An intelligent optimization method for simulation of water-wind-solar-storage multi-energy complementary operation based on heuristic feasible solution strategy
Through an improved artificial bee colony algorithm based on a heuristic feasible solution strategy, combined with the heuristic feasible solution strategy of cascade hydropower stations and pumped storage power stations, the problem of insufficient simulation accuracy and versatility of hydro, wind, photovoltaic and storage multi-energy complementary power generation systems is solved and achieved Efficient energy balance and operation optimization.
Patent Information
- Application Number
- CN202411008045.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-07-26
AI Technical Summary
The existing operation simulation technology of hydro-wind-solar multi-energy complementary power generation system has the problems of dimensionality disaster, low simulation accuracy and insufficient versatility, and cannot effectively guide the actual engineering.
An improved artificial bee colony algorithm based on a heuristic feasible solution strategy is used to construct a simulation optimization model for hydro, wind, solar and storage multi-energy complementary operations, and combine the heuristic feasible solution strategies of cascade hydropower stations and pumped storage power stations to carry out real number encoding and feasible region derivation. , ensure that the decision variables are within the feasible range and improve the versatility and accuracy of the simulation.
A hydro-wind-solar-storage multi-energy complementary operation model that efficiently solves complex constraints is realized, which improves the versatility and practicality of the simulation, provides strong technical support for clean energy bases, and improves the operating efficiency and energy balance of the system.
Smart Images

Figure CN118539520B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of energy base dispatching, and specifically relates to an intelligent optimization method for simulating the complementary operation of water, wind, solar and storage multi-energy based on a heuristic feasible solution strategy. Background Art
[0002] Under the general trend of energy transformation and development, the contribution of renewable energy power generation has continued to rise. According to relevant research, when the penetration rate of intermittent renewable energy exceeds about 25%, it will have an adverse impact on the safe and stable operation of the power system. Therefore, to build a new power system with new energy as the main body, on the one hand, vigorously promote the construction of wind power and photovoltaics, and on the other hand, focus on the construction of clean and renewable flexible power sources such as hydropower and pumped storage, and create a clean energy base that complements water, wind, light and storage to achieve the synergy of water, wind, light and storage.
[0003] The types of power sources in the cascade water, wind, solar and storage clean energy bases in the basin are diverse, and the joint operation conditions are complex. The base is required to meet the needs of the receiving power system as a whole, and it is also necessary to solve the problems of new energy consumption and resource optimization allocation by implementing water storage joint compensation optimization operation. Therefore, it is an extremely urgent engineering application demand to propose an operation simulation method of water, wind, solar and storage multi-energy complementary power generation system with universality, universality, advancement and high efficiency to effectively serve the planning, design and production scheduling of clean energy bases. The existing operation simulation technical means of water, wind, solar and storage multi-energy complementary power generation system either use typical days or weeks as simulation cycles to reduce the number of simulation time periods and shorten the simulation cycle to solve the "dimensionality curse" problem faced by the optimization model solution of this problem to a certain extent, but the cost is to reduce the simulation accuracy to a certain extent, and the engineering practicality is reduced; or the heuristic judgment rules of artificial experience and other technical means are used to arrange the operation modes of various power sources according to empirical formulas or artificial rules in each period, but this method is not universal, and there are also problems such as low simulation accuracy and inability to effectively guide engineering practice. Summary of the invention
[0004] In view of the defects of the prior art, the present invention provides an intelligent optimization method for simulating the complementary operation of water, wind, solar and storage multi-energy based on a heuristic feasible solution strategy, which can effectively solve the above problems.
[0005] The technical solution adopted by the present invention is as follows:
[0006] The present invention provides a method for simulating intelligent optimization of water-wind-solar-storage multi-energy complementary operation based on a heuristic feasible solution strategy, comprising the following steps:
[0007] Step S1, based on the composition of the power generation equipment of the hydro-wind-solar-storage clean energy base, set the basic data required for the hydro-wind-solar-storage multi-energy complementary operation simulation;
[0008] Step S2, constructing a simulation optimization model for the operation of water, wind, solar and storage multi-energy complementary according to the basic data required for the simulation of the operation of water, wind, solar and storage multi-energy complementary; the simulation optimization model for the operation of water, wind, solar and storage multi-energy complementary includes an objective function F and constraint conditions;
[0009] Step S3, the decision variable X of the water-wind-solar-storage multi-energy complementary operation simulation optimization model includes the operating water level of each cascade hydropower station in the cascade hydropower station group in each time period t during the operation simulation period, and the output of each pumped storage power station in the pumped storage power station group in each time period t during the operation simulation period; the decision variable X is encoded in real number form to obtain the decision variable X in the encoded form shown in formula (1):
[0010] (1)
[0011] in: [ WL 1 1 , WL 2 1 , ⋅⋅⋅ , WL t 1 , ⋅⋅⋅ , WL T 1 ] is the operating water level of the first-level cascade hydropower station at each time period t during the operation simulation period; [ WL 1 n hp , WL 2 n hp , ⋅⋅⋅ , WL t n hp , ⋅⋅⋅ , WL T n hp ] For nth hp The operating water level of the cascade hydropower stations in each time period t during the operation simulation period; the operating water level of the cascade hydropower stations from the first stage to the nth stage hp Cascade hydropower stations are cascade hydropower stations arranged in sequence from upstream to downstream; [ P ps , 1 1 , P ps , 2 1 , ⋅⋅⋅ , P ps , t 1 , ⋅⋅⋅ , P ps , T 1 ] is the output of the first pumped storage power station at each time period t during the operation simulation period; [ P ps , 1 n ps , P ps , 2 n ps , ⋅⋅⋅ , P ps , t n ps , ⋅⋅⋅ , P ps , T n ps ] For nth ps The output of a pumped storage power station in each time period t during the operation simulation period;
[0012] T is the total number of time periods in the operation simulation period; therefore, the operation simulation period is divided into T time periods, each of which is represented by time period t, t=1,2,…,T; n hp 、n ps They are the total number of cascade hydropower stations and the total number of pumped storage power stations; For nth hp The operating water level of the cascade hydropower station at the end of period t; For nth ps The output of a pumped-storage power station in time period t, including power generation output and pumping output;
[0013] Step S4, setting a heuristic feasible solution strategy, including a heuristic feasible solution strategy for the operating water level of cascade hydropower stations and a feasible solution strategy for the output during the pumped storage period;
[0014] Step S5, using an improved artificial bee colony algorithm based on a heuristic feasible solution strategy to solve the water-wind-solar-storage multi-energy complementary operation simulation optimization model to obtain the optimal solution of the decision variable X, which is the final optimal operation plan for the cascade hydropower station and pumped-storage power station.
[0015] Preferably, in step S1, the basic data required for the water-wind-solar-storage multi-energy complementary operation simulation include the power transmission load process in each time period during the operation simulation period, the monthly or ten-day runoff process of the cascade hydropower station, the water level storage capacity curve of the cascade hydropower station, the head expected output curve of the cascade hydropower station, the downstream water level relationship curve of the outflow flow of the cascade hydropower station, the characteristic parameters of the pumped-storage power station, the designed output process of the wind power station in each time period during the operation simulation period, and the designed output process of the photovoltaic power station in each time period during the operation simulation period; wherein, the characteristic parameters of the pumped-storage power station include the installed capacity of the pumped-storage power station, the continuous full-power utilization hours of the pumped-storage power station, the energy conversion efficiency of the pumped-storage power station, and the power generation and pumping operation characteristic data of the pumped-storage unit.
[0016] Preferably, in step S2, the objective function F is expressed as:
[0017] (2)
[0018] Where: n sol 、n wd They represent the total number of photovoltaic power stations and wind power stations in the water, wind, solar and storage clean energy bases respectively; , , , , respectively represent the power generation output of the i-th cascade hydropower station in time period t, the power generation output of the j-th pumped-storage power station in time period t, the power generation output of the k-th photovoltaic power station in time period t, and the power generation output of the l-th wind power station in time period t; Δt represents the length of each time period t.
[0019] Preferably, in step S2, the constraints include:
[0020] 1) Water balance constraints of cascade hydropower stations:
[0021] (3)
[0022] in: represents the operating water level of the i-th cascade hydropower station at the end of period t-1; represents the inflow of the i-th cascade hydropower station in time period t; represents the outflow of the i-th cascade hydropower station in time period t; FWV() represents the operation of calculating the storage capacity value by interpolating the water level and storage capacity curve of the cascade hydropower station reservoir through the operating water level value; FVW() represents the operation of calculating the operating water level value by interpolating the water level and storage capacity curve of the cascade hydropower station reservoir through the storage capacity value;
[0023] 2) Time-period operating water level constraints for cascade hydropower stations:
[0024] (4)
[0025] in: represents the operating water level of the i-th cascade hydropower station at the end of period t;
[0026] , , respectively represent the lower and upper limits of the operating water level of the i-th cascade hydropower station in time period t;
[0027] 3) Constraints on the time-interval variation of the operating water level of cascade hydropower stations:
[0028] (5)
[0029] in: It represents the maximum value of the operating water level of the i-th cascade hydropower station allowed to change in the interval between time period t and time period t-1;
[0030] 4) Water level constraints at the beginning and end of the simulated operation period for cascade hydropower stations:
[0031] (6)
[0032] in: It represents the initial operating water level of the i-th cascade hydropower station in period 1, that is, the initial water level in the simulated operation period; It represents the operating water level of the i-th cascade hydropower station at the end of period T, that is, the end water level of the simulated operation period; represents the set control water level of the i-th cascade hydropower station;
[0033] 5) Constraints on outflow from cascade hydropower stations during certain periods of time
[0034] (7)
[0035] in: , , respectively represent the minimum and maximum allowable outflow rate of the i-th cascade hydropower station in time period t; It represents the outflow of the i-th cascade hydropower station used for power generation; It represents the abandoned water flow that cannot be used for power generation in the outflow of the i-th cascade hydropower station;
[0036] 6) Output constraints of cascade hydropower stations during certain periods of time:
[0037] (8)
[0038] in: , , respectively represent the lower and upper limits of the power generation output of the i-th cascade hydropower station in time period t;
[0039] 7) Constraints on generating head of cascade hydropower station generators during the period:
[0040] (9)
[0041] in: represents the generating head of the nth unit of the i-th cascade hydropower station in time period t; , , respectively represent the lower and upper limits of the generating head of the nth unit of the i-th cascade hydropower station in time period t;
[0042] 8) Wind power station output constraints during the period:
[0043] (10)
[0044] in: , , respectively represent the lower and upper limits of the power output allowed by the lth wind power station in time period t;
[0045] 9) Output constraints of photovoltaic power stations during certain periods of time:
[0046] (11)
[0047] in: , They represent the lower and upper limits of the power output allowed by the k-th photovoltaic power station in time period t respectively;
[0048] 10) Output constraints of pumped storage power stations during certain periods of time:
[0049] (12)
[0050] in: represents the operating condition of the jth pumped storage power station in time period t. When the value is negative, The value is 0, indicating that the operating condition is pumping; When the value is positive, The value is 1, indicating that the operating condition is power generation; , They represent the upper limit absolute value of power generation output and pumping output of the j-th pumped-storage power station in time period t respectively;
[0051] 11) Storage capacity constraints of pumped storage power stations:
[0052] (13)
[0053] in: represents the storage capacity of the jth pumped storage power station in time period t; represents the installed capacity of the jth pumped storage power station; represents the continuous full-power utilization hours of the jth pumped-storage power station;
[0054] 12) Constraints on energy balance of pumped storage power stations:
[0055] (14)
[0056] in: represents the storage capacity of the jth pumped storage power station in time period t-1; represents the energy conversion efficiency of the jth pumped storage power station;
[0057] 13) Storage capacity constraints of pumped storage power station at the beginning and end of the simulated operation period:
[0058] (15)
[0059] in: represents the initial storage capacity of the jth pumped storage power station during the simulated operation period; represents the storage capacity of the jth pumped storage power station at the end of the simulated operation period; It is the initial energy storage coefficient. When its value is 1, it means that the energy storage of the pumped-storage power station is full at the beginning and end of the simulated operation period. When its value is 0, it means that the energy storage of the pumped-storage power station is empty at the beginning and end of the simulated operation period.
[0060] Preferably, in step S4, the heuristic feasible solution strategy for the operating water level of the cascade hydropower station is:
[0061] Step S41, forward deducing the feasible region of the operating water level of the cascade hydropower station, includes:
[0062] For the i-th cascade hydropower station, the initial water level during the simulated operation period is To set the control water level , is a known value; according to the known water level value of the previous period and the constraints of the feasible domain of the water level in this period, the upper and lower limits of the value of the operating water level coding feasible conditions of the i-th cascade hydropower station in period 1 to period T are forward derived in the sequential order from period 1 to period T;
[0063] For the simulated operation period t, the operating water level of the i-th cascade hydropower station in period t-1 is It has been corrected by the feasible solution strategy operation and is a known value. Therefore, the process of forward deducing the feasible domain of the operating water level of the i-th cascade hydropower station in time period t includes:
[0064] The expression of the feasible domain derived forward from the time-interval variation constraint of the operating water level of the cascade hydropower station is:
[0065] (16)
[0066] The expression of the feasible domain derived forward from the outflow constraints of the cascade hydropower stations during the period is:
[0067] (17)
[0068] represents the inflow of the i-th cascade hydropower station in time period t-1; , , respectively represent the minimum and maximum allowable outflow rate of the i-th cascade hydropower station in time period t-1;
[0069] The expression of the feasible region derived forward from the output constraints of cascade hydropower stations during each period is:
[0070] (18)
[0071] in: , , respectively represent the lower limit and upper limit of the power generation output of the i-th cascade hydropower station in time period t-1; FloopPWQ() represents the operation of iteratively calculating the water level in the previous period of the specified period and the corresponding outflow flow when the cascade hydropower station outputs;
[0072] Step S42, reversely deriving the feasible domain of the operating water level of the cascade hydropower station, includes:
[0073] For the i-th cascade hydropower station, in order to reflect the water balance constraint during the simulated operation period, after the simulation of the operation period is completed, the water level at the end of the simulated operation period is Need to return to the set control water level , then the water level value in the later period and the constraints of the feasible domain of the water level in this period are known, and the upper and lower limits of the value of the operating water level coding feasible conditions of the i-th cascade hydropower station in the period T to the period 1 are reversely derived in reverse order from the period T to the period 1;
[0074] For the simulated operation period t, the operating water level of the i-th cascade hydropower station in period t+1 has been corrected by the feasible solution strategy operation and is a known value. Therefore, the process of reversely deriving the feasible domain of the operating water level of the i-th cascade hydropower station in period t includes:
[0075] The expression of the feasible domain derived by reverse deduction from the time-interval variation constraint of the operating water level of the cascade hydropower station is:
[0076] (19)
[0077] in: represents the operating water level of the i-th cascade hydropower station at the end of time period t+1;
[0078] The expression of the feasible domain derived from the outflow constraints of the cascade hydropower stations is:
[0079] (20)
[0080] The expression of the feasible region derived from the output constraints of the cascade hydropower stations is:
[0081] (twenty one)
[0082] in: , , respectively represent the lower limit and upper limit of the power generation output of the i-th cascade hydropower station in time period t+1; FloopPWQ() represents the operation of iteratively calculating the water level in the later period of the specified period and the corresponding outflow flow when the cascade hydropower station outputs;
[0083] Step S43, merging the feasible domains and deriving the feasible domain of the branch water level of the i-th cascade hydropower station in time period t by taking the envelope, the expression of the operation is:
[0084] (twenty two)
[0085] in: , , , , , , respectively represent the first lower limit, the second lower limit, the third lower limit, the fourth lower limit, the fifth lower limit and the sixth lower limit of the operating water level of the i-th cascade hydropower station in time period t; , , , , , , respectively represent the first upper limit, the second upper limit, the third upper limit, the fourth upper limit, the fifth upper limit and the sixth upper limit of the operating water level of the i-th cascade hydropower station in time period t; , , respectively represent the upper and lower limits of the feasible values of the operating water level coding of the i-th cascade hydropower station in time period t; arrive The range of the final feasible domain of the operating water level of the i-th cascade hydropower station in time period t is formed;
[0086] Step S44, using the feasible domain of the operating water level of the cascade hydropower station to carry out the feasible correction operation of the operating water level includes:
[0087] Carry out the correction strategy step by step from the most upstream cascade hydropower station to the most downstream cascade hydropower station;
[0088] According to the obtained feasible domain of operating water level, the operating water level value of the cascade hydropower station in the time period is corrected: when the operating water level of the time period to be corrected is within the feasible domain of the operating water level, it indicates that the operating water level of the time period to be corrected meets the forward and reverse constraints of the before and after time periods of the water-wind-solar-storage multi-energy complementary operation simulation optimization model, and is a feasible solution, so its value is retained; when the operating water level of the time period to be corrected is greater than the upper limit of the feasible domain of the operating water level or less than the lower limit When the operating water level of the time period to be corrected is corrected, a feasible operating water level is randomly generated according to the feasible domain of the operating water level to replace the operating water level of the time period to be corrected, so as to ensure that the corrected solution is feasible.
[0089] Preferably, The specific operation process is:
[0090] Set the maximum number of iterations , set the initial value of the outflow flow of the i-th cascade hydropower station in time period t-1 during the iterative trial calculation for:
[0091] (twenty three)
[0092] The number of iterations Starting from 0, the expression for iterative calculation of the outflow flow of a specified cascade hydropower station is:
[0093] (twenty four)
[0094] in: Indicates that the At the iteration, the generating head of the i-th cascade hydropower station in time period t-1; represents the comprehensive power generation efficiency of the i-th cascade hydropower station; Indicates that the In the first iteration, the power generation output of the i-th cascade hydropower station in time period t-1; For the In the first iteration, the deviation between the power generation output of the i-th cascade hydropower station in time period t-1 and the upper limit of power generation output; Indicates In the first iteration, the outflow of the i-th cascade hydropower station in time period t-1 is output as +1 input at iteration; is the given value of deviation; It indicates the operation of calculating the downstream water level value of the reservoir by interpolating the downstream water level curve of the reservoir flow through the outflow value; It indicates the operation of calculating the head loss value of the hydropower station by interpolating the reservoir flow head loss curve through the outflow value;
[0095] The specific operation process is:
[0096] Set the maximum number of iterations , set the initial value of the outflow flow of the i-th cascade hydropower station in time period t+1 during the iterative trial calculation for:
[0097] (25)
[0098] The number of iterations Starting from 0, the expression for iterative calculation of the outflow flow of a specified cascade hydropower station is:
[0099] (26)
[0100] in:
[0101] , , respectively represent the minimum and maximum allowable outflow rate of the i-th cascade hydropower station in time period t+1; represents the inflow of the i-th cascade hydropower station in time period t+1; Indicates that the In the first iteration, the outflow of the i-th cascade hydropower station in time period t; Indicates that the In the iteration, the operating water level of the i-th cascade hydropower station in time period t; Indicates that the At the iteration, the generating head of the i-th cascade hydropower station in time period t+1; represents the comprehensive power generation efficiency of the i-th cascade hydropower station; Indicates that the In the first iteration, the power generation output of the i-th cascade hydropower station in time period t+1; represents the upper limit of the power generation output of the i-th cascade hydropower station in time period t+1; is the power generation output of the i-th cascade hydropower station in time period t+1 and the deviation from the upper limit of power generation output; is the given value of deviation; represents the maximum allowable outflow rate of the i-th cascade hydropower station in time period t+1; Indicates that the In the first iteration, the outflow of the i-th cascade hydropower station in time period t+1 is output as +1 input at iteration.
[0102] Preferably, in step S4, the feasible solution strategy for the output during the pumped storage period is:
[0103] Step S45: forward deriving the feasible region of the storage capacity of the pumped storage power station during the period, including:
[0104] For the jth pumped storage power station, the initial storage capacity before the operation simulation starts is For the setting value , then the constraints of the energy storage capacity in the previous period and the feasible domain of energy storage capacity in this period are known, and the upper and lower limits of the energy storage capacity of the j-th pumped storage power station under the feasible conditions of energy storage capacity in period 1 to period T are derived in a forward order from period 1 to period T;
[0105] For the simulated operation period t, the storage capacity of the jth pumped storage power station in period t-1 is It has been corrected by the feasible solution strategy operation and is a known value. Then the expression of the feasible domain operation of the j-th pumped storage power station in the storage capacity of time period t is forward derived as follows:
[0106] (27)
[0107] in: and , respectively represent the lower and upper limits of the initial storage capacity of the jth pumped storage power station before the start of the operation simulation; and , respectively represent the lower and upper limits of the storage capacity of the j-th pumped storage power station in time period t when calculating in the first feasible domain; and , respectively represent the lower and upper limits of the storage capacity of the j-th pumped storage power station in time period t-1 when calculating the first feasible domain;
[0108] Step S46: reversely deriving the feasible region of the storage capacity of the pumped storage power station during the period, including:
[0109] For the j-th pumped storage power station, in order to reflect the annual storage balance constraint, after all the operation simulations are completed, the storage capacity of the j-th pumped storage power station at the end of the period is calculated as follows: Need to return to the set value , then by knowing the storage capacity of the next period and the constraints of the feasible domain of storage capacity in this period, the upper and lower limits of the storage capacity of the j-th pumped storage power station under the feasible conditions of storage capacity from period T to period 1 are reversely derived in reverse order from period T to period 1;
[0110] For the simulated operation period t, the storage capacity of the jth pumped storage power station in period t+1 is It has been corrected by the feasible solution strategy operation and is a known value. Then the expression of the feasible domain operation of the j-th pumped storage power station in the storage capacity of time period t is reversely derived as follows:
[0111] (28)
[0112] in: and , respectively represent the lower and upper limits of the storage capacity of the jth pumped storage power station after the operation simulation is completed; and , respectively represent the lower and upper limits of the storage capacity of the j-th pumped storage power station in time period t when calculating in the second feasible domain; and , respectively represent the lower and upper limits of the storage capacity of the j-th pumped storage power station in time period t+1 when calculating the second feasible domain;
[0113] Step S47: Merge the feasible domains and derive the feasible domain of the storage capacity of the j-th pumped storage power station in time period t by taking the envelope. The expression of the operation is:
[0114] (29)
[0115] in: and , respectively represent the lower and upper limits of the feasible value of the energy storage capacity encoding of the j-th pumped storage power station in time period t, arrive The range of , forms the final feasible region of the storage capacity of the j-th pumped storage power station in time period t;
[0116] Step S48: According to the feasible region of the storage capacity of the pumped-storage power station, the upper and lower limits of the values under the feasible conditions of the power generation / pumping output of the pumped-storage power station in each period are forward derived in the chronological order from period 1 to period T;
[0117] For the simulated operation period t-1, assume that the storage capacity of the jth pumped storage power station in period t-1 is and power generation / pumping output It has been corrected by the feasible solution strategy operation and is a known value. Then, by calculating the energy balance equation of the pumped storage power station, the output feasible domain of the j-th pumped storage power station in time period t can be obtained, which is the power generation output feasible domain or the pumping output feasible domain, and the expression is:
[0118] (30)
[0119] in: , , respectively represent the upper limit of power generation output and pumping output of the j-th pumped storage power station in time period t, and the lower limit is 0; therefore, 0 to The range of 0 to 1 forms the feasible region of power generation output of the j-th pumped storage power station in time period t; The range of the pumping output of the j-th pumped storage power station in time period t is formed;
[0120] Step S49: Using the feasible domain of the pumped-storage power station's pumping / generating output, perform feasible correction operations on the pumped-storage power station's pumping / generating output:
[0121] When the pumping / power generation output of the time period to be corrected is within the feasible range of the output, it indicates that the pumping / power generation output of the time period to be corrected meets the constraints before, after and in the current period of the simulation optimization model for the complementary operation of water, wind, solar and storage multi-energy, and is a feasible pumping / power generation output, so its value is retained; when the pumping / power generation output of the time period to be corrected is greater than the upper limit of the feasible range of the output, the output value is corrected, and a feasible output is randomly generated according to the calculated feasible range of the output to replace the output value to be corrected, so as to ensure that the corrected solution is feasible.
[0122] The intelligent optimization method for simulating the complementary operation of water, wind, solar and storage multi-energy based on a heuristic feasible solution strategy provided by the present invention has the following advantages:
[0123] The present invention proposes an intelligent operation simulation method for a water-wind-solar-storage multi-energy complementary power generation system based on a heuristic feasible solution strategy, which efficiently solves a joint operation optimization model that considers multiple constraints and takes the optimal power generation of the water-wind-solar-storage multi-energy complementary power generation system as the optimization target. The technical means takes into account the versatility, practicality and efficiency of the algorithm solution through the feasible corridor deduction of complex constraints and variable-scale chaotic search, and solves the technical bottlenecks existing in the current technical means. The results can provide strong technical support for the operation simulation of the current typical river basin cascade water-wind-solar-storage multi-energy complementary power generation system. BRIEF DESCRIPTION OF THE DRAWINGS
[0124] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the related technologies, the following briefly introduces the drawings required for use in the embodiments or the related technologies. Obviously, the drawings described below are only some embodiments of the present application, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0125] Figure 1 A flow chart of an intelligent operation simulation method for a water-wind-solar-storage multi-energy complementary power generation system based on a heuristic feasible solution strategy provided by the present invention;
[0126] Figure 2 A schematic diagram of the initial solution generation and correction effect of the hydropower heuristic feasible solution strategy provided by the present invention;
[0127] Figure 3 A schematic diagram of the initial solution generation and correction effect of the feasible solution corridor of the pumped-storage power station output according to the pumped-storage heuristic feasible solution strategy provided by the present invention;
[0128] Figure 4 A schematic diagram of the initial solution generation and correction effect of the feasible solution corridor of the pumped-storage power station storage capacity according to the pumped-storage heuristic feasible solution strategy provided by the present invention;
[0129] Figure 5 A schematic diagram of the simulation of the water-wind-solar-storage multi-energy complementary operation based on the heuristic feasible solution strategy provided by the present invention;
[0130] Figure 6 This is a schematic diagram of the solution effect of the improved artificial bee colony algorithm based on the heuristic feasible solution strategy provided by the present invention. DETAILED DESCRIPTION
[0131] In order to make the technical problems, technical solutions and beneficial effects solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0132] The present invention proposes an intelligent operation simulation method for a water-wind-solar-storage multi-energy complementary power generation system based on a heuristic feasible solution strategy, which efficiently solves a joint operation optimization model that considers multiple constraints and takes the optimal power generation of the water-wind-solar-storage multi-energy complementary power generation system as the optimization target. The technical means takes into account the versatility, practicality and efficiency of the algorithm solution through the feasible corridor deduction of complex constraints and variable-scale chaotic search, and solves the technical bottlenecks existing in the current technical means. The results can provide strong technical support for the operation simulation of the current typical river basin cascade water-wind-solar-storage multi-energy complementary power generation system.
[0133] The present invention provides a method for simulating intelligent optimization of water-wind-solar-storage multi-energy complementary operation based on a heuristic feasible solution strategy, comprising the following steps:
[0134] Step S1, based on the composition of the power generation equipment of the water-wind-solar-storage clean energy base, set the basic data required for the operation simulation of the water-wind-solar-storage multi-energy complementary operation; the basic data required for the operation simulation of the water-wind-solar-storage multi-energy complementary operation include the power transmission load process in each time period during the operation simulation period (for example, the power transmission load process in each time period for 8760 hours in a year), the monthly or ten-day runoff process of the cascade hydropower station in the year, the water level storage capacity curve of the cascade hydropower station, the head expected output curve of the cascade hydropower station, the downstream water level relationship curve of the outflow flow of the cascade hydropower station, the characteristic parameters of the pumped-storage power station, the designed output process of the wind power station in each time period during the operation simulation period, and the designed output process of the photovoltaic power station in each time period during the operation simulation period, for example, the designed output process of wind power and photovoltaic power in each time period for 8760 hours in a year; wherein, the characteristic parameters of the pumped-storage power station include the installed capacity of the pumped-storage power station, the continuous full-power utilization hours of the pumped-storage power station, the energy conversion efficiency of the pumped-storage power station, and the power generation and pumping operation characteristic data of the pumped-storage unit.
[0135] Step S2, according to the basic data required for the water-wind-solar-storage multi-energy complementary operation simulation, and according to the basic data setting, construct a water-wind-solar-storage multi-energy complementary operation simulation optimization model with the goal of maximizing power generation; the water-wind-solar-storage multi-energy complementary operation simulation optimization model includes an objective function F and constraints;
[0136] The objective function F is expressed as:
[0137] (2)
[0138] Where: n sol 、n wd They represent the total number of photovoltaic power stations and wind power stations in the water, wind, solar and storage clean energy bases respectively; , , , , respectively represent the power generation output of the i-th cascade hydropower station in time period t, the power generation output of the j-th pumped-storage power station in time period t, the power generation output of the k-th photovoltaic power station in time period t, and the power generation output of the l-th wind power station in time period t; Δt represents the time period length of each time period t; t represents the time period number of the simulation period.
[0139] The constraints include:
[0140] 1) Water balance constraints of cascade hydropower stations:
[0141] (3)
[0142] in: represents the operating water level of the i-th cascade hydropower station at the end of period t-1; represents the inflow of the i-th cascade hydropower station in time period t; It represents the outflow of the i-th cascade hydropower station in time period t; FWV() represents the operation of calculating the storage capacity value by interpolating the water level and storage capacity curve of the cascade hydropower station reservoir through the operating water level value; FVW() represents the operation of calculating the operating water level value by interpolating the water level and storage capacity curve of the cascade hydropower station reservoir through the storage capacity value; In the present invention, the water volume and water level of the cascade hydropower station refer to the water volume and water level of the cascade hydropower station reservoir.
[0143] 2) Time-period operating water level constraints for cascade hydropower stations:
[0144] (4)
[0145] in: represents the operating water level of the i-th cascade hydropower station at the end of period t; , , respectively represent the lower and upper limits of the operating water level of the i-th cascade hydropower station in time period t;
[0146] 3) Constraints on the time-interval variation of the operating water level of cascade hydropower stations:
[0147] (5)
[0148] in: It represents the maximum value of the operating water level of the i-th cascade hydropower station allowed to change in the interval between time period t and time period t-1;
[0149] 4) Water level constraints at the beginning and end of the simulated operation period for cascade hydropower stations:
[0150] (6)
[0151] in: It represents the initial operating water level of the i-th cascade hydropower station in period 1, that is, the initial water level in the simulated operation period; It represents the operating water level of the i-th cascade hydropower station at the end of period T, that is, the end water level of the simulated operation period; represents the set control water level of the i-th cascade hydropower station;
[0152] 5) Constraints on outflow from cascade hydropower stations during certain periods of time
[0153] (7)
[0154] in: , , respectively represent the minimum and maximum allowable outflow rate of the i-th cascade hydropower station in time period t; It represents the outflow of the i-th cascade hydropower station used for power generation; It represents the abandoned water flow that cannot be used for power generation in the outflow of the i-th cascade hydropower station;
[0155] 6) Output constraints of cascade hydropower stations during certain periods of time:
[0156] (8)
[0157] in: , , respectively represent the lower and upper limits of the power generation output of the i-th cascade hydropower station in time period t;
[0158] 7) Constraints on generating head of cascade hydropower station generators during the period:
[0159] (9)
[0160] in: represents the generating head of the nth unit of the i-th cascade hydropower station in time period t; , , respectively represent the lower and upper limits of the generating head of the nth unit of the i-th cascade hydropower station in time period t;
[0161] 8) Wind power station output constraints during the period:
[0162] (10)
[0163] in: , , respectively represent the lower and upper limits of the power output allowed by the lth wind power station in time period t;
[0164] 9) Output constraints of photovoltaic power stations during certain periods of time:
[0165] (11)
[0166] in: , They represent the lower and upper limits of the power output allowed by the k-th photovoltaic power station in time period t respectively;
[0167] 10) Output constraints of pumped storage power stations during certain periods of time, i.e., pumping / power generation output constraints:
[0168] (12)
[0169] in: represents the operating condition of the jth pumped storage power station in time period t. When the value is negative, The value is 0, indicating that the operating condition is pumping; When the value is positive, The value is 1, indicating that the operating condition is power generation; , They represent the upper limit absolute value of power generation output and pumping output of the j-th pumped-storage power station in time period t respectively;
[0170] 11) Storage capacity constraints of pumped storage power stations:
[0171] (13)
[0172] in: represents the storage capacity of the jth pumped storage power station in time period t; represents the installed capacity of the jth pumped storage power station; represents the continuous full-power utilization hours of the jth pumped-storage power station;
[0173] 12) Constraints on energy balance of pumped storage power stations:
[0174] (14)
[0175] in: represents the storage capacity of the jth pumped storage power station in time period t-1; represents the energy conversion efficiency of the jth pumped storage power station;
[0176] 13) Storage capacity constraints of pumped storage power station at the beginning and end of the simulated operation period:
[0177] (15)
[0178] in: represents the initial storage capacity of the jth pumped storage power station during the simulated operation period; represents the storage capacity of the jth pumped storage power station at the end of the simulated operation period; It is the initial energy storage coefficient. When its value is 1, it means that the energy storage of the pumped-storage power station is full at the beginning and end of the simulated operation period. When its value is 0, it means that the energy storage of the pumped-storage power station is empty at the beginning and end of the simulated operation period.
[0179] Step S3, the decision variable X of the water-wind-solar-storage multi-energy complementary operation simulation optimization model includes the operating water level of each cascade hydropower station in the cascade hydropower station group in each time period t during the operation simulation period, and the output of each pumped storage power station in the pumped storage power station group in each time period t during the operation simulation period; the decision variable X is encoded in real number form to obtain the decision variable X in the encoded form shown in formula (1):
[0180] (1)
[0181] in: [ WL 1 1 , WL 2 1 , ⋅⋅⋅ , WL t 1 , ⋅⋅⋅ , WL T 1 ] is the operating water level of the first-level cascade hydropower station at each time period t during the operation simulation period; [ WL 1 n hp , WL 2 n hp , ⋅⋅⋅ , WL t n hp , ⋅⋅⋅ , WL T n hp ] For nth hp The operating water level of the cascade hydropower stations in each time period t during the operation simulation period; the operating water level of the cascade hydropower stations from the first stage to the nth stage hp Cascade hydropower stations are cascade hydropower stations arranged in sequence from upstream to downstream; [ P ps , 1 1 , P ps , 2 1 , ⋅⋅⋅ , P ps , t 1 , ⋅⋅⋅ , P ps , T 1 ] is the output of the first pumped storage power station at each time period t during the operation simulation period; [ P ps , 1 n ps , P ps , 2 n ps , ⋅⋅⋅ , P ps , t n ps , ⋅⋅⋅ , P ps , T n ps ] For nth ps The output of a pumped storage power station in each time period t during the operation simulation period;
[0182] T is the total number of time periods in the operation simulation period; therefore, the operation simulation period is divided into T time periods, each of which is represented by time period t, t=1,2,…,T; n hp 、n ps They are the total number of cascade hydropower stations and the total number of pumped storage power stations; For nth hp The operating water level of the cascade hydropower station at the end of period t; For nth ps The output of a pumped-storage power station in time period t, including power generation output and pumping output;
[0183] For example, the possible solutions of the water-wind-solar-storage multi-energy complementary operation simulation optimization model can be encoded in real numbers by combining the operating water level process of the cascade hydropower station reservoirs during the 8760-hour period of the year and the power generation / pumping output process of the pumped-storage power station during the 8760-hour period of the year.
[0184] Step S4, setting a heuristic feasible solution strategy, including a heuristic feasible solution strategy for the operating water level of cascade hydropower stations and a feasible solution strategy for the output during the pumped storage period;
[0185] The heuristic feasible solution strategy for the operating water level of cascade hydropower stations is:
[0186] Step S41, forward deducing the feasible region of the operating water level of the cascade hydropower station, includes:
[0187] For the i-th cascade hydropower station, the initial water level during the simulated operation period is To set the control water level , is a known value; according to the known water level value of the previous period and the constraints of the feasible domain of the water level in this period, the upper and lower limits of the value of the operating water level coding feasible conditions of the i-th cascade hydropower station in period 1 to period T are forward derived in the sequential order from period 1 to period T;
[0188] For the simulated operation period t, the operating water level of the i-th cascade hydropower station in period t-1 is It has been corrected by the feasible solution strategy operation and is a known value. Therefore, the process of forward deducing the feasible domain of the operating water level of the i-th cascade hydropower station in time period t includes:
[0189] The expression of the feasible domain derived forward from the time-interval variation constraint of the operating water level of the cascade hydropower station is:
[0190] (16)
[0191] The expression of the feasible domain derived forward from the outflow constraints of the cascade hydropower stations during the period is:
[0192] (17)
[0193] represents the inflow of the i-th cascade hydropower station in time period t-1; , , respectively represent the minimum and maximum allowable outflow rate of the i-th cascade hydropower station in time period t-1;
[0194] The expression of the feasible region derived forward from the output constraints of cascade hydropower stations during each period is:
[0195] (18)
[0196] in: , , respectively represent the lower limit and upper limit of the power generation output of the i-th cascade hydropower station in time period t-1; FloopPWQ() represents the operation of iteratively calculating the water level in the previous period of the specified period and the corresponding outflow flow when the cascade hydropower station outputs. The specific process is as follows:
[0197] Set the maximum number of iterations , set the initial value of the outflow flow of the i-th cascade hydropower station in time period t-1 during the iterative trial calculation for:
[0198] (twenty three)
[0199] The number of iterations Starting from 0, the expression for iterative calculation of the outflow flow of a specified cascade hydropower station is:
[0200] (twenty four)
[0201] in: Indicates that the At the iteration, the generating head of the i-th cascade hydropower station in time period t-1; represents the comprehensive power generation efficiency of the i-th cascade hydropower station; Indicates that the In the first iteration, the power generation output of the i-th cascade hydropower station in time period t-1; For the In the first iteration, the deviation between the power generation output of the i-th cascade hydropower station in time period t-1 and the upper limit of power generation output; Indicates In the first iteration, the outflow of the i-th cascade hydropower station in time period t-1 is output as +1 input at iteration; is the given value of deviation; It indicates the operation of calculating the downstream water level value of the reservoir by interpolating the downstream water level curve of the reservoir flow through the outflow value; It indicates the operation of calculating the head loss value of the hydropower station by interpolating the reservoir flow head loss curve through the outflow value;
[0202] Step S42, reversely deriving the feasible domain of the operating water level of the cascade hydropower station, includes:
[0203] For the i-th cascade hydropower station, in order to reflect the water balance constraint during the simulated operation period, after the simulation of the operation period is completed, the water level at the end of the simulated operation period is Need to return to the set control water level , then the water level value in the later period and the constraints of the feasible domain of the water level in this period are known, and the upper and lower limits of the value of the operating water level coding feasible conditions of the i-th cascade hydropower station in the period T to the period 1 are reversely derived in reverse order from the period T to the period 1;
[0204] For the simulated operation period t, the operating water level of the i-th cascade hydropower station in period t+1 has been corrected by the feasible solution strategy operation and is a known value. Therefore, the process of reversely deriving the feasible domain of the operating water level of the i-th cascade hydropower station in period t includes:
[0205] The expression of the feasible domain derived by reverse deduction from the time-interval variation constraint of the operating water level of the cascade hydropower station is:
[0206] (19)
[0207] in: represents the operating water level of the i-th cascade hydropower station at the end of time period t+1;
[0208] The expression of the feasible domain derived from the outflow constraints of the cascade hydropower stations is:
[0209] (20)
[0210] The expression of the feasible region derived from the output constraints of the cascade hydropower stations is:
[0211] (twenty one)
[0212] in: , , respectively represent the lower limit and upper limit of the power generation output of the i-th cascade hydropower station in time period t+1; FloopPWQ() represents the operation of iteratively calculating the water level in the later period of the specified period and the corresponding outflow flow when the cascade hydropower station outputs;
[0213] The specific operation process is:
[0214] Set the maximum number of iterations , set the initial value of the outflow flow of the i-th cascade hydropower station in time period t+1 during the iterative trial calculation for:
[0215] (25)
[0216] The number of iterations Starting from 0, the expression for iterative calculation of the outflow flow of a specified cascade hydropower station is:
[0217] (26)
[0218] in:
[0219] , , respectively represent the minimum and maximum allowable outflow rate of the i-th cascade hydropower station in time period t+1; represents the inflow of the i-th cascade hydropower station in time period t+1; Indicates that the In the first iteration, the outflow of the i-th cascade hydropower station in time period t; Indicates that the In the iteration, the operating water level of the i-th cascade hydropower station in time period t; Indicates that the At the iteration, the generating head of the i-th cascade hydropower station in time period t+1; represents the comprehensive power generation efficiency of the i-th cascade hydropower station; Indicates that the In the first iteration, the power generation output of the i-th cascade hydropower station in time period t+1; represents the upper limit of the power generation output of the i-th cascade hydropower station in time period t+1; is the power generation output of the i-th cascade hydropower station in time period t+1 and the deviation from the upper limit of power generation output; is the given value of deviation; represents the maximum allowable outflow rate of the i-th cascade hydropower station in time period t+1; Indicates that the In the first iteration, the outflow of the i-th cascade hydropower station in time period t+1 is output as +1 input at iteration.
[0220] Step S43, merging the feasible domains and deriving the feasible domain of the branch water level of the i-th cascade hydropower station in time period t by taking the envelope, the expression of the operation is:
[0221] (twenty two)
[0222] in: , , , , , , respectively represent the first lower limit, the second lower limit, the third lower limit, the fourth lower limit, the fifth lower limit and the sixth lower limit of the operating water level of the i-th cascade hydropower station in time period t; , , , , , , respectively represent the first upper limit, the second upper limit, the third upper limit, the fourth upper limit, the fifth upper limit and the sixth upper limit of the operating water level of the i-th cascade hydropower station in time period t; , , respectively represent the upper and lower limits of the feasible values of the operating water level coding of the i-th cascade hydropower station in time period t; arrive The range of the final feasible domain of the operating water level of the i-th cascade hydropower station in time period t is formed;
[0223] Step S44, using the feasible domain of the operating water level of the cascade hydropower station to carry out the feasible correction operation of the operating water level includes:
[0224] Carry out the correction strategy step by step from the most upstream cascade hydropower station to the most downstream cascade hydropower station;
[0225] According to the obtained feasible domain of operating water level, the operating water level value of the cascade hydropower station in the time period is corrected: when the operating water level of the time period to be corrected is within the feasible domain of the operating water level, it indicates that the operating water level of the time period to be corrected meets the forward and reverse constraints of the before and after time periods of the water-wind-solar-storage multi-energy complementary operation simulation optimization model, and is a feasible solution, so its value is retained; when the operating water level of the time period to be corrected is greater than the upper limit of the feasible domain of the operating water level or less than the lower limit When the operating water level of the time period to be corrected is corrected, a feasible operating water level is randomly generated according to the feasible domain of the operating water level to replace the operating water level of the time period to be corrected, so as to ensure that the corrected solution is feasible.
[0226] The feasible solution strategy for power generation / pumping output during the pumped storage period is:
[0227] Step S45: forward deriving the feasible region of the storage capacity of the pumped storage power station during the period, including:
[0228] For the jth pumped storage power station, the initial storage capacity before the operation simulation starts is For the setting value , then the constraints of the energy storage capacity in the previous period and the feasible domain of energy storage capacity in this period are known, and the upper and lower limits of the energy storage capacity of the j-th pumped storage power station under the feasible conditions of energy storage capacity in period 1 to period T are derived in a forward order from period 1 to period T;
[0229] For the simulated operation period t, the storage capacity of the jth pumped storage power station in period t-1 is It has been corrected by the feasible solution strategy operation and is a known value. Then the expression of the feasible domain operation of the j-th pumped storage power station in the storage capacity of time period t is forward derived as follows:
[0230] (27)
[0231] in: and , respectively represent the lower and upper limits of the initial storage capacity of the jth pumped storage power station before the start of the operation simulation; and , respectively represent the lower and upper limits of the storage capacity of the j-th pumped storage power station in time period t when calculating in the first feasible domain; and , respectively represent the lower and upper limits of the storage capacity of the j-th pumped storage power station in time period t-1 when calculating the first feasible domain;
[0232] Step S46: reversely deriving the feasible region of the storage capacity of the pumped storage power station during the period, including:
[0233] For the j-th pumped storage power station, in order to reflect the annual storage balance constraint, after all the operation simulations are completed, the storage capacity of the j-th pumped storage power station at the end of the period is calculated as follows: Need to return to the set value , then by knowing the storage capacity of the next period and the constraints of the feasible domain of storage capacity in this period, the upper and lower limits of the storage capacity of the j-th pumped storage power station under the feasible conditions of storage capacity from period T to period 1 are reversely derived in reverse order from period T to period 1;
[0234] For the simulated operation period t, the storage capacity of the jth pumped storage power station in period t+1 is It has been corrected by the feasible solution strategy operation and is a known value. Then the expression of the feasible domain operation of the j-th pumped storage power station in the storage capacity of time period t is reversely derived as follows:
[0235] (28)
[0236] in: and , respectively represent the lower and upper limits of the storage capacity of the jth pumped storage power station after the operation simulation is completed; and , respectively represent the lower and upper limits of the storage capacity of the j-th pumped storage power station in time period t when calculating in the second feasible domain; and , respectively represent the lower and upper limits of the storage capacity of the j-th pumped storage power station in time period t+1 when calculating the second feasible domain;
[0237] Step S47: Merge the feasible domains and derive the feasible domain of the storage capacity of the j-th pumped storage power station in time period t by taking the envelope. The expression of the operation is:
[0238] (29)
[0239] in: and , respectively represent the lower and upper limits of the feasible value of the energy storage capacity encoding of the j-th pumped storage power station in time period t, arrive The range of , forms the final feasible region of the storage capacity of the j-th pumped storage power station in time period t;
[0240] Step S48: According to the feasible region of the storage capacity of the pumped-storage power station, the upper and lower limits of the values under the feasible conditions of the power generation / pumping output of the pumped-storage power station in each period are forward derived in the chronological order from period 1 to period T;
[0241] For the simulated operation period t-1, assume that the storage capacity of the jth pumped storage power station in period t-1 is and power generation / pumping output It has been corrected by the feasible solution strategy operation and is a known value. Then, by calculating the energy balance equation of the pumped storage power station, the output feasible domain of the j-th pumped storage power station in time period t can be obtained, which is the power generation output feasible domain or the pumping output feasible domain, and the expression is:
[0242] (30)
[0243] in: , , respectively represent the upper limit of power generation output and pumping output of the j-th pumped storage power station in time period t, and the lower limit is 0; therefore, 0 to The range of 0 to 1 forms the feasible region of power generation output of the j-th pumped storage power station in time period t; The range of the pumping output of the j-th pumped storage power station in time period t is formed;
[0244] Step S49: Using the feasible domain of the pumped-storage power station's pumping / generating output, perform feasible correction operations on the pumped-storage power station's pumping / generating output:
[0245] When the pumping / power generation output of the time period to be corrected is within the feasible range of the output, it indicates that the pumping / power generation output of the time period to be corrected meets the constraints before, after and in the current period of the simulation optimization model for the complementary operation of water, wind, solar and storage multi-energy, and is a feasible pumping / power generation output, so its value is retained; when the pumping / power generation output of the time period to be corrected is greater than the upper limit of the feasible range of the output, the output value is corrected, and a feasible output is randomly generated according to the calculated feasible range of the output to replace the output value to be corrected, so as to ensure that the corrected solution is feasible.
[0246] Step S5, using an improved artificial bee colony algorithm based on a heuristic feasible solution strategy to solve the water-wind-solar-storage multi-energy complementary operation simulation optimization model to obtain the optimal solution of the decision variable X, which is the final optimal operation plan for the cascade hydropower station and pumped-storage power station.
[0247] Step S5 is specifically as follows:
[0248] Step S51: setting the size of the bee colony, and the nectar source information recorded by each individual bee in the bee colony is expressed in the real number code set in step S3;
[0249] Randomly select and generate initial nectar source information for each individual bee within the upper and lower limit constraints of each code, and then correct the initial nectar source information recorded by each individual bee through the heuristic feasible solution strategy to generate an initialized bee colony; the nectar source information recorded by each individual bee in the bee colony represents a feasible solution of the water-wind-solar-storage multi-energy complementary operation simulation optimization model, that is, the value of the decision variable X;
[0250] Step S52: Calculate the objective function value of the nectar source information recorded by each bee in the bee colony according to the mathematical equation of the objective function F of the water-wind-solar-storage multi-energy complementary operation simulation optimization model; select the bee individual with the best objective function value as the optimal individual;
[0251] Step S53: Based on the optimal individual, the nectar source information recorded by all bee individuals in the bee colony is mutated by random disturbance; in order to avoid falling into the local optimum too early in the solution process, the nectar source information recorded by all bee individuals before and after the mutation is cross-operated; after the mutation and cross-operation are performed, the heuristic feasible solution strategy is used to correct the nectar source information recorded by each bee individual, ensuring that the variables of the real number coding in each time period are within the feasible domain, avoiding the occurrence of infeasible coding;
[0252] Step S54: return to step S52, loop through steps S52 to S53, set a fixed number of iterations, and when the objective function value of the selected optimal individual is not updated within the fixed number of iterations, output the optimal individual at the last iteration;
[0253] Step S55: setting the number of searches, performing a variable scale chaos search on the nectar source information recorded by the optimal individual outputted in step S54, and outputting the nectar source information recorded by the optimal individual after the variable scale chaos search;
[0254] Step S56: When the set number of iterations is reached, the nectar source information recorded by the optimal individual is output as the optimal operation plan for water-wind-solar-storage multi-energy complementarity, otherwise steps S52 to S55 are re-executed.
[0255] In step S55, the process of variable scale chaos search is specifically as follows:
[0256] Step S551, setting the chaos iteration vector The initial value is , chaos search scale The initial value is :
[0257] Chaos Iteration Vector Initial value of Expressed as:
[0258] { C 0 = [ C 0 , 1 , C 0 , 2 , ⋅⋅⋅ , C 0 , T ] C 0 , t = rnd ( 0 , 1 ) , t = 1 , 2 , ⋅⋅⋅ , T (31)
[0259] in: ,for Elements of Represents the initial value of the chaos iteration vector; Represents a random number generation function between 0 and 1;
[0260] Initial value of chaos search scale for:
[0261] { Δ X 0 = [ [ Δ WL 1 , 0 1 , Δ WL 2 , 0 1 , ⋅⋅⋅ , Δ WL t , 0 1 , ⋅⋅⋅ , Δ WL T , 0 1 ] , ⋅⋅⋅ , [ Δ WL 1 , 0 n hp , Δ WL 2 , 0 n hp , ⋅⋅⋅ , Δ WL t , 0 n hp , ⋅⋅⋅ , Δ WL T , 0 n hp ] [ Δ P ps , 1 , 0 1 , Δ P ps , 2 , 0 1 , ⋅⋅⋅ , Δ P ps , t , 0 1 , ⋅⋅⋅ , Δ P ps , T , 0 1 ] , ⋅⋅⋅ , [ Δ P ps , 1 , 0 n ps , Δ P ps , 2 , 0 n ps , ⋅⋅⋅ , Δ P ps , t , 0 n ps , ⋅⋅⋅ , Δ P ps , T , 0 n ps ] ] Δ WL t , 0 i = ( WL t , con , up i − WL t , con , down i ) t = 1 , 2 , ⋅⋅⋅ , T i = 1 , 2 , ⋅⋅⋅ , n hp Δ P ps , t , 0 j = P ps . t , up _ o , con j t = 1 , 2 , ⋅⋅⋅ , T j = 1 , 2 , ⋅⋅⋅ , n ps if I ps , t j = 1 Δ P ps , t , 0 j = P ps . t , up _ p , con j t = 1 , 2 , ⋅⋅⋅ , T j = 1 , 2 , ⋅⋅⋅ , n ps if I ps , t j = 0 (32)
[0262] in: represents the initial value of the chaos search scale; represents the initial value of the operating water level change of the i-th cascade hydropower station in time period t; represents the initial value of the output change of the j-th pumped storage power station in time period t; wherein the output includes the power generation output and the pumping output;
[0263] Step S552, set the number of iterations ;
[0264] Step S553, calculating the chaos search scale :
[0265] (33)
[0266] in:
[0267] is the chaotic iteration vector used in the nth iteration; , is the chaotic iteration vector used in the n-1th iteration; To conduct the The chaos search scale at the iteration;
[0268] is the variable scale coefficient, which is calculated using the following formula:
[0269] (34)
[0270] Where: cloop represents the fixed time interval of the variable scaling coefficient reduction, that is, every cloop fixed time interval, update ,make Reduced to 0.9 times the previous fixed period interval; is the initial value of the variable scaling coefficient;
[0271] Step S554: set the chaos search scale The nectar source information recorded by the individual bee performing the variable scale chaos search is superimposed on the nectar source information, and the heuristic feasible solution strategy is used to correct the nectar source information recorded by the individual bee. If the objective function value of the nectar source information recorded by the individual bee after the search is better than that before the correction, the nectar source information recorded by the individual bee is replaced;
[0272] Step S555, make , return to step S553, and loop through steps S553 to S555 until the set number of iterations is reached, ending the variable-scale chaotic search and outputting the bee individual.
[0273] The above-mentioned intelligent optimization method for water-wind-solar-storage multi-energy complementary operation simulation based on heuristic feasible solution strategy includes the following steps: S1: based on a specific water-wind-solar-storage clean energy base, set the data required for the 8760h operation simulation of the water-wind-solar-storage complementary power generation system in a year; S2: according to the requirements of the water-wind-solar-storage multi-energy complementary operation simulation, according to the basic data setting, construct a water-wind-solar-storage multi-energy complementary operation simulation optimization model with the goal of maximizing power generation, and set the constraints of the model; S3: adopt the cascade hydropower station reservoir 8760h in a year The combination of the operating water level process in the 0h period and the power generation / pumping output process of the pumped-storage power station in the 8760h period of the year is used to encode the possible solutions of the water-wind-solar-storage multi-energy complementary operation simulation optimization model in real number form; S4: a heuristic feasible solution strategy is proposed, including a heuristic feasible solution strategy for the operating water level of cascade hydropower stations and a feasible solution strategy for the output during the pumped-storage period; S5: an improved artificial bee colony algorithm based on the heuristic feasible solution strategy is used to solve the water-wind-solar-storage multi-energy complementary operation simulation optimization model to obtain the optimal operation plan.
[0274] The present invention provides a method for simulating intelligent optimization of water-wind-solar-storage multi-energy complementary operation based on a heuristic feasible solution strategy, and the steps are summarized as follows:
[0275] (1) Set up the basic data required for the simulation of the complementary operation of hydropower, wind power, solar power and storage;
[0276] Based on the water-wind-solar-storage clean energy base, the basic data required for the water-wind-solar-storage multi-energy complementary operation simulation of the base are set, including the power transmission load process in each time period (hour) during the operation simulation period, the monthly or ten-day runoff process of the cascade hydropower station in the year, the water level storage capacity curve of the cascade hydropower station, the expected head output curve of the cascade hydropower station, the downstream water level relationship curve of the outflow flow of the cascade hydropower station, the installed capacity of the pumped-storage power station, the continuous full-power utilization hours of the pumped-storage power station, the energy conversion efficiency of the pumped-storage power station, the power generation and pumping operation characteristic data of the pumped-storage unit, the designed output process in each time period during the operation simulation period of the wind power station, and the designed output process in each time period during the operation simulation period of the photovoltaic power station, so as to prepare for the subsequent model simulation calculation steps.
[0277] (2) Construct a simulation optimization model for the complementary operation of hydropower, wind power, solar power and storage with the goal of maximizing power generation, and set the constraints of the model;
[0278] According to the requirements of the simulation of the complementary operation of water, wind, solar and storage, and based on the basic data settings, a simulation optimization model of the complementary operation of water, wind, solar and storage is constructed based on the power and electricity balance and the water balance. The model target is set to maximize the power generation, and the complex constraints of various power sources and power transmission in the model are determined, such as the water balance constraints of the reservoirs of cascade hydropower stations, the time period operating water level constraints of the reservoirs of cascade hydropower stations, the time period variation constraints of the operating water level of the reservoirs of cascade hydropower stations, the water level constraints at the beginning and end of the simulated operation period of the reservoirs of cascade hydropower stations, the water flow time lag constraints between cascade hydropower stations, the time period output constraints of photovoltaic power stations, the energy balance constraints of pumped-storage power stations, and the energy constraints at the beginning and end of the simulated operation period of pumped-storage power stations.
[0279] (3) The simulation optimization model of the complementary operation of hydropower, wind power, solar power and storage can solve the real number coding;
[0280] The possible solutions of the simulation optimization model for the complementary operation of water, wind, solar and storage are encoded in real numbers by combining the operating water level process of the cascade hydropower station reservoirs at each period within the cycle and the power generation / pumping output process of the pumped-storage power station at each period within the cycle.
[0281] (4) Based on the improved artificial bee colony algorithm with heuristic feasible solution strategy, the simulation optimization model of hydropower, wind power, solar power and storage multi-energy complementary operation is solved, and the optimal operation plan is obtained according to the following process.
[0282] Step 1: Set the size of the bee colony. The nectar source information recorded by each individual bee in the bee colony is expressed in the real number code. The initial nectar source information of the individual bee is randomly selected and generated within the upper and lower limit constraints of each code. The nectar source information recorded by all individual bees is corrected through the heuristic feasible solution strategy for the operating water level of the hydropower station reservoir and the feasible solution strategy for power generation / pumping output during the pumped storage period to generate an initialized bee colony. The nectar source information recorded by each individual bee in the bee colony represents a possible feasible solution to the water-wind-solar-storage multi-energy complementary operation simulation optimization model.
[0283] Step 2: Calculate the objective function value of the nectar source information recorded by all bees in the initialized bee colony according to the mathematical equation of the objective function of the water-wind-solar-storage multi-energy complementary operation simulation optimization model; and based on the objective function value, select the bee individual with the best nectar source information as the optimal individual;
[0284] Step 3: Based on the optimal individual, random disturbances are introduced on its basis to achieve mutation of the nectar source information recorded by all bee individuals in the bee colony; in order to avoid falling into the local optimum too early in the solution process, crossover operations are performed on the nectar source information recorded by all bee individuals before and after the mutation; after the mutation and crossover operations are performed, the heuristic feasible solution strategy of the operating water level of the hydropower station reservoir and the feasible solution strategy of power generation / pumping output during the pumped storage period are used to correct the nectar source information recorded by all bee individuals, ensuring that the real-number coded variables in each period are within the feasible value range to avoid the occurrence of infeasible coding;
[0285] Step 4: Set a fixed number of iterations. If the objective function value of the selected optimal individual is not updated in the fixed number of iterations, output the optimal individual at the last iteration.
[0286] Step 5: Set the number of searches and perform variable-scale chaotic search on the nectar source information recorded by the optimal individual;
[0287] Step 6: When the set number of iterations is reached, the nectar source information recorded by the optimal individual is output as the optimal operation plan for water-wind-solar-storage multi-energy complementarity, otherwise steps 2 to 5 are re-executed.
[0288] The present invention provides an intelligent optimization method for simulating the complementary operation of water, wind, solar and storage multi-energy based on a heuristic feasible solution strategy. When a conventional swarm intelligent optimization algorithm is used to solve a complex multi-constrained simulation optimization model of water, wind, solar and storage multi-energy, a technical difficulty faced is to solve the problem of dynamic balance of reservoir water volume and power station energy of cascade hydropower stations and pumped storage power stations during refined compensation of wind and solar operation. The conventional solution is to set a penalty function for constraint violation, but firstly, the selection of the penalty factor is difficult, and secondly, it is found in application practice that a large number of infeasible solutions are filled in the initial population generation and optimization process of the algorithm, resulting in low efficiency in solving the model, and poor versatility and engineering practicality. Therefore, the present invention proposes a heuristic feasible solution strategy. The heuristic feasible solution strategy can greatly improve the computational efficiency and practicality of the method proposed in the present invention. However, since the nectar source information recorded by individual bees in the bee colony after feasible correction is a feasible solution, the overlap between the solutions is relatively high. The technical method is prone to fall into local optimality during implementation, which may affect the accuracy of the method in solving the problem. Therefore, after optimizing the individual bees in the bee colony, the present invention introduces a variable-scale chaotic search step, thereby taking into account the versatility, practicality and efficiency of the algorithm solution.
[0289] The method of the present invention, based on the improved artificial bee colony algorithm framework, is to solve the problem of efficiently solving the water-wind-solar-storage multi-energy complementary operation simulation optimization model. By incorporating a heuristic feasible solution strategy with the technical features of deriving the feasible domain of the operating water level of the hydropower station reservoir and the feasible domain of the power generation / pumping output of the pumped-storage power station in forward and reverse time sequence, it cleverly and efficiently solves the problem of dynamic balance of water volume and energy in the cascade hydropower stations and pumped-storage power stations in the refined compensation of wind and solar operation in the multi-energy complementary power generation system, and incorporates variable-scale chaotic search into the method to improve the solution accuracy, further improving the practicality and effectiveness of the method of the present invention. The method can scientifically and rationally formulate a multi-power source joint operation plan for the water-wind-solar-storage multi-energy complementary power generation system, and provide support for the planning and scheduling of clean energy bases.
[0290] Example
[0291] Taking a wind, solar, and storage clean energy base in a certain river basin in the southwest as an example, with the goal of maximizing the total power generation of the clean energy base, 25% frequency water and new energy simulated hourly output are selected as model inputs, and the above-mentioned water, wind, solar, and storage multi-energy complementary operation simulation intelligent optimization method based on the heuristic feasible solution strategy is adopted to carry out simulation optimization of multi-energy complementary operation schemes with annual scheduling period and hourly scheduling period, which illustrates the effectiveness, efficiency and rationality of the present invention.
[0292] The total installed capacity of a basin base in the southwest is 25.6 million kW, including 17.78 million kW of photovoltaic power, 3 million kW of pumped storage, and 4.82 million kW of hydropower. Among them, the photovoltaic power stations are DQ photovoltaic cluster (installed capacity of 4.54 million kW, utilization hours of 1700h), KR photovoltaic cluster (installed capacity of 3.82 million kW, utilization hours of 1650h), CY photovoltaic cluster (8.4 million kW, utilization hours of 1750h); BS photovoltaic cluster (installed capacity of 1.02 million kW, utilization hours of 1700h), pumped storage power station is JT pumped storage (installed capacity of 3 million kW, full generation hours of 6h), hydropower station is BDa hydropower station (installed capacity of 1.5 million kW, full generation hours of 6h), BDo hydropower station (installed capacity of 2.6 million kW), RM hydropower station (installed capacity of 720,000 kW). The base transmits power to the receiving end through a ±800kV ultra-high voltage direct current transmission project, with a transmission capacity of 8 million kW.
[0293] (1) Heuristic feasible solution strategy initial solution generation and correction
[0294] The present invention encodes the operating water level process of the cascade hydropower station reservoir in the 8760h period of the year and the power generation / pumping output process of the pumped storage power station in the 8760h period of the year in real numbers. The method of the present invention first considers the constraints such as the outflow flow, output, and water level fluctuation, and positively and negatively derives the feasible solution range of the upper and lower limits of the water level of each hydropower station in each period, and positively and negatively derives the feasible solution range of the upper and lower limits of the output and storage capacity of each pumped storage station in each period by considering the output and storage capacity constraints of the pumped storage station, and then randomly selects and generates an initial solution within the upper and lower limit constraints of each period, and corrects the randomly generated initial solution through the heuristic feasible solution strategy of the operating water level of the hydropower station reservoir and the feasible solution strategy of power generation / pumping output in the pumped storage period, so as to further ensure the feasibility of the initial solution. In the traditional scheme, a swarm intelligence optimization algorithm is used to randomly generate an initial solution set between the highest and lowest water levels of the hydropower station and between the maximum and minimum output of the pumped storage.
[0295] The initial solution generation of a typical BDa hydropower station and JT pumped storage is selected as an example to compare the above two initial solution generation methods. Figure 2 As shown, it is a comparison diagram of the random initial solution of the swarm intelligence optimization algorithm and the initial solution generation and correction effect of the hydropower heuristic feasible solution strategy of the present invention; Figure 2 It can be seen that the initial solutions of hydropower and pumped storage randomly generated by the swarm intelligence optimization algorithm and the random initial solutions cannot guarantee their feasibility. For example, the solutions of some periods of hydropower will be outside the upper and lower limits of the feasible solutions; the pumped storage output meets the output constraints, but cannot meet the storage capacity constraints. This method will greatly reduce the efficiency of model solution. On the other hand, the heuristic initial solutions and heuristic time-by-time correction solutions generated by the heuristic feasible solution strategy can ensure the feasibility of the initial solution set, so that the initial solution set meets the various constraints of hydropower and pumped storage, greatly improving the efficiency of model optimization.
[0296] (2) Simulation of the complementary operation of water, wind, solar and storage based on heuristic feasible solution strategy
[0297] Cascade hydropower stations in the basin mainly use the regulation of reservoirs to smooth out short-term fluctuations in water inflow, and can flexibly adjust the daily output of hydropower stations and pumped storage stations according to demand. The combined operation of hydropower stations, pumped storage and photovoltaic power stations is achieved, and the regulation of hydropower stations and pumped storage stations is used to compensate for the daily fluctuations of photovoltaic power stations, so as to improve the stability of system output and increase the utilization rate of channels. Figure 3 As shown, it is a schematic diagram of the initial solution generation and correction effect of the feasible solution corridor of the pumped-storage power station output according to the pumped-storage heuristic feasible solution strategy provided by the present invention; Figure 4As shown, it is a schematic diagram of the initial solution generation and correction effect of the feasible solution corridor of the pumped-storage power station energy storage according to the pumped-storage heuristic feasible solution strategy provided by the present invention. When the photovoltaic output is large during the day, hydropower cooperates with photovoltaic operation to reduce the output, making way for photovoltaic to fully absorb the photovoltaic power. If the hydropower reduces the output, and the photovoltaic output still partially exceeds the power transmission capacity of the channel, the pumped-storage power station will play its energy storage role, absorb the photovoltaic output that exceeds the power transmission capacity of the channel, and convert it into energy storage. If the pumped storage has stored energy according to the maximum capacity, but still cannot fully absorb the photovoltaic output, photovoltaic power will be abandoned. When photovoltaic power is not generating electricity at night, hydropower increases its output, and pumped storage discharges water for power generation, so that the photovoltaic power absorbed during the day is transferred to release at night to fully improve the channel utilization rate and photovoltaic absorption rate. In general, through the regulation of hydropower and pumped storage, the complementary operation between water, light and storage can be effectively realized.
[0298] (3) Solution effect of improved artificial bee colony algorithm based on heuristic feasible solution strategy
[0299] The present invention adopts an improved artificial bee colony algorithm based on a heuristic feasible solution strategy to solve the water-wind-solar-storage multi-energy complementary operation simulation optimization model. The algorithm parameters are set as follows: population size NP=50, maximum evolutionary generation GEmax=20. The model optimization results of successive iterations are as follows: Figure 5 and Figure 6 As shown, it is a schematic diagram of the initial solution generation and correction effect of the feasible solution corridor of the pumped storage power station energy storage capacity according to the pumped storage heuristic feasible solution strategy provided by the present invention. Compared with the system power generation of 886 million kWh in the first iteration, after 20 iterations, the system power generation is 905 million kWh, and the system power generation increases by about 19 million kWh. The calculation time of 20 model iterations is 20s. It takes 110 iterations and 115s to achieve the optimization effect using the swarm intelligence optimization algorithm. Compared with the swarm intelligence optimization algorithm, which is full of a large number of infeasible solutions in the initial population generation and optimization process, resulting in low efficiency in model solution, poor versatility and engineering practicality, the method of the present invention can ensure the feasibility of the solution set in the initial solution and mutation process, greatly improve the solution efficiency, and significantly improve the optimization effect under the same number of iterations.
[0300] The intelligent optimization method for simulating the operation of multi-energy complementary water-wind-solar-storage system based on a heuristic feasible solution strategy provided by the present invention realizes the simulation optimization of the operation plan of the clean energy multi-energy complementary base formed by the combination of various power sources such as cascade hydropower stations, wind power, photovoltaic power stations and pumped-storage power stations in the basin with years as the simulation time unit and hours as the basic time scale, so as to give full play to the benefits of natural complementarity and active compensation among various energy resources, scientifically and reasonably formulate the joint operation plan of multiple power sources of the water-wind-solar-storage system, and provide support for the planning and scheduling operation of the clean energy base. The method of the present invention, based on the improvement of the artificial bee colony algorithm framework, is to solve the problem of efficiently solving the water-wind-solar-storage multi-energy complementary operation simulation optimization model. By incorporating a heuristic feasible solution strategy with the technical characteristics of deriving the feasible domain of the operating water level of the hydropower station reservoir and the feasible domain of the power generation / pumping output of the pumped-storage power station in forward and reverse time sequence, it cleverly and efficiently solves the problem of dynamic balance of water volume and energy of cascade hydropower stations and pumped-storage power stations in the multi-energy complementary power generation system during the refined compensation of wind and solar operation. Variable-scale chaos search is incorporated into the method to improve the solution accuracy, further improving the practicability and effectiveness of the method of the present invention.
[0301] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0302] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. An intelligent optimization method for simulating the complementary operation of water, wind, solar and storage based on a heuristic feasible solution strategy. It is characterized in that The following steps are involved: Step S1, based on the composition of the power generation equipment of the hydro-wind-solar-storage clean energy base, set the basic data required for the hydro-wind-solar-storage multi-energy complementary operation simulation; Step S2, constructing a simulation optimization model for the operation of water, wind, solar and storage multi-energy complementary according to the basic data required for the simulation of the operation of water, wind, solar and storage multi-energy complementary; the simulation optimization model for the operation of water, wind, solar and storage multi-energy complementary includes an objective function F and constraint conditions; Step S3, the decision variable X of the water-wind-solar-storage multi-energy complementary operation simulation optimization model includes the operating water level of each cascade hydropower station in the cascade hydropower station group in each time period t during the operation simulation period, and the output of each pumped-storage power station in the pumped-storage power station group in each time period t during the operation simulation period; the decision variable X is encoded in real number form to obtain the decision variable X in the encoded form shown in formula (1): in: is the operating water level of the first-level cascade hydropower station at each time period t during the operation simulation period; For nth hp The operating water level of the cascade hydropower stations in each time period t during the operation simulation period; the operating water level of the cascade hydropower stations from the first stage to the nth stage hp Cascade hydropower stations are cascade hydropower stations arranged in sequence from upstream to downstream; is the output of the first pumped storage power station at each time period t during the operation simulation period; For nth ps The output of a pumped storage power station in each time period t during the operation simulation period; T is the total number of time periods in the operation simulation period; therefore, the operation simulation period is divided into T time periods, each of which is represented by time period t, t = 1, 2, ..., T; n hp 、n ps They are the total number of cascade hydropower stations and the total number of pumped storage power stations; For nth hp The operating water level of the cascade hydropower station at the end of period t; For nth ps The output of a pumped-storage power station in time period t, including power generation output and pumping output; Step S4, setting a heuristic feasible solution strategy, including a heuristic feasible solution strategy for the operating water level of cascade hydropower stations and a feasible solution strategy for the output during the pumped storage period; In step S4, the heuristic feasible solution strategy for the operating water level of cascade hydropower stations is: Step S41, forward deducing the feasible region of the operating water level of the cascade hydropower station, includes: For the i-th cascade hydropower station, the initial water level during the simulated operation period is To set the control water level is a known value; based on the known water level value of the previous period and the constraints of the feasible domain of the water level in this period, the upper and lower limits of the value of the operating water level coding feasible conditions of the i-th cascade hydropower station in period 1 to period T are derived forward in the sequential order from period 1 to period T; For the simulated operation period t, the operating water level of the i-th cascade hydropower station in period t-1 is It has been corrected by the feasible solution strategy operation and is a known value. Therefore, the process of forward deducing the feasible domain of the operating water level of the i-th cascade hydropower station in time period t includes: The expression of the feasible domain derived forward from the time-interval variation constraint of the operating water level of the cascade hydropower station is: The expression of the feasible domain derived forward from the outflow constraints of the cascade hydropower stations during the period is: represents the inflow of the i-th cascade hydropower station in time period t-1; They represent the minimum and maximum allowable outflow rate of the i-th cascade hydropower station in time period t-1 respectively; The expression of the feasible region derived forward from the output constraints of cascade hydropower stations during each period is: in: They represent the lower limit and upper limit of the power generation output of the i-th cascade hydropower station in time period t-1 respectively; FloopPWQ() represents the operation of iteratively calculating the water level in the previous period of the specified period and the corresponding outflow flow when the cascade hydropower station outputs; Step S42, reversely deriving the feasible domain of the operating water level of the cascade hydropower station, includes: For the i-th cascade hydropower station, in order to reflect the water balance constraint during the simulated operation period, after the simulation of the operation period is completed, the water level at the end of the simulated operation period is Need to return to the set control water level Then, given the water level value in the later period and the constraints of the feasible domain of the water level in this period, the upper and lower limits of the value of the operating water level coding feasible conditions of the i-th cascade hydropower station in the period T to the period 1 are reversely derived in reverse order from the period T to the period 1; For the simulated operation period t, the operating water level of the i-th cascade hydropower station in period t+1 has been corrected by the feasible solution strategy operation and is a known value. Therefore, the process of reversely deriving the feasible domain of the operating water level of the i-th cascade hydropower station in period t includes: The expression of the feasible domain derived by reverse deduction from the time-interval variation constraint of the operating water level of the cascade hydropower station is: in: represents the operating water level of the i-th cascade hydropower station at the end of time period t+1; The expression of the feasible domain derived from the outflow constraints of the cascade hydropower stations is: The expression of the feasible region derived from the output constraints of the cascade hydropower stations is: in: They represent the lower limit and upper limit of the power generation output of the i-th cascade hydropower station in time period t+1 respectively; FloopPWQ() represents the operation of iteratively calculating the water level in the later period of the specified period and the corresponding outflow flow when the cascade hydropower station outputs; Step S43, merging the feasible domains and deriving the feasible domain of the branch water level of the i-th cascade hydropower station in time period t by taking the envelope, the expression of the operation is: in: They respectively represent the first lower limit, the second lower limit, the third lower limit, the fourth lower limit, the fifth lower limit and the sixth lower limit of the operating water level of the i-th cascade hydropower station in time period t; They represent the first upper limit, the second upper limit, the third upper limit, the fourth upper limit, the fifth upper limit and the sixth upper limit of the operating water level of the i-th cascade hydropower station in time period t respectively; They represent the lower and upper limits of the feasible values of the operating water level code of the i-th cascade hydropower station in time period t, respectively; arrive The range of the final feasible domain of the operating water level of the i-th cascade hydropower station in time period t is formed; Step S44, using the feasible domain of the operating water level of the cascade hydropower station to carry out the feasible correction operation of the operating water level includes: Carry out the correction strategy step by step from the most upstream cascade hydropower station to the most downstream cascade hydropower station; According to the obtained feasible domain of operating water level, the operating water level value of the cascade hydropower station in the time period is corrected: when the operating water level of the time period to be corrected is within the feasible domain of the operating water level, it indicates that the operating water level of the time period to be corrected meets the forward and reverse constraints of the before and after time periods of the water-wind-solar-storage multi-energy complementary operation simulation optimization model, and is a feasible solution, so its value is retained; when the operating water level of the time period to be corrected is greater than the upper limit of the feasible domain of the operating water level or less than the lower limit When the operating water level of the time period to be corrected is corrected, a feasible operating water level is randomly generated according to the feasible domain of the operating water level to replace the operating water level of the time period to be corrected, so as to ensure that the corrected solution is feasible; Step S5, using an improved artificial bee colony algorithm based on a heuristic feasible solution strategy to solve the water-wind-solar-storage multi-energy complementary operation simulation optimization model to obtain the optimal solution of the decision variable X, which is the final optimal operation plan for the cascade hydropower station and pumped-storage power station.
2. According to the intelligent optimization method for simulating the complementary operation of water, wind, solar and storage based on a heuristic feasible solution strategy as described in claim 1, It is characterized in that In step S1, the basic data required for the water-wind-solar-storage multi-energy complementary operation simulation include the power transmission load process in each time period during the operation simulation period, the monthly or ten-day runoff process of the cascade hydropower station, the water level storage capacity curve of the cascade hydropower station, the head expected output curve of the cascade hydropower station, the downstream water level relationship curve of the outflow flow of the cascade hydropower station, the characteristic parameters of the pumped-storage power station, the designed output process of the wind power station in each time period during the operation simulation period, and the designed output process of the photovoltaic power station in each time period during the operation simulation period; among them, the characteristic parameters of the pumped-storage power station include the installed capacity of the pumped-storage power station, the continuous full-power utilization hours of the pumped-storage power station, the energy conversion efficiency of the pumped-storage power station, and the power generation and pumping operation characteristic data of the pumped-storage unit.
3. According to the intelligent optimization method for simulating the complementary operation of water, wind, solar and storage based on a heuristic feasible solution strategy as described in claim 1, It is characterized in that In step S2, the objective function F is expressed as: Where: n sol 、n wd They represent the total number of photovoltaic power stations and wind power stations in the water, wind, solar and storage clean energy bases respectively; They respectively represent the power generation output of the i-th cascade hydropower station in time period t, the power generation output of the j-th pumped-storage power station in time period t, the power generation output of the k-th photovoltaic power station in time period t, and the power generation output of the l-th wind power station in time period t; Δt represents the length of each time period t.
4. According to the method of intelligent optimization for simulating the complementary operation of water, wind, solar and storage based on heuristic feasible solution strategy in claim 1, It is characterized in that In step S2, the constraints include: 1) Water balance constraints of cascade hydropower stations: in: represents the operating water level of the i-th cascade hydropower station at the end of period t-1; represents the inflow of the i-th cascade hydropower station in time period t; represents the outflow of the i-th cascade hydropower station in time period t; FWV() represents the operation of calculating the storage capacity value by interpolating the water level and storage capacity curve of the cascade hydropower station reservoir through the operating water level value; FVW() represents the operation of calculating the operating water level value by interpolating the water level and storage capacity curve of the cascade hydropower station reservoir through the storage capacity value; 2) Time-period operating water level constraints of cascade hydropower stations: in: represents the operating water level of the i-th cascade hydropower station at the end of period t; They represent the lower and upper limits of the operating water level of the i-th cascade hydropower station in time period t respectively; 3) Time-interval variation constraints of the operating water level of cascade hydropower stations: in: It represents the maximum value of the operating water level of the i-th cascade hydropower station allowed to change in the interval between time period t and time period t-1; 4) Water level constraints at the beginning and end of the simulated operation period for cascade hydropower stations: in: It represents the initial operating water level of the i-th cascade hydropower station in period 1, that is, the initial water level in the simulated operation period; It represents the operating water level of the i-th cascade hydropower station at the end of period T, that is, the end water level of the simulated operation period; represents the set control water level of the i-th cascade hydropower station; 5) Constraints on outflow from cascade hydropower stations during certain periods of time in: They represent the minimum and maximum allowable outflow rate of the i-th cascade hydropower station in time period t respectively; It represents the outflow of the i-th cascade hydropower station used for power generation; It represents the abandoned water flow that cannot be used for power generation in the outflow of the i-th cascade hydropower station; 6) Output constraints of cascade hydropower stations during certain periods of time: in: They represent the lower and upper limits of the power generation output of the i-th cascade hydropower station in time period t respectively; 7) Constraints on generating head of cascade hydropower station generators during the period: in: represents the generating head of the nth unit of the i-th cascade hydropower station in time period t; They represent the lower and upper limits of the generating head of the nth unit of the i-th cascade hydropower station in time period t respectively; 8) Wind power station output constraints during the period: in: They represent the lower and upper limits of the power output allowed by the lth wind power station in time period t respectively; 9) Output constraints of photovoltaic power stations during certain time periods: in: They represent the lower and upper limits of the power output allowed by the k-th photovoltaic power station in time period t respectively; 10) Output constraints of pumped storage power stations during certain periods of time: in: represents the operating condition of the jth pumped storage power station in time period t. When the value is negative, The value is 0, indicating that the operating condition is pumping; When the value is positive, The value is 1, indicating that the operating condition is power generation; They represent the upper limit absolute value of power generation output and pumping output of the j-th pumped-storage power station in time period t respectively; 11) Constraints on storage capacity of pumped storage power stations: in: represents the storage capacity of the jth pumped storage power station in time period t; represents the installed capacity of the jth pumped storage power station; represents the continuous full-power utilization hours of the jth pumped-storage power station; 12) Pumped storage power station energy balance constraints: in: represents the storage capacity of the jth pumped storage power station in time period t-1; represents the energy conversion efficiency of the jth pumped storage power station; 13) Storage capacity constraints of pumped storage power station at the beginning and end of the simulated operation period: in: represents the initial storage capacity of the jth pumped storage power station during the simulated operation period; It represents the energy storage of the jth pumped-storage power station at the end of the simulated operation period; λ is the initial energy storage coefficient. When its value is 1, it means that the energy storage of the pumped-storage power station at the beginning and end of the simulated operation period is full. When its value is 0, it means that the energy storage of the pumped-storage power station at the beginning and end of the simulated operation period is empty.
5. According to the method of intelligent optimization for simulating the complementary operation of water, wind, solar and storage based on heuristic feasible solution strategy in claim 1, It is characterized in that The specific operation process is: Set the maximum number of iterations τ max , set the initial value of the outflow flow of the i-th cascade hydropower station in time period t-1 during the iterative trial calculation for: Then the number of iterations τ starts from 0, and the specific expression for iterative calculation of the outflow flow of a specified cascade hydropower station is: in: It represents the generating head of the i-th cascade hydropower station in time period t-1 during the τ-th iteration; represents the comprehensive power generation efficiency of the i-th cascade hydropower station; represents the power generation output of the i-th cascade hydropower station in time period t-1 when the τ-th iteration is performed; ε is the deviation between the power generation output of the i-th cascade hydropower station in time period t-1 and the upper limit of power generation output when the τ-th iteration is performed; Indicates the outflow of the i-th cascade hydropower station in time period t-1 at the τth iteration, which is used as the input at the τ+1th iteration; ε con is the given value of the deviation; FWLDQ() represents the operation of calculating the downstream water level value of the reservoir by interpolating the downstream water level curve of the reservoir flow through the outflow value; FHLQ() represents the operation of calculating the head loss value of the hydropower station by interpolating the head loss curve of the reservoir flow through the outflow value; The specific operation process is: Set the maximum number of iterations τ max , set the initial value of the outflow flow of the i-th cascade hydropower station in time period t+1 during the iterative calculation for: Then the number of iterations τ starts from 0, and the specific expression for iterative calculation of the outflow flow of a specified cascade hydropower station is: in: They represent the minimum and maximum allowable outflow rate of the i-th cascade hydropower station in time period t+1; represents the inflow of the i-th cascade hydropower station in time period t+1; It represents the outflow of the i-th cascade hydropower station in time period t during the τ-th iteration; It represents the operating water level of the i-th cascade hydropower station in time period t during the τ-th iteration; It represents the generating head of the i-th cascade hydropower station in time period t+1 during the τ-th iteration; represents the comprehensive power generation efficiency of the i-th cascade hydropower station; It represents the power generation output of the i-th cascade hydropower station in time period t+1 during the τ-th iteration; represents the upper limit of the power output of the i-th cascade hydropower station in time period t+1; ε is the deviation between the power output of the i-th cascade hydropower station in time period t+1 and the upper limit of the power output; ε con is the given value of the deviation; represents the maximum allowable outflow rate of the i-th cascade hydropower station in time period t+1; It means that during the τth iteration, the outflow of the i-th cascade hydropower station in the time period t+1 is output as the input for the τ+1th iteration.
6. According to the intelligent optimization method for simulating the complementary operation of water, wind, solar and storage based on a heuristic feasible solution strategy as described in claim 1, It is characterized in that In step S4, the feasible solution strategy for the output during the pumped storage period is: Step S45: forward deriving the feasible region of the storage capacity of the pumped storage power station during the period, including: For the jth pumped storage power station, the initial storage capacity before the operation simulation starts is For the setting value Then, given the constraints of the storage capacity in the previous period and the feasible domain of the storage capacity in this period, the upper and lower limits of the storage capacity of the j-th pumped storage power station under the feasible conditions of the storage capacity in the period 1 to the period T are derived in a forward order from the period 1 to the period T; For the simulated operation period t, the storage capacity of the jth pumped storage power station in period t-1 is It has been corrected by the feasible solution strategy operation and is a known value. Then the expression of the feasible domain operation of the j-th pumped storage power station in the storage capacity of time period t is forward derived as follows: in: and They represent the lower and upper limits of the initial storage capacity of the jth pumped storage power station before the start of the operation simulation; and They represent the lower and upper limits of the storage capacity of the j-th pumped storage power station in time period t when calculating the first feasible domain; and They represent the lower and upper limits of the storage capacity of the j-th pumped storage power station in time period t-1 when calculating the first feasible domain; Step S46: reversely deriving the feasible region of the storage capacity of the pumped storage power station during the period, including: For the j-th pumped storage power station, in order to reflect the annual storage balance constraint, after all the operation simulations are completed, the storage capacity of the j-th pumped storage power station at the end of the period is calculated as follows: Need to return to the set value Then, by knowing the storage capacity of the next period and the constraints of the feasible domain of storage capacity in this period, the upper and lower limits of the storage capacity of the j-th pumped storage power station under the feasible conditions of storage capacity from period T to period 1 are reversely derived in reverse order from period T to period 1; For the simulated operation period t, the storage capacity of the jth pumped storage power station in period t+1 is It has been corrected by the feasible solution strategy operation and is a known value. Then the expression of the feasible domain operation of the j-th pumped storage power station in the storage capacity of time period t is reversely derived as follows: in: and They represent the lower and upper limits of the storage capacity of the jth pumped storage power station after the operation simulation is completed; and They represent the lower and upper limits of the storage capacity of the j-th pumped storage power station in time period t when calculating the second feasible domain; and They represent the lower and upper limits of the storage capacity of the j-th pumped storage power station in time period t+1 when calculating the second feasible domain; Step S47: Merge the feasible domains and derive the feasible domain of the storage capacity of the j-th pumped storage power station in time period t by taking the envelope. The expression of the operation is: in: and They represent the lower and upper limits of the feasible value of the energy storage encoding of the j-th pumped storage power station in time period t, arrive The range of , forms the final feasible region of the storage capacity of the j-th pumped storage power station in time period t; Step S48: According to the feasible region of the storage capacity of the pumped-storage power station, the upper and lower limits of the values under the feasible conditions of the power generation / pumping output of the pumped-storage power station in each period are forward derived in the chronological order from period 1 to period T; For the simulated operation period t-1, assume that the storage capacity of the jth pumped storage power station in period t-1 is and power generation / pumping output It has been corrected by the feasible solution strategy operation and is a known value. Then, by calculating the energy balance equation of the pumped storage power station, the output feasible domain of the j-th pumped storage power station in time period t can be obtained, which is the power generation output feasible domain or the pumping output feasible domain, and the expression is: in: They represent the upper limit of power generation output and pumping output of the j-th pumped storage power station in time period t, and the lower limit is 0; therefore, 0 to The range of 0 to 1 forms the feasible region of power generation output of the j-th pumped storage power station in time period t; The range of the pumping output of the j-th pumped storage power station in time period t is formed; Step S49: Using the feasible domain of the pumped-storage power station's pumping / generating output, perform feasible correction operations on the pumped-storage power station's pumping / generating output: When the pumping / power generation output of the time period to be corrected is within the feasible range of the output, it indicates that the pumping / power generation output of the time period to be corrected meets the constraints before, after and in the current period of the simulation optimization model for the complementary operation of water, wind, solar and storage multi-energy, and is a feasible pumping / power generation output, so its value is retained; when the pumping / power generation output of the time period to be corrected is greater than the upper limit of the feasible range of the output, the output value is corrected, and a feasible output is randomly generated according to the calculated feasible range of the output to replace the output value to be corrected, so as to ensure that the corrected solution is feasible.
7. According to claim 1, a method for simulating intelligent optimization of water-wind-solar-storage multi-energy complementary operation based on a heuristic feasible solution strategy, It is characterized in that Step S5 is specifically as follows: Step S51: setting the size of the bee colony, and the nectar source information recorded by each individual bee in the bee colony is expressed in the real number code set in step S3; Randomly select and generate initial nectar source information for each individual bee within the upper and lower limit constraints of each code, and then correct the initial nectar source information recorded by each individual bee through the heuristic feasible solution strategy to generate an initialized bee colony; the nectar source information recorded by each individual bee in the bee colony represents a feasible solution of the water-wind-solar-storage multi-energy complementary operation simulation optimization model, that is, the value of the decision variable X; Step S52: Calculate the objective function value of the nectar source information recorded by each bee in the bee colony according to the mathematical equation of the objective function F of the water-wind-solar-storage multi-energy complementary operation simulation optimization model; select the bee individual with the best objective function value as the optimal individual; Step S53: Based on the optimal individual, the nectar source information recorded by all bee individuals in the bee colony is mutated by random disturbance; in order to avoid falling into the local optimum too early in the solution process, the nectar source information recorded by all bee individuals before and after the mutation is cross-operated; after the mutation and cross-operation are performed, the heuristic feasible solution strategy is used to correct the nectar source information recorded by each bee individual, ensuring that the variables of the real number coding in each time period are within the feasible domain, avoiding the occurrence of infeasible coding; Step S54: Return to step S52, loop through steps S52 to S53, set a fixed number of iterations, and when the objective function value of the selected optimal individual is not updated within the fixed number of iterations, output the optimal individual at the last iteration; Step S55: setting the number of searches, performing a variable scale chaos search on the nectar source information recorded by the optimal individual output in step S54, and outputting the nectar source information recorded by the optimal individual after the variable scale chaos search; Step S56: When the set number of iterations is reached, the nectar source information recorded by the optimal individual is output as the optimal operation plan for water-wind-solar-storage multi-energy complementarity, otherwise steps S52 to S55 are re-executed.
8. According to claim 7, a method for simulating intelligent optimization of water-wind-solar-storage multi-energy complementary operation based on a heuristic feasible solution strategy, It is characterized in that Step S55 is specifically as follows: Step S551, set the chaotic iteration vector C n The initial value is C 0 , chaos search scale ΔX n The initial value of ΔX 0 : Chaos Iteration Vector C n The initial value C 0 Expressed as: Where: C 0,1 ,C 0,2 ,···,C 0,T , is C 0 Elements; C 0,t Represents the initial value of the chaotic iteration vector; rnd(0,1) represents the random number generation function between 0 and 1; Initial value of chaos search scale ΔX 0 for: Where: ΔX 0 represents the initial value of the chaos search scale; represents the initial value of the operating water level change of the i-th cascade hydropower station in time period t; represents the initial value of the output change of the j-th pumped-storage power station in time period t; wherein the output includes the power generation output and the pumping output; Step S552, set the number of iterations n=1; Step S553, calculate the chaos search scale ΔX n : ΔX n =C n ·ΔX n-1 ·m n (33) in: C n is the chaotic iteration vector used in the nth iteration; C n =4·C n-1 ·(1-C n-1 ), C n-1 is the chaotic iteration vector used in the n-1th iteration; ΔX n-1 is the chaotic search scale for the n-1th iteration; m n is the variable scale coefficient, which is calculated using the following formula: Where: cloop represents the fixed time interval of the variable scaling coefficient reduction, that is, every cloop fixed time interval, update m n , so that m n Reduced to 0.9 times the previous fixed period interval; m 0 is the initial value of the variable scaling coefficient; Step S554: Set the chaos search scale ΔX n The nectar source information recorded by the individual bee performing the variable scale chaos search is superimposed on the nectar source information, and the heuristic feasible solution strategy is used to correct the nectar source information recorded by the individual bee. If the objective function value of the nectar source information recorded by the individual bee after the search is better than that before the correction, the nectar source information recorded by the individual bee is replaced; Step S555, set n=n+1, return to step S553, and execute steps S553 to S555 in a loop until the set number of iterations is reached, then end the variable scale chaotic search and output the bee individual.