Regional biodiversity monitoring method, device, equipment and storage medium
By performing transformation parameter projection and integrated parameter optimization in the biological distribution prediction network, the problem of scattered network parameter debugging is solved, the accuracy and reliability of ecological intervention strategies are improved, and the needs of modern ecological protection are met.
Patent Information
- Application Number
- CN202410973361.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-07-19
AI Technical Summary
During the construction and debugging process of the existing biological distribution prediction network, the debugging process of network parameters is relatively scattered, resulting in insufficient accuracy and robustness of the machine learning network, making it difficult to meet the needs of modern ecological protection.
By obtaining the transformation parameters in the biological distribution prediction network and performing projection operations, the integration parameters are obtained, and the learning sample library is used to perform dimension transformation and representation information integration, and the network parameters are optimized to improve the accuracy of the ecological intervention strategy.
It improves the accuracy and reliability of the biological distribution prediction network, ensures the scientificity and reliability of ecological intervention strategies, and meets the needs of modern ecological protection.
Smart Images

Figure CN118522340B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of data processing technology, and in particular to a method, device, equipment and storage medium for regional biodiversity monitoring. Background Art
[0002] With the increasing awareness of environmental protection and the deepening of ecological science research, the monitoring and assessment of regional biodiversity has become increasingly important. The protection of biodiversity is not only related to the balance and stability of natural ecosystems, but also directly affects the sustainable development of human society. However, traditional biodiversity monitoring methods often rely on manual surveys and data statistics, which have problems such as large workload, long cycle, and low accuracy, and are difficult to meet the needs of modern ecological protection. In recent years, with the rapid development of machine learning technology, especially the successful application of deep learning in image recognition, natural language processing and other fields, it has provided new ideas for the automated monitoring of biodiversity. By constructing a biological distribution estimation network based on machine learning, large-scale ecological data can be quickly processed and analyzed, thereby improving the efficiency and accuracy of biodiversity monitoring. However, in the construction and debugging process of the existing biological distribution estimation network, the debugging process of network parameters is relatively scattered, which makes the accuracy and robustness of the debugged machine learning network insufficient. Summary of the invention
[0003] In view of this, the present application provides a method, device, equipment and storage medium for regional biodiversity monitoring. The technical solution of the present application is implemented as follows:
[0004] In a first aspect, the present application provides a method for biodiversity monitoring in a regional scope, comprising: obtaining ecological element data of a target monitoring area and each candidate habitat intervention strategy of a target monitoring area; loading the ecological element data of the target monitoring area and the candidate habitat intervention strategy into a debugged biological distribution prediction network for inference, and obtaining the target biodiversity distribution results of the target monitoring area for each of the candidate habitat intervention strategies; matching the candidate habitat intervention strategies whose target biodiversity distribution results conform to the preset biodiversity distribution results to the target monitoring area; wherein the debugging process of the biological distribution prediction network comprises: obtaining transformation parameters used to characterize information dimensionality transformation in the biological distribution prediction network; performing a projection operation on the transformation parameters to obtain integration parameters of the biological distribution prediction network used to characterize information integration; obtaining the biological distribution prediction network; and A learning sample library of a network, each learning sample in the learning sample library includes regional ecological element data of the monitoring area learning sample and an intervention strategy sample for the monitoring area learning sample to generate a preset biodiversity distribution result; based on the transformation parameter, the learning sample is subjected to dimensional transformation processing to obtain one or more transformation representation information corresponding to the learning sample; based on the integration parameter, one or more of the transformation representation information is subjected to representation information integration processing to obtain first integrated representation information corresponding to the learning sample; based on the first integrated representation information, the biodiversity distribution result of the monitoring area learning sample for the intervention strategy sample is estimated, and based on the estimated biodiversity distribution result, the biological distribution estimation network is debugged, the transformation parameter and the integration parameter are optimized, and a debugged biological distribution estimation network for determining the ecological intervention strategy is obtained.
[0005] In a second aspect, the present application provides a regional biodiversity monitoring device, including: a data acquisition module, used to obtain the ecological element data of the target monitoring area and each candidate habitat intervention strategy of the target monitoring area; a diversity reasoning module, used to load the ecological element data of the target monitoring area and the candidate habitat intervention strategy into a debugged biological distribution prediction network for reasoning, and obtain the target biodiversity distribution results of the target monitoring area for each candidate habitat intervention strategy; a strategy matching module, used to match the candidate habitat intervention strategy whose target biodiversity distribution results conform to the preset biodiversity distribution results to the target monitoring area; a network debugging module, used to debug the biological distribution prediction network according to the following steps: obtain the transformation parameter variables used to characterize the information dimensionality transformation in the biological distribution prediction network; perform a projection operation on the transformation parameter variables to obtain the biological distribution prediction network used to characterize the information dimensionality transformation The invention relates to a method for predicting the biodiversity distribution of an object and a method for predicting the biodiversity distribution of an object. The method comprises: obtaining a learning sample library of the biodiversity distribution prediction network, wherein each learning sample in the learning sample library includes regional ecological element data of a monitoring area learning sample and an intervention strategy sample for generating a preset biodiversity distribution result for the monitoring area learning sample; performing dimensionality transformation processing on the learning sample based on the transformation parameter to obtain one or more transformation representation information corresponding to the learning sample; performing representation information integration processing on one or more of the transformation representation information based on the integration parameter to obtain first integrated representation information corresponding to the learning sample; estimating the biodiversity distribution result of the monitoring area learning sample for the intervention strategy sample based on the first integrated representation information, and debugging the biodiversity distribution prediction network based on the estimated biodiversity distribution result, optimizing the transformation parameter and the integration parameter, and obtaining a debugged biodistribution prediction network for determining the ecological intervention strategy.
[0006] In a third aspect, the present application provides a computer device, comprising a memory and a processor, wherein the memory stores a computer program executable on the processor, and the processor implements the steps in the above method when executing the program.
[0007] In a fourth aspect, the present application provides a computer-readable storage medium having a computer program stored thereon, which implements the steps in the above-described method when executed by a processor.
[0008] The beneficial effects of the present application include at least: in the embodiment of the present application, by obtaining the transformation parameter used to characterize the information dimension transformation in the biological distribution prediction network, the transformation parameter is projected to obtain the integrated parameter used to characterize the information integration of the biological distribution prediction network. Then, a learning sample library of the biological distribution prediction network is obtained, and each learning sample in the learning sample library includes the regional ecological element data of the monitoring area learning sample and the intervention strategy sample of the monitoring area learning sample to generate the preset biodiversity distribution result. Then, the learning sample is subjected to dimensional transformation processing based on the transformation parameter to obtain one or more transformation representation information corresponding to the learning sample, and one or more integrated representation information is subjected to representation information integration processing based on the integration parameter to obtain the first integrated representation information corresponding to the learning sample. Finally, based on the first integrated representation information, the biodiversity distribution result of the monitoring area learning sample for the intervention strategy sample is estimated, and the biological distribution prediction network is debugged based on the estimated biodiversity distribution result, and the transformation parameter and the integration parameter are optimized to obtain a debugged biological distribution prediction network for determining the ecological intervention strategy. Based on this, because the present application performs a projection operation on the transformed parameters after obtaining the transformed parameters to obtain the integrated parameters, so that an association is generated between the transformed parameters and the integrated parameters, then based on the transformed parameters, the learning samples are dimensionally transformed to obtain one or more transformed representation information corresponding to the learning samples, and one or more integrated representation information are integrated based on the integrated parameters to obtain the first integrated representation information corresponding to the learning samples. Then, based on the first integrated representation information, the biodiversity distribution results of the learning samples in the monitored area for the intervention strategy samples are estimated, and the biological distribution prediction network is debugged based on the estimated biodiversity distribution results, the transformed parameters and the integrated parameters are optimized, and the debugged biological distribution prediction network obtained is more reliable in determining the accuracy of ecological intervention strategies. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] Figure 1 A schematic diagram of the implementation flow of a regional biodiversity monitoring method provided in an embodiment of the present application.
[0010] Figure 2 A schematic diagram of the composition structure of a regional biodiversity monitoring device provided in an embodiment of the present application.
[0011] Figure 3 A hardware entity diagram of a computer device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0012] The embodiment of the present application provides a method for monitoring biodiversity in a regional scope, which can be executed by a processor of a computer device. The computer device may refer to a server, a laptop, a tablet computer, a desktop computer, a mobile device (such as a mobile phone, a portable video player, a personal digital assistant, a dedicated messaging device, a portable gaming device), or other device with data processing capabilities.
[0013] Figure 1 A schematic diagram of the implementation flow of a regional biodiversity monitoring method provided in an embodiment of the present application is shown in FIG. Figure 1 As shown, the method includes:
[0014] Step S100: Obtain ecological element data of the target monitoring area and intervention strategies for each candidate habitat in the target monitoring area.
[0015] In the embodiment of the present application, the computer equipment performs detailed data collection work for the target monitoring area. These ecological element data include, but are not limited to: climate data: such as average annual precipitation (for example, the average annual precipitation in the area is 1200 mm), average monthly temperature range (such as the average temperature of each month from January to December is between -5°C and 25°C), seasonal wind direction and wind speed, etc. These data are usually recorded in the form of time series to form a climate feature vector. Soil information: including soil type (such as loam, sand, clay, etc.), soil acidity (pH value), soil moisture, soil fertility (such as nitrogen, phosphorus, potassium content), etc. These data are obtained through field sampling and laboratory analysis to form a soil feature array. Vegetation coverage: record the distribution, coverage area, species diversity index, etc. of different vegetation types in the area. These data may be collected through remote sensing satellite image analysis, drone aerial photography or ground field surveys to form a vegetation coverage feature matrix. Animal populations: Monitor and record the types, numbers, distribution ranges, reproductive status, etc. of animal species in the area. This data may be obtained through infrared camera traps, direct observation or expert assessment to form a list of animal population characteristics.
[0016] At the same time, the computer equipment will also collect and organize a series of candidate habitat intervention strategies. These strategies aim to improve or maintain the biodiversity of the target monitoring area, including but not limited to: Afforestation: plans to plant specific types of trees to restore or expand forest area. The strategy details tree species selection, planting density, maintenance measures, etc. Wetland restoration: Design and implement a series of restoration measures for degraded wetland ecosystems, such as removing invasive species, rebuilding aquatic vegetation, and introducing native aquatic animals. Species protection: For endangered species, formulate protection plans, including habitat protection, population monitoring, disease prevention and control, artificial breeding and release, etc. Ecological corridor construction: In order to promote species migration and gene exchange, plan and build ecological corridors to connect fragmented habitat patches. Each candidate strategy contains specific implementation steps, expected effects and possible risk assessments, forming a set of strategy documents for use in subsequent steps.
[0017] Step S200: Loading the ecological element data of the target monitoring area and the candidate habitat intervention strategies into the debugged biological distribution estimation network for inference, and obtaining the target biodiversity distribution results of the target monitoring area for each candidate habitat intervention strategy.
[0018] In an embodiment of the present application, step S200 inputs the ecological element data of the target monitoring area and the candidate habitat intervention strategies collected in the early stage into the debugged biological distribution estimation network for reasoning. This step is intended to simulate the possible changes in the biodiversity of the target monitoring area after the implementation of different intervention strategies, and provide a scientific basis for the selection and optimization of strategies. Specifically, the computer device loads the debugged biological distribution estimation network. This network is built based on complex machine learning algorithms, and may include deep neural networks (such as convolutional neural networks CNN, recurrent neural networks RNN or long short-term memory networks LSTM, used to process time series data), random forests, gradient boosting trees and other models, or a combination of these models to adapt to the diversity and complexity of ecological data. During the debugging stage, the network has been trained with a large amount of historical ecological data and known intervention strategy results, and has learned how to extract key features from the input data and predict the changing trends of biodiversity.
[0019] Next, the computer device uses the ecological element data of the target monitoring area (such as climate data vectors, soil information arrays, vegetation cover matrices, animal population lists, etc.) as input features, and specifies one or more candidate habitat intervention strategies as conditional variables. These data and strategies are carefully encoded into a format that the network can understand, such as processing strategy labels through One-Hot Encoding, or standardizing numerical data to the same scale. Then, the debugged biological distribution estimation network begins to execute the inference process. Inside the network, the input data is first preliminarily processed through the embedding layer (Embeddings) or the fully connected layer to map the original features to a higher dimension or a space more suitable for subsequent processing. Subsequently, the network uses a multi-layer neural network structure to extract and integrate feature information layer by layer, while considering the impact of intervention strategies, and introducing complexity through nonlinear activation functions to simulate the complex interaction relationships in the ecosystem.
[0020] In the final stage of inference, the network output layer predicts the biodiversity distribution results of the target monitoring area under different candidate habitat intervention strategies based on the integrated feature information. These results may be given in the form of probability distribution, indicating the expected abundance or coverage of different species or ecological communities at a certain point in the future. For example, for a specific afforestation strategy, the network may predict that the forest cover will increase by 5%, and the population of certain animal species that rely on forest ecosystems will also increase accordingly.
[0021] Step S300: Matching candidate habitat intervention strategies whose target biodiversity distribution results meet preset biodiversity distribution results to target monitoring areas.
[0022] In step S300 of the embodiment of the present application, the computer device will compare and analyze the target biodiversity distribution result obtained based on the biological distribution estimation network reasoning in step S200 with the preset biodiversity distribution target, so as to screen out the candidate habitat intervention strategy that meets or optimizes the target monitoring area. Specifically, the computer device obtains the preset biodiversity distribution target, which is usually formulated by ecological protection experts or management departments based on the regional ecological status, protection needs and future vision. The preset target may include specific species abundance indicators (such as the number of a certain endangered species must reach a specific threshold), ecological community structure indicators (such as forest coverage, wetland proportion, etc.), biodiversity index (such as Shannon-Wiener diversity index), etc., which together constitute the expected state of biodiversity conservation. Then, the computer device will compare the predicted biodiversity distribution results under each candidate habitat intervention strategy with the preset target. This comparison process may involve complex statistical analysis and pattern matching algorithms to ensure the accuracy and objectivity of the evaluation. For example, computer equipment can use indicators such as mean square error (MSE) or correlation coefficient (R²) to measure the closeness between the predicted results and the target; or through multi-objective optimization algorithms (such as NSGA-II) to comprehensively consider multiple preset goals and find the strategy with the best overall performance.
[0023] After screening out candidate strategies that meet the preset goals, the computer equipment will further evaluate these strategies' feasibility, cost-effectiveness, potential risks and other factors. This process may rely on additional databases and expert knowledge bases to provide resource information, historical cases and expert opinions required for strategy implementation. Ultimately, the computer equipment will match the candidate habitat intervention strategy that best meets the preset biodiversity distribution goals and has the best comprehensive evaluation to the target monitoring area. The matching results will be presented in the form of a report, detailing the content, expected effects, implementation steps and precautions of the recommended strategy, for reference and decision-making by ecological protection departments and management agencies.
[0024] In the embodiment of the present application, the debugging process of the biological distribution prediction network includes the following steps:
[0025] Step S10: Obtain transformation parameters used to characterize information dimension transformation in the biological distribution prediction network.
[0026] In an embodiment of the present application, step S10 obtains transformation parameters used to characterize the information dimensionality transformation. These parameters play a vital role in the biological distribution prediction network. They define how to map the high-dimensional feature vectors of the original ecological data into a low-dimensional or high-dimensional space that is more suitable for subsequent processing and analysis.
[0027] Specifically, the computer device defines the preset projection dimensions in the biological distribution estimation network. These preset projection dimensions are pre-set according to the ecological characteristics of the monitoring area, the monitoring objectives, and the characteristics of the machine learning model. For example, when processing climate data, the computer device can set a series of preset projection dimensions to represent different aspects of key climate factors such as temperature, precipitation, and wind speed; when processing vegetation data, the dimensions may be set to reflect characteristics such as vegetation coverage and species diversity. Then, for each preset projection dimension, the computer device determines the corresponding weight parameter, that is, the transformation parameter. These transformation parameters are key components in the network for realizing feature dimensionality transformation. They achieve information screening and integration by adjusting the weights of each element in the original feature vector. In actual operation, these transformation parameters usually exist in the form of matrices or vectors, and each row of the matrix or each element of the vector corresponds to the weight value of one or more features in the original feature vector.
[0028] Taking deep neural networks as an example, the biological distribution estimation network may contain multiple fully connected layers (DenseLayers), each of which performs a feature dimension transformation. In these fully connected layers, the weight matrix plays the role of transformation parameters. Through the forward propagation process, the input feature vector is multiplied by the weight matrix, and then the bias term is added. After being processed by the activation function, the output feature vector is obtained. This output vector is the new feature representation obtained after the original feature vector is transformed in dimension, which contains information that is more suitable for subsequent tasks (such as biodiversity distribution prediction). Therefore, in step S10, the computer device constructs a flexible and powerful feature transformation framework for the biological distribution estimation network by defining a preset projection dimension and corresponding transformation parameters. This framework can automatically learn and adjust the feature transformation method according to the characteristics of the input data and the requirements of the monitoring task, thereby realizing deep mining and analysis of biodiversity monitoring data.
[0029] Step S20: Perform a projection operation on the transformed parameters to obtain integrated parameters for characterizing information integration of the biological distribution prediction network.
[0030] In the embodiment of the present application, the core of step S20 is to perform a projection operation on the previously acquired transformation parameters (i.e., weight parameters used to characterize the information dimension transformation) to generate integrated parameters, which play an important role in integrating and fusing information of different dimensions in the network. Specifically, the computer device applies a series of mathematical and computational methods to process the transformation parameters. These transformation parameters originally acted independently on different dimensions of the input data, and the information was screened and transformed through specific weight allocation. However, in order to obtain more comprehensive and accurate biodiversity distribution estimation results, it is necessary to effectively integrate these information from different dimensions. The projection operation (or mapping processing) is the key step to achieve this goal. In this process, the computer device can use a variety of mathematical tools and techniques, such as matrix multiplication, linear transformation, nonlinear activation function, etc., to map the transformation parameters to a new parameter space to form integrated parameters. The integrated parameters can be regarded as a set of fusion weight parameters, which contains the knowledge of how to integrate information of different dimensions according to certain rules to form the final feature representation.
[0031] Taking deep neural networks as an example, this step may correspond to one or more layers of processing units in the network. For example, after the fully connected layer (Dense Layer), an activation layer (such as a ReLU layer or a Sigmoid layer) may follow, which performs a nonlinear transformation on the output of the fully connected layer to generate a new feature vector. The activation function and its parameters here can be regarded as a projection operation, which maps the transformed parameters (i.e., the weight matrix of the fully connected layer) to a space containing nonlinear integrated information, thereby forming integrated parameters (i.e., the activated feature vector). These integrated parameters will help computer equipment better understand and explain the complex ecological relationships in the input data. For example, when the input data contains characteristics of multiple dimensions such as climate, soil, vegetation, and animal populations, the integrated parameters can capture the interactions and dependencies between these characteristics, thereby providing a more accurate and comprehensive information basis for subsequent biodiversity distribution estimates.
[0032] Through the projection operation in step S20, the computer device successfully transforms the transformed parameter into the integrated parameter, laying a solid foundation for further processing and analysis of the biological distribution estimation network. The implementation of this step not only enhances the feature extraction and integration capabilities of the network, but also improves the accuracy and reliability of biodiversity monitoring results.
[0033] Step S30: obtaining a learning sample library of the biological distribution prediction network, wherein each learning sample in the learning sample library includes regional ecological element data of the monitoring area learning sample and an intervention strategy sample for generating a preset biodiversity distribution result of the monitoring area learning sample.
[0034] In the embodiment of the present application, the core of step S30 is to obtain a rich and diverse library of learning samples, which not only contain the ecological element data of the monitoring area, but also record the preset biodiversity distribution results after the implementation of a specific intervention strategy. Specifically, the computer device constructs a learning sample library specifically for training the biological distribution estimation network. Each learning sample in this library is a complete data set, which describes in detail the ecological status of a certain monitoring area (such as a nature reserve, wetland, forest, etc.) and the changes in biodiversity after the implementation of a specific intervention strategy in the area. Ecological element data is one of the core components of learning samples, which covers multi-dimensional feature information of the monitoring area. For example, these data may include climate data (such as average annual precipitation, temperature distribution), soil conditions (such as soil type, fertility), vegetation coverage (such as main vegetation types, coverage area), animal population dynamics (such as species, quantity, distribution range), etc. These data usually exist in the form of vectors, matrices or more complex data structures, such as time series data, image data or spatial distribution data.
[0035] In addition to ecological element data, the learning samples also include intervention strategy samples, that is, those strategies that have been implemented in the actual monitoring area and have produced observable biodiversity distribution results. These strategies may include afforestation, wetland restoration, species introduction, habitat protection and other types. Each strategy records in detail the specific measures, time, location, and expected and actual biodiversity impacts of its implementation. For example, an intervention strategy sample may describe a strategy to plant specific tree species in a specific area to restore forest cover, while recording the change data of forest cover and species diversity before and after implementation.
[0036] By learning from these examples in the sample library, the computer equipment can capture the complex relationship between ecological elements and biodiversity distribution, as well as the impact of different intervention strategies on these relationships. These examples provide rich training data for the biological distribution estimation network, allowing the network to gradually optimize its internal parameters and structure by learning the patterns and laws in these examples, thereby achieving accurate estimation of biodiversity distribution in new monitoring areas.
[0037] Step S40: Perform dimensionality transformation processing on the learning sample based on the transformation parameter to obtain one or more transformation representation information corresponding to the learning sample.
[0038] In the embodiment of the present application, the core of step S40 is to use transformation parameters to perform dimensionality transformation processing on the ecological element data in the learning sample, so as to extract more critical and effective feature information for biodiversity distribution prediction, namely, transformation representation information.
[0039] Specifically, the computer device accesses the learning sample library and extracts learning samples containing ecological element data of the monitoring area. These ecological element data are usually high-dimensional and contain complex information in multiple aspects such as climate, soil, vegetation, and animal populations. In order to more effectively use these data to predict the distribution of biodiversity, they need to be transformed. In this step, the computer device uses the transformation parameters obtained in the previous step (i.e., those weight parameters used to characterize the information dimensionality transformation) as a guide to transform the ecological element data in the learning sample. The transformation parameters define the mapping relationship from the original high-dimensional feature space to the low-dimensional or high-dimensional feature space. By adjusting the values of these parameters, the feature information can be screened, integrated, and enhanced. For example, assume that the ecological element data contains a vector about climate, which contains information in multiple dimensions such as average annual precipitation, temperature, and wind speed. The computer device will perform weighted summation or other forms of linear transformation on these climate features according to the corresponding weight values in the transformation parameters, thereby obtaining a lower-dimensional or higher-dimensional but more compact and effective climate feature vector. This new vector is a form of transformed representation information, which retains the key information in the original climate data while removing redundancy and noise. In addition to climate characteristics, other ecological element data such as soil conditions, vegetation cover, and animal populations will also undergo a similar dimensionality transformation process. Ultimately, the computer device will generate one or more transformed representation information for each learning example. This information exists in the form of vectors, matrices, or tensors, and contains more refined and useful feature representations, providing a solid foundation for subsequent biodiversity distribution predictions. In practical applications, the specific implementation of dimensionality transformation processing may depend on the machine learning model or algorithm used. For example, in a deep neural network, this step may correspond to an embedding layer or a fully connected layer in the network, which performs linear transformation and nonlinear activation processing on the input data through learned weight parameters to generate transformed representation information. Regardless of the method used to implement dimensionality transformation processing, its purpose is to extract the most critical and effective feature information for biodiversity distribution prediction from the original ecological element data.
[0040] Step S50: performing representation information integration processing on one or more transformed representation information based on the integration parameter variable to obtain first integrated representation information corresponding to the learning example.
[0041] In the embodiment of the present application, the core of step S50 is to use integrated parameters (i.e., fusion weight parameters used for characterization information integration) to integrate one or more transformed characterization information obtained through dimensional transformation, thereby generating first integrated characterization information that can comprehensively reflect the ecological status of the monitored area.
[0042] Specifically, in step S40, the computer device has extracted the transformation representation information by learning the ecological element data in the sample. This information may exist in the form of vectors, matrices or tensors, and represents the characteristics of different aspects such as climate, soil, vegetation, animal populations, etc. However, these transformation representation information are still relatively independent. They each describe one aspect of the ecological element, but fail to fully reflect the comprehensive ecological status of the monitoring area. In order to make up for this deficiency, step S50 introduces integrated parameters. The integrated parameters are learned by the biological distribution prediction network during the training process. They define the strategy of how to organically integrate the transformation representation information of different sources and dimensions. In actual operation, the computer device will perform weighted summation, splicing, convolution or other forms of mathematical operations on the transformation representation information according to the value of the integrated parameter, so as to realize the integration processing of information. For example, suppose there are two transformation representation information: one is a vector of climate characteristics, and the other is a matrix of vegetation coverage. The computer device can perform weighted summation on the two representation information according to the corresponding weight values in the integrated parameter to obtain a comprehensive vector that contains both climate information and vegetation coverage information. This comprehensive vector is a form of first integrated representation information, which reflects the ecological status of the monitored area more comprehensively.
[0043] In addition to simple weighted summation, the integration process may also involve more complex operations. For example, in a deep neural network, this step may correspond to a convolutional layer or a pooling layer in the network, which integrates the transformed representation information in space or time through convolution kernels and pooling operations to extract higher-level feature representations. Finally, after the integration process of step S50, the computer device generates the first integrated representation information for each learning example. This information not only contains the multi-faceted ecological characteristics of the monitored area, but also realizes the organic fusion and enhancement of information through the role of integrated parameters. This provides a richer and more comprehensive input feature representation for subsequent biodiversity distribution predictions, which helps to improve the accuracy and reliability of the prediction.
[0044] Step S60: Based on the first integrated representation information, estimate the biodiversity distribution results of the monitoring area learning samples for the intervention strategy samples, and debug the biological distribution prediction network based on the estimated biodiversity distribution results, optimize the transformation parameters and the integration parameters, and obtain a debugged biological distribution prediction network for determining the ecological intervention strategy.
[0045] In an embodiment of the present application, step S60 aims to estimate the biodiversity distribution results of the monitoring area learning samples under a specific intervention strategy sample based on the first integrated representation information, and to obtain a model that can accurately guide the determination of ecological intervention strategies by continuously debugging and optimizing the parameters of the biological distribution prediction network.
[0046] Specifically, in step S50, the computer device has generated first integrated representation information for each learning example, which comprehensively and concisely reflects the ecological status of the monitoring area. In step S60, the computer device will use this information as input to perform inference and prediction through specific algorithms or models (such as deep neural networks, random forests, gradient boosting trees, etc.) in the biological distribution prediction network. These algorithms or models have learned how to extract key information from input features during the training process and predict the biodiversity distribution results based on this. Taking the deep neural network as an example, the first integrated representation information may first be sent to one or more hidden layers, and further features are extracted and transformed through the action of nonlinear activation functions and weight matrices. Subsequently, this information is passed to the output layer, and a probability vector or matrix representing the biodiversity distribution results is output through the softmax function or other appropriate activation functions. Each element in this vector or matrix corresponds to the expected abundance or coverage area of a species or ecological community in the monitoring area.
[0047] After obtaining the estimated biodiversity distribution results, the computer device will compare them with the actual results recorded in the learning sample library and calculate the error or loss function value. This error value reflects the degree of difference between the estimated results and the actual results, and is an important indicator for measuring the performance of the biological distribution estimation network. Next, the computer device will debug and optimize the biological distribution estimation network according to the error value. This process usually includes the application of the backpropagation algorithm, and the values of the transformation parameters and integration parameters in the network are adjusted by gradient descent or other optimization algorithms to minimize the error function. As the number of iterations increases, the prediction ability of the network gradually increases, and the error value gradually decreases until the preset stop condition (such as error threshold, upper limit of iteration number, etc.) is met. Finally, after multiple iterations and optimizations, the computer device obtains a debugged biological distribution estimation network. This network can accurately estimate the biodiversity distribution results under different intervention strategies in the monitoring area, providing scientific and reliable decision-making support for ecological protection and management departments. By using this network, relevant departments can formulate more reasonable and effective ecological intervention strategies to promote the protection and restoration of regional biodiversity.
[0048] As an implementation method, step S20, performing a projection operation on the transformed parameter to obtain the integrated parameter of the biological distribution prediction network, may specifically include:
[0049] Step S21: Perform a first linear projection operation on the transformed parameters to obtain candidate integrated parameters for characterizing information integration of the biological distribution prediction network.
[0050] In the biological distribution estimation network, transformation parameters refer to those weight parameters used to characterize the information dimension transformation, which define the rules for mapping the original high-dimensional ecological element data into low-dimensional or high-dimensional feature space. These transformation parameters may exist in the form of vectors, matrices, or more complex tensors, depending on the network structure and the dimension of the input data. In step S21, the computer device performs a first linear projection operation on these transformation parameters. The core of this operation is to map the transformation parameters to a new space using linear transformations (such as matrix multiplication) to generate candidate integrated parameters. The linear projection operation can use a fully connected layer (Dense Layer) in a neural network. In the fully connected mapping, each input feature (i.e., each element in the transformation parameter) is linearly combined with the output feature (i.e., each element in the candidate integrated parameter) through a weight matrix. Each element in the weight matrix is a learnable parameter, which is updated by the back propagation algorithm during the network training process to minimize the prediction error.
[0051] Specifically in the scenario of biodiversity monitoring, suppose there is a monitoring area containing ecological element data in four dimensions: climate, soil, vegetation, and animal population. The transformation parameter may be a four-dimensional vector, and the elements in each dimension correspond to the feature transformation weights of these four aspects. Through the fully connected mapping, the computer device maps these transformed parameters to a higher or lower dimensional space to generate candidate integrated parameters. This new vector or matrix will contain the integrated information, which is no longer limited to a single dimension of the original data, but integrates multiple aspects of feature representation. For example, if the goal is to predict the distribution of an endangered species in the monitoring area, then the candidate integrated parameter may contain information on multiple aspects of climate, soil, vegetation coverage, and potential food sources that are closely related to the survival of the species. This information may be scattered in different dimensions in the original data, but through the linear projection operation of the fully connected mapping, they are effectively integrated together, providing more comprehensive and accurate input features for subsequent biodiversity distribution estimates.
[0052] Step S22: Perform a nonlinear projection operation on the candidate integrated parameter variables to obtain the integrated parameter variables of the biological distribution prediction network.
[0053] In step S22, the computer device first applies a nonlinear projection operation to the candidate integrated parameter variables, which is usually implemented by an activation function. The activation function is one of the core components in the neural network, which can introduce nonlinear factors so that the network can handle complex nonlinear relationships. In the biological distribution estimation network, the choice of the activation function has a crucial impact on the performance of the model. Specifically, in the implementation of step S22, it is assumed that the biological distribution estimation network includes a gated network component, which consists of a first affine component (i.e., a part that performs linear transformation, such as a fully connected layer) and an activation component (i.e., a part that performs nonlinear transformation). In step S21, the first affine component has performed a first linear projection operation on the transformed parameter variables to generate candidate integrated parameter variables. Now, the activation component will perform a nonlinear projection operation on these candidate integrated parameter variables. There are many choices for activation functions, and common ones include Sigmoid, ReLU, Tanh, etc. In the context of the biological distribution estimation network, if the integrated parameter variables need to be mapped to the range of [0, 1], then the Sigmoid function is a suitable choice. The Sigmoid function can compress any real value into the interval (0, 1), which makes it very suitable for generating probability distribution or normalization. By applying the Sigmoid function to the candidate integrated parameters through the activation component, the computer device obtains the final integrated parameters. These integrated parameters not only contain the information in the candidate integrated parameters, but also introduce new feature representations through nonlinear transformation, making them more suitable for subsequent biodiversity distribution estimation tasks.
[0054] Taking regional biodiversity monitoring as an example, the hypothetical goal is to predict the distribution of a rare animal in a nature reserve. In the biological distribution estimation network, the transformed parameter may represent the characteristic weights of multiple ecological elements such as climate, soil, vegetation, and water sources. After the first linear projection operation, these characteristic weights are integrated into candidate integrated parameter variables. Then, through the nonlinear projection operation of the Sigmoid activation function, the candidate integrated parameter variables are further transformed into integrated parameter variables. These integrated parameter variables reflect the comprehensive impact of different ecological elements on the distribution of the rare animal, and are normalized to the range of [0, 1], which is convenient for subsequent probability interpretation and decision analysis.
[0055] As an implementation method, step S22, performing a nonlinear projection operation on the candidate integrated parameter variables to obtain the integrated parameter variables of the biological distribution estimation network, may specifically include:
[0056] Step S221: Perform nonlinear projection operation on the candidate integrated parameters to obtain basic integrated parameters of the biological distribution prediction network.
[0057] In an embodiment of the present application, step S221 involves performing a nonlinear projection operation on the candidate integrated parameters to obtain basic integrated parameters. This step is automatically performed by a computer device and aims to enhance the network model's ability to model complex ecological relationships by introducing nonlinear factors. Specifically, in step S21, the computer device has processed the transformed parameters through a first linear projection operation (such as a fully connected mapping) to generate candidate integrated parameters. These candidate integrated parameters preliminarily integrate ecological element information of different dimensions, but are still linear combinations and cannot fully capture the nonlinear relationships that are prevalent in ecosystems.
[0058] In order to solve this problem, step S221 introduces a nonlinear projection operation. This operation is usually implemented through an activation function, which is a key component used to introduce nonlinearity in a neural network. In the biological distribution estimation network, commonly used activation functions include Sigmoid, ReLU, Tanh, etc., each of which has different characteristics and applicable scenarios. Taking the Sigmoid function as an example, it can map any real-valued input to the interval (0, 1) and output a value between 0 and 1. In the application scenario of biodiversity monitoring, if the candidate integrated parameter represents the potential intensity of the impact of a certain ecological factor on biodiversity, then after nonlinear projection through the Sigmoid function, the basic integrated parameter can be interpreted as the probability or possibility of such an impact. Assume that the candidate integrated parameter is a vector containing information on ecological factors in multiple dimensions such as climate, soil, and vegetation, and the value of each dimension represents the relative contribution of the factor to the distribution of biodiversity. After nonlinear projection through the Sigmoid activation function, these values are converted into basic integrated parameters, and each value now represents a probabilistic representation of the impact of the corresponding ecological factor on the distribution of biodiversity. This probabilistic representation not only retains the key information of the original data, but also introduces new feature representations through nonlinear transformations, making the basic integrated parameters more suitable for subsequent biodiversity distribution estimation tasks.
[0059] It should be noted that the specific implementation of the nonlinear projection operation (i.e., the activation function to be selected) depends on the specific requirements and data characteristics of the biological distribution estimation network. In practical applications, the computer equipment can select the most appropriate activation function based on experimental results and domain knowledge.
[0060] Step S222: Perform a gradient-compatible discretization operation on the basic integrated parameter variables to obtain the integrated parameter variables of the biological distribution prediction network.
[0061] In the embodiment of the present application, step S222 is intended to obtain the integrated parameter variables of the biological distribution prediction network through a gradient-compatible discretization operation. This step is automatically performed by a computer device, which combines discrete processing and differentiable processing to ensure that the gradient can be kept transferable during the optimization process, thereby effectively training the network model. In step S221, the candidate integrated parameter variables are subjected to a nonlinear projection operation to generate basic integrated parameter variables. These variables usually still exist in the form of continuous values. Although they have introduced new feature representations through nonlinear transformations, in some cases, these continuous values may need to be converted into discrete values to meet specific model requirements or constraints. The gradient-compatible discretization operation is designed to meet this demand. It first maps the basic integrated parameter variables to a discrete value space through discrete processing to obtain discrete integrated parameter variables. This discrete processing may involve operations such as threshold comparison, quantization, and classification, depending on the application scenario and model requirements. However, it is usually a challenge to directly optimize discrete integrated parameter variables because the discrete operation itself is not differentiable. This means that when training a network based on an optimization algorithm such as gradient descent, the gradient of the objective function to the discrete integrated parameter variables cannot be directly calculated. To solve this problem, gradient-compatible discretization operations also include differentiable operations, which use one or more techniques to approximate the gradient of discrete integrated parameters. These techniques usually include softening techniques, such as using softmax function or Gumbel-Softmax technique to simulate discrete distribution. The softmax function can map continuous values to probability distribution, while the Gumbel-Softmax technique achieves continuous approximation of discrete distribution by introducing Gumbel noise. These techniques allow the model's behavior and output to approximate discrete situations during the optimization process, even though continuous values are actually being processed.
[0062] Taking the biological distribution prediction network as an example, it is assumed that the basic integrated parameter variables (representing the impact intensity of different ecological elements on biodiversity distribution) need to be discretized into several fixed categories (such as low impact, medium impact, and high impact). After discretization, discrete integrated parameter variables are obtained, but it is not feasible to optimize these variables directly. Therefore, the softmax function is used for differentiable processing to convert the discrete integrated parameter variables into a probability distribution form. In this way, during the optimization process, the original discrete integrated parameter variables can be indirectly optimized by calculating the gradient of the objective function with respect to these probability distributions. Finally, after the gradient-compatible discretization operation, the computer device obtains the integrated parameter variables of the biological distribution prediction network. These integrated parameter variables not only meet the discretization requirements, but also maintain the transferability of the gradient, so that the entire network model can be effectively trained based on optimization algorithms such as gradient descent. In the application scenario of biodiversity monitoring, this means that the impact of different ecological elements on biodiversity distribution can be more accurately estimated, thereby providing more scientific decision-making support for ecological protection and management.
[0063] As an implementation manner, in step S60, before estimating the biodiversity distribution result of the monitoring area learning sample for the intervention strategy sample based on the first integrated representation information, the method further includes:
[0064] Step S60a: Perform a second linear projection operation on the transformed representation information to obtain second integrated representation information corresponding to the learning example.
[0065] In an embodiment of the present application, step S60a is intended to further process the transformed characterization information, generate second integrated characterization information through a second linear projection operation, and thus provide a more comprehensive and rich feature representation for subsequent biodiversity distribution estimation. In step S40, the computer device has performed a dimensionality transformation process on the original ecological element data and extracted the transformed characterization information. This information usually exists in the form of vectors, matrices, or higher-dimensional tensors, capturing the key features of ecological elements in different dimensions. However, in order to more deeply explore the potential relationships between these features and further improve the accuracy of the estimate, the transformed characterization information needs to be further processed.
[0066] Step S60a is designed to achieve this goal. In this step, the computer device performs a second linear projection operation on the transformed representation information. This operation is similar to a fully connected layer (Dense Layer) or a linear transformation layer in a neural network, which maps the transformed representation information to a new feature space through a set of learnable weight parameters and bias items.
[0067] Specifically, assume that the transformed representation information is a vector or matrix containing multiple features, denoted as X. In the second linear projection operation, the computer device defines a weight matrix W and a bias vector b. Then, X is mapped to a new vector or matrix Y through matrix multiplication (for vectors) or matrix-matrix multiplication (for matrices) and the addition of bias terms. This process can be expressed as Y=WX+b (for vectors) or Y=WX+bI (for matrices, where I is a unit matrix of the same shape as X, used to expand the bias term to match the dimension of X). After the second linear projection operation, the transformed representation information X is converted into the second integrated representation information Y. Y not only retains the key feature information in X, but also introduces new feature combinations and potential relationships through linear transformation. These new feature representations may be more suitable for subsequent biodiversity distribution estimation tasks. Taking regional biodiversity monitoring as an example, assume that the transformed representation information contains ecological element characteristics in multiple dimensions such as climate, soil, and vegetation. In the second linear projection operation, the computer device can learn the interactions and dependencies between these features and integrate them into the second integrated representation information. For example, if climate and soil conditions have an important impact on the growth of a certain plant, the computer device can strengthen the relationship between these features through a second linear projection operation, thereby more accurately reflecting this impact in the subsequent estimation process.
[0068] Step S60, based on the first integrated representation information, estimating the biodiversity distribution results of the monitoring area learning sample for the intervention strategy sample, including:
[0069] Step S61: combining the first integrated representation information and the second integrated representation information to obtain integrated representation information.
[0070] In the embodiment of the present application, step S61 generates integrated characterization information by combining (such as splicing) the first integrated characterization information and the second integrated characterization information, providing a more comprehensive and accurate data basis for subsequent biodiversity distribution estimation. Regarding the sources and characteristics of the first integrated characterization information and the second integrated characterization information. The first integrated characterization information is generated in step S50, which is obtained by integrating the transformed characterization information based on the transformed parameter, and contains the key features of the ecological element data in the monitoring area and the preliminary integrated relationship between them. The second integrated characterization information is obtained through the second linear projection operation in step S60a, which further explores the potential feature combinations and relationships in the transformed characterization information, and provides additional information supplement for biodiversity distribution estimation.
[0071] In step S61, the computer device performs a combination operation on the two integrated representation information. The specific method of combination can be concatenation, that is, directly connecting the two representation information in the feature dimension to form a longer feature vector or a higher-dimensional feature matrix. This combination method is simple and effective. It can retain all the features in the two representation information and increase the dimension of the model input data through simple feature expansion. Through the combination operation of step S61, the computer device successfully integrates the feature information from different sources and at different levels to construct a more comprehensive and complex feature space for the biological distribution estimation network. This feature space not only contains the key features of ecological elements, but also introduces more potential relationships and combination patterns through feature integration and expansion, providing a strong guarantee for the accuracy of biodiversity distribution estimation.
[0072] Step S62: Based on the integrated representation information, estimate the biodiversity distribution results of the monitoring area learning samples for the intervention strategy samples.
[0073] In step S62 of the embodiment of the present application, the computer device first receives the integrated characterization information as input. The integrated characterization information is obtained by combining (such as splicing) the first integrated characterization information and the second integrated characterization information in step S61, and it contains a comprehensive and integrated feature representation of the ecological element data in the monitoring area. These features not only reflect the properties of the ecological elements themselves, but also reveal the complex relationships and interactions between them through integration processing. Then, the computer device inputs the integrated characterization information into the trained biological distribution prediction model. This model is constructed based on a large amount of historical data and prior knowledge, and can learn and simulate the complex mapping relationship between ecological elements and biodiversity distribution. During the training process, the model minimizes the prediction error by continuously adjusting internal parameters (such as weights, biases, etc.), thereby gradually approaching the true distribution law of biodiversity. Specifically, in the implementation method, the biological distribution prediction model can be a deep learning model such as a multi-layer perceptron (MLP), a convolutional neural network (CNN), a recurrent neural network (RNN) or its variants (such as LSTM, GRU). These models extract and integrate the feature information in the input data layer by layer by stacking multiple processing layers (such as fully connected layers, convolutional layers, pooling layers, recurrent layers, etc.), and finally output the estimated biodiversity distribution results. Taking the multi-layer perceptron as an example, when the integrated representation information is input to the first layer of the model, it first performs matrix multiplication with the weight matrix of the layer, adds a bias term, and then introduces nonlinear factors through activation functions (such as ReLU, Sigmoid, etc.) to generate the output features of the layer. This process is repeated in each subsequent layer until the output layer is reached. In the output layer, the model calculates the estimated biodiversity distribution results based on the output features of the last layer. This result may be a probability distribution vector, a classification label, or a specific numerical representation.
[0074] In the application scenario of regional biodiversity monitoring, the estimated biodiversity distribution results are of great significance for formulating scientific and reasonable ecological protection and management strategies. For example, if the bird diversity distribution in a wetland reserve is being monitored, the bird diversity distribution results estimated in step S62 can help understand the impact of different intervention strategies (such as wetland restoration, ecological corridor construction, etc.) on the number and distribution of bird populations, so as to select the optimal strategy to protect and restore the wetland ecosystem.
[0075] As an implementation mode, the biological distribution estimation network includes a plurality of preset projection dimensions corresponding to the transformation parameter variables; step S40, performing dimension transformation processing on the learning sample based on the transformation parameter variables to obtain one or more transformation representation information corresponding to the learning sample, may specifically include:
[0076] Step S41: extracting representation information of the learning sample to obtain one or more representation spaces corresponding to the learning sample.
[0077] In the embodiment of the present application, the core of step S41 is to extract characterization information from the learning sample, that is, feature extraction. This process aims to extract characteristic information that is critical to the estimation of biodiversity distribution from complex and diverse ecological element data, laying a solid foundation for subsequent processing and analysis. Specifically, the learning sample contains ecological element data of the monitoring area in a specific time period, which may cover multiple aspects such as climate, soil, vegetation, and animal populations. These data usually exist in a high-dimensional and complex form, containing a large amount of original information and noise. Direct use for biodiversity distribution estimation is not only inefficient, but also difficult to ensure the accuracy of the results. In order to overcome this problem, the computer device adopts the characterization information extraction technology in step S41. This technology converts and compresses the original ecological element data through specific algorithms or models, such as principal component analysis (PCA), linear discriminant analysis (LDA), autoencoder (Autoencoder) or deep learning network (such as convolutional neural network CNN, recurrent neural network RNN, etc.), and extracts the most representative characteristic information. Taking the deep learning network as an example, if the learning sample contains satellite remote sensing image data, the computer device can use a convolutional neural network (CNN) to process it. CNN automatically learns low-level features such as edges, textures, and shapes in images through structures such as convolutional layers and pooling layers, and gradually combines them into higher-level and more abstract feature representations. These feature representations not only reduce the dimensionality of the data, but also retain the most critical information in the image for estimating the distribution of biodiversity. For example, if the learning sample contains time series data (such as climate monitoring data), the computer device can use a recurrent neural network (RNN) or its variants (such as LSTM, GRU) for processing. RNN can capture the temporal dependencies in the data, expand in time through the cyclic structure, and gradually extract the key features in the time series. These features are of great significance for understanding the impact of climate change on the distribution of biodiversity. After the representation information is extracted, the computer device obtains one or more representation spaces (i.e., feature spaces) corresponding to the learning sample. These representation spaces exist in the form of vectors, matrices, or higher-dimensional tensors, and contain the core feature information of the ecological element data. These feature information is not only more compact and easy to process, but also more directly and significantly related to the distribution of biodiversity.
[0078] Step S42: Based on a plurality of preset projection dimensions, a dimensional projection operation is performed on the representation space to obtain candidate transformation representation information of the representation space for each preset projection dimension.
[0079] In the embodiment of the present application, step S42 performs a dimensional projection operation on the representation space based on multiple preset projection dimensions to obtain candidate transformation representation information. This process is automatically performed by a computer device, aiming to deeply understand the ecological factor data by transforming the perspective and dimension, and provide a richer and more diverse feature representation for the subsequent biodiversity distribution estimation. In the biological distribution estimation network, the preset projection dimension is pre-set according to domain knowledge, prior information or data characteristics, and is used to guide the dimensional parameters of the data from the original feature space to the new feature space. These dimensional parameters represent different analysis perspectives and focuses, which help to fully capture the complex relationships and information in the ecological factor data. In step S42, the computer device first obtains the representation space, which is obtained by extracting the representation information in the previous step S41. The representation space contains the key feature information of the ecological factor data, but it is still high-dimensional and complex. In order to further reduce the dimension and extract useful information, the computer device performs a dimensional projection operation on the representation space according to the preset projection dimension. The dimensional projection operation is usually implemented by linear transformation, such as matrix multiplication. For each preset projection dimension, the computer device defines a corresponding projection matrix (or weight vector). The data in the representation space is then multiplied by the corresponding projection matrix to obtain candidate transformation representation information under the preset projection dimension.
[0080] In step S42, the computer device first obtains a representation space containing climate, soil and vegetation characteristics. Then, for each preset projection dimension (climate, soil, vegetation), the computer device defines a projection matrix respectively. These projection matrices are designed based on domain knowledge and data characteristics, and can capture key information on the corresponding feature dimensions. Next, the computer device multiplies the data in the representation space with the projection matrix corresponding to each preset projection dimension to obtain candidate transformation representation information under climate characteristics, soil characteristics and vegetation characteristics respectively. This information exists in the form of vectors or matrices, respectively reflecting the projection results of ecological element data on different feature dimensions. Through these candidate transformation representation information, the computer device can have a deeper understanding of the performance and correlation of ecological element data in different dimensions. This provides a richer and more diverse feature representation for subsequent biodiversity distribution estimates, which helps to improve the accuracy and reliability of the estimates.
[0081] Step S43: Based on the transformation parameters, a dimensionality integration operation is performed on the candidate transformation representation information of each representation space to obtain the transformation representation information corresponding to the representation space.
[0082] In the embodiment of the present application, step S43 performs a dimensional integration operation on the candidate transformation representation information based on the transformation parameter to obtain the transformation representation information corresponding to the representation space. This process is automatically performed by a computer device, and aims to achieve effective integration and fusion of feature information of different dimensions through the role of the transformation parameter, so as to provide a more comprehensive and accurate feature representation for subsequent biodiversity distribution estimation.
[0083] In step S42, the computer device has performed a dimensional projection operation on the representation space based on multiple preset projection dimensions, and obtained candidate transformation representation information under each preset projection dimension. These candidate transformation representation information exist in the form of vectors, matrices or higher-dimensional tensors, respectively reflecting the projection results of ecological element data in different dimensions. However, these candidate transformation representation information are still relatively independent. They each describe one aspect of the ecological element and fail to fully reflect the comprehensive ecological status of the monitored area. In order to make up for this deficiency, step S43 introduces transformation parameters for dimensional integration operations. Transformation parameters are parameters used to control the integration weights of features of different dimensions in the biological distribution prediction network. They learn the optimal values through the training process to achieve effective integration of candidate transformation representation information.
[0084] In terms of specific implementation methods, the dimensional integration operation may adopt a variety of methods such as weighted summation, concatenation, and convolution. Here, weighted summation is used as an example for explanation. The computer device first assigns corresponding weights to each candidate transformation representation information based on the value of the transformation parameter. These weights reflect the importance and contribution of different dimensional features in the integration process. Then, the computer device multiplies each candidate transformation representation information by its corresponding weight to obtain the weighted candidate transformation representation information. Finally, the computer device sums all the weighted candidate transformation representation information to obtain the transformation representation information corresponding to the representation space.
[0085] For example, suppose that the distribution of biodiversity in a wetland reserve is being monitored. In the reserve, climate, hydrology and vegetation are three important ecological elements. After processing in step S42, candidate transformation characterization information under climate characteristics, hydrological characteristics and vegetation characteristics has been obtained. In step S43, the computer device assigns different weights to the three candidate transformation characterization information according to the values of the transformation parameters. For example, if the climate characteristics have a greater impact on the distribution of wetland biodiversity, the corresponding weight will also be higher. Then, the computer device sums the weighted candidate transformation characterization information to obtain a transformation characterization information that comprehensively reflects the climate, hydrological and vegetation characteristics.
[0086] This transformation representation information not only contains the key characteristic information of the original ecological element data, but also realizes the effective integration and fusion of characteristics of different dimensions through the role of transformation parameters, providing a richer and more comprehensive feature representation for subsequent biodiversity distribution estimates, which helps to improve the accuracy and reliability of the estimates.
[0087] As an implementation manner, step S50, performing representation information integration processing on one or more transformed representation information based on the integration parameter to obtain first integrated representation information corresponding to the learning example, may specifically include:
[0088] Step S51: perform inner product calculation on the transformed representation information to obtain one or more candidate integrated representation information.
[0089] In the embodiment of the present application, step S51 performs inner product calculation on the transformed representation information to obtain candidate integrated representation information. This process is automatically performed by a computer device, and is intended to capture the intrinsic connection and potential relationship between different transformed representation information through mathematical operations, so as to provide a more comprehensive and in-depth feature representation for subsequent biodiversity distribution estimation. In the previous steps, the computer device has performed dimensional transformation processing on the original ecological element data to generate transformed representation information. This information exists in the form of vectors, matrices or higher-dimensional tensors, representing the feature representation of ecological element data in different dimensions. For example, climate characteristics may be represented as a vector containing elements such as temperature and precipitation, while soil characteristics may be represented as a matrix containing elements such as soil type and fertility. In step S51, the computer device performs inner product calculation on these transformed representation information. The inner product is a basic concept in linear algebra, which measures the similarity or angle between two vectors. In the application scenario of biodiversity monitoring, inner product calculation can be used to evaluate the correlation or complementarity between different transformed representation information. Specifically, the computer device will regard the two transformation representation information as vectors and calculate the dot product between them (i.e., the corresponding elements are multiplied and then summed), thereby obtaining a scalar value as the candidate integrated representation information. This scalar value reflects the comprehensive influence or similarity between the two transformation representation information. If the two transformation representation information obtain a larger value in the inner product calculation, it can be considered that there is a strong correlation or complementarity between them, and the contribution to the estimation of biodiversity distribution is also greater. On the contrary, if the inner product value is small, it may indicate that the two transformation representation information are relatively independent and have limited contribution to the estimation result. It should be noted that step S51 may involve the inner product calculation between multiple transformation representation information, thereby generating multiple candidate integrated representation information. These candidate information may represent different impact patterns of different combinations of ecological elements on biodiversity distribution. For example, the inner product between climate characteristics and vegetation characteristics may reflect the impact of climate on vegetation distribution; while the inner product between soil characteristics and hydrological characteristics may reflect the impact of soil conditions on water resource availability.
[0090] Through the processing of step S51, the computer device obtains one or more candidate integrated representation information. This information not only captures the intrinsic connection between different transformed representation information, but also provides multiple possibilities for subsequent integration processing. In the subsequent steps, the computer device will further integrate and optimize these candidate information based on the integration parameter to generate the final first integrated representation information, providing a comprehensive feature representation for biodiversity distribution estimation.
[0091] Step S52: Based on the integration parameter variables among the integration parameter variables that match the candidate integrated representation information, perform representation information integration processing on the candidate integrated representation information to obtain first integrated representation information corresponding to the learning sample.
[0092] In an embodiment of the present application, step S52 integrates the candidate integrated representation information based on the integrated parameter variables to obtain the first integrated representation information corresponding to the learning sample. The integrated parameter variables are obtained through the projection operation in the previous step, and they reflect the importance and contribution of different candidate integrated representation information in the integration process. These parameters learn the optimal values through the training process of the biological distribution prediction network to achieve effective integration of the candidate information. The candidate integrated representation information is obtained by performing inner product calculation on the transformed representation information in step S51, and they represent different impact patterns of different combinations of ecological elements on the distribution of biodiversity. In step S52, the computer device first identifies the integrated parameter variables that match each candidate integrated representation information. This process may be based on a matching mechanism or rule, for example, determining the corresponding integrated parameter variables according to the characteristic dimensions or attributes of the candidate information. Once the matching is completed, the computer device will use these integrated parameter variables to integrate the candidate integrated representation information.
[0093] The specific method of integration processing may vary depending on the application scenario and model design, but it usually involves weighted summation, splicing, convolution or other complex nonlinear transformation methods. Taking weighted summation as an example, the computer device will weight the candidate integrated representation information according to the value of the integrated parameter, so that the information that contributes more to the estimated result has a higher weight in the final representation. After weighted summation, the computer device adds all the weighted candidate information to obtain the first integrated representation information.
[0094] Assume that there are two candidate integrated representation information A and B, which represent the comprehensive impact between climate and vegetation, soil and hydrology respectively. At the same time, there are two corresponding integrated parameter variables α and β, which respectively reflect the importance of A and B in the integration process. In step S52, the computer device performs weighted processing on A and B according to the values of α and β to obtain weighted information αA and βB. Then, αA and βB are added to obtain the first integrated representation information C=αA+βB. This information C integrates the impact of multiple ecological factors such as climate, vegetation, soil and hydrology on the distribution of biodiversity, and provides a comprehensive feature representation for subsequent estimation tasks. It should be noted that other complex operations and transformations may be involved in the integration process to ensure that the first integrated representation information can accurately reflect the comprehensive ecological status of the monitoring area. These operations may be implemented based on deep learning models, machine learning algorithms or other advanced data processing technologies, depending on the design requirements and performance requirements of the biological distribution estimation network.
[0095] As an embodiment, the biodistribution estimation network includes a state update regulator for performing feature conversion. Based on this, step S20 performs a projection operation on the transformed parameter to obtain the integrated parameter of the biodistribution estimation network, which may specifically include:
[0096] Step S2A: Based on the state update regulator, a projection operation is performed on the transformed parameters to obtain the integrated parameters of the biological distribution estimation network.
[0097] In an embodiment of the present application, step S2A uses a state update regulator to perform a projection operation on the transformed parameter to obtain an integrated parameter. This process is automatically performed by a computer device, and aims to improve the network's ability to model complex ecological relationships by introducing a dynamic adjustment mechanism. The state update regulator is an important component of the biological distribution estimation network. It usually contains a set of learnable parameters that can dynamically adjust the way information flows and feature conversions according to the state of the network and input data. In recurrent neural networks (RNNs) and their variants (such as LSTM, GRU), the state update regulator exists in the form of a gating mechanism to control the forgetting, updating, and output of information. In this embodiment, the state update regulator is used to perform a projection operation on the transformed parameter to generate an integrated parameter.
[0098] Transformation parameters are weight parameters used to characterize the transformation of information dimensions in the biological distribution estimation network. They define how to map the original ecological element data into a new feature space. These transformation parameters may exist in the form of vectors, matrices, or higher-dimensional tensors, depending on the dimensions of the input data and the design of the network structure. In step S2A, the computer device first obtains the state update regulator and the transformation parameters as input. Then, it uses the parameters in the state update regulator to perform a projection operation on the transformation parameters. This operation may involve linear transformations (such as matrix multiplication), nonlinear activations (such as Sigmoid, Tanh function), or other complex mathematical operations. Through these operations, the computer device is able to generate integrated parameters, which not only contain the information of the transformation parameters, but also introduce additional feature conversion and dynamic adjustment capabilities through the action of the state update regulator.
[0099] In step S2A, the computer device first projects the transformed parameter variables according to the gating parameters of the state update regulator. For example, if the current input data indicates that the climate conditions in the protected area have changed significantly, the state update regulator can increase the weight of the transformed parameter variables related to the climate factor and reduce the weight of other factors accordingly. In this way, the computer device can generate integrated parameter variables that are more in line with the current ecological conditions and provide more accurate feature representation for subsequent biodiversity distribution estimates.
[0100] In summary, step S2A achieves effective integration and dynamic adjustment of ecological factor data by introducing a state update regulator to perform projection operations on the transformation parameters. This process not only improves the modeling ability of the biological distribution estimation network for complex ecological relationships, but also provides a more comprehensive and accurate feature representation for subsequent biodiversity distribution estimation.
[0101] In step S60, the biodiversity distribution prediction network is debugged based on the estimated biodiversity distribution results, and the transformed parameters and integrated parameters are optimized to obtain a debugged biodiversity distribution prediction network for determining ecological intervention strategies, including:
[0102] Step S6A: Determine a first target training cost based on the estimated biodiversity distribution result and the actual biodiversity distribution result corresponding to the learning sample library.
[0103] In the embodiment of the present application, step S6A is based on the comparison between the estimated biodiversity distribution results and the corresponding actual results in the learning sample library to determine the first target training cost. This process is automatically performed by a computer device, aiming to quantify the gap between the network's estimated performance and the actual situation, and provide guidance for subsequent network parameter adjustments. The estimated biodiversity distribution results are obtained by inputting the ecological element data of the monitoring area into the trained biological distribution estimation network, which reflects the network's prediction of the distribution of biodiversity under the current ecological conditions. The actual results are obtained through historical data in the learning sample library, which record the actual distribution of biodiversity in the monitoring area at different times and under different intervention strategies. In step S6A, the computer device first obtains the estimated biodiversity distribution results and the corresponding actual results. These results usually exist in the form of vectors, matrices or more complex data structures, which contain distribution information of different species or ecological communities in the monitoring area. For example, the estimated result may be a vector containing multiple elements, each element corresponding to the estimated density or distribution area of a specific species in the monitoring area; and the actual result may be a corresponding vector, containing the density or distribution area of these species in the actual situation. Next, the computer device determines the first target training cost by comparing the difference between the estimated result and the actual result. This comparison process may involve a variety of mathematical operations and evaluation indicators, such as mean square error (MSE), cross-entropy loss (Cross-EntropyLoss), accuracy (Accuracy), etc. These indicators can quantify the degree of deviation between the estimated result and the actual result, thereby providing a basis for the evaluation and optimization of network performance. Taking the mean square error as an example, the computer device can calculate the sum of the squares of the differences between the corresponding elements of the estimated result vector and the actual result vector, and then divide it by the number of elements to obtain the mean square error value. The smaller this value is, the closer the estimated result is to the actual result, and the better the estimated performance of the network. On the contrary, if the mean square error value is large, it means that the network has a large deviation in the estimation process, and the network parameters need to be further adjusted and optimized.
[0104] After determining the first target training cost, the computer device will evaluate the performance of the current biological distribution estimation network based on this cost value and decide whether to enter the subsequent optimization steps (such as steps S6B to S6F). If the cost value does not meet the preset optimization conditions (such as error threshold, upper limit of iteration number, etc.), the computer device continues to execute the optimization process, and reduces the estimation error and improves network performance by adjusting network parameters such as state update regulator and transformation parameters. Step S6A determines the first target training cost by comparing the difference between the estimated biodiversity distribution results and the actual results in the learning sample library, which provides an important quantitative indicator for the debugging and optimization of the biological distribution estimation network. This process not only helps to evaluate the estimated performance of the network, but also points out the direction for subsequent network parameter adjustment and optimization.
[0105] Step S6B: If the first target training cost does not meet the first debugging cutoff requirement, the state update regulator is optimized based on the first target training cost to obtain an optimized state update regulator.
[0106] In the embodiment of the present application, step S6B optimizes the state update regulator based on the first target training cost. When the deviation between the estimated biodiversity distribution result and the actual result (i.e., the first target training cost) exceeds a preset acceptable range (i.e., the first debugging cutoff requirement), the computer device will execute this step in order to improve the estimated performance of the network by adjusting the parameters of the state update regulator.
[0107] First, it is necessary to clarify the concepts of the first target training cost and the first debugging cutoff requirement. The first target training cost is calculated by comparing the estimated biodiversity distribution results with the actual results in the learning sample library, which quantifies the gap between the estimated network performance and the actual situation. The first debugging cutoff requirement is a preset standard or threshold used to determine whether the current network estimated performance meets the requirements. If the first target training cost does not meet the first debugging cutoff requirement, it means that the estimated performance of the network still has room for improvement and needs further debugging and optimization. In step S6B, the computer device first determines whether the first target training cost exceeds the first debugging cutoff requirement. If it exceeds, the optimization process is entered. The core of the optimization process is to adjust the parameters of the state update regulator based on gradient descent or other optimization algorithms. These parameters play an important role in the biological distribution estimation network. They affect the estimated performance of the network by dynamically adjusting the information flow and feature conversion. Specifically, the computer device will guide the adjustment direction of the state update regulator parameters according to the gradient information of the first target training cost (i.e., the partial derivative of the cost function to the network parameters). The gradient information reflects the trend of the cost function changing with the change of network parameters. By adjusting the parameter value along the direction of gradient descent, the first target training cost can be gradually reduced and the estimated performance of the network can be improved. Taking the gradient descent algorithm as an example, the computer device first calculates the partial derivative of the first target training cost for each parameter in the state update regulator to obtain a set of gradient vectors. Then, according to the preset learning rate (a hyperparameter that controls the parameter update step) and the direction of the gradient vector, the value of each parameter is updated. This process is repeated for multiple iterations until the first target training cost is reduced to a level that meets the first debugging cutoff requirement. It should be noted that during the optimization process, the computer device can adopt a variety of strategies to accelerate convergence and improve the optimization effect. For example, the momentum term can be used to accelerate the speed of gradient descent; the adaptive learning rate adjustment algorithm (such as Adam, RMSprop, etc.) can be used to automatically adjust the size of the learning rate; regularization technology can also be used to prevent overfitting.
[0108] By executing step S6B, the computer device can optimize the state update regulator based on the first target training cost to obtain an optimized state update regulator. This optimization process not only improves the prediction performance of the biological distribution prediction network, but also provides a better starting point for the optimization of integrated parameters and transformed parameters in subsequent steps. Ultimately, after multiple iterations of debugging and optimization, the biological distribution prediction network will be able to more accurately predict the biodiversity distribution results of the monitoring area, providing more reliable technical support for ecological protection and management.
[0109] Step S6C: Based on the optimized state update regulator and the transformation parameter, the integration parameter is optimized to obtain the optimized integration parameter.
[0110] In an embodiment of the present application, step S6C optimizes the integration parameters based on the optimized state update regulator and the transformation parameters. The optimized state update regulator is the network parameter adjusted by step S6B, which is responsible for dynamically controlling the flow and conversion of information in the network and has a direct impact on the estimated performance of the network. The transformation parameters are weight parameters used to characterize the information dimension transformation, which define how to map the original ecological element data to the new feature space. The integration parameters are obtained through a series of projection and integration operations, which comprehensively reflect the comprehensive impact of different ecological elements on the distribution of biodiversity. In step S6C, the computer device first obtains the optimized state update regulator and the original transformation parameters as input. Then, it uses these parameters to optimize the integration parameters. This optimization process may involve complex mathematical operations and parameter adjustment strategies to ensure that the integration parameters can more accurately reflect the complex relationship between ecological element data.
[0111] Specifically, the computer device can use a back-propagation algorithm or a similar optimization algorithm to optimize the integrated parameters. During the back-propagation process, the computer device first calculates the gradient (i.e., partial derivative) of the first target training cost (i.e., the deviation between the estimated result and the actual result) to the integrated parameter, and then guides the adjustment direction of the integrated parameter based on the gradient information. By continuously iteratively updating the value of the integrated parameter, the computer device can gradually reduce the first target training cost and improve the estimated performance of the network. Since the optimization of the integrated parameters is based on the optimized state update regulator and the original transformation parameters, this optimization process not only considers the influence of the integrated parameters themselves, but also fully considers the interaction between the state update regulator and the transformation parameters. This comprehensive consideration helps to achieve global optimization of network parameters and improve the generalization ability and estimation accuracy of the network.
[0112] Step S6D: Optimize the transformation parameter based on the first target training cost to obtain the optimized transformation parameter.
[0113] In the embodiment of the present application, the transformation parameter, as one of the core parameters in the network, directly affects the representation of ecological factor data in the feature space, and thus has a profound impact on the estimated results of biodiversity distribution. Therefore, the optimization of the transformation parameter is an important way to improve the network estimation performance. In step S6D, the computer device first reviews the first target training cost calculated in step S6A. This cost quantifies the gap between the estimated biodiversity distribution results and the actual results, and is an important indicator for measuring the network estimation performance. The computer device uses this cost information to optimize the transformation parameter based on gradient descent or other optimization algorithms. The core of the optimization process is to reduce the first target training cost by adjusting the value of the transformation parameter. Specifically, the computer device calculates the gradient of the first target training cost to the transformation parameter, that is, the partial derivative of the cost function with respect to the transformation parameter. This gradient vector indicates the trend of the cost function changing with the change of the transformation parameter, and is an important basis for the optimization algorithm to adjust the parameter value.
[0114] Taking the gradient descent algorithm as an example, the computer device will adjust the value of the transformation parameter along the opposite direction of the gradient vector (that is, the direction in which the cost function decreases fastest). The adjustment amplitude is controlled by the learning rate, which is a hyperparameter that needs to be adjusted according to the actual situation to balance the optimization speed and stability. Through multiple iterations of this process, the computer device can gradually find the transformation parameter value that minimizes the training cost of the first target, that is, the optimized transformation parameter. It should be noted that while optimizing the transformation parameter, the computer device also needs to consider the influence of the state update regulator and the integration parameter. Although step S6D focuses on the optimization of the transformation parameter, in fact, these network parameters are interrelated, and their joint action determines the estimated performance of the network. Therefore, during the optimization process, the computer device can adopt an alternating optimization or joint optimization strategy to ensure that all key parameters can be fully adjusted and optimized.
[0115] Step S6E: Use the optimized transformation parameter as the transformation parameter, use the optimized integration parameter as the integration parameter, and then jump to the step of extracting representation information of the learning sample to obtain one or more representation spaces corresponding to the learning sample for execution.
[0116] In the embodiment of the present application, step S6E is a transitional step in the debugging process of the biological distribution estimation network, which marks the completion of the parameter optimization of the current iteration round and is ready for the next iteration round. This step is automatically performed by the computer device to ensure the continuity and efficiency of the debugging process.
[0117] Specifically, in step S6E, the computer device first replaces the optimized transformation parameters and integration parameters with the current parameter values in the network respectively. This replacement operation is a direct result of parameter optimization, which enables the network to perform subsequent estimation and debugging based on the updated parameter values. By continuously iterating this process, the computer device can gradually approach the optimal network parameter configuration, thereby improving the accuracy of the estimated biodiversity distribution. After completing the parameter replacement, the computer device will jump to the characterization information extraction step of the learning sample, that is, restart the series of operations starting from step S41. This jump operation is a key link in the cyclic iteration of the debugging process, which enables the computer device to use the updated network parameters to perform feature extraction and integration processing on the new learning samples. By continuously repeating this process, the computer device can continuously accumulate learning experience and gradually improve the ability to estimate the distribution of biodiversity in the monitoring area.
[0118] In a certain iteration round, the computer device optimizes the transformation parameters and integration parameters according to the first target training cost. After the optimization is completed, the computer device executes step S6E, replaces the optimized parameter values with the current parameter values in the network, and jumps to the representation information extraction step of the learning sample. When re-executing the representation information extraction step, the computer device will use the updated transformation parameters to perform dimensionality transformation on the original ecological element data to generate new transformation representation information. Subsequently, it will integrate these transformation representation information based on the optimized integration parameters to generate a more accurate and comprehensive representation space. These representation spaces not only contain the key feature information of the original data, but also realize the effective fusion and complementarity between different dimensional features through the optimized parameter values.
[0119] Finally, the computer device will use these updated representation spaces to estimate the distribution of biodiversity and calculate the first target training cost based on the new estimation results. If the cost value still does not meet the preset optimization conditions, the computer device will continue to execute subsequent steps (such as S6A to S6D) to perform a new round of parameter optimization and debugging. By continuously iterating this process, the computer device can gradually improve the estimation performance of the biological distribution estimation network and provide more reliable technical support for biodiversity monitoring in wetland reserves.
[0120] Step S6F: If the first target training cost meets the first debugging cutoff requirement, a debugged biological distribution estimation network for determining ecological intervention strategies is obtained.
[0121] In the embodiment of the present application, when the first target training cost (i.e., the deviation between the estimated biodiversity distribution result and the actual result in the learning sample library) meets the preset first debugging cutoff requirement, the computer device confirms that the network has achieved the expected estimated performance, thereby obtaining a debugged biological distribution estimation network for ecological intervention strategy determination. This step is a key node in the debugging process. It is not only an affirmation of the results of the previous debugging work, but also an important basis for the formulation and implementation of subsequent ecological intervention strategies. Through step S6F, the computer device ensures that the biological distribution estimation network can accurately reflect the ecological status of the monitoring area, and provides a scientific and reliable decision-making basis for the ecological protection and management departments. During the debugging process, the computer device continuously iterates and optimizes the parameters of the network (including transformation parameters, integration parameters, and state update regulators, etc.) to reduce the first target training cost. After multiple rounds of debugging and optimization, when the first target training cost is reduced to meet the preset first debugging cutoff requirement, the computer device determines that the network has sufficient estimation accuracy and can be officially put into use. At this point, the debugged biological distribution prediction network can quickly and accurately predict the distribution of different species and their response to environmental changes based on the ecological element data of the monitoring area (such as climate, hydrology, vegetation, etc.). Conservation departments can rely on this network to simulate the implementation effects of different ecological intervention strategies, evaluate their contribution to biodiversity conservation, and thus formulate the optimal ecological intervention plan.
[0122] As an implementation mode, the transformation parameter variable includes multiple ones, each of which corresponds to a preset projection dimension; based on this, in step S6F, if the first target training cost meets the first debugging cutoff requirement, a debugged biological distribution estimation network for determining the ecological intervention strategy is obtained, including:
[0123] Step S6F1: If the first target training cost meets the first debugging cutoff requirement, the largest transformation parameter among the multiple transformation parameters is used as the target transformation parameter corresponding to the representation space, and the preset projection dimension corresponding to the target transformation parameter is used as the target projection dimension corresponding to the representation space.
[0124] In the embodiment of the present application, step S6F1 selects the one that contributes the most to the estimation result from multiple transformation parameters, and determines it as the target transformation parameter, and determines the corresponding preset projection dimension as the target projection dimension. Specifically, in step S6F1, the computer device checks whether the first target training cost meets the preset first debugging cutoff requirement. If it does, it means that the current biological distribution estimation network has achieved the expected estimation accuracy, and the transformation parameter can be further analyzed to optimize the network structure.
[0125] Next, the computer device traverses all the transformation parameters, which play an important role in the biological distribution estimation network. They define how to map the original ecological element data into the new feature space and have a direct impact on the estimation results. Each transformation parameter corresponds to a preset projection dimension, which reflects a specific dimension of the feature space. During the traversal process, the computer device compares the values of all transformation parameters to find the largest one. This largest transformation parameter is considered to contribute the most to the estimation result because the feature dimension it represents plays a key role in the estimation process. Therefore, the computer device determines this largest transformation parameter as the target transformation parameter. At the same time, the computer device also looks for the preset projection dimension corresponding to the target transformation parameter and determines it as the target projection dimension. This target projection dimension not only represents a key dimension in the feature space, but also implies the specific manifestations and relationships of the ecological element data in this dimension. By focusing on this dimension, the computer device can more accurately capture the key information in the ecological element data and generate more accurate estimation results. Through the execution of step S6F1, the computer device successfully selects the one that contributes the most to the estimation result from multiple transformation parameters and determines the corresponding target projection dimension. This process not only optimizes the feature representation ability of the biological distribution estimation network, but also provides more accurate and reliable decision support for subsequent biodiversity monitoring and management.
[0126] Step S6F2: Based on the target transformation parameters, target projection dimension and integration parameters, a debugged biological distribution estimation network for determining ecological intervention strategies is obtained.
[0127] In step S6F2 of the embodiment of the present application, the computer device finally configures and optimizes the biological distribution estimation network based on the target transformation parameters, target projection dimensions, and integration parameters determined in the previous steps to obtain a debugged network model that can accurately estimate the distribution of biodiversity and support the determination of ecological intervention strategies. Specifically, the computer device reviews the target transformation parameters and target projection dimensions determined in step S6F1. These parameters represent the most critical and sensitive feature dimensions in the ecological factor data, and they have an important impact on the estimated results of biodiversity distribution. At the same time, the integration parameters, as a set of parameters in the network used to characterize information integration, also play an indispensable role in this process.
[0128] Next, the biological distribution estimation network is adjusted and optimized based on these key parameters. This process may involve multiple aspects, including but not limited to fine-tuning of the network structure, reconfiguration of inter-layer connections, selection and adjustment of activation functions, etc. For example, the computer device can increase the number of network layers or nodes corresponding to the target projection dimension to enhance the network's ability to capture and represent the characteristics of this dimension; at the same time, it will also adjust the value of the integrated parameter to better integrate the feature information of different dimensions and generate more comprehensive and accurate estimation results. During the optimization process, the computer device will also use the data in the learning sample library to verify and test the adjusted network. By comparing the differences between the estimated results and the actual biodiversity distribution data, the computer device can evaluate whether the network's estimation performance meets the requirements, and further adjust the network parameters to achieve the optimal state accordingly.
[0129] For example, suppose that the biodiversity distribution in a wetland reserve is being monitored, and the computer device has determined the climate characteristics as the target transformation parameter and its corresponding target projection dimension through the previous steps. In step S6F2, the computer device will adjust and optimize the biological distribution estimation network based on this information. For example, it can increase the number of network layers or nodes related to climate characteristics to improve the network's sensitivity to climate change and the accuracy of prediction; at the same time, it will also adjust the value of the integrated parameter to better integrate the information of climate characteristics and other ecological element characteristics. After such optimization, the biological distribution estimation network will be able to more accurately estimate the impact of different ecological intervention strategies on the distribution of wetland biodiversity, and provide strong decision-making support for ecological protection and management departments.
[0130] As an implementation mode, step S6F2, based on the target transformation parameter, the target projection dimension and the integration parameter, obtains a debugged biological distribution estimation network for determining the ecological intervention strategy, which may specifically include:
[0131] Step S6F21: taking the integrated parameter variables that are greater than the set reference value among the integrated parameter variables as the target integrated parameter variables.
[0132] In the embodiment of the present application, step S6F21 further screens and optimizes the integrated parameters. As a set of parameters used to characterize information integration in the network, the integrated parameters play a key role in generating accurate biodiversity distribution estimation results. However, not all integrated parameters have an equally important impact on the estimation results, so the execution of step S6F21 is particularly important. Specifically, in step S6F21, a set reference value is set, which is a threshold value that is predetermined based on the actual application scenario and network performance requirements. Then, the computer device traverses all the integrated parameters and compares their size relationship with the set reference value. For those integrated parameters that are greater than the set reference value, the computer device marks them as target integrated parameters. These target integrated parameters are considered to be parameters that have a significant impact on the estimation results, and they will be given higher priority and weight in subsequent network configuration and estimation processes.
[0133] By executing step S6F21, the computer device can screen out the integrated parameters that have a significant impact on the prediction results, namely the target integrated parameters. These target integrated parameters not only reduce the number and complexity of network parameters, but also improve the accuracy and efficiency of network prediction. In subsequent steps, the computer device will further optimize the biological distribution prediction network based on these target integrated parameters to support the formulation and implementation of ecological intervention strategies.
[0134] Step S6F22: Based on the target transformation parameters, target projection dimension and target integration parameters, a debugged biological distribution estimation network for determining ecological intervention strategies is obtained.
[0135] In step S6F22 of the embodiment of the present application, the computer device finally configures and optimizes the biological distribution prediction network based on the target transformation parameters, target projection dimension, and target integration parameters determined in the previous steps, thereby obtaining a debugged network model that can accurately predict the distribution of biodiversity and support the determination of ecological intervention strategies.
[0136] Specifically, in step S6F22, the computer device reviews and integrates the key parameters identified in the previous steps: target transformation parameters, target projection dimensions, and target integration parameters. These parameters represent the most critical feature dimensions in the ecological element data, the specific projection directions in the feature space, and the important weights in the information integration process. By comprehensively considering these parameters, the computer device can more accurately capture the complex relationships between ecological elements and generate more accurate estimation results.
[0137] Next, the computer device adjusts and optimizes the biological distribution estimation network based on these key parameters. This process may involve multiple aspects, including but not limited to fine-tuning of the network structure, reconfiguration of inter-layer connections, selection and adjustment of activation functions, etc. For example, the computer device can increase the corresponding number of network layers or nodes according to the target projection dimension to better capture the characteristic information on this dimension; at the same time, it will also adjust the weight distribution in the characteristic integration mechanism according to the value of the target integration parameter to ensure that the interaction between different ecological elements can be accurately reflected. During the optimization process, the computer device will also use the data in the learning sample library to verify and test the adjusted network. By comparing the differences between the estimated results and the actual biodiversity distribution data, the computer device can evaluate whether the network's estimated performance meets the requirements, and further adjust the network parameters accordingly to achieve the optimal state. After multiple iterations and optimizations, the computer device will eventually obtain a debugged biological distribution estimation network model.
[0138] As an embodiment, the biological distribution estimation network further includes network component parameters. Step S6A determines the first target training cost based on the estimated biological diversity distribution result and the actual biological diversity distribution result corresponding to the learning sample library, which may specifically include:
[0139] Step S6A1: Determine a second target training cost based on the estimated biodiversity distribution result and the actual biodiversity distribution result corresponding to the learning sample library.
[0140] In the embodiment of the present application, step S6A1 determines the second target training cost by comparing the estimated biodiversity distribution result with the corresponding actual result in the learning sample library. This process is an important basis for evaluating the network estimation performance and guiding the subsequent parameter adjustment.
[0141] Specifically, in step S6A1, the computer device obtains the estimated biodiversity distribution results. These estimated results are obtained by inputting the ecological element data of the monitoring area into the biological distribution estimation network, and they reflect the network's prediction of the distribution of biodiversity under the current ecological conditions. The estimated results usually exist in the form of vectors, matrices or more complex data structures, and contain the estimated distribution information of different species or ecological communities in the monitoring area. Then, the computer device retrieves the actual biodiversity distribution results corresponding to the current monitoring area from the learning sample library. The learning sample library is a database containing a large amount of historical monitoring data, which records the actual distribution of biodiversity in different monitoring areas at different times and under different intervention strategies. For the current monitoring area, there will be corresponding actual results in the learning sample library. These results also exist in the form of vectors, matrices, etc., and contain the actual distribution information of various species or ecological communities in the monitoring area.
[0142] With the predicted and actual results, the computer device then calculates the difference between them to determine the second target training cost. This calculation process is usually implemented through some form of error function or loss function, which can quantify the degree of deviation between the predicted and actual results. For example, the mean square error (MSE) can be used as an error function, which calculates the average of the sum of squares of the corresponding element differences between the predicted result vector and the actual result vector. The smaller this value is, the closer the predicted result is to the actual result, and the better the prediction performance of the network. For example, suppose that the distribution of biodiversity in a forest reserve is being monitored. In the reserve, the main species of concern include some rare birds and several important tree species. Through the biological distribution estimation network, the estimated distribution results of these species in the reserve are obtained, which are represented as a vector containing multiple elements (each element corresponds to a grid unit or sub-area in the reserve). At the same time, the actual distribution result vector that matches the current monitoring time, climate conditions, etc. is retrieved from the learning sample library. Then, the computer device calculates the difference between the predicted result vector and the actual result vector using the mean square error function to obtain the second target training cost. This cost value reflects the performance of the current biological distribution estimation network in estimating the distribution of biodiversity in the protected area. If the cost value is large, it means that the network's estimated results are significantly different from the actual situation, and the network parameters need to be further adjusted to optimize the estimation performance. On the contrary, if the cost value is small, it means that the network's estimation performance is already good, and its generalization ability on the test set can be further evaluated.
[0143] Step S6A2: If the second target training cost does not meet the second debugging cutoff requirement, the network component parameters are updated based on the second target training cost, and then the step of extracting representation information of the learning sample and obtaining one or more representation spaces corresponding to the learning sample is executed.
[0144] In the embodiment of the present application, step S6A2 is an iterative optimization link in the debugging process of the biological distribution estimation network. When the second target training cost (i.e., the quantitative value of the difference between the estimated biological diversity distribution result and the actual result in the learning sample library) does not meet the preset second debugging cutoff requirement, it means that the estimation performance of the current network needs to be improved, so the computer device will update the network component parameters according to this error signal, in order to reduce the estimation error by optimizing these parameters and improve the estimation accuracy of the network.
[0145] Specifically, in step S6A2, the computer device checks whether the second target training cost meets the preset second debugging cutoff requirement. This cutoff requirement is usually set according to the actual application requirements and network performance expectations. It may be a specific error threshold, or it may be a condition related to the number of iterations, training time, etc. If the second target training cost does not meet this requirement, the computer device will start the parameter update process. The parameter update process usually involves the application of gradient descent or other optimization algorithms. In these algorithms, the second target training cost is used as a loss function, and its gradient (i.e., partial derivative) with respect to the network component parameters indicates the direction and step size of the parameter adjustment. The computer device will update the network component parameters (such as the weights and biases of the information extraction layer) based on this gradient information, in order to reduce the estimated error in the next iteration.
[0146] It should be noted that when updating the parameters of the network components, the computer device keeps the transformation parameters and integration parameters unchanged. This is because the transformation parameters and integration parameters play a more core role in the network. They define how to map the original ecological factor data to the feature space and integrate them, and have a more direct impact on the estimated results. If all types of parameters are adjusted at the same time, it can lead to instability and overfitting in the network optimization process.
[0147] After completing the update of the network component parameters, the computer device jumps to the step of extracting the representation information of the learning sample (i.e., step S41 and its subsequent steps) to regenerate the representation space based on the updated parameters and continue the subsequent estimation and debugging process. This process is a cyclic iterative process. As the number of iterations increases, the network component parameters will gradually converge to the vicinity of the optimal value, and the estimation error will gradually decrease until the second debugging cutoff requirement is met.
[0148] For example, suppose that the distribution of biodiversity in a wetland reserve is being monitored. In a certain iteration round, the second target training cost calculated by the computer device exceeds the preset threshold, indicating that the current network's estimation performance needs to be improved. Therefore, the computer device updates the network component parameters (such as adjusting the weights and biases of the representation information extraction layer) according to the gradient information of the second target training cost in order to reduce the estimation error. After completing the parameter update, the computer device re-executes the representation information extraction step, generates a new representation space based on the updated parameters, and continues the subsequent estimation and debugging process. By continuously iterating this process, the computer device can eventually obtain a biological distribution estimation network with estimated performance that meets the requirements, providing strong support for biodiversity monitoring in wetland reserves.
[0149] Step S6A3: If the second target training cost meets the second debugging cutoff requirement, a pending biological distribution estimation network is obtained.
[0150] In the embodiment of the present application, step S6A3 is an important milestone in the debugging process of the biological distribution estimation network. When the second target training cost (i.e., the quantitative value of the difference between the estimated biodiversity distribution result and the actual result in the learning sample library) meets the preset second debugging cutoff requirement, it means that the estimated performance of the current network has reached an acceptable level and can be regarded as a pending biological distribution estimation network for subsequent evaluation and application. Specifically, in step S6A3, the computer device checks whether the second target training cost meets the preset second debugging cutoff requirement. This cutoff requirement is usually set after comprehensive consideration of multiple factors such as the needs of the actual application scenario, the complexity of the data, and the estimation ability of the network. It may be a specific numerical threshold, such as the mean square error (MSE) is less than a certain value; it may also be a condition related to the number of iterations, training time, etc., such as the decrease in the second target training cost in multiple consecutive iterations is less than a certain threshold. Once it is confirmed that the second target training cost meets the second debugging cutoff requirement, the computer device will stop further adjustment of the current network component parameters and save the current network state as a pending biological distribution estimation network. This pending network not only represents the best estimated performance in the current debugging process, but will also be the basis for subsequent evaluation and application.
[0151] It should be noted that although the candidate biological distribution estimation network has shown good estimation performance on the training set, its generalization ability in practical applications still needs to be further verified. Therefore, after step S6A3, the computer device usually performs additional testing steps (such as step S6A4) to apply the candidate network to independent test set data to evaluate its estimation accuracy on unseen data.
[0152] For example, suppose that the distribution of biodiversity in a forest reserve is being monitored. During the debugging process, after multiple rounds of iterative optimization, the second target training cost calculated by the computer device gradually decreases, and finally meets the preset second debugging cutoff requirement. At this point, the computer device will save the current network state as a pending biological distribution estimation network, which has been able to accurately estimate the distribution of different species in the forest reserve on the training set. However, in order to ensure the reliability of the network in practical applications, it needs to be applied to independent test set data for further verification. If the test results show that the network also has good prediction performance, it can be formally applied to biodiversity monitoring in forest reserves, providing a scientific basis for ecological protection and management.
[0153] Step S6A4: Load the test learning samples in the test sample set into the undetermined biological distribution estimation network for inference to obtain the first target training cost.
[0154] In the previous steps, the computer device has debugged and optimized the biological distribution estimation network through the training set data, and obtained the pending network based on the second target training cost. However, it is not sufficient to judge the performance of the network only by the performance on the training set, because the network may just overfit the training data and perform poorly on unseen data. Therefore, step S6A4 introduces a test sample set (i.e., test set) to further verify the generalization ability of the pending network. Specifically, in step S6A4, the computer device prepares a test sample set. This test set is another set of data independent of the training set and the validation set. It contains ecological element data and corresponding actual biodiversity distribution results of the monitoring area at different times and under different conditions. These data have never been used in the debugging and optimization process of the network, so they can objectively reflect the network's estimation performance on unseen data. Then, the computer device loads the test learning samples in the test sample set one by one into the pending biological distribution estimation network for inference. The inference process is similar to the estimation step in the training process, but test data is used instead of training data. Through reasoning, the computer device can obtain the estimated biodiversity distribution results corresponding to each test learning example.
[0155] The computer device then compares these estimates with the actual biodiversity distribution results corresponding to the test sample set to calculate the first target training cost. The calculation method of the first target training cost is similar to the second target training cost, and is also implemented through some form of error function or loss function. This cost value quantifies the estimated error of the candidate network on the test set and reflects the generalization ability of the network.
[0156] For example, suppose that the biodiversity distribution of a wetland reserve is being monitored. In the previous steps, the proposed biological distribution estimation network has been obtained through debugging and optimization of the training set data. Now, a test sample set containing ecological element data of wetland reserves at multiple different times and different climatic conditions and actual biodiversity distribution results is prepared. In step S6A4, the computer device loads the data in the test sample set into the proposed network one by one for reasoning, and obtains the estimated results corresponding to each test sample. Then, the computer device compares these estimated results with the actual results and calculates the first target training cost. If the first target training cost is small, it means that the proposed network also shows good estimation performance on the test set and has strong generalization ability; otherwise, it means that the network may be overfitting and needs further adjustment and optimization. Through the evaluation of this step, the performance of the proposed network can be more comprehensively understood, providing a reliable basis for the subsequent formulation of ecological intervention strategies.
[0157] As an implementation method, jump to the step of extracting representation information of the learning sample and obtaining one or more representation spaces corresponding to the learning sample, including: jump to the step of loading the test learning sample in the test sample set into the pending biological distribution prediction network for inference, and obtain the first target training cost.
[0158] In an embodiment of the present application, if the second target training cost does not meet the preset second debugging cutoff requirement, the next operation will no longer continue along the original training path, but will turn to a step of evaluating the generalization ability of the pending network. Specifically, this "jump" can be understood as a process change, that is, from continuing to optimize the network component parameters to evaluating the performance of the network on unseen data. In step S6A2, when the computer device determines that the second target training cost does not meet the second debugging cutoff requirement, it will update the network component parameters (such as the weights and biases of the characterization information extraction layer) based on the current second target training cost, in order to reduce the estimation error in the next round of iteration. However, the key here is that updating the network component parameters is not the end of step S6A2. On the contrary, since the performance of the current network on the training set has not yet reached a satisfactory level, the computer device chooses not to immediately enter the next round of training iterations, but jumps to an evaluation step, that is, using a test sample set to verify the generalization ability of the pending biological distribution estimation network. After updating the parameters of the network components, the computer device will not immediately return to the step of extracting the representation information of the learning sample (i.e., the process before step S41) to start a new round of training iterations, but will change the current execution process and load the test learning sample in the test sample set into the pending biological distribution estimation network for inference. This inference process is similar to the estimation step in the training process, but the key is that it uses independent test data instead of training data. Through this inference process, the computer device can obtain the estimated results of the pending network on the test set, and calculate the first target training cost based on this to evaluate the generalization ability of the network.
[0159] In step S6A2, if the computer device finds that the estimated performance of the current network on the training set still does not meet the preset standard (that is, the second target training cost does not meet the second debugging cutoff requirement), the network component parameters are first updated to try to improve performance. However, since the training set data may have limitations or noise, simply relying on the performance on the training set to evaluate network performance may not be comprehensive enough. Therefore, the computer device chooses to load the data in the test sample set (such as forest ecological element data in different seasons and different climatic conditions) into the pending network for inference to verify the network's estimated accuracy on unseen data. This step not only helps to have a more comprehensive understanding of the generalization ability of the network, but also provides valuable feedback for subsequent network adjustments and optimizations.
[0160] Based on the foregoing embodiments, the embodiments of the present application provide a regional biodiversity monitoring device, wherein each unit included in the device and each module included in each unit can be implemented by a processor in a computer device; of course, it can also be implemented by a specific logic circuit. Figure 2 A schematic diagram of the composition structure of a regional biodiversity monitoring device provided in an embodiment of the present application is shown in FIG. Figure 2 As shown, the regional biodiversity monitoring device 200 includes:
[0161] A data acquisition module 210 is used to acquire ecological element data of a target monitoring area and intervention strategies for each candidate habitat in the target monitoring area;
[0162] The diversity reasoning module 220 is used to load the ecological element data of the target monitoring area and the candidate habitat intervention strategy into the debugged biological distribution estimation network for reasoning, and obtain the target biodiversity distribution results of the target monitoring area for each candidate habitat intervention strategy;
[0163] A strategy matching module 230, for matching candidate habitat intervention strategies whose target biodiversity distribution results meet preset biodiversity distribution results to the target monitoring area;
[0164] The network debugging module 240 is used to debug the biological distribution prediction network according to the following process: obtaining transformation parameters for characterizing information dimensionality transformation in the biological distribution prediction network; performing a projection operation on the transformation parameters to obtain integration parameters for characterizing information integration of the biological distribution prediction network; obtaining a learning sample library of the biological distribution prediction network, wherein each learning sample in the learning sample library includes regional ecological element data of a monitoring area learning sample and an intervention strategy sample for generating a preset biodiversity distribution result for the monitoring area learning sample; performing dimensionality transformation processing on the learning sample based on the transformation parameters to obtain one or more transformation representation information corresponding to the learning sample; performing representation information integration processing on one or more of the transformation representation information based on the integration parameters to obtain first integrated representation information corresponding to the learning sample; based on the first integrated representation information, estimating the biodiversity distribution result of the monitoring area learning sample for the intervention strategy sample, and debugging the biological distribution prediction network based on the estimated biodiversity distribution result, optimizing the transformation parameters and the integration parameters, and obtaining a debugged biological distribution prediction network for determining the ecological intervention strategy. The description of the above device embodiment is similar to the description of the above method embodiment, and has similar beneficial effects as the method embodiment. In some embodiments, the functions or modules included in the device provided in the embodiment of the present application can be used to execute the method described in the above method embodiment. For technical details not disclosed in the device embodiment of the present application, please refer to the description of the method embodiment of the present application for understanding.
[0165] An embodiment of the present application provides a computer device, including a memory and a processor, wherein the memory stores a computer program that can be run on the processor, and when the processor executes the program, some or all of the steps in the above method are implemented. Figure 3 A hardware entity diagram of a computer device provided in an embodiment of the present application is shown in FIG. Figure 3As shown, the hardware entity of the computer device 1000 includes: a processor 1001 and a memory 1002, wherein the memory 1002 stores a computer program that can be run on the processor 1001, and the steps in the method of any of the above embodiments are implemented when the processor 1001 executes the program. The memory 1002 stores a computer program that can be run on the processor, and the memory 1002 is configured to store instructions and applications executable by the processor 1001, and can also cache the data to be processed or processed by the processor 1001 and each module in the computer device 1000 (for example, image data, audio data, voice communication data, and video communication data), which can be implemented by flash memory (FLASH) or random access memory (Random Access Memory, RAM). When the processor 1001 executes the program, the steps of any of the above regional biodiversity monitoring methods are implemented. The processor 1001 generally controls the overall operation of the computer device 1000.
[0166] An embodiment of the present application provides a computer storage medium storing one or more programs, which can be executed by one or more processors to implement the steps of the regional biodiversity monitoring method of any of the above embodiments.
Claims
1. A method for regional biodiversity monitoring, characterized in that: include: Obtain ecological element data of target monitoring areas and intervention strategies for each candidate habitat in the target monitoring area; The ecological element data of the target monitoring area and the candidate habitat intervention strategies are loaded into the debugged biological distribution estimation network for reasoning, so as to obtain the target biodiversity distribution results of the target monitoring area for each candidate habitat intervention strategy; Matching candidate habitat intervention strategies whose target biodiversity distribution results meet the preset biodiversity distribution results to the target monitoring area; The debugging process of the biological distribution prediction network includes: Obtaining transformation parameters used to characterize information dimension transformation in a biological distribution prediction network; Performing a projection operation on the transformed parameter to obtain an integrated parameter for characterizing information integration of the biological distribution prediction network; Acquire a learning sample library of the biological distribution prediction network, wherein each learning sample in the learning sample library includes regional ecological element data of a monitoring area learning sample and an intervention strategy sample for generating a preset biodiversity distribution result for the monitoring area learning sample; Performing dimensional transformation processing on the learning sample based on the transformation parameter to obtain one or more transformation representation information corresponding to the learning sample; Performing representation information integration processing on one or more of the transformed representation information based on the integration parameter variable to obtain first integrated representation information corresponding to the learning example; Based on the first integrated representation information, the biodiversity distribution results of the monitoring area learning sample for the intervention strategy sample are estimated, and based on the estimated biodiversity distribution results, the biodistribution estimation network is debugged, the transformation parameters and the integration parameters are optimized, and a debugged biodistribution estimation network for determining the ecological intervention strategy is obtained; The step of performing a projection operation on the transformed parameter to obtain an integrated parameter for characterizing information integration of the biological distribution prediction network includes: Performing a first linear projection operation on the transformed parameter to obtain a candidate integrated parameter for characterizing information integration of the biodistribution prediction network; Performing a nonlinear projection operation on the candidate integrated parameter variables to obtain the integrated parameter variables of the biodistribution prediction network; The step of performing a nonlinear projection operation on the candidate integrated parameter variables to obtain the integrated parameter variables of the biological distribution prediction network includes: Performing a nonlinear projection operation on the candidate integrated parameter variables to obtain basic integrated parameter variables of the biodistribution prediction network; The basic integrated parameter variables are subjected to a gradient-compatible discretization operation to obtain the integrated parameter variables of the biological distribution prediction network.
2. The method for regional biodiversity monitoring according to claim 1, characterized in that: Before estimating the biodiversity distribution result of the monitoring area learning sample for the intervention strategy sample based on the first integrated representation information, the method further includes: Performing a second linear projection operation on the transformed representation information to obtain second integrated representation information corresponding to the learning example; The estimating the biodiversity distribution result of the monitoring area learning sample for the intervention strategy sample based on the first integrated representation information includes: Combining the first integrated representation information and the second integrated representation information to obtain integrated representation information; Based on the integrated representation information, estimating the biodiversity distribution results of the monitoring area learning sample for the intervention strategy sample; The biological distribution prediction network includes a plurality of preset projection dimensions corresponding to the transformation parameter; performing dimension transformation processing on the learning sample based on the transformation parameter to obtain one or more transformation representation information corresponding to the learning sample, including: Extracting representation information from the learning sample to obtain one or more representation spaces corresponding to the learning sample; Based on the plurality of the preset projection dimensions, performing a dimensional projection operation on the representation space to obtain candidate transformation representation information of the representation space for each of the preset projection dimensions; Based on the transformation parameter, performing a dimensionality integration operation on the candidate transformation representation information of each of the representation spaces to obtain transformation representation information corresponding to the representation space; The step of performing representation information integration processing on one or more of the transformed representation information based on the integration parameter to obtain first integrated representation information corresponding to the learning example includes: Performing inner product calculation on the transformed representation information to obtain one or more candidate integrated representation information; Based on the integration parameter variables among the integration parameter variables that match the candidate integrated representation information, representation information integration processing is performed on the candidate integrated representation information to obtain first integrated representation information corresponding to the learning example.
3. The method for regional biodiversity monitoring according to claim 2, characterized in that: The biological distribution prediction network includes a state update regulator for performing feature conversion, and the projection operation is performed on the transformed parameter to obtain the integrated parameter of the biological distribution prediction network, including: Based on the state update regulator, a projection operation is performed on the transformed parameter to obtain an integrated parameter of the biological distribution prediction network; The method of debugging the biological distribution prediction network based on the predicted biodiversity distribution result, optimizing the transformation parameter and the integration parameter, and obtaining a debugged biological distribution prediction network for determining an ecological intervention strategy includes: Determining a first target training cost based on the estimated biodiversity distribution result and the actual biodiversity distribution result corresponding to the learning sample library; If the first target training cost does not meet the first debugging cutoff requirement, optimizing the state update regulator based on the first target training cost to obtain an optimized state update regulator; Based on the optimized state update regulator and the transformation parameter, the integration parameter is optimized to obtain an optimized integration parameter; Optimizing the transformation parameter based on the first target training cost to obtain an optimized transformation parameter; The optimized transformation parameter is used as the transformation parameter, the optimized integration parameter is used as the integration parameter, and then the step of extracting representation information of the learning sample to obtain one or more representation spaces corresponding to the learning sample is executed; If the first target training cost meets the first debugging cutoff requirement, a debugged biological distribution estimation network for determining ecological intervention strategies is obtained.
4. The method for regional biodiversity monitoring according to claim 3, characterized in that: The transformation parameter comprises a plurality of parameters, each of which corresponds to one of the preset projection dimensions; If the first target training cost meets the first debugging cutoff requirement, obtaining a debugged biological distribution estimation network for determining an ecological intervention strategy includes: If the first target training cost meets the first debugging cutoff requirement, taking the largest transformation parameter among the plurality of transformation parameters as the target transformation parameter corresponding to the representation space, and taking the preset projection dimension corresponding to the target transformation parameter as the target projection dimension corresponding to the representation space; Based on the target transformation parameters, the target projection dimension and the integration parameters, a debugged biological distribution prediction network for determining ecological intervention strategies is obtained.
5. The method for regional biodiversity monitoring according to claim 4, characterized in that: The method of obtaining a debugged biological distribution estimation network for determining ecological intervention strategies based on the target transformation parameter, the target projection dimension and the integration parameter comprises: The integrated parameter variable that is greater than the set reference value among the integrated parameter variables is used as the target integrated parameter variable; Based on the target transformation parameters, the target projection dimension and the target integration parameters, a debugged biological distribution prediction network for determining ecological intervention strategies is obtained.
6. According to the method for regional biodiversity monitoring of claim 3, the biological distribution estimation network further comprises network component parameters, and the first target training cost is determined based on the estimated biodiversity distribution result and the actual biodiversity distribution result corresponding to the learning sample library, comprising: Determining a second objective training cost based on the estimated biodiversity distribution result and the actual biodiversity distribution result corresponding to the learning sample library; If the second target training cost does not meet the second debugging cutoff requirement, updating the network component parameters based on the second target training cost, and then jumping to the step of extracting representation information of the learning sample to obtain one or more representation spaces corresponding to the learning sample for execution; If the second target training cost meets the second debugging cutoff requirement, obtaining a pending biological distribution estimation network; Loading the test learning samples in the test sample set into the undetermined biological distribution estimation network for inference to obtain a first target training cost; The step of jumping to extracting representation information of the learning sample and obtaining one or more representation spaces corresponding to the learning sample comprises: Jump to the step of loading the test learning samples in the test sample set into the undetermined biological distribution estimation network for reasoning, and obtaining the first target training cost for execution.
7. A regional biodiversity monitoring device, characterized in that: include: A data acquisition module is used to obtain ecological element data of the target monitoring area and intervention strategies for each candidate habitat in the target monitoring area; A diversity reasoning module is used to load the ecological element data of the target monitoring area and the candidate habitat intervention strategy into the debugged biological distribution estimation network for reasoning, and obtain the target biodiversity distribution results of the target monitoring area for each candidate habitat intervention strategy; A strategy matching module, for matching candidate habitat intervention strategies whose target biodiversity distribution results meet preset biodiversity distribution results to the target monitoring area; The network debugging module is used to debug the biological distribution estimation network according to the following steps: Obtaining transformation parameters used to characterize information dimension transformation in a biological distribution prediction network; Performing a projection operation on the transformed parameter to obtain an integrated parameter for characterizing information integration of the biological distribution prediction network; Acquire a learning sample library of the biological distribution prediction network, wherein each learning sample in the learning sample library includes regional ecological element data of a monitoring area learning sample and an intervention strategy sample for generating a preset biodiversity distribution result for the monitoring area learning sample; Performing dimensional transformation processing on the learning sample based on the transformation parameter to obtain one or more transformation representation information corresponding to the learning sample; Performing representation information integration processing on one or more of the transformed representation information based on the integration parameter variable to obtain first integrated representation information corresponding to the learning example; Based on the first integrated representation information, the biodiversity distribution results of the monitoring area learning sample for the intervention strategy sample are estimated, and based on the estimated biodiversity distribution results, the biodistribution estimation network is debugged, the transformation parameters and the integration parameters are optimized, and a debugged biodistribution estimation network for determining the ecological intervention strategy is obtained; The step of performing a projection operation on the transformed parameter to obtain an integrated parameter for characterizing information integration of the biological distribution prediction network includes: Performing a first linear projection operation on the transformed parameter to obtain a candidate integrated parameter for characterizing information integration of the biodistribution prediction network; Performing a nonlinear projection operation on the candidate integrated parameter variables to obtain the integrated parameter variables of the biodistribution prediction network; The step of performing a nonlinear projection operation on the candidate integrated parameter variables to obtain the integrated parameter variables of the biological distribution prediction network includes: Performing a nonlinear projection operation on the candidate integrated parameter variables to obtain basic integrated parameter variables of the biodistribution prediction network; The basic integrated parameter variables are subjected to a gradient-compatible discretization operation to obtain the integrated parameter variables of the biological distribution prediction network.
8. A computer device comprising a memory and a processor, wherein the memory stores a computer program executable on the processor, wherein: When the processor executes the program, the steps in the method according to any one of claims 1 to 6 are implemented.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps in the method according to any one of claims 1 to 6 are implemented.
Citation Information
Patent Citations
Unmanned aerial vehicle forest exploration system based on monocular depth-of-field prediction and deep reinforcement learning
CN114943757A
Model construction method for application data training and related equipment
CN118332344A
