A method for optimizing the scheduling of terminal loading and unloading equipment
By analyzing the dock loading and unloading rate and cargo surplus, identifying adjustable docks and waiting docks, optimizing the dock loading and unloading equipment scheduling plan solves the problems of inaccurate freight dispatching and equipment back-and-forth transportation in the existing technology, and improves dock loading and unloading efficiency and scheduling. Effect.
Patent Information
- Application Number
- CN202411054645.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-08-02
AI Technical Summary
There are human judgment factors in the scheduling of existing terminal loading and unloading equipment, which lead to inaccurate freight dispatching, and the round-trip transportation of equipment wastes time and the scheduling effect is poor.
By analyzing the loading and unloading rate and cargo balance of the terminal, we can determine the completion time and arrival time of the terminal, identify the adjustable terminals and the terminals to be adjusted, optimize the scheduling plan based on the time difference, reduce the number of equipment dispatches, and perform delay confirmation in a timely manner.
It improves the accuracy and efficiency of terminal loading and unloading equipment dispatching, reduces the number of equipment dispatches, optimizes freight time, adapts to unschedulable situations, and ensures smooth transportation of goods.
Smart Images

Figure CN118569615B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of terminal dispatching, and in particular to an optimal method for dispatching terminal loading and unloading equipment. Background Art
[0002] Lifting and transport machinery used for loading and unloading cargo from ships and vehicles at ports and stacking cargo in warehouses generally needs to have a high working speed and productivity and be able to adapt to the requirements of frequent and continuous operations.
[0003] The application with publication number CN106651049A discloses a method for rescheduling automated container terminal loading and unloading equipment, comprising: step 1 establishing a model of three-stage equipment; step 2 determining the scheduling status of each equipment in the three stages; step 3 determining the rescheduling of each equipment in the three stages; that is, providing a scheduling scheme for optimizing each equipment in the three stages through a state monitoring controller of the container terminal; then after a time period, the state monitoring controller measures the actual position and actual speed of each equipment in the three stages; updates the minimum completion time required for an upcoming task according to the state measurement values of the actual position and actual speed; then enables the state monitoring controller to monitor the updated task time according to the minimum completion time required for an upcoming task; and finally, the state monitoring controller determines a new scheduling scheme for each equipment in the three interacting stages. The invention has the advantage of providing a fast and accurate rescheduling scheme when the loading and unloading equipment is disturbed.
[0004] During the relevant scheduling process of its terminal loading and unloading equipment, the relevant equipment is generally dispatched based on the cargo volume of the corresponding terminal, and the relevant operators make judgments based on the cargo situation of the corresponding terminal. However, this processing method has certain human judgment factors in the actual scheduling process, and its freight scheduling judgment is not accurate. In addition, in the actual scheduling process, its related equipment also has the situation of being transported back and forth, which also wastes a lot of scheduling time, and its scheduling effect is not good. Summary of the invention
[0005] In view of the deficiencies in the prior art, the present invention provides an optimal method for dispatching terminal loading and unloading equipment, which solves the problem that in the actual dispatching process, there are certain human judgment factors, the freight dispatching judgment is not accurate, and in the actual dispatching process, the related equipment also has the problem of being transported back and forth.
[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: A preferred method for dispatching terminal loading and unloading equipment, comprising the following steps:
[0007] S1) Determine the loading and unloading rate of the relevant terminal based on the loading and unloading data of the relevant terminal in the past period, including:
[0008] Determine the working time T and loading and unloading volume L of the relevant terminal during the normal working hours in the past. The terminal loading and unloading equipment in the corresponding terminal during the normal working hours are all in operation. Use V=L÷T to confirm the loading and unloading rate V of the corresponding terminal during the corresponding working hours. Then confirm the loading and unloading rates of other working hours T one by one. The selected working hours shall be at least 5 groups. From several groups of loading and unloading rates V, select a group with the maximum value as the standard rate Vb of the relevant terminal.
[0009] The standard rates Vb of different relevant terminals are confirmed one by one and marked as Vb i , where i represents different relevant docks;
[0010] S2) Confirm the current amount of cargo to be loaded and unloaded at the relevant terminal and the standard rate of the corresponding relevant terminal, determine the completion time of the relevant terminal, and then determine the arrival time of the next cargo at the relevant terminal based on the relevant order, and mark different relevant terminals as terminals to be adjusted or adjustable terminals. The specific method is as follows:
[0011] S21. Based on the current time t1, determine the remaining cargo volume H to be loaded and unloaded at the relevant terminal. i , and then determine the standard rate Vb corresponding to the relevant terminal i , determine the completion time S of its related terminal i , and S i =H i ÷Vb i ;
[0012] S22, then determine the next arrival time t2 of the relevant terminal i , determine the current time t1 and the arrival time t2 i The time difference between i , and the time unit of the relevant time is consistent with that of the completion time;
[0013] S23, if X i >S i , mark this relevant dock as an adjustable dock, if X i <S i , mark the relevant terminal as the terminal to be adjusted;
[0014] S3), based on the determined adjustable wharf and the wharf to be adjusted, identifying whether the time difference between the adjustable wharf and the wharf to be adjusted meets the standard, the specific method is as follows:
[0015] S31, based on the confirmed adjustable dock, confirm the time difference X of the adjustable dock i and completion time S i , using X i -S i =Cz iConfirm the adjustable time Cz corresponding to the adjustable terminal i , and then the adjustable time Cz of several adjustable terminals i Perform summation to determine the total adjustable time ZZ i ;
[0016] S32: Based on the confirmed dock to be adjusted, confirm the time difference X of the dock to be adjusted i and completion time S i , using S i -X i =Cc i Confirm the waiting time Cc of the corresponding adjustable terminal i , and then the waiting time Cc of several adjustable terminals i Perform summation to determine the total time to be adjusted Zc i ;
[0017] S33, adjust the total time ZZ i And the total time to be adjusted Zc i Compare: If ZZ i ≥(Zc i + Y1), where Y1 is a preset value, it means that the time difference can be fully scheduled, and step S4 is executed to perform relevant scheduling. If ZZ i <(Zc i +Y1), it means that the time difference is completely insufficient for related scheduling, and step S5 is executed for delay confirmation;
[0018] S4) Determine the adjustable time of the adjustable terminal and the corresponding waiting time of the waiting terminal, and sort the relevant time parameters of the terminals of the same type according to the relevant time parameters of the corresponding relevant terminals, determine the time sequence, and perform relevant scheduling based on the relevant display of the corresponding time sequence. The specific method is as follows:
[0019] S41, the adjustable time Cz of several adjustable terminals i The adjustable time sequence is generated by sorting the values from small to large, and then the waiting time Cc of several waiting terminals is calculated. i Sort the values from small to large to generate the time series to be adjusted;
[0020] S42, from the time sequence to be adjusted and the adjustable time sequence, identify whether there is a time parameter that satisfies: Cz i -Cc i >Cz i×C1, where C1 is a preset fixed coefficient factor. If it exists, the relevant adjustable time and the adjustable terminal and the terminal to be adjusted corresponding to the time to be adjusted are taken as the same group of objects to be adjusted, and other time parameters in the time series to be adjusted and the adjustable time series are selected one by one. The number of the time to be adjusted and the adjustable time selected in the same batch is not limited, and it can be one group or multiple groups, but the selected time to be adjusted and the adjustable time in the same batch must meet the following conditions: the time to be adjusted < the adjustable time, and the selected time to be adjusted and the adjustable time are taken as the same group of time. Based on multiple selection processes, multiple selection schemes are determined;
[0021] S43, identifying from multiple selection schemes whether there is only one set of waiting time in different same group time, if yes, generating a set of assignment 1, if not, identifying whether there are only two sets of waiting time in the same group time, if yes, generating a set of assignment 0.5, if not, generating a set of assignment 0;
[0022] Determine the sum of all the assignments generated by different selection schemes, select the maximum value from the sum of different assignments, and mark this selection scheme as the execution scheduling scheme;
[0023] S44, based on the determined execution scheduling scheme and the objects to be scheduled in the same group:
[0024] After the loading and unloading equipment of the adjustable dock in the same group of objects to be dispatched completes the relevant work, it will be directly dispatched to the dock to be dispatched to carry out the relevant work;
[0025] Determine the same group time from the execution of the scheduling plan. When the loading and unloading equipment associated with the adjustable terminal associated with the same group time completes the relevant work, it will be directly dispatched to the waiting terminal to perform the relevant work. When the waiting terminal completes the relevant work, if there are other waiting terminals in the same group time, the loading and unloading equipment associated with the adjustable terminal will be dispatched to other waiting terminals to perform the relevant work. Then confirm and process other same group times in turn to complete the relevant loading and unloading equipment scheduling work.
[0026] S5) Based on the time difference between the adjustable terminals and the terminals to be adjusted, a group of terminals to be adjusted with the shortest adjustment time is eliminated to identify whether the adjustable terminals can complete the relevant scheduling process, and determine the relevant processing process based on the corresponding identification results; the specific method is:
[0027] S51, based on the confirmed adjustable total time ZZ i And the total time to be adjusted Zc i , because ZZ i <(Zc i +Y1), then from ZC i Eliminate a group of minimum waiting time values to determine a new group of total waiting time Sc i , if ZZi Still less than (Sc i +Y1), then eliminate another group of minimum values of waiting time, and so on until ZZ i ≥ (Sc i +Y1), and mark the waiting-to-adjust terminal corresponding to the eliminated waiting-to-adjust time as the delayed terminal;
[0028] S52, determine the adjustable total time ZZ i The corresponding adjustable time series and the determination of Sc i The time parameters of the corresponding time series to be scheduled are sorted in ascending order, and then steps S42-S44 are executed to confirm the relevant scheduling process and perform scheduling processing;
[0029] S53, confirm the waiting time Cc of the delayed terminal i And this time will be used as the delay time and sent to the relevant cargo ships arriving at this terminal in the next stage.
[0030] The present invention provides an optimal method for dispatching terminal loading and unloading equipment. Compared with the prior art, it has the following beneficial effects:
[0031] The present invention determines the completion time of the corresponding terminal by comparing the loading rate of the relevant terminal and the relevant cargo surplus. Based on the comparison result of the time, the relevant terminal is determined to be an adjustable terminal or a terminal to be adjusted. Based on the relevant time difference analysis, it is determined whether the terminals can be scheduled. For the dispatchable situation, the best scheduling plan is determined based on the relevant time analysis, so that the number of scheduling between equipment is reduced to a minimum, achieving a better scheduling processing effect, and facilitating the relevant personnel to perform related scheduling and transportation work.
[0032] For situations where scheduling is not possible, the relevant terminals to be scheduled with shorter scheduling time are eliminated, and then related scheduling is carried out for other relevant terminals that meet the standards. This scheduling method can not only carry out relevant scheduling for situations where scheduling is not possible, but also carry out delayed scheduling confirmation, so that the relevant cargo ships can know the relevant time and respond in time, which can achieve better scheduling optimization processing effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is a schematic diagram of the process of the present invention. DETAILED DESCRIPTION
[0034] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0035] Example 1
[0036] See also Figure 1 The present application provides a preferred method for scheduling terminal loading and unloading equipment, comprising the following steps:
[0037] S1), based on the loading and unloading data of the relevant terminal in the past period, determine the loading and unloading rate of the relevant terminal, wherein the specific sub-steps of determining include:
[0038] Determine the working time T and loading and unloading volume L of the normal working period in the relevant terminal. The terminal loading and unloading equipment in the corresponding terminal during the normal working period is in operation. Use V=L÷T to confirm the loading and unloading rate V of the corresponding terminal during the corresponding working time, and then confirm the loading and unloading rates of other working times T one by one. The selected working period is at least 5 groups. From several groups of loading and unloading rates V, select a group of maximum values as the standard rate Vb of the relevant terminal. The maximum value is selected here because there may be a small amount of cargo in the relevant terminal, so there is no need for multiple loading and unloading equipment to operate synchronously. It is also possible that a single device will be started in the subsequent period. In this case, the generated rate will have relevant changes, and the generated loading and unloading rate will be slower. In order to facilitate the subsequent specific value confirmation and scheduling, it is necessary to determine the maximum rate that each terminal can generate per unit time and perform relevant processing;
[0039] The standard rates Vb of different relevant terminals are confirmed one by one and marked as Vb i , where i represents different relevant docks;
[0040] S2) confirm the current amount of cargo to be loaded and unloaded at the relevant terminal and the standard rate of the corresponding relevant terminal, determine the completion time of the relevant terminal, and then determine the arrival time of the next cargo at the relevant terminal based on the relevant order, and mark different relevant terminals as terminals to be adjusted or adjustable terminals. The specific method of marking is:
[0041] S21. Based on the current time t1, determine the remaining cargo volume H to be loaded and unloaded at the relevant terminal. i , and then determine the standard rate Vb corresponding to the relevant terminal i , determine the completion time S of its related terminal i , and S i =Hi ÷Vb i ;
[0042] S22, then determine the next arrival time t2 of the relevant terminal i , determine the current time t1 and the arrival time t2 i The time difference between i , and the time unit of the relevant time is consistent with that of the completion time;
[0043] S23, if X i >S i , mark this relevant dock as an adjustable dock, if X i <S i , mark the relevant terminal as the waiting terminal. Specifically, the so-called adjustable terminal means that before the next arrival of goods, this terminal can complete the loading and unloading of goods at this stage in advance, and there is still a certain amount of spare time. The so-called waiting terminal means that before the next arrival of goods, this terminal cannot complete the loading and unloading of goods at this stage in advance, so its loading and unloading time is insufficient, and it is necessary to call relevant loading and unloading equipment from other terminals to ensure that this terminal can complete the loading and unloading before the arrival of goods;
[0044] S3), based on the determined adjustable dock and the dock to be adjusted, identify whether the time difference between the adjustable dock and the dock to be adjusted meets the standard. If it meets the standard, execute step S4 to perform relevant scheduling. If it does not meet the standard, execute step S5 to perform delayed confirmation. The specific sub-steps of confirming whether the time difference meets the standard include:
[0045] S31, based on the confirmed adjustable dock, confirm the time difference X of the adjustable dock i and completion time S i , using X i -S i =Cz i Confirm the adjustable time Cz corresponding to the adjustable terminal i , and then the adjustable time Cz of several adjustable terminals i Perform summation to determine the total adjustable time ZZ i ;
[0046] S32: Based on the confirmed dock to be adjusted, confirm the time difference X of the dock to be adjusted i and completion time S i , using S i -X i =Cc i Confirm the waiting time Cc of the corresponding adjustable terminal i , and then the waiting time Cc of several adjustable terminals i Perform summation to determine the total time to be adjusted Zc i ;
[0047] S33, adjust the total time ZZ i And the total time to be adjusted Zc i Compare: If ZZ i ≥(Zc i +Y1), where Y1 is a preset value, and its specific value is determined by the operator. It can be understood as the relevant time required for the corresponding loading and unloading equipment to transfer, which means that the time difference can be fully scheduled. Step S4 is executed for relevant scheduling. If ZZ i <(Zc i +Y1), it means that the time difference is not enough for relevant scheduling, and step S5 is executed for delayed confirmation. Specifically, during the relevant call processing of the relevant terminal, the total time that can be called cannot meet the demand time of other terminals. The reason for the relevant time analysis here is that although the loading and unloading rates of each terminal are different, the loading and unloading equipment used are the same, so the time confirmation between the terminals can be performed to assess whether they can be scheduled. Combined with the example, it is necessary to clarify that the number of loading and unloading equipment at each terminal is the same. Due to the difference in cargo, the loading and unloading rates also vary. There is an adjustable terminal A with a processing rate of 4kg per second, which can be processed within 5 seconds, and there are 15 seconds left before the next arrival. There is a terminal B to be adjusted with a processing rate of 5kg per second. Its cargo needs to be processed within 10s, and there are 5 seconds left before the next arrival. Then B needs to increase 5 seconds, and the 15 seconds of the terminal A can be transferred to the terminal B to be adjusted. After its loading and unloading equipment is transferred to B, because the loading and unloading equipment is the same, it is completely accurate to use time to make a judgment;
[0048] S4) determining the adjustable time of the adjustable terminal and the corresponding waiting time of the waiting terminal, and sorting the relevant time parameters of the same type of terminals according to the relevant time parameters of the corresponding relevant terminals, determining the time sequence, and performing relevant scheduling based on the relevant display of the corresponding time sequence, wherein the specific method of performing the relevant scheduling is:
[0049] S41, the adjustable time Cz of several adjustable terminals i The adjustable time sequence is generated by sorting the values from small to large, and then the waiting time Cc of several waiting terminals is calculated. i Sort the values from small to large to generate the time series to be adjusted;
[0050] S42, from the time sequence to be adjusted and the adjustable time sequence, identify whether there is a time parameter that satisfies: Cz i -Cc i >Cz i×C1, where C1 is a preset fixed coefficient factor, and its specific value is determined by the operator based on experience, and is generally 0.05 or even smaller. If it exists, the relevant adjustable time and the adjustable terminal and the terminal to be adjusted corresponding to the waiting time are taken as the same group of waiting objects, and the other time parameters within the waiting time series and the adjustable time series are selected one by one. The number of waiting time and adjustable time selected in the same batch is not limited, and it is one group or multiple groups, but the waiting time and adjustable time selected in the same batch must meet the following requirements: waiting time < adjustable time (here is to ensure that the adjustable time can fully meet the required waiting time during scheduling), and the selected waiting time and adjustable time are taken as the same group time, and multiple selection schemes are determined based on multiple selection processes;
[0051] S43, identifying from multiple selection schemes whether there is only one set of waiting time in different same group time, if yes, generating a set of assignment 1 (indicating that the corresponding terminal associated with the same group time only needs to perform one scheduling process, so the transit time of its related terminal loading and unloading equipment can be shortened), if no, identifying whether there are only two sets of waiting time in the same group time, if yes, generating a set of assignment 0.5 (indicating that the corresponding terminal associated with the same group time only needs to perform two scheduling processes, so the transit time of its related terminal loading and unloading equipment can be shortened), if no, generating an assignment 0;
[0052] Determine the sum of all the assignments generated by different selection schemes, select the maximum value from the sum of different assignments, and mark this selection scheme as the execution scheduling scheme. Specifically, because each loading and unloading equipment may have multiple scheduling schemes that can complete the relevant scheduling process during the scheduling process, but it is possible that in other scheduling schemes, a certain loading and unloading equipment needs to go through multiple scheduling processes, then such processes will cause relevant time waste. Then, after the above-mentioned assignment analysis and processing, a group of optimal scheduling schemes can be selected from several scheduling schemes for relevant execution to achieve better scheduling processing results;
[0053] S44, based on the determined execution scheduling scheme and the objects to be scheduled in the same group:
[0054] After the loading and unloading equipment of the adjustable dock in the same group of objects to be dispatched completes the relevant work, it will be directly dispatched to the dock to be dispatched to carry out the relevant work;
[0055] The same group time is determined from the execution scheduling plan. When the loading and unloading equipment associated with the adjustable terminal associated with the same group time completes the relevant work, it will be directly dispatched to the waiting terminal to perform the relevant work. When the waiting terminal completes the relevant work, if there are other waiting terminals within the same group time, the loading and unloading equipment associated with the adjustable terminal will be dispatched to other waiting terminals to perform the relevant work, and then the other same group times will be confirmed and processed in turn to complete the relevant loading and unloading equipment scheduling work. The same group time is the time when the relevant scheduling can be completed, and there are generally several same group times in the determined execution scheduling plan. The adjustable terminals and the corresponding waiting terminals associated with the same group time can complete the relevant scheduling confirmation process, and it is also the best execution process confirmed after relevant analysis. Then, for the terminals associated with the same group time, the relevant scheduling can be directly carried out;
[0056] S5), based on the relevant time difference between the adjustable terminal and the terminal to be adjusted, by eliminating a group of terminals to be adjusted with the least waiting time, identify whether the adjustable terminal can complete the relevant scheduling process, determine the relevant processing process based on the corresponding identification result, and determine the delayed cargo ship corresponding to the corresponding terminal to be adjusted, wherein the specific method of determination is:
[0057] S51, based on the confirmed adjustable total time ZZ i And the total time to be adjusted Zc i , because ZZ i <(Zc i +Y1), then from ZC i Eliminate a group of minimum waiting time values to determine a new group of total waiting time Sc i , if ZZ i Still less than (Sc i +Y1), then eliminate another group of minimum values of waiting time, and so on until ZZ i ≥ (Sc i +Y1), and mark the waiting-to-adjust terminal corresponding to the eliminated waiting-to-adjust time as the delayed terminal;
[0058] S52, determine the adjustable total time ZZ i The corresponding adjustable time series and the determination of Sc i The time parameters of the corresponding time series to be scheduled are sorted in ascending order, and then steps S42-S44 are executed to confirm the relevant scheduling process and perform scheduling processing;
[0059] S53, confirm the waiting time Cc of the delayed terminal iAnd this time is used as the delay time and sent to the relevant cargo ships arriving at this terminal in the next stage, and the operators will perform relevant operations. Because the corresponding terminal cannot meet its relevant scheduling requirements even after the corresponding scheduling processing, it can only inform the relevant cargo ships to delay entering the port, so that this terminal can transfer goods normally and there will be no cargo detention, so as to ensure the scheduling and processing effect of the entire freight terminal.
[0060] Some of the data in the above formulas are dimensionless and numerically calculated. Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.
[0061] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.
Claims
1. A method for optimizing the scheduling of terminal loading and unloading equipment, It is characterized in that The following steps are involved: S1) Determine the loading and unloading rate of the relevant terminal based on the loading and unloading data of the relevant terminal in the past period, including: Determine the working time T and loading and unloading volume L of the relevant terminal during the normal working hours in the past. The terminal loading and unloading equipment in the corresponding terminal during the normal working hours are all in operation. Use V=L÷T to confirm the loading and unloading rate V of the corresponding terminal during the corresponding working hours. Then confirm the loading and unloading rates of other working hours T one by one. The selected working hours shall be at least 5 groups. From several groups of loading and unloading rates V, select a group with the maximum value as the standard rate Vb of the relevant terminal. The standard rates Vb of different relevant terminals are confirmed one by one and marked as Vb i , where i represents different relevant docks; S2) Confirm the current amount of cargo to be loaded and unloaded at the relevant terminal and the standard rate of the corresponding relevant terminal, determine the completion time of the relevant terminal, and then determine the arrival time of the next cargo at the relevant terminal based on the relevant order, and mark different relevant terminals as terminals to be adjusted or adjustable terminals. The specific method is as follows: S21. Based on the current time t1, determine the remaining cargo volume H to be loaded and unloaded at the relevant terminal. i , and then determine the standard rate Vb corresponding to the relevant terminal i , determine the completion time S of its related terminal i , and S i =H i ÷Vb i ; S22, then determine the next arrival time t2 of the relevant terminal i , determine the current time t1 and the arrival time t2 i The time difference between i , and the time unit of the relevant time is consistent with that of the completion time; S23, if X i >S i , mark this relevant dock as an adjustable dock, if X i <S i , mark the relevant terminal as the terminal to be adjusted; S3), based on the determined adjustable dock and the dock to be adjusted, identify whether the time difference between the adjustable dock and the dock to be adjusted meets the standard. If it meets the standard, execute step S4 to perform relevant scheduling. If it does not meet the standard, execute step S5 to perform delayed confirmation. The specific method is: S31, based on the confirmed adjustable dock, confirm the time difference X of the adjustable dock i and completion time S i , using X i -S i =Cz i Confirm the adjustable time Cz corresponding to the adjustable terminal i , and then the adjustable time Cz of several adjustable terminals i Perform summation to determine the total adjustable time ZZ i ; S32: Based on the confirmed dock to be adjusted, confirm the time difference X of the dock to be adjusted i and completion time S i , using S i -X i =Cc i Confirm the waiting time Cc of the corresponding adjustable terminal i , and then the waiting time Cc of several adjustable terminals i Perform summation to determine the total adjustment time Zc i ; S33, adjust the total time ZZ i And the total time to be adjusted Zc i Compare: If ZZ i ≥(Zc i + Y1), where Y1 is a preset value, it means that the time difference is sufficient for related scheduling, and step S4 is executed for related scheduling. If ZZ i <(Zc i +Y1), it means that the time difference is completely insufficient for related scheduling, and step S5 is executed for delay confirmation; S4) Determine the adjustable time of the adjustable terminal and the corresponding waiting time of the waiting terminal, and sort the relevant time parameters of the terminals of the same type according to the relevant time parameters of the corresponding relevant terminals, determine the time sequence, and perform relevant scheduling based on the relevant display of the corresponding time sequence. The specific method is as follows: S41, the adjustable time Cz of several adjustable terminals i The adjustable time sequence is generated by sorting the values from small to large, and then the waiting time Cc of several waiting terminals is calculated. i Sort the values from small to large to generate the time series to be adjusted; S42, from the time sequence to be adjusted and the adjustable time sequence, identify whether there is a time parameter that satisfies: Cz i -Cc i >Cz i ×C1, where C1 is a preset fixed coefficient factor. If it exists, the relevant adjustable time and the adjustable terminal and the terminal to be adjusted corresponding to the time to be adjusted are taken as the same group of objects to be adjusted, and other time parameters in the time series to be adjusted and the adjustable time series are selected one by one. The number of the time to be adjusted and the adjustable time selected in the same batch is not limited, and it can be one group or multiple groups, but the selected time to be adjusted and the adjustable time in the same batch must meet the following conditions: the time to be adjusted < the adjustable time, and the selected time to be adjusted and the adjustable time are taken as the same group of time. Based on multiple selection processes, multiple selection schemes are determined; S43, identifying from multiple selection schemes whether there is only one set of waiting time in different same group time, if yes, generating a set of assignment 1, if not, identifying whether there are only two sets of waiting time in the same group time, if yes, generating a set of assignment 0.5, if not, generating a set of assignment 0; Determine the sum of all the assignments generated by different selection schemes, select the maximum value from the sum of different assignments, and mark this selection scheme as the execution scheduling scheme; S44, based on the determined execution scheduling scheme and the objects to be scheduled in the same group: After the loading and unloading equipment of the adjustable dock in the same group of objects to be dispatched completes the relevant work, it will be directly dispatched to the dock to be dispatched to carry out the relevant work; Determine the same group time from the execution of the scheduling plan. When the loading and unloading equipment associated with the adjustable terminal associated with the same group time completes the relevant work, it will be directly dispatched to the waiting terminal to perform the relevant work. When the waiting terminal completes the relevant work, if there are other waiting terminals in the same group time, the loading and unloading equipment associated with the adjustable terminal will be dispatched to other waiting terminals to perform the relevant work. Then confirm and process other same group times in turn to complete the relevant loading and unloading equipment scheduling work; S5) Based on the time difference between the adjustable terminals and the terminals to be adjusted, a group of terminals to be adjusted with the shortest adjustment time is eliminated to identify whether the adjustable terminals can complete the relevant scheduling process. Based on the corresponding identification results, the relevant processing process is determined. The specific method is as follows: S51, based on the confirmed adjustable total time ZZ i And the total time to be adjusted Zc i , because ZZ i <(Zc i +Y1), then from ZC i Eliminate a group of minimum waiting time values to determine a new group of total waiting time Sc i , if ZZ i Still less than (Sc i +Y1), then eliminate another group of minimum values of waiting time, and so on until ZZ i ≥ (Sc i +Y1), and mark the waiting-to-adjust terminal corresponding to the eliminated waiting-to-adjust time as the delayed terminal; S52, determine the adjustable total time ZZ i The corresponding adjustable time series and the determination of Sc i The time parameters of the corresponding time series to be scheduled are sorted in ascending order, and then steps S42-S44 are executed to confirm the relevant scheduling process and perform scheduling processing; S53, confirm the waiting time Cc of the delayed terminal i And this time will be used as the delay time and sent to the relevant cargo ships arriving at this terminal in the next stage.
Citation Information
Patent Citations
Rescheduling method for automatic container terminal handling equipment
CN106651049A
Intelligent container wharf loading / unloading scheduling device
CN107808222A
Automatic container wharf AGV scheduling method capable of selecting loading and unloading completion time
CN110516976A
Full-autonomous water transportation scheduling method and system between container wharfs
CN112001064A
Intelligent energy-saving comprehensive dispatching method for automatic container wharf
CN112686439A