A fast energy-saving intelligent control system for refrigerators
By subdividing the interior of the freezer into multiple sub-areas and collecting detailed data, a comprehensive cycle index is constructed and control instructions are generated, which solves the problem of the traditional freezer system being unable to effectively respond to complex environmental changes and achieves refined management and energy efficiency improvement within the freezer.
Patent Information
- Application Number
- CN202411009882.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-07-26
AI Technical Summary
Traditional freezer intelligent control systems cannot effectively respond to complex environmental changes and real-time control requirements, resulting in energy waste and increased operating costs, and lack of detailed monitoring and optimization of energy efficiency in each sub-region.
The area division unit and temperature control module are used to subdivide the interior of the freezer into multiple sub-areas, and set up monitoring points and independent temperature controllers in each sub-area. The number of items, frost conditions and biological pollution data are collected through the analysis unit. Construct a comprehensive circulation index and generate control instructions to optimize temperature, humidity and air flow.
It achieves refined management inside the freezer, improves refrigeration efficiency and energy efficiency management, reduces local temperature unevenness and abnormal humidity problems, reduces operational risks and energy consumption, and extends the service life of the equipment.
Smart Images

Figure CN118532876B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of refrigerator control, and in particular to a rapid energy-saving intelligent control system for a refrigerator. Background Art
[0002] A freezer is a device used to store frozen food or other perishable items. Its main function is to reduce the internal temperature to below freezing point through refrigeration technology to extend the shelf life of food and maintain its quality. It is used in supermarkets, restaurants, food processing plants, etc.
[0003] Traditional refrigerator intelligent control systems are usually simple in design, mainly relying on basic temperature control and switching functions, and cannot effectively respond to complex environmental changes and real-time regulation needs. The energy efficiency management of traditional refrigerator systems is mainly achieved through basic refrigeration control, lacking detailed monitoring and optimization of the real-time energy efficiency of each sub-area. Since it is impossible to accurately analyze the energy consumption contribution of each area, there is a risk of energy waste and increased operating costs. Traditional refrigerator systems can usually only provide basic temperature monitoring, and lack detailed monitoring of humidity, air flow, and item distribution. This may lead to problems such as local over-high or over-low temperatures and abnormal humidity inside the refrigerator, affecting the long-term storage and quality maintenance of food. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present invention provides a rapid energy-saving intelligent control system for a refrigerator to solve the problems mentioned in the background technology.
[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions: a refrigerator rapid energy-saving intelligent control system, comprising:
[0006] An area division unit is used to divide the interior of the refrigerator into multiple sub-areas, and to set monitoring points inside and outside each sub-area, and to install a temperature control cooler inside the sub-area;
[0007] The first analysis unit is used to collect the quantity, volume and distribution information of the articles stored in each sub-area, establish a first data set, and construct a flow barrier index Ldx according to the preprocessed first data set. When the flow barrier index Ldx exceeds a preset load threshold, a first warning instruction is sent to the outside;
[0008] The second analysis unit is used to collect and obtain the frost conditions of the sub-areas, record the opening and closing frequency and time of the refrigerator doors in each sub-area, collect the external heat and the lost cooling capacity, establish a second data set, and construct a first frost index Jsz and a second opening and closing door loss index Ksh based on the preprocessed first data set;
[0009] The third analysis unit is used to collect biological contamination data of each sub-area of the refrigerator, establish a third data set, and construct a biological contamination coefficient Swz based on the pre-processed third data set;
[0010] The comprehensive evaluation unit fits the flow barrier index Ldx, the first frost index Jsz, the second switch door loss index Ksh and the biological pollution coefficient Swz to obtain the comprehensive circulation index Zhz. When the comprehensive circulation index Zhz exceeds the first threshold, the hierarchical evaluation instruction is triggered;
[0011] The hierarchical control unit is used to evaluate the first frost index Jsz, the second switch door loss index Ksh and the biological contamination coefficient Swz of each sub-area after receiving the hierarchical evaluation instruction, obtain the corresponding evaluation results, and generate the control instruction according to the corresponding evaluation results.
[0012] Preferably, the area division unit includes an isolation module and a temperature control module;
[0013] The isolation module is used to separate the sub-areas using vacuum insulation panels;
[0014] The temperature control module is used to install an independent temperature controller in each sub-area, and to install a defrosting device in each sub-area, including an electric heating wire and a hot air circulation device.
[0015] Preferably, the first analysis unit includes a first acquisition module, a first calculation module and a first evaluation module;
[0016] The first acquisition module is used to install a scanner at the internal monitoring point of each sub-area to take real-time photos to obtain internal images, and after image correction, denoising and image enhancement processing of the internal images, use a depth sensor to obtain the three-dimensional contour and spacing information of the objects, and obtain the total number of objects N, the spacing D between the objects and adjacent objects, the surface area A of the objects and the volume V of the objects through an image recognition algorithm and extraction of the number, area and volume features of the objects in the internal images;
[0017] The total number of items N, the distance D between items and adjacent items, the surface area A of items and the volume V of items in each sub-area are collected, and after dimensionless processing, the flow barrier index Ldx is calculated by the following formula:
[0018] ;
[0019] Where i=1, 2, 3, ..., N, N represents the total number of items in the sub-area, represents the distance between the i-th item and its adjacent items, represents the volume of the i-th item, represents the surface area of the ith object, represents the total volume of the sub-region; Indicates the number density of items, bz indicates the minimum average item spacing threshold that the sub-area is preset to bear, Represents the inverse of the average item spacing between items, Represents the volume density of the item. represents the surface area density of the object; w1, w2, w3 and w4 represent weight values, and , , , , the specific value is set by the user; ;
[0020] The first evaluation module is used to perform a preliminary evaluation on the flow barrier index Ldx to obtain a first evaluation result, including:
[0021] When the flow barrier index Ldx>preset load threshold, it indicates that the load of items in the sub-area is abnormal and the density of items is too high, thereby affecting the refrigeration efficiency of the refrigerator and triggering the first warning instruction, indicating a load exceeding standard warning;
[0022] When the flow barrier index Ldx ≤ the preset load threshold, it means that the load of items in the sub-area is normal and continuous monitoring is performed.
[0023] Preferably, the second analysis unit includes a second acquisition module and a second processing module;
[0024] The second acquisition module is used to acquire the frost condition of the sub-area, record the opening and closing frequency and time of the refrigerator door in each sub-area, acquire the external heat and the lost cooling capacity, and establish the second data set.
[0025] The second data set includes: internal temperature value nbT, external temperature value wbT, internal humidity ndH, external humidity wbH, cooling time Tc, frost thickness Df, operation cycle Rc, door opening times Fdo, door opening and closing time duration Tdo, external heat input value Qin and cooling capacity loss value Qloss;
[0026] The second processing module is used to preprocess the second data set, and the preprocessing includes: data cleaning, removal of outliers, data standardization, feature extraction and data set division.
[0027] Preferably, the second analysis unit further includes a frosting calculation module and a loss calculation module;
[0028] The frosting calculation module is used to calculate the first frosting index Jsz according to the following steps;
[0029] S11. First calculate the amount of water vapor that enters the refrigerator area each time the door is opened. :
[0030] ;
[0031] In the formula, is the relative humidity converted to a decimal, is the air density in the refrigerator, is the air volume of the sub-area in the refrigerator;
[0032] S12. Calculate the amount of condensed water :
[0033] ;
[0034] In the formula, represents the temperature difference between inside and outside of the sub-area;
[0035] S13. Calculate the accumulated frost amount :
[0036] ;
[0037] Where Fdo is the number of door openings, and Tdo is the duration of each door opening;
[0038] S14. Calculate the first frost index Jsz:
[0039] ;
[0040] In the formula, and is the weight value; and , , the specific value is set by the user. .
[0041] Preferably, the loss calculation module is used to calculate the second switch gate loss Ksh according to the following steps;
[0042] S21. First, calculate the heat transfer coefficient U of the refrigerator door and the internal convection thermal resistance of the sub-area :
[0043] ; ;
[0044] Where d represents the thickness of the freezer door material, k represents the thermal conductivity of the freezer door material, represents the thickness of the i-th layer of refrigerator material, m represents the total number of refrigerator material layers, represents the thermal conductivity of the material of the i-th layer of the refrigerator, Represents the external convection thermal resistance, which is 0.04m²K / W;
[0045] S22. According to the heat transfer coefficient U of the refrigerator door, the second door opening and closing loss Ksh is calculated by the following formula:
[0046] ;
[0047] ;
[0048] ;
[0049] In the formula, Qin represents the external heat output value, Qloss represents the cooling capacity loss value, U represents the heat transfer coefficient of the refrigerator door, and B represents the area of the refrigerator door. represents the temperature difference between the inside and outside of the sub-area, Tdo is the time when the refrigerator door is opened, is the air volume of the sub-area in the refrigerator; Cp is the specific heat capacity of the air, and Rc represents the operating cycle of the sub-area.
[0050] Preferably, the third analysis unit includes a third acquisition module and a third calculation module;
[0051] The third collection module is used to collect biological contamination data of each sub-area of the refrigerator to establish a third data set;
[0052] The third data set includes external microbial particles Awb, internal yeast total number Anb, fungal spore proportion Azj, bacteria proportion Axj and mold proportion Amj;
[0053] The third calculation module is used to construct the biological pollution coefficient Swz after dimensionless processing based on the external microbial particles Awb, the total number of internal yeast Anb, the fungal spore proportion Azj, the bacteria proportion Axj and the mold proportion Amj extracted from the third data set;
[0054] ;
[0055] In the formula, is the air volume of the sub-area in the refrigerator.
[0056] Preferably, the comprehensive evaluation unit includes a fitting module and a total evaluation module;
[0057] The fitting module is used to generate a comprehensive cycle index Zhz by fitting the flow barrier index Ldx, the first frost index Jsz, the second switch door loss index Ksh and the biological contamination coefficient Swz through the following formula:
[0058] ;
[0059] Where d1, d2, d3 and w4 represent the weight values of the flow barrier index Ldx, the first frost index Jsz, the second switch loss index Ksh and the biological contamination coefficient Swz of each sub-area, respectively, and , , , , the specific value is set by the user; ;
[0060] The overall assessment module is used to compare the comprehensive cycle index Zhz with the first threshold value to obtain a first judgment result, including: when the comprehensive cycle index Zhz ≥ the first threshold value, it indicates that the refrigeration efficiency of the refrigerator area is at risk, and a first hierarchical assessment instruction is generated;
[0061] When the comprehensive cycle index Zhz is less than the first threshold, it indicates that the refrigeration efficiency of the refrigerator area is risk-free and continuous monitoring is performed. Preferably, the hierarchical control unit includes a first control module, a second control module and a third control module;
[0062] The first control module is used to evaluate the first frost index Js of each sub-area after receiving the graded evaluation instruction, and obtain a first evaluation result, including: when the first frost index Js ≥ the first risk threshold, it indicates that there is a risk of frost in the sub-area, and generate a first control strategy, including: regularly cleaning the frost layer in the sub-area 1-3 times a week or starting the defrosting equipment for cleaning, using a desiccant or a dehumidifying device to reduce the relative humidity of the sub-area by 20-50%, and checking and repairing the refrigerator sealing strip;
[0063] When the first frost index Js is less than the first risk threshold, it means that there is no risk of frost in the sub-area and monitoring is continued;
[0064] The second control module is used to evaluate the second door opening and closing loss Ksh of each sub-area after receiving the graded evaluation instruction, and obtain the second evaluation result, including: when the second door opening and closing loss Ksh ≥ the second risk threshold, it indicates that the door opening loss of the sub-area is abnormal, and a second control strategy is generated, including: optimizing the process of picking up and placing items, reducing 10-30% unnecessary door opening operations; installing a door magnetic switch and an alarm system, prompting the user to reduce the door opening and staying time of the refrigerator by 30-50%, recording and analyzing the door opening and closing data, and finding and improving the reasons for high-frequency door opening;
[0065] When the second door opening and closing loss Ksh is less than the second risk threshold, it means that the door opening loss in the sub-area is normal and monitoring is continued;
[0066] The third control module is used to evaluate the biological contamination coefficient Swz of each sub-area after receiving the graded evaluation instruction, and obtain a second evaluation result, including: when the biological contamination coefficient Swz ≥ the third risk threshold, it indicates that the biological contamination of the sub-area is abnormal, and a third control strategy is generated, including: regularly cleaning the biological contamination source in the sub-area with detergents and disinfectants 1-3 times a week, using desiccants or dehumidification equipment to reduce the relative humidity of the sub-area by 10-20%, and optimizing the parameters of the air circulation equipment by 10%;
[0067] When the biological contamination coefficient Swz is less than the third risk threshold, it means that there is no abnormality in biological contamination in the sub-area and monitoring should be continued.
[0068] Preferably, it also includes an item control unit, which is used to generate item rearrangement suggestions when receiving the first warning instruction, including: using partitions or shelves to separate items, and using distance measuring sensors to prompt that the minimum distance between items is maintained at 3-5CM.
[0069] The present invention provides a fast energy-saving intelligent control system for refrigerators, which has the following beneficial effects:
[0070] (1) Traditional refrigerator systems usually rely on basic temperature control, while this refrigerator fast energy-saving intelligent control system realizes refined management inside the refrigerator through area division units and temperature control modules. Each sub-area is equipped with an independent temperature controller and defrost device, which can adjust the temperature and humidity according to specific needs, effectively reducing the problem of local temperature being too high or too low, and improving the quality and safety of long-term food storage.
[0071] (2) Traditional refrigerator systems lack the ability to collect and analyze detailed data. This refrigerator fast energy-saving intelligent control system collects and analyzes multi-dimensional data such as the number of items, frost conditions, and biological contamination in real time through the first analysis unit, the second analysis unit, and the third analysis unit. This data-driven intelligent analysis capability enables the system to quickly identify and respond to potential problems, improving refrigeration efficiency and energy efficiency management.
[0072] (3) The comprehensive evaluation unit and the hierarchical control unit can achieve a comprehensive evaluation of the refrigeration efficiency of each sub-area of the refrigerator through the calculation of the comprehensive cycle index Zhz and the threshold determination. Based on the evaluation results, the system generates corresponding control strategies, such as optimizing frosting treatment, reducing door opening losses, and managing biological contamination sources, effectively reducing operating risks and energy consumption.
[0073] (4) The object control unit uses distance sensors and detailed object placement data to generate accurate object rearrangement suggestions. These suggestions not only improve the efficiency of object placement and space utilization, but also help reduce energy loss and the risk of reduced cooling efficiency. Through intelligent object control strategies, the system effectively reduces operating costs and maintenance costs and extends the service life of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0074] Figure 1 This is a schematic diagram of the flowchart of a rapid energy-saving intelligent control system for a refrigerator according to the present invention. DETAILED DESCRIPTION
[0075] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0076] Example 1: Please refer to Figure 1 , a refrigerator fast energy-saving intelligent control system, comprising:
[0077] An area division unit is used to divide the interior of the refrigerator into multiple sub-areas, and to set monitoring points inside and outside each sub-area, and to install a temperature control cooler inside the sub-area;
[0078] The first analysis unit is used to collect the quantity, volume and distribution information of the articles stored in each sub-area, establish a first data set, and construct a flow barrier index Ldx according to the preprocessed first data set. When the flow barrier index Ldx exceeds a preset load threshold, a first warning instruction is sent to the outside;
[0079] The second analysis unit is used to collect and obtain the frost conditions of the sub-areas, record the opening and closing frequency and time of the refrigerator doors in each sub-area, collect the external heat and the lost cooling capacity, establish a second data set, and construct a first frost index Jsz and a second opening and closing door loss index Ksh based on the preprocessed first data set;
[0080] The third analysis unit is used to collect biological contamination data of each sub-area of the refrigerator, establish a third data set, and construct a biological contamination coefficient Swz based on the pre-processed third data set;
[0081] The comprehensive evaluation unit fits the flow barrier index Ldx, the first frost index Jsz, the second switch door loss index Ksh and the biological pollution coefficient Swz to obtain the comprehensive circulation index Zhz. When the comprehensive circulation index Zhz exceeds the first threshold, the hierarchical evaluation instruction is triggered;
[0082] The hierarchical control unit is used to evaluate the first frost index Jsz, the second switch door loss index Ksh and the biological contamination coefficient Swz of each sub-area after receiving the hierarchical evaluation instruction, obtain the corresponding evaluation results, and generate the control instruction according to the corresponding evaluation results.
[0083] In this embodiment, the area division unit can subdivide the interior of the refrigerator into multiple sub-areas and accurately set monitoring points and temperature control refrigerators. This refined management enables the temperature, humidity and air flow of each sub-area to be more accurately controlled and adjusted, effectively avoiding the problems of local temperature unevenness and humidity abnormality caused by overall control in traditional systems. The first analysis unit establishes and updates the flow barrier index Ldx in real time by collecting and analyzing information such as the number, volume, and distribution of items in each sub-area. This real-time monitoring can accurately assess the load conditions of each area. Once the preset load threshold is exceeded, the system can quickly issue an early warning instruction to help reduce energy waste and operating costs. The second analysis unit constructs the first frost index (Jsz) and the second door opening and closing loss index (Ksh) by recording and analyzing data such as frosting conditions, door opening and closing frequency, and external heat loss. These indexes not only help decision makers understand the operating status of the refrigerator, but also predict possible energy efficiency problems and take timely measures to adjust them, thereby improving the accuracy and effectiveness of energy efficiency management. The third analysis unit focuses on collecting and analyzing biological contamination data for each sub-area and establishing a biological contamination coefficient (Swz). By monitoring and processing the biocontamination coefficient, the system can prevent and reduce the growth of microorganisms such as bacteria, fungi and mold inside the refrigerator, ensuring the hygiene and safety of stored food. The comprehensive evaluation unit conducts comprehensive analysis to obtain the comprehensive circulation index Zhz. Once Zhz exceeds the set threshold, the system triggers the hierarchical evaluation instruction and accurately evaluates and regulates each sub-area through the hierarchical control unit. This intelligent management method greatly improves the efficiency and reliability of refrigerator operation.
[0084] Example 2: Please refer to Figure 1 ,Specifically, the area division unit includes an isolation module and a temperature control module;
[0085] The isolation module is used to separate the sub-areas using vacuum insulation panels;
[0086] The temperature control module is used to install an independent temperature controller in each sub-area, and to install a defrosting device in each sub-area, including an electric heating wire and a hot air circulation device.
[0087] The isolation module uses vacuum insulation panels to isolate each sub-area. The vacuum insulation panels have excellent thermal insulation properties, effectively reducing heat exchange between sub-areas, thereby reducing energy loss and the burden on the refrigeration system. This isolation design helps to improve the energy efficiency and energy saving of the freezer. The defrosting device includes a heating wire and a hot air circulation device. The heating wire can quickly defrost, while the hot air circulation device can effectively and evenly distribute heat, accelerate the defrosting process and reduce energy consumption. This optimization ensures that the frost problem inside the freezer is solved in a timely and effective manner, maintaining the normal operation of the freezer. The temperature control module installs an independent temperature controller in each sub-area. This means that each area can adjust the temperature separately as needed, whether it is refrigeration or freezing, it can be precisely controlled, avoiding the uneven temperature and changes that may be caused by overall control in traditional systems.
[0088] Example 3: Please refer to Figure 1 , specifically, the first analysis unit includes a first acquisition module, a first calculation module and a first evaluation module;
[0089] The first acquisition module is used to install a scanner at the internal monitoring point of each sub-area to take real-time photos to obtain internal images, and after image correction, denoising and image enhancement processing of the internal images, use a depth sensor to obtain the three-dimensional contour and spacing information of the objects, and obtain the total number of objects N, the spacing D between the objects and adjacent objects, the surface area A of the objects and the volume V of the objects through an image recognition algorithm and extraction of the number, area and volume features of the objects in the internal images;
[0090] The total number of items N, the distance D between items and adjacent items, the surface area A of items and the volume V of items in each sub-area are collected, and after dimensionless processing, the flow barrier index Ldx is calculated by the following formula:
[0091] ;
[0092] Where i=1, 2, 3, ..., N, N represents the total number of items in the sub-area, represents the distance between the i-th item and its adjacent items, represents the volume of the i-th item, represents the surface area of the ith object, represents the total volume of the sub-region; Indicates the number density of items, bz indicates the minimum average item spacing threshold that the sub-area is preset to bear, Represents the inverse of the average item spacing between items, Represents the volume density of the item. represents the surface area density of the object; w1, w2, w3 and w4 represent weight values, and , , , , the specific value is set by the user; ;
[0093] The first evaluation module is used to perform a preliminary evaluation on the flow barrier index Ldx to obtain a first evaluation result, including:
[0094] When the flow barrier index Ldx>preset load threshold, it indicates that the load of items in the sub-area is abnormal and the density of items is too high, thereby affecting the refrigeration efficiency of the refrigerator and triggering the first warning instruction, indicating a load exceeding standard warning;
[0095] When the flow barrier index Ldx ≤ the preset load threshold, it means that the load of items in the sub-area is normal and continuous monitoring is performed.
[0096] In this embodiment, by collecting information such as the number, volume, and distance between adjacent items in each sub-area, and after dimensionless processing, the flow barrier index Ldx is calculated using a formula. This index comprehensively considers the density of the number of items, the inverse of the average value of the distance between items, the volume density of items, and the surface area density of items, and can objectively reflect the compactness of the placement of items within the sub-area and the efficiency of space utilization. When the flow barrier index Ldx exceeds the preset load threshold, the system triggers the first early warning instruction. This indicates that the load density of items in the sub-area is too high, which may affect the refrigeration efficiency and energy efficiency performance of the refrigerator. Through timely early warnings, the system can prompt the operation and maintenance personnel to adjust the placement of items or take other measures to reduce energy waste and maintain the normal operation of the refrigerator.
[0097] Example 4: Please refer to Figure 1 ,Specifically, the second analysis unit includes a second acquisition module and a second processing module;
[0098] The second acquisition module is used to acquire the frost condition of the sub-area, record the opening and closing frequency and time of the refrigerator door in each sub-area, acquire the external heat and the lost cooling capacity, and establish the second data set.
[0099] The second data set includes: internal temperature value nbT, external temperature value wbT, internal humidity ndH, external humidity wbH, cooling time Tc, frost thickness Df, operation cycle Rc, door opening times Fdo, door opening and closing time duration Tdo, external heat input value Qin and cooling capacity loss value Qloss;
[0100] The second processing module is used to preprocess the second data set, and the preprocessing includes: data cleaning, removal of outliers, data standardization, feature extraction and data set division.
[0101] The second analysis unit also includes a frosting calculation module and a loss calculation module;
[0102] The frosting calculation module is used to calculate the first frosting index Jsz according to the following steps;
[0103] S11. First calculate the amount of water vapor that enters the refrigerator area each time the door is opened. :
[0104] ;
[0105] In the formula, is the relative humidity converted to a decimal, is the air density in the refrigerator, is the air volume of the sub-area in the refrigerator;
[0106] S12. Calculate the amount of condensed water :
[0107] ;
[0108] In the formula, represents the temperature difference between inside and outside of the sub-area;
[0109] S13. Calculate the accumulated frost amount :
[0110] ;
[0111] Where Fdo is the number of door openings, and Tdo is the duration of each door opening;
[0112] S14. Calculate the first frost index Jsz:
[0113] ;
[0114] In the formula, and is the weight value; and , , the specific value is set by the user; .
[0115] Specifically, the loss calculation module is used to calculate the second switch gate loss Ksh according to the following steps;
[0116] S21. First, calculate the heat transfer coefficient U of the refrigerator door and the internal convection thermal resistance of the sub-area :
[0117] ; ;
[0118] Where d represents the thickness of the freezer door material, k represents the thermal conductivity of the freezer door material, represents the thickness of the i-th layer of refrigerator material, m represents the total number of refrigerator material layers, represents the thermal conductivity of the material of the i-th layer of the refrigerator, represents the external convection thermal resistance, and its value is 0.04m²K / W; represents the external convection thermal resistance, and its value is 0.04, and its unit is square meter Kelvin per watt;
[0119] S22. According to the heat transfer coefficient U of the refrigerator door, the second door opening and closing loss Ksh is calculated by the following formula:
[0120] ;
[0121] ;
[0122] ;
[0123] In the formula, Qin represents the external heat output value, Qloss represents the cooling capacity loss value, U represents the heat transfer coefficient of the refrigerator door, and B represents the area of the refrigerator door. represents the temperature difference between the inside and outside of the sub-area, Tdo is the time when the refrigerator door is opened, is the air volume of the sub-area in the refrigerator; Cp is the specific heat capacity of the air, and Rc represents the operating cycle of the sub-area.
[0124] In this embodiment, the amount of water vapor, condensed water and accumulated frost entering the refrigerator sub-area each time the door is opened is calculated, and the accumulated frost is calculated in combination with the number of door openings and duration. These steps help the system to accurately evaluate the frosting situation in each sub-area. The accumulated frost is converted into the first frost index Jsz using the weighted value and the weight parameter set by the user. This index reflects the degree of influence of frost on the performance and energy efficiency of the refrigerator, which helps to provide early warning and take necessary defrosting measures to maintain the efficiency and stability of the refrigerator operation. Through real-time monitoring and calculation, the system can instantly feedback the frosting situation in the sub-area and reduce the negative impact of frost on the temperature and humidity control inside the refrigerator. This helps to extend the service life of refrigeration equipment, reduce energy consumption, and improve the overall performance and reliability of the refrigerator.
[0125] According to the thermal conductivity and thickness of the freezer door material and the set value of the external convection thermal resistance, the heat transfer coefficient U of the freezer door and the convection thermal resistance inside the sub-area are calculated. These parameters affect the heat exchange efficiency of the freezer door during the opening and closing process. Using the external heat input value Qin, the cooling capacity loss value Qloss, the door opening time Tdo, the temperature difference between the inside and outside of the sub-area, the air volume and the operation cycle Rc, the second door opening and closing loss Ksh is calculated by formula. The second door opening and closing loss Ksh reflects the energy loss caused by each opening and closing of the freezer door to the sub-area, which helps to optimize the frequency and duration of door opening and reduce the energy consumption of the freezer operation.
[0126] Example 5: Please refer to Figure 1 , specifically, the third analysis unit includes a third acquisition module and a third calculation module;
[0127] The third collection module is used to collect biological contamination data of each sub-area of the refrigerator to establish a third data set;
[0128] The third data set includes external microbial particles Awb, internal yeast total number Anb, fungal spore proportion Azj, bacteria proportion Axj and mold proportion Amj;
[0129] The third calculation module is used to construct the biological pollution coefficient Swz after dimensionless processing based on the external microbial particles Awb, the total number of internal yeast Anb, the fungal spore proportion Azj, the bacteria proportion Axj and the mold proportion Amj extracted from the third data set;
[0130] ;
[0131] In the formula, is the air volume of the sub-area in the refrigerator.
[0132] In this embodiment, by calculating the biological contamination coefficient Swz, the system can evaluate the biological contamination situation inside each sub-area in real time. By reducing the possibility of biological contamination, the system can reduce the maintenance cost and early damage risk of refrigerator equipment and extend the service life of the equipment. Effective management of biological contamination not only helps maintain the safety and freshness of refrigerated food, but also maintains the high quality and nutritional value of food, meeting consumers' demand for food quality and safety.
[0133] Example 6: Please refer to Figure 1 ,Specifically, the comprehensive evaluation unit includes a fitting module and a total evaluation module;
[0134] The fitting module is used to generate a comprehensive cycle index Zhz by fitting the flow barrier index Ldx, the first frost index Jsz, the second switch door loss index Ksh and the biological contamination coefficient Swz through the following formula:
[0135] ;
[0136] Where d1, d2, d3 and w4 represent the weight values of the flow barrier index Ldx, the first frost index Jsz, the second switch gate loss index Ksh and the biological contamination coefficient Swz of each sub-area, respectively, and , , , , the specific value is set by the user; ;
[0137] The overall assessment module is used to compare the comprehensive cycle index Zhz with the first threshold value to obtain a first judgment result, including: when the comprehensive cycle index Zhz ≥ the first threshold value, it indicates that the refrigeration efficiency of the refrigerator area is at risk, and a first hierarchical assessment instruction is generated;
[0138] When the comprehensive cycle index Zhz is less than the first threshold, it indicates that the refrigeration efficiency of the freezer area is risk-free and continuous monitoring is performed.
[0139] In this embodiment, the fitting module generates a comprehensive circulation index Zhz by combining the flow barrier index Ldx, the first frost index Jsz, the second switch door loss index Ksh and the biological contamination coefficient Swz according to the set weights. These weights can be adjusted according to the actual situation and user needs to ensure that the evaluation results are more in line with the actual situation. The overall evaluation module is responsible for comparing the comprehensive circulation index Zhz with the preset first threshold. Based on the comparison results, the system generates a corresponding first graded evaluation instruction to indicate the refrigeration efficiency risk of the current refrigerator area.
[0140] Example 7: Please refer to Figure 1 , specifically, the hierarchical control unit includes a first control module, a second control module and a third control module;
[0141] The first control module is used to evaluate the first frost index Js of each sub-area after receiving the graded evaluation instruction, and obtain a first evaluation result, including: when the first frost index Js ≥ the first risk threshold, it indicates that there is a risk of frost in the sub-area, and generate a first control strategy, including: regularly cleaning the frost layer in the sub-area 1-3 times a week or starting the defrost equipment for cleaning, using desiccant or dehumidification equipment, reducing the relative humidity of the sub-area by 20-50%, and checking and repairing the refrigerator sealing strip; this timely frost management strategy helps to prevent energy loss and reduced refrigerator operating efficiency during the frosting process, thereby improving the refrigeration effect and energy saving level.
[0142] When the first frost index Js is less than the first risk threshold, it means that there is no risk of frost in the sub-area and monitoring is continued;
[0143] The second control module is used to evaluate the second door opening and closing loss Ksh of each sub-area after receiving the graded evaluation instruction, and obtain the second evaluation result, including: when the second door opening and closing loss Ksh ≥ the second risk threshold, it indicates that the door opening loss of the sub-area is abnormal, and a second control strategy is generated, including: optimizing the process of picking and placing items, reducing 10-30% of unnecessary door opening operations; installing door magnetic switches and alarm systems to prompt users to reduce the door opening time of the refrigerator by 30-50%, record and analyze the door opening and closing data, and find and improve the reasons for high-frequency door opening; by reducing high-frequency door opening operations and optimizing door opening time, the system effectively reduces temperature fluctuations and energy losses inside the refrigerator, and improves energy efficiency and refrigeration effects.
[0144] When the second door opening and closing loss Ksh is less than the second risk threshold, it means that the door opening loss in the sub-area is normal and monitoring is continued;
[0145] The third control module is used to evaluate the biological contamination coefficient Swz of each sub-area after receiving the graded assessment instruction, and obtain a second assessment result, including: when the biological contamination coefficient Swz ≥ the third risk threshold, it indicates that the biological contamination of the sub-area is abnormal, and a third control strategy is generated, including: regularly cleaning the biological contamination sources in the sub-area with detergents and disinfectants 1-3 times a week, using desiccants or dehumidification equipment to reduce the relative humidity of the sub-area by 10-20%, and optimizing the parameters of the air circulation equipment by 10%; this management strategy helps to reduce the risk of food contamination, ensure food safety, and extend the shelf life of food.
[0146] When the biological contamination coefficient Swz is less than the third risk threshold, it means that there is no abnormality in biological contamination in the sub-area and monitoring should be continued.
[0147] In this embodiment, the hierarchical control unit effectively improves the management efficiency, energy efficiency management level and food safety assurance capability of the refrigerator intelligent control system through hierarchical precise evaluation and targeted control strategies.
[0148] Example 8: Please refer to Figure 1 Specifically, it also includes an item control unit, which is used to generate item rearrangement suggestions when receiving the first warning instruction, including: using partitions or shelves to separate items, and using distance measuring sensors to prompt that the minimum distance between items is maintained at 3-5CM.
[0149] In this embodiment, the item control unit can receive and respond to information from the first warning instruction. These warning instructions are usually based on abnormal conditions of the flow barrier index Ldx, indicating that the density of items placed in the sub-area is too high, which may affect the refrigeration efficiency of the refrigerator. When receiving the warning instruction, the item control unit will generate suggestions for re-arranging items. These suggestions include using partition walls or shelves to separate items and ensuring that the minimum distance between items is 3-5 cm.
[0150] By optimizing the spatial layout of items, the system can reduce heat exchange and air flow resistance between items, thereby improving the air circulation efficiency and refrigeration effect inside the refrigerator.
[0151] The threshold is set to facilitate comparison. The size of the threshold depends on the amount of sample data and the number of bases set by technicians in this field for each group of sample data; as long as it does not affect the proportional relationship between the parameter and the quantized value.
[0152] The above formulas are obtained by collecting a large amount of data for software simulation and selecting a formula that is close to the actual value. The coefficients in the formula are set by technical personnel in this field according to actual conditions. The above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited to this. Any technical personnel familiar with the technical field within the technical scope disclosed by the present invention, according to the technical solution and the inventive concept of the present invention, make equivalent replacement or change, which should be covered within the protection scope of the present invention.
Claims
1. A rapid energy-saving intelligent control system for refrigerators, characterized in that: include, An area division unit is used to divide the interior of the refrigerator into multiple sub-areas, and to set monitoring points inside and outside each sub-area, and to install a temperature control cooler inside the sub-area; The first analysis unit is used to collect the quantity, volume and distribution information of the articles stored in each sub-area, establish a first data set, and construct a flow barrier index Ldx according to the preprocessed first data set. When the flow barrier index Ldx exceeds a preset load threshold, a first warning instruction is sent to the outside; The first analysis unit includes a first acquisition module, a first calculation module and a first evaluation module; The first acquisition module is used to install a scanner at the internal monitoring point of each sub-area to take real-time photos to obtain internal images, and after image correction, denoising and image enhancement processing of the internal images, use a depth sensor to obtain the three-dimensional contour and spacing information of the objects, and obtain the total number of objects N, the spacing D between the objects and adjacent objects, the surface area A of the objects and the volume V of the objects through an image recognition algorithm and extraction of the number, area and volume features of the objects in the internal images; The total number of items N, the distance D between items and adjacent items, the surface area A of items and the volume V of items in each sub-area are collected, and after dimensionless processing, the flow barrier index Ldx is calculated by the following formula: ; Where i=1, 2, 3, ..., N, N represents the total number of items in the sub-area, represents the distance between the i-th item and its adjacent items, represents the volume of the i-th item, represents the surface area of the ith object, represents the total volume of the sub-region; Indicates the number density of items, bz indicates the minimum average item spacing threshold that the sub-area is preset to bear, Represents the inverse of the average item spacing between items, Represents the volume density of the item. Indicates the surface area density of an object; w1, w2, w3 and w4 represent weight values, and , , , , the specific value is set by the user; ; The first evaluation module is used to perform a preliminary evaluation on the flow barrier index Ldx to obtain a first evaluation result, including: When the flow barrier index Ldx>preset load threshold, it indicates that the load of items in the sub-area is abnormal and the density of items is too high, thereby affecting the refrigeration efficiency of the refrigerator and triggering the first warning instruction, indicating a load exceeding standard warning; When the flow barrier index Ldx ≤ the preset load threshold, it means that the load of items in the sub-area is normal and monitoring is continued; The second analysis unit is used to collect and obtain the frost conditions of the sub-areas, record the opening and closing frequency and time of the refrigerator doors in each sub-area, collect the external heat and the lost cooling capacity, establish a second data set, and construct a first frost index Jsz and a second opening and closing door loss index Ksh based on the pre-processed second data set; The third analysis unit is used to collect biological contamination data of each sub-area of the refrigerator, establish a third data set, and construct a biological contamination coefficient Swz based on the pre-processed third data set; The comprehensive evaluation unit fits the flow barrier index Ldx, the first frost index Jsz, the second switch door loss index Ksh and the biological pollution coefficient Swz to obtain the comprehensive circulation index Zhz. When the comprehensive circulation index Zhz exceeds the first threshold, the hierarchical evaluation instruction is triggered; The hierarchical control unit is used to evaluate the first frost index Jsz, the second switch door loss index Ksh and the biological contamination coefficient Swz of each sub-area after receiving the hierarchical evaluation instruction, obtain the corresponding evaluation results, and generate the control instruction according to the corresponding evaluation results.
2. According to claim 1, a refrigerator rapid energy-saving intelligent control system is characterized in that: The area division unit includes an isolation module and a temperature control module; The isolation module is used to separate the sub-areas using vacuum insulation panels; The temperature control module is used to install an independent temperature controller in each sub-area, and to install a defrosting device in each sub-area, including an electric heating wire and a hot air circulation device.
3. According to claim 1, a refrigerator rapid energy-saving intelligent control system is characterized by: The second analysis unit includes a second acquisition module and a second processing module; The second acquisition module is used to acquire the frost condition of the sub-area, record the opening and closing frequency and time of the refrigerator door in each sub-area, acquire the external heat and the lost cooling capacity, and establish the second data set. The second data set includes: internal temperature value nbT, external temperature value wbT, internal humidity ndH, external humidity wbH, cooling time Tc, frost thickness Df, operation cycle Rc, door opening times Fdo, door opening and closing time duration Tdo, external heat input value Qin and cooling capacity loss value Qloss; The second processing module is used to preprocess the second data set, and the preprocessing includes: data cleaning, removal of outliers, data standardization, feature extraction and data set division.
4. According to claim 1, a refrigerator rapid energy-saving intelligent control system is characterized in that: The second analysis unit also includes a frosting calculation module and a loss calculation module; The frosting calculation module is used to calculate the first frosting index Jsz according to the following steps; S11. First calculate the amount of water vapor that enters the refrigerator area each time the door is opened. : ; In the formula, is the relative humidity converted to a decimal, is the air density in the refrigerator, is the air volume of the sub-area in the refrigerator; S12. Calculate the amount of condensed water : ; In the formula, represents the temperature difference between inside and outside of the sub-area; S13. Calculate the accumulated frost amount : ; Where Fdo is the number of door openings, and Tdo is the duration of each door opening; S14. Calculate the first frost index Jsz: ; In the formula, and is the weight value; and , , the specific value is set by the user; .
5. The intelligent control system for rapid energy saving of refrigerators according to claim 4 is characterized in that: The loss calculation module is used to calculate the second switch gate loss Ksh according to the following steps; S21. First, calculate the heat transfer coefficient U of the refrigerator door and the internal convection thermal resistance of the sub-area : ; Where d represents the thickness of the freezer door material, k represents the thermal conductivity of the freezer door material, represents the thickness of the i-th layer of refrigerator material, m represents the total number of refrigerator material layers, represents the thermal conductivity of the material of the i-th layer of the refrigerator, Represents the external convection thermal resistance, which is 0.04m²K / W; S22. According to the heat transfer coefficient U of the refrigerator door, the second door opening and closing loss Ksh is calculated by the following formula: ; ; ; In the formula, Qin represents the external heat output value, Qloss represents the cooling capacity loss value, U represents the heat transfer coefficient of the refrigerator door, and B represents the area of the refrigerator door. represents the temperature difference between the inside and outside of the sub-area, Tdo is the time when the refrigerator door is opened, is the air volume of the sub-area in the refrigerator; Cp is the specific heat capacity of the air, and Rc represents the operating cycle of the sub-area.
6. The intelligent control system for rapid energy saving of refrigerators according to claim 1, characterized in that: The third analysis unit includes a third acquisition module and a third calculation module; The third collection module is used to collect biological contamination data of each sub-area of the refrigerator to establish a third data set; The third data set includes external microbial particles Awb, internal yeast total number Anb, fungal spore proportion Azj, bacteria proportion Axj and mold proportion Amj; The third calculation module is used to construct the biological pollution coefficient Swz after dimensionless processing based on the external microbial particles Awb, the total number of internal yeast Anb, the fungal spore proportion Azj, the bacteria proportion Axj and the mold proportion Amj extracted from the third data set; ; In the formula, is the air volume of the sub-area in the refrigerator.
7. The intelligent control system for rapid energy saving of refrigerators according to claim 1, characterized in that: The comprehensive evaluation unit includes a fitting module and a total evaluation module; The fitting module is used to generate a comprehensive cycle index Zhz by fitting the flow barrier index Ldx, the first frost index Jsz, the second switch door loss index Ksh and the biological contamination coefficient Swz through the following formula: ; Where d1, d2, d3 and w4 represent the weight values of the flow barrier index Ldx, the first frost index Jsz, the second switch gate loss index Ksh and the biological contamination coefficient Swz of each sub-area, respectively, and , , , , the specific value is set by the user; ; The overall assessment module is used to compare the comprehensive cycle index Zhz with the first threshold value to obtain a first judgment result, including: when the comprehensive cycle index Zhz ≥ the first threshold value, it indicates that the refrigeration efficiency of the refrigerator area is at risk, and a first hierarchical assessment instruction is generated; When the comprehensive cycle index Zhz is less than the first threshold, it indicates that the refrigeration efficiency of the freezer area is risk-free and continuous monitoring is performed.
8. The intelligent control system for rapid energy saving of refrigerators according to claim 7, characterized in that: The hierarchical control unit includes a first control module, a second control module and a third control module; The first control module is used to evaluate the first frost index Js of each sub-area after receiving the graded evaluation instruction, and obtain a first evaluation result, including: when the first frost index Js ≥ the first risk threshold, it indicates that there is a risk of frost in the sub-area, and generate a first control strategy, including: regularly cleaning the frost layer in the sub-area 1-3 times a week or starting the defrosting equipment for cleaning, using a desiccant or a dehumidifying device to reduce the relative humidity of the sub-area by 20-50%, and checking and repairing the refrigerator sealing strip; When the first frost index Js is less than the first risk threshold, it means that there is no risk of frost in the sub-area and monitoring is continued; The second control module is used to evaluate the second door opening and closing loss Ksh of each sub-area after receiving the graded evaluation instruction, and obtain the second evaluation result, including: when the second door opening and closing loss Ksh ≥ the second risk threshold, it indicates that the door opening loss of the sub-area is abnormal, and a second control strategy is generated, including: optimizing the process of picking up and placing items, reducing 10-30% unnecessary door opening operations; installing a door magnetic switch and an alarm system, prompting the user to reduce the door opening and staying time of the refrigerator by 30-50%, recording and analyzing the door opening and closing data, and finding and improving the reasons for high-frequency door opening; When the second door opening and closing loss Ksh is less than the second risk threshold, it means that the door opening loss in the sub-area is normal and monitoring is continued; The third control module is used to evaluate the biological contamination coefficient Swz of each sub-area after receiving the graded evaluation instruction, and obtain a second evaluation result, including: when the biological contamination coefficient Swz ≥ the third risk threshold, it indicates that the biological contamination of the sub-area is abnormal, and a third control strategy is generated, including: regularly cleaning the biological contamination source in the sub-area with detergents and disinfectants 1-3 times a week, using desiccants or dehumidification equipment to reduce the relative humidity of the sub-area by 10-20%, and optimizing the parameters of the air circulation equipment by 10%; When the biological contamination coefficient Swz is less than the third risk threshold, it means that there is no abnormality in biological contamination in the sub-area and monitoring should be continued.
9. The intelligent control system for rapid energy saving of refrigerators according to claim 8, characterized in that: It also includes an item control unit, which is used to generate item rearrangement suggestions when receiving the first warning instruction, including: using partitions or shelves to separate items, and using distance measuring sensors to prompt that the minimum distance between items is maintained at 3-5CM.
Citation Information
Cited By
Intelligent energy-saving cabinet based on silicon controlled rectifier voltage regulation and harmonic suppression
CN121076798A
Quick-frozen corn kernel grading regulation and control method and system based on grain state perception
CN122605721A
