Method and device for reconstructing the structure of inclined-steeply inclined extremely broken ore body stope

Through the advanced development of accurate joint drainage and 'U'-shaped hole bottom fixed high-prestressed grouting long anchor cable support technology, the problem of stability control of the upper and lower walls of surrounding rocks in inclined-sharply inclined extremely broken ore body stopes has been solved. It achieves effective support of soft and broken rock mass and reconstruction of stope structure, and promotes safe, efficient and low-cost large-scale mining.

CN118532174BActive Publication Date: 2024-10-01NORTHEASTERN UNIV CHINA
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411004317.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-10-01
Estimated Expiration
2044-07-25

AI Technical Summary

Technical Problem

Existing technology is difficult to effectively control the stability of the upper and lower surrounding rocks in inclined-sharply inclined extremely broken ore body stopes, especially under conditions of soft and broken rock masses, resulting in high mining costs, low efficiency, and difficulty in achieving large-scale mining.

Method used

The advanced development and accurate joint drainage hole technology is used to dewater the rock mass, combined with support methods such as fixed high-prestressed grouting long anchor cables and resin anchors at the bottom of the hole to form a 'U'-shaped support structure, which transforms the anchoring concentration into Distribute stress, enhance the stability of surrounding rock, and reinforce the roof through sprayed concrete and other methods.

Benefits of technology

It achieves effective support of soft and broken rock mass, increases the size of the stope, ensures safe, efficient, low-cost and large-scale mining of ore bodies, and overcomes the problems of insufficient stability control and support of the existing technology.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118532174B_ABST
    Figure CN118532174B_ABST
Patent Text Reader

Abstract

The present application discloses a method and device for reconstructing the mining field structure of an inclined, steeply inclined, extremely broken ore body. The method comprises: determining the mining field size of the inclined, steeply inclined, extremely broken ore body under support conditions, and determining the mining method according to the mining field size; dividing the mining area into ore blocks according to the occurrence of the ore body and the mining field size; conducting advanced development and mining in the mining area, supporting the development and mining engineering completed by the advanced development and mining, and constructing inclined drainage holes, wherein the development and mining engineering comprises segmented tunnels, mine exit access roads, upper ventilation and filling tunnels, and lower mine exit tunnels, and the support operations comprise hole bottom fixed high prestressed grouting long anchor cable support, resin anchor rod support, metal mesh support, and shotcrete support; constructing a rock drilling chamber and a bottom pulling chamber based on the development and mining engineering and performing support operations; and performing "U"-shaped support operations on the upper plate surrounding rock and the lower plate surrounding rock using a hole bottom fixed high prestressed grouting long anchor cable, so as to realize the reconstruction of the mining field structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of metal mining, and in particular to a method and device for reconstructing the structure of an inclined-steeply inclined extremely broken ore body stope, a storage medium, and a computer device. Background Art

[0002] For inclined and steeply inclined ore bodies where both the ore body and the surrounding rocks of the upper and lower plates are broken, the entry filling mining method or the layered filling mining method is generally used for mining. There are problems such as low production capacity of the stope, large mining and cutting engineering volume, high mining and cutting costs, and low mining efficiency, which makes it difficult to achieve large-scale mining. The medium-deep hole mining method with large stope structure parameters can greatly reduce mining costs and improve mining efficiency, but it is difficult to control the stability of the stope surrounding rocks, especially the stability of the upper and lower plates. The stability of the stope structure is mutually influential. For example, the instability of the surrounding rocks of the upper and lower plates will lead to the increase of the actual span of the stope, and then induce the instability and collapse of the stope roof, resulting in ore loss and dilution, or even inability to mine; therefore, for the mining of inclined and steeply inclined ore bodies where both the ore body and the surrounding rocks of the upper and lower plates are broken, the effective control of the stability of the roof and the surrounding rocks of the upper and lower plates, and the reconstruction of the stope structure of the extremely broken ore body are the key to restricting the safe, efficient, low-cost and large-scale mining of such ore bodies.

[0003] In response to the problem of controlling the stability of the surrounding rock in a mine where both the ore body and the upper and lower surrounding rocks are broken, patents with application numbers 202110154495.3 and 202010152997.8 have proposed corresponding technical solutions. However, the above-mentioned technical solutions are only applicable to the mining of thin ore veins, and construction personnel are required to enter the goaf during support. This makes the above-mentioned technical solutions unsuitable for medium-deep hole mining methods with large mine structure parameters; the patent with application number 202110051708.X proposes a technical solution for constructing pre-reinforced long anchor rods in the upper and lower surrounding rocks respectively and performing grouting. However, the above-mentioned technical solutions are only applicable to the mining of thin ore veins, and construction personnel are required to enter the goaf during support. The technical scheme lacks anchor cable anchoring and only relies on grouting and reinforcing long anchor rods for support, which is not suitable for "soft and broken" rock mass. Under the action of mining, large-scale instability of the upper and lower surrounding rocks is very likely to occur; the patent with application number 201310404154.2 proposes a technical scheme that uses fan-shaped medium-deep holes in multifunctional tunnels and uses fan-shaped medium-deep holes for surrounding rock grouting reinforcement and anchor cable support engineering. However, this scheme has the disadvantages that the upper and lower surrounding rock support operations lag behind the blasting and mining operations and cannot convert the concentrated anchoring force into distributed stress, making it difficult to achieve effective support for "soft and broken" rock mass. In addition, the existing technical schemes often use grouting reinforcement and anchor cable (anchor rod) support as the main methods for surrounding rock stability control, ignoring the influence of groundwater on rock mass stability. "Soft and broken" rock mass often has strong water resistance, and groundwater has a significant weakening effect on its strength, showing the characteristic of turning into mud when encountering water. Therefore, the stability control scheme of "soft and broken" rock mass should consider the influence of groundwater.

[0004] In view of this, in order to meet the needs of safe, efficient and large-scale mining of inclined and steeply inclined extremely broken ore bodies, it is urgent to develop a stability control scheme that fully considers the characteristics of "soft and broken" rock masses and realize the reconstruction of the mining field structure of inclined and steeply inclined extremely broken ore bodies. Summary of the invention

[0005] In view of this, the embodiments of the present application provide a method and device for reconstructing the mining field structure of an inclined-steeply inclined extremely broken ore body, a storage medium, and a computer device, and provide a method for reconstructing the mining field structure of an inclined-steeply inclined extremely broken ore body. By adopting the technology of advanced development and accurate mining and combined drainage holes, the advanced drainage of the rock mass in the to-be-mined area is achieved, so as to achieve the purpose of drainage and reinforcement of the "soft and broken" rock mass. At the same time, a "U"-shaped hole bottom fixed high prestressed grouting long anchor cable is adopted to achieve advanced support of the upper and lower surrounding rocks, and the concentrated anchoring force is converted into distributed stress, thereby achieving effective support for the "soft and broken" rock mass. The mining field roof adopts a support method of a hole bottom fixed high prestressed grouting long anchor cable + resin anchor rod + metal mesh + shotcrete, which achieves the purpose of reconstructing the mining field structure of an inclined-steeply inclined extremely broken ore body, increases the mining field size, and meets the needs of safe, efficient and large-scale mining of inclined-steeply inclined extremely broken ore bodies.

[0006] According to one aspect of the present application, a method for reconstructing an inclined-steeply inclined extremely broken ore body stope structure is provided, the method comprising:

[0007] For inclined-steeply inclined extremely broken ore bodies, determine the stope size of the ore body under support conditions, and determine the mining method based on the stope size;

[0008] Determine the area to be mined of the ore body, and divide the area to be mined into ore blocks according to the occurrence of the ore body and the size of the stope;

[0009] Based on the divided ore blocks, advance development and mining are carried out in the area to be mined, support operations are carried out on the development and mining projects completed in advance, and inclined drainage holes are constructed, wherein the development and mining projects include segmented tunnels, mine access roads, upper ventilation and filling tunnels, and lower mine exit tunnels, and the support operations include fixed high prestressed grouting long anchor cable support at the bottom of the hole, resin anchor support, metal mesh support, and shotcrete support;

[0010] Based on the development and mining project, a rock drilling chamber and a bottom pulling chamber are constructed, and support operations are performed on the rock drilling chamber and the bottom pulling chamber;

[0011] A "U"-shaped support operation is carried out on the upper and lower surrounding rocks by using a high prestressed grouting long anchor cable fixed at the bottom of the hole to achieve the reconstruction of the stope structure so that stope cutting, mining and filling can be carried out based on the stope after structural reconstruction according to the mining method.

[0012] In the embodiment of the present application, optionally, determining the stope size of the ore body under support conditions includes:

[0013] According to the average thickness and segment height of the ore body, the critical stable hydraulic radius of the stope roof under support conditions, the critical stable hydraulic radius of the upper wall surrounding rock under support conditions, and the critical stable hydraulic radius of the lower wall surrounding rock under support conditions are obtained through the stability chart;

[0014] Determine the minimum value of the critical stable hydraulic radius of the stope roof under support conditions, the critical stable hydraulic radius of the upper wall surrounding rock under support conditions, and the critical stable hydraulic radius of the lower wall surrounding rock under support conditions as the design basis for the stope size, and determine the maximum length of the stope structure type that can remain stable after support based on the stope structure type with the critical stable hydraulic radius corresponding to the minimum value;

[0015] The maximum length, the segmented height of the stope, and the average thickness of the ore body in the stope are respectively used as the length, height, and width corresponding to the stope to obtain the stope size.

[0016] In the embodiment of the present application, optionally, based on the divided ore blocks, the area to be mined is advanced developed and mined, support operations are performed on the advanced developed and mined project, and inclined drainage holes are constructed, including:

[0017] Based on the divided ore blocks, segmented tunnels, mine access roads, upper ventilation and filling tunnels, and lower mine exit tunnels are constructed in the form of three-center arches in the area to be mined;

[0018] The following support operations are performed for the development and mining project: support operations of bottom-fixed high prestressed grouting long anchor cable support with a first preset long anchor cable length and a first preset mesh size, support operations of resin anchor rod support with a first preset resin anchor rod mesh size and a first preset rod length, support operations of metal mesh support with a metal mesh welded with steel bars of a first preset diameter according to a first preset mesh size and a first preset mesh shape, and support operations of shotcrete support with a first preset shotcrete coagulation thickness;

[0019] The inclined drainage hole is constructed with a preset hole diameter, a preset drainage hole depth and a preset drainage hole inclination angle.

[0020] In an embodiment of the present application, optionally, constructing a rock drilling chamber and a bottom pulling chamber based on the development and mining project, and performing support operations on the rock drilling chamber and the bottom pulling chamber, including:

[0021] Expanding the upper ventilation and filling tunnel to form the rock drilling chamber with a preset rock drilling chamber size, and expanding the lower mining tunnel to form the bottom pulling chamber with a preset bottom pulling chamber size;

[0022] The following support operations are performed on the rock drilling chamber and the bottom pulling chamber: support operations of fixed high prestressed grouting long anchor cable support at the bottom of the hole with the second preset long anchor cable length and the second preset mesh size, support operations of resin anchor rod support with the second preset resin anchor rod mesh size and the second preset rod length, support operations of metal mesh support with a metal mesh welded with second preset diameter steel bars according to the second preset grid size and the second preset grid shape, and support operations of shotcrete support with the second preset shotcrete thickness.

[0023] In the embodiment of the present application, optionally, a high prestressed grouting long anchor cable fixed at the bottom of the hole is used to perform a "U"-shaped support operation on the upper wall surrounding rock and the lower wall surrounding rock to achieve the reconstruction of the stope structure, including:

[0024] Downward anchor cable holes are constructed by the rock drilling chamber along the inclination direction of the ore body at the junction of the ore body and the upper wall surrounding rock and at the junction of the ore body and the lower wall surrounding rock respectively, and surrounding rock anchor cable holes corresponding to the positions of the downward anchor cable holes are constructed by the rock drilling chamber and the bottom pulling chamber to the upper wall surrounding rock and the lower wall surrounding rock respectively;

[0025] Installing a bottom-fixed high prestressed grouting long anchor cable in the surrounding rock anchor cable hole, installing a vertical steel strand in the downward anchor cable hole and performing high-pressure grouting;

[0026] The vertical steel strands are tensioned and connected with the corresponding long high prestressed grouting anchor cables fixed at the bottom of the hole, so that the adjacent long high prestressed grouting anchor cables fixed at the bottom of the hole form a "U"-shaped support structure through the vertical steel strands, providing advanced support for the upper and lower surrounding rocks and realizing the reconstruction of the mining field structure.

[0027] In an embodiment of the present application, optionally, the direction of the surrounding rock anchor hole is perpendicular to the bedding direction of the surrounding rock; the depth of the downward anchor hole is the middle height; the depth of the surrounding rock anchor hole is 1.5 times the depth of the plastic zone of the surrounding rock; the hole spacing between the downward anchor hole and the surrounding rock anchor hole is the same; the vertical steel strand is exposed 1.8~2.5m from the hole mouth.

[0028] In an embodiment of the present application, optionally, according to the mining method, stope cutting, mining and filling are performed based on the stope after structural reconstruction, including:

[0029] A cutting well is formed by blasting a medium-long hole at the end of the stope, and a cutting groove is formed by blasting a downward parallel medium-long hole based on the free surface and compensation space provided by the cutting well. Recovery blasting is performed based on the free surface and compensation space provided by the cutting groove, wherein the recovery blasting adopts a stepwise sequential blasting of downward parallel medium-long holes to drop the ore, and the inclination angle of the blasthole of the downward parallel medium-long hole of the recovery blasting is consistent with the inclination angle of the ore body;

[0030] The stope is cleaned by using the gas flowing through the lower mine exit tunnel, so that the dirty gas generated after cleaning is discharged through the upper ventilation filling tunnel;

[0031] Use scrapers and remote-controlled loaders to remove caved ore and transport it to the surface;

[0032] The goaf is filled via the upper ventilation filling tunnel using the filling pipe.

[0033] According to another aspect of the present application, a device for reconstructing an inclined-steeply inclined extremely broken ore body stope structure is provided, the device comprising:

[0034] A size determination module, for determining the stope size of an inclined-steeply inclined extremely broken ore body under support conditions, and determining a mining method according to the stope size;

[0035] A division module is used to determine the area to be mined of the ore body and divide the area to be mined into ore blocks according to the occurrence of the ore body and the size of the stope;

[0036] A construction module is used to carry out advanced development and mining of the area to be mined based on the divided ore blocks, to carry out support operations on the development and mining projects completed through advanced development and mining, and to construct inclined drainage holes, wherein the development and mining projects include segmented tunnels, mine access roads, upper ventilation and filling tunnels, and lower mine access tunnels, and the support operations include fixed high prestressed grouting long anchor cable support at the bottom of the hole, resin anchor support, metal mesh support, and shotcrete support;

[0037] The construction module is also used to construct a rock drilling chamber and a bottom pulling chamber based on the development and mining project, and to perform support operations on the rock drilling chamber and the bottom pulling chamber;

[0038] The construction module is also used to perform "U"-shaped support operations on the upper and lower surrounding rocks using long high-prestressed grouting anchor cables fixed at the bottom of the hole to achieve mining field structure reconstruction, so that mining field cutting, backfilling and filling can be carried out based on the mining field after structural reconstruction according to the mining method.

[0039] In the embodiment of the present application, optionally, the size determination module is used to:

[0040] According to the average thickness and segment height of the ore body, the critical stable hydraulic radius of the stope roof under support conditions, the critical stable hydraulic radius of the upper wall surrounding rock under support conditions, and the critical stable hydraulic radius of the lower wall surrounding rock under support conditions are obtained through the stability chart;

[0041] Determine the minimum value of the critical stable hydraulic radius of the stope roof under support conditions, the critical stable hydraulic radius of the upper wall surrounding rock under support conditions, and the critical stable hydraulic radius of the lower wall surrounding rock under support conditions as the design basis for the stope size, and determine the maximum length of the stope structure type that can remain stable after support based on the stope structure type with the critical stable hydraulic radius corresponding to the minimum value;

[0042] The maximum length, the segmented height of the stope, and the average thickness of the ore body in the stope are respectively used as the length, height, and width corresponding to the stope to obtain the stope size.

[0043] In the embodiment of the present application, optionally, the construction module is used to:

[0044] Based on the divided ore blocks, segmented tunnels, mine access roads, upper ventilation and filling tunnels, and lower mine exit tunnels are constructed in the form of three-center arches in the area to be mined;

[0045] The following support operations are performed for the development and mining project: support operations of bottom-fixed high prestressed grouting long anchor cable support with a first preset long anchor cable length and a first preset mesh size, support operations of resin anchor rod support with a first preset resin anchor rod mesh size and a first preset rod length, support operations of metal mesh support with a metal mesh welded with steel bars of a first preset diameter according to a first preset mesh size and a first preset mesh shape, and support operations of shotcrete support with a first preset shotcrete coagulation thickness;

[0046] The inclined drainage hole is constructed with a preset hole diameter, a preset drainage hole depth and a preset drainage hole inclination angle.

[0047] In the embodiment of the present application, optionally, the construction module is used to:

[0048] Expanding the upper ventilation and filling tunnel to form the rock drilling chamber with a preset rock drilling chamber size, and expanding the lower mining tunnel to form the bottom pulling chamber with a preset bottom pulling chamber size;

[0049] The following support operations are performed on the rock drilling chamber and the bottom pulling chamber: support operations of fixed high prestressed grouting long anchor cable support at the bottom of the hole with the second preset long anchor cable length and the second preset mesh size, support operations of resin anchor rod support with the second preset resin anchor rod mesh size and the second preset rod length, support operations of metal mesh support with a metal mesh welded with second preset diameter steel bars according to the second preset grid size and the second preset grid shape, and support operations of shotcrete support with the second preset shotcrete thickness.

[0050] In the embodiment of the present application, optionally, the construction module is used to:

[0051] Downward anchor cable holes are constructed by the rock drilling chamber along the inclination direction of the ore body at the junction of the ore body and the upper wall surrounding rock and at the junction of the ore body and the lower wall surrounding rock respectively, and surrounding rock anchor cable holes corresponding to the positions of the downward anchor cable holes are constructed by the rock drilling chamber and the bottom pulling chamber to the upper wall surrounding rock and the lower wall surrounding rock respectively;

[0052] Installing a bottom-fixed high prestressed grouting long anchor cable in the surrounding rock anchor cable hole, installing a vertical steel strand in the downward anchor cable hole and performing high-pressure grouting;

[0053] The vertical steel strands are tensioned and connected with the corresponding long high prestressed grouting anchor cables fixed at the bottom of the hole, so that the adjacent long high prestressed grouting anchor cables fixed at the bottom of the hole form a "U"-shaped support structure through the vertical steel strands, providing advanced support for the upper and lower surrounding rocks and realizing the reconstruction of the mining field structure.

[0054] In an embodiment of the present application, optionally, the direction of the surrounding rock anchor hole is perpendicular to the bedding direction of the surrounding rock; the depth of the downward anchor hole is the middle height; the depth of the surrounding rock anchor hole is 1.5 times the depth of the plastic zone of the surrounding rock; the hole spacing between the downward anchor hole and the surrounding rock anchor hole is the same; the vertical steel strand is exposed 1.8~2.5m from the hole mouth.

[0055] In the embodiment of the present application, optionally, the construction module is used to:

[0056] A cutting well is formed by blasting a medium-long hole at the end of the stope, and a cutting groove is formed by blasting a downward parallel medium-long hole based on the free surface and compensation space provided by the cutting well. Recovery blasting is performed based on the free surface and compensation space provided by the cutting groove, wherein the recovery blasting adopts a stepwise sequential blasting of downward parallel medium-long holes to drop the ore, and the inclination angle of the blasthole of the downward parallel medium-long hole of the recovery blasting is consistent with the inclination angle of the ore body;

[0057] The stope is cleaned by using the gas flowing through the lower mine exit tunnel, so that the dirty gas generated after cleaning is discharged through the upper ventilation filling tunnel;

[0058] Use scrapers and remote-controlled loaders to remove caved ore and transport it to the surface;

[0059] The goaf is filled via the upper ventilation filling tunnel using the filling pipe.

[0060] According to another aspect of the present application, a storage medium is provided, on which a computer program is stored, and when the program is executed by a processor, the above-mentioned inclined-steeply inclined extremely broken ore body stope structure reconstruction method is implemented.

[0061] According to another aspect of the present application, a computer device is provided, including a storage medium, a processor, and a computer program stored on the storage medium and executable on the processor, wherein the processor implements the above-mentioned method for reconstructing the structure of an inclined-steeply inclined extremely broken ore body mining area when executing the program.

[0062] By means of the above technical scheme, the embodiment of the present application provides a method and device for reconstructing the structure of a mining site of an inclined-steeply inclined extremely broken ore body, a storage medium, and a computer device, which solves the technical problem of safe and efficient mining of the ore body under the condition that the upper and lower surrounding rocks and the ore body are both "soft and broken" rock bodies, and realizes the reconstruction of the mining site structure under the condition of "soft and broken" rock bodies. By combining the advanced drainage with the "U"-shaped hole bottom fixed high prestressed grouting long anchor cable support technology, the hydraulic properties of the "soft and broken" rock body are fully considered, and the drainage reinforcement of the rock body is realized. The "U"-shaped hole bottom fixed high prestressed grouting long anchor cable can convert the anchoring concentrated force into distributed stress, and the grouting can further reinforce the broken surrounding rock. The bottom fixing device of the hole can quickly provide prestress, realize the rapid compensation of the excavation surface stress, hinder the development of the plastic zone of the surrounding rock, and then realize the effective support of the "soft and broken" rock body, overcoming the shortcomings of the existing technical solutions. The present application can increase the mining site size of the inclined-steeply inclined extremely broken ore body, and then realize the safe, efficient, green, and large-scale mining of the inclined-steeply inclined extremely broken ore body.

[0063] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0064] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0065] Figure 1 A schematic flow chart of a method for reconstructing an inclined-steeply inclined extremely broken ore body stope structure provided in an embodiment of the present application is shown;

[0066] Figure 2 A schematic structural diagram of an inclined-steeply inclined extremely broken ore body stope structure reconstruction device provided in an embodiment of the present application is shown. DETAILED DESCRIPTION

[0067] The present application will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.

[0068] Inclined to steeply inclined extremely broken ore bodies are a type of ore deposit with special geological characteristics. The characteristics of this type of ore body can be understood from the following aspects:

[0069] 1. Inclination Angle: Inclination ore bodies refer to ore bodies with an inclination angle generally between 30° and 55°, while steeply inclined ore bodies have an angle greater than 55°. The definitions of these angles may vary depending on different literature and industry standards, but in general, steeply inclined ore bodies refer to those that are almost vertical or close to vertical.

[0070] 2. Degree of fragmentation: Extreme fragmentation means that the rock structure of the ore body is very unstable, with a large number of cracks, faults and broken zones, which may be caused by geological tectonic activities. This fragmentation greatly reduces the strength and stability of the ore body, increasing the difficulty and danger of mining.

[0071] 3. Mining challenges: The main challenges faced when mining this type of ore body include: the instability and collapse of the ore body, which requires the use of special mining techniques and support measures to ensure personnel safety and mining efficiency. Controlling ground pressure and preventing surrounding rock collapse, which may require the use of advanced monitoring systems and predictive models. Reducing the dilution rate and improving the recovery rate, because broken ore is easily mixed with waste rock, affecting the quality of the ore. Managing groundwater and controlling dust, broken ore bodies are prone to water accumulation and generate a lot of dust.

[0072] Mining these ore bodies often requires customized solutions that incorporate the latest technologies and engineering practices to ensure economic benefits while ensuring safety.

[0073] In this embodiment, a method for reconstructing the structure of an inclined-steeply inclined extremely broken ore body stope is provided. Figure 1 As shown, the method includes:

[0074] Step 101, for an inclined-steeply inclined extremely broken ore body, determine the stope size of the ore body under support conditions, and determine the mining method according to the stope size.

[0075] In the embodiment of the present application, first, the feasible stope size under the support conditions is determined, which can be determined according to the rock mass quality, the physical and mechanical properties of the mining ground pressure ore body, the inclination angle, the degree of crushing, and the capacity of the existing support technology. Then, based on the stope size, the most suitable mining method for the ore body conditions is selected, such as the room-and-pillar method, the backfill method, the medium-deep hole backfill mining method or other special mining methods to ensure the safety and economy of the mining operation. For example, the medium-deep hole backfill mining method is used.

[0076] In an embodiment of the present application, optionally, determining the size of a mine under support conditions of an ore body includes: obtaining, through a stability diagram, the critical stable hydraulic radius of a mine roof under support conditions, the critical stable hydraulic radius of an upper plate surrounding rock under support conditions, and the critical stable hydraulic radius of a lower plate surrounding rock under support conditions according to an average thickness and segmented height of the ore body; determining the minimum value of the critical stable hydraulic radius of the mine roof under support conditions, the critical stable hydraulic radius of an upper plate surrounding rock under support conditions, and the critical stable hydraulic radius of a lower plate surrounding rock under support conditions as a design basis for the size of the mine, and determining the maximum length of the mine structure type that can remain stable after support based on the type of mine structure with the critical stable hydraulic radius corresponding to the minimum value; and using the maximum length, the segmented height of the mine, and the average thickness of the ore body of the mine as the length, height, and width corresponding to the mine, respectively, to obtain the size of the mine.

[0077] In this embodiment, the average thickness of the ore body refers to the average thickness of the ore body in the horizontal direction, which is an important parameter for designing the width of the stope. Segment height: Considering the stability of the ore body, the stope is usually divided into multiple segments, and the height of each segment needs to be determined according to the mechanical properties and support capacity of the ore body. The critical stable hydraulic radius refers to the maximum span of the roof, the hanging wall surrounding rock and the lower wall surrounding rock that can remain stable under given support conditions. This value can be obtained through empirical formulas, laboratory tests or field monitoring data, or by referring to stability charts, which are usually generated based on a large number of engineering practices and theoretical calculations, reflecting the stability relationship under different rock types, support methods and stress states. Among the critical stable hydraulic radii of the roof, the hanging wall surrounding rock and the lower wall surrounding rock, the smallest one is selected as the design basis. This is because the smallest critical stable hydraulic radius represents the weakest link and determines the stability of the entire stope. According to the type of stope structure corresponding to the selected critical stable hydraulic radius, the maximum length that can remain stable after support is calculated. This length is affected by factors such as surrounding rock stability, support materials and construction technology. The maximum stable length, segment height and average thickness of the ore body are respectively the length, height and width of the stope, which constitute the basic dimensions of the stope. The combination of these parameters ensures that the stope can remain stable during the mining process under support conditions and avoid geological disasters. In this way, the mining efficiency and resource recovery rate of the stope can be maximized while ensuring safety.

[0078] Step 102, determining the area to be mined of the ore body, and dividing the area to be mined into ore blocks according to the occurrence of the ore body and the size of the stope.

[0079] In the embodiment of the present application, the area to be mined is divided into a plurality of manageable ore blocks according to the occurrence of the ore body (i.e., the spatial form and position of the ore body) and the previously determined stope size. The division of ore blocks facilitates subsequent mining planning and operation management, ensuring the effective exploitation of resources.

[0080] Step 103, based on the divided ore blocks, advance development and mining are carried out for the area to be mined, support operations are carried out for the development and mining projects completed by advance development and mining, and inclined drainage holes are constructed, wherein the development and mining projects include segmented tunnels, mine access roads, upper ventilation and filling tunnels, and lower mine exit tunnels, and the support operations include fixed high prestressed grouting long anchor cable support at the bottom of the hole, resin anchor support, metal mesh support, and shotcrete support.

[0081] In the embodiment of the present application, for the divided ore blocks, advance development and mining work is first carried out to establish necessary tunnels and passages, including segmented tunnels, mine access roads, upper ventilation and filling tunnels, and lower mine exit tunnels. Subsequently, support operations are carried out on these development and mining projects, and high prestressed grouting long anchor cables, resin anchors, metal meshes, and shotcrete fixed at the bottom of the hole are used to strengthen the stability of the surrounding rock and prevent collapse accidents. An inclined drainage hole is constructed to discharge moisture from the surrounding rock, keep the surrounding rock dry, prevent mudification of the surrounding rock, and reduce safety hazards. The support parameters are determined according to the stability of the rock mass. For example, the diameter of the drainage hole is 80~120mm, the depth of the drainage hole is preferably about 25m into the surrounding rock, and the drainage hole is inclined at an angle of 5°~70°.

[0082] In an embodiment of the present application, optionally, based on the divided ore blocks, the area to be mined is advanced developed and mined, support operations are performed on the development and mining projects completed by the advanced developed and mined, and inclined drainage holes are constructed, including: based on the divided ore blocks, segmented tunnels, mine access roads, upper ventilation and filling tunnels, and lower mine exit tunnels are constructed in the form of three-center arches in the area to be mined; the following support operations are performed on the development and mining projects: support operations of fixed high prestressed grouting long anchor cable support at the bottom of the hole with a first preset long anchor cable length and a first preset mesh size, support operations of resin anchor cable support with a first preset resin anchor cable mesh size and a first preset rod length, support operations of metal mesh support with a metal mesh welded with a first preset diameter steel bar according to a first preset grid size and a first preset grid shape, and support operations of sprayed concrete support with a first preset sprayed concrete thickness; inclined drainage holes are constructed with a preset hole diameter, a preset drainage hole depth, and a preset drainage hole inclination angle.

[0083] In the above embodiment, segmented tunnels are constructed in the form of three-center arches (a commonly used underground tunnel cross-section form with good stability and compressive resistance) according to the divided ore blocks. These tunnels will run through the entire ore block and provide channels for subsequent mining operations. Mine exit route: Between the segmented tunnels or at specific locations, a mine exit route is constructed for the transportation of ore. Upper ventilation and filling tunnel: In order to ensure ventilation and subsequent filling operations in the ore block, an upper ventilation and filling tunnel needs to be constructed. Lower mine exit tunnel: As another main channel for ore transportation, the construction of the lower mine exit tunnel is equally important. In order to ensure the structural stability and safety of the development and mining project, the following support operations need to be carried out: Bottom-fixed high prestressed grouting long anchor cable support: Use the preset long anchor cable length and mesh size to fix the end of the long anchor cable at the bottom of the hole, and reinforce it through grouting to form a powerful anchoring system to improve the stability of the surrounding rock. Resin anchor support: According to the preset resin anchor mesh and rod length, the resin anchor is driven into the surrounding rock. Through the curing effect of the resin, the anchor is tightly connected to the surrounding rock to enhance the support effect. Metal mesh support: Use steel bars of preset diameter, weld them into metal mesh according to the preset grid size and shape, and lay them on the surface of the surrounding rock to prevent rock fragments from falling and increase the overall support strength. Sprayed concrete support: Spray a certain thickness of concrete on the surface of the supported surrounding rock to form a solid protective layer to improve the overall bearing capacity and durability of the tunnel. Further carry out the construction of inclined drainage holes. According to the preset hole diameter, drainage hole depth and inclination angle, the inclined drainage holes are constructed. The selection of these parameters needs to take into account the geological conditions, hydrological conditions and drainage requirements of the ore body. The inclined drainage holes can effectively discharge the accumulated water in the surrounding rock, prevent the surrounding rock from mudding, and ensure the safety of mining operations. This series of advanced development and mining, support operations and drainage hole construction measures together constitute an important part of the reconstruction of the inclined-steeply inclined and extremely broken ore body mining site structure, providing a solid foundation and guarantee for subsequent mining operations.

[0084] Step 104: construct a rock drilling chamber and a bottom pulling chamber based on the development and mining project, and perform support operations on the rock drilling chamber and the bottom pulling chamber.

[0085] In the embodiment of the present application, based on the completed development and mining project, rock drilling chambers and bottom pulling chambers are further constructed to provide necessary space for subsequent mining operations. Support operations are performed on the above chambers to ensure that their structures are stable and can withstand the impact and pressure caused by mining operations. Support parameters are determined according to the stability of the rock mass.

[0086] In an embodiment of the present application, optionally, a drilling chamber and a bottom pulling chamber are constructed based on the development and mining project, and support operations are performed on the drilling chamber and the bottom pulling chamber, including: expanding the upper ventilation and filling tunnel to form the drilling chamber of a preset drilling chamber size, and expanding the lower mining tunnel to form the bottom pulling chamber of a preset bottom pulling chamber size; performing the following support operations on the drilling chamber and the bottom pulling chamber: supporting operations of bottom hole fixed high prestressed grouting long anchor cable support with a second preset long anchor cable length and a second preset mesh size, supporting operations of resin anchor rod support with a second preset resin anchor rod mesh size and a second preset rod length, supporting operations of metal mesh support with a metal mesh welded with second preset diameter steel bars according to a second preset mesh size and a second preset mesh shape, and supporting operations of shotcrete support with a second preset shotcrete thickness.

[0087] In the above embodiment, in the mining process of inclined-steeply inclined extremely broken ore bodies, it is crucial to further construct rock drilling chambers and bottom pulling chambers based on the completed development and mining engineering, and to carry out detailed support operations for these key spaces. The construction of rock drilling chambers and bottom pulling chambers is carried out first. Rock drilling chamber construction: wall expansion operation: First, the upper ventilation and filling tunnel is expanded to form a rock drilling chamber that meets the preset size. The rock drilling chamber is an important space for placing rock drilling equipment and performing drilling operations, and its size needs to be determined according to the specifications of the rock drilling equipment and the operating requirements. Construction requirements: During the wall expansion process, the construction quality and safety must be strictly controlled to ensure the stability and safety of the rock drilling chamber. Bottom pulling chamber construction: wall expansion operation: Similarly, the lower mining tunnel is expanded to form a bottom pulling chamber that meets the preset size. The bottom pulling chamber is mainly used for bottom pulling operations in the mine, that is, mining the ore at the bottom of the mine and forming compensation space and free surface for subsequent blasting operations. Construction requirements: It is also necessary to strictly control the construction quality and safety to ensure the structural stability and operation safety of the bottom pulling chamber.

[0088] Then carry out support operations. For rock drilling chambers and bottom pulling chambers, the following support operations are required to enhance their structural stability and safety: Bottom fixed high prestressed grouting long anchor cable support: Use the second preset long anchor cable length and mesh to carry out bottom fixed high prestressed grouting long anchor cable support. This support method can penetrate deep into the rock mass, form a strong anchoring force, and effectively improve the stability of the surrounding rock. Resin anchor rod support: According to the second preset resin anchor rod mesh and rod length, resin anchor rod support is carried out. Resin anchor rods can quickly consolidate with the surrounding rock to form an effective support structure. Metal mesh support: Use steel bars of the second preset diameter, weld them into metal mesh according to the second preset grid size and shape, and lay them on the surface of the surrounding rock. The metal mesh can prevent rock fragments from falling and enhance the overall support effect. Sprayed concrete support: On the basis of completing the above support operations, spray concrete operations are carried out on the surrounding rock surface of the rock drilling chamber and bottom pulling chamber to form a protective layer of a certain thickness. Shotcrete can further improve the bearing capacity and durability of the surrounding rock.

[0089] Through meticulous rock drilling and bottom pulling chamber construction and comprehensive support operations, the structural stability and safety of the inclined, steeply inclined and extremely broken ore body mining area can be ensured, providing strong guarantees for subsequent mining operations.

[0090] Step 105, using a long anchor cable with high prestressed grouting fixed at the bottom of the hole to perform "U"-shaped support operations on the upper and lower surrounding rocks to achieve the reconstruction of the stope structure, so as to carry out stope cutting, mining and filling based on the stope after structural reconstruction according to the mining method.

[0091] In the embodiment of the present application, after completing the above-mentioned development and mining project, a high prestressed grouting long anchor cable fixed at the bottom of the hole is further used to strengthen the support of the upper and lower surrounding rocks. A high prestressed grouting long anchor cable fixed at the bottom of the hole is used to deeply support the upper and lower surrounding rocks to achieve the reconstruction of the mining field structure and improve the overall stability. In the mining field after structural reconstruction, cutting, mining and filling operations are carried out according to the established mining method. In this process, it is necessary to pay close attention to the stability of the surrounding rock, and adjust the support measures in time to ensure the safety of the operation.

[0092] In the embodiment of the present application, optionally, a high prestressed grouting long anchor cable fixed at the bottom of the hole is used to support the upper wall surrounding rock and the lower wall surrounding rock to achieve the reconstruction of the mining field structure, including: constructing downward anchor cable holes along the inclination direction of the ore body by the rock drilling chamber at the junction of the ore body and the upper wall surrounding rock and at the junction of the ore body and the lower wall surrounding rock, respectively, and constructing surrounding rock corresponding to the position of the downward anchor cable holes to the upper wall surrounding rock and the lower wall surrounding rock by the rock drilling chamber and the bottom pulling chamber respectively. Anchor cable hole; install a long anchor cable with high prestressed grouting fixed at the bottom of the hole in the surrounding rock anchor cable hole, install a vertical steel strand in the downward anchor cable hole and perform high-pressure grouting; tension and connect the vertical steel strand with the corresponding long anchor cable with high prestressed grouting fixed at the bottom of the hole, so that the adjacent long anchor cables with high prestressed grouting fixed at the bottom of the hole form a "U"-shaped support structure through the vertical steel strand, provide advanced support for the upper and lower surrounding rocks, and realize the reconstruction of the mining site structure. Among them, the direction of the surrounding rock anchor cable hole is perpendicular to the bedding direction of the surrounding rock; the depth of the downward anchor cable hole is the middle section height; the depth of the surrounding rock anchor cable hole is 1.5 times the depth of the plastic zone of the surrounding rock; the hole spacing between the downward anchor cable hole and the surrounding rock anchor cable hole is the same; the vertical steel strand is exposed 1.8~2.5m from the hole mouth.

[0093] In the above embodiment, the construction positions of the anchor holes are determined at the junction of the ore body and the upper surrounding rock and at the junction of the ore body and the lower surrounding rock. These positions are usually located in the rock drilling chamber and the bottom pulling chamber, and are arranged along the inclination direction of the ore body. Then the anchor holes are constructed: Downward anchor holes: Starting from the rock drilling chamber, downward anchor holes are constructed downward along the inclination direction of the ore body. The depth of these holes should reach the middle height to ensure that the vertical steel strands can be effectively connected to the anchor cables to form an effective "U"-shaped support structure to achieve effective support of the surrounding rock. Surrounding rock anchor holes: Starting from the rock drilling chamber and the bottom pulling chamber, surrounding rock anchor holes corresponding to the positions of the downward anchor holes are constructed in the upper surrounding rock and the lower surrounding rock respectively. The direction of these holes should be perpendicular to the bedding direction of the surrounding rock to maximize the support effect of the anchor cables. The depth of the surrounding rock anchor hole is usually 1.5 times the depth of the surrounding rock plastic zone to ensure that the anchor can pass through the plastic zone and be fixed in a more stable rock mass. The opening of the surrounding rock anchor hole is 1.5m~2.2m away from the bottom plate of the rock drilling chamber or the bottom pulling chamber. The depth of the downward anchor hole is the middle section height, and the hole diameter is 60~100mm. The depth of the surrounding rock anchor hole is 1.5 times the depth of the surrounding rock plastic zone, and the hole diameter is 60~100mm; the hole spacing between the downward anchor hole and the surrounding rock anchor hole is the same, which is 1.0~2.0m. Post-installation anchor cable and grouting: Install bottom-fixed high prestressed grouting long anchor cables in the surrounding rock anchor hole. These anchor cables are fixed at the bottom of the hole by special devices to ensure stability during grouting and subsequent tensioning. After installation, they are cured for 15~20 days. Install vertical steel strands in the downward anchor hole and perform high-pressure grouting. After installation, maintain for 15 to 20 days. The grouting material should have good fluidity and adhesion, and be able to fully fill the gap between the hole wall and the steel strand to form a solid anchor body. Finally, tension connection is performed: the vertical steel strand is tensioned and connected with the corresponding long anchor cable with high prestressed grouting fixed at the bottom of the hole. This step is crucial. It enables the adjacent long anchor cables with high prestressed grouting fixed at the bottom of the hole to form a "U"-shaped support structure through the vertical steel strands, providing advance support for the upper and lower surrounding rocks. Among them, ensure that the hole spacing between the downward anchor hole and the surrounding rock anchor hole is the same to facilitate subsequent tension connection operations. Control the length of the vertical steel strand exposed at the hole mouth between 1.8 and 2.5m to facilitate subsequent tensioning and locking operations. Through the above steps, the use of fixed high prestressed grouting long anchor cables to support the upper and lower surrounding rocks can effectively achieve the reconstruction of the mining site structure, improve the stability of the surrounding rock, and provide strong support for subsequent mining operations.

[0094] In the embodiment of the present application, optionally, after step 105, the following steps are further included:

[0095] Step 106, at the end of the mining area, a cutting well is formed by a one-time medium-deep hole blasting method, and a cutting groove is formed by a downward parallel medium-deep hole blasting based on the free surface and compensation space provided by the cutting well, and recovery blasting is performed based on the free surface and compensation space provided by the cutting groove, wherein the recovery blasting adopts a downward parallel medium-deep hole segmented sequential blasting to drop the ore, and the inclination angle of the blasthole of the downward parallel medium-deep hole of the recovery blasting is consistent with the inclination angle of the ore body; the mining area is cleaned by using the gas flowing through the lower mining tunnel, so that the dirty gas generated after cleaning is discharged through the upper ventilation and filling tunnel; a scraper and a remote-controlled scraper are used to mine and transport the collapsed ore to the surface; and the goaf is filled from the upper ventilation and filling tunnel using a filling pipe.

[0096] In the above embodiment, at the end of the stope, a cutting well is formed by blasting a medium-deep hole one-time well formation method. This method quickly and accurately creates a vertical or inclined shaft through precisely designed medium-deep hole blasting, providing an initial free surface and compensation space for subsequent cutting slot blasting. Based on the free surface and compensation space provided by the cutting well, a cutting slot is formed by using a downward parallel medium-deep hole blasting technology. The formation of the cutting slot further expands the free surface and compensation space, creating favorable conditions for subsequent recovery blasting. The downward parallel medium-deep hole arrangement is conducive to controlling the blasting direction and range and improving the blasting efficiency. Recovery blasting uses downward parallel medium-deep holes in a sequential sequence to blast the ore. This blasting method reasonably designs the blasthole inclination and blasting sequence according to the ore body inclination and ore body morphology to achieve effective ore collapse and recovery. The blasthole inclination is consistent with the ore body inclination, which helps to reduce ore loss and depletion. The stope is cleaned by the gas flowing through the lower mine exit tunnel to remove dust and harmful gases generated by the blasting. The cleaned dirty gas is discharged through the upper ventilation filling tunnel, ensuring the air quality in the mine and protecting the health of the workers. Scrapers and remote-controlled scrapers are used to remove the collapsed ore. Scrapers have the advantages of strong loading capacity, good mobility and high efficiency, and can quickly transport ore out of the mine. Remote-controlled scrapers further improve the safety of operations and reduce the risk of direct exposure of personnel to dangerous environments. The goaf is filled through the upper ventilation filling tunnel using a filling pipe. The filling material can be waste rock, tailings, glue tailings or other suitable filling materials. The filling operation not only helps to control the ground pressure and reduce the risk of surface subsidence and collapse, but also provides a safe working environment for subsequent mining operations. In summary, this mining method achieves high efficiency, safety and environmental protection in the mining process by comprehensively applying a variety of advanced technologies and management methods. The successful application of this method is of great significance to improving mine production efficiency, reducing production costs and protecting the ecological environment.

[0097] By applying the technical solution of this embodiment, a method for reconstructing the stope structure of an inclined-steeply inclined extremely broken ore body is provided, and the beneficial effect is that it solves the technical problem of safe and efficient mining of the ore body under the condition that the upper and lower surrounding rocks and the ore body are both "soft and broken" rock bodies, and realizes the reconstruction of the stope structure under the condition of "soft and broken" rock bodies. By combining the advanced drainage with the "U"-shaped hole bottom fixed high prestressed grouting long anchor cable support technology, the hydraulic properties of the "soft and broken" rock body are fully considered, and the drainage reinforcement of the rock body is realized. The "U"-shaped hole bottom fixed high prestressed grouting long anchor cable can convert the anchoring concentrated force into distributed stress, and the grouting can further reinforce the broken surrounding rock. The bottom fixing device of the hole can quickly provide prestress, realize the rapid compensation of the excavation surface stress, hinder the development of the plastic zone of the surrounding rock, and then realize the effective support of the "soft and broken" rock body, overcoming the shortcomings of the existing technical solutions. The present application can increase the stope size of the inclined-steeply inclined extremely broken ore body, and then realize the safe, efficient, green and large-scale mining of the inclined-steeply inclined extremely broken ore body.

[0098] Further, as Figure 1 The specific implementation of the method, the embodiment of the present application provides a device for reconstructing the structure of an inclined-steeply inclined extremely broken ore body stope, such as Figure 2 As shown, the device comprises:

[0099] A size determination module, for determining the stope size of an inclined-steeply inclined extremely broken ore body under support conditions, and determining a mining method according to the stope size;

[0100] A division module is used to determine the area to be mined of the ore body and divide the area to be mined into ore blocks according to the occurrence of the ore body and the size of the stope;

[0101] A construction module is used to carry out advanced development and mining of the area to be mined based on the divided ore blocks, to carry out support operations on the development and mining projects completed through advanced development and mining, and to construct inclined drainage holes, wherein the development and mining projects include segmented tunnels, mine access roads, upper ventilation and filling tunnels, and lower mine access tunnels, and the support operations include fixed high prestressed grouting long anchor cable support at the bottom of the hole, resin anchor support, metal mesh support, and shotcrete support;

[0102] The construction module is also used to construct a rock drilling chamber and a bottom pulling chamber based on the development and mining project, and to perform support operations on the rock drilling chamber and the bottom pulling chamber;

[0103] The construction module is also used to support the upper and lower surrounding rocks with long high prestressed grouting anchor cables fixed at the bottom of the hole to achieve the reconstruction of the mining field structure, so as to carry out mining field cutting, backfilling and filling based on the mining field after structural reconstruction according to the mining method.

[0104] In the embodiment of the present application, optionally, the size determination module is used to:

[0105] According to the average thickness and segment height of the ore body, the critical stable hydraulic radius of the stope roof under support conditions, the critical stable hydraulic radius of the upper wall surrounding rock under support conditions, and the critical stable hydraulic radius of the lower wall surrounding rock under support conditions are obtained through the stability chart;

[0106] Determine the minimum value of the critical stable hydraulic radius of the stope roof under support conditions, the critical stable hydraulic radius of the upper wall surrounding rock under support conditions, and the critical stable hydraulic radius of the lower wall surrounding rock under support conditions as the design basis for the stope size, and determine the maximum length of the stope structure type that can remain stable after support based on the stope structure type with the critical stable hydraulic radius corresponding to the minimum value;

[0107] The maximum length, the segmented height of the stope, and the average thickness of the ore body in the stope are respectively used as the length, height, and width corresponding to the stope to obtain the stope size.

[0108] In the embodiment of the present application, optionally, the construction module is used to:

[0109] Based on the divided ore blocks, segmented tunnels, mine access roads, upper ventilation and filling tunnels, and lower mine exit tunnels are constructed in the form of three-center arches in the area to be mined;

[0110] The following support operations are performed for the development and mining project: support operations of bottom-fixed high prestressed grouting long anchor cable support with a first preset long anchor cable length and a first preset mesh size, support operations of resin anchor rod support with a first preset resin anchor rod mesh size and a first preset rod length, support operations of metal mesh support with a metal mesh welded with steel bars of a first preset diameter according to a first preset mesh size and a first preset mesh shape, and support operations of shotcrete support with a first preset shotcrete coagulation thickness;

[0111] The inclined drainage hole is constructed with a preset hole diameter, a preset drainage hole depth and a preset drainage hole inclination angle.

[0112] In the embodiment of the present application, optionally, the construction module is used to:

[0113] Expanding the upper ventilation and filling tunnel to form the rock drilling chamber with a preset rock drilling chamber size, and expanding the lower mining tunnel to form the bottom pulling chamber with a preset bottom pulling chamber size;

[0114] The following support operations are performed on the rock drilling chamber and the bottom pulling chamber: support operations of fixed high prestressed grouting long anchor cable support at the bottom of the hole with the second preset long anchor cable length and the second preset mesh size, support operations of resin anchor rod support with the second preset resin anchor rod mesh size and the second preset rod length, support operations of metal mesh support with a metal mesh welded with second preset diameter steel bars according to the second preset grid size and the second preset grid shape, and support operations of shotcrete support with the second preset shotcrete thickness.

[0115] In the embodiment of the present application, optionally, the construction module is used to:

[0116] Downward anchor cable holes are constructed by the rock drilling chamber along the inclination direction of the ore body at the junction of the ore body and the upper wall surrounding rock and at the junction of the ore body and the lower wall surrounding rock respectively, and surrounding rock anchor cable holes corresponding to the positions of the downward anchor cable holes are constructed by the rock drilling chamber and the bottom pulling chamber to the upper wall surrounding rock and the lower wall surrounding rock respectively;

[0117] Installing a bottom-fixed high prestressed grouting long anchor cable in the surrounding rock anchor cable hole, installing a vertical steel strand in the downward anchor cable hole and performing high-pressure grouting;

[0118] The vertical steel strands are tensioned and connected with the corresponding long high prestressed grouting anchor cables fixed at the bottom of the hole, so that the adjacent long high prestressed grouting anchor cables fixed at the bottom of the hole form a "U"-shaped support structure through the vertical steel strands, providing advanced support for the upper and lower surrounding rocks and realizing the reconstruction of the mining field structure.

[0119] In an embodiment of the present application, optionally, the direction of the surrounding rock anchor hole is perpendicular to the bedding direction of the surrounding rock; the depth of the downward anchor hole is the middle height; the depth of the surrounding rock anchor hole is 1.5 times the depth of the plastic zone of the surrounding rock; the hole spacing between the downward anchor hole and the surrounding rock anchor hole is the same; the vertical steel strand is exposed 1.8~2.5m from the hole mouth.

[0120] In the embodiment of the present application, optionally, the construction module is used to:

[0121] A cutting well is formed by blasting a medium-long hole at the end of the stope, and a cutting groove is formed by blasting a downward parallel medium-long hole based on the free surface and compensation space provided by the cutting well. Recovery blasting is performed based on the free surface and compensation space provided by the cutting groove, wherein the recovery blasting adopts a stepwise sequential blasting of downward parallel medium-long holes to drop the ore, and the inclination angle of the blasthole of the downward parallel medium-long hole of the recovery blasting is consistent with the inclination angle of the ore body;

[0122] The stope is cleaned by using the gas flowing through the lower mine exit tunnel, so that the dirty gas generated after cleaning is discharged through the upper ventilation filling tunnel;

[0123] Use scrapers and remote-controlled loaders to remove caved ore and transport it to the surface;

[0124] The goaf is filled via the upper ventilation filling tunnel using the filling pipe.

[0125] It should be noted that for other corresponding descriptions of the functional units involved in the inclined-steeply inclined extremely broken ore body stope structure reconstruction device provided in the embodiment of the present application, reference can be made to Figure 1 The corresponding description in the method will not be repeated here.

[0126] The embodiment of the present application also provides a computer device, which can be a personal computer, a server, a network device, etc. The computer device includes a bus, a processor, a memory and a communication interface, and can also include an input and output interface and a display device. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store location information. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, the steps in each method embodiment are implemented.

[0127] Those skilled in the art will appreciate that the structure of the above-mentioned computer device is only a partial structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components, or combine certain components, or have a different arrangement of components.

[0128] In one embodiment, a computer-readable storage medium is provided. The computer-readable storage medium may be non-volatile or volatile, and stores a computer program thereon. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented.

[0129] In one embodiment, a computer program product is provided, including a computer program, which implements the steps in the above method embodiments when executed by a processor.

[0130] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties.

[0131] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in this application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.

[0132] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0133] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A method for reconstructing the structure of an inclined-steeply inclined extremely broken ore body stope, characterized in that: The method comprises: For inclined-steeply inclined extremely broken ore bodies, determine the stope size of the ore body under support conditions, and determine the mining method based on the stope size; Determine the area to be mined of the ore body, and divide the area to be mined into ore blocks according to the occurrence of the ore body and the size of the stope; Based on the divided ore blocks, advance development and mining are carried out in the area to be mined, support operations are carried out on the development and mining projects completed in advance, and inclined drainage holes are constructed, wherein the development and mining projects include segmented tunnels, mine access roads, upper ventilation and filling tunnels, and lower mine exit tunnels, and the support operations include fixed high prestressed grouting long anchor cable support at the bottom of the hole, resin anchor support, metal mesh support, and shotcrete support; Based on the development and mining project, a rock drilling chamber and a bottom pulling chamber are constructed, and support operations are performed on the rock drilling chamber and the bottom pulling chamber; Using a long anchor cable with high prestressed grouting fixed at the bottom of the hole to carry out "U"-shaped support operations on the upper wall surrounding rock and the lower wall surrounding rock to achieve stope structure reconstruction, so as to carry out stope cutting, mining and filling based on the stope after structural reconstruction according to the mining method; Based on the divided ore blocks, advance development and mining are carried out for the area to be mined, support operations are carried out for the development and mining projects completed by advance development and mining, and inclined drainage holes are constructed, including: based on the divided ore blocks, segmented tunnels, mine access roads, upper ventilation and filling tunnels, and lower mine exit tunnels are constructed in the form of three-center arches for the area to be mined; the following support operations are carried out for the development and mining projects: support operations of fixed high prestressed grouting long anchor cable support at the bottom of the hole with a first preset long anchor cable length and a first preset mesh size, support operations of resin anchor cable support with a first preset resin anchor cable mesh size and a first preset rod length, support operations of metal mesh support with a metal mesh welded with a first preset diameter steel bar according to a first preset mesh size and a first preset mesh shape, and support operations of sprayed concrete support with a first preset sprayed concrete thickness; upward-inclined drainage holes are constructed with a preset hole diameter, a preset drainage hole depth, and a preset drainage hole inclination angle; Based on the development and mining project, a rock drilling chamber and a bottom pulling chamber are constructed, and support operations are performed on the rock drilling chamber and the bottom pulling chamber, including: expanding the upper ventilation and filling tunnel to form the rock drilling chamber of a preset rock drilling chamber size, and expanding the lower mining tunnel to form the bottom pulling chamber of a preset bottom pulling chamber size; performing the following support operations on the rock drilling chamber and the bottom pulling chamber: supporting operations of bottom hole fixed high prestressed grouting long anchor cable support with a second preset long anchor cable length and a second preset mesh size, supporting operations of resin anchor rod support with a second preset resin anchor rod mesh size and a second preset rod length, supporting operations of metal mesh support with a metal mesh welded by steel bars of a second preset diameter according to a second preset mesh size and a second preset mesh shape, and supporting operations of shotcrete support with a second preset shotcrete thickness; A "U"-shaped support operation is carried out on the upper wall surrounding rock and the lower wall surrounding rock by using a hole bottom fixed high prestressed grouting long anchor cable to realize the reconstruction of the mining field structure, including: constructing downward anchor cable holes along the inclination direction of the ore body at the junction of the ore body and the upper wall surrounding rock and at the junction of the ore body and the lower wall surrounding rock by a rock drilling chamber, respectively, constructing surrounding rock anchor cable holes corresponding to the positions of the downward anchor cable holes in the upper wall surrounding rock and the lower wall surrounding rock by a rock drilling chamber and a bottom pulling chamber respectively; installing a hole bottom fixed high prestressed grouting long anchor cable in the surrounding rock anchor cable hole, installing a vertical steel strand in the downward anchor cable hole and performing high-pressure grouting; tensioning and connecting the vertical steel strand with the corresponding hole bottom fixed high prestressed grouting long anchor cable, so that the adjacent hole bottom fixed high prestressed grouting long anchor cables form a "U"-shaped support structure through the vertical steel strand, providing advanced support for the upper wall surrounding rock and the lower wall surrounding rock, and realizing the reconstruction of the mining field structure.

2. The method for reconstructing the structure of an inclined-steeply inclined extremely broken ore body stope according to claim 1, characterized in that: Determine the stope dimensions of the ore body under support conditions, including: According to the average thickness and segment height of the ore body, the critical stable hydraulic radius of the stope roof under support conditions, the critical stable hydraulic radius of the upper wall surrounding rock under support conditions, and the critical stable hydraulic radius of the lower wall surrounding rock under support conditions are obtained through the stability chart; Determine the minimum value of the critical stable hydraulic radius of the stope roof under support conditions, the critical stable hydraulic radius of the upper wall surrounding rock under support conditions, and the critical stable hydraulic radius of the lower wall surrounding rock under support conditions as the design basis for the stope size, and determine the maximum length of the stope structure type that can remain stable after support based on the stope structure type with the critical stable hydraulic radius corresponding to the minimum value; The maximum length, the segmented height of the stope, and the average thickness of the ore body in the stope are respectively used as the length, height, and width corresponding to the stope to obtain the stope size.

3. The method for reconstructing the structure of an inclined-steeply inclined extremely broken ore body stope according to claim 1, characterized in that: The direction of the surrounding rock anchor hole is perpendicular to the bedding direction of the surrounding rock; the depth of the downward anchor hole is the middle section height; the depth of the surrounding rock anchor hole is 1.5 times the depth of the plastic zone of the surrounding rock; the hole spacing between the downward anchor hole and the surrounding rock anchor hole is the same; the vertical steel strand is exposed 1.8~2.5m from the hole mouth.

4. The method for reconstructing the structure of an inclined-steeply inclined extremely broken ore body stope according to claim 1, characterized in that: According to the mining method, the stope cutting, mining and filling are carried out based on the stope after structural reconstruction, including: A cutting well is formed by blasting a medium-long hole at the end of the stope, and a cutting groove is formed by blasting a downward parallel medium-long hole based on the free surface and compensation space provided by the cutting well. Recovery blasting is performed based on the free surface and compensation space provided by the cutting groove, wherein the recovery blasting adopts a stepwise sequential blasting of downward parallel medium-long holes to drop the ore, and the inclination angle of the blasthole of the downward parallel medium-long hole of the recovery blasting is consistent with the inclination angle of the ore body; The stope is cleaned by using the gas flowing through the lower mine exit tunnel, so that the dirty gas generated after cleaning is discharged through the upper ventilation filling tunnel; Use scrapers and remote-controlled loaders to remove caved ore and transport it to the surface; The goaf is filled via the upper ventilation filling tunnel using the filling pipe.

5. A device for rebuilding the structure of an inclined-steeply inclined extremely broken ore body stope, characterized in that: The device comprises: A size determination module, for determining the stope size of an inclined-steeply inclined extremely broken ore body under support conditions, and determining a mining method according to the stope size; A division module is used to determine the area to be mined of the ore body and divide the area to be mined into ore blocks according to the occurrence of the ore body and the size of the stope; A construction module is used to carry out advanced development and mining of the area to be mined based on the divided ore blocks, to carry out support operations on the development and mining projects completed through advanced development and mining, and to construct inclined drainage holes, wherein the development and mining projects include segmented tunnels, mine access roads, upper ventilation and filling tunnels, and lower mine access tunnels, and the support operations include fixed high prestressed grouting long anchor cable support at the bottom of the hole, resin anchor support, metal mesh support, and shotcrete support; The construction module is also used to construct a rock drilling chamber and a bottom pulling chamber based on the development and mining project, and to perform support operations on the rock drilling chamber and the bottom pulling chamber; The construction module is also used to perform "U"-shaped support operations on the upper wall surrounding rock and the lower wall surrounding rock using a long anchor cable with high prestressed grouting fixed at the bottom of the hole, so as to achieve the reconstruction of the stope structure, so as to carry out stope cutting, mining and filling based on the stope after structural reconstruction according to the mining method; The construction module is specifically used for: constructing segmented tunnels, mine access roads, upper ventilation filling tunnels, and lower mine exit tunnels in the area to be mined in the form of three-center arches based on the divided ore blocks; performing the following support operations for the development and mining project: performing bottom-hole fixed high prestressed grouting long anchor support with a first preset long anchor length and a first preset mesh size, performing resin anchor support with a first preset resin anchor mesh size and a first preset rod length, performing metal mesh support with a metal mesh welded with steel bars of a first preset diameter according to a first preset mesh size and a first preset mesh shape, and performing sprayed concrete support with a first preset sprayed concrete thickness; constructing an inclined drainage hole with a preset hole diameter, a preset drainage hole depth, and a preset drainage hole inclination angle; The construction module is specifically used to: expand the upper ventilation and filling tunnel to form the rock drilling chamber of the preset rock drilling chamber size, and expand the lower mining tunnel to form the bottom pulling chamber of the preset bottom pulling chamber size; perform the following support operations on the rock drilling chamber and the bottom pulling chamber: perform bottom hole fixed high prestressed grouting long anchor support with a second preset long anchor length and a second preset mesh size, perform resin anchor support with a second preset resin anchor mesh size and a second preset rod length, perform metal mesh support with a metal mesh welded with a second preset diameter steel bar according to a second preset mesh size and a second preset mesh shape, and perform sprayed concrete support with a second preset sprayed concrete thickness; The construction module is specifically used for: constructing downward anchor holes at the junction of the ore body and the upper wall surrounding rock and at the junction of the ore body and the lower wall surrounding rock by the rock drilling chamber along the inclination direction of the ore body, respectively, and constructing surrounding rock anchor holes corresponding to the positions of the downward anchor holes in the upper wall surrounding rock and the lower wall surrounding rock by the rock drilling chamber and the bottom pulling chamber respectively; installing a hole bottom fixed high prestressed grouting long anchor cable in the surrounding rock anchor cable hole, installing a vertical steel strand in the downward anchor cable hole and performing high-pressure grouting; tensioning and connecting the vertical steel strand with the corresponding hole bottom fixed high prestressed grouting long anchor cable, so that the adjacent hole bottom fixed high prestressed grouting long anchor cables form a "U"-shaped support structure through the vertical steel strands, providing advanced support for the upper wall surrounding rock and the lower wall surrounding rock, and realizing the reconstruction of the mining field structure.

6. A storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 4 is implemented.

7. A computer device comprising a storage medium, a processor, and a computer program stored in the storage medium and executable on the processor, characterized in that: When the processor executes the computer program, the method according to any one of claims 1 to 4 is implemented.