Assembled steel frame assembly for steel structure building and assembly method thereof
By using the combined structure of the second I-shaped steel component, the first I-shaped steel component and the concrete base in the steel structure building, and using the combination of insert plates, triangular support plates and bolts, the problem of hoisting problems in steel structure buildings in the existing technology is solved. The problem of inability to complete splicing during transportation is eliminated, rapid fixation and efficient assembly are achieved, and assembly efficiency and connection stability are improved.
Patent Information
- Application Number
- CN202411018149.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-07-29
AI Technical Summary
Existing steel structure buildings cannot be spliced when being lifted and placed, requiring staff to control the lifting equipment to make adjustments, resulting in low assembly efficiency.
A combined structure including the second I-shaped steel component, the first I-shaped steel component and a concrete base is adopted. Through the combination of insert plates, triangular support plates, bolts and nuts, the components are quickly fixed and connected to ensure that they can be The initial fixation is completed and the connection is further strengthened with bolts and nuts.
It realizes the rapid construction and efficient assembly of steel structure building frames, improves the construction speed, and ensures the stability and strength of the connection through the fixation of bolts and nuts, avoiding corrosion problems caused by welding fixation.
Smart Images

Figure CN118531903B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of assembled steel structure buildings, and in particular to an assembled steel frame assembly for steel structure buildings and an assembly method thereof. Background Art
[0002] Steel structure is a structure made of steel materials. It is one of the main types of building structures. The structure is mainly composed of steel beams, steel columns, steel trusses and other components supported by steel sections and steel plates, and adopts silanization, pure manganese phosphating, water washing and drying, galvanizing and other rust removal processes. The components or parts are usually connected by welds, bolts or rivets. Because of its light weight and simple construction, it is widely used in large factories, venues, super high-rise buildings and other fields.
[0003] The existing Chinese patent publication number is CN117587925A, which is an energy-saving assembled steel structure building and installation method. It includes a plurality of columns arranged in a rectangular shape, the bottom of the column is rotatably connected to a fixed seat, one side of the column is rotatably connected to an arc-shaped plug rod through a pin shaft, and the fixed seat is surrounded by a plurality of slots corresponding to the arc-shaped plug rod; the installation method includes the following steps: step 1: rotating the column, adjusting the direction of the column, and then fixing the column with the arc-shaped plug rod; step 2: lifting the connected load-bearing plate and connecting plate, and setting them on the top of the column, and inserting the connecting block into the top of the column; step 3: passing the fastening rod through the connecting block, and then fixing the fastening rod through a locking mechanism to achieve the installation of the steel structure building. The present invention can quickly connect and fix the components of the steel structure building through the setting of the clamping connection mechanism, and at the same time, it can avoid welding fixation, effectively prevent corrosion at the welding point, thereby effectively improving the connection stability of the steel structure building.
[0004] The steel structure frame in the existing technical solution can be connected through corresponding components after placement, but it cannot be spliced during lifting and placement. The staff needs to control the lifting equipment and coordinate the lifting and lowering of the steel structure components to make corresponding adjustments, which is not conducive to improving the assembly efficiency of the steel structure frame, so improvement is needed. Summary of the invention
[0005] The purpose of the present invention is to solve the shortcomings of the prior art and to propose an assembled steel frame assembly for steel structure buildings and an assembly method thereof.
[0006] In order to achieve the above object, the present invention adopts the following technical solutions:
[0007] An assembled steel frame assembly for a steel structure building comprises a second I-shaped steel assembly, both sides of the lower end of the second I-shaped steel assembly are detachably connected to the first I-shaped steel assembly, and the lower ends of the two first I-shaped steel assemblies are detachably connected to a concrete base;
[0008] Two plug-in plates are fixed on both sides of the lower end of the second I-shaped steel component. The two plug-in plates located at the same end of the second I-shaped steel component extend into the first I-shaped steel component on the same side. An ejection mechanism is installed on the plug-in plate. Two triangular support plates are rotatably connected to the opposite sides of the two first I-shaped steel components. The ejection mechanism conflicts with the first I-shaped steel component on the same side.
[0009] An adaptable mechanism is provided on the triangular support plate, and the adaptable mechanism is connected to the first I-shaped steel component. Three fixing rods are provided on the adaptable mechanism. A support plate is fixed to the upper end of the triangular support plate. A linkage mechanism is installed in the support plate. The linkage mechanism is connected to the fixing rod. Three top rods are provided on the linkage mechanism. Bolt components are slidably installed on both sides of the lower end of the second I-shaped steel component. The upper end of the top rod component extends into the second I-shaped steel component, and the lower end of the bolt component is screwed into the corresponding top rod component.
[0010] Compared with the prior art, the present application can quickly fix and connect the second I-shaped steel component and the two first I-shaped steel components, and at the same time further improve the firmness of the connection through the action of the triangular support plate, and can complete the preliminary fixation when the second I-shaped steel component and the first I-shaped steel component are assembled, and then use bolts and nuts to ensure the firmness of the connection, so as to achieve energy-saving construction of the steel structure building frame and improve the construction speed.
[0011] Preferably, connection components are fixed to the four corners of the lower end of the first I-shaped steel component, and the lower end of the connection component extends into the concrete base.
[0012] Furthermore, the concrete base is prepared by pouring reinforced concrete. During the preparation, the lower end of the connecting component is connected and fixed to the steel bar and further fixed by pouring concrete. The lower end of the first I-shaped steel component is inserted into the four connecting components at the upper end of the same concrete base. The gaps between the four connecting components are arranged in an I-shaped shape to facilitate the insertion of the first I-shaped steel component. After the insertion is completed, it is fixed by the bolt and nut assembly.
[0013] Preferably, the ejection mechanism includes three sliding sets fixed on the plug-in plate from top to bottom in sequence, a connecting ring is fixed in the sliding set, a load-bearing shaft is slidably installed in the connecting ring, three through holes are opened on both sides of the first I-shaped steel component, one end of the three load-bearing shafts respectively penetrates through the three through holes on the same side, a synchronization rod is commonly fixed on the three load-bearing shafts located in the first I-shaped steel component, a downward pressing and pulling mechanism is connected to the synchronization rod, and the downward pressing and pulling mechanism is connected to the first I-shaped steel component.
[0014] Furthermore, the position of the synchronization rod can be controlled by pressing down on the pulling mechanism, so that the synchronization rod can push the load-bearing shaft through the through hole to preliminarily complete the connection between the first I-shaped steel assembly and the second I-shaped steel assembly, and the first I-shaped steel assembly and the second I-shaped steel assembly can be prevented from rocking left and right and front and back through the plug-in plate, and the first I-shaped steel assembly and the second I-shaped steel assembly can be rocked up and down and front and back through the load-bearing shaft and the through hole.
[0015] Preferably, the downward pressure and pulling mechanism includes an oblique push plate slidably installed on one side of the plug plate, a second tension spring is commonly fixed between the oblique push plate and the second I-shaped steel component, one end of the second tension spring is rotatably connected to the first swing rod, the lower end of the first swing rod is rotatably connected to the rotating rod, the lower end of the rotating rod is rotatably connected to the second swing rod, the rotating rod is rotatably connected to one side of the plug plate, a sliding groove is provided at the upper end of the synchronization rod, a lifting block is slidably installed in the sliding groove, a first tension spring is commonly fixed between the lower end of the lifting block and the bottom of the sliding groove, and the lower end of the second swing rod is rotatably connected to one side of the lifting block.
[0016] Furthermore, one side of the lower end of the oblique push plate is inclined and can contact the first I-shaped steel assembly to move the oblique push plate. When the oblique push plate moves, the rotating rod can be pushed to rotate in a horizontal direction through the first swing rod. The rotating rod can drive the lifting block through the second swing rod to stretch the first tension spring. When the plug plate is gradually inserted into the first I-shaped steel assembly, the load-bearing shaft and the first I-shaped steel assembly can be contacted. At the same time, when the first I-shaped steel assembly and the oblique push plate contact, the first tension spring can be stretched, further making the load-bearing shaft contact the first I-shaped steel assembly. When the load-bearing shaft and the through hole correspond, they can quickly penetrate the first I-shaped steel assembly to complete the connection.
[0017] Preferably, the adaptation mechanism includes two discs slidably mounted on a triangular support plate, a first resistance spring is commonly fixed between the two discs, a connecting rod and a resistance rod are respectively fixed on one side of the two discs, two connecting grooves are provided on one side of the first I-shaped steel component, the two connecting rods are respectively located in the two connecting grooves, a vertical plate is fixed to one end of the resistance rod away from the disc, an oblique rod is rotatably connected to the triangular support plate, both ends of the oblique rod are rotatably connected to sliding parts, a horizontal axis is commonly fixed to the lower ends of the three fixed rods on the same side, and the two sliding parts are respectively slidably mounted on the vertical plate and the horizontal axis.
[0018] Furthermore, when the triangular support plate rotates under the action of the load-bearing shaft, the triangular support plate will gradually rotate to a state where the first I-shaped steel component is vertical. As the triangular support plate rotates, the connecting rod can be inserted into the connecting groove. Through the action of the connecting rod and the first resistance spring, the resistance rod can be moved so that the inclined rod can push the fixed rod up through the sliding member to effectively promote the operation of the linkage mechanism.
[0019] Preferably, the linkage mechanism includes three sleeves that are equidistantly arranged in the support plate, three fixed rods extend into the three sleeves respectively, a spring telescopic assembly is installed on the upper end of the fixed rod, three top rods are installed on the three spring telescopic assemblies respectively, and plug rods are installed on both sides of the upper end of the top rod, three connecting holes are provided on both sides of the lower end of the second I-shaped steel assembly, the upper end of the top rod extends into the corresponding connecting hole, transverse grooves are opened on both sides of the connecting hole, and the plug rod extends into the corresponding transverse grooves.
[0020] Furthermore, as the triangular support plate rotates, the fixing rod can rise and the top rod can be pushed up by the spring telescopic assembly, so that the inserted rod can be inserted into the corresponding transverse groove, and can also be screwed and fixed by bolts to effectively fix the position of the triangular support plate, so as to improve the strength of the connection and the overall strength.
[0021] Preferably, vertical plates are slidably installed on opposite sides of the two first I-shaped steel components, and three horizontal plates are fixed on the vertical plates at equal intervals from top to bottom. Positioning rods are fixed on both ends of the horizontal plates, and a through hole is opened on the load-bearing shaft. The lower end of the positioning rod extends into the corresponding through hole. A connecting mechanism is installed on the first I-shaped steel component, and the connecting mechanism is connected to the vertical plate.
[0022] Furthermore, the position of the vertical plate can be limited by the connecting mechanism. When the bearing shaft moves into position, the vertical plate will drive the horizontal plate and the positioning rod to descend, and the positioning rod can be inserted into the corresponding through-hole to effectively limit the corresponding components and avoid loose connections.
[0023] Preferably, the connecting mechanism includes a screw rod slidably mounted on the first I-shaped steel component, a round shaft is fixed to the end of the screw rod away from the first I-shaped steel component, the round shaft is in conflict with two triangular support plates on the same side thereof, a through hole is provided on the screw rod, the lower end of the vertical plate extends through the through hole to the lower end of the screw rod, a notch is provided on one side of the upper end of the through hole, a pressure plate member is fixed to one side of the upper end of the vertical plate, the pressure plate member is located in the notch, a fastening mechanism is provided on the screw rod, and the pressure plate member is located in the fastening mechanism.
[0024] Furthermore, when the triangular support plate rotates, the circular shaft can drive the screw to move so that the vertical plate can be inserted into the through-hole, and the pressure plate can be inserted into the notch so that the positioning rod can be inserted into the corresponding load-bearing shaft, thereby fully completing the connection and fixation.
[0025] Preferably, the fastening mechanism includes a nut threaded on a screw rod, the pressure plate is located inside the nut, a turntable is rotatably sleeved on the side of the nut close to the circular shaft, a second resistance spring is sleeved on the screw rod, and the two ends of the second resistance spring are respectively fixed on the opposite sides of the turntable and the circular shaft.
[0026] Furthermore, the second resistance spring can enable the turntable to push the nut so that the nut can rotate and the nut and the vertical plate can come into contact with each other, thereby effectively fixing the pressure plate and the screw rod in connection.
[0027] The present invention also proposes an assembly method of an assembled steel frame assembly for a steel structure building, which is applicable to the above-mentioned assembled steel frame assembly for a steel structure building, and comprises the following steps:
[0028] S1. In actual production and preparation, a corresponding pit is set on the base, and a steel frame is placed in the pit, the connection component and the steel frame are connected, and then concrete is poured. The gaps in the four connection components at the upper end of the same pit are set in an I-shaped manner, and the first I-shaped steel component is inserted into the corresponding I-shaped gap, and the connection component and the first I-shaped steel component are firmly connected by bolts and nuts;
[0029] S2, lifting the second I-shaped steel assembly by lifting equipment, etc., so that the plug-in plate under the second I-shaped steel assembly can be plugged into the first I-shaped steel assembly accordingly, and as the second I-shaped steel assembly descends, the oblique push plate can rotate the rotating rod through the first swing rod, so that the lifting block can move in the sliding groove through the second swing rod, and the synchronous rod can push the through-hole to move, and as the through-hole penetrates the corresponding through hole, it can contact the triangular support plate, so that the triangular support plate can drive the support plate to contact the lower end of the second I-shaped steel assembly and rotate;
[0030] S3. As the triangular support plate rotates, the connecting rod will be inserted into the connecting groove, which can make the first resistance spring push the resistance rod to move, so as to push the horizontal axis up through the oblique rod, and then the top rod will rise through the action of the fixed rod and the spring telescopic assembly. The top rod can push the bolt to rise, which is convenient for the staff to screw the bolt with the top rod by rotating it. At the same time, as the top rod rises, the insertion rod will correspond to the horizontal groove and be inserted into the horizontal groove, completing the connection between the triangular support plate and the second I-shaped steel assembly;
[0031] S4. As the triangular support plate rotates, the triangular support plate can push the circular shaft to move the screw rod. The movement of the screw rod can make the vertical plate and the through-holes on the screw rod correspond to each other, so that the vertical plate can be lowered so that the positioning rod can be inserted into the corresponding through-hole, and the pressure plate can be inserted into the notch. At the same time, the nut can be rotated to correspond to the vertical plate. At the same time, the position of the nut can be further limited by the action of the second resistance spring.
[0032] Compared with the prior art, the present application clearly describes how to install energy-saving prefabricated steel structure buildings. From the above description, it can be understood that multiple fixations can be achieved when connecting the second I-shaped steel component and the first I-shaped steel component, and the firmness of the connection is further improved through the action of nuts and bolts, compared with the traditional connection method through welding and multiple sets of bolts.
[0033] The beneficial effects of the present invention are:
[0034] 1. During actual production and preparation, the concrete base is prepared by reinforced concrete. During preparation, the connection components are connected to the steel bars in the concrete base, which can fully ensure the stability of the connection components. During preparation, the gaps in the four connection components on the concrete base are set in an I-shaped configuration, which is convenient for the corresponding insertion of the first I-shaped steel components. During assembly, ensure that the through holes between the corresponding two first I-shaped steel components on the corresponding two connection components are in the middle position, which is convenient for subsequent operation. At the same time, the two triangular support plates on the two first I-shaped steel components are located between the two first I-shaped steel components and at the upper end, and the connection components and the first I-shaped steel components are ensured to be firmly connected through the combination of bolts and nuts;
[0035] 2. The second I-shaped steel assembly is lifted up by the lifting equipment, so that the two plug-in plates at both ends of the second I-shaped steel assembly can be plugged into the corresponding cross plates in the first I-shaped steel assembly. At the same time, the lower end of the plug-in plate is set in a trapezoidal shape to facilitate better insertion;
[0036] 3. When the plug-in plate is stably inserted into the corresponding first I-shaped steel component, the inclined push plate will move against the first I-shaped steel component when it descends. When the first I-shaped steel component moves, the lifting block can pull the first tension spring to adapt to the corresponding component through the action of the first swing rod, the rotating rod and the second swing rod. When the bearing shaft and the through hole correspond, they can quickly penetrate the first I-shaped steel component to complete the initial connection;
[0037] 4. When the load-bearing shaft passes through the first I-shaped steel component, the triangular support plate can be pushed and rotated, and the triangular support plate drives the support plate to resist the lower end of the second I-shaped steel component to rotate, so as to realize the vertical setting with the first I-shaped steel component. When the triangular support plate rotates, the connecting rod will be inserted into the connecting groove, and then the first resistance spring will make the resisting rod move, which can push the horizontal axis and the fixed rod fixed thereon to rise, and the top rod can be raised by the spring telescopic assembly, and the inserted rod can be further connected with the second I-shaped steel component. At the same time, the bolt member can rotate and be screwed and connected with the top rod member to ensure the firmness of the connection;
[0038] 5. When the triangular support plate rotates, it can push the circular shaft to move, so that the screw rod moves, and the lower end of the vertical plate contacts the screw rod. When the through holes on the vertical plate and the screw rod correspond, and the vertical plate passes through the through holes, the pressure plate can also be inserted into the notch, and then the nut rotates and moves, and the second resistance spring can further ensure the stability of the nut position. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 A front view of an assembled steel frame assembly for a steel structure building proposed by the present invention;
[0040] Figure 2 A schematic diagram of the triangular support plate structure of an assembled steel frame assembly for a steel structure building proposed by the present invention;
[0041] Figure 3 The present invention is attached Figure 1 A magnified image of point A;
[0042] Figure 4 A structural diagram of the connection between the top rod and the bolt of a prefabricated steel frame assembly for a steel structure building proposed by the present invention;
[0043] Figure 5 The present invention is attached Figure 2 The enlarged view of point B;
[0044] Figure 6 This is a structural diagram of a load-bearing shaft and a synchronous rod of an assembled steel frame assembly for a steel structure building proposed by the present invention;
[0045] Figure 7 A vertical plate structure diagram of a prefabricated steel frame assembly for a steel structure building proposed by the present invention;
[0046] Figure 8 This is a structural diagram of a first I-shaped steel component and a second I-shaped steel component of an assembled steel frame component for a steel structure building proposed by the present invention;
[0047] In the figure: 1, concrete base; 2, connection assembly; 3, first I-shaped steel assembly; 4, plug plate; 5, second I-shaped steel assembly; 6, triangular support plate; 7, bolt member; 8, transverse groove; 9, sleeve; 10, transverse axis; 11, oblique rod; 12, connection groove; 13, pressure plate; 14, plug rod; 15, top rod; 16, spring expansion assembly; 17, fixed rod; 18, sliding member; 19, vertical plate; 20, first resistance spring; 21, resistance rod; 22, disc ; 23. Connecting rod; 24. Synchronizing rod; 25. Sliding set; 26. Through hole; 27. Support plate; 28. Screw rod; 29. Round shaft; 30. Second resistance spring; 31. Nut; 32. Turntable; 33. First rocker arm; 34. Rotating rod; 35. Second rocker arm; 36. First tension spring; 37. Second tension spring; 38. Sliding groove; 39. Lifting block; 40. Through opening; 41. Connecting ring; 42. Load-bearing shaft; 43. Horizontal plate; 44. Positioning rod; 45. Vertical plate. DETAILED DESCRIPTION
[0048] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0049] Reference Figure 1-8, an assembled steel frame assembly for a steel structure building, comprising a second I-shaped steel assembly 5, both sides of the lower end of the second I-shaped steel assembly 5 are detachably connected to the first I-shaped steel assembly 3, the lower ends of the two first I-shaped steel assemblies 3 are detachably connected to a concrete base 1, and the four corners of the lower end of the first I-shaped steel assembly 3 are fixed with connecting assemblies 2, and the lower end of the connecting assembly 2 extends into the concrete base 1. During actual production and preparation, the concrete base 1 is composed of concrete and a steel frame. At the same time, during actual preparation, it is ensured that the connecting assembly 2 and the steel frame are connected and fixed, and the gaps of the four connecting assemblies 2 on the same concrete base 1 are arranged in an I-shaped manner, so that the first I-shaped steel assembly 3 can be inserted into the gap, and then connected and fixed by a bolt assembly. The connecting assembly 2 is composed of an L-shaped steel plate, a reinforcing plate installed thereon, and a through hole opened thereon.
[0050] Reference Figure 1-2 Two plug-in plates 4 are fixed on both sides of the lower end of the second I-shaped steel component 5. The two plug-in plates 4 located at the same end of the second I-shaped steel component 5 extend into the first I-shaped steel component 3 on the same side. An ejection mechanism is installed on the plug-in plate 4. Two triangular support plates 6 are rotatably connected to the opposite sides of the two first I-shaped steel components 3. The ejection mechanism conflicts with the first I-shaped steel component 3 on the same side. During actual production and preparation, the distance between the two plug-in plates 4 at the same end is the same as the specification of the first I-shaped steel component 3, so as to facilitate stable insertion, so as to effectively complete the connection between the second I-shaped steel component 5 and the first I-shaped steel component 3. At the same time, the triangular support plates 6 can be used to form a reinforcement structure to improve the strength of the overall frame.
[0051] Reference Figure 1-2 , an adaptation mechanism is provided on the triangular support plate 6, the adaptation mechanism is connected to the first I-shaped steel component 3, three fixing rods 17 are provided on the adaptation mechanism, a support plate 27 is fixed to the upper end of the triangular support plate 6, a linkage mechanism is installed in the support plate 27, the linkage mechanism is connected to the fixing rod 17, and three top rods 15 are provided on the linkage mechanism. Bolts 7 are slidably installed on both sides of the lower end of the second I-shaped steel component 5, the upper end of the top rod 15 extends into the second I-shaped steel component 5, and the lower end of the bolt 7 is screwed into the corresponding top rod 15. When the bearing shaft 42 passes through the first I-shaped steel component 3, the triangular support plate 6 is pushed to rotate, and the triangular support plate 6 drives the support plate 27 to rotate against the lower end of the second I-shaped steel component 5 to achieve a vertical setting with the first I-shaped steel component 3. When the triangular support plate 6 rotates, the connecting rod 23 will be inserted into the connecting groove 12, and then the first resistance spring 20 will make the resisting rod 21 move, which can push the horizontal axis 10 and the fixed rod 17 fixed thereon to rise, and the spring telescopic component 16 can make the top rod 15 rise, and the inserted rod 14 can be further connected to the second I-shaped steel component 5. At the same time, the bolt member 7 can rotate and be screwed together with the top rod 15 to ensure the firmness of the connection.
[0052] Reference Figure 1 , 2 , 5, 6, 8, the ejection mechanism includes three sliding sets 25 fixed on the plug plate 4 from top to bottom in sequence, a connecting ring 41 is fixed in the sliding set 25, a bearing shaft 42 is slidably installed in the connecting ring 41, three through holes 26 are opened on both sides of the first I-shaped steel component 3, one end of the three bearing shafts 42 respectively penetrates through the three through holes 26 on the same side, and a synchronization rod 24 is fixed on the three bearing shafts 42 located in the first I-shaped steel component 3. A downward pressing and pulling mechanism is connected to the synchronization rod 24, and the downward pressing and pulling mechanism is connected to the first I-shaped steel component 3. The position of the synchronization rod 24 can be controlled by the downward pressing and pulling mechanism, so that the synchronization rod 24 can push the bearing shaft 42 to penetrate through the through hole 26, so as to preliminarily complete the connection between the first I-shaped steel component 3 and the second I-shaped steel component 5. The plug plate 4 can prevent the first I-shaped steel component 3 and the second I-shaped steel component 5 from shaking left and right and front and back, and the bearing shaft 42 and the through hole 26 can make the first I-shaped steel component 3 and the second I-shaped steel component 5 shake up and down and front and back.
[0053] Reference Figure 1 , 2 , 5, 6, 8, the downward pressing and pulling mechanism includes an oblique push plate slidably installed on one side of the plug plate 4, a second tension spring 37 is commonly fixed between the oblique push plate and the second I-shaped steel component 5, one end of the second tension spring 37 is rotatably connected to the first swing rod 33, the lower end of the first swing rod 33 is rotatably connected to the rotating rod 34, the lower end of the rotating rod 34 is rotatably connected to the second swing rod 35, the rotating rod 34 is rotatably connected to one side of the plug plate 4, a sliding groove 38 is provided at the upper end of the synchronization rod 24, a lifting block 39 is slidably installed in the sliding groove 38, a first tension spring 36 is commonly fixed between the lower end of the lifting block 39 and the bottom of the sliding groove 38, the lower end of the second swing rod 35 is rotatably connected to one side of the lifting block 39, One side of the lower end of the push plate is inclined, and can contact the first I-shaped steel component 3 to move the oblique push plate. When the oblique push plate moves, the first swing rod 33 can push the rotating rod 34 to rotate in the horizontal direction. The rotating rod 34 can drive the lifting block 39 through the second swing rod 35 to stretch the first tension spring 36. When the plug plate 4 is gradually inserted into the first I-shaped steel component 3, the load-bearing shaft 42 can contact the first I-shaped steel component 3. At the same time, when the first I-shaped steel component 3 and the oblique push plate contact, the first tension spring 36 can be stretched, further making the load-bearing shaft 42 contact the first I-shaped steel component 3. When the load-bearing shaft 42 and the through hole 26 correspond, they can quickly penetrate the first I-shaped steel component 3 to complete the connection.
[0054] Reference Figure 1 , 2, 3, 4, the adaptation mechanism includes two discs 22 slidably mounted on the triangular support plate 6, a first resistance spring 20 is fixed between the two discs 22, a connecting rod 23 and a resisting rod 21 are respectively fixed on one side of the two discs 22, two connecting grooves 12 are provided on one side of the first I-shaped steel component 3, the two connecting rods 23 are respectively located in the two connecting grooves 12, a vertical plate 19 is fixed to one end of the resisting rod 21 away from the disc 22, an oblique rod 11 is rotatably connected to the triangular support plate 6, and both ends of the oblique rod 11 are rotatably connected to the sliding member 18, and three fixed rods on the same side The lower ends of the vertical plates 19 and the horizontal shaft 10 are fixed with the horizontal shaft 10, and the two sliding members 18 are respectively slidably mounted on the vertical plate 19 and the horizontal shaft 10. When the triangular support plate 6 rotates under the action of the load-bearing shaft 42, the triangular support plate 6 will gradually rotate to a vertical state of the first I-shaped steel component 3. With the rotation of the triangular support plate 6, the connecting rod 23 can be inserted into the connecting groove 12. Through the action of the connecting rod 23 and the first resistance spring 20, the resistance rod 21 can be moved so that the oblique rod 11 can make the horizontal shaft 10 push the fixed rod 17 to rise through the sliding member 18, so as to effectively promote the operation of the linkage mechanism.
[0055] Reference Figure 1 , 3 4. The linkage mechanism includes three sleeves 9 that are evenly spaced and penetrate through the support plate 27. Three fixed rods 17 extend into the three sleeves 9 respectively. A spring telescopic assembly 16 is installed on the upper end of the fixed rod 17. Three top rods 15 are installed on the three spring telescopic assemblies 16 respectively. Insert rods 14 are installed on both sides of the upper end of the top rod 15. Three connecting holes are provided on both sides of the lower end of the second I-shaped steel assembly 5. The upper end of the top rod 15 extends into the corresponding connecting hole. Transverse grooves 8 are provided on both sides of the connecting hole. The insert rod 14 extends into the corresponding transverse groove 8. With the rotation of the triangular support plate 6, the fixed rod 17 can rise and the spring telescopic assembly 16 can push the top rod 15 to rise, so that the insert rod 14 can be inserted into the corresponding transverse groove 8, and it can also be screwed and fixed by the bolt 7 to effectively fix the position of the triangular support plate 6, so as to improve the strength of the connection and the overall strength.
[0056] Reference Figure 1 , 2, 5, 6, 7, vertical plates 45 are slidably installed on opposite sides of the two first I-shaped steel components 3, and three horizontal plates 43 are fixed on the vertical plates 45 at equal intervals from top to bottom, and positioning rods 44 are fixed at both ends of the horizontal plates 43. A through hole 40 is opened on the load-bearing shaft 42, and the lower end of the positioning rod 44 extends into the corresponding through hole 40. A connecting mechanism is installed on the first I-shaped steel component 3, and the connecting mechanism is connected to the vertical plates 45. The position of the vertical plates 45 can be limited by the connecting mechanism. When the load-bearing shaft 42 moves into place, the vertical plates 45 will drive the horizontal plates 43 and the positioning rods 44 to descend, so that the positioning rods 44 can be inserted into the corresponding through holes 40, so as to effectively limit the corresponding components and avoid loose connections.
[0057] Reference Figure 1 , 2 , 5, 7, the connecting mechanism includes a screw 28 slidably mounted on the first I-shaped steel component 3, a round shaft 29 is fixed to one end of the screw 28 away from the first I-shaped steel component 3, the round shaft 29 conflicts with the two triangular support plates 6 on the same side thereof, a through hole 40 is opened on the screw 28, the lower end of the vertical plate 45 passes through the through hole 40 and extends to the lower end of the screw 28, a notch is opened on one side of the upper end of the through hole 40, a pressure plate 13 is fixed to one side of the upper end of the vertical plate 45, the pressure plate 13 is located in the notch, a fastening mechanism is provided on the screw 28, and the pressure plate 13 is located in the fastening mechanism, when the triangular support plate 6 rotates, the round shaft 29 can drive the screw 28 to move, so that the vertical plate 45 can be inserted into the through hole 40, and the pressure plate 13 can be inserted into the notch, so that the positioning rod 44 is inserted into the corresponding load-bearing shaft 42, and the connection and fixation are fully completed.
[0058] Reference Figure 2 , 5 The fastening mechanism includes a nut 31 screwed on the screw rod 28, the pressure plate member 13 is located in the nut 31, and a turntable 32 is rotatably sleeved on the side of the nut 31 close to the circular shaft 29. A second resistance spring 30 is sleeved on the screw rod 28, and the two ends of the second resistance spring 30 are respectively fixed on the opposite side of the turntable 32 and the circular shaft 29. Through the action of the second resistance spring 30, the turntable 32 can push the nut 31 so that the nut 31 can rotate and make the nut 31 contact with the vertical plate 45, which can effectively fix the pressure plate member 13 and the screw rod 28.
[0059] The present invention also proposes an assembly method of an assembled steel frame assembly for a steel structure building, which is applicable to the above-mentioned assembled steel frame assembly for a steel structure building, and comprises the following steps:
[0060] S1. In actual production and preparation, a corresponding pit is set on the base, and a steel frame is placed in the pit, the connection component 2 is connected to the steel frame, and then concrete is injected. The gaps in the four connection components 2 at the upper end of the same pit are set in an I-shaped manner, and the first I-shaped steel component 3 is inserted into the corresponding I-shaped gap, and the connection component 2 and the first I-shaped steel component 3 are firmly connected by bolts and nuts;
[0061] S2, lift the second I-shaped steel assembly 5 by lifting equipment, etc., so that the plug-in plate 4 under the second I-shaped steel assembly 5 and the first I-shaped steel assembly 3 can be plugged in correspondingly, and as the second I-shaped steel assembly 5 descends, the oblique push plate can rotate the rotating rod 34 through the first swing rod 33, so that the lifting block 39 can move in the sliding groove 38 through the second swing rod 35, so that the synchronous rod 24 can push the through-hole 40 to move, and as the through-hole 40 penetrates the corresponding through hole 26, it can contact the triangular support plate 6, so that the triangular support plate 6 can drive the support plate 27 to contact the lower end of the second I-shaped steel assembly 5 and rotate;
[0062] S3. With the rotation of the triangular support plate 6, the connecting rod 23 will be inserted into the connecting groove 12, which can make the first resistance spring 20 push the contact rod 21 to move, so as to push the horizontal axis 10 up through the inclined rod 11, and then the top rod 15 will be raised through the action of the fixed rod 17 and the spring expansion assembly 16. The top rod 15 can push the bolt member 7 to rise, which is convenient for the staff to screw the bolt member 7 with the top rod 15 by rotating it. At the same time, with the rise of the top rod 15, the insertion rod 14 will correspond to the horizontal groove 8 and be inserted into the horizontal groove 8, completing the connection between the triangular support plate 6 and the second I-shaped steel assembly 5;
[0063] S4. With the rotation of the triangular support plate 6, the triangular support plate 6 can push the circular shaft 29 to move the screw rod 28. The movement of the screw rod 28 can make the vertical plate 45 correspond to the through hole 40 on the screw rod 28, and the vertical plate 45 can be lowered so that the positioning rod 44 can be inserted into the corresponding through hole 40, and the pressure plate 13 can be inserted into the notch. At the same time, the nut 31 can be rotated to correspond to the vertical plate 45. At the same time, the position of the nut 31 can be further limited by the action of the second resistance spring 30.
[0064] In the present invention, during actual production and preparation, a corresponding pit is set on the base, and a steel frame is placed in the pit, the connection component 2 and the steel frame are connected, and then concrete is injected. The gaps in the four connection components 2 at the upper end of the same pit are set in an I-shaped manner, and the first I-shaped steel component 3 is inserted into the corresponding I-shaped gap, and the connection component 2 and the first I-shaped steel component 3 are firmly connected by bolts and nuts;
[0065] By lifting the second I-shaped steel assembly 5 with lifting equipment, the plug-in plate 4 under the second I-shaped steel assembly 5 can be plugged into the first I-shaped steel assembly 3 accordingly. As the second I-shaped steel assembly 5 descends, the oblique push plate can rotate the rotating rod 34 through the first swing rod 33, so that the lifting block 39 can move in the sliding groove 38 through the second swing rod 35, so that the synchronous rod 24 can push the through-hole 40 to move. As the through-hole 40 penetrates the corresponding through-hole 26, it can contact the triangular support plate 6, so that the triangular support plate 6 can drive the support plate 27 to contact the lower end of the second I-shaped steel assembly 5 and rotate;
[0066] As the triangular support plate 6 rotates, the connecting rod 23 will be inserted into the connecting groove 12, which can make the first resistance spring 20 push the resistance rod 21 to move, so as to push the horizontal axis 10 up through the inclined rod 11, and then the top rod 15 will rise through the action of the fixed rod 17 and the spring expansion assembly 16. The top rod 15 can push the bolt member 7 to rise, which is convenient for the staff to screw the bolt member 7 with the top rod 15 by rotating it. At the same time, as the top rod 15 rises, the insertion rod 14 will correspond to the horizontal groove 8 and be inserted into the horizontal groove 8, completing the connection between the triangular support plate 6 and the second I-shaped steel assembly 5;
[0067] As the triangular support plate 6 rotates, the triangular support plate 6 can push the circular shaft 29 to move the screw rod 28. The movement of the screw rod 28 can make the vertical plate 45 correspond to the through hole 40 on the screw rod 28, and the vertical plate 45 can be lowered so that the positioning rod 44 can be inserted into the corresponding through hole 40, and the pressure plate 13 can be inserted into the notch. At the same time, the nut 31 can be rotated to correspond to the vertical plate 45. At the same time, the position of the nut 31 can be further limited by the action of the second resistance spring 30.
[0068] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. An assembled steel frame assembly for a steel structure building, comprising a second I-shaped steel assembly (5), Features: Both sides of the lower end of the second I-shaped steel component (5) are detachably connected to the first I-shaped steel components (3), and the lower ends of the two first I-shaped steel components (3) are detachably connected to the concrete base (1); Two plug-in plates (4) are fixed on both sides of the lower end of the second I-shaped steel component (5), the two plug-in plates (4) located at the same end of the second I-shaped steel component (5) extend into the first I-shaped steel component (3) on the same side thereof, an ejection mechanism is installed on the plug-in plate (4), and two triangular support plates (6) are rotatably connected to the opposite sides of the two first I-shaped steel components (3), and the ejection mechanism and the first I-shaped steel component (3) on the same side thereof are in conflict; The ejection mechanism comprises three sliding sleeves (25) fixed on the plug plate (4) in sequence from top to bottom, a connecting ring (41) being fixed inside the sliding sleeve (25), a bearing shaft (42) being slidably mounted inside the connecting ring (41), three through holes (26) being opened on both sides of the first I-shaped steel component (3), one end of the three bearing shafts (42) respectively passing through the three through holes (26) on the same side thereof, a synchronization rod (24) being fixed on the three bearing shafts (42) located inside the first I-shaped steel component (3), a downward pressing and pulling mechanism being connected to the synchronization rod (24), and the downward pressing and pulling mechanism being connected to the first I-shaped steel component (3); The downward pressing and pulling mechanism comprises an inclined push plate member slidably mounted on one side of the plug plate member (4); a second tension spring (37) is fixed between the inclined push plate member and the second I-shaped steel component (5); one end of the second tension spring (37) is rotatably connected to a first swing rod (33); the lower end of the first swing rod (33) is rotatably connected to a rotating rod (34); the lower end of the rotating rod (34) is rotatably connected to a second swing rod (35); the rotating rod (34) is rotatably connected to one side of the plug plate member (4); a sliding groove (38) is formed at the upper end of the synchronization rod (24); a lifting block (39) is slidably mounted in the sliding groove (38); a first tension spring (36) is fixed between the lower end of the lifting block (39) and the bottom of the sliding groove (38); the lower end of the second swing rod (35) is rotatably connected to one side of the lifting block (39); An adaption mechanism is provided on the triangular support plate (6), the adaption mechanism is connected to the first I-shaped steel component (3), and three fixing rods (17) are provided on the adaption mechanism; The adaptability mechanism comprises two discs (22) slidably mounted on a triangular support plate (6), a first resistance spring (20) being fixed between the two discs (22), a connecting rod (23) and a resisting rod (21) being fixed on one side of the two discs (22), two connecting grooves (12) being provided on one side of the first I-shaped steel component (3), the two connecting rods (23) being respectively located in the two connecting grooves (12), a vertical plate (19) being fixed on one end of the resisting rod (21) away from the discs (22), an inclined rod (11) being rotatably connected to the triangular support plate (6), both ends of the inclined rod (11) being rotatably connected to sliding members (18), a horizontal shaft (10) being fixed on the lower ends of the three fixed rods (17) on the same side, and two sliding members (18) being slidably mounted on the vertical plate (19) and the horizontal shaft (10), respectively; A support plate (27) is fixed to the upper end of the triangular support plate (6), a linkage mechanism is installed in the support plate (27), the linkage mechanism is connected to the fixing rod (17), three push rods (15) are arranged on the linkage mechanism, bolts (7) are slidably installed on both sides of the lower end of the second I-shaped steel component (5), the upper end of the push rod (15) extends into the second I-shaped steel component (5), and the lower end of the bolt (7) is screwed into the corresponding push rod (15); The linkage mechanism comprises three sleeves (9) which are evenly spaced and penetrate the support plate (27); three fixing rods (17) extend into the three sleeves (9) respectively; a spring telescopic assembly (16) is installed at the upper end of the fixing rod (17); three top rods (15) are installed on the three spring telescopic assemblies (16) respectively; plug rods (14) are installed on both sides of the upper end of the top rod (15); three connecting holes are provided on both sides of the lower end of the second I-shaped steel assembly (5); the upper end of the top rod (15) extends into the corresponding connecting hole; transverse grooves (8) are provided on both sides of the connecting hole; and the plug rod (14) extends into the corresponding transverse groove (8); A vertical plate (45) is slidably mounted on opposite sides of the two first I-shaped steel components (3); three horizontal plates (43) are fixed to the vertical plates (45) at equal intervals from top to bottom; positioning rods (44) are fixed to both ends of the horizontal plates (43); a through hole (40) is formed on the bearing shaft (42); the lower end of the positioning rod (44) extends into the corresponding through hole (40); a connecting mechanism is mounted on the first I-shaped steel component (3); the connecting mechanism is connected to the vertical plate (45); The connecting mechanism comprises a screw rod (28) slidably mounted on the first I-shaped steel component (3); a round shaft (29) is fixed to one end of the screw rod (28) away from the first I-shaped steel component (3); the round shaft (29) abuts against two triangular support plates (6) on the same side thereof; a through hole (40) is provided on the screw rod (28); the lower end of the vertical plate (45) passes through the through hole (40) and extends to the lower end of the screw rod (28); a notch is provided on one side of the upper end of the through hole (40); a pressure plate component (13) is fixed to one side of the upper end of the vertical plate (45); the pressure plate component (13) is located in the notch; a fastening mechanism is provided on the screw rod (28); the pressure plate component (13) is located in the fastening mechanism.
2. The assembled steel frame assembly for a steel structure building according to claim 1, Features: Connecting assemblies (2) are fixed to the four corners of the lower end of the first I-shaped steel assembly (3), and the lower end of the connecting assembly (2) extends into the concrete base (1).
3. The assembled steel frame assembly for a steel structure building according to claim 1, Features: The fastening mechanism comprises a nut (31) screwed onto the screw rod (28), the pressure plate member (13) being located inside the nut (31), a rotating disk (32) being rotatably sleeved on a side of the nut (31) close to the circular shaft (29), a second resistance spring (30) being sleeved on the screw rod (28), and two ends of the second resistance spring (30) being respectively fixed to opposite sides of the rotating disk (32) and the circular shaft (29).
4. A method for assembling an assembled steel frame assembly for a steel structure building, It is characterized in that An assembled steel frame assembly for a steel structure building applicable to any one of claims 1 to 3 above comprises the following steps: S1. In actual production and preparation, a corresponding pit is set on the base, and a steel frame is placed in the pit, the connection component (2) and the steel frame are connected, and then concrete is poured. The gaps in the four connection components (2) at the upper end of the same pit are arranged in an I-shaped manner, and the first I-shaped steel component (3) is inserted into the corresponding I-shaped gap, and the connection component (2) and the first I-shaped steel component (3) are firmly connected by bolts and nuts; S2, lifting the second I-shaped steel component (5) by means of a lifting device or the like, so that the plug-in plate (4) under the second I-shaped steel component (5) and the first I-shaped steel component (3) can be plugged in correspondingly, and as the second I-shaped steel component (5) descends, the inclined push plate component can rotate the rotating rod (34) through the first swing rod (33), so that the lifting block (39) can be moved in the sliding groove (38) through the second swing rod (35), so that the synchronous rod (24) can push the through hole (40) to move, and as the through hole (40) penetrates the corresponding through hole (26), it can contact the triangular support plate (6), so that the triangular support plate (6) can drive the support plate (27) to contact the lower end of the second I-shaped steel component (5) and rotate; S3. As the triangular support plate (6) rotates, the connecting rod (23) is inserted into the connecting groove (12), which enables the first resistance spring (20) to push the contact rod (21) to move, so that the horizontal axis (10) is pushed up through the inclined rod (11), and then the top rod (15) is raised through the action of the fixed rod (17) and the spring telescopic assembly (16). The top rod (15) can push the bolt member (7) to rise, making it convenient for the staff to screw the bolt member (7) with the top rod (15) by rotating it. At the same time, as the top rod (15) rises, the insertion rod (14) corresponds to the horizontal groove (8) and is inserted into the horizontal groove (8), completing the connection between the triangular support plate (6) and the second I-shaped steel assembly (5); S4. As the triangular support plate (6) rotates, the triangular support plate (6) can push the circular shaft (29) to move the screw rod (28). The movement of the screw rod (28) can make the vertical plate (45) correspond to the through-hole (40) on the screw rod (28), so that the vertical plate (45) can be lowered so that the positioning rod (44) can be inserted into the corresponding through-hole (40), and the pressure plate (13) can be inserted into the notch. At the same time, the nut (31) can be rotated so as to correspond to the vertical plate (45). At the same time, the position of the nut (31) can be further limited by the action of the second resistance spring (30).
Citation Information
Patent Citations
Building energy-saving assembly type steel structure building and installation method
CN117587925A
Fabricated building beam column steel structure
CN115198889A
Fabricated steel structure based on pseudo-classic architecture and mounting method
CN117846132A