Auxiliary construction device and construction method for non-prestressed cast-in-place box beam

By using devices such as guide rails, mobile cranes, flexible mixing rods and rotating drive mechanisms in the construction of non-prestressed cast-in-place box beams, the problem of uneven distribution of concrete slurry is solved and the uniform distribution of concrete within the box beams is achieved. Improved construction efficiency and quality.

CN118516925BActive Publication Date: 2024-10-08CHINA METALLURGICAL ROAD & BRIDGE CONSTR CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410993244.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-10-08
Estimated Expiration
2044-07-24

AI Technical Summary

Technical Problem

During the construction of non-prestressed cast-in-place box beams, the uneven distribution of concrete slurry causes the steel bars to have a blocking effect on stones and gravel, resulting in uneven distribution of concrete within the box beams, affecting construction efficiency and quality.

Method used

An auxiliary construction device including a guide rail, a mobile suspension seat, a telescopic rod, a hanging plate, a slurry guide tube, a flexible mixing rod and a rotary drive mechanism is designed. The flexible mixing rod automatically adjusts its position through elastic telescopic components and torsion springs. , combined with the diversion screw blade and control pump, to achieve uniform distribution of concrete slurry.

Benefits of technology

It improves the construction efficiency and ensures that the stones and large-sized stones in the concrete slurry are evenly distributed in various areas of the box beam, solving the problem of uneven distribution of concrete and improving the construction quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118516925B_ABST
    Figure CN118516925B_ABST
Patent Text Reader

Abstract

The invention discloses an auxiliary construction device and a construction method for a non-prestressed cast-in-situ box girder, which relate to the technical field of cast-box girders, and comprise a stand arranged outside a foundation trench, wherein a guide rail 1 is mounted on the stand, a guide rail 2 which is perpendicular to the guide rail 1 is mounted on the guide rail 1, a casting device is mounted on the guide rail 2, the casting device comprises a movable hanger mounted on the guide rail 2, a telescopic rod 1 is mounted on the lower end of the movable hanger, a hanging plate is mounted on the lower end of the telescopic rod, a slurry guide pipe is mounted on the hanging plate, a hanging plate is rotatably mounted on the lower end of the slurry guide pipe, a plurality of mixing assemblies are mounted on the outer periphery of the hanging plate, the mixing assemblies comprise an elastic telescopic member connected to the hanging plate, a mixing rod and a rotating drive mechanism for controlling the mixing rod are mounted on the elastic telescopic member; by designing the flexible mixing rod and the drainage screw blade, gravel and large-diameter stones in the concrete slurry can be evenly distributed in various areas of the steel frame box girder.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of cast box girders, and in particular to an auxiliary construction device and a construction method for a non-prestressed cast-in-situ box girder. Background Art

[0002] With the continuous development of modern bridge engineering technology and the acceleration of urbanization, box girders of reinforced concrete structures have been widely used in construction. Box girders are mainly divided into two types: prefabricated box girders and cast-in-place box girders. Prefabricated box girders are box girder components that are prefabricated in an independent site and erected by hoisting and other equipment. Non-prestressed cast-in-place box girders are box girder structures made by directly pouring concrete on the construction site, because they can be flexibly adjusted according to the actual situation on site.

[0003] Among them, in the box girder structure planned and laid on the foundation pit, the casting surface of the box girder is relatively wide. Moreover, since there are many horizontal and vertical steel bars in the box girder, during the casting process of the box girder, it is generally poured directly on the top of the box girder to allow the concrete slurry to diffuse and flow on its own. Since the concrete slurry is mixed with stones, gravel, etc., the horizontal and vertical steel bars have a blocking effect on the stones, gravel, etc., which causes uneven distribution of the concrete slurry in the box girder.

[0004] Therefore, it is necessary to provide a non-prestressed cast-in-situ box girder auxiliary construction device and construction method to solve the problems raised in the above background technology. Summary of the invention

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: an auxiliary construction device for non-prestressed cast-in-place box girders, comprising a stand arranged outside a foundation trench, a guide rail 1 being installed on the stand, a guide rail 2 perpendicular to the guide rail 1 being installed on the guide rail 1, a casting device being installed on the guide rail 2, the casting device comprising a movable hanger installed on the guide rail 2, a telescopic rod 1 being installed at the lower end of the movable hanger, a hanging plate being installed at the lower end of the telescopic rod, a slurry guide pipe being installed at the hanging plate, a hanging plate being rotatably installed at the lower end of the slurry guide pipe, a plurality of mixing assemblies being installed at the periphery of the hanging plate, the mixing assemblies comprising an elastic telescopic member connected to the hanging plate, a mixing rod and a rotating drive mechanism for controlling the mixing rod being installed on the elastic telescopic member.

[0006] Furthermore, the hanging plate and the hanging tray are connected via a torsion spring.

[0007] Furthermore, the hanging plate is provided with a column cavity located on a plane, and the elastic telescopic member includes a plunger rod, one end of which extends into the column cavity, and the other end of the plunger rod is installed with a support, and the support is connected to the hanging plate through a spring.

[0008] Furthermore, a chamber 1 is formed between the plunger rod 1 and the column cavity, a control pump 1 is installed on the hanging plate, and an air passage for connecting the chamber 1 and the control pump 1 is provided on the hanging plate.

[0009] Furthermore, the stirring rod comprises an outer column tube that passes through the support and is rotatably connected to the support, a telescopic rod 2 is installed on the upper end of the outer column tube, and a flexible stirring rod that passes through the lower end of the outer column tube is connected to the lower end of the telescopic rod 2.

[0010] Furthermore, the lower end of the flexible stirring rod is covered with a weight sleeve, and the weight distribution of the weight sleeve gradually decreases from bottom to top.

[0011] Furthermore, a lower through cavity is provided in the flexible stirring rod, a plunger rod 2 is installed in the lower through cavity, a chamber 3 is formed between the upper end of the plunger rod 2 and the lower through cavity, a drainage screw blade is installed at the lower end of the plunger rod 2, a chamber 2 is formed between the upper end of the flexible stirring rod and the outer column tube, a through hole for connecting chamber 3 with chamber 2 is provided on the flexible stirring rod, a control pump 2 is also installed on the outer column tube, the control pump 2 is connected with chamber 2 through an air pipe, and a guide plug rod penetrating the upper end of the flexible stirring rod is installed at the upper end of the plunger rod 2.

[0012] Furthermore, the rotary drive mechanism includes a motor mounted on a support and a gear ring sleeved outside the outer cylinder, and a gear meshingly connected to the gear ring is mounted on the output end of the motor.

[0013] A construction method of a non-prestressed cast-in-situ box beam auxiliary construction device, comprising the following steps:

[0014] S1: Control the pouring device to move above the foundation trench through the guide rails 1 and 2;

[0015] S2: The hanging plate is controlled to move up and down by telescopic rod 1, and the flexible mixing rod is controlled to move up and down by telescopic rod 2, so as to adjust the flexible mixing rod to extend into the steel frame box beam in the base groove;

[0016] S3: Adaptively positioning the mixing rod into the steel frame box girder through the elastic telescopic member;

[0017] S4: controlling the rotation rate of the stirring rod by a rotation drive mechanism;

[0018] S5: The positions of the flexible mixing rod and the drainage screw blade in the steel frame box girder are controlled by the telescopic rod 1 and the control pump 2 in the mixing rod.

[0019] Compared with the prior art, the present invention provides a non-prestressed cast-in-place box girder auxiliary construction device and construction method, which has the following beneficial effects:

[0020] The present invention adopts a design structure of a rotatable connection between an elastic telescopic member and a hanging plate and a hanging plate, so that when the lower end of the flexible mixing rod touches the transverse and longitudinal steel bars in the steel frame box girder, the flexible mixing rod is automatically forced to move, thereby eliminating the need to actively adjust the position of the flexible mixing rod according to the arrangement position of the transverse and longitudinal steel bars in the steel frame box girder, so that the flexible mixing rod can directly and quickly extend into the steel frame box girder, and through the provision of a torsion spring, after each forced displacement of the flexible mixing rod, when it leaves the steel frame box girder, the flexible mixing rod can automatically reset, thereby improving construction efficiency; in addition, the position of the mixing rod can be adjusted through the elastic telescopic member, so that the flexible mixing rod can be placed in the middle of its outward and inward movement to touch the transverse and longitudinal steel bars, so that the flexible mixing rod can mix the concrete slurry, so as to facilitate the flexible mixing rod to stir; through the design of the flexible mixing rod and the drainage screw blade, the gravel and large-size stones in the concrete slurry can be evenly distributed in various areas of the steel frame box girder. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0022] Figure 2 It is a schematic diagram of the structure of the pouring device in the present invention;

[0023] Figure 3 It is a schematic diagram of the local structure of the elastic telescopic member in the present invention;

[0024] Figure 4 It is a schematic diagram of the structure of the stirring rod in the present invention;

[0025] Figure 5 It is a structural schematic diagram of the plunger rod 2 in the present invention;

[0026] In the figure: 1, base groove; 2, stand; 3, guide rail 1; 4, guide rail 2; 5, casting device; 51, mobile hanger; 52, telescopic rod 1; 53, hanging plate; 54, slurry guide pipe; 55, hanging plate; 56, stirring assembly; 57, torsion spring; 6, elastic telescopic member; 7, rotating drive mechanism; 8, stirring rod; 551, column cavity; 552, airway; 553, chamber 1; 61, plunger rod 1; 62 , spring; 63, support; 64, control pump one; 71, motor; 72, gear; 73, gear ring; 81, outer cylinder; 82, telescopic rod two; 83, flexible stirring rod; 84, control pump two; 85, air pipe; 86, plunger rod two; 811, chamber two; 831, counterweight sleeve; 832, through hole; 833, chamber three; 834, lower through cavity; 861, drainage screw blade; 862, guide plug rod. DETAILED DESCRIPTION

[0027] Reference Figure 1-Figure 5The present invention provides a technical solution: an auxiliary construction device for a non-prestressed cast-in-situ box girder, comprising a stand 2 arranged outside a foundation trench 1, a guide rail 3 being installed on the stand 2, a guide rail 2 4 being installed perpendicular to the guide rail 3 on the guide rail 3, a casting device 5 being installed on the guide rail 2 4, the casting device 5 comprising a movable hanger 51 installed on the guide rail 2 4, a telescopic rod 52 being installed at the lower end of the movable hanger 51, a hanging plate 53 being installed at the lower end of the telescopic rod 52, a slurry guide pipe 54 being installed on the hanging plate 53, a hanging plate 55 being rotatably installed at the lower end of the slurry guide pipe 54, a plurality of mixing components 56 being installed on the periphery of the hanging plate 55, the mixing component 56 comprising an elastic telescopic member 6 connected to the hanging plate 55, a mixing rod 8 and a rotation driving mechanism 7 for controlling the mixing rod 8 being installed on the elastic telescopic member 6.

[0028] In this embodiment, the hanging plate 55 is connected to the hanging plate 53 by a torsion spring 57; specifically, in the process of pouring the steel frame box girder in the foundation trench, the steel frame box girder is formed by staggered horizontal and vertical steel bars. Therefore, when the guide rail 1 3 and the guide rail 2 4 adjust the pouring device 5 to move and change position above the foundation trench, when the flexible mixing rod 83 in the pouring device 5 extends into the steel frame box girder, when the lower end of the flexible mixing rod 83 touches the horizontal and vertical steel bars in the steel frame box girder, the flexible mixing rod 83 is automatically forced to shift through the rotating connection structure between the hanging plate 55 and the hanging plate 53, so that there is no need to actively adjust the position of the flexible mixing rod 83 according to the layout position of the horizontal and vertical steel bars in the steel frame box girder, so that the flexible mixing rod 83 can be directly and quickly extended into the steel frame box girder, and the torsion spring 57 is set so that after each forced displacement of the flexible mixing rod 83, when it leaves the steel frame box girder, the flexible mixing rod 83 can be reset automatically, thereby improving construction efficiency.

[0029] In this embodiment, the hanging plate 55 is provided with a column cavity 551 located on a plane, and the elastic telescopic member 6 includes a plunger rod 61, one end of the plunger rod 61 extends into the column cavity 551, and the other end of the plunger rod 61 is installed with a support 63, and the support 63 is connected to the hanging plate 55 by a spring 62; that is, the spring 62 assists the plunger rod 61 to move and reset in the column cavity 551.

[0030] Among them, a chamber 553 is formed between the plunger rod 61 and the column cavity 551, a control pump 64 is installed on the hanging plate 55, and an air channel 552 for connecting the chamber 553 and the control pump 64 is provided on the hanging plate 55; that is, when the flexible stirring rod 83 extends into the steel frame box girder, the control pump 64 controls the column cavity 551 to communicate with the external space through the air channel 552, so that the flexible stirring rod 83 is forced to shift, and when the flexible stirring rod 83 is forced to shift, at this time, the control pump 64 controls the column cavity 551 to be disconnected from the external space and is in a sealed state; in this embodiment, It also includes a deformation sensor for monitoring the deformation of the spring 62 and a displacement sensor for monitoring the displacement of the plunger rod 61. The deformation sensor is used to monitor whether the spring 62 is in a compressed state. Specifically, when the spring is in a compressed state, it indicates that the flexible stirring rod 83 is in the state of pressing the horizontal and vertical steel bars in the steel frame box girder outward. At this time, the displacement sensor is started to prepare to measure the displacement of the plunger rod 61, and the air pressure in the chamber 553 is reduced by controlling the pump 64 to drive the plunger rod 61 to move inward until the spring 62 is in the stretching moment, and then the air pressure in the chamber 553 is stopped from being reduced, and the displacement of the plunger rod 61 is obtained. Then, the air pressure in chamber 553 is increased by controlling pump 64, driving plunger rod 61 to move outward until the displacement monitored by the displacement sensor reaches When the air pressure in chamber 553 is increased, chamber 553 is controlled to be sealed. When spring 62 is in a stretched state, it indicates that the flexible stirring rod 83 is in the process of pressing the transverse and longitudinal steel bars in the steel frame box girder. At this time, the displacement sensor is started to measure the displacement of the plunger rod 61. The air pressure in chamber 553 is increased by controlling pump 64 to drive the plunger rod 61 to move outward until the spring 62 is in the compressed state. Then, the air pressure in chamber 553 is stopped from being increased. The displacement of the plunger rod 61 is obtained as Then, the air pressure in chamber 553 is reduced by controlling pump 64, driving plunger rod 61 to move inward until the displacement monitored by the displacement sensor reaches When the air pressure in chamber 553 is reduced, the air pressure in chamber 553 is stopped and chamber 553 is controlled to be in a sealed state; therefore, the flexible stirring rod 83 can be placed in the middle of its outward movement and inward movement to touch the horizontal and vertical steel bars, so that the flexible stirring rod 83 can stir the concrete slurry and facilitate the flexible stirring rod 83 to stir.

[0031] In this embodiment, the mixing rod 8 includes an outer column 81 that passes through the support 63 and is rotatably connected to the support 63. A telescopic rod 82 is installed at the upper end of the outer column 81, and the lower end of the telescopic rod 82 is connected to a flexible mixing rod 83 that passes through the lower end of the outer column 81. Specifically, when the concrete slurry is discharged from the slurry guide pipe 54 into the steel frame box girder, the mixing rod 8 on the periphery of the slurry guide pipe 54 can quickly stir and drain the concrete slurry near the discharge outlet of the slurry guide pipe 54, so that the concrete slurry can be quickly and evenly spread.

[0032] In this embodiment, the lower end of the flexible stirring rod 83 is sleeved with a counterweight sleeve 831, and the weight distribution of the counterweight sleeve 831 gradually decreases from bottom to top. That is to say, since the flexible stirring rod 83 is a flexible structure, when the rotating drive mechanism 7 controls the flexible stirring rod 83 to rotate at different speeds, it is beneficial to make the range of adjustment of the stirring trajectory of the lower end of the flexible stirring rod 83 wider.

[0033] In this embodiment, a lower through cavity 834 is provided in the flexible mixing rod 83, a plunger rod 86 is installed in the lower through cavity 834, a chamber 833 is formed between the upper end of the plunger rod 86 and the lower through cavity 834, a drainage screw blade 861 is installed at the lower end of the plunger rod 86, a chamber 811 is formed between the upper end of the flexible mixing rod 83 and the outer cylinder 81, a through hole 832 for connecting the chamber 833 and the chamber 811 is provided on the flexible mixing rod 83, and a control pump 84 is also installed on the outer cylinder 81, and the control pump 84 is connected to the chamber 811 through the air pipe 85, and a guide plug rod 862 that passes through the upper end of the flexible mixing rod 83 is installed on the upper end of the plunger rod 86; specifically, when the flexible mixing rod 83 cooperates with the slurry guide pipe 54 to complete the pouring of concrete slurry on the steel frame box girder After construction, the outer column 81 is regulated to move up and down by the telescopic rod 2 82. At the same time, the control pump 2 84 is used to regulate the air pressure in the chamber 3 833 so that the drainage vane 861 is exposed from the outer column 81. It should be noted that at this time, the guide plug rod 862 can have the effect of straightening the flexible stirring rod 83. Therefore, when the flexible stirring rod 83 is driven to rotate by the rotary drive mechanism 7, the drainage vane 861 will guide the concrete slurry vertically. Among them, the concrete slurry can be guided in an upward or downward direction through the drainage vanes 861 that rotate differently, thereby preventing the gravel or large-size stones in the concrete slurry from depositing at the bottom of the foundation trench, and then the gravel or large-size stones in the concrete slurry can be evenly distributed to various areas of the steel frame box girder.

[0034] In this embodiment, the rotary drive mechanism 7 includes a motor 71 mounted on the support 63 and a gear ring 73 sleeved on the outer cylinder 81 , and a gear 72 meshingly connected to the gear ring 73 is installed at the output end of the motor 71 .

[0035] In specific implementation, it includes the following steps:

[0036] S1: Control the pouring device 5 to move above the foundation trench 1 through the guide rail 1 3 and the guide rail 2 4;

[0037] S2: The telescopic rod 1 52 controls the hanging plate 53 to move up and down, and the telescopic rod 2 82 controls the flexible mixing rod 83 to move up and down, and regulates the flexible mixing rod 83 to extend into the steel frame box beam in the base trench 1;

[0038] S3: Adaptively positioning the stirring rod 8 into the steel frame box girder through the elastic telescopic member 6;

[0039] S4: controlling the rotation speed of the stirring rod 8 by the rotation driving mechanism 7;

[0040] S5: The positions of the flexible stirring rod 83 and the drainage screw blade 861 in the steel frame box girder are controlled by the telescopic rod 1 52 and the control pump 2 84 in the stirring rod 8.

[0041] The above description is only a preferred specific implementation manner of the invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the invention, which should be covered by the protection scope of the present invention.

Claims

1. An auxiliary construction device for a non-prestressed cast-in-place box beam, comprising a stand (2) arranged outside a foundation trench (1), a guide rail 1 (3) being mounted on the stand (2), a guide rail 2 (4) being mounted on the guide rail 1 (3) and being perpendicular to the guide rail 1 (3), a casting device (5) being mounted on the guide rail 2 (4), characterized in that: The pouring device (5) comprises a movable hanging seat (51) mounted on a second guide rail (4); a telescopic rod (52) is mounted on the lower end of the movable hanging seat (51); a hanging plate (53) is mounted on the lower end of the telescopic rod (52); a slurry guide pipe (54) is mounted on the hanging plate (53); a hanging plate (55) is rotatably mounted on the lower end of the slurry guide pipe (54); a plurality of stirring assemblies (56) are mounted on the outer periphery of the hanging plate (55); the stirring assemblies (56) comprise an elastic telescopic member (6) connected to the hanging plate (55); a stirring rod (8) and a rotation driving mechanism (7) for controlling the stirring rod (8) are mounted on the elastic telescopic member (6); The hanging plate (55) is provided with a column cavity (551) located on a plane, the elastic telescopic member (6) comprises a plunger rod (61), one end of the plunger rod (61) extends into the column cavity (551), and a support (63) is installed at the other end of the plunger rod (61), and the support (63) is connected to the hanging plate (55) via a spring (62); A chamber (553) is formed between the plunger rod (61) and the column cavity (551), a control pump (64) is installed on the hanging plate (55), and an air passage (552) for connecting the chamber (553) and the control pump (64) is provided on the hanging plate (55).

2. The auxiliary construction device for non-prestressed cast-in-situ box beam according to claim 1 is characterized in that: The hanging plate (55) is connected to the hanging plate (53) via a torsion spring (57).

3. The auxiliary construction device for non-prestressed cast-in-situ box beam according to claim 1 is characterized in that: The stirring rod (8) comprises an outer column (81) that passes through the support (63) and is rotatably connected to the support (63); a second telescopic rod (82) is mounted on the upper end of the outer column (81); and a flexible stirring rod (83) that passes through the lower end of the outer column (81) is connected to the lower end of the second telescopic rod (82).

4. The auxiliary construction device for non-prestressed cast-in-situ box beam according to claim 3 is characterized in that: The lower end of the flexible stirring rod (83) is sleeved with a weight sleeve (831), and the weight distribution of the weight sleeve (831) gradually decreases from bottom to top.

5. The auxiliary construction device for non-prestressed cast-in-situ box beam according to claim 3 is characterized in that: The flexible mixing rod (83) is provided with a lower through cavity (834), a second plunger rod (86) is installed in the lower through cavity (834), a third chamber (833) is formed between the upper end of the second plunger rod (86) and the lower through cavity (834), a drainage spiral blade (861) is installed at the lower end of the second plunger rod (86), a second chamber (811) is formed between the upper end of the flexible mixing rod (83) and the outer cylinder (81), a through hole (832) for connecting the third chamber (833) and the second chamber (811) is provided on the flexible mixing rod (83), the outer cylinder (81) is also provided with a second control pump (84), the second control pump (84) is connected to the second chamber (811) through an air pipe (85), and a guide plug rod (862) penetrating the upper end of the flexible mixing rod (83) is installed at the upper end of the second plunger rod (86).

6. The auxiliary construction device for non-prestressed cast-in-situ box beam according to claim 3 is characterized in that: The rotary drive mechanism (7) comprises a motor (71) mounted on a support (63) and a gear ring (73) sleeved outside an outer cylinder (81); a gear (72) meshingly connected to the gear ring (73) is mounted on the output end of the motor (71).

7. A method for auxiliary construction of a non-prestressed cast-in-place box girder, which adopts an auxiliary construction device for a non-prestressed cast-in-place box girder as claimed in any one of claims 3 to 6, characterized in that: It includes the following steps: S1: controlling the pouring device (5) to move above the foundation trench (1) through the guide rail 1 (3) and the guide rail 2 (4); S2: Controlling the lifting plate (53) to move up and down by using the telescopic rod 1 (52), and controlling the flexible stirring rod (83) to move up and down by using the telescopic rod 2 (82), so as to adjust the flexible stirring rod (83) to extend into the steel frame box beam in the base trench (1); S3: Adaptively positioning the mixing rod (8) into the position of the steel frame box girder through the elastic telescopic member (6); S4: controlling the rotation speed of the stirring rod (8) by means of the rotation drive mechanism (7); S5: The positions of the flexible stirring rod (83) and the drainage screw blade (861) in the steel frame box girder are controlled by the telescopic rod 1 (52) and the control pump 2 (84) in the stirring rod (8).

Citation Information

Cited By

  • Auxiliary construction device for cast-in-place box girder

    CN120649385A