A method for realizing belt conveyor design calculation based on secondary development
Through a method based on secondary development, historical data and artificial intelligence technology are used to automatically optimize the design parameters of the belt conveyor, solving the problems of low design efficiency and accuracy in the existing technology, and achieving a more efficient design and cost balance.
Patent Information
- Application Number
- CN202410962037.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-07-18
AI Technical Summary
The existing methods and software used to design belt conveyors are not intelligent enough, resulting in low design efficiency and accuracy. Part models and process drawings need to be drawn manually, and designers rely on experience to determine parameters.
Using a method based on secondary development, historical data are collected for preprocessing and scoring, a calculation model is established to recommend design parameters, and artificial intelligence and big data technology are combined to automatically optimize operating speed and bandwidth, perform resonance analysis and power prediction, and generate design drawings.
It improves design efficiency and accuracy, provides a larger choice space, reduces the calculation burden of designers, and achieves calculation results based on existing data to balance construction and operation costs.
Smart Images

Figure CN118504432B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of auxiliary design, and in particular relates to a method for realizing design calculation of a belt conveyor based on secondary development. Background Art
[0002] Belt conveyors are the main equipment for modern bulk material transportation. With its advantages of safe and efficient continuous transportation, they have been widely used in metallurgy, chemical industry, mining, power stations, ports and other industrial fields at home and abroad. However, the existing methods and software for designing belt conveyors are not intelligent enough, and various part models still need to be manually drawn by personnel, resulting in low design efficiency.
[0003] In order to improve the design efficiency of belt conveyors, the following methods are proposed in the prior art. For example, Chinese patent document CN118153222A discloses a parametric intelligent design method, system and program product for belt conveyors. The method first receives the belt conveyor selection and assembly parameter values input by the user, and calculates the design parameters of the belt conveyor; then, according to the selection, the assembly parameter values and the calculated design parameters, the component model and / or drawing number are selected from a preset parametric component library, and the component model and / or drawing number are imported into a preset three-dimensional component database to generate a corresponding three-dimensional component model; finally, a pre-assembly template is selected from a parametric assembly template library according to the selection, and the corresponding attributes of the pre-assembly template are automatically adjusted according to the assembly parameter values and the preset logical chain affecting the assembly relationship, so as to adjust the assembly relationship between the components in the template and generate a three-dimensional model of the overall assembly of the belt conveyor.
[0004] However, the above method also requires the user to obtain process parameters and equipment parameters from the two-dimensional process diagram and then create the model. When drawing the process diagram, many of the parameters are currently determined based on the experience of designers, so there are still problems with low design efficiency and accuracy. Summary of the invention
[0005] In order to solve the above problems, the present invention provides a method for realizing belt conveyor design calculation based on secondary development to solve the problems in the prior art.
[0006] In order to achieve the above-mentioned purpose of the invention, the present invention proposes a method for realizing belt conveyor design calculation based on secondary development, comprising:
[0007] Collecting first historical data, the first historical data including material properties, transportation distance, transportation inclination, unit transportation volume, operating speed and bandwidth, and updating the first historical data at every preset time interval;
[0008] Setting an evaluation index, preprocessing the first historical data based on the evaluation index, and obtaining an evaluation value for each piece of the first historical data;
[0009] Establishing a calculation model based on the evaluation value and the first historical data, identifying the target property and the target transportation volume marked in the design drawing, wherein the calculation model generates a recommendation list based on the target property and the target transportation volume, wherein the recommendation list includes a plurality of recommendation data, each of which includes the running speed, the bandwidth and the evaluation value of the conveyor;
[0010] receiving the running speed and the bandwidth selected from the recommendation list, and optimizing them to obtain a recommended speed, a recommended bandwidth, and a roller spacing;
[0011] Setting a plurality of calculation methods, obtaining the calculation results returned by the selected calculation methods, wherein the calculation results include the running resistance under no-load and full-load conditions, the power of the driving motor and the tension of the conveyor belt, and determining the placement position of the driving motor according to the calculation results;
[0012] A resonance analysis is performed based on the tension, the recommended speed and the roller parameters in the design drawing. After the analysis is passed, a predicted operating power of the conveyor is calculated based on the second historical data.
[0013] Further, calculating the predicted operating power includes the following steps:
[0014] Identify the first position of the drive motor and the second position of each roller in the design drawing, and divide the design drawing into a first transport section, a second transport section, a third transport section, a fourth transport section and a fifth transport section based on the first position and the second position, wherein the first transport section and the second transport section are respectively the sections for ascending and descending when carrying materials, the third transport section and the fourth transport section are respectively the sections for ascending and descending when empty, and the fifth transport section is a section for horizontal transport;
[0015] The second historical data includes basic data and unit power consumption. Each transport segment includes at least one sub-transport segment. The basic data of each sub-transport segment under each transport segment is obtained. The similarity between each current sub-transport segment and each piece of the second historical data is calculated based on the basic data. The second historical data with the similarity with the sub-transport segment greater than a first threshold and with the largest value is used as the target data. The unit power consumption is extracted from the target data. The predicted operating power P is calculated based on a first formula. The first formula is: , where Mn is the number of sub-transportation sections existing under the nth transport section, is the length of the mth sub-transport segment in the nth type of transport segment, The unit power consumption of the mth sub-transport segment in the nth transport segment.
[0016] Furthermore, the basic data includes the length of each transport segment, the target property, the unit transport volume, the transport inclination, the recommended speed, the recommended bandwidth and the power of the drive motors at both ends of the transport segment.
[0017] Further, the similarity between the sub-transportation segment and the second historical data is calculated based on a second formula: , the second formula is: ,in, is the difference between the transport segment and the second historical data in the i-th basic data, is the preset weight of the i-th type of basic data.
[0018] Furthermore, the preset weight of the driving motor power is the largest, and the preset weight of the recommended bandwidth is the smallest.
[0019] Further, the calculation methods include DIN22101, ISO5048, CEMA, Goodyear and Goodrich.
[0020] Furthermore, the same calculation method is respectively provided with a first calculation program and a second calculation program, the first calculation program and the second calculation program are written based on different coding languages, recognize the design drawings and obtain input parameters, and input the input parameters into the first calculation program and the second calculation program respectively to obtain a first result and a second result. If the first result and the second result are the same, the first result is output as the calculation result, otherwise an error warning is generated.
[0021] Furthermore, optimizing the operating speed and the bandwidth includes the following steps:
[0022] An objective function and constraints are set, wherein the objective function is minimum power consumption, and the constraints include belt speed constraint, bandwidth constraint and transport volume constraint, wherein the value of the transport volume constraint is greater than or equal to the target transport volume, and the objective function is solved to obtain an optimal solution that satisfies the objective function, wherein the optimal solution includes the recommended speed, the recommended bandwidth and the roller spacing.
[0023] Furthermore, the running speed and the bandwidth selected from the recommendation list are defined as the basic speed and the basic bandwidth respectively, a first floating value and a second floating value are set, the bandwidth constraint is generated based on the basic speed and the first floating value, and the bandwidth constraint is generated based on the basic bandwidth and the second floating value.
[0024] Further, calculating the evaluation value of the first historical data includes the following steps:
[0025] The first cost of the first historical data is calculated based on the bandwidth and the corresponding length, the second cost of the first historical data is calculated based on the unit volume and the running speed, and the evaluation value of the first historical data is calculated based on a third formula, where the third formula is: , where x is the first cost, y is the second cost, and are the weights of the first cost and the second cost respectively.
[0026] Compared with the prior art, the beneficial effects of the present invention are at least as follows:
[0027] The present invention first collects a large amount of first historical data, and then establishes an evaluation index to score the first historical data, so as to distinguish the pros and cons of the first historical data; then, a calculation model is established through the first historical data and a machine learning algorithm, and the calculation model generated by training based on the first historical data can better recommend the actual transportation speed and bandwidth according to the design requirements, and the calculation model also recommends multiple design parameters at a time, thereby giving designers a larger choice space; after the designer determines the choice, if there is still a need to reduce the construction cost, the selected operating speed and bandwidth can be automatically optimized. The present invention combines artificial intelligence and big data technology, so that designers only need to input the target design parameters to obtain the bandwidth and belt speed, and the calculation results are based on the data that has been designed, so it is more feasible.
[0028] The present invention also designs a variety of calculation methods, and designers can choose appropriate algorithms for calculation according to their own needs. The present invention can also automatically perform resonance analysis on the conveyor according to the drawings, further reducing the calculation burden of the designer. Finally, the operating power of the conveyor after completion can be predicted according to the final design drawings, so that relevant personnel can balance the construction cost and operation cost later. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a flow chart of the steps of the method for realizing belt conveyor design calculation based on secondary development of the present invention;
[0030] Figure 2 This is a schematic diagram of the principle of dividing the conveying sections according to the present invention. DETAILED DESCRIPTION
[0031] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0032] It is understood that the terms "first", "second", etc. used in this application may be used herein to describe various elements, but unless otherwise specified, these elements are not limited by these terms. These terms are only used to distinguish a first element from another element. For example, without departing from the scope of this application, a first xx script may be referred to as a second xx script, and similarly, a second xx script may be referred to as a first xx script.
[0033] like Figure 1 As shown, a method for realizing belt conveyor design calculation based on secondary development includes:
[0034] Step S1: collecting first historical data, the first historical data including material properties, transportation distance, transportation inclination, unit transportation volume, operating speed and bandwidth, and updating the first historical data at every preset time interval.
[0035] Step S2: setting evaluation indicators, preprocessing the first historical data based on the evaluation indicators, and obtaining an evaluation value of each piece of the first historical data.
[0036] The first historical data is the historical design drawings that have been designed and stored in the database. These historical design drawings are designed for different material properties, transportation distances and unit transportation volume requirements. Among them, the material properties include the density, particle size, unit weight and other information of the material to be transported by the conveyor, the transportation distance is the distance between the starting point and the end point of the conveyor, the transportation inclination is the angle difference between the starting point and the end point in the vertical direction or horizontal direction, the unit transportation volume is the material transportation volume required per hour, the running speed is the running speed of the conveyor belt, and the bandwidth is the width of the conveyor belt.
[0037] In this embodiment, the first historical data is updated once every month to continuously increase the amount of the first historical data. After obtaining a large amount of first historical data, the first historical data needs to be merged and cleaned, and then an evaluation index is established. Each piece of first historical data is scored by the evaluation index, that is, an evaluation value is obtained. The higher the evaluation value of the first historical data, the better the design result of the first historical data.
[0038] Step S3: A calculation model is established based on the evaluation value and the first historical data to identify the target properties and target transport volume marked in the design drawing. The calculation model generates a recommendation list based on the target properties and target transport volume. The recommendation list includes multiple recommended data, each recommended data including the operating speed, bandwidth and evaluation value of the conveyor.
[0039] Since the relationship between material properties, transportation distance, transportation inclination, unit transportation volume, operating speed and bandwidth is nonlinear, an artificial intelligence model is used here to generate a calculation model in combination with a large amount of first historical data. This embodiment uses a BP neural network model to establish a calculation model. When designing, it is necessary to determine the operating speed and bandwidth according to the specific material properties, transportation distance, transportation inclination and unit transportation volume. Since this embodiment also needs to output multiple results, each result includes operating speed, bandwidth and evaluation value, the number of input neurons of the calculation model is 4, and the input features are material properties, transportation distance, transportation inclination and unit transportation volume. The number of output neurons is set to 8, that is, 8 results are output, each result includes operating speed, bandwidth and evaluation value. The number of hidden layers is set to 1, and the number of hidden neurons is set to 5. Then, based on the first historical data and evaluation value, a training set, a test set and a validation set are constructed, and the mean square error MSE is used as the evaluation value indicator to verify the calculation effect of the calculation model; after the calculation model outputs 8 results, these 8 results are sorted into a recommendation list and displayed for selection by relevant personnel. After completing the training of the calculation model, the system can automatically generate a recommendation list through manual input or identification of parameters marked in the current design drawing.
[0040] Step S4: receiving the running speed and bandwidth selected from the recommendation list, and optimizing them to obtain the recommended speed, recommended bandwidth and roller spacing.
[0041] The data in the first historical data may only consider the factors of equipment safety and normal operation during design. In reality, there may also be a need to reduce construction costs. Therefore, after selecting speed and bandwidth from the recommended list, designers can also optimize the selected operating speed and bandwidth again, reduce the bandwidth, and increase the operating speed to reduce the initial investment amount. The specific method will be introduced later. After optimization, a solution to reduce the construction cost of the conveyor can be obtained for selection while ensuring safety and normal operation.
[0042] Step S5: Set a plurality of calculation methods, obtain the calculation results returned by the selected calculation method, the calculation results include the running resistance under no-load and full-load conditions, the power of the drive motor and the tension of the conveyor belt, and determine the placement position of the drive motor according to the calculation results.
[0043] The calculation methods implemented in this paper include DIN22101, ISO5048, CEMA, Goodyear and Goodrich. Designers can choose the corresponding calculation method according to actual needs. After determining the structure and parameters of the rollers, they can select the required calculation method. The system automatically identifies the drawings to obtain the corresponding parameters, and calculates and returns the running resistance of the conveyor under no-load and full-load conditions, the power of the drive motor, the tension of the conveyor belt and other data based on the parameters. Finally, relevant personnel can determine the placement of the drive motor and the design of the tensioning device according to the calculation results of the drive motor and resistance. The placement positions include head placement, middle placement and tail placement.
[0044] Step S6: Perform resonance analysis based on the tension, recommended speed and roller parameters in the design drawing. After the analysis is passed, calculate the predicted operating power of the conveyor based on the second historical data.
[0045] After completing all the designs of the design drawings, the system can automatically perform resonance analysis. During the analysis, the system calculates the natural frequency of the conveyor belt and the excitation frequency of the rollers. If the natural frequency of the conveyor belt is greater than the excitation frequency of the rollers, resonance will not occur; wherein, the excitation frequency of the rollers is calculated based on the rotation speed, which is the running speed of the belt. The natural frequency of the conveyor belt is determined based on the roller spacing, the conveyor belt tension, the weight per unit length of the conveyor belt, and the weight per unit length of the load. The specific formula is a prior art and will not be introduced here. After the resonance analysis is passed, the present invention can also predict the power of the designed conveyor, thereby predicting the operating cost of the conveyor, which is convenient for designers to refer to.
[0046] The present invention first collects a large amount of first historical data, and then establishes an evaluation index to score the first historical data, so as to distinguish the pros and cons of the first historical data; then, a calculation model is established through the first historical data and a machine learning algorithm, and the calculation model generated by training based on the first historical data can better recommend the actual transportation speed and bandwidth according to the design requirements, and the calculation model also recommends multiple design parameters at a time, thereby giving designers a larger choice space; after the designer determines the choice, if there is still a need to reduce the construction cost, the selected operating speed and bandwidth can be automatically optimized. The present invention combines artificial intelligence and big data technology, so that designers only need to input the target design parameters to obtain the bandwidth and belt speed, and the calculation results are based on the data that has been designed, so it is more feasible.
[0047] The present invention also designs a variety of calculation methods, and designers can choose appropriate algorithms for calculation according to their own needs. The present invention can also automatically perform resonance analysis on the conveyor according to the drawings, further reducing the calculation burden of the designer. Finally, the operating power of the conveyor after completion can be predicted according to the final design drawings, so that relevant personnel can balance the construction cost and operation cost later.
[0048] It is particularly noteworthy that, through the present invention, a variety of recommended design parameters can be automatically generated according to the design requirements of the conveyor belt, thereby greatly improving the work efficiency of designers.
[0049] The calculation of the predicted operating power in this embodiment includes the following steps:
[0050] Identify the first position of the drive motor and the second position of each roller in the design drawing, and divide the design drawing into a first transport section, a second transport section, a third transport section, a fourth transport section and a fifth transport section based on the first position and the second position. The first transport section and the second transport section are respectively the sections for ascending and descending when carrying materials, the third transport section and the fourth transport section are respectively the sections for ascending and descending when empty, and the fifth transport section is a section for horizontal transportation;
[0051] First, obtain the first position of each drive motor in the design drawing and the second position of each roller. In this way, the inclination angle between the first position and the second position can be determined according to the height relationship between the two positions, and the specific driving conditions of each drive motor can be known, such as Figure 2 As shown, assuming that there are drive motors M1 and M2, and roller T, the first positions of the drive motors M1 and M2 and the second position of the roller T are obtained respectively, wherein the material falls onto the conveyor at V and leaves the conveyor at U. Then according to the above analysis, it can be obtained that Figure 2 The first transport section is between the driving motor M1 and the roller T, the second transport section is between the driving motor T and the roller M2, and the third transport section is between the driving motors M2 and M1.
[0052] The second historical data includes basic data and unit power consumption. Each transport section includes at least one sub-transport section. The basic data of each sub-transport section under each transport section is obtained. The similarity between each current sub-transport section and each second historical data is calculated based on the basic data. The second historical data with the largest value and a similarity with the sub-transport section greater than the first threshold is used as the target data. The unit power consumption is extracted from the target data. The predicted operating power P is calculated based on the first formula. The first formula is: , where Mn is the number of sub-transportation sections under the nth transport section, is the length of the mth sub-transport segment in the nth transport segment, Unit power consumption of the mth sub-transport segment in the nth transport segment.
[0053] The basic data include the length of each transport section, target properties, unit transport volume, transport inclination, recommended speed, recommended bandwidth and the power of the drive motors at both ends of the transport section.
[0054] The basic data in this embodiment include the length of each transport section, target properties, unit transport volume, transport inclination, optimized speed, recommended bandwidth and the power of the drive motors at both ends. The unit power consumption is the power actually measured and obtained by the drive motor, and its unit can be m / kw·h, which represents the power consumed by the drive motor per unit time; for example, the second historical data is 3 meters in length, the unit density of the transported items is 7.36g / cm³, the unit transport volume is 0.01t / s, the transport inclination is 2°, the optimized speed is 0.5m / s, and the motor power at both ends is 400kw. In the rest of the second historical data, there may be only one drive motor at one end, so there will only be one motor power.
[0055] After completing the division of the transport sections, obtain the basic data of each transport section. In particular, each transport section may include multiple separate sub-transport sections. For example, in a conveyor, materials are transported ascending, horizontally, and ascending in sequence, so the first transport section has two sub-transport sections. Figure 2 The third transport section is an empty transport section, so there is no target property and unit transport volume. Afterwards, the first transport section is taken as the target and matched with each second historical data to obtain the second historical data closest to the first transport section. When matching, the first threshold setting is used for screening. If there is only one second historical data with a similarity value greater than the first threshold value, the second historical data is directly used as the target data. If there are multiple second historical data greater than the first threshold value, the second historical data with the largest value is selected as the target data. After determining the target data of the first transport section, the unit power consumption is extracted from it as the unit power consumption of the first transport section. After obtaining the unit power consumption of each sub-transport section, the length of each sub-transport section is multiplied and accumulated by the corresponding unit power consumption according to the first formula, so as to obtain the predicted operating power of the conveyor designed this time. This step combines big data to more accurately predict the predicted operating power of the conveyor after it is actually put into operation.
[0056] This embodiment calculates the similarity between the sub-transportation segment and the second historical data based on the second formula , the second formula is: ,in, is the difference between the transport segment and the second historical data in the i-th basic data, is the preset weight of the i-th basic data.
[0057] The preset weight of the drive motor power is the largest, and the preset weight of the recommended bandwidth is the smallest.
[0058] For example, if the length of the sub-transport segment is 3.5 meters and the length in the second historical data is 3 meters, the value of A1 is 0.5. The corresponding preset weights can be set freely. In this embodiment, the preset weight of the drive motor power is the largest, because the drive motor power has the greatest impact on the power consumption of the transport segment. The preset weight of the recommended bandwidth is the smallest, because the recommended bandwidth has the smallest impact on the power consumption of the transport segment. It can be seen from the second formula that the smaller the difference between the sub-transport segment and the second historical data, the greater the corresponding similarity.
[0059] The same calculation method is respectively provided with a first calculation program and a second calculation program, which are written based on different coding languages, recognize design drawings and obtain input parameters, and input the input parameters to the first calculation program and the second calculation program respectively to obtain a first result and a second result. If the first result and the second result are the same, the first result is output as the calculation result, otherwise an error warning is generated.
[0060] Specifically, the first calculation program and the second calculation program are written in Python and C# languages respectively. After obtaining the input parameters needed in the design drawings, the input parameters are input into the first calculation program and the second calculation program respectively to obtain the first result and the second result. If the first result and the second result are the same, it indicates that the calculation process of the two calculation programs is correct and the correct result is obtained. If the first result and the second result are different, it indicates that one of the results is wrong, which may be due to a problem in the program logic. At this time, an error warning is generated to prevent designers from using wrong calculation results. This step makes the output calculation results more reliable.
[0061] This embodiment optimizes the running speed and bandwidth and includes the following steps:
[0062] Set the objective function and constraints. The objective function is the minimum power consumption. The constraints include belt speed constraint, bandwidth constraint and transport volume constraint. The value of the transport volume constraint is greater than or equal to the target transport volume. Solve the objective function to obtain the optimal solution that satisfies the objective function. The optimal solution includes the recommended speed, recommended bandwidth and roller spacing.
[0063] The objective function of this embodiment is , where W is the recommended belt width, v is the recommended belt speed, c1 and c2 are the roller spacings of the load branch and the return branch respectively, the belt speed constraint is a numerical range, which is determined according to the calculation model, and the transport capacity constraint is , where F is the cargo cross-sectional area of the conveyor belt and r is the cargo capacity. Solving the objective function under the constraints can obtain the recommended speed, recommended bandwidth and roller spacing.
[0064] Define the operating speed and bandwidth selected from the recommendation list as the basic speed and basic bandwidth respectively, set the first floating value and the second floating value, generate the speed constraint based on the basic speed and the first floating value, and generate the bandwidth constraint based on the basic bandwidth and the second floating value.
[0065] Specifically, the speed constraint is generated by adding or subtracting the first floating value from the basic speed, and the bandwidth constraint is generated by adding or subtracting the second floating value from the basic bandwidth. The speed constraint and bandwidth constraint generated in this way enable the optimization result to be obtained more quickly when solving the objective function.
[0066] In this embodiment, calculating the evaluation value of the first historical data includes the following steps:
[0067] The first cost of the first historical data is calculated based on the bandwidth and the corresponding length, the second cost of the first historical data is calculated based on the unit volume and the running speed, and the evaluation value of the first historical data is calculated based on the third formula. The third formula is: , where x is the first cost and y is the second cost, and are the weights of the first cost and the second cost respectively.
[0068] The first cost represents the initial construction cost. The larger the bandwidth, the greater the initial construction cost, that is, the greater the first cost. It can be calculated based on the material, length and bandwidth of the belt. The second cost represents the operating cost. The greater the unit volume and operating speed, the greater the later power consumption and the higher the second cost. It can be determined based on the product of the unit volume and the operating speed. Add the two and take the inverse as the evaluation value. The larger the sum of the two, the lower the evaluation value.
[0069] It should be understood that, although each step in the flow chart of each embodiment of the present invention is shown in sequence according to the indication of the arrow, these steps are not necessarily performed in sequence according to the order indicated by the arrow. Unless there is a clear explanation in this article, the execution of these steps does not have strict order restrictions, and these steps can be performed in other orders. Moreover, at least a portion of the steps in each embodiment may include a plurality of sub-steps or a plurality of stages, and these sub-steps or stages are not necessarily performed at the same time, but can be performed at different times, and the execution order of these sub-steps or stages is not necessarily performed in sequence, but can be performed in turn or alternately with at least a portion of other steps or sub-steps or stages of other steps.
[0070] The technical features of the above-mentioned embodiments can be combined arbitrarily. In order to make the description concise, not all possible combinations of the technical features in the above-mentioned embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0071] The above embodiments only express several implementation methods of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that, for those of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.
[0072] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for realizing belt conveyor design calculation based on secondary development, characterized in that: include: Collecting first historical data, the first historical data including material properties, transportation distance, transportation inclination, unit transportation volume, operating speed and bandwidth, and updating the first historical data at every preset time interval; Setting an evaluation index, preprocessing the first historical data based on the evaluation index, and obtaining an evaluation value for each piece of the first historical data; Establishing a calculation model based on the evaluation value and the first historical data, identifying the target property and the target transportation volume marked in the design drawing, wherein the calculation model generates a recommendation list based on the target property and the target transportation volume, wherein the recommendation list includes a plurality of recommendation data, each of which includes the running speed, the bandwidth and the evaluation value of the conveyor; receiving the running speed and the bandwidth selected from the recommendation list, and optimizing them to obtain a recommended speed, a recommended bandwidth, and a roller spacing; Setting a plurality of calculation methods, obtaining the calculation results returned by the selected calculation methods, wherein the calculation results include the running resistance under no-load and full-load conditions, the power of the driving motor and the tension of the conveyor belt, and determining the placement position of the driving motor according to the calculation results; Performing resonance analysis based on the tension, the recommended speed and the roller parameters in the design drawing, and after the analysis is passed, calculating the predicted operating power of the conveyor based on the second historical data; Calculating the predicted operating power includes the following steps: Identify the first position of the drive motor and the second position of each roller in the design drawing, and divide the design drawing into a first transport section, a second transport section, a third transport section, a fourth transport section and a fifth transport section based on the first position and the second position, wherein the first transport section and the second transport section are respectively the sections for ascending and descending when carrying materials, the third transport section and the fourth transport section are respectively the sections for ascending and descending when empty, and the fifth transport section is a section for horizontal transport; The second historical data includes basic data and unit power consumption. Each transport segment includes at least one sub-transport segment. The basic data of each sub-transport segment under each transport segment is obtained. The similarity between each current sub-transport segment and each piece of the second historical data is calculated based on the basic data. The second historical data with the similarity with the sub-transport segment greater than a first threshold and with the largest value is used as the target data. The unit power consumption is extracted from the target data. The predicted operating power P is calculated based on a first formula. The first formula is: , where Mn is the number of sub-transportation sections existing under the nth transport section, is the length of the mth sub-transport segment in the nth type of transport segment, The unit power consumption of the mth sub-transport segment in the nth transport segment.
2. The method according to claim 1, characterized in that The basic data includes the length of each transport segment, the target properties, the unit transport volume, the transport inclination, the recommended speed, the recommended bandwidth and the power of the drive motors at both ends of the transport segment.
3. The method according to claim 2, characterized in that Calculate the similarity between the sub-transportation segment and the second historical data based on a second formula , the second formula is: ,in, is the difference between the transport segment and the second historical data in the i-th basic data, is the preset weight of the i-th type of basic data.
4. The method according to claim 3, characterized in that The preset weight of the driving motor power is the largest, and the preset weight of the recommended bandwidth is the smallest.
5. The method according to claim 1, characterized in that The calculation methods include DIN22101, ISO5048, CEMA, Goodyear and Goodrich.
6. The method according to claim 1, characterized in that The same calculation method is respectively provided with a first calculation program and a second calculation program, the first calculation program and the second calculation program are written based on different coding languages, identify the design drawings and obtain input parameters, input the input parameters to the first calculation program and the second calculation program respectively to obtain a first result and a second result, if the first result and the second result are the same, the first result is output as the calculation result, otherwise an error warning is generated.
7. The method according to claim 3, characterized in that Optimizing the operating speed and the bandwidth includes the following steps: An objective function and constraints are set, wherein the objective function is minimum power consumption, and the constraints include belt speed constraint, bandwidth constraint and transport volume constraint, wherein the value of the transport volume constraint is greater than or equal to the target transport volume, and the objective function is solved to obtain an optimal solution that satisfies the objective function, wherein the optimal solution includes the recommended speed, the recommended bandwidth and the roller spacing.
8. The method according to claim 7, characterized in that Define the operating speed and the bandwidth selected from the recommendation list as the basic speed and basic bandwidth respectively, set a first floating value and a second floating value, generate the bandwidth constraint based on the basic speed and the first floating value, and generate the bandwidth constraint based on the basic bandwidth and the second floating value.
9. The method according to claim 1, characterized in that: Calculating the evaluation value of the first historical data comprises the following steps: The first cost of the first historical data is calculated based on the bandwidth and the corresponding length, the second cost of the first historical data is calculated based on the unit volume and the running speed, and the evaluation value of the first historical data is calculated based on a third formula, where the third formula is: , where x is the first cost, y is the second cost, and are the weights of the first cost and the second cost respectively.
Citation Information
Patent Citations
Parameterized intelligent design method and system for belt conveyor and program product
CN118153222A
Belt type conveyor dynamics parameter calculation method
CN101101608A
Belt conveyor control device and method based on multi-target particle swarm algorithm
CN111169942A
Optimized operation control method for belt conveyor
CN115848943A
Conveyor belt working condition detection method and system, electronic equipment and storage medium
CN118155113A