Grouting method for pipe jacking grouting system

Through real-time monitoring of data through wireless transmission modules and monitoring equipment, a prediction model is established, and hierarchical grouting instructions are output, which solves the problem of inaccurate grouting during pipe jacking construction, achieves intelligent and precise grouting, and improves construction efficiency and stratum stability. sex.

CN118564254BActive Publication Date: 2024-10-11SUN YAT SEN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411063295.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-10-11
Estimated Expiration
2044-08-05

AI Technical Summary

Technical Problem

During pipe jacking construction, existing technology is difficult to achieve intelligent and precise grouting, resulting in large friction fluctuations, low construction efficiency and serious waste of mud. Moreover, the monitoring method is single and difficult to accurately reflect the construction needs of different sections.

Method used

Using a wireless transmission module and multiple main monitoring pipe sections, the pipe section status data and jacking status data are obtained in real time through the monitoring equipment, a grouting amount prediction model and a multi-data feedback model are established, and hierarchical grouting instructions are output to realize intelligent, Precise grouting.

Benefits of technology

Through multi-dimensional data monitoring and analysis, we can accurately predict the amount of grouting in each section, improve construction efficiency, reduce mud waste, and ensure formation stability and environmental protection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118564254B_ABST
    Figure CN118564254B_ABST
Patent Text Reader

Abstract

The present application discloses a grouting method for a pipe jacking grouting system, the method comprising: monitoring the pipe segment status and jacking status and other multivariate data in real time through monitoring equipment, analyzing the status of each section and the grouting amount required for each section under different states, so as to train a grouting amount prediction model, and at the same time continuously collecting historical monitoring data of each pipe segment using a cloud platform, inputting it into the grouting amount prediction model for continuous learning and optimization, and then outputting the graded grouting instructions corresponding to each section, so that each section performs grouting according to its corresponding instructions. It can be seen that the monitoring of multivariate data makes the monitoring more comprehensive, and the combined analysis of the pipe segment status data and the jacking status data can determine whether the environment in which the pipeline is located is an extreme working condition (such as stuck pipe, empty, floating, etc.) according to the real-time status of the pipeline, and derive the optimal grouting amount prediction model, so that the grouting amount result output by the model more accurately meets the needs of each section, thereby realizing intelligent and accurate grouting of each section of the pipe jacking.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of trenchless underground construction engineering, and more specifically, to a grouting method for a jacking pipe grouting system. Background Art

[0002] As an efficient, safe and environmentally friendly trenchless pipeline / tunnel construction technology, pipe jacking has been widely used in municipal engineering, underground space engineering and other fields. With the advancement of technology and the increase in demand, the cross-section of pipe jacking sections continues to increase, the jacking distance continues to extend, and the geological conditions and surrounding environment faced are becoming increasingly complex.

[0003] The basic principle of pipe jacking construction is to rely on the jacking force of the main jacking cylinder to lift the pipe jacking machine from the starting well through the formation to the receiving well. During the jacking process, the pipe jacking machine cuts the soil layer in front, and the soil is discharged through the excavation device. The rear pipe section is then pushed forward until the jacking section is connected. The jacking force is crucial in the design and construction of pipe jacking projects. It is composed of head-on resistance and friction resistance around the pipe. The friction resistance around the pipe is a controllable parameter in construction, which is usually reduced by injecting bentonite lubricating slurry. However, the drag reduction effect of grouting lubrication is a major test of the construction technology level.

[0004] In actual engineering, the grouting volume requirements in different sections of complex formations vary. If grouting and secondary grouting are not timely or insufficient, the friction resistance will increase sharply and the jacking will be difficult; if it cannot be adjusted according to the actual jacking section, it will also cause a large amount of mud waste, causing uneven settlement of the formation and damage to the surrounding environment. From a construction perspective, workers often inject a certain amount of mud at a specific time based on experience, which is highly random and less scientific. In addition, the grouting main pipe is used for grouting throughout the line without considering the section differences. From a monitoring perspective, the lubrication grouting effect is often indirectly calculated through a single monitoring project to calculate the friction resistance around the pipe, ignoring the difference between the jacking and pipe section status. The calculated results are prone to large deviations from the actual situation, and the difference is more significant under extreme working conditions (such as stuck pipes, emptying, floating, etc.). Summary of the invention

[0005] In view of the above problems, the present application provides a grouting method for a pipe jacking grouting system to achieve intelligent and precise grouting of each section of the pipe jacking.

[0006] In order to achieve the above objectives, the specific plan is proposed as follows:

[0007] A grouting method for a pipe grouting system is applied to a data control terminal, wherein the pipe grouting system comprises a wireless transmission module and a plurality of pipe sections, wherein the plurality of pipe sections comprises a plurality of main monitoring pipe sections, each main monitoring pipe section is provided with a monitoring device, each monitoring device is connected to the wireless transmission module, and the wireless transmission module is connected to the data control terminal through a cloud platform;

[0008] The method includes:

[0009] Obtaining the pipe segment status data and jacking status data monitored in real time by the monitoring equipment;

[0010] Inputting the pipe segment status data and the jacking status data into a pre-established grouting amount prediction model, and outputting the graded grouting instructions corresponding to each section of the jacking pipe grouting system, so that each section of the jacking pipe grouting system performs grouting according to the graded grouting instructions corresponding to each section;

[0011] The process of establishing the grouting amount prediction model includes:

[0012] Obtain multiple sets of historical monitoring data for each pipe segment, each set of historical monitoring data includes pipe segment status data and jacking status data;

[0013] By coupling the pipe segment status data and the jacking status data of each set of historical monitoring data, the status of each section of the jacking pipe grouting system under the set of monitoring data is determined;

[0014] According to the state of each section of the jacking pipe grouting system under each set of historical monitoring data, determining the grouting amount of each section of the jacking pipe grouting system under the set of historical monitoring data;

[0015] Each group of historical monitoring data is used as a training sample, the pipe segment status data and jacking status data of the historical monitoring data are used as sample input, and the grouting volume of each section of the jacking pipe grouting system under the historical monitoring data is used as the target output to train a grouting volume prediction model.

[0016] Optionally, the monitoring equipment includes an earth pressure gauge, a pore water pressure gauge, a surface strain gauge, a displacement sensor and a mud electromagnetic flow valve installed in each main monitoring pipe segment. The earth pressure gauge and the pore water pressure gauge of each main monitoring pipe segment are arranged at annular intervals according to the diameter of the main monitoring pipe segment in which they are located, and are arranged at the top and bottom of the main monitoring pipe segment. The sensing end of the earth pressure gauge and the sensing end of the pore water pressure gauge of each main monitoring pipe segment are flush with the outer surface of the main monitoring pipe segment.

[0017] The pipe joint status data includes the soil pressure data around the pipe measured by each soil pressure gauge, the pore water pressure data measured by each pore water pressure gauge, the surface axial strain data measured by each surface strain gauge, the socket joint offset data measured by each displacement sensor, and the grouting hole flow data measured by each mud electromagnetic flow valve.

[0018] Optionally, the method further includes:

[0019] Inputting the pipe segment state data and the jacking state data into a pre-established multivariate data feedback model, and outputting the state corresponding to each section of the jacking pipe grouting system;

[0020] Concentrated mud is injected into the section of the jacking pipe grouting system that is in a hollow or floating state.

[0021] Optionally, the process of establishing the multivariate data feedback model includes:

[0022] Each group of historical monitoring data is used as a training sample, the pipe segment status data and jacking status data of the historical monitoring data are used as sample input, and the status of each section of the jacking grouting system under the historical monitoring data is used as the target output to train a multivariate data feedback model.

[0023] Optionally, the process of injecting thick mud into a section in the jacking grouting system that is in a hollow or floating state comprises:

[0024] Driving a grouting pump truck with thick mud stored therein to inject the thick mud into the grouting branch pipe of the pipe segment of the target section in the jacking grouting system which is in an empty state, wherein the thick mud is prepared by mixing sodium-based montmorillonite with water in a ratio of 1.1:1;

[0025] or,

[0026] The grouting pump truck is driven to inject the thick mud into the grouting branch pipe of the pipe segment of the target section in the jacking grouting system which is in a floating state, and the buoyancy of the target section is reduced by means of in-pipe ballasting, and the grouting branch pipe of the bottom grouting hole of the pipe segment of the target section is disassembled to be separated from the grouting main pipe.

[0027] Optionally, the pipe segment status data includes the axial strain and the displacement of the receiving plug of each main monitoring pipe, and the jacking status data includes the spacing between each main monitoring pipe;

[0028] The method of coupling the pipe segment status data and the jacking status data of each set of historical monitoring data to determine the status of each section of the jacking grouting system under the set of historical monitoring data includes:

[0029] For each set of historical monitoring data:

[0030] The following formula is used to couple the pipe segment status data and jacking status data of the historical monitoring data to obtain the unit length friction resistance and joint relative displacement of each section:

[0031]

[0032] in, is the axial strain of the kth main monitoring tube, is the axial strain of the k-1th main monitoring tube, is the distance between the kth main monitoring tube and the k-1th main monitoring tube, is the friction per unit length of the section between the kth main monitoring tube and the k-1th main monitoring tube, is the displacement of the socket plug of the kth main monitoring tube, is the displacement of the connecting plug of the k-1th main monitoring pipe, is the relative displacement of the joint between the kth main monitoring pipe and the k-1th main monitoring pipe;

[0033] When the frictional resistance per unit length of a section is extremely large and the relative displacement of the joint of the section is extremely small, it is determined that the state of the section under the historical monitoring data is a stuck pipe.

[0034] Optionally, the pipe segment status data and the jacking status data are input into a pre-established grouting amount prediction model, and a graded grouting instruction corresponding to each section of the jacking pipe grouting system is output, including:

[0035] The pipe segment status data and the jacking status data are input into a pre-established grouting volume prediction model, and the first main monitoring pipe segment of the jacking pipe grouting system is used for calculation iteration. The data of subsequent main monitoring pipe segments of the first main monitoring pipe segment are used for optimization, and the graded grouting instructions corresponding to each section of the jacking pipe grouting system are output.

[0036] Optionally, each main monitoring pipe section also includes a data acquisition instrument equipped with a signal strength amplifier;

[0037] The data acquisition device of each main monitoring pipe section is a box structure and is placed on the first bracket inside the main monitoring pipe section;

[0038] Each of the data acquisition instruments comprises a main controller, a measuring module, a wiring port and a battery device;

[0039] The soil pressure gauge, pore water pressure gauge, surface strain gauge and displacement sensor of each main monitoring pipe section are connected to the data acquisition instrument of the main monitoring pipe section through a signal line.

[0040] Optionally, each main monitoring pipe section further includes an annular grouting branch pipe, a grouting main pipe, a grouting controller and supporting pipe jacking facilities;

[0041] The supporting pipe jacking facilities of each main monitoring pipe section are placed on the second bracket inside the main monitoring pipe section;

[0042] Each annular grouting branch pipe is connected to the grouting main pipe, and the annular grouting branch pipe has a plurality of grouting holes, and each grouting hole is equipped with a three-way ball valve to control the grouting at the grouting hole;

[0043] The mud electromagnetic flow valve of each main monitoring pipe section is installed at the first fork position of the grouting branch pipe of the main monitoring pipe section and is connected to the grouting controller of the main monitoring pipe section by wire.

[0044] Optionally, the jacking pipe grouting system further includes a plurality of secondary monitoring pipe sections, each of which includes a mud electromagnetic flow valve.

[0045] Optionally, the construction system of the pipe jacking grouting system includes a pipe jacking head, a hydraulic cylinder, a back wall, a launching well and annular mud;

[0046] A roller meter is arranged vertically above the pipe section of the starting well close to the cave entrance. The roller meter includes a spring limit device and is connected to the wireless transmission module.

[0047] By means of the above technical scheme, the present application analyzes the status of each section and the amount of grouting required for each section under different states through the historical monitoring data of each pipe joint, so as to train a grouting amount prediction model, and then monitors the pipe joint status data and the jacking status data in real time through the monitoring equipment, and inputs them into the grouting amount prediction model, and outputs the graded grouting instructions corresponding to each section, so that each section performs grouting according to the graded grouting instructions corresponding to each section. It can be seen that the monitoring of multivariate data makes the monitoring more comprehensive, and the combined analysis of the multivariate data of the pipe joint and the jacking status data fully considers the difference between the jacking and pipe joint states. The model for predicting the grouting amount can be analyzed in combination with the working conditions of the pipe joints in each section, and the grouting amount results output by the model more accurately meet the needs of each section, thereby realizing intelligent and precise grouting of each section of the jacking pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present application. Also, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0049] Figure 1 A schematic diagram of implementing grouting in a pipe jacking grouting system provided in an embodiment of the present application;

[0050] Figure 2 A layout diagram of primary and secondary monitoring pipe segment devices for a pipe grouting system provided in an embodiment of the present application;

[0051] Figure 3 A cross-sectional view of a main monitoring pipe section of a pipe jacking grouting system provided in an embodiment of the present application;

[0052] Figure 4 A cross-sectional view of a secondary monitoring pipe section of a pipe grouting system provided in an embodiment of the present application;

[0053] Figure 5 A schematic diagram of a flow chart of implementing grouting of a pipe jacking grouting system using a data control terminal provided in an embodiment of the present application;

[0054] Figure 6 A schematic diagram of a process for establishing a grouting amount prediction model provided in an embodiment of the present application;

[0055] Figure 7 A cross-sectional view of the pipe clamping area of ​​the AA section of a pipe jacking grouting system provided in an embodiment of the present application;

[0056] Figure 8 A cross-sectional view of the BB section depletion area of ​​a pipe grouting system provided in an embodiment of the present application;

[0057] Fig. 9 A schematic diagram of the construction of the floating area of ​​a grouting pump truck provided in an embodiment of the present application.

[0058] The reference numerals in the accompanying drawings are explained as follows:

[0059] 1-pipe jacking head, 2-pipe section, 3-grouting hole, 4-hydraulic cylinder, 5-back wall, 6-starting well, 7-annular mud, 8-grouting main pipe, 81-grouting branch pipe, 9-mud electromagnetic flow valve, 10-grouting controller, 11-data acquisition instrument, 111-signal line, 112-signal strength enhancer, 12-earth pressure gauge, 13-pore water pressure gauge, 14-surface strain gauge, 15-displacement sensor, 16-roller meter, 17-wireless transmission module, 18-cloud platform, 19-data control terminal, 20-grouting pump truck, 201-small wheel, 202-grouting pipe, 21-slurry barrel, 22-sediment material, 23-empty area, 24-rivers and lakes, 25-pipe jacking supporting facilities. DETAILED DESCRIPTION

[0060] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0061] Figure 1 A schematic diagram of the structure of the pipe grouting system for implementing grouting provided in the embodiment of the present application is shown in FIG. Figure 1 As shown, the pipe grouting system may include: a wireless transmission module 17 and a plurality of pipe segments 2.

[0062] The plurality of pipe sections 2 may include a plurality of main monitoring pipe sections. Each main monitoring pipe section is provided with a monitoring device. Each monitoring device is connected to a wireless transmission module 17. The wireless transmission module 17 is connected to a data control terminal 19 through a cloud platform 18 for communication.

[0063] Figure 1 The distances between the main monitoring pipe sections Ⅰ, Ⅱ, Ⅲ and the machine head are L1, L2, and L3 respectively. The main monitoring pipe section Ⅰ is as close to the jacking machine head 1 as possible to facilitate the measurement of more and more effective data. At the same time, more monitoring sections can be arranged according to the jacking length, and the distance between each main monitoring pipe section can be no more than 50 m.

[0064] The monitoring equipment may include a mud electromagnetic flow valve 9, an earth pressure gauge 12, a pore water pressure gauge 13, a surface strain gauge 14 and a displacement sensor 15. The monitoring equipment may be a vibrating string type, which is more adaptable to the complex working environment in the top pipe than current or resistance type instruments and equipment, and has better reliability, sensitivity and installation convenience.

[0065] Furthermore, each main monitoring pipe section may also include a data acquisition instrument 11 equipped with a signal strength booster 112. The data acquisition instrument 11 may include a main controller, a measurement module, a wiring port, and a battery device. The signal strength booster 112 may receive the frequency signal transmitted by the data acquisition instrument 11 of the front main monitoring pipe section, and relay the amplified signal to the rear data acquisition instrument 11 under channel conversion until the starting well 6 is uploaded to the cloud platform 18, thereby realizing wireless transmission of data upload and control command issuance in the pipe under long-distance jacking conditions. The data acquisition instrument 11 may be a box structure, placed on the first bracket inside the main monitoring pipe section, and each data acquisition instrument 11 may include a main controller, a measurement module, a wiring port, and a battery device.

[0066] The soil pressure gauge 12 , the pore water pressure gauge 13 , the surface strain gauge 14 and the displacement sensor 15 of each main monitoring pipe section are connected to the data acquisition device 11 of the main monitoring pipe section through a signal line 111 .

[0067] Further, such as Figure 2-4As shown, each main monitoring pipe section may also include an annular grouting branch pipe 81, a grouting main pipe 8, a grouting controller 10 and a top pipe supporting facility 25, and the top pipe supporting facility 25 may include a grouting pipe, a grouting pipe, a ventilation pipe, a cable, etc. The top pipe supporting facility 25 of each main monitoring pipe section can be placed on the second bracket inside the main monitoring pipe section, which is different from the first bracket where the data acquisition instrument 11 is placed, so as to reduce the influence of leakage and cable current. Each annular grouting branch pipe 81 is connected to the grouting main pipe 8, and there are multiple grouting holes 3 on the annular grouting branch pipe 81, and the number of grouting holes 3 can be specifically 4-8. A three-way ball valve is installed at each grouting hole 3 to control the grouting at the grouting hole 3. The mud electromagnetic flow valve 9 of each main monitoring pipe section is installed at the first fork position of the grouting branch pipe of the main monitoring pipe section, and is connected to the grouting controller 10 of the main monitoring pipe section by wire. The grouting controller 10 is a low-power electrical appliance, which contains a battery device and can be powered by a 12V voltage. Generally, the voltage of the lamp strip in the pipeline can be used to power and charge it, so it can meet the continuous monitoring within a certain period of time under the condition of shutdown and power outage. The grouting controller 10 may include a relay device and a signal transmitting antenna device. When the data control terminal 19 issues a grouting or grouting reduction instruction, the relay device can be controlled to control the mud electromagnetic flow valve 9, thereby effectively monitoring the grouting pressure and grouting amount of the grouting section for a long time.

[0068] Furthermore, the earth pressure gauge 12 and pore water pressure gauge 13 of the main monitoring pipe section are arranged at annular spacing according to the diameter of the main monitoring pipe section in which they are located, and are arranged at the top and bottom of the main monitoring pipe section, and the sensor support needs to be pre-buried at the corresponding position before the pipe section is cast in the pipeline factory. It should be noted that since the sensing ends of the earth pressure gauge 12 and the pore water pressure gauge 13 are in contact with the mud and rock and soil outside the pipe, the sensing ends of the earth pressure gauge 12 and the pore water pressure gauge 13 of each main monitoring pipe section are flush with the outer surface of the main monitoring pipe section to avoid damage to the sensor caused by the sensing end exceeding the surface. The surface strain gauge 14 and displacement sensor 15 of each main monitoring pipe section are respectively installed at the inner surface of the main monitoring pipe section and the joints of the primary and secondary monitoring pipe sections through the front and rear bases. The base can be fastened to the inner surface of the concrete by expansion bolts or screws, and the surface strain gauge 14 and displacement sensor 15 of each main monitoring pipe section can be arranged in annular spacing, and their number and position correspond to the soil pressure gauge 12.

[0069] In addition, the construction system of the jacking pipe grouting system may include: a jacking pipe head 1 , a hydraulic cylinder 4 , a back wall 5 , a launching well 6 and annular mud 7 .

[0070] A roller meter 16 is arranged vertically above the pipe section of the launch well 6 close to the hole. The roller meter 16 may include a spring limiter to ensure that the recorded pipe jacking length and speed are accurate. The roller meter 16 is connected to the wireless transmission module 17 to wirelessly transmit the monitoring data to the cloud platform 18.

[0071] The cloud platform 18 may be an intelligent Internet of Things (IoT) cloud platform, which can receive different types of network signals such as WiFi, Ethernet, 4G, GPRS, etc., and send the monitoring data to the data control terminal 19. After receiving the data sorted and analyzed by the cloud platform 18, the user can remotely send the grouting system control instructions.

[0072] Furthermore, the jacking pipe grouting system may also include a plurality of secondary monitoring pipe sections, each of which includes a mud electromagnetic flow valve 9 .

[0073] It is understandable that, when coupled with the data of the main monitoring pipe section, it can not only reduce the impact of too many monitoring projects on the construction space, but also reduce the economic cost and computing power cost, thereby realizing intelligent grouting of long-distance pipe jacking pipelines.

[0074] based on Figure 1-Figure 4 The structure of the pipe grouting system shown in the figure is as follows: Figure 5 A schematic diagram of a process for implementing grouting of a pipe grouting system by a data control terminal 19 provided in an embodiment of the present application is shown, referring to Figure 5 , the process may include:

[0075] Step S110, obtaining the pipe segment status data and jacking status data monitored in real time by the monitoring equipment.

[0076] The pipe joint status data may include the soil pressure data around the pipe measured by each soil pressure gauge 12, the pore water pressure data measured by each pore water pressure gauge 13, the surface axial strain data measured by each surface strain gauge 14, the socket joint offset data measured by each displacement sensor 15, and the grouting hole flow data measured by each mud electromagnetic flow valve 9. The jacking status data may include the jacking force, jacking distance and jacking speed.

[0077] Specifically, when the soil pressure gauge 12, the pore water pressure gauge 13, the surface strain gauge 14 and the mud electromagnetic flow valve 9 monitor and obtain real-time data, the signal can be amplified by the signal strength amplifier 112, and then transmitted to the cloud platform 18 through the wireless transmission module 17, so that the data control terminal 19 can obtain the real-time monitoring data from the cloud platform 18.

[0078] Step S120, input the pipe segment status data and the jacking status data into a pre-established grouting volume prediction model, and output the graded grouting instructions corresponding to each section of the jacking pipe grouting system, so that each section of the jacking pipe grouting system performs grouting according to the graded grouting instructions corresponding to each section.

[0079] It can be understood that by sending electromagnetic flow valve control instructions to each zone end / pipe section through the data control terminal, the grouting pressure and grouting volume are adjusted in stages to achieve graded grouting of the entire pipeline, thereby intelligently controlling the status of the pipe section according to actual conditions, improving construction efficiency and reducing construction costs.

[0080] Specifically, the process of establishing the grouting amount prediction model is as follows: Figure 6 As shown, the establishment process may include:

[0081] Step S210: Acquire multiple groups of historical monitoring data of each pipe segment.

[0082] Among them, each set of historical monitoring data includes pipe segment status data and jacking status data.

[0083] Step S220, by coupling the pipe segment status data and the jacking status data of each set of historical monitoring data, the status of each section of the jacking pipe grouting system under the set of monitoring data is determined.

[0084] It is understandable that during the long-distance and complex stratum jacking construction, there may be many special working conditions such as pipe segment stuck, over-excavation and hollowing, pipe segment floating, etc., which seriously affect the construction progress and the stability of the pipeline and stratum. Therefore, the status of the pipe segment section of the jacking grouting system can include normal, hollowing, floating, stuck, etc. The pipe segment section has the parameter characteristics shown in the following table in each state:

[0085]

[0086] Among them, under normal conditions, the soil pressure T, pore water pressure K, surface axial strain σ, socket joint offset S and grouting hole flow Q are not much different, and the data described are the data of the same monitoring pipe segment ring upward.

[0087] Step S230: Determine the grouting amount of each section of the jacking pipe grouting system under each set of historical monitoring data according to the state of each section of the jacking pipe grouting system under the set of historical monitoring data.

[0088] Step S240, using each group of historical monitoring data as a training sample, the pipe segment status data and jacking status data of the group of historical monitoring data as sample input, and the grouting amount of each section of the jacking pipe grouting system under the group of historical monitoring data as the target output, to train a grouting amount prediction model.

[0089] Specifically, during the training process, the grouting amount prediction model can be continuously optimized based on the measured data of jacking status and pipe segment status through machine learning or deep learning methods to discover the law of grouting / grouting amount.

[0090] The grouting method of the jacking pipe grouting system provided in this embodiment analyzes the status of each section and the grouting amount required for each section under different states through the historical monitoring data of each pipe section, so as to train a grouting amount prediction model, and then monitors the pipe section status data and the jacking status data in real time through the monitoring equipment, and inputs them into the grouting amount prediction model, and outputs the graded grouting instructions corresponding to each section, so that each section performs grouting according to the graded grouting instructions corresponding to each section. It can be seen that the monitoring of multivariate data makes the monitoring more comprehensive, and the combined analysis of the multivariate data of the pipe section and the jacking status data fully considers the difference between the jacking and pipe section states. The model for predicting the grouting amount can be analyzed in combination with the working conditions of the pipe sections in each section, and the grouting amount results output by the model more accurately meet the needs of each section, thereby realizing intelligent and accurate grouting of each section of the jacking pipe.

[0091] In some embodiments of the present application, special working conditions encountered during pipe jacking are taken into consideration, such as a stuck pipe. Figure 7 As shown, under complex formation conditions, pipe jacking may face soft upper and hard lower formations or rock formations. When the sediment material 22 cannot be discharged in the annular mud 7, it may accumulate to the bottom of the pipe segment 2. When the accumulation is too much, the friction resistance of the pipe segment will be too large and the pipe will be stuck. Pipe sticking accidents are more common in rock pipe jacking. The water and soil pressure around the pipe and the pipe segment stress in the stuck pipe area are significantly different from those in the normal jacking area. Therefore, the whole jacking cycle monitoring can be carried out through the monitoring equipment, and the sediment material 22 can be flushed through the automatic grouting system to achieve the escape of the pipe segment.

[0092] Based on the stuck pipe situation, the process of step S220 of the above embodiment, coupling the pipe segment status data and the jacking status data of each set of historical monitoring data to determine the status of each section of the jacking pipe grouting system under the set of monitoring data, is further introduced. The process may include:

[0093] S1. For each set of historical monitoring data, the pipe segment status data and jacking status data of the historical monitoring data are coupled using the following formula to obtain the unit length friction resistance and joint relative displacement of each section:

[0094]

[0095] in, is the axial strain of the kth main monitoring tube, is the axial strain of the k-1th main monitoring tube, is the distance between the kth main monitoring tube and the k-1th main monitoring tube, is the friction per unit length of the section between the kth main monitoring tube and the k-1th main monitoring tube, is the displacement of the socket plug of the kth main monitoring tube, is the displacement of the connecting plug of the k-1th main monitoring pipe, is the relative displacement of the joint between the kth main monitoring pipe and the k-1th main monitoring pipe.

[0096] S2. For each set of historical monitoring data, when the frictional resistance per unit length of a certain section is extremely large and the relative displacement of the joint of the section is extremely small, it is determined that the state of the section under the historical monitoring data is a stuck pipe.

[0097] Further, when it is determined that the state of a certain section is a stuck pipe, and the stuck pipe situation cannot be solved after grouting, the grouting pump truck 20 can be driven to inject mud with better lubrication effect until the stuck pipe is released.

[0098] Among them, the grouting pump truck 20 can be equipped with a slurry barrel 21, and the slurry barrel 21 can be equipped with thick mud, AB liquid and other slurries different from those of the jacking grouting system according to actual working conditions.

[0099] Considering that pipe joint jacking may encounter more special working conditions, such as emptying and floating, it is possible to timely intervene by injecting concentrated mud. Based on this, in some embodiments of the present application, when the pipe jacking grouting system encounters emptying and floating, the grouting method of the pipe jacking grouting system may also include:

[0100] S1. Input the pipe segment status data and the jacking status data into a pre-established multivariate data feedback model, and output the status corresponding to each section of the jacking pipe grouting system.

[0101] Specifically, the training process of the multivariate data feedback model can be:

[0102] Each set of historical monitoring data is used as a training sample, the pipe segment status data and jacking status data of the historical monitoring data are used as sample input, and the status of each section of the jacking grouting system under the historical monitoring data is used as the target output to train a multivariate data feedback model.

[0103] Specifically, in the training process of the multivariate data feedback model, machine learning or deep learning methods can be used to continuously optimize based on the measured data of the jacking status and the pipe segment status, and find the corresponding relationship between the status of each section and the jacking status and the pipe segment status.

[0104] S2. Inject thick mud into the hollow or floating sections of the jacking pipe grouting system.

[0105] It is understandable that due to factors such as over-excavation of the top pipe or excessive soil and water loss in the local stratum, the annular gap does not present a regular ring shape, and a large-scale void area 23 appears in the local area, such as Figure 8 As shown, if not treated, the de-emptied area will further develop under a larger grouting pressure, and in severe cases, the upper stratum will be greatly subsided. At this time, the grouting pump truck 20 can be driven to inject thick mud or mud-killing liquid into the grouting branch pipe 81 of the pipe section of the target section in the top pipe grouting system.

[0106] Among them, the concentrated mud can be prepared by mixing sodium montmorillonite and water at a ratio of 1.1:1. The effective mud liquid can be prepared by mixing liquid A (effective mud mixed liquid) and liquid B (mixture of water glass and water) at a ratio of 12.5:1. Due to the high viscosity and low fluidity of the two slurries, it is difficult for them to flow to other locations, so they can fill and support the de-voided area to achieve the effect of controlling the formation settlement.

[0107] It is understandable that long-distance pipe jacking projects inevitably need to cross rivers, lakes and seas. When the larger soil is unloaded, the pipe section may float up below the river or lake 24, and the axial direction of the pipe jacking may deviate from the predetermined elevation. Fig. 9 As shown. Excessive floating of the pipe segment will cause pipeline instability, and a large deviation angle may damage the joint sealing rubber ring and cause the joint to fail. At this time, the grouting pump truck 20 can be driven to inject thick mud or mud-killing liquid into the grouting branch pipe 81 of the pipe segment in the target section of the jacking grouting system that is in a floating state. Because the grouting pump truck is relatively heavy, the buoyancy effect of the target section can be reduced by ballasting the pipe, and the grouting branch pipe 81 of the bottom grouting hole 3 can be disassembled from the grouting main pipe 8, so that the mud accumulated at the bottom of the pipe is discharged, thereby reducing the floating amount of the pipe segment until it passes through the floating area smoothly.

[0108] The grouting method for the jacking pipe grouting system provided in this embodiment establishes a multivariate data feedback model to quickly and accurately identify sections in the jacking pipe grouting system where abnormal conditions exist, and drives the grouting pump truck to inject mud with better lubrication effect into the abnormal sections, so that the jacking project can continue more smoothly.

[0109] In some embodiments of the present application, the process of inputting the pipe segment status data and the jacking status data into a pre-established grouting amount prediction model in step S20, outputting the graded grouting instructions corresponding to each section of the jacking pipe grouting system, so that each section of the jacking pipe grouting system performs grouting according to the graded grouting instructions corresponding to each section is introduced, and the process may include:

[0110] The pipe segment status data and jacking status data are input into a pre-established grouting volume prediction model, and the first main monitoring pipe segment of the jacking pipe grouting system is used for calculation iteration. The data of subsequent main monitoring pipe segments of the first main monitoring pipe segment are used for optimization, and the graded grouting instructions corresponding to each section of the jacking pipe grouting system are output.

[0111] It is understandable that since the first section of the main monitoring pipe is close to the machine head, it may be the first to encounter working conditions such as pipe floating, and it has a memory function for the geological conditions and grouting conditions of each section. With the support of the cloud platform algorithm, the grouting volume prediction model is iterated based on the calculation of the first section of the main monitoring pipe, and is optimized and improved with more data from subsequent pipe sections, making the prediction model more accurate and efficient.

[0112] Finally, it should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

[0113] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The various embodiments can be combined as needed, and the same or similar parts can refer to each other.

[0114] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A grouting method for a pipe jacking grouting system, characterized in that: Applied to a data control terminal, the jacking grouting system includes a wireless transmission module and a plurality of pipe sections, the plurality of pipe sections include a plurality of main monitoring pipe sections, each main monitoring pipe section is provided with a monitoring device, each monitoring device is connected to the wireless transmission module, and the wireless transmission module is connected to the data control terminal through a cloud platform; The method includes: Obtaining the pipe segment status data and jacking status data monitored in real time by the monitoring equipment; Inputting the pipe segment status data and the jacking status data into a pre-established grouting amount prediction model, and outputting the graded grouting instructions corresponding to each section of the jacking pipe grouting system, so that each section of the jacking pipe grouting system performs grouting according to the graded grouting instructions corresponding to each section; The process of establishing the grouting amount prediction model includes: Obtain multiple sets of historical monitoring data for each pipe segment, each set of historical monitoring data includes pipe segment status data and jacking status data; By coupling the pipe segment status data and the jacking status data of each set of historical monitoring data, the status of each section of the jacking pipe grouting system under the set of historical monitoring data is determined; According to the state of each section of the jacking pipe grouting system under each set of historical monitoring data, determining the grouting amount of each section of the jacking pipe grouting system under the set of historical monitoring data; Each group of historical monitoring data is used as a training sample, the pipe segment status data and jacking status data of the historical monitoring data are used as sample input, and the grouting volume of each section of the jacking pipe grouting system under the historical monitoring data is used as the target output to train a grouting volume prediction model.

2. The method according to claim 1, characterized in that The monitoring equipment includes an earth pressure gauge, a pore water pressure gauge, a surface strain gauge, a displacement sensor and a mud electromagnetic flow valve installed in each main monitoring pipe segment. The earth pressure gauge and the pore water pressure gauge of each main monitoring pipe segment are arranged at annular intervals according to the diameter of the main monitoring pipe segment in which they are located, and are arranged at the top and bottom of the main monitoring pipe segment. The sensing end of the earth pressure gauge and the sensing end of the pore water pressure gauge of each main monitoring pipe segment are flush with the outer surface of the main monitoring pipe segment. The pipe joint status data includes the soil pressure data around the pipe measured by each soil pressure gauge, the pore water pressure data measured by each pore water pressure gauge, the surface axial strain data measured by each surface strain gauge, the socket joint offset data measured by each displacement sensor, and the grouting hole flow data measured by each mud electromagnetic flow valve.

3. The method according to claim 1, characterized in that Also includes: Inputting the pipe segment state data and the jacking state data into a pre-established multivariate data feedback model, and outputting the state corresponding to each section of the jacking pipe grouting system; Concentrated mud is injected into the section of the jacking pipe grouting system that is in a hollow or floating state.

4. The method according to claim 3, characterized in that The process of establishing the multivariate data feedback model includes: Each group of historical monitoring data is used as a training sample, the pipe segment status data and jacking status data of the historical monitoring data are used as sample input, and the status of each section of the jacking grouting system under the historical monitoring data is used as the target output to train a multivariate data feedback model.

5. The method according to claim 3, characterized in that: Injecting thick mud into the section in the jacking pipe grouting system that is in a hollow or floating state includes: Driving a grouting pump truck with thick mud stored therein to inject the thick mud into the grouting branch pipe of the pipe segment of the target section in the jacking grouting system which is in an empty state, wherein the thick mud is prepared by mixing sodium-based montmorillonite with water in a ratio of 1.1:1; or, The grouting pump truck is driven to inject the thick mud into the grouting branch pipe of the pipe segment of the target section in the jacking grouting system which is in a floating state, and the buoyancy of the target section is reduced by means of in-pipe ballasting, and the grouting branch pipe of the bottom grouting hole of the pipe segment of the target section is disassembled to be separated from the grouting main pipe.

6. The method according to claim 1, characterized in that The pipe segment status data includes the axial strain and the displacement of the receiving plug of each main monitoring pipe, and the jacking status data includes the spacing between each main monitoring pipe; The method of coupling the pipe segment status data and the jacking status data of each set of historical monitoring data to determine the status of each section of the jacking grouting system under the set of historical monitoring data includes: For each set of historical monitoring data: The following formula is used to couple the pipe segment status data and jacking status data of the historical monitoring data to obtain the unit length friction resistance and joint relative displacement of each section: ; in, is the axial strain of the kth main monitoring tube, is the axial strain of the k-1th main monitoring tube, is the distance between the kth main monitoring tube and the k-1th main monitoring tube, is the friction per unit length of the section between the kth main monitoring tube and the k-1th main monitoring tube, is the displacement of the socket plug of the kth main monitoring tube, is the displacement of the connecting plug of the k-1th main monitoring pipe, is the relative displacement of the joint between the kth main monitoring pipe and the k-1th main monitoring pipe; When the frictional resistance per unit length of a section is extremely large and the relative displacement of the joint of the section is extremely small, it is determined that the state of the section under the historical monitoring data is a stuck pipe.

7. The method according to claim 1, characterized in that The pipe segment status data and the jacking status data are input into a pre-established grouting amount prediction model, and the graded grouting instructions corresponding to each section of the jacking pipe grouting system are output, including: The pipe segment status data and the jacking status data are input into a pre-established grouting volume prediction model, and the first main monitoring pipe segment of the jacking pipe grouting system is used for calculation iteration. The data of subsequent main monitoring pipe segments of the first main monitoring pipe segment are used for optimization, and the graded grouting instructions corresponding to each section of the jacking pipe grouting system are output.

8. The method according to claim 2, characterized in that: Each main monitoring pipe section also includes a data acquisition instrument equipped with a signal strength enhancer; The data acquisition device of each main monitoring pipe section is a box structure and is placed on the first bracket inside the main monitoring pipe section; Each of the data acquisition instruments comprises a main controller, a measuring module, a wiring port and a battery device; The soil pressure gauge, pore water pressure gauge, surface strain gauge and displacement sensor of each main monitoring pipe section are connected to the data acquisition instrument of the main monitoring pipe section through a signal line.

9. The method according to claim 8, characterized in that Each main monitoring pipe section also includes an annular grouting branch pipe, a grouting main pipe, a grouting controller and supporting facilities for jacking pipes; The supporting pipe jacking facilities of each main monitoring pipe section are placed on the second bracket inside the main monitoring pipe section; Each annular grouting branch pipe is connected to the grouting main pipe, and the annular grouting branch pipe has a plurality of grouting holes, and each grouting hole is equipped with a three-way ball valve to control the grouting at the grouting hole; The mud electromagnetic flow valve of each main monitoring pipe section is installed at the first fork position of the grouting branch pipe of the main monitoring pipe section and is connected to the grouting controller of the main monitoring pipe section by wire.

10. The method according to claim 9, characterized in that The jacking pipe grouting system also includes a plurality of secondary monitoring pipe sections, each of which includes a mud electromagnetic flow valve.

11. The method according to any one of claims 1 to 10, characterized in that: The construction system of the pipe jacking grouting system includes a pipe jacking machine head, a hydraulic cylinder, a back wall, a launching well and annular mud; A roller meter is arranged vertically above the pipe section of the starting well close to the cave entrance. The roller meter includes a spring limit device and is connected to the wireless transmission module.