A pile foundation verticality deviation monitoring device and method based on standard timing
Through the device that monitors the drilling offset in real time during the drilling process, the vehicle-mounted control system and the wireless intelligent acquisition and monitoring device are used to solve the problem that the existing technology cannot detect the drilling offset in real time, and realize real-time adjustment during the drilling process. and efficiency improvement, ensuring the quality of pile foundations and project progress.
Patent Information
- Application Number
- CN202410964383.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-07-18
AI Technical Summary
Existing borehole detection technology cannot detect borehole offset in real time during the drilling process, resulting in hole offset problems and affecting the quality of pile foundations and project progress.
A pile foundation vertical offset monitoring device based on standard timing is adopted, including a vehicle-mounted control system and a wireless intelligent collection and monitoring device. The electronic gyroscope, GPS positioning module and FPGA processor are used to collect and analyze the parameters and parameters of the drilling rig and drill bucket in real time. Azimuth data, synchronized timing through wireless communication, real-time monitoring and adjustment of drilling direction to ensure that the drilling offset is within a safe range.
It achieves real-time detection of drilling offset during the drilling process, adjusts the drilling direction in a timely manner, improves drilling efficiency, ensures the safe support quality of pile foundations, and reduces repeated construction.
Smart Images

Figure CN118517222B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a pile foundation verticality deviation monitoring device and method based on standard timing, belonging to the technical field of pile foundation drilling construction. Background Art
[0002] As an important part of engineering construction, foundation engineering plays a decisive role in the quality control of engineering construction. Pile foundations are widely used in various foundation projects because of their advantages such as high strength, high bearing capacity and low deformation. Since pile foundations are underground hidden projects, existing deep pile foundations are mainly made by drilling first and then grouting and solidification. Affected by stratum stress and underground geological conditions, drilling deviation often occurs when drilling in deep underground spaces (i.e., the design requires vertical downward drilling, but the actual drilling deviates from the designed drilling route due to different geological conditions encountered during the drilling process). Large drilling deviation will affect the quality of subsequent grouting and solidification of pile foundations, and ultimately threaten the safety of the project.
[0003] In order to ensure the quality of the pile foundation, it is necessary to detect the offset of the borehole. However, the existing drilling detection technology detects the quality of the hole after the drilling rig completes the entire drilling operation. Since the vibration of the drill bucket during the drilling process and the surrounding conditions of the drilling depth affect the transmission of radio waves, the current method cannot realize real-time detection of the borehole offset during the drilling process, resulting in the only way to reselect the position and drill again when the offset of the hole detection does not meet the requirements. This method will slow down the progress of the project and is difficult to meet the needs of existing foundation projects. In actual drilling projects, if hard rock blocks are encountered, the problem of hole offset often occurs. Therefore, how to provide a new device and method that can detect the offset of the drilling during the drilling process, so as to adjust the drilling direction in time, ensure that the offset after the drilling meets the requirements of pile foundation safety support, and can effectively improve the efficiency of drilling work, is the research direction required by the present invention. Summary of the invention
[0004] In view of the problems existing in the above-mentioned prior art, the present invention provides a pile foundation verticality deviation monitoring device and method based on standard alignment, which can detect the drilling deviation during the drilling process, so as to adjust the drilling direction in time to ensure that the deviation after the drilling hole meets the pile foundation safety support requirements and can effectively improve the drilling work efficiency.
[0005] In order to achieve the above-mentioned object, the technical solution adopted by the present invention is: a pile foundation verticality deviation monitoring device based on standard timing, including a vehicle-mounted control system and a wireless intelligent acquisition monitoring device;
[0006] The vehicle-mounted control system is installed on the rotary drilling rig, which includes a display, a central processor, a wireless communication module 1, a drilling parameter acquisition module, a GPS positioning module, a timing device 1, a first electronic gyroscope and a power supply 1; the first electronic gyroscope is used to obtain the current ground leveling information according to the posture of the rotary drilling rig; the drilling parameter acquisition module includes a second electronic gyroscope installed on the top of the drill rod and the detection system of the rotary drilling rig itself, which is used to obtain the parameters, orientation and offset data of the drill rod during the drilling process of the drilling rig; the timing device 1 is used for timing, and the GPS positioning module is used to locate the position of the rotary drilling rig; the wireless communication module 1 is used to receive data sent by the wireless intelligent acquisition and monitoring device; the central processor is connected with the display, the wireless communication module 1, the GPS positioning module, the first electronic gyroscope, the drilling parameter acquisition module and the timing device 1, and is used to obtain the data fed back by the first electronic gyroscope, the GPS positioning module, the drilling parameter acquisition module and the wireless communication module 1 and store it in combination with the time recorded by the timing device 1, and then display the data through the display after analysis and processing; at the same time, the timing of the timing device 1 is controlled according to the data fed back by the wireless communication module 1; the power supply 1 supplies power to the vehicle-mounted control system.
[0007] The wireless intelligent acquisition and monitoring device is installed at the connection between the drill bucket and the drill rod, and includes a third electronic gyroscope, a second timing device, a second wireless communication module, a shock absorbing device, an FPGA processor and a second power supply. The shock absorbing device wraps the third electronic gyroscope, the second timing device, the second wireless communication module, the FPGA processor and the second power supply, and is used to shock and buffer the entire wireless intelligent acquisition and monitoring device; the third electronic gyroscope is used to obtain real-time azimuth data of the drill bucket, the second timing device is used for timing, the FPGA processor is connected to the third electronic gyroscope, the second timing device and the second wireless communication module, and is used to receive data fed back by the third electronic gyroscope and store it in combination with the time recorded by the second timing device, and the second power supply supplies power to the wireless intelligent acquisition and monitoring device; the second electronic gyroscope is used to obtain the offset of the drill rod during drilling, and to construct a coordinate system P_vehicle based on this; the first electronic gyroscope obtains the current ground leveling information, and constructs a world coordinate system P_world in combination with the drilling rig position determined by the GPS positioning module in the vehicle-mounted system.
[0008] When wireless communication module 2 and wireless communication module 1 establish wireless communication, the FPGA processor sends data to wireless communication module 1 through wireless communication module 2. The central processor receives the data for analysis and processing to obtain the vertical offset of the current drilling hole. At the same time, timing device 1 and timing device 2 perform a time synchronization to synchronize the timing of the two.
[0009] Furthermore, the parameters, orientation and offset data of the drill pipe include the angular velocity, drilling pressure, drilling speed, torque, feed depth and number of rotations of the drill pipe during the drilling process of the drilling rig; the real-time orientation data of the drill bucket includes real-time angular velocity and inclination data.
[0010] Furthermore, the power source one and the power source two are both lithium batteries.
[0011] Furthermore, the wireless communication module 1 and the wireless communication module 2 are both Zigbee communication modules.
[0012] Furthermore, the shock absorbing device is composed of a shock-isolating pad and a shock-absorbing rubber layer.
[0013] The working method of the pile foundation verticality deviation monitoring device based on standard timing is specifically as follows:
[0014] Step 1: Preparation before drilling:
[0015] A. The vehicle-mounted control system and the wireless intelligent collection and monitoring device are respectively installed at the corresponding positions of the rotary drilling rig, and the rotary drilling rig is made to reach the designated position;
[0016] B. Input the preset drilling trajectory into the central processor of the vehicle control system and set the vertical deviation threshold;
[0017] C. The central processor of the vehicle control system uses the data collected by the second electronic gyroscope installed on the top of the drill rod to construct a coordinate system P_vehicle with the top connection of the drill rod as the origin, and uses the data collected by the first electronic gyroscope in the vehicle control system and the positioning data of the GPS to build a world coordinate system P_world based on the national geodetic coordinate system; the FPGA processor of the wireless intelligent acquisition and monitoring device uses the data collected by the third electronic gyroscope to establish a coordinate system P_hole, and transmits the coordinate system data to the vehicle control system through wireless communication. The central processor of the vehicle control system projects the coordinate system P_hole and the coordinate system P_vehicle into the world coordinate system P_world through coordinate transformation;
[0018] D. The central processor in the vehicle control system records the virtual positions of P_vehicle and P_hole in the world coordinate system P_world after the projection transformation, and transmits them to the wireless intelligent acquisition and monitoring device through wireless communication. After completion, the vehicle control system and the wireless intelligent acquisition and monitoring device are wirelessly communicated, so that the timing device 1 and the timing device 2 are synchronized once and the two start timing synchronously; the role of timing is: when the wireless intelligent acquisition and monitoring device is drilling in the borehole with the drill bucket, it cannot communicate with the vehicle control system in real time. In order to ensure that the data collected by the vehicle control system in the same time period and the data collected by the wireless intelligent acquisition and monitoring device in the same time period can correspond in subsequent processing, the timing device 1 and the timing device 2 are set to perform synchronous timing respectively. In this way, for the same time period, the timing device 1 can correspond to the data collected by the vehicle control system by recording the time, and the timing device 2 can correspond to the data collected by the wireless intelligent acquisition and monitoring device by recording the time, so that the correspondence of the data obtained by the two in the same time period in subsequent wireless communication is realized.
[0019] Step 2: Drilling data collection:
[0020] ① After the rotary drilling rig starts working, the vehicle-mounted control system uses the drilling parameter acquisition module to obtain the real-time engineering parameters and azimuth data of the drilling rig and feeds it back to the central processor in combination with the time recorded by the timing device 1; at the same time, the wireless intelligent acquisition and monitoring device uses the third electronic gyroscope to obtain the real-time azimuth data of the drilling bucket during drilling and feeds it back to the FPGA processor in combination with the time recorded by the timing device 2;
[0021] ②. The central processor of the vehicle control system performs preliminary processing on the acquired real-time engineering parameters and azimuth data in combination with the time recorded by the first timing device, calculates the drilling depth, drilling speed, and offset of the drill pipe at different times, and simultaneously calculates the transformation of the coordinate system P_vehicle during the rotation of the drill pipe; the FPGA processor in the wireless intelligent acquisition and monitoring device performs preliminary calculations on the trajectory of the drill pipe at different times during the drilling process and the transformation of the coordinate system P_hole according to the time recorded by the second timing device and the data fed back by the third electronic gyroscope.
[0022] Step 3: Determine the vertical offset of the borehole:
[0023] Ⅰ. During the drilling process, the drill bucket needs to be lifted after drilling a certain distance, that is, the drill bucket carries the soil generated by drilling to the ground. Wireless communication module 2 and wireless communication module 1 always remain in a waiting state. When the drill bucket comes out of the borehole and reaches the ground for a short time, wireless communication module 2 and wireless communication module 1 establish wireless communication. The wireless intelligent acquisition and monitoring device transmits the real-time azimuth data of the drill bucket and the data initially calculated by the FPGA processor to the vehicle control system through wireless communication. At the same time, the timing device 1 and the timing device 2 perform a time synchronization through this wireless communication to calibrate the synchronous timing of the two.
[0024] Ⅱ. The central processor of the vehicle control system performs correction and calculation based on the data transmitted by the wireless intelligent acquisition and monitoring device, the data collected by the first electronic gyroscope and the drilling parameter acquisition module (the data fed back by the wireless intelligent acquisition and monitoring device and the data collected by the first electronic gyroscope and the drilling parameter acquisition module are all data of the same time period, and the two are synchronized by two timing devices to achieve correspondence), and determines the relative transformation of the coordinate systems P_hole and P_vehicle during the drilling process. According to the difference in the relative transformation of the two coordinate systems, combined with the azimuth data collected by the third electronic gyroscope in the wireless intelligent acquisition and monitoring device, the inclination data of the drill bucket in the world coordinate system P_world during the communication acquisition time period during the drilling process is calculated;
[0025] III. The central processor calculates the drilling depth and drill rod offset data within the communication acquisition time period according to the data fed back by the drilling parameter acquisition module, and obtains the drill bucket inclination data within the time period in combination with step II, thereby generating the drilling trajectory within the communication acquisition time period;
[0026] IV. Compare the drilling trajectory within the communication acquisition time period in step III with the preset drilling trajectory within the time period. If the vertical offset of the two does not exceed the vertical offset threshold, the drill bucket continues to perform subsequent drilling construction, and the on-board control system displays the operating status, drill bucket trajectory and vertical offset data of the drill rig in the world coordinate system P_world within the communication acquisition time period on the display; and repeat steps I to III to judge the vertical offset again when the drill bucket takes soil to the ground next time; if the vertical offset of the two does not exceed the vertical offset threshold, the on-board control system issues an alarm prompt, and the drilling work of the drill bucket is stopped in time, and the drilling parameters of the drill rig are adjusted according to the obtained vertical offset before continuing the drilling construction.
[0027] Compared with the prior art, in order to solve the problem that the drilling bucket cannot communicate in real time during the drilling process, resulting in the inability to determine the drilling trajectory of the drilling bucket during the drilling process, and thus the inability to monitor the deviation of the pile foundation, the inventor has found that during the drilling process, the drilling bucket needs to perform a drill lifting operation after drilling a certain distance, that is, the drilling bucket carries the soil generated by drilling to the ground, and then enters the borehole to continue drilling. Based on this feature, the present invention adopts a combination of a vehicle-mounted control system and a wireless intelligent collection and monitoring device, wherein the vehicle-mounted control system is installed on the rotary drilling rig to collect the working data of the drilling rig on the ground, and the wireless intelligent collection and monitoring device is installed near the drilling bucket to collect the real-time azimuth data of the drilling bucket in the borehole; the timing device one and the timing device two can be used during drilling. During the process, the time is recorded synchronously, so as to determine the data obtained by the vehicle-mounted control system and the wireless intelligent collection and monitoring device in the same time period; when the drill bucket takes soil to the ground for a short time, the vehicle-mounted control system and the wireless intelligent collection and monitoring device communicate wirelessly, so that the data collected by the wireless intelligent collection and monitoring device is sent to the vehicle-mounted control system, and the two are synchronized once to synchronize the timing of the two; then the vehicle-mounted control system combines the drilling rig and drill bucket data obtained in the same time period to obtain the drilling trajectory of the drill bucket in the time period, and compares the trajectory with the preset drilling trajectory. If it exceeds the threshold, an alarm prompt is issued, and the drilling parameters of the drill rig and drill bit are changed in time; if it does not exceed, the drill bucket continues to work according to the set drilling parameters. This method will not affect the drilling process of the rotary drilling rig, and only uses the short time when the drill bucket takes soil and is lifted to the ground to complete the data interaction. The data of the drill rig and the drill bucket in the same time period are obtained by synchronous timing, so as to finally obtain whether the drilling trajectory deviates from the preset trajectory, and adjust the drilling parameters in time according to the deviation situation, so as to finally ensure that the pile foundation safety support requirements are met after the hole is formed, and reduce the repeated construction of drilling holes as much as possible, effectively improving the drilling work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is the overall layout diagram of the present invention;
[0029] Figure 2 is a schematic diagram of the vehicle-mounted control system of the present invention;
[0030] Figure 3 It is a schematic diagram of the wireless intelligent collection and monitoring device in the present invention.
[0031] In the figure: A, vehicle-mounted control system, B, wireless intelligent data acquisition and monitoring device; 1, display; 2, central processor; 3, wireless communication module 1; 4, drilling parameter acquisition module; 5, timing device 1; 6, first electronic gyroscope; 7, GPS positioning module; 8, power supply 1; 9, third electronic gyroscope; 10, timing device 2; 11, power supply 2; 12, shock absorption device; 13, FPGA processor; 14, wireless communication module 2. DETAILED DESCRIPTION
[0032] The present invention will be further described below.
[0033] like Figure 1 As shown, a pile foundation verticality deviation monitoring device based on standard timing includes a vehicle-mounted control system and a wireless intelligent acquisition monitoring device;
[0034] The vehicle-mounted control system is installed on the rotary drilling rig, which includes a display 1, a central processor 2, a wireless communication module 3, a drilling parameter acquisition module 4, a GPS positioning module 7, a timing device 5, a first electronic gyroscope 6 and a power supply 8; the first electronic gyroscope 6 is used to obtain the current ground leveling information according to the posture of the rotary drilling rig; the drilling parameter acquisition module 4 includes a second electronic gyroscope installed on the top of the drill rod and the detection system of the rotary drilling rig itself, which is used to obtain the parameters, orientation and offset data of the drill rod during the drilling process of the drilling rig, including the angular velocity, drilling pressure, drilling speed, torque, feed depth and number of rotations of the drill rod during the drilling process of the drilling rig; the timing device 5 is used for timing, and the GPS positioning module Block 7 is used to locate the position of the rotary drilling rig; the wireless communication module 3 is used to receive data sent by the wireless intelligent collection and monitoring device; the central processor 2 is connected to the display 1, the wireless communication module 3, the GPS positioning module 7, the first electronic gyroscope 6, the drilling parameter collection module 4 and the timing device 5, and is used to obtain the data fed back by the first electronic gyroscope 6, the GPS positioning module 7, the drilling parameter collection module 4 and the wireless communication module 3 and store them in combination with the time recorded by the timing device 5, and then display the data through the display 1 after analysis and processing; at the same time, the timing of the timing device 5 is controlled according to the data fed back by the wireless communication module 3; the power supply 8 supplies power to the vehicle-mounted control system.
[0035] The wireless intelligent acquisition monitoring device is installed at the connection between the drill bucket and the drill rod, and includes a third electronic gyroscope 9, a second timing device 10, a second wireless communication module 14, a shock absorbing device 12, an FPGA processor 13 and a second power supply 11. The shock absorbing device 12 wraps the third electronic gyroscope 9, the second timing device 10, the second wireless communication module 14, the FPGA processor 13 and the second power supply 11, and is used to perform shock absorption and buffering on the entire wireless intelligent acquisition monitoring device; the third electronic gyroscope 9 is used to obtain real-time azimuth data of the drill bucket, including real-time angular velocity and inclination data; the second timing device 10 is used for timing, and the FPGA processor 13 is connected to the third electronic gyroscope 9, the second timing device 10 and the second wireless communication module 14 The device is connected to receive the data fed back by the third electronic gyroscope 9 and store it in combination with the time recorded by the timing device 2 10; the power supply 2 11 supplies power to the wireless intelligent acquisition and monitoring device; the second electronic gyroscope is used to obtain the offset of the drill rod during drilling, and construct the coordinate system P_vehicle based on this; the first electronic gyroscope 6 obtains the current ground flatness information, and constructs the world coordinate system P_world in combination with the drilling rig position determined by the GPS positioning module in the vehicle control system; the power supply 1 8 and the power supply 2 11 are both lithium batteries; the wireless communication module 1 3 and the wireless communication module 2 14 are both Zigbee communication modules; the shock absorbing device 12 is composed of a shock-absorbing pad and a shock-absorbing rubber layer.
[0036] When wireless communication module 2 14 and wireless communication module 1 3 establish wireless communication, FPGA processor 13 sends data to wireless communication module 1 3 through wireless communication module 2 14, central processor 2 receives the data for analysis and processing to obtain the vertical offset of the current drilling hole, and at the same time, timing device 1 5 and timing device 2 10 perform a time synchronization to synchronize the timing of the two.
[0037] The working method of the pile foundation verticality deviation monitoring device based on standard timing is specifically as follows:
[0038] Step 1: Preparation before drilling:
[0039] A. The vehicle-mounted control system and the wireless intelligent collection and monitoring device are respectively installed at the corresponding positions of the rotary drilling rig, and the rotary drilling rig is made to reach the designated position;
[0040] B. Inputting a preset drilling trajectory into the central processor 2 of the vehicle-mounted control system and setting a vertical offset threshold;
[0041] C. The central processor 2 of the vehicle control system uses the data collected by the second electronic gyroscope installed on the top of the drill rod to construct a coordinate system P_vehicle with the top connection of the drill rod as the origin, and uses the data collected by the first electronic gyroscope 6 in the vehicle control system and the positioning data of the GPS to construct a world coordinate system P_world based on the national geodetic coordinate system; the FPGA processor 13 of the wireless intelligent acquisition and monitoring device establishes a coordinate system P_hole with the data collected by the third electronic gyroscope 9, and transmits the coordinate system data to the vehicle control system through wireless communication. The central processor of the vehicle control system projects the coordinate system P_hole and the coordinate system P_vehicle into the world coordinate system P_world through coordinate transformation;
[0042] D. The central processor 2 in the vehicle control system records the virtual positions of P_vehicle and P_hole in the world coordinate system P_world after the projection transformation, and transmits them to the wireless intelligent acquisition and monitoring device through wireless communication. After completion, the vehicle control system and the wireless intelligent acquisition and monitoring device are wirelessly communicated, so that the timing device 1 5 and the timing device 2 10 are synchronized once and then the two start timing synchronously; the role of timing is: when the wireless intelligent acquisition and monitoring device is drilling in the borehole, it cannot communicate with the vehicle control system in real time. In order to ensure that the data collected by the vehicle control system in the same time period and the data collected by the wireless intelligent acquisition and monitoring device in the same time period can correspond in subsequent processing, the timing device 1 5 and the timing device 2 10 are set to perform synchronous timing respectively, so that for the same time period, the timing device 1 5 can correspond to the data collected by the vehicle control system by recording time, and the timing device 2 10 can correspond to the data collected by the wireless intelligent acquisition and monitoring device by recording time, so as to achieve the correspondence of the data obtained by the two in the same time period during subsequent wireless communication.
[0043] Step 2: Drilling data collection:
[0044] ①, after the rotary drilling rig starts working, the vehicle-mounted control system uses the drilling parameter acquisition module 4 to obtain the real-time engineering parameters and azimuth data of the drilling rig and feeds it back to the central processor 2 in combination with the time recorded by the timing device 1; at the same time, the wireless intelligent acquisition and monitoring device uses the third electronic gyroscope 9 to obtain the real-time azimuth data of the drilling bucket during drilling and feeds it back to the FPGA processor 13 in combination with the time recorded by the timing device 2 10;
[0045] ②. The central processor 2 of the vehicle control system performs preliminary processing on the acquired real-time engineering parameters and azimuth data in combination with the time recorded by the timing device 1 5, calculates the drilling depth, drilling speed, and displacement of the drill pipe at different times, and simultaneously calculates the transformation of the coordinate system P_vehicle during the rotation of the drill pipe; the FPGA processor 13 in the wireless intelligent acquisition and monitoring device performs preliminary calculations on the trajectory of the drill pipe at different times during the drilling process and the transformation of the coordinate system P_hole according to the time recorded by the timing device 2 10 and the data fed back by the third electronic gyroscope 9.
[0046] Step 3: Determine the vertical offset of the borehole:
[0047] Ⅰ. During the drilling process, the drill bucket needs to be lifted after drilling a certain distance, that is, the drill bucket carries the soil produced by drilling to the ground, and the wireless communication module 2 14 and the wireless communication module 1 3 always remain in a waiting state. When the drill bucket comes out of the borehole and reaches the ground for a short time, the wireless communication module 2 14 and the wireless communication module 1 3 establish wireless communication, and the wireless intelligent acquisition and monitoring device transmits the real-time azimuth data of the drill bucket and the data initially calculated by the FPGA processor 13 to the vehicle control system through wireless communication. At the same time, the timing device 1 5 and the timing device 2 10 perform a time synchronization through this wireless communication to calibrate the synchronous timing of the two.
[0048] II. The central processor 2 of the vehicle control system performs correction and calculation based on the data transmitted by the wireless intelligent acquisition monitoring device, the data collected by the first electronic gyroscope 6 and the drilling parameter acquisition module 4 (the data fed back by the wireless intelligent acquisition monitoring device and the data collected by the drilling parameter acquisition module 4 are all data of the same time period, and the two are synchronized by two timing devices to achieve correspondence), and determines the relative transformation of the coordinate systems P_hole and P_vehicle during the drilling process. According to the difference in the relative transformation of the two coordinate systems, combined with the azimuth data collected by the third electronic gyroscope 9 in the wireless intelligent acquisition monitoring device, the inclination data of the drill bucket in the world coordinate system P_world during the communication acquisition time period during the drilling process is calculated; the projection transformation of the above coordinate systems adopts existing well-known methods, which are all prior art;
[0049] III. The central processor 2 calculates the drilling depth and drill rod offset data within the communication acquisition time period according to the data fed back by the drilling parameter acquisition module 4, and obtains the drill bucket inclination data within the time period in combination with step II, thereby generating the drilling trajectory within the communication acquisition time period;
[0050] IV. Compare the drilling trajectory within the communication acquisition time period in step III with the preset drilling trajectory within the time period. If the vertical offset of the two does not exceed the vertical offset threshold, the drill bucket continues to perform subsequent drilling construction, and the on-board control system displays the operating status, drill bucket trajectory and vertical offset data of the drilling rig in the world coordinate system P_world within the communication acquisition time period on the display 1; and repeat steps I to III to judge the vertical offset again when the drill bucket takes soil to the ground next time; if the vertical offset of the two does not exceed the vertical offset threshold, the on-board control system issues an alarm prompt, and the drilling work of the drill bucket is stopped in time, and the drilling parameters of the drill rig are adjusted according to the obtained vertical offset before continuing the drilling construction.
[0051] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A pile foundation verticality deviation monitoring device based on standard timing, characterized in that: Including vehicle-mounted control system and wireless intelligent collection and monitoring device; The vehicle-mounted control system is installed on the rotary drilling rig, which includes a display, a central processor, a wireless communication module 1, a drilling parameter acquisition module, a GPS positioning module, a timing device 1, a first electronic gyroscope and a power supply 1; the first electronic gyroscope is used to obtain the current ground leveling information according to the posture of the rotary drilling rig; the drilling parameter acquisition module includes a second electronic gyroscope installed on the top of the drill rod and the detection system of the rotary drilling rig itself, which is used to obtain the parameters, orientation and offset data of the drill rod during the drilling process of the drilling rig; the timing device 1 is used for timing, and the GPS positioning module is used to locate the position of the rotary drilling rig; the wireless communication module 1 is used to receive data sent by the wireless intelligent acquisition and monitoring device; the central processor is connected with the display, the wireless communication module 1, the GPS positioning module, the first electronic gyroscope, the drilling parameter acquisition module and the timing device 1, and is used to obtain the data fed back by the first electronic gyroscope, the GPS positioning module, the drilling parameter acquisition module and the wireless communication module 1 and store it in combination with the time recorded by the timing device 1, and then display the data through the display after analysis and processing; at the same time, the timing of the timing device 1 is controlled according to the data fed back by the wireless communication module 1; the power supply 1 supplies power to the vehicle-mounted control system; The wireless intelligent acquisition monitoring device is installed at the connection between the drill bucket and the drill rod, and includes a third electronic gyroscope, a second timing device, a second wireless communication module, a shock absorbing device, an FPGA processor and a second power supply. The shock absorbing device wraps the third electronic gyroscope, the second timing device, the second wireless communication module, the FPGA processor and the second power supply, and is used to perform shock absorption and buffering on the entire wireless intelligent acquisition monitoring device; the third electronic gyroscope is used to obtain real-time azimuth data of the drill bucket, the second timing device is used for timing, the FPGA processor is connected with the third electronic gyroscope, the second timing device and the second wireless communication module, and is used to receive data fed back by the third electronic gyroscope and store it in combination with the time recorded by the second timing device, and the second power supply supplies power to the wireless intelligent acquisition monitoring device; When wireless communication module 2 and wireless communication module 1 establish wireless communication, the FPGA processor sends data to wireless communication module 1 through wireless communication module 2. The central processor receives the data for analysis and processing to obtain the vertical offset of the current drilling hole. At the same time, timing device 1 and timing device 2 perform a time synchronization to synchronize the timing of the two.
2. The pile foundation verticality deviation monitoring device based on standard timing according to claim 1 is characterized in that: The parameters, orientation and offset data of the drill pipe include the angular velocity, drilling pressure, drilling speed, torque, feed depth and number of rotations of the drill pipe during the drilling process of the drilling rig; the real-time orientation data of the drill bucket includes real-time angular velocity and inclination data.
3. The pile foundation verticality deviation monitoring device based on standard timing according to claim 1 is characterized in that: The power source 1 and the power source 2 are both lithium batteries.
4. The pile foundation verticality deviation monitoring device based on standard timing according to claim 1 is characterized in that: The wireless communication module 1 and the wireless communication module 2 are both Zigbee communication modules.
5. The pile foundation verticality deviation monitoring device based on standard timing according to claim 1 is characterized in that: The shock absorbing device is composed of a shock-isolating pad and a shock-absorbing rubber layer.
6. A working method of the pile foundation verticality deviation monitoring device based on standard timing according to any one of claims 1 to 5, characterized in that: The specific steps are: Step 1: Preparation before drilling: A. The vehicle-mounted control system and the wireless intelligent collection and monitoring device are respectively installed at the corresponding positions of the rotary drilling rig, and the rotary drilling rig is made to reach the designated position; B. Input the preset drilling trajectory into the central processor of the vehicle control system and set the vertical deviation threshold; C. The central processor of the vehicle control system uses the data collected by the second electronic gyroscope installed on the top of the drill rod to construct a coordinate system P_vehicle with the top connection of the drill rod as the origin, and uses the data collected by the first electronic gyroscope in the vehicle control system and the positioning data of the GPS to build a world coordinate system P_world based on the national geodetic coordinate system; the FPGA processor of the wireless intelligent acquisition and monitoring device uses the data collected by the third electronic gyroscope to establish a coordinate system P_hole, and transmits the coordinate system data to the vehicle control system through wireless communication. The central processor of the vehicle control system projects the coordinate system P_hole and the coordinate system P_vehicle into the world coordinate system P_world through coordinate transformation; D. The central processor in the vehicle control system records the virtual position of P_vehicle and P_hole in the world coordinate system P_world after the projection transformation, and transmits it to the wireless intelligent acquisition monitoring device through wireless communication. After completion, the vehicle control system and the wireless intelligent acquisition monitoring device communicate with each other wirelessly, so that the time synchronization device 1 and the time synchronization device 2 are synchronized once and then the two start timing synchronously; Step 2: Drilling data collection: ① After the rotary drilling rig starts working, the vehicle-mounted control system uses the drilling parameter acquisition module to obtain the real-time engineering parameters and azimuth data of the drilling rig and feeds it back to the central processor in combination with the time recorded by the timing device 1; at the same time, the wireless intelligent acquisition and monitoring device uses the third electronic gyroscope to obtain the real-time azimuth data of the drilling bucket during drilling and feeds it back to the FPGA processor in combination with the time recorded by the timing device 2; ② The central processor of the vehicle control system performs preliminary processing on the acquired real-time engineering parameters and azimuth data in combination with the time recorded by the first timing device, calculates the drilling depth, drilling speed, and offset of the drill pipe at different times, and calculates the transformation of the coordinate system P_vehicle during the rotation of the drill pipe; the FPGA processor in the wireless intelligent acquisition and monitoring device performs preliminary calculations on the trajectory of the drill pipe at different times during the drilling process and the transformation of the coordinate system P_hole according to the time recorded by the second timing device and the data fed back by the third electronic gyroscope; Step 3: Determine the vertical offset of the drill hole: Ⅰ. After drilling a certain distance, the drill bucket needs to transport the soil produced by drilling to the ground. When the drill bucket takes soil and reaches the ground for a short time, the wireless communication module 2 and the wireless communication module 1 establish wireless communication. At this time, the wireless intelligent acquisition and monitoring device transmits the real-time position data of the drill bucket and the data initially calculated by the FPGA processor to the vehicle control system through wireless communication. At the same time, the timing device 1 and the timing device 2 perform a time synchronization through this wireless communication to calibrate the synchronous timing of the two. Ⅱ. The central processor of the vehicle control system performs correction and calculation based on the data transmitted by the wireless intelligent acquisition and monitoring device, the data collected by the first electronic gyroscope and the drilling parameter acquisition module, determines the projection transformation of the coordinate systems P_hole and P_vehicle during the drilling process, and calculates the inclination data of the drill bucket in the world coordinate system P_world during the communication acquisition time period during the drilling process according to the difference in the relative transformation of the two coordinate systems and the azimuth data collected by the third electronic gyroscope in the wireless intelligent acquisition and monitoring device; III. The central processor calculates the drilling depth and drill rod offset data within the communication acquisition time period according to the data fed back by the drilling parameter acquisition module, and obtains the drill bucket inclination data within the time period in combination with step II, thereby generating the drilling trajectory within the communication acquisition time period; IV. Compare the drilling trajectory within the communication acquisition time period in step III with the preset drilling trajectory within the time period. If the vertical offset of the two does not exceed the vertical offset threshold, the drill bucket continues to perform subsequent drilling construction, and the on-board control system displays the operating status, drill bucket trajectory and vertical offset data of the drill rig in the world coordinate system P_world within the communication acquisition time period on the display; and repeat steps I to III to judge the vertical offset again when the drill bucket takes soil to the ground next time; if the vertical offset of the two exceeds the vertical offset threshold, the on-board control system issues an alarm prompt, and the drilling work of the drill bucket is stopped in time, and the drilling parameters of the drill rig are adjusted according to the obtained vertical offset before continuing the drilling construction.