water injection system and storage medium
CN109961195A
Subdivision control method of mine drainage system based on peak and valley electric charges
CN110359956A
Medical wastewater regulating tank with controllable water quantity
CN210973923U
Water heater system, and starting control method for the same
JP2012184884A
Operation method of submersible pump of pump gate
JP2022124943A