A fault alarm device for monitoring power distribution cabinets in power grids

By designing a sliding equipment rack and a spiral arm structure in the power distribution cabinet, the isolation of faulty electrical components is achieved, and high-pressure carbon dioxide is quickly ejected through the spiral pipe, which solves the problem in the existing technology that the transfer of faulty equipment affects the monitoring equipment and ensures Safety monitoring and fire response of distribution cabinets.

CN118508282BActive Publication Date: 2024-10-18GUANGDONG TIANAN PROJECT MANAGEMENT CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410947434.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-10-18
Estimated Expiration
2044-07-16

AI Technical Summary

Technical Problem

When the faulty equipment in the existing power distribution cabinet is transferred to the guide base, it is easy to affect the monitoring equipment and the gas storage tank in the guide base, causing a chain reaction and making it impossible to effectively extinguish the faulty equipment or monitor and alarm.

Method used

A fault alarm device for power grid distribution cabinets is designed, which includes a cabinet, an alarm installed on the cabinet, and a monitoring mechanism installed in the cabinet. Through the vertically sliding equipment rack and cover, the device uses a rotating The arms and elastic parts realize the sliding closure of the partition to avoid the impact of faulty equipment on the monitoring mechanism, and realize the rapid ejection of high-pressure carbon dioxide through the coil and docking groove.

Benefits of technology

It realizes the isolation of abnormal electrical components, avoids damage, ensures the continued operation of the monitoring mechanism, simplifies equipment procedures and improves reliability, and ensures safe monitoring and rapid fire response of power distribution cabinets.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118508282B_ABST
    Figure CN118508282B_ABST
Patent Text Reader

Abstract

The present invention discloses a fault alarm device for monitoring power distribution cabinets in power grids, including a cabinet, an alarm and a monitoring mechanism; an equipment rack is vertically slidable in the cabinet, two partitions are vertically slidable in the shield, an elastic member for driving two spiral arms distributed on the same side to open is arranged in the shell; a second driving member is arranged on the equipment rack; a gas storage chamber is installed on the top of the cabinet, and a transverse pipe is fixedly arranged in the butt joint pipe. In the present invention, firstly, when the shield isolates abnormal electrical components, the partition of the shield toward the outer frame opening can avoid the damaged electrical components from affecting the monitoring mechanism, which is beneficial to the monitoring mechanism's subsequent continued monitoring of the power distribution cabinet; secondly, after the two partitions are closed, as the spiral tube rotates, the pipeline and the shield are automatically connected, thereby realizing the rapid ejection of high-pressure carbon dioxide, which is beneficial to simplifying the equipment operation procedure while improving the reliability of the equipment operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of distribution cabinet fault detection devices, and in particular to a fault alarm device for monitoring a power distribution cabinet of a power grid. Background Art

[0002] The power distribution cabinet is a general term for the motor control center and is the final equipment of the power distribution system. The fault monitoring and alarm system can monitor the operation of the electrical components in the power distribution cabinet, which is conducive to the staff to maintain the abnormal electrical components in time.

[0003] According to the prior art, a fault alarm device with Chinese patent application number 202310361088.9 detects that a device installed in a power distribution cabinet has a fault through a smoke sensor. The device clamps the faulty device to the guide seat through a clamp, and then controls the flipping of the guide seat to isolate the faulty device, so as to avoid a chain reaction between the faulty device and a large number of other components in the power distribution cabinet, resulting in damage to other components. However, since the smoke sensor, fill light and camera for equipment fault detection are all installed in the guide seat, when the faulty device is transferred to the guide seat, it is easy to affect the monitoring device in the guide seat and the gas tank installed on the rear side of the guide seat, resulting in a chain reaction. If the electric control valve of the gas tank fails, it will not be able to meet the fire extinguishing and firefighting treatment of the faulty equipment. If the monitoring device in the guide seat fails, it will be unfavorable for the monitoring device to continue to monitor and alarm the distribution box.

[0004] In view of the above-mentioned defects, a fault alarm device for monitoring a power distribution cabinet in a power grid is provided. Summary of the invention

[0005] The purpose of the present invention is to solve the above-mentioned problem and to propose a fault alarm device for monitoring a power distribution cabinet in a power grid.

[0006] In order to achieve the above-mentioned object, the present invention adopts the following technical scheme: a fault alarm device for monitoring a power distribution cabinet of a power grid, comprising a cabinet, an alarm installed on the cabinet, and a monitoring mechanism arranged in the cabinet;

[0007] An equipment rack installed and mounted in cooperation with the monitoring mechanism is vertically slidable in the cabinet, a first driving member for driving the equipment rack to move vertically is provided in the cabinet, a shield is slidably provided on the inner side of the equipment rack, two partitions are vertically slidable in the shield, a swivel arm for controlling the partition to slide relative to the shield is rotatably connected to the side end of the shield, a shell is slidably provided on the side end of the shield, and an elastic member for driving two swivel arms distributed on the same side to open is provided in the shell;

[0008] The equipment frame is provided with a second driving member for driving the shield to move horizontally relative to the equipment frame, and a pressing member is provided at the side end of the shield. When the shield is away from the partition, the shell will move horizontally relative to the shield under the action of the pressing member, and the two partitions will slide closed under the action of the rotary arm.

[0009] A docking pipe is fixedly connected to the cover, an air storage chamber is installed on the top of the cabinet, a pipeline is connected between the air storage chamber and the docking pipe, a transverse pipe is fixedly provided in the docking pipe, a hole groove is formed through the transverse pipe, a rotary tube is rotatably connected inside the transverse tube, a docking groove that matches the hole groove and is connected to the rotary tube is formed, and a guide member for adjusting the docking state of the hole groove and the docking groove is provided on the cabinet.

[0010] Preferably, a cross bar is fixedly provided on the side end of the partition, and a sliding groove cooperating with the sliding of the cross bar is formed in the rotary arm.

[0011] Preferably, the elastic member includes two sliding arms slidably arranged in the shell and corresponding to the swing arm, the sliding arm is rotatably connected to the swing arm, a sliding rod slidably connected to the two sliding arms is arranged in the shell, and a compression spring is arranged on the outer side of the sliding rod for reversely acting on the two sliding arms.

[0012] Preferably, the second driving member includes a screw rod rotatably connected to the inner side of the equipment frame, a first motor for controlling the rotation of the screw rod is installed at the outer end of the equipment frame, and a screw sleeve screwed and connected to the screw rod is fixed at the side end of the cover.

[0013] Preferably, the pressing member is a push plate fixed to the free end of the screw rod.

[0014] Preferably, the guide member includes a sliding sleeve slidably connected to the shield, a frame plate fixed on the shield, a pressure member driving the sliding sleeve away from the frame plate, and a magnetic member driving the sliding sleeve toward the frame plate. The frame plate is rotatably connected to a horizontal axis coaxially fixed with the rotary tube, and the sliding sleeve is slidably arranged on the outside of the horizontal axis.

[0015] Preferably, a protrusion is formed on the inner wall of the sliding sleeve, and a slide rail that slides in cooperation with the protrusion is formed on the side wall of the transverse shaft, and the slide rail is a spiral structure.

[0016] Preferably, the pressing member is a return spring which is sleeved on the outside of the horizontal axis and acts on the sliding sleeve by abutting against the frame plate.

[0017] Preferably, the magnetic attraction member comprises a magnetic sheet, the sliding sleeve is fixed to the magnetic sheet by sliding through a frame rod of the frame plate, and a magnetic block cooperating with the magnetic sheet for adsorption is fixedly disposed at the inner end of the partition.

[0018] Preferably, the first driving member comprises a bracket fixedly mounted on a side end of the equipment frame, a lead screw rotatably connected to the bracket is disposed in the cabinet, and a second motor for controlling the rotation of the lead screw is mounted on the cabinet.

[0019] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:

[0020] 1. In the present application, the shield is controlled to be horizontally close to the electrical components, so that the partition slides and closes the outward frame opening of the shield under the action of the swing arm. When the inward frame opening of the shield is engaged with the inner wall of the cabinet, the abnormal electrical components are isolated. At the same time, the partition of the outward frame opening of the shield can prevent the damaged electrical components from affecting the monitoring mechanism, which is beneficial to the subsequent monitoring of the distribution cabinet by the monitoring mechanism.

[0021] 2. In the present application, the abnormal electrical components are isolated by covering, so that after the two partitions are closed, as the coil rotates, the pipeline and the cover are automatically connected, thereby achieving rapid ejection of high-pressure carbon dioxide, which is conducive to simplifying the equipment operation procedure while improving the reliability of equipment operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 A three-dimensional schematic diagram of a power distribution cabinet provided according to an embodiment of the present invention is shown;

[0023] Figure 2 A cross-sectional schematic diagram of a power distribution cabinet provided according to an embodiment of the present invention is shown;

[0024] Figure 3 A schematic diagram of the inner structure of a device rack provided according to an embodiment of the present invention is shown;

[0025] Figure 4 A schematic top-sectional view of a device rack provided according to an embodiment of the present invention is shown;

[0026] Figure 5 A schematic diagram of the matching structure of a butt joint pipe and a coil provided according to an embodiment of the present invention is shown.

[0027] Legend:

[0028] 1. Cabinet; 2. Shield; 3. Partition; 4. Swivel arm; 5. Shell; 6. Slide arm; 7. Slide rod; 8. Compression spring; 9. Bracket; 10. Screw sleeve; 11. Equipment rack; 12. Monitoring mechanism; 13. Screw rod; 14. Push plate; 15. First motor; 16. Butt joint; 17. Pipeline; 18. Horizontal pipe; 19. Hole groove; 20. Swivel pipe; 21. Butt joint groove; 22. Horizontal axis; 23. Slide rail; 24. Shelf; 25. Reset spring; 26. Slide sleeve; 27. Protrusion; 28. Magnetic sheet; 29. ​​Magnetic block; 30. Lead screw; 31. Second motor; 32. Gas storage chamber; 33. Alarm. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] See also Figure 1-5 The present invention provides a technical solution: a fault alarm device for monitoring a power distribution cabinet of a power grid, comprising a cabinet 1, an alarm 33 installed on the cabinet 1, and a monitoring mechanism 12 arranged in the cabinet 1; the monitoring mechanism 12 is an existing smoke sensor, a camera, and a fill light. When the smoke sensor detects that an electrical component in the cabinet 1 is abnormal, the monitoring information will be transmitted to the controller, and the controller will control the alarm 33 to issue an alarm prompt.

[0031] An equipment rack 11 is vertically slidable in the cabinet 1 and is installed and erected to cooperate with a monitoring mechanism 12. A first driving member is provided in the cabinet 1 to drive the equipment rack 11 to move vertically. A cover 2 is slidably provided on the inner side of the equipment rack 11. Two partitions 3 are vertically slid in the cover 2. The side ends of the cover 2 are rotatably connected to a swing arm 4 for controlling the partition 3 to slide relative to the cover 2. A shell 5 is slidably provided on the side ends of the cover 2, and an elastic member is provided in the shell 5 to drive the two swing arms 4 distributed on the same side to open. The equipment rack 11 is controlled to move in the vertical direction by the first driving member, so that the monitoring mechanism 12 moves vertically in the cabinet 1 with the equipment rack 11, and the electronic components installed in the cabinet 1 are inspected to realize the coverage monitoring operation of various components.

[0032] When the monitoring mechanism 12 moves vertically with the equipment rack 11 , the swing arm 4 drives the two partitions 3 to open under the action of the elastic member, so that the monitoring mechanism 12 can monitor the electrical components installed in the cabinet 1 through the frame opening of the cover 2 .

[0033] The equipment frame 11 is provided with a second driving member for driving the shield 2 to move horizontally relative to the equipment frame 11. A pressing member is provided at the side end of the shield 2. When the shield 2 moves away from the partition 3, the shell 5 will move horizontally relative to the shield 2 under the action of the pressing member, and the two partitions 3 will slide closed under the action of the rotary arm 4.

[0034] When the equipment rack 11 detects an abnormality in a component in the cabinet 1 during inspection and the component needs to be urgently isolated, the second driving member controls the shield 2 to move horizontally toward the electrical component. During this process, the partition 3 will slide and close the outward frame opening of the shield 2 under the action of the swing arm 4 until the inward frame opening of the shield 2 is completely engaged with the inner wall of the cabinet 1, thereby isolating the abnormal electrical component to prevent the abnormal electrical component from affecting the surrounding components. At the same time, the partition 3 separates the outward frame opening of the shield 2 to prevent damaged electrical components from affecting the monitoring mechanism 12.

[0035] A docking pipe 16 is fixedly provided on the cover 2, an air storage chamber 32 is installed on the top of the cabinet 1, a pipe 17 is connected between the air storage chamber 32 and the docking pipe 16, a transverse pipe 18 is fixedly provided in the docking pipe 16, a hole groove 19 is formed through the transverse pipe 18, a rotary tube 20 is rotatably connected inside the transverse tube 18, a docking groove 21 is formed in the rotary tube 20 and is connected to the hole groove 19, and a guide member for adjusting the docking state of the hole groove 19 and the docking groove 21 is provided on the cabinet 1.

[0036] When the monitoring mechanism 12 is inspecting the equipment rack 11, the docking groove 21 and the hole groove 19 on the coil 20 are in a staggered state. At this time, the docking tube 16 and the mask 2 are in a non-connected state until the mask 2 completes the isolation of the abnormal electrical components. The coil 20 will rotate so that the docking groove 21 and the hole groove 19 are aligned, so that the high-pressure carbon dioxide in the gas storage chamber 32 is sprayed into the mask 2 through the pipe 17, which plays a role in fire extinguishing.

[0037] Specifically, Figure 3 and Figure 4 As shown, a cross bar is fixedly provided at the side end of the partition 3, and a sliding groove is formed in the swing arm 4 to cooperate with the sliding of the cross bar; the elastic member includes two sliding arms 6 which are slidably arranged in the shell sleeve 5 and correspond to the swing arm 4, the sliding arm 6 is rotatably connected to the swing arm 4, and a sliding rod 7 which is slidably connected to the two sliding arms 6 is arranged in the shell sleeve 5, and a compression spring 8 which acts on the two sliding arms 6 in the opposite direction is arranged on the outer side of the sliding rod 7.

[0038] When the swing arm 4 rotates, the slide slot will drive the partition 3 to slide along the cover 2 by pressing the cross bar. When the cover 2 is close to the equipment rack 11, the shell 5 is not pushed by the pressing member. At this time, the two slide arms 6 will, under the action of the compression spring 8, press the two swing arms 4 distributed on the same side to drive the two partitions 3 to open.

[0039] Specifically, Figure 2-4As shown, the second driving member includes a screw 13 rotatably connected to the inner side of the equipment frame 11, and a first motor 15 for controlling the rotation of the screw 13 is installed at the outer end of the equipment frame 11. A screw sleeve 10 screwed together with the screw 13 is fixed to the side end of the cover 2; the pressing member is a push plate 14 fixed to the free end of the screw 13.

[0040] Start the first motor 15 to control the screw 13 to rotate, so that the screw sleeve 10 screwed with the screw 13 drives the shield 2 fixed thereto to slide horizontally relative to the equipment frame 11. When the shield 2 slides away from the equipment frame 11, until the monitoring mechanism 12 installed on the equipment frame 11 is pulled out of the shield 2, as the shield 2 continues to slide away from the equipment frame 11, the push plate 14 fixed on the screw 13 will act on the side wall of the shell 5 to drive the shell 5 to slide horizontally relative to the shield 2. In this process, the sliding arm 6 slidably connected in the shell 5 will drive the two partitions 3 to move synchronously in opposite directions by pulling the swing arm 4 until the port of the shield 2 is engaged with the cabinet 1 and the two partitions 3 are in a closed state. The shell 5 sliding sleeve is arranged on the outside of the screw 13.

[0041] Specifically, Figure 3 and Figure 5 As shown, the guide member includes a sleeve 26 slidably connected to the shield 2, a frame plate 24 fixed on the shield 2, a pressure member driving the sleeve 26 away from the frame plate 24, and a magnetic member driving the sleeve 26 to stick to the frame plate 24. A transverse shaft 22 coaxially fixed to the spiral tube 20 is rotatably connected to the frame plate 24, and the sleeve 26 is slidably sleeved on the outside of the transverse shaft 22; a protrusion 27 is formed on the inner wall of the sleeve 26, and a slide rail 23 for sliding with the protrusion 27 is formed on the side wall of the transverse shaft 22, and the slide rail 23 is a spiral structure; the pressure member is sleeved on the outside of the transverse shaft 22, and acts on the reset spring 25 of the sleeve 26 by abutting the frame plate 24; the magnetic member includes a magnetic sheet 28, and the sleeve 26 is fixed to the magnetic sheet 28 by a frame rod sliding through the frame plate 24, and a magnetic block 29 for adsorbing the magnetic sheet 28 is fixed on the inner end of the partition 3.

[0042] When the monitoring mechanism 12 moves with the equipment rack 11 for inspection, the two partitions 3 remain in an open state. During this process, the magnetic block 29 and the magnetic sheet 28 are in a vertically staggered state. The sliding sleeve 26 will be in a position close to the docking pipe 16 under the action of the reset spring 25. At this time, the docking groove 21 formed on the spiral tube 20 is staggered with the hole groove 19. When the shield 2 moves away from the equipment rack 11, until the two partitions 3 slide and close, the magnetic block 29 and the magnetic sheet 28 fixed on the partition 3 are in the same straight line distribution. At this time, the magnetic sheet 28 will drive the sliding sleeve 26 to slide toward the frame plate 24 under the magnetic attraction of the magnetic block 29. During this process, the protrusion 27 fixed on the inner wall of the sliding sleeve 26 will slide along the slide rail 23. Through the compression transmission of the protrusion 27 on the slide rail 23, the spiral tube 20 fixed to the horizontal axis 22 is driven to rotate until the magnetic sheet 28 and the magnetic block 29 complete the magnetic attraction and fit, and the docking groove 21 is aligned with the hole groove 19.

[0043] The abnormal electrical components are isolated by the mask 2, so that after the two partitions 3 are closed, as the coil 20 rotates, the pipeline 17 and the mask 2 are automatically connected, thereby realizing the rapid ejection of high-pressure carbon dioxide, which is beneficial to simplify the equipment operation procedure and improve the reliability of equipment operation.

[0044] Specifically, Figure 1 and Figure 2 As shown, the first driving member includes a bracket 9 fixed to the side end of the equipment frame 11, a lead screw 30 screwed to the bracket 9 is rotatably connected in the cabinet 1, and a second motor 31 for controlling the rotation of the lead screw 30 is installed on the cabinet 1. The second motor 31 is started to control the rotation of the lead screw 30, so that the bracket 9 screwed to the lead screw 30 drives the equipment frame 11 to move in the vertical direction.

[0045] The above description of the embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A fault alarm device for monitoring a power distribution cabinet in a power grid, comprising a cabinet (1), an alarm (33) mounted on the cabinet (1), and a monitoring mechanism (12) arranged in the cabinet (1), characterized in that: The cabinet (1) has an equipment rack (11) mounted and arranged to cooperate with the monitoring mechanism (12) and slides vertically therein; the cabinet (1) is provided with a first driving member for driving the equipment rack (11) to move vertically; a shield (2) is slidably arranged on the inner side of the equipment rack (11); two partitions (3) are vertically slidably arranged in the shield (2); a swivel arm (4) for controlling the partition (3) to slide relative to the shield (2) is rotatably connected to the side end of the shield (2); a shell (5) is slidably arranged on the side end of the shield (2); and an elastic member for driving two swivel arms (4) distributed on the same side to open is arranged in the shell (5); The equipment frame (11) is provided with a second driving member for driving the shield (2) to move horizontally relative to the equipment frame (11), and a pressing member is provided at the side end of the shield (2). When the shield (2) moves away from the partition (3), the shell (5) will move horizontally relative to the shield (2) under the action of the pressing member, and the two partitions (3) will slide and close the outward frame opening of the shield (2) under the action of the swing arm (4) until the inward frame opening of the shield (2) is completely engaged with the inner wall of the cabinet (1); A butt joint pipe (16) is fixedly connected to the cover (2), an air storage chamber (32) is installed on the top of the cabinet (1), a pipe (17) is connected between the air storage chamber (32) and the butt joint pipe (16), a transverse pipe (18) is fixedly provided in the butt joint pipe (16), a hole groove (19) is formed through the transverse pipe (18), a rotary pipe (20) is rotatably connected inside the transverse pipe (18), a butt joint groove (21) is formed in the rotary pipe (20) and is matched with the hole groove (19) for butt joint communication, and a guide member for adjusting the butt joint state between the hole groove (19) and the butt joint groove (21) is provided on the cabinet (1); The second driving member comprises a screw rod (13) rotatably connected to the inner side of the equipment frame (11); a first motor (15) for controlling the rotation of the screw rod (13) is mounted on the outer end of the equipment frame (11); a screw sleeve (10) screwed together with the screw rod (13) is fixedly disposed at the side end of the shield (2); and the pressing member is a push plate (14) fixedly disposed at the free end of the screw rod (13); The guide member comprises a sliding sleeve (26) slidably connected to the shield (2), a frame plate (24) fixedly mounted on the shield (2), a pressing member for driving the sliding sleeve (26) away from the frame plate (24), and a magnetic attraction member for driving the sliding sleeve (26) toward the frame plate (24); a transverse shaft (22) coaxially fixed with the rotary tube (20) is rotatably connected to the frame plate (24), and the sliding sleeve (26) is slidably mounted on the outside of the transverse shaft (22); The inner wall of the sliding sleeve (26) is formed with a protrusion (27), and the side wall of the transverse shaft (22) is formed with a slide rail (23) that slides in cooperation with the protrusion (27), and the slide rail (23) is a spiral structure; The magnetic attraction member comprises a magnetic sheet (28), the sliding sleeve (26) is fixed to the magnetic sheet (28) by means of a frame rod that slides through the frame plate (24), and a magnetic block (29) that cooperates with the magnetic sheet (28) to be attracted is fixedly provided at the inner end of the partition plate (3); Until the two partitions (3) slide closed, the magnetic block (29) and the magnetic sheet (28) fixed on the partition (3) are in the same straight line distribution, at this time, the magnetic sheet (28) will drive the sliding sleeve (26) to slide towards the frame plate (24) under the magnetic attraction of the magnetic block (29), and in this process, the protrusion (27) fixed on the inner wall of the sliding sleeve (26) will slide along the slide rail (23), and the protrusion (27) will press the slide rail (23) to drive the spiral tube (20) fixed to the horizontal axis (22) to rotate until the magnetic sheet (28) and the magnetic block (29) are magnetically attached, the docking groove (21) is aligned with the hole groove (19), and the pipeline (17) and the mask (2) are automatically connected, so as to achieve the rapid ejection of high-pressure carbon dioxide.

2. A fault alarm device for monitoring a power distribution cabinet in a power grid according to claim 1, characterized in that: A cross bar is fixedly provided at the side end of the partition plate (3), and a sliding groove cooperating with the sliding of the cross bar is formed in the rotary arm (4).

3. A fault alarm device for monitoring a power distribution cabinet in a power grid according to claim 2, characterized in that: The elastic member comprises two sliding arms (6) slidably arranged in the shell (5) and corresponding to the swing arms (4); the sliding arms (6) are rotatably connected to the swing arms (4); a sliding rod (7) slidably connected to the two sliding arms (6) is arranged in the shell (5); and a compression spring (8) for acting on the two sliding arms (6) in opposite directions is sleeved on the outer side of the sliding rod (7).

4. A fault alarm device for monitoring a power distribution cabinet in a power grid according to claim 1, characterized in that: The pressing member is a return spring (25) which is sleeved on the outside of the horizontal axis (22) and acts on the sliding sleeve (26) by abutting against the frame plate (24).

5. A fault alarm device for monitoring a power distribution cabinet in a power grid according to claim 1, characterized in that: The first driving member comprises a bracket (9) fixedly mounted on a side end of the equipment frame (11); a lead screw (30) is rotatably connected in the cabinet (1) and is screwed to the bracket (9); and a second motor (31) for controlling the rotation of the lead screw (30) is mounted on the cabinet (1).

Citation Information

Patent Citations

  • A fault alarm device

    CN116092276B

  • High-safety power distribution cabinet for electromechanical equipment

    CN115719923A

  • Load monitoring device for power distribution network

    CN117239565A

  • Power distribution cabinet

    CN219477285U

  • Maintenance box

    CN220585804U