Drilling device and method for hydraulic fracturing construction

Through the connection of the cooling flow channel between the drill pipe and the drill bit and the real-time monitoring of the detection flow channel, the problem of serious wear of the drill bit at high rotation speed is solved, achieving stable cooling and extending the service life.

CN118564180BActive Publication Date: 2024-10-18SICHUAN JIAYANG GRP CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411040294.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-10-18
Estimated Expiration
2044-07-31

AI Technical Summary

Technical Problem

When the existing hydraulic fracturing drill bit rotates at high speed, the bumps frequently squeeze the valve, causing serious wear and unstable cooling effect.

Method used

A drilling device for hydraulic fracturing construction is designed. It is connected through the cooling flow channel of the drill pipe and drill bit, and uses cooling water to directly cool down. The cooling water pressure is monitored in real time by detecting the flow channel and pressure maintaining components, and the worn blades are replaced in time. The electronic pressure regulating valve is used to adjust the cooling water flow according to the drill bit speed.

Benefits of technology

It effectively reduces the wear of the drill bit, extends the service life of the drilling device, ensures the stable cooling effect of the drill bit, and prevents more serious losses through real-time monitoring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118564180B_ABST
    Figure CN118564180B_ABST
Patent Text Reader

Abstract

The invention provides a drilling device and method for hydraulic fracturing construction, belonging to the technical field of hydraulic fracturing, comprising a drill rod, a drill bit and a ground support platform, wherein the top of the drill rod is clamped and fixed by the ground support platform, the bottom of the drill rod is rotatably connected to the drill bit, the outer side of the drill rod is coaxially fixed with a mounting sleeve, and a driving member for driving the drill bit to rotate is arranged in the mounting sleeve; a first cooling flow channel is coaxially opened inside the drill rod, a second cooling flow channel is arranged in the drill bit, a water outlet is opened at the bottom of the drill bit, the drill bit comprises a plurality of cutter bits distributed at intervals on the outer wall, a third cooling flow channel corresponding to the cutter bits is opened in the drill bit, the drill bit can be cooled by directly passing cooling water into the drill bit, and the cooling water in the drill bit is jetted toward the bottom, which can not only flush the rock layer at the bottom, but also cool the cutter bits outside the drill bit, and has a good cooling effect on the drill bit.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of hydraulic fracturing, and in particular to a drilling device and method for hydraulic fracturing construction. Background Art

[0002] Hydraulic fracturing, also known as hydraulic fracturing, is the process of injecting high-pressure fluid (liquid or gas) into the target rock formation to produce cracks or restart natural cracks. By transforming the rock structure and forming a fracture network system, industrial goals such as increasing resource recovery can be achieved. Hydraulic fracturing is a conventional low-permeability oil and gas permeability enhancement technology, and has gradually been promoted and applied in unconventional oil and gas extraction, shale oil and gas development, geothermal resource development, nuclear fertilizer processing, CO2 storage, and underground coal mine rock control, showing a wide range of industrial application value. In recent years, hydraulic fracturing technology has gradually been used in coal mine geostress testing, coal seam permeability enhancement, roof softening, and pressure relief to prevent re-entry rock control, and has achieved good application results.

[0003] The patent with publication number CN118241986A discloses a hydraulic fracturing drilling device for preventing hole collapse, including a base plate, a support frame, a connecting frame, a lifting mechanism, a drilling mechanism and a water spraying mechanism, wherein the drilling mechanism includes a transmission shaft and a drill bit, and the water spraying mechanism includes a third fixed block, a water pipe, a valve and a second torsion spring. The upper and lower parts of the casing are connected to the third fixed block, a water pipe is connected between the third fixed blocks, a valve is rotatably connected to the lower part of the water pipe, the valve is squeezed and matched with a convex block, and a second torsion spring is connected between the valve and the water pipe. The rotation of the drill bit drives the convex block to rotate, and the convex block rotates and reciprocates to squeeze the valve and cooperates with the second torsion spring, so that the valve is automatically opened and closed, and water is intermittently supplied to the drill bit for cooling, and the opening and closing control can be automatically performed according to the drilling speed of the drill bit, and water is intermittently supplied to the drill bit for cooling, and the water output can be automatically controlled according to the drilling speed of the drill bit, so as to better protect the drill bit.

[0004] However, the drill bit has a high rotation speed when in operation, and the bumps on the drill bit will frequently squeeze the valve, causing high wear on the bumps and valve, and having a poor cooling and stabilizing effect on the drill bit. Summary of the invention

[0005] In view of the above problems in the prior art, the present invention provides a drilling device and method for hydraulic fracturing construction.

[0006] In order to achieve the above-mentioned object of the invention, the technical solution adopted by the present invention is as follows:

[0007] In a first aspect, a drilling device for hydraulic fracturing construction is provided, comprising a drill pipe, a drill bit and a ground support platform, wherein the top of the drill pipe is clamped and fixed by the ground support platform, the bottom of the drill pipe is rotatably connected to the drill bit, and a mounting sleeve is coaxially fixed on the outer side of the drill pipe, and a driving member for driving the drill bit to rotate is arranged in the mounting sleeve;

[0008] A first cooling channel is coaxially provided inside the drill pipe, a second cooling channel is provided inside the drill bit, the first cooling channel is connected to the second cooling channel, a water outlet connected to the second cooling channel is provided at the bottom of the drill bit, the drill bit includes a plurality of cutter bits spaced apart on the outer wall, a third cooling channel corresponding to the cutter bits is provided inside the drill bit, the third cooling channel is connected to the second cooling channel, one end of the third cooling channel extends away from the second cooling channel and is connected to the bottom wall of the cutter bit, and the top opening of the first cooling channel of the drill pipe on the ground support platform is connected to an external water pump and a cooling water source.

[0009] Furthermore, a detection channel connected to the third cooling channel is opened in the cutter head, a pressure maintaining component is arranged in the third cooling channel, and a pressure tester is arranged on the ground support platform, and the pressure tester is used to detect the pressure of the cooling water in the first cooling channel.

[0010] Furthermore, the pressure maintaining assembly includes a block, a support rod and a spring. An installation step is provided in the third cooling channel. The spring and the block are sequentially arranged on the side of the installation step away from the cutter head. One end of the support rod is fixedly connected to the block, and the other end passes through the installation step and abuts against the detection channel of the cutter head, so that a gap is formed between the block and the installation step for cooling water to pass through. The spring is used to drive the block to move toward the installation step and block the installation step.

[0011] Furthermore, the support rod is made of brittle material.

[0012] Furthermore, the drill bit includes a connecting head and a working head, the connecting head is connected to the drill rod, the working head sleeve is arranged on the outside of the connecting head, the working head and the connecting head are detachably connected by a plurality of bolts, the detection flow channel and the pressure maintaining assembly are both arranged on the working head, a third cooling flow channel is formed between the connecting head and the working head, an auxiliary flow channel is opened between the connecting head and the working head along their own circumference, one end of the auxiliary flow channel is connected to the third flow channel, and the other end is vertically upward along the axial direction of the drill rod.

[0013] Furthermore, a plurality of slurry outlets for slurry to pass through are provided between the mounting sleeve and the drill rod, and a plurality of drainage grooves extending from the head to the tail are provided on the outer wall of the drill bit.

[0014] Furthermore, an eccentric block is provided on the outer wall of the connector, the eccentric block and the connector are connected via a pressure sensor, an electronic pressure regulating valve is provided on the ground support platform between the drill pipe and the water pump, and the pressure sensor communicates and controls the electronic pressure regulating valve.

[0015] Furthermore, a driving assembly for driving the drill pipe to descend is provided on the ground support platform;

[0016] The driving assembly includes two sets of lifting platforms, on which two driving screws are arranged for vertical rotation. Both sets of lifting platforms are connected to the ground support platform for vertical lifting through guide rods. The two sets of lifting platforms are respectively threaded with the two driving screws. The ground support platform is provided with driving motors for driving the two driving screws to rotate respectively. The lifting platform is provided with clearance holes for the drill rod to pass through. Clamps are arranged on both sides of the clearance holes on the lifting platform for sliding along the axial direction of the drill rod. The lifting platform is provided with hydraulic cylinders for driving the clamps to slide.

[0017] Furthermore, a guide cylinder is fixedly arranged on the ground support platform, and the mounting sleeve is coaxially slidably inserted into the guide cylinder.

[0018] In a second aspect, a method for a drilling device for hydraulic fracturing construction is provided, based on a drilling device for hydraulic fracturing construction proposed in the first aspect, comprising:

[0019] S01. Install the ground support platform, assemble and inspect the drill bit and drill rod;

[0020] S02, putting the drill bit and the drill rod into the ground, and starting the drill bit to drill;

[0021] S03, turning on the water pump to fill the cooling channel inside the drill bit with cooling water to cool the drill bit;

[0022] S04. Ground personnel observe the real-time pressure data of the pressure tester. If they observe that the pressure tester value has continuous pressure loss or cumulative pressure loss for many times, they should lift the drill pipe and drill bit and replace the working head on the drill bit.

[0023] S05, lowering the drill bit and drill rod again to perform drilling work;

[0024] S06. Repeat steps S02-S05 until the hole is drilled to a predetermined depth.

[0025] The beneficial effects of the present invention are as follows: 1. By connecting the first cooling channel in the drill rod with the second cooling channel in the drill bit, cooling water can be directly introduced into the drill bit to cool the drill bit. At the same time, the cooling water in the drill bit is sprayed toward the bottom, which can not only flush the bottom rock formation, but also cool the cutter head outside the drill bit;

[0026] 2. By real-time monitoring of the cooling water pressure in the cooling channels of the drill rod and drill bit, the integrity of the cutter head on the drill bit can be remotely judged, and the drill bit can be lifted and replaced in time to avoid more serious losses;

[0027] 3. The eccentric block on the drill bit generates different centrifugal forces during the rotation of the drill bit to determine the actual rotation speed of the drill bit, and adjust the electronic pressure regulating valve on the ground support platform so that the coolant pressure in the cooling channel is proportional to the actual rotation speed of the drill bit, thereby controlling the water flow rate of the water outlet at the bottom of the drill bit and saving cooling water. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 This is a schematic diagram of the overall structure of a drilling device for hydraulic fracturing construction according to Example 1 of the present application;

[0029] Figure 2 This is a schematic diagram of the overall structure of the drill bit of Example 1 of the present application;

[0030] Figure 3 This is a schematic diagram of the internal cross-sectional structure of the drill rod and drill bit of Example 1 of the present application;

[0031] Figure 4 This is a schematic cross-sectional structural diagram of a cutter head and a pressure-maintaining assembly according to Example 1 of the present application;

[0032] Figure 5 This is a flowchart of the steps of the method of Example 2 of the present application.

[0033] Among them, 1. drill rod; 11. first cooling channel; 2. drill bit; 21. second cooling channel; 22. water outlet; 23. cutter head; 24. third cooling channel; 25. detection channel; 26. connector; 27. working head; 28. auxiliary channel; 29. ​​drainage trough; 3. ground support platform; 4. mounting sleeve; 41. slurry outlet; 5. water pump; 51. pressure tester; 61. block; 62. support rod; 63. spring; 64. mounting step; 71. eccentric block; 72. pressure sensor; 73. electronic pressure regulating valve; 81. lifting platform; 82. drive screw; 83. drive motor; 84. guide rod; 85. clearance hole; 86. splint; 87. hydraulic cylinder; 88. guide cylinder; 9. suction pump. DETAILED DESCRIPTION

[0034] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0035] Example 1

[0036] The embodiment of the present invention provides a drilling device for hydraulic fracturing construction, referring to Figure 1 , Figure 2 and Figure 3, including a drill rod 1, a drill bit 2 and a ground support platform 3. The ground support platform 3 is fixed to the ground platform to be drilled by structures such as anchor bolts. The top of the drill rod 1 is clamped and fixed by the ground support platform 3. The bottom of the drill rod 1 is connected to the drill hole of the drill bit 2. The outer coaxial fixed sleeve of the drill rod 1 is provided with a mounting sleeve 4. The mounting sleeve 4 is provided with a driving member (not shown in the figure) for driving the drill bit 2 to rotate. The driving member can be an electric motor, which is fixed in the mounting sleeve 4. The output shaft of the motor is connected to the drill bit 2 in a transmission manner. The mounting sleeve 4 extends upward to above the ground, forming a channel between the mounting sleeve 4 and the drill rod 1. A blocking structure is used on the ground to block the channel opening between the mounting sleeve 4 and the drill rod 1, and a suction pump 9 is used to suck the channel between the mounting sleeve 4 and the drill rod 1, so that the mud and sand generated during the drilling process are sucked out of the ground, and the cooling water therein is reused after filtering.

[0037] Reference Figure 4 A first cooling channel 11 is coaxially provided inside the drill rod 1, and both ends of the first cooling channel 11 penetrate the drill rod 1. A second cooling channel 21 is provided inside the drill bit 2, and the second cooling channel 21 is connected to the first cooling channel 11. A water outlet 22 connected to the second cooling channel 21 is provided at the bottom of the drill bit 2. A plurality of cutter bits 23 are spaced apart on the outer wall of the drill bit 2, and a plurality of third cooling channels 24 are provided inside the drill bit 2, and the third cooling channels 24 correspond to the cutter bits 23 one by one, and one end of the third cooling channel 24 is connected to the second cooling channel 21, and the other end is extended and connected to the bottom wall of the cutter bit 23. The top opening of the first cooling channel 11 of the drill pipe 1 on the ground support platform 3 is connected to an external water pump 5 and a cooling water source. When the drill bit 2 is drilling underground, the water pump 5 is turned on to inject cooling water into the drill pipe 1. The cooling water fills the first cooling channel 11, the second cooling channel 21 and the third cooling channel 24, so that the cooling water can directly contact the bottom wall of the cutter head 23 to cool the cutter head 23. At the same time, through the water outlet 22 at the bottom of the drill bit 2, the cooling water can flow out from the bottom of the drill bit 2 during the drilling process of the drill bit 2 to cool the direct working surface of the cutter head 23 on the drill bit 2. There is no need to frequently turn on the drill bit 2 to cool it, thereby increasing the service life of various parts of the drilling device.

[0038] Furthermore, a detection channel 25 connected to the third cooling channel 24 is provided on the bottom wall of the cutter head 23, a pressure-maintaining assembly is provided in the third cooling channel 24, a pressure test gauge 51 is provided on the ground support platform 3, and the pressure test gauge 51 is connected to the pipeline connecting the drill pipe 1 and the water pump 5, and is used to detect the pressure of the cooling water in the first cooling channel 11. During the operation of the drill bit 2, when the cutter head 23 is greatly worn or broken, the third cooling channel 24 in the cutter head 23 is directly connected to the outside. In the connected state, the pressure in each cooling channel is reduced, which is directly reflected on the pressure test gauge 51 on the ground support platform 3. When the third cooling channel 24 is connected to the outside, the third cooling channel 24 is closed again by the pressure-maintaining assembly to maintain the cooling water pressure in each cooling channel. By detecting the cooling water pressure, the approximate degree of wear of the cutter bits 23 on the drill bit 2 can be remotely acquired. When it is detected that multiple pressure fluctuations occur within a set time period, or a set number of pressure fluctuations occur cumulatively since the start of the drill bit 2, it means that the drill bit 2 touches a hard formation, causing multiple cutter bits 23 on the drill bit 2 to be worn or broken. It is necessary to lift the drill bit 2 and the drill rod 1 in time, and restart the drilling operation after replacing the drill bit 2 to avoid serious damage to the drill bit 2 or even breakage in the hole.

[0039] In the embodiment of the present application, the pressure maintaining assembly includes a block 61, a support rod 62 and a spring 63. A mounting step 64 is coaxially provided in the third cooling channel 24. The spring 63 and the block 61 are connected in sequence on the side of the mounting step 64 away from the cutter head 23. One end of the support rod 62 is fixedly connected to the block 61, and the other end is inserted into the detection channel 25 after passing through the mounting step 64. The diameter of the support rod 62 should be smaller than the diameter of the detection channel 25. When the support rod 62 abuts against the inner bottom wall of the detection channel 25, the block 61 is supported away from the mounting step 64, and a gap is formed between the block 61 and the mounting step 64 for cooling water to pass through. The spring 63 is used to drive the stopper 61 to move toward the installation step 64 and block the installation step 64. When the cutter head 23 is broken or worn and the support rod 62 is exposed, the support rod 62 is pushed out of the drill bit 2 under the action of the spring 63. After being worn or broken, the stopper 61 is pulled under the action of the spring 63 and blocks the installation step 64 to prevent cooling water from continuing to flow out of the drill bit 2.

[0040] Furthermore, the support rod 62 can be made of brittle materials, such as ceramics and glass. When the support rod 62 extends out of the drill bit 2 and contacts the external rock formation, the strong impact force directly breaks the support rod 62, so that the stopper 61 can be smoothly pulled by the spring 63 to block the installation step 64, thereby avoiding the bending deformation of the support rod 62 during the contact with the rock formation, which affects the block 61 to close the installation step 64.

[0041] In the embodiment of the present application, the drill bit 2 includes a connector 26 and a working head 27. The connector 26 is coaxially rotatably connected to the drill rod 1. The working head 27 is coaxially sleeved on the outer side of the connector 26 away from the end of the drill rod 1. The working head 27 and the connector 26 are detachably fixedly connected by a plurality of bolts, and the bolts are threadedly connected to the connector 26 after passing through the working head 27. The detection channel 25 and the pressure-maintaining assembly are both provided on the working head 27. A third cooling channel 24 is formed between the connector 26 and the working head 27, and an auxiliary channel 28 is also formed between the connector 26 and the working head 27. One end of the auxiliary channel 28 is connected to the third channel, and the other end is vertically upward along the axial direction of the drill rod 1. A plurality of auxiliary channels 28 are provided at intervals along the circumference of the drill bit 2. By spraying the coolant upward through the auxiliary flow channel 28, the mud and sand produced by drilling around the drill bit 2 can be sprayed upward, reducing the deposition of mud and sand above the drill bit 2. At the same time, the contact area between the working head 27 and the cooling is increased, thereby improving the cooling effect on the working head 27.

[0042] Furthermore, a plurality of slurry outlets 41 for slurry to pass through are provided between the mounting sleeve 4 and the drill rod 1, and a plurality of drainage grooves 29 extending from the head to the tail are provided on the outer wall of the drill bit 2. Through the drainage grooves 29 and the slurry outlets 41, the mud and sand slurry in the drilling process can be guided upward more quickly to avoid mud and sand deposition.

[0043] Furthermore, an eccentric block 71 is provided on the outer wall of the connector 26, and the eccentric block 71 is connected to the connector 26 through a pressure sensor 72. A conductive circuit is vertically provided on the drill rod 1, and a conductive slip ring is provided between the bottom end of the drill rod 1 and the connector 26 to connect the conductive circuit to the pressure sensor 72. An electronic pressure regulating valve 73 is also provided between the drill rod 1 and the water pump 5 on the ground support platform 3. The electronic pressure regulating valve 73 should be located between the pressure tester 51 and the water pump 5. The pressure sensor 72 and the electronic pressure regulating valve 73 are both connected to the processor by telecommunication. During the rotation of the drill bit 2, the eccentric block 71 squeezes the pressure sensor 72 under the action of centrifugal force. The faster the drill bit 2 rotates, the greater the value of the force detected by the pressure sensor 72. Based on the pressure value detected by the pressure sensor 72 and output to the processor, the rotation speed of the drill bit 2 is calculated and determined, and based on the rotation speed, the output pressure of the electronic pressure regulating valve 73 is controlled and adjusted, thereby controlling the water outlet rate of the water outlet 22 and the auxiliary flow channel 28 on the drill bit 2 to meet the cooling demand of the drill bit 2.

[0044] In other embodiments, a speed sensor may be provided at the output shaft of the motor to monitor the output shaft speed of the motor in real time, and the water outlet rate of the water outlet 22 and the auxiliary flow channel 28 on the drill bit 2 may be adjusted in real time according to the output shaft speed of the motor.

[0045] A driving assembly needs to be provided on the ground support platform 3 to drive the drill rod 1 to descend vertically. In the embodiment of the present application, the driving assembly includes two sets of lifting platforms 81. Both sets of lifting platforms 81 are vertically lifted and set on the ground support platform 3. Each set of lifting platforms 81 is also provided with a clamping assembly for clamping the drill rod 1. The two sets of lifting platforms 81 are independently lifted and connected to the ground support platform 3. By alternately clamping the drill rod 1 by the clamping assemblies on the two sets of lifting platforms 81, the drill rod 1 can be gradually moved deeper into the ground.

[0046] Specifically, at least two guide rods 84 are vertically fixedly installed on the ground support platform 3, and a guide sleeve that matches and corresponds to the guide rod 84 is fixedly installed on the lifting platform 81. The lifting platform 81 is vertically slidably connected to the guide rod 84 through the guide sleeve. Two driving screws 82 are also vertically arranged on the ground support platform 3, and both ends of the driving screw 82 are rotatably connected to the ground support platform 3. A driving motor 83 is fixedly installed on the ground support platform 3. There are two driving motors 83, which are respectively connected to the two driving screws 82 to drive the driving screw 82 to rotate. The transmission method can be gear transmission or direct transmission, etc. Screw sleeves are fixedly installed on the two lifting platforms 81, and the screw sleeves on the two lifting platforms 81 are respectively threadedly sleeved on the two driving screws 82.

[0047] The clamping assembly includes a clamping plate 86 and a hydraulic cylinder 87. A clearance hole 85 for the drill rod 1 to pass vertically is provided on the lifting platform 81. The clamping plate 86 is provided with at least two pieces, and the clamping plates 86 are arranged circumferentially along the clearance hole 85. The number of hydraulic cylinders 87 is consistent with the number of clamping plates 86 and corresponds one to one. The piston rod of the hydraulic cylinder 87 is fixedly connected to the clamping plate 86. The clamping plate 86 slides radially relative to the lifting platform 81 along the clearance hole 85 through the extension and retraction of the piston rod of the hydraulic cylinder 87. The drill rod 1 is clamped by multiple clamping plates 86 at the same time, so that the drill rod 1 is fixed to the lifting platform 81 and vertically lifted and lowered with the lifting platform 81. In order to enhance the clamping effect of the clamping plate 86 on the drill rod 1, an annular groove or anti-skid pattern can be provided on the outer wall of the drill rod 1, and a protrusion matching the surface of the drill rod 1 is provided on the side of the clamping plate 86 close to the drill rod 1. When the lifting platform 81 moves relative to the drill rod 1, the stroke is determined so that the protrusion on the clamping plate 86 can fully match the annular groove or anti-skid pattern on the outer wall of the drill rod 1. In other embodiments, the hydraulic cylinder 87 can also be an electric push rod, a connecting rod structure, etc.

[0048] Furthermore, in order to improve the guiding effect of the ground support platform 3 on the drill rod 1 and the mounting sleeve 4, a guide cylinder 88 is also fixed on the ground support platform 3. The guide cylinder 88 is located below the lifting platform 81, and the mounting sleeve 4 is coaxially slidably inserted into the guide cylinder 88. Through the joint action of at least one clamping assembly on the lifting platform 81 and the guide cylinder 88, it can effectively ensure that the drill rod 1 remains vertical during the lifting process.

[0049] Both the drill rod 1 and the mounting sleeve 4 can be designed as a multi-section detachable design. Adjacent drill rods 1 can be connected by threads. On the ground support platform 3, an installation gap for the installation and connection of the mounting sleeve 4 can be reserved between the lifting platform 81 located at the bottom layer and the guide cylinder 88. The mounting sleeve 4 is composed of two halves that are connected by bolts. The mounting sleeve 4 is relatively fixed with the drill rod 1 by means of the annular groove or anti-slip texture on the surface of the drill rod 1. The mounting sleeve 4 is quickly connected and fixed to the drill rod 1 at the installation gap through auxiliary installation equipment.

[0050] Example 2

[0051] Reference Figure 5 The present application embodiment provides a method for drilling a hole for hydraulic fracturing construction, based on a drilling device for hydraulic fracturing construction provided in embodiment 1, comprising the following steps:

[0052] S01. Install the ground support platform 3, assemble and inspect the drill bit 2 and drill rod 1, ensure that the equipment structure is connected stably, and that the power lines, hydraulic lines and cooling water lines are installed in place;

[0053] S02, drill bit 2 and drill rod 1 are placed into the ground, and drill bit 2 is started to drill;

[0054] S03, turning on the water pump 5 to fill the cooling channel inside the drill bit 2 with cooling water to cool the drill bit 2;

[0055] S04. Ground personnel observe the real-time pressure data of the pressure tester 51, and observe whether the value of the pressure tester 51 fluctuates greatly based on the pressure at the output end of the electronic pressure regulating valve 73. When it is observed that the value displayed on the pressure tester 51 has lost pressure multiple times cumulatively, and the cumulative number of times reaches a preset number value, it means that the wear or collapse of the drill bit 2 on the drill bit 2 has reached the set replaceable standard, and it is necessary to lift the drill rod 1 and the drill bit 2, and replace the working head 27 on the drill bit 2; when it is observed that the value displayed on the pressure tester 51 has lost pressure multiple times continuously within a set time, and the number of pressure losses reaches or exceeds another preset number value, it means that the drill bit 2 has contacted a hard formation and has suffered a lot of wear or collapse, and it is necessary to lift the drill rod 1 and the drill bit 2, recalculate and formulate the drilling parameters, and replace the working head 27 on the drill bit 2 with an appropriate one.

[0056] S05, after replacing the complete working head 27, insert the drill bit 2 and the drill rod 1 again to perform the drilling work;

[0057] S06. Repeat steps S02-S05 until the hole is drilled to a predetermined depth.

[0058] It should be understood by those skilled in the art that, although preferred embodiments of the present invention have been described, additional changes and modifications may be made to these embodiments once those skilled in the art are aware of the basic inventive concepts. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention. Obviously, those skilled in the art may make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A drilling device for hydraulic fracturing construction, characterized in that: The drill rod (1) comprises a drill bit (2) and a ground support platform (3); the top of the drill rod (1) is clamped and fixed by the ground support platform (3); the bottom of the drill rod (1) is rotatably connected to the drill bit (2); a mounting sleeve (4) is coaxially fixed on the outer side of the drill rod (1); a driving member for driving the drill bit (2) to rotate is arranged inside the mounting sleeve (4); A first cooling channel (11) is coaxially provided inside the drill rod (1), a second cooling channel (21) is provided inside the drill bit (2), the first cooling channel (11) and the second cooling channel (21) are connected, a water outlet (22) connected to the second cooling channel (21) is provided at the bottom of the drill bit (2), the drill bit (2) comprises a plurality of cutter heads (23) spaced apart on the outer wall, a third cooling channel (24) corresponding to the cutter heads (23) is provided inside the drill bit (2), the third cooling channel (24) is connected to the second cooling channel (21), one end of the third cooling channel (24) away from the second cooling channel (21) extends and is connected to the bottom wall of the cutter head (23), the top opening of the first cooling channel (11) of the drill rod (1) on the ground support platform (3) is externally connected to a water pump (5) and a cooling water source; The cutter head (23) is provided with a detection channel (25) connected to the third cooling channel (24), the third cooling channel (24) is provided with a pressure maintaining component, and the ground support platform (3) is provided with a pressure tester (51), and the pressure tester (51) is used to detect the pressure of the cooling water in the first cooling channel (11); The pressure-maintaining assembly comprises a block (61), a support rod (62) and a spring (63); a mounting step (64) is arranged in the third cooling channel (24); the spring (63) and the block (61) are sequentially connected to a side of the mounting step (64) away from the cutter head (23); one end of the support rod (62) is fixedly connected to the block (61), and the other end passes through the mounting step (64) and abuts against the detection channel (25) of the cutter head (23), so that a gap is formed between the block (61) and the mounting step (64) for cooling water to pass through; the spring (63) is used to drive the block (61) to move toward the mounting step (64) and block the mounting step (64).

2. A drilling device for hydraulic fracturing construction according to claim 1, characterized in that: The support rod (62) is made of brittle material.

3. A drilling device for hydraulic fracturing construction according to claim 1, characterized in that: The drill bit (2) comprises a connecting head (26) and a working head (27); the connecting head (26) is connected to the drill rod (1); the working head (27) is sleeved on the outside of the connecting head (26); the working head (27) and the connecting head (26) are detachably connected via a plurality of bolts; the detection flow channel (25) and the pressure-maintaining assembly are both arranged on the working head (27); a third cooling flow channel (24) is formed between the connecting head (26) and the working head (27); an auxiliary flow channel (28) is provided between the connecting head (26) and the working head (27) along their own circumference; one end of the auxiliary flow channel (28) is communicated with the third flow channel, and the other end is vertically upward along the axial direction of the drill rod (1).

4. A drilling device for hydraulic fracturing construction according to claim 3, characterized in that: A plurality of slurry outlets (41) for slurry to pass through are provided between the installation sleeve (4) and the drill rod (1), and a plurality of drainage grooves (29) extending from the head to the tail are provided on the outer wall of the drill bit (2).

5. A drilling device for hydraulic fracturing construction according to claim 4, characterized in that: An eccentric block (71) is arranged on the outer wall of the connecting head (26); the eccentric block (71) and the connecting head (26) are connected via a pressure sensor (72); an electronic pressure regulating valve (73) is arranged between the drill pipe (1) and the water pump (5) on the ground support platform (3); and the pressure sensor (72) communicates and controls the electronic pressure regulating valve (73).

6. A drilling device for hydraulic fracturing construction according to claim 1, characterized in that: The ground support platform (3) is provided with a driving assembly for driving the drill rod (1) to descend; The driving assembly comprises two groups of lifting platforms (81), two driving screws (82) are vertically rotatably arranged on the lifting platforms (81), the two groups of lifting platforms (81) are vertically lifted and connected to the ground support platform (3) through guide rods (84), the two groups of lifting platforms (81) are respectively threadedly driven with the two driving screws (82), the ground support platform (3) is provided with a driving motor (83) for driving the two driving screws (82) to rotate respectively, the lifting platform (81) is provided with a clearance hole (85) for the drill rod (1) to pass through, clamping plates (86) are arranged on both sides of the clearance hole (85) on the lifting platform (81) and are slidable along the axial direction of the drill rod (1), and the lifting platform (81) is provided with a hydraulic cylinder (87) for driving the clamping plates (86) to slide.

7. A drilling device for hydraulic fracturing construction according to claim 6, characterized in that: A guide cylinder (88) is fixedly arranged on the ground support platform (3), and the installation sleeve (4) is coaxially slidably inserted into the guide cylinder (88).

8. A method for using a drilling device for hydraulic fracturing construction, based on a drilling device for hydraulic fracturing construction as claimed in any one of claims 1 to 7, comprising: S01. Install the ground support platform (3), assemble the drill bit (2) and the drill rod (1), and inspect them; S02, placing the drill bit (2) and the drill rod (1) into the ground, and starting the drill bit (2) to drill a hole; S03, turning on the water pump (5) to allow the cooling water to fill the cooling channel inside the drill bit (2) to cool the drill bit (2); S04, the ground personnel observe the real-time pressure data of the pressure tester (51), and when they observe that the value of the pressure tester (51) shows continuous pressure loss or cumulative pressure loss for multiple times, they lift the drill pipe (1) and the drill bit (2), and replace the working head (27) on the drill bit (2); S05, lowering the drill bit (2) and the drill rod (1) again to perform drilling work; S06. Repeat steps S02-S05 until the hole is drilled to a predetermined depth.

Citation Information

Patent Citations

  • Rapid drilling device of small-bore tunnel bottom plate drill

    CN101761350A

  • System and method for monitoring wear of a drill bit

    CN112272728A

  • Hydraulic fracturing drilling device capable of preventing hole collapse

    CN118241986A

  • Indexable violent drill bit

    CN214920761U

  • Early wear detection

    US20110290560A1