An artificial intelligence driven intelligent optimization control method, system and medium
By calculating the production equipment operation index and influencing factors and adjusting the production rhythm, the problem that the production rhythm cannot be intelligently optimized in the existing technology is solved, the efficiency and flexibility of the production line are improved, and intelligent optimization control driven by artificial intelligence is realized.
Patent Information
- Application Number
- CN202410942914.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-07-15
AI Technical Summary
The production rhythm of existing product production lines cannot be intelligently optimized and controlled based on product model, process difficulty and equipment status, resulting in low production efficiency.
By obtaining the equipment status, personnel status, parts status and quality control data of the product production line, the production equipment operation index and influencing factors are calculated, and the production rhythm is adjusted to achieve real-time optimal control.
It improves the efficiency and flexibility of the product production line, adapts to the needs of different products and process complexity, and realizes intelligent optimization control driven by artificial intelligence.
Smart Images

Figure CN118504932B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of intelligent control, and more specifically, to an artificial intelligence-driven intelligent optimization control method, system and medium. Background Art
[0002] With the increasing demand for industrial products and the intensified competition in the industry, the industry is also striving for excellence in the control of product production. Production control includes both cost control and delivery control, so the efficiency control of product production lines is crucial to product production. However, the current production rhythm in product production lines is based on relatively fixed data obtained after process evaluation, and it is impossible to achieve intelligent optimization control based on product models, process difficulty, and production equipment conditions. Therefore, in order to improve product production efficiency and adapt to the different production rhythm requirements of different products and different process complexities, it is necessary to better realize intelligent optimization control driven by artificial intelligence, which has become a problem that needs to be solved at present.
[0003] In view of the above problems, effective technical solutions are urgently needed. Summary of the invention
[0004] The purpose of this application is to provide an artificial intelligence-driven intelligent optimization control method, system and medium, which can realize the technology of artificial intelligence-driven intelligent optimization control by calculating the real-time production rhythm data of effective products in the product production line.
[0005] The present application also provides an artificial intelligence-driven intelligent optimization control method, comprising the following steps:
[0006] Obtain equipment status data, personnel status data, parts status data, quality control data and product assembly process data of product production lines;
[0007] Input the equipment condition data into a preset production equipment operation index model for processing to obtain a production equipment operation index, and compare the production equipment operation index with a preset production equipment operation standard index to obtain production equipment operation status data;
[0008] Calculate and obtain the first influencing factor of production operation according to the production equipment operation status data, personnel situation data and assembly process data;
[0009] The second influencing factor of production operation is obtained by processing the component condition data and the quality control data through a preset second influencing factor model of production operation;
[0010] Calculate the production rhythm correction index according to the first production operation influencing factor and the second production operation influencing factor;
[0011] The real-time production rhythm data of the product is calculated based on the production rhythm correction index and the preset product standard production rhythm data, and the threshold value is compared to obtain the real-time production rhythm data of the valid product;
[0012] The comprehensive operating speed of the product production line is adjusted according to the real-time production rhythm data of the effective products and the preset production line product scheduling plan data.
[0013] Optionally, in the artificial intelligence driven intelligent optimization control method described in the present application, the acquisition of equipment status data, personnel status data, parts status data, quality control data and product assembly process data of the product production line specifically includes:
[0014] Obtain equipment status data of product production lines, including equipment failure rate data, equipment effective operation time data, equipment maintenance-free standard time data, equipment operation load average data, and equipment operation standard load data;
[0015] Obtain personnel data on the product production line, including personnel proficiency data, personnel continuous working hours data, and personnel physical condition data;
[0016] Obtain data on parts and components of product production lines, including data on the timely supply rate of parts and components, data on the quality pass rate of parts and components, and data on the loss of parts and components during assembly;
[0017] Obtain quality control data for product production lines, including data on the strictness of quality inspection standards and the duration of quality inspection processes;
[0018] Obtain product assembly process data of product production lines, including process complexity data and process standardization degree data.
[0019] Optionally, in the artificial intelligence driven intelligent optimization control method described in the present application, the inputting of the equipment condition data into a preset production equipment operation index model for processing to obtain the production equipment operation index, and comparing the production equipment operation index with a preset production equipment operation standard index to obtain the production equipment operation status data specifically includes:
[0020] Input the equipment failure rate data, equipment effective operation time data, equipment maintenance-free standard time data, equipment operation load mean data and equipment operation standard load data into a preset production equipment operation index model for processing to obtain a production equipment operation index;
[0021] Dividing the production equipment operation index by a preset production equipment operation standard index to obtain production equipment operation status data;
[0022] The calculation formula of the production equipment operation index is:
[0023] ;
[0024] in, is the production equipment operation index, is the equipment failure rate data, It is the effective operation time data of the equipment. It is the standard maintenance-free time data of the equipment. is the average data of equipment operating load, It is the standard load data of equipment operation. is the preset characteristic coefficient.
[0025] Optionally, in the artificial intelligence driven intelligent optimization control method described in the present application, the first production operation influencing factor is calculated based on the production equipment operation status data, personnel situation data and assembly process data, specifically including:
[0026] Input the production equipment operation status data, personnel proficiency data, personnel continuous working time data, personnel physical condition data, process complexity data and process standardization degree data into a preset production operation first influencing factor model to calculate and obtain the production operation first influencing factor;
[0027] The calculation formula of the first influencing factor of production operation in the first influencing factor model of production operation is:
[0028] ;
[0029] in, It is the first influencing factor of production operation. To produce equipment operating status data, For personnel proficiency data, The continuous working time data of personnel, For personnel physical condition data, is the process complexity data, is the process standardization degree data, , is the preset characteristic coefficient.
[0030] Optionally, in the artificial intelligence driven intelligent optimization control method described in the present application, the second influencing factor of production operation is obtained by processing the component condition data and the quality control data through a preset second influencing factor model of production operation, specifically including:
[0031] Input the parts supply timeliness rate data, parts quality qualification rate data, parts assembly loss data, quality inspection standard strictness data and quality inspection process duration data into a preset production operation second influencing factor model, and process to obtain the production operation second influencing factor;
[0032] The calculation formula of the second influencing factor of production operation in the second influencing factor model of production operation is:
[0033] ;
[0034] in, It is the second influencing factor of production operation. Provide timely data for parts supply, is the quality qualification rate data of parts and components, For parts assembly loss data, For the strictness data of quality inspection standards, The duration data of the quality inspection process. is the preset characteristic coefficient.
[0035] Optionally, in the artificial intelligence driven intelligent optimization control method described in the present application, the production rhythm correction index is calculated according to the first production operation influencing factor and the second production operation influencing factor, specifically including:
[0036] Inputting the first production operation influencing factor and the second production operation influencing factor into a preset production rhythm correction index model to obtain a production rhythm correction index;
[0037] The calculation formula of the production cycle correction index in the production cycle correction index model is:
[0038] ;
[0039] in, is the production rhythm correction index, It is the first influencing factor of production operation. It is the second influencing factor of production operation. The default feature.
[0040] Optionally, in the artificial intelligence-driven intelligent optimization control method described in the present application, the step of calculating the real-time production rhythm data of the product based on the production rhythm correction index and the preset product standard production rhythm data and performing threshold comparison to obtain the real-time production rhythm data of the effective product specifically includes:
[0041] Multiplying the production rhythm correction index and the preset product standard production rhythm data to obtain the real-time production rhythm data of the product;
[0042] Calculate the beat deviation rate data according to the real-time production beat data of the product and the standard production beat data of the product;
[0043] The beat deviation rate data is compared with a preset beat deviation rate threshold to obtain corresponding real-time production beat data of effective products.
[0044] In a second aspect, the present application provides an artificial intelligence-driven intelligent optimization control system, the system comprising: a memory and a processor, the memory comprising a program of an artificial intelligence-driven intelligent optimization control method, and the program of the artificial intelligence-driven intelligent optimization control method, when executed by the processor, implements the following steps:
[0045] Obtain equipment status data, personnel status data, parts status data, quality control data and product assembly process data of product production lines;
[0046] Input the equipment condition data into a preset production equipment operation index model for processing to obtain a production equipment operation index, and compare the production equipment operation index with a preset production equipment operation standard index to obtain production equipment operation status data;
[0047] Calculate and obtain the first influencing factor of production operation according to the production equipment operation status data, personnel situation data and assembly process data;
[0048] The second influencing factor of production operation is obtained by processing the component condition data and the quality control data through a preset second influencing factor model of production operation;
[0049] Calculate the production rhythm correction index according to the first production operation influencing factor and the second production operation influencing factor;
[0050] The real-time production rhythm data of the product is calculated based on the production rhythm correction index and the preset product standard production rhythm data, and the threshold value is compared to obtain the real-time production rhythm data of the valid product;
[0051] The comprehensive operating speed of the product production line is adjusted according to the real-time production rhythm data of the effective products and the preset production line product scheduling plan data.
[0052] Optionally, in the artificial intelligence driven intelligent optimization control system described in the present application, the acquisition of equipment status data, personnel status data, parts status data, quality control data and product assembly process data of the product production line specifically includes:
[0053] Obtain equipment status data of product production lines, including equipment failure rate data, equipment effective operation time data, equipment maintenance-free standard time data, equipment operation load average data, and equipment operation standard load data;
[0054] Obtain personnel data on the product production line, including personnel proficiency data, personnel continuous working hours data, and personnel physical condition data;
[0055] Obtain data on parts and components of product production lines, including data on the timely supply rate of parts and components, data on the quality pass rate of parts and components, and data on the loss of parts and components during assembly;
[0056] Obtain quality control data for product production lines, including data on the strictness of quality inspection standards and the duration of quality inspection processes;
[0057] Obtain product assembly process data of product production lines, including process complexity data and process standardization degree data.
[0058] In the third aspect, the present application also provides a readable storage medium, which includes an artificial intelligence-driven intelligent optimization control method program. When the artificial intelligence-driven intelligent optimization control method program is executed by a processor, the steps of the artificial intelligence-driven intelligent optimization control method as described in any one of the above items are implemented.
[0059] From the above, it can be seen that the artificial intelligence-driven intelligent optimization control method, system and medium provided by the present application. The method obtains the equipment condition data, personnel condition data, parts condition data, quality control data and product assembly process data of the product production line, obtains the production equipment operation index and equipment operation status data after processing the equipment condition data, and then calculates the first influencing factor of production operation in combination with the personnel condition data and the assembly process data, and then obtains the second influencing factor of production operation in accordance with the parts condition data and the quality control data, and calculates the production rhythm correction index, and then obtains the real-time production rhythm data of effective products in combination with the preset product standard production rhythm data, and then adjusts the comprehensive operation speed of the product production line; thereby, by calculating the real-time production rhythm data of effective products in the product production line, the technology of intelligent optimization control driven by artificial intelligence is realized.
[0060] Other features and advantages of the present application will be described in the following description, and partly become apparent from the description, or understood by practicing the present application. The purpose and other advantages of the present application can be realized and obtained by the structures particularly pointed out in the written description and the drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0061] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments of the present application will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0062] Figure 1 A flow chart of an artificial intelligence driven intelligent optimization control method provided in an embodiment of the present application;
[0063] Figure 2 A flow chart of obtaining equipment status data, personnel status data, component status data, quality control data, and product assembly process data of a product production line according to an artificial intelligence-driven intelligent optimization control method provided in an embodiment of the present application;
[0064] Figure 3 A flow chart of obtaining production equipment operating status data of an artificial intelligence-driven intelligent optimization control method provided in an embodiment of the present application;
[0065] Figure 4 A flowchart of obtaining real-time production rhythm data of effective products according to the artificial intelligence-driven intelligent optimization control method provided in an embodiment of the present application. DETAILED DESCRIPTION
[0066] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only a part of the embodiments of the present application, rather than all of the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the application claimed for protection, but merely represents the selected embodiments of the present application. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present application.
[0067] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in subsequent drawings. At the same time, in the description of this application, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0068] Please refer to Figure 1 , Figure 1 1 is a flow chart of an artificial intelligence-driven intelligent optimization control method in some embodiments of the present application. The artificial intelligence-driven intelligent optimization control method is used in a terminal device, such as a computer. The artificial intelligence-driven intelligent optimization control method comprises the following steps:
[0069] S11. Obtain equipment status data, personnel status data, parts status data, quality control data and product assembly process data of the product production line;
[0070] S12, inputting the equipment condition data into a preset production equipment operation index model for processing to obtain a production equipment operation index, and comparing the production equipment operation index with a preset production equipment operation standard index to obtain production equipment operation status data;
[0071] S13, calculating and obtaining a first influencing factor of production operation according to the production equipment operation status data, personnel situation data and assembly process data;
[0072] S14, processing the component condition data and the quality control data through a preset production operation second influencing factor model to obtain a production operation second influencing factor;
[0073] S15, calculating and obtaining a production rhythm correction index according to the first production operation influencing factor and the second production operation influencing factor;
[0074] S16, calculating the real-time production rhythm data of the product according to the production rhythm correction index and the preset product standard production rhythm data, and performing threshold comparison to obtain the real-time production rhythm data of the valid product;
[0075] S17. Adjust the comprehensive operating speed of the product production line according to the real-time production rhythm data of the effective products and the preset production line product scheduling plan data.
[0076] It should be noted that the intelligent optimization control technology driven by artificial intelligence can realize the intelligent control of the comprehensive operating speed of the product production line. The comprehensive operating speed of product production refers to the final speed of the production line operation in the product production workshop, taking into account that multiple different models of products will be produced on the same production line at the same time, and taking into account the production speed of each product. In addition to the difference in product models, the same model of products also has different assembly processes and other objective factors, which will also lead to different product assembly times. Therefore, the operating speed of the production line is also different. To realize the intelligent control of the product production line, it is necessary to comprehensively consider various factors. First of all, it is necessary to obtain the equipment status data, personnel status data, parts status data, quality control data of the product production line There are various factors that affect the product production speed. The equipment condition data is processed to obtain the operating status data of the production equipment, and then the operating status data of the production equipment is combined with the personnel condition data and the assembly process data to obtain the first influencing factor of the production operation. The parts condition data and the quality control data are processed to obtain the second influencing factor of the production operation. The production rhythm correction index is calculated based on the first influencing factor of the production operation and the second influencing factor of the production operation. The real-time production rhythm data of the effective product is obtained based on the production rhythm correction index and the preset product standard production rhythm data. The comprehensive operating speed of the product production line is dynamically adjusted based on the real-time production rhythm data of the effective product and the preset production line product scheduling plan data.
[0077] Please refer to Figure 2 , Figure 2 The flowchart of the artificial intelligence driven intelligent optimization control method provided in the embodiment of the present application for obtaining equipment status data, personnel status data, parts status data, quality control data and product assembly process data. According to the embodiment of the present invention, the acquisition of equipment status data, personnel status data, parts status data, quality control data and product assembly process data of the product production line specifically includes:
[0078] S21. Obtain equipment status data of the product production line, including equipment failure rate data, equipment effective operation time data, equipment maintenance-free standard time data, equipment operation load average data, and equipment operation standard load data;
[0079] S22. Obtaining personnel data of the product production line, including personnel proficiency data, personnel continuous working hours data, and personnel physical condition data;
[0080] S23. Obtaining data on the parts situation of the product production line, including data on the timely supply rate of parts, data on the quality pass rate of parts, and data on the loss of parts assembly;
[0081] S24. Obtain quality control data of the product production line, including data on the strictness of quality inspection standards and the duration of the quality inspection process;
[0082] S25. Obtain product assembly process data of the product production line, including process complexity data and process standardization degree data.
[0083] It should be noted that there are multiple influencing factors in the operation of the product production line. In order to realize intelligent optimization control more comprehensively, it is necessary to obtain equipment status data, personnel status data, parts status data, quality control data and product assembly process data. Equipment status data refers to the operation and use of key equipment in the production line, including equipment failure rate data, equipment effective operation time data, equipment maintenance-free standard time data, equipment operation load mean data and equipment operation standard load data. Equipment failure rate data refers to the probability of equipment failure during use. Equipment effective operation time data refers to the effective working time data of the equipment when it is turned on; equipment maintenance-free standard time data refers to the standard time data from the time the equipment is overhauled to the next maintenance; equipment operation load mean data refers to the average load borne by the equipment during actual operation or work; equipment operation standard load data refers to the standard load borne by the equipment during operation or work; parts assembly loss data refers to the loss data caused by improper operation and other reasons during the production and assembly of product parts; process standardization degree data is data reflecting the degree of standardization in the process assembly process.
[0084] Please refer to Figure 3 , Figure 3 The flowchart of obtaining the operation status data of the production equipment of the artificial intelligence driven intelligent optimization control method provided by the embodiment of the present application. According to the embodiment of the present invention, the equipment condition data is input into the preset production equipment operation index model for processing, the production equipment operation index is obtained, and the production equipment operation index is compared with the preset production equipment operation standard index to obtain the production equipment operation status data, specifically including:
[0085] S31, inputting the equipment failure rate data, equipment effective operation time data, equipment maintenance-free standard time data, equipment operation load mean data and equipment operation standard load data into a preset production equipment operation index model for processing to obtain a production equipment operation index;
[0086] S32, dividing the production equipment operation index by a preset production equipment operation standard index to obtain production equipment operation status data;
[0087] The calculation formula of the production equipment operation index is:
[0088] ;
[0089] in, is the production equipment operation index, is the equipment failure rate data, It is the effective operation time data of the equipment. It is the standard maintenance-free time data of the equipment. is the average data of equipment operating load, It is the standard load data of equipment operation. It is the preset characteristic coefficient (the characteristic coefficient is obtained by querying the preset artificial intelligence driven intelligent optimization control platform).
[0090] It should be noted that the production equipment operation index refers to data that can reflect the equipment operation status to a certain extent. During the operation of the equipment, the operation data may be inconsistent with the standard operation data due to some objective reasons such as equipment wear. In order to better consider the impact of production equipment on the efficiency of the production line, it is necessary to first evaluate the operating status of the equipment, obtain the production equipment operation index through calculation, and then divide the production equipment operation index by the preset production equipment operation standard index to obtain the production equipment operation status data. The production equipment operation status data can more directly obtain the actual operation status of the production equipment, and then more accurately evaluate the operation status of the production line; the preset production equipment operation index model is obtained through training and analysis of a large amount of historical data, and the production equipment operation index can be calculated.
[0091] According to an embodiment of the present invention, the first influencing factor of production operation is calculated based on the production equipment operation status data, personnel situation data and assembly process data, specifically including:
[0092] Input the production equipment operation status data, personnel proficiency data, personnel continuous working time data, personnel physical condition data, process complexity data and process standardization degree data into a preset production operation first influencing factor model to calculate and obtain the production operation first influencing factor;
[0093] The calculation formula of the first influencing factor of production operation in the first influencing factor model of production operation is:
[0094] ;
[0095] in, It is the first influencing factor of production operation. To produce equipment operating status data, For personnel proficiency data, The continuous working time data of personnel, For personnel physical condition data, is the process complexity data, is the process standardization degree data, , It is the preset characteristic coefficient (the characteristic coefficient is obtained by querying the preset artificial intelligence driven intelligent optimization control platform).
[0096] It should be noted that after the production equipment operation status data is determined, the personnel situation data and assembly process data are combined to calculate the first influencing factor of production operation. The personnel proficiency data refers to the proficiency of personnel in the production line. The higher the proficiency, the faster the operation; in the personnel continuous working time data, the larger the data, the more tired the personnel, which will affect the efficiency; the personnel physical condition data refers to the personnel health status data, such as cervical spondylosis, arthritis, etc., which have a certain impact on the work; different products and different parts have different processes. The larger the process complexity data, the slower the assembly production; the larger the process standardization degree data, the higher the efficiency; the first influencing factor of production operation refers to data that can affect the production rhythm to a certain extent; the preset production operation first influencing factor model is obtained through training and analysis of a large amount of historical data, and the first influencing factor of production operation can be calculated.
[0097] According to an embodiment of the present invention, the processing of the component condition data and the quality control data by a preset production operation second influencing factor model to obtain the production operation second influencing factor specifically includes:
[0098] Input the parts supply timeliness rate data, parts quality qualification rate data, parts assembly loss data, quality inspection standard strictness data and quality inspection process duration data into a preset production operation second influencing factor model, and process to obtain the production operation second influencing factor;
[0099] The calculation formula of the second influencing factor of production operation in the second influencing factor model of production operation is:
[0100] ;
[0101] in, It is the second influencing factor of production operation. Provide timely data for parts supply, is the quality qualification rate data of parts and components, For parts assembly loss data, For the strictness data of quality inspection standards, The duration data of the quality inspection process. It is the preset characteristic coefficient (the characteristic coefficient is obtained by querying the preset artificial intelligence driven intelligent optimization control platform).
[0102] It should be noted that in order to reduce the logistics turnover and space occupied by parts in the factory during the production process, a time-zone flow supply model for parts is generally implemented. Therefore, the timeliness of parts supply directly affects the operation of the production line. The parts quality qualification rate data directly reflects the quality qualification of the parts, and to a certain extent, it also affects the operation of the production line; the quality inspection standard strictness data refers to the product in the production process, for different uses or types, even the same parts have different quality inspection requirements. The higher the requirements, the more careful the quality inspection and the lower the fault tolerance; the quality inspection process duration data refers to the time required for the quality inspection process; the second influencing factor of production operation refers to the data that can affect the production rhythm to a certain extent, which is relative to the first influencing factor of production operation, and is a factor that affects the production rhythm; the preset second influencing factor model of production operation is obtained through training and analysis of a large amount of historical data, and the second influencing factor of production operation can be calculated.
[0103] According to an embodiment of the present invention, the calculating and obtaining the production rhythm correction index according to the first production operation influencing factor and the second production operation influencing factor specifically includes:
[0104] Inputting the first production operation influencing factor and the second production operation influencing factor into a preset production rhythm correction index model to obtain a production rhythm correction index;
[0105] The calculation formula of the production cycle correction index in the production cycle correction index model is:
[0106] ;
[0107] in, is the production rhythm correction index, It is the first influencing factor of production operation. It is the second influencing factor of production operation. It is a preset feature (the feature coefficient is obtained by querying the preset artificial intelligence driven intelligent optimization control platform).
[0108] It should be noted that the production cycle refers to the interval time between the consecutive completion of two identical products (or two services, or two batches of products). The first influencing factor of production operation and the second influencing factor of production operation are two important factors affecting the production cycle. The production cycle correction index is calculated based on the first influencing factor of production operation and the second influencing factor of production operation. The production cycle correction index is a coefficient for correcting the standard production cycle. The standard production cycle refers to a generally applicable data obtained through assembly process evaluation, which is universal. However, in order to improve efficiency, it can be more intelligent and accurate to correct different coefficients according to different situations.
[0109] Please refer to Figure 4 , Figure 4 It is a flow chart of obtaining effective product real-time production beat data of the artificial intelligence-driven intelligent optimization control method provided in the embodiment of the present application. According to the embodiment of the present invention, the real-time production beat data of the product is calculated based on the production beat correction index and the preset product standard production beat data, and the threshold value is compared to obtain the effective product real-time production beat data, specifically including:
[0110] S41, multiplying the production rhythm correction index and the preset product standard production rhythm data to obtain the real-time production rhythm data of the product;
[0111] S42, calculating and obtaining beat deviation rate data according to the real-time production beat data of the product and the standard production beat data of the product;
[0112] S43, comparing the beat deviation rate data with a preset beat deviation rate threshold, and obtaining corresponding real-time production beat data of effective products.
[0113] It should be noted that the product standard production cycle data refers to the different standard production cycles of different products or different configurations of the same product due to the different parts and components and different assembly processes and sequences. The real-time production cycle data of the product can be calculated based on the production cycle correction index and the preset product standard production cycle data, that is, the real-time production cycle data of the product; since the difference between the real-time production cycle data of the product and the annual production cycle data of the product is not too large, in order to determine whether the real-time production cycle data of the product fluctuates within the normal range, it is necessary to calculate the cycle deviation rate data. The calculation formula of the cycle deviation rate data is:
[0114] ;
[0115] in, is the beat deviation rate data, Real-time production rhythm data for products, Standard production cycle data for products. is a preset characteristic coefficient (the characteristic coefficient is obtained by querying the preset artificial intelligence driven intelligent optimization control platform);
[0116] Compare the beat deviation rate data with the preset beat deviation rate threshold. If the beat deviation rate data is within the threshold range, it can be adjusted according to the situation to obtain effective real-time production beat data of the product. If the beat deviation rate data is outside the threshold range, it means that it has exceeded the normal fluctuation range and the cause of the abnormality needs to be analyzed. The specific threshold range can be customized according to user needs. In this implementation, the threshold range is [-20%, 20%]. If the beat deviation rate data is 16%, it is effective beat deviation rate data.
[0117] The present invention also discloses an artificial intelligence-driven intelligent optimization control system, comprising a memory and a processor, wherein the memory comprises an artificial intelligence-driven intelligent optimization control method program, and when the artificial intelligence-driven intelligent optimization control method program is executed by the processor, the following steps are implemented:
[0118] Obtain equipment status data, personnel status data, parts status data, quality control data and product assembly process data of product production lines;
[0119] Input the equipment condition data into a preset production equipment operation index model for processing to obtain a production equipment operation index, and compare the production equipment operation index with a preset production equipment operation standard index to obtain production equipment operation status data;
[0120] Calculate and obtain the first influencing factor of production operation according to the production equipment operation status data, personnel situation data and assembly process data;
[0121] The second influencing factor of production operation is obtained by processing the component condition data and the quality control data through a preset second influencing factor model of production operation;
[0122] Calculate the production rhythm correction index according to the first production operation influencing factor and the second production operation influencing factor;
[0123] The real-time production rhythm data of the product is calculated based on the production rhythm correction index and the preset product standard production rhythm data, and the threshold value is compared to obtain the real-time production rhythm data of the valid product;
[0124] The comprehensive operating speed of the product production line is adjusted according to the real-time production rhythm data of the effective products and the preset production line product scheduling plan data.
[0125] It should be noted that the intelligent optimization control technology driven by artificial intelligence can realize the intelligent control of the comprehensive operating speed of the product production line. The comprehensive operating speed of product production refers to the final speed of the production line operation in the product production workshop, taking into account that multiple different models of products will be produced on the same production line at the same time, and taking into account the production speed of each product. In addition to the difference in product models, the same model of products also has different assembly processes and other objective factors, which will also lead to different product assembly times. Therefore, the operating speed of the production line is also different. To realize the intelligent control of the product production line, it is necessary to comprehensively consider various factors. First of all, it is necessary to obtain the equipment status data, personnel status data, parts status data, quality control data of the product production line There are various factors that affect the product production speed. The equipment condition data is processed to obtain the operating status data of the production equipment, and then the operating status data of the production equipment is combined with the personnel condition data and the assembly process data to obtain the first influencing factor of the production operation. The parts condition data and the quality control data are processed to obtain the second influencing factor of the production operation. The production rhythm correction index is calculated based on the first influencing factor of the production operation and the second influencing factor of the production operation. The real-time production rhythm data of the effective product is obtained based on the production rhythm correction index and the preset product standard production rhythm data. The comprehensive operating speed of the product production line is dynamically adjusted based on the real-time production rhythm data of the effective product and the preset production line product scheduling plan data.
[0126] According to an embodiment of the present invention, the acquisition of equipment status data, personnel status data, parts status data, quality control data and product assembly process data of a product production line specifically includes:
[0127] Obtain equipment status data of product production lines, including equipment failure rate data, equipment effective operation time data, equipment maintenance-free standard time data, equipment operation load average data, and equipment operation standard load data;
[0128] Obtain personnel data on the product production line, including personnel proficiency data, personnel continuous working hours data, and personnel physical condition data;
[0129] Obtain data on parts and components of product production lines, including data on the timely supply rate of parts and components, data on the quality pass rate of parts and components, and data on the loss of parts and components during assembly;
[0130] Obtain quality control data for product production lines, including data on the strictness of quality inspection standards and the duration of quality inspection processes;
[0131] Obtain product assembly process data of product production lines, including process complexity data and process standardization degree data.
[0132] It should be noted that there are multiple influencing factors in the operation of the product production line. In order to realize intelligent optimization control more comprehensively, it is necessary to obtain equipment status data, personnel status data, parts status data, quality control data and product assembly process data. Equipment status data refers to the operation and use of key equipment in the production line, including equipment failure rate data, equipment effective operation time data, equipment maintenance-free standard time data, equipment operation load mean data and equipment operation standard load data. Equipment failure rate data refers to the probability of equipment failure during use. Equipment effective operation time data refers to the effective working time data of the equipment when it is turned on; equipment maintenance-free standard time data refers to the standard time data from the time the equipment is overhauled to the next maintenance; equipment operation load mean data refers to the average load borne by the equipment during actual operation or work; equipment operation standard load data refers to the standard load borne by the equipment during operation or work; parts assembly loss data refers to the loss data caused by improper operation and other reasons during the production and assembly of product parts; process standardization degree data is data reflecting the degree of standardization in the process assembly process.
[0133] According to an embodiment of the present invention, the inputting the equipment condition data into a preset production equipment operation index model for processing to obtain a production equipment operation index, and comparing the production equipment operation index with a preset production equipment operation standard index to obtain production equipment operation status data specifically includes:
[0134] Input the equipment failure rate data, equipment effective operation time data, equipment maintenance-free standard time data, equipment operation load mean data and equipment operation standard load data into a preset production equipment operation index model for processing to obtain a production equipment operation index;
[0135] Dividing the production equipment operation index by a preset production equipment operation standard index to obtain production equipment operation status data;
[0136] The calculation formula of the production equipment operation index is:
[0137] ;
[0138] in, is the production equipment operation index, is the equipment failure rate data, It is the effective operation time data of the equipment. It is the standard maintenance-free time data of the equipment. is the average data of equipment operating load, It is the standard load data of equipment operation. It is the preset characteristic coefficient (the characteristic coefficient is obtained by querying the preset artificial intelligence driven intelligent optimization control platform).
[0139] It should be noted that the production equipment operation index refers to data that can reflect the equipment operation status to a certain extent. During the operation of the equipment, the operation data may be inconsistent with the standard operation data due to some objective reasons such as equipment wear. In order to better consider the impact of production equipment on the efficiency of the production line, it is necessary to first evaluate the operating status of the equipment, obtain the production equipment operation index through calculation, and then divide the production equipment operation index by the preset production equipment operation standard index to obtain the production equipment operation status data. The production equipment operation status data can more directly obtain the actual operation status of the production equipment, and then more accurately evaluate the operation status of the production line; the preset production equipment operation index model is obtained through training and analysis of a large amount of historical data, and the production equipment operation index can be calculated.
[0140] According to an embodiment of the present invention, the first influencing factor of production operation is calculated based on the production equipment operation status data, personnel situation data and assembly process data, specifically including:
[0141] Input the production equipment operation status data, personnel proficiency data, personnel continuous working time data, personnel physical condition data, process complexity data and process standardization degree data into a preset production operation first influencing factor model to calculate and obtain the production operation first influencing factor;
[0142] The calculation formula of the first influencing factor of production operation in the first influencing factor model of production operation is:
[0143] ;
[0144] in, It is the first influencing factor of production operation. To produce equipment operating status data, For personnel proficiency data, The continuous working time data of personnel, For personnel physical condition data, is the process complexity data, is the process standardization degree data, , It is the preset characteristic coefficient (the characteristic coefficient is obtained by querying the preset artificial intelligence driven intelligent optimization control platform).
[0145] It should be noted that after the production equipment operation status data is determined, the personnel situation data and assembly process data are combined to calculate the first influencing factor of production operation. The personnel proficiency data refers to the proficiency of personnel in the production line. The higher the proficiency, the faster the operation; in the personnel continuous working time data, the larger the data, the more tired the personnel, which will affect the efficiency; the personnel physical condition data refers to the personnel health status data, such as cervical spondylosis, arthritis, etc., which have a certain impact on the work; different products and different parts have different processes. The larger the process complexity data, the slower the assembly production; the larger the process standardization degree data, the higher the efficiency; the first influencing factor of production operation refers to data that can affect the production rhythm to a certain extent; the preset production operation first influencing factor model is obtained through training and analysis of a large amount of historical data, and the first influencing factor of production operation can be calculated.
[0146] According to an embodiment of the present invention, the processing of the component condition data and the quality control data by a preset production operation second influencing factor model to obtain the production operation second influencing factor specifically includes:
[0147] Input the parts supply timeliness rate data, parts quality qualification rate data, parts assembly loss data, quality inspection standard strictness data and quality inspection process duration data into a preset production operation second influencing factor model, and process to obtain the production operation second influencing factor;
[0148] The calculation formula of the second influencing factor of production operation in the second influencing factor model of production operation is:
[0149] ;
[0150] in, It is the second influencing factor of production operation. Provide timely data for parts supply, is the quality qualification rate data of parts and components, For parts assembly loss data, For the strictness data of quality inspection standards, The duration data of the quality inspection process. It is the preset characteristic coefficient (the characteristic coefficient is obtained by querying the preset artificial intelligence driven intelligent optimization control platform).
[0151] It should be noted that in order to reduce the logistics turnover and space occupied by parts in the factory during the production process, a time-zone flow supply model for parts is generally implemented. Therefore, the timeliness of parts supply directly affects the operation of the production line. The parts quality qualification rate data directly reflects the quality qualification of the parts, and to a certain extent, it also affects the operation of the production line; the quality inspection standard strictness data refers to the product in the production process, for different uses or types, even the same parts have different quality inspection requirements. The higher the requirements, the more careful the quality inspection and the lower the fault tolerance; the quality inspection process duration data refers to the time required for the quality inspection process; the second influencing factor of production operation refers to the data that can affect the production rhythm to a certain extent, which is relative to the first influencing factor of production operation, and is a factor that affects the production rhythm; the preset second influencing factor model of production operation is obtained through training and analysis of a large amount of historical data, and the second influencing factor of production operation can be calculated.
[0152] According to an embodiment of the present invention, the calculating and obtaining the production rhythm correction index according to the first production operation influencing factor and the second production operation influencing factor specifically includes:
[0153] Inputting the first production operation influencing factor and the second production operation influencing factor into a preset production rhythm correction index model to obtain a production rhythm correction index;
[0154] The calculation formula of the production cycle correction index in the production cycle correction index model is:
[0155] ;
[0156] in, is the production rhythm correction index, It is the first influencing factor of production operation. It is the second influencing factor of production operation. It is a preset feature (the feature coefficient is obtained by querying the preset artificial intelligence driven intelligent optimization control platform).
[0157] It should be noted that the production cycle refers to the interval time between the consecutive completion of two identical products (or two services, or two batches of products). The first influencing factor of production operation and the second influencing factor of production operation are two important factors affecting the production cycle. The production cycle correction index is calculated based on the first influencing factor of production operation and the second influencing factor of production operation. The production cycle correction index is a coefficient for correcting the standard production cycle. The standard production cycle refers to a generally applicable data obtained through assembly process evaluation, which is universal. However, in order to improve efficiency, it can be more intelligent and accurate to correct different coefficients according to different situations.
[0158] According to an embodiment of the present invention, the real-time production rhythm data of the product is calculated based on the production rhythm correction index and the preset product standard production rhythm data, and a threshold value is compared to obtain the real-time production rhythm data of the valid product, specifically including:
[0159] Multiplying the production rhythm correction index and the preset product standard production rhythm data to obtain the real-time production rhythm data of the product;
[0160] Calculate the beat deviation rate data according to the real-time production beat data of the product and the standard production beat data of the product;
[0161] The beat deviation rate data is compared with a preset beat deviation rate threshold to obtain corresponding real-time production beat data of effective products.
[0162] It should be noted that the product standard production cycle data refers to the different standard production cycles of different products or different configurations of the same product due to the different parts and components and different assembly processes and sequences. The real-time production cycle data of the product can be calculated based on the production cycle correction index and the preset product standard production cycle data, that is, the real-time production cycle data of the product; since the difference between the real-time production cycle data of the product and the annual production cycle data of the product is not too large, in order to determine whether the real-time production cycle data of the product fluctuates within the normal range, it is necessary to calculate the cycle deviation rate data. The calculation formula of the cycle deviation rate data is:
[0163] ;
[0164] in, is the beat deviation rate data, Real-time production rhythm data for products, Standard production cycle data for products. is a preset characteristic coefficient (the characteristic coefficient is obtained by querying the preset artificial intelligence driven intelligent optimization control platform);
[0165] Compare the beat deviation rate data with the preset beat deviation rate threshold. If the beat deviation rate data is within the threshold range, it can be adjusted according to the situation to obtain effective real-time production beat data of the product. If the beat deviation rate data is outside the threshold range, it means that it has exceeded the normal fluctuation range and the cause of the abnormality needs to be analyzed. The specific threshold range can be customized according to user needs. In this implementation, the threshold range is [-20%, 20%]. If the beat deviation rate data is 16%, it is effective beat deviation rate data.
[0166] The third aspect of the present invention provides a readable storage medium, which includes an artificial intelligence-driven intelligent optimization control method program. When the artificial intelligence-driven intelligent optimization control method program is executed by a processor, the steps of the artificial intelligence-driven intelligent optimization control method as described in any one of the above items are implemented.
[0167] The artificial intelligence-driven intelligent optimization control method, system and medium disclosed in the present invention obtain equipment status data, personnel status data, parts status data, quality control data and product assembly process data of a product production line, obtain the production equipment operation index and equipment operation status data after processing the equipment status data, and then calculate the first influencing factor of production operation in combination with the personnel status data and the assembly process data, and then obtain the second influencing factor of production operation by processing the parts status data and the quality control data, and calculate the production rhythm correction index, and then obtain the real-time production rhythm data of effective products in combination with the preset product standard production rhythm data, and then adjust the comprehensive operation speed of the product production line; thereby, the technology of intelligent optimization control driven by artificial intelligence is realized by calculating the real-time production rhythm data of effective products in the product production line.
[0168] In the several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. The device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as: multiple units or components can be combined, or can be integrated into another system, or some features can be ignored or not executed. In addition, the coupling, direct coupling, or communication connection between the components shown or discussed can be through some interfaces, and the indirect coupling or communication connection of the devices or units can be electrical, mechanical or other forms.
[0169] The units described above as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units; they may be located in one place or distributed on multiple network units; some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0170] In addition, all functional units in the embodiments of the present invention may be integrated into one processing unit, or each unit may be separately used as a unit, or two or more units may be integrated into one unit; the above-mentioned integrated units may be implemented in the form of hardware or in the form of hardware plus software functional units.
[0171] Those skilled in the art can understand that: all or part of the steps of implementing the above method embodiments can be completed by hardware related to program instructions, the aforementioned program can be stored in a readable storage medium, and when the program is executed, it executes the steps of the above method embodiments; and the aforementioned storage medium includes: mobile storage devices, read-only memories (ROM, Read-Only Memory), random access memories (RAM, Random Access Memory), disks or optical disks, and other media that can store program codes.
[0172] Alternatively, if the above-mentioned integrated unit of the present invention is implemented in the form of a software function module and sold or used as an independent product, it can also be stored in a readable storage medium. Based on this understanding, the technical solution of the embodiment of the present invention can be essentially or partly reflected in the form of a software product that contributes to the prior art. The software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to execute all or part of the methods described in each embodiment of the present invention. The aforementioned storage medium includes: various media that can store program codes, such as mobile storage devices, ROM, RAM, magnetic disks or optical disks.
Claims
1. An artificial intelligence driven intelligent optimization control method, characterized in that: include: Obtain equipment status data, personnel status data, parts status data, quality control data and product assembly process data of product production lines; Input the equipment condition data into a preset production equipment operation index model for processing to obtain a production equipment operation index, and compare the production equipment operation index with a preset production equipment operation standard index to obtain production equipment operation status data; Calculate and obtain the first influencing factor of production operation according to the production equipment operation status data, personnel situation data and assembly process data; The second influencing factor of production operation is obtained by processing the component condition data and the quality control data through a preset second influencing factor model of production operation; Calculate the production rhythm correction index according to the first production operation influencing factor and the second production operation influencing factor; The real-time production rhythm data of the product is calculated based on the production rhythm correction index and the preset product standard production rhythm data, and the threshold value is compared to obtain the real-time production rhythm data of the valid product; Adjust the comprehensive operating speed of the product production line according to the real-time production rhythm data of the effective product and the preset production line product scheduling plan data; The acquisition of equipment status data, personnel status data, parts status data, quality control data and product assembly process data of the product production line specifically includes: Obtain equipment status data of product production lines, including equipment failure rate data, equipment effective operation time data, equipment maintenance-free standard time data, equipment operation load average data, and equipment operation standard load data; Obtain personnel data on the product production line, including personnel proficiency data, personnel continuous working hours data, and personnel physical condition data; Obtain data on parts and components of product production lines, including data on the timely supply rate of parts and components, data on the quality pass rate of parts and components, and data on the loss of parts and components during assembly; Obtain quality control data for product production lines, including data on the strictness of quality inspection standards and the duration of quality inspection processes; Obtain product assembly process data of product production lines, including process complexity data and process standardization degree data; The inputting the equipment condition data into a preset production equipment operation index model for processing to obtain a production equipment operation index, and comparing the production equipment operation index with a preset production equipment operation standard index to obtain production equipment operation status data specifically includes: Input the equipment failure rate data, equipment effective operation time data, equipment maintenance-free standard time data, equipment operation load mean data and equipment operation standard load data into a preset production equipment operation index model for processing to obtain a production equipment operation index; Dividing the production equipment operation index by a preset production equipment operation standard index to obtain production equipment operation status data; The calculation formula of the production equipment operation index is: ; in, is the production equipment operation index, is the equipment failure rate data, It is the effective operation time data of the equipment. It is the standard maintenance-free time data of the equipment. is the average data of equipment operating load, It is the standard load data of equipment operation. is the preset characteristic coefficient; The step of calculating the first influencing factor of production operation according to the production equipment operation status data, personnel situation data and assembly process data specifically includes: Input the production equipment operation status data, personnel proficiency data, personnel continuous working time data, personnel physical condition data, process complexity data and process standardization degree data into a preset production operation first influencing factor model to calculate and obtain the production operation first influencing factor; The calculation formula of the first influencing factor of production operation in the first influencing factor model of production operation is: ; in, It is the first influencing factor of production operation. To produce equipment operating status data, For personnel proficiency data, The continuous working time data of personnel, For personnel physical condition data, is the process complexity data, is the process standardization degree data, is the preset characteristic coefficient; The obtaining of the second production operation influencing factor by processing the component condition data and the quality control data through a preset production operation second influencing factor model specifically includes: Input the parts supply timeliness rate data, parts quality qualification rate data, parts assembly loss data, quality inspection standard strictness data and quality inspection process duration data into a preset production operation second influencing factor model, and process to obtain the production operation second influencing factor; The calculation formula of the second influencing factor of production operation in the second influencing factor model of production operation is: ; in, It is the second influencing factor of production operation. Provide timely data for parts supply, is the quality qualification rate data of parts and components, For parts assembly loss data, For the strictness data of quality inspection standards, The duration data of the quality inspection process. is the preset characteristic coefficient; The step of calculating the real-time production rhythm data of the product based on the production rhythm correction index and the preset product standard production rhythm data and performing threshold comparison to obtain the real-time production rhythm data of the valid product specifically includes: Multiplying the production beat correction index and the preset product standard production beat data to obtain the real-time production beat data of the product; Calculate the beat deviation rate data according to the real-time production beat data of the product and the standard production beat data of the product; Compare the beat deviation rate data with a preset beat deviation rate threshold value to obtain corresponding real-time production beat data of effective products; If the beat deviation rate data is within the threshold range, it is the real-time production beat data of the valid product.
2. The artificial intelligence driven intelligent optimization control method according to claim 1, characterized in that: The step of calculating the production rhythm correction index according to the first production operation influencing factor and the second production operation influencing factor specifically includes: Inputting the first production operation influencing factor and the second production operation influencing factor into a preset production rhythm correction index model to obtain a production rhythm correction index; The calculation formula of the production cycle correction index in the production cycle correction index model is: ; in, is the production rhythm correction index, It is the first influencing factor of production operation. It is the second influencing factor of production operation. is the preset characteristic coefficient.
3. An artificial intelligence driven intelligent optimization control system, characterized in that: The invention comprises a memory and a processor, wherein the memory comprises an artificial intelligence-driven intelligent optimization control method program, and when the artificial intelligence-driven intelligent optimization control method program is executed by the processor, the following steps are implemented: Obtain equipment status data, personnel status data, parts status data, quality control data and product assembly process data of product production lines; Input the equipment condition data into a preset production equipment operation index model for processing to obtain a production equipment operation index, and compare the production equipment operation index with a preset production equipment operation standard index to obtain production equipment operation status data; Calculate and obtain the first influencing factor of production operation according to the production equipment operation status data, personnel situation data and assembly process data; The second influencing factor of production operation is obtained by processing the component condition data and the quality control data through a preset second influencing factor model of production operation; Calculate the production rhythm correction index according to the first production operation influencing factor and the second production operation influencing factor; The real-time production rhythm data of the product is calculated based on the production rhythm correction index and the preset product standard production rhythm data, and the threshold value is compared to obtain the real-time production rhythm data of the valid product; Adjust the comprehensive operation speed of the product production line according to the real-time production rhythm data of the effective product and the preset production line product scheduling plan data; The acquisition of equipment status data, personnel status data, parts status data, quality control data and product assembly process data of the product production line specifically includes: Obtain equipment status data of product production lines, including equipment failure rate data, equipment effective operation time data, equipment maintenance-free standard time data, equipment operation load average data, and equipment operation standard load data; Obtain personnel data on the product production line, including personnel proficiency data, personnel continuous working hours data, and personnel physical condition data; Obtain data on parts and components of product production lines, including timely supply rate of parts and components, qualified quality rate of parts and components, and loss of parts and components during assembly; Obtain quality control data for product production lines, including data on the strictness of quality inspection standards and the duration of quality inspection processes; Obtain product assembly process data of product production lines, including process complexity data and process standardization degree data; The inputting the equipment condition data into a preset production equipment operation index model for processing to obtain a production equipment operation index, and comparing the production equipment operation index with a preset production equipment operation standard index to obtain production equipment operation status data specifically includes: Input the equipment failure rate data, equipment effective operation time data, equipment maintenance-free standard time data, equipment operation load mean data and equipment operation standard load data into a preset production equipment operation index model for processing to obtain a production equipment operation index; Dividing the production equipment operation index by a preset production equipment operation standard index to obtain production equipment operation status data; The calculation formula of the production equipment operation index is: ; in, is the production equipment operation index, is the equipment failure rate data, It is the effective operation time data of the equipment. It is the standard maintenance-free time data of the equipment. is the average data of equipment operating load, It is the standard load data of equipment operation. is the preset characteristic coefficient; The step of calculating the first influencing factor of production operation according to the production equipment operation status data, personnel situation data and assembly process data specifically includes: Input the production equipment operation status data, personnel proficiency data, personnel continuous working time data, personnel physical condition data, process complexity data and process standardization degree data into a preset production operation first influencing factor model to calculate and obtain the production operation first influencing factor; The calculation formula of the first influencing factor of production operation in the first influencing factor model of production operation is: ; in, It is the first influencing factor of production operation. To produce equipment operating status data, For personnel proficiency data, The continuous working time data of personnel, For personnel physical condition data, is the process complexity data, is the process standardization degree data, is the preset characteristic coefficient; The processing of the component condition data and the quality control data by a preset production operation second influencing factor model to obtain the production operation second influencing factor specifically includes: Input the parts supply timeliness rate data, parts quality qualification rate data, parts assembly loss data, quality inspection standard strictness data and quality inspection process duration data into a preset production operation second influencing factor model, and process to obtain the production operation second influencing factor; The calculation formula of the second influencing factor of production operation in the second influencing factor model of production operation is: ; in, It is the second influencing factor of production operation. Provide timely data for parts supply, is the quality qualification rate data of parts and components, For parts assembly loss data, For the strictness data of quality inspection standards, The duration data of the quality inspection process. is the preset characteristic coefficient; The step of calculating the real-time production rhythm data of the product based on the production rhythm correction index and the preset product standard production rhythm data and performing threshold comparison to obtain the real-time production rhythm data of the valid product specifically includes: Multiplying the production beat correction index and the preset product standard production beat data to obtain the real-time production beat data of the product; Calculate the beat deviation rate data according to the real-time production beat data of the product and the standard production beat data of the product; Compare the beat deviation rate data with a preset beat deviation rate threshold value to obtain corresponding real-time production beat data of effective products; If the beat deviation rate data is within the threshold range, it is the real-time production beat data of the valid product.
4. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes an artificial intelligence-driven intelligent optimization control method program. When the artificial intelligence-driven intelligent optimization control method program is executed by a processor, the steps of the artificial intelligence-driven intelligent optimization control method as described in any one of claims 1 to 2 are implemented.
Citation Information
Patent Citations
Production plan intelligent planning method and system based on big data, and medium
CN116523262A
Multi-dimensional intelligent report analyzing and processing system
CN117350604A
Quantitative evaluation method, device and equipment for real-time production and operation conditions of enterprise and medium