Method for establishing a rapid plugging model for concentrated dike breaches

By establishing a fast plugging model for concentrated large flow breach of embankment, using carrier models such as shipwrecks, intercepting dikes, and combined dikes, the functions of rapid interception and composite plugging are achieved, and the rapid plugging of embankment is solved under high flow velocity and high water depth conditions. Blocking the problem provides reliable technical support for dam breach.

CN118551463BActive Publication Date: 2024-11-08CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411025799.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-08
Estimated Expiration
2044-07-30

AI Technical Summary

Technical Problem

Under high flow rates and complex water flow conditions, the erosion range and depth of the soil layer at the bottom of the embankment breach continue to increase. The existing technology has not yet formed a complete rapid sealing system, which leads to serious harm caused by the breach. It is necessary to quickly seal it to reduce the breach. hazards caused.

Method used

Establish a rapid plugging model for the concentrated large flow rate of embankment, which is divided into the interception stage, the plugging stage and the air-retaining stage. Through carrier models such as shipwreck, interception dike, combined dike, rear dike, underwater soil throwing and pond filling and foundation solidification, Achieve rapid flow interception, composite port blocking and multi-mode air closure functions.

Benefits of technology

It has achieved rapid sealing of concentrated large flow breaches of embankments, provided reliable technical support for short window periods, and is suitable for large flow breaches of embankments, filling the gap in the functional model.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118551463B_ABST
    Figure CN118551463B_ABST
Patent Text Reader

Abstract

The present invention relates to a method for establishing a model for rapid plugging of concentrated dike breaches. By establishing a rapid plugging function model and a plugging function carrier model for concentrated dike breaches with large flow rates, a rapid interception function is realized through a shipwreck and interception buttress carrier selection model; a composite plugging function is realized through a combined dike and rear buttress carrier selection model; a multi-mode air-locking function is realized through an underwater earth-throwing carrier selection model; and by combining the above functions, the present invention provides reliable technical support for realizing rapid rescue of concentrated dike breaches with large flow rates in a short window period.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of rapid emergency rescue of dikes, and in particular to a method for establishing a rapid plugging model for concentrated dike breaches. Background Art

[0002] Levees are important infrastructure for flood prevention. my country has 400,000 kilometers of levees at all levels. Due to global climate change, extreme rainstorms and floods beyond the standard are frequent, which has led to extremely serious security threats to levees. Once a levee fails, it will seriously threaten the safety of people's lives and property. It must be quickly sealed to reduce the damage caused by the breach.

[0003] Under the conditions of high flow velocity, large water depth and complex water flow, the turbulent water flow has strong drag force, and the scouring range and depth of the soil layer at the bottom of the breach are constantly increasing. If it is not blocked, the consequences of the levee breach will be disastrous. In recent years, the levee breach with concentrated large flow has occurred frequently. The treatment of disasters mostly relies on on-site experience, and a complete rapid blocking system has not yet been formed. Summary of the invention

[0004] In order to solve the above problems, the present invention provides a method for establishing a model for rapid plugging of concentrated large-flow dike breaches, thereby providing reliable technical support for rapid rescue of concentrated large-flow dike breaches in a short window period.

[0005] The technical solution adopted by the present invention is: a method for establishing a model for rapid plugging of concentrated dike breaches, characterized in that it comprises the following steps:

[0006] S1. Establishment of a rapid plugging function model for concentrated dike breaches

[0007] The rapid sealing of concentrated breaches in dikes can be divided into three stages: interception stage, plugging stage and air-locking stage. The interception stage can quickly reduce the flow and velocity at the breach and plug the larger gap; the plugging structure is reinforced by different methods in the plugging stage; the air-locking stage requires multiple methods to ensure the stability of foundation seepage;

[0008] A rapid plugging function model for concentrated large-flow breaches in dikes is established to realize rapid interception function, composite plugging function and multi-mode air-locking function, as shown in Formula 1:

[0009] F=[F1,F2,F3] Formula 1

[0010] In the formula: F is the set of plugging functions for concentrated large-flow breaches of dikes, among which F1 is the rapid interception function; F2 is the composite plugging function; F3 is the multi-mode air-locking function;

[0011] S2. Establish a carrier model for rapid sealing of concentrated dike breaches

[0012] In formula 1, the rapid plugging function of concentrated large-flow breaches of dikes needs to be realized through different carrier models; the realization of the rapid interception function F1 requires the use of shipwrecks and interception dike carriers; the realization of the composite plugging function F2 requires combined dikes and back dike carriers; the realization of the multi-mode air-locking function F3 requires underwater soil dumping and pond filling foundation carriers; establish a carrier model to realize the rapid plugging function of concentrated dike breaches, as shown in formula 2:

[0013] G(F1)=[f 11 , f 12 ]

[0014] G(F2)=[f 21 , f 22 ]

[0015] G(F3)=[f 31 , f 32 Formula 2

[0016] In Formula 2, G(F1) is the carrier model set of the rapid interception function F1, which includes two subsets, namely, the shipwreck carrier model f 11 and interception dike carrier model f 12 ; G(F2) is the carrier model set of the composite plugging function F2, including two subsets, namely, the combined dike carrier model f 21 and the rear dike carrier model f 22 ; G(F3) is a carrier model set for realizing the multi-mode breath-holding function F3, including two subsets, namely, underwater earth throwing carrier model f 31 and the model of the solid base carrier 32 ;

[0017] S3. Establish a model for realizing the rapid interception function of concentrated dike breach

[0018] According to Formula 2, the carrier model set G(F1) of the rapid interception function F1 includes the shipwreck carrier model f 11 and interception dike carrier model f 12 ; Among them, the shipwreck carrier model f 11 As shown in Equation 3, the selected model includes the number, height, length of the sunken ship and the speed of the ship during the plugging operation; the interception dike carrier model f 12 As shown in Equation 4, the selection model includes the selection of dike materials, structure bottom width and length, and slope ratio.

[0019]

[0020] In formula 3, U 11 Function for quick selection of sunken ships; n c is the number of sunken ships, consisting of 1 large ship and n small ships, where n is 3 to 6; hc H is the height from the bottom of a large ship to the deck. k is the actual height of the dike breach, L k is the width of the levee breach, α is the relative enhancement coefficient, which is 1.2 to 1.5; l c is the length of the sunken ship, v c is the speed of the ship during blocking; μ1 is the velocity adjustment coefficient, ranging from 1 to 1.3; H1 is the water level difference between the upstream and downstream water levels;

[0021] f 12 =U 12 (n q ,b q ,L q ,θ q )

[0022]

[0023] b q =γ·L k

[0024]

[0025] In formula 4, U 12 Function for fast selection of interception dikes; n q For the type of dike, when the flow velocity at the breach is less than 3m / s, the riprap type is selected; when the flow velocity at the breach is greater than 3m / s, the steel cage riprap type is selected; b q is the width of the dike structure, Lq is the length of the dike structure; γ is the relative improvement coefficient of the dike, which is 1.3~1.5; L k is the width of the dike breach; k is the turbulent permeability coefficient, v k is the flow velocity at the breach; m p is the porosity of the riprap of the dike; θ q is the slope ratio of the dike;

[0026] S4. Establish a model for realizing the composite plugging function of concentrated dike breaches

[0027] According to Formula 2, the carrier model set G(F2) of the composite plugging function F2 includes the combined embankment carrier model f 21 and the rear dike carrier model f 22 By establishing the combined dike carrier model and the back dike carrier model, a method support is provided for the rapid plugging of the port, as shown in Formula 5:

[0028]

[0029] Z z =e1∪e2∪e3

[0030] d z<d 50

[0031] θ h >θ j Formula 5

[0032] In formula 5, U 21 The function for quick selection of the combination embankment, U 22 To realize the function of fast selection of back dike; z It is a steel-wood frame bag composite embankment assembly set, e1 is a steel pipe, e2 is a wooden pile, and e3 is a riprap bag; b z is the number of rows of steel pipes and wooden piles, take 3-5; d z Refers to the diameter of the steel pipe, d 50 Refers to the particle size corresponding to the cumulative particle size distribution percentage of the riprap diameter reaching 50%; θ h is the slope ratio of the back dike, θ j For contact seepage path, the slope ratio of the back dike must be greater than the contact seepage path;

[0033] S5. Establishment of a model for the realization of the centralized breach sealing function of dikes

[0034] According to Formula 2, the carrier model set G(F3) of the multi-mode breath-holding function F3 includes the underwater earth throwing carrier model f 31 and the model of the solid base carrier 31 The realization model of the breach sealing function is shown in Formula 6. If there is concentrated leakage in the underwater dumped gabion, geotextile is laid first and then underwater dumping is performed. If there is no concentrated leakage, underwater dumping is directly used.

[0035]

[0036] f 32 =U 32 (b)

[0037]

[0038] In formula 6, U1 is the function used when there is no concentrated leakage, that is, the underwater soil dumping method is directly adopted; U2 is the function used when there is concentrated leakage, that is, geotextile is first laid at the leakage point, and then the underwater soil dumping method is adopted; U 32 is a function formula for quick selection of pond filling and foundation consolidation; q is a judgment function, q=0 means no concentrated leakage of underwater gabions, q≠0 means concentrated leakage of underwater gabions; h is the height of underwater soil dumping, in m; H k is the actual height of the breach of the embankment; d is the diameter of the dumped soil block, in meters; b is the type set of dumped soil materials, b1 is general clay, b2 is sub-clay, and b3 is plastic fertile clay with a high natural water content;

[0039] S6. Integrate the models of S1 to S5 to achieve rapid plugging of concentrated embankment breaches.

[0040] The beneficial effects achieved by the present invention are as follows: the present invention establishes a rapid plugging function model and a plugging function carrier model for concentrated large-flow breaches of dikes, and realizes a rapid interception function through a shipwreck and interception dike carrier selection model; realizes a composite plugging function through a combined dike and rear dike carrier selection model; realizes a multi-mode air-locking function through an underwater earth-throwing carrier selection model; and, by combining the above functions, the present invention provides reliable technical support for realizing rapid rescue of concentrated large-flow breaches of dikes in a short window period. The present invention has the following advantages:

[0041] 1. For the first time, a rapid plugging function model for concentrated large-flow breaches in dikes was established, which can realize rapid interception function, composite plugging function, and multi-mode air-locking function;

[0042] 2. The present invention realizes the rapid interception function through carrier models such as sunken ships and interception dikes; realizes the composite plugging function through carrier models such as combined dikes and rear dikes; and realizes the multi-mode air-locking function through carrier models such as underwater earth throwing. Combining the above functions, it provides reliable technical support for the rapid rescue of concentrated large-flow dike breaches in a short window period;

[0043] 3. The present invention is suitable for sealing breaches of large-flow embankments, filling the blank of this functional model in my country. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1 It is a schematic diagram of the present invention. DETAILED DESCRIPTION

[0045] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0046] like Figure 1 As shown, a method for establishing a model for rapid plugging of concentrated dike breaches of the present invention is characterized by comprising the following steps:

[0047] S1. Establishment of a rapid plugging function model for concentrated dike breaches

[0048] The rapid sealing of concentrated breaches in dikes can be divided into three stages: interception stage, plugging stage and air-locking stage. The interception stage can quickly reduce the flow and velocity at the breach and plug the larger gap; the plugging structure is reinforced by different methods in the plugging stage; the air-locking stage requires multiple methods to ensure the stability of foundation seepage;

[0049] A rapid plugging function model for concentrated large-flow breaches in dikes is established to realize rapid interception function, composite plugging function and multi-mode air-locking function, as shown in Formula 1:

[0050] F=[F1,F2,F3] Formula 1

[0051] In the formula: F is the set of plugging functions for concentrated large-flow breaches of dikes, among which F1 is the rapid interception function; F2 is the composite plugging function; F3 is the multi-mode air-locking function;

[0052] S2. Establish a carrier model for rapid sealing of concentrated dike breaches

[0053] The rapid plugging function of concentrated large-flow breaches in the dike in Formula 1 needs to be realized through different carrier models; the realization of the rapid interception function F1 requires the use of the shipwreck carrier model and the interception dike carrier model; the realization of the composite plugging function F2 requires the combined dike carrier model and the rear dike carrier model; the realization of the multi-mode air-locking function F3 requires the underwater earth throwing carrier model and the pond filling foundation solidification carrier model; the carrier model for realizing the rapid plugging function of concentrated dike breaches is established, as shown in Formula 2:

[0054] G(F1)=[f 11 ,f 12 ]

[0055] G(F2)=[f 21 , f 22 ]

[0056] G(F3)=[f 31 , f 32 Formula 2

[0057] In Formula 2, G(F1) is the carrier model set of the rapid interception function F1, which includes two subsets, namely, the shipwreck carrier model f 11 and interception dike carrier model f 12 ; G(F2) is the carrier model set of the composite plugging function F2, including two subsets, namely, the combined dike carrier model f 21 and the rear dike carrier model f 22 ; G(F3) is the carrier model set of the multi-mode breath-holding function F3, including two subsets, namely, underwater earth throwing carrier model f 31 and the model of the solid base carrier 32 ;

[0058] S3. Establish a model for realizing the rapid interception function of concentrated dike breach

[0059] According to Formula 2, the carrier model set G(F1) of the rapid interception function F1 includes the shipwreck carrier model f 11 and interception dike carrier model f12 ; Among them, the shipwreck carrier model f 11 As shown in Equation 3, the selected model includes the number, height, length of the sunken ship and the speed of the ship during the plugging operation; the interception dike carrier model f 12 As shown in Equation 4, the selection model includes the choice of dike material, structure bottom width and length, and slope ratio.

[0060]

[0061] In formula 3, U 11 Function for quick selection of sunken ships; n c is the number of sunken ships, consisting of 1 large ship and n small ships, where n is 3 to 6; h c H is the height from the bottom of a large ship to the deck. k is the actual height of the dike breach, L k is the width of the levee breach, α is the relative enhancement coefficient, which is 1.2 to 1.5; l c is the length of the sunken ship, v c is the speed of the ship during blocking; μ1 is the velocity adjustment coefficient, ranging from 1 to 1.3; H1 is the water level difference between the upstream and downstream water levels;

[0062] f 12 =U 12 (n q ,b q ,L q ,θ q )

[0063]

[0064] b q =γ·L k

[0065]

[0066] In formula 4, U 12 Function for fast selection of interception dikes; n q For the type of dike, when the flow velocity at the breach is less than 3m / s, the riprap type is selected; when the flow velocity at the breach is greater than 3m / s, the steel cage riprap type is selected; b q is the width of the dike structure, Lq is the length of the dike structure; γ is the relative improvement coefficient of the dike, which is 1.3~1.5; L k is the width of the dike breach; k is the turbulent permeability coefficient, v k is the flow velocity at the breach; m p is the porosity of the riprap of the dike; θ q is the slope ratio of the dike;

[0067] S4. Establish a model for realizing the composite plugging function of concentrated dike breaches

[0068] According to Formula 2, the carrier model set G(F2) of the composite plugging function F2 includes the combined embankment carrier model f 21 and the rear dike carrier model f 22 , by establishing a combined embankment carrier model f 21 and the rear dike carrier model f 22 , which provides method support for rapid plugging and sealing, as shown in Formula 5:

[0069]

[0070] Z z =e1∪e2∪e3

[0071] d z <d 50

[0072] θ h >θ j Formula 5

[0073] In formula 5, U 21 To realize the function of fast selection of combined embankments, U 22 To realize the function of fast selection of back dike; z It is a steel-wood frame bag composite embankment assembly set, e1 is a steel pipe, e2 is a wooden pile, and e3 is a riprap bag; b z is the number of rows of steel pipes and wooden piles, take 3-5; d z Refers to the diameter of the steel pipe, d 50 Refers to the particle size corresponding to the cumulative particle size distribution percentage of the riprap diameter reaching 50%; θ h is the slope ratio of the back dike, θ j For contact seepage path, the slope ratio of the back dike must be greater than the contact seepage path;

[0074] S5. Establishment of a model for the realization of the centralized breach sealing function of dikes

[0075] According to Formula 2, the carrier model set G(F3) of the multi-mode air-locking function F3 includes the underwater earth dumping carrier model and the pond filling and foundation consolidation carrier model. The breach air-locking function realization model is shown in Formula 6. If there is concentrated leakage in the underwater earth dumping gabion, geotextile is laid first and then underwater earth dumping is performed. If there is no concentrated leakage, underwater earth dumping is directly used.

[0076]

[0077] f 32 =U 32 (b)

[0078]

[0079] In formula 6, U1 is the function used when there is no concentrated leakage, that is, the underwater soil dumping method is directly adopted; U2 is the function used when there is concentrated leakage, that is, geotextile is first laid at the leakage point, and then the underwater soil dumping method is adopted; U 32 is a function formula for quick selection of pond filling and foundation consolidation; q is a judgment function, q=0 means no concentrated leakage of underwater gabions, q≠0 means concentrated leakage of underwater gabions; h is the height of underwater soil dumping, in m; H k is the actual height of the breach of the embankment; d is the diameter of the dumped soil block, in meters; b is the type set of dumped soil materials, b1 is general clay, b2 is sub-clay, and b3 is plastic fertile clay with a high natural water content;

[0080] S6. Integrate the models of S1 to S5 to achieve rapid plugging of concentrated embankment breaches.

[0081] The method of the present invention establishes a rapid plugging function model for concentrated large-flow breaches of dikes and a plugging function carrier model, and realizes a rapid interception function based on carrier selection models such as sunken ships and interception dikes; realizes a composite plugging function based on carrier selection models such as combined dikes and back dikes; and realizes a multi-mode air-locking function based on carrier selection models such as underwater earth throwing. Combining the above functions, reliable technical support is provided for realizing rapid rescue of concentrated large-flow breaches of dikes in a short window period.

[0082] It should be noted that the description of the above technical solutions is exemplary, and this specification can be embodied in different forms and should not be interpreted as being limited to the technical solutions set forth herein. On the contrary, providing these descriptions will make the disclosure of the present invention thorough and complete, and will fully convey the scope disclosed in this specification to those skilled in the art. In addition, the technical solutions of the present invention are limited only by the scope of the claims.

[0083] Finally, it should be pointed out that the above embodiments are only representative examples of the present invention. Obviously, the present invention is not limited to the above embodiments, and there are many variations. Any simple modification, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention should be considered to belong to the protection scope of the present invention.

Claims

1. A method for establishing a rapid plugging model for concentrated dike breaches, characterized in that: The following steps are involved: S1. Establishment of a rapid plugging function model for concentrated dike breaches A rapid plugging function model for concentrated breaches of dikes is established to realize rapid interception function, composite plugging function and multi-mode air-locking function, as shown in Formula 1: F=[F1,F2,F3] Formula 1 In formula 1: F is the set of concentrated breach blocking functions of the dike; F1 is the rapid interception function; F2 is the composite blocking function; F3 is the multi-mode air-locking function; S2. Establish a carrier model for the rapid sealing function of concentrated dike breaches, as shown in Formula 2: G(F1)=[f 11 ,f 12 ] G(F2)=[f 21 ,f 22 ] G(F3) = [f 31 , f 32 Formula 2 In Formula 2, G(F1) is the carrier model set of the rapid interception function F1, which includes two subsets, namely, the shipwreck carrier model f 11 and interception dike carrier model f 12 ; G(F2) is the carrier model set of the composite plugging function F2, including two subsets, namely, the combined dike carrier model f 21 and the rear dike carrier model f 22 ; G(F3) is the carrier model set of the multi-mode breath-holding function F3, including two subsets, namely, the underwater earth throwing carrier model f 31 and the model of the solid foundation carrier 32 ; S3. Establish a model for realizing the rapid interception function of concentrated dike breach According to Formula 2, the carrier model set G(F1) of the rapid interception function F1 includes the shipwreck carrier model f 11 and interception dike carrier model f 12 ; Among them, the shipwreck carrier model f 11 As shown in Equation 3, the selected model includes the number, height, length of the sunken ship and the speed of the ship during the plugging operation; the interception dike carrier model f 12 As shown in Equation 4, the selection model includes the selection of dike materials, structure bottom width and length, and slope ratio. In formula 3: U 11 Function for quick selection of sunken ships; n c is the number of sunken ships; h c H is the height from the bottom to the deck of a large ship; k is the actual height of the dike breach; L k is the width of the dike breach; α is the relative improvement coefficient; l c is the length of the sunken ship; v c is the speed of the ship during blocking; μ1 is the velocity adjustment coefficient, H1 is the water level difference between upstream and downstream; f 12 =U 12 (n q ,b q ,L q ,i q ) b q =γ·L k In formula 4: U 12 Function for fast selection of interception dikes; n q b is the type of dike; b q is the width of the dike structure, Lq is the length of the dike structure; γ is the relative improvement coefficient of the dike; L k is the width of the dike breach; k is the turbulent permeability coefficient; v k is the flow velocity at the breach; m p is the porosity of the riprap of the dike; θ q is the slope ratio of the dike; S4. Establish a model for realizing the composite plugging function of concentrated dike breaches According to Formula 2, the carrier model set G(F2) of the composite plugging function F2 includes the combined embankment carrier model f 21 and the rear dike carrier model f 22 By establishing the combined dike carrier model and the back dike carrier model, a method support is provided for achieving plugging, as shown in Formula 5: With z =e1∪e2∪e3 d z <d 50 i h >θ j formula 5 In formula 5: U 21 The function for quick selection of the combination embankment, U 22 Function for quick selection of back dike; z It is a steel-wood frame bag composite embankment assembly set; e1 is a steel pipe; e2 is a wooden pile; e3 is a riprap bag; b z is the number of rows of steel pipes and wooden piles; d z Refers to the diameter of the steel pipe; d 50 Refers to the particle size corresponding to the cumulative particle size distribution percentage of the riprap diameter reaching 50%; θ h is the slope ratio of the rear dike; θ j is the contact seepage path; S5. Establishment of a model for the realization of the centralized breach sealing function of dikes According to Formula 2, the carrier model set G(F3) of the multi-mode breath-holding function F3 includes the underwater earth throwing carrier model f 31 and the model of the solid foundation carrier 32 , the breach air-tightness realization model is shown in Formula 6. If there is concentrated leakage in the underwater dumped gabion, geotextile is laid first and then underwater dumping is performed. If there is no concentrated leakage, underwater dumping is directly used. f 32 =U 32 (b) In formula 6, U1 is the function used when there is no concentrated leakage; U2 is the function used when there is concentrated leakage; U 32 is a function formula for quick selection of pond filling and foundation consolidation; q is a judgment function, q=0 means no concentrated leakage of underwater gabions, q≠0 means concentrated leakage of underwater gabions; h is the height of underwater soil dumping; H k is the actual height of the breach of the embankment; d is the diameter of the dumped soil block; b is the type of dumped soil, b1 is clay, b2 is sub-clay, and b3 is plastic fertile clay with a high natural water content; S6. Integrate the models of S1 to S5 to achieve rapid plugging of concentrated embankment breaches.

2. The method for establishing a rapid plugging model for concentrated dike breaches according to claim 1 is characterized by: In step S1, the rapid plugging of concentrated breaches in the dike can be divided into three stages: the interception stage, the plugging stage and the air-blocking stage. The interception stage reduces the flow and flow velocity at the breach. Strengthen the plugging structure during the plugging stage; The air-locking stage ensures the foundation penetration stability.

3. The method for establishing a rapid plugging model for concentrated dike breaches according to claim 1 is characterized by: In step S3, in formula 3, n is 3 to 6, α is 1.2 to 1.5, and μ1 is 1 to 1.

3.

4. The method for establishing a rapid plugging model for concentrated dike breaches according to claim 1 is characterized by: In step S3, in formula 4, when the flow velocity at the breach is less than 3 m / s, n q It is a riprap type; when the flow velocity at the breach is greater than 3m / s, n q It is a reinforced cage riprap type; γ is taken as 1.3~1.

5.

5. The method for establishing a rapid plugging model for concentrated dike breaches according to claim 3 is characterized by: In step S4, in formula 5, b z Take 3 to 5; the slope ratio of the rear dike θ h Greater than the contact seepage diameter θ j .